Maintenance Philosophy Service High Voltage Products, Transmission GIS, January 2012 ELK 1, 2, 3

Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

Embed Size (px)

Citation preview

Page 1: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

Maintenance PhilosophyService High Voltage Products, Transmission GIS, January 2012

ELK 1, 2, 3

Page 2: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 2, 1HC0088391_E01_AA

Gas Insulated SwitchgearMaintenance Philosophy

Maintenance Philosophy for GIS type ELK1, 2, 3

time basedmaintenance

condition basedmaintenance

Criteria§ ≥ 20 years of operation for

indoor application§ ≥ 10 years of operation for

outdoor application

Criteria§ Maximum No of CO* operation is

reached§ Maximum No of SCC* switch

operation is reached§ Combination of No of CO* and

SCC*§ Recommendation in diagnosis

report

* Information is mentioned in operational manualCO: close-open operationSCC: short circuit breaking current

Page 3: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 3, 1HC0088391_E01_AA

Maintenance Philosophy

§ TBM definition§ The criteria for time-based maintenance are aging of

material based on environmental conditions ofinstallation

§ CBM definition§ CBM is to maintain the correct equipment at the right

time. With CBM you can exchange just thecomponents or parts that have been subjected to themost wear over their many years of reliable operation

§ The most efficient way for contributing to life timeexpansion is following maintenance strategy combined withproduct improvements and support services.

TBM & CBM Definition

Page 4: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 4, 1HC0088391_E01_AA

Maintenance Philosophy

§ Dynamic Sealing Kit contents:§ Replacement of dynamic stressed sealings§ Adsorber (filter)

TBM Time Based Maintenance

time basedmaintenance

Criteria§ ≥ 20 years of operation for

indoor application§ ≥ 10 years of operation for

outdoor application

Replacement of:§ Dynamic Sealing Kit CB§ Dynamic Sealing Kit DS§ Dynamic Sealing Kit ES§ Dynamic Sealing Kit FAES

Page 5: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 5, 1HC0088391_E01_AA

Maintenance Philosophy

§ Overhaul contents:§ Replacement of dynamic stressed sealings§ Adsorber (filter)§ All contact parts which are affected during switching,

mechanical wearing

CBM Condition Based Maintenance

condition basedmaintenance

Product§ Overhaul CB§ Overhaul DS§ Overhaul ES§ Overhaul FAES§ Overhaul Drive

HMB, AHMA, HKA, SN§ Retrofit instead of overhaul

Criteria§ Maximum No of CO* operation is

reached§ Maximum No of SCC* switch

operation is reached§ Combination of No of CO* and

SCC*§ Recommendation in diagnosis

report

* Information is mentioned in operationalmanual

Page 6: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 6, 1HC0088391_E01_AA

Maintenance Philosophy

§ Pilot Overhaul contents:§ Replacement of dynamic stressed sealings§ Absorber (filter)§ All contact parts which are affected during switching,

mechanical wearing§ Laboratory analysis of material/contact parts with

report document

CBM Condition Based Maintenance

condition basedmaintenance

Product§ Pilotoverhaul bay§ Pilotoverhaul CB

Criteria§ If the data are not available?

Page 7: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

SF6 Gas Insulated SwitchgearMaintenance of circuit-breaker

Service High Voltage Products, Transmission GIS, January 2012

© ABB03/12/2013 | Slide 7

Page 8: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 8, 1HC0088391_E01_AA

Maintenance of circuit-breaker

§ If max. life time of dynamic sealings has been reached§ >20 years for indoor application§ >10 years for outdoor application

à Dynamic Sealing Kit

§ If max. number of operation have been reached§ Max number of close-open operation

(2’000 / 5’000 / 10’000 CO, exact figure is mentioned inoperational manual)

§ Max number of short circuit breaking current(10 / 15 / 20 times the max. breaking current, exact figureis mentioned in operational manual)

§ Combination of close-open operations andshort circuit breaking current

à Overhaul

When do you need to maintain?

Page 9: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 9, 1HC0088391_E01_AA

Maintenance of circuit-breaker

§ If no information available about number of operations andnumber of short-circuit breaking current and the circuit-breaker is older 10 years

à Diagnosis or Pilotoverhaul

When do you need to maintain?

Page 10: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 10, 1HC0088391_E01_AA

Maintenance of circuit-breaker

§ De-commissioning of circuit-breaker includes gas quality check, gas leakagecheck, travel curve and dynamic resistance measurement

§ Installation of Dynamic Sealing Kit§ Re-commissioning of circuit-breaker includes gas quality check, gas leakage

check, travel curve and dynamic resistance measurement

1. Linear movementbushing

2. Operating road3. Support insulator4. Current

connection5. Chamber insulator6. Filter / Adsorber7. Current

connection

Dynamic Sealing Kit – scope of work

Page 11: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 11, 1HC0088391_E01_AA

Maintenance of circuit-breaker

§ De-commissioning of circuit-breaker includes gas quality check, gas leakagecheck, travel curve and dynamic resistance measurement

§ Installation of Overhaul Kit§ Re-commissioning of circuit-breaker includes gas quality check, gas leakage

check, travel curve and dynamic resistance measurement

1. Linear movementbushing

2. Operating road3. Support insulator4. Current

connection5. Chamber insulator6. Filter / Adsorber7. Current

connection8. Puffing cylinder9. Diaphragm10. Erosion finger,

cylinder base,auxiliary nozzle,contact ring

11. nozzle12. contact finger,

finger retainer13. fixed contact pin

Overhaul – scope of work

Page 12: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 12, 1HC0088391_E01_AA

Maintenance of circuit-breaker

§ De-commissioning of circuit-breaker includes gas quality check, gas leakagecheck, travel curve and dynamic resistance measurement

§ Installation of Overhaul Kit§ Re-commissioning of circuit-breaker includes gas quality check, gas leakage

check, travel curve and dynamic resistance measurement§ Laboratory investigation of contacts§ Detailed laboratory report§ Maintenance recommendation for the rest of circuit-breakers within the GIS

1. Linear movementbushing

2. Operating road3. Support insulator4. Current

connection5. Chamber insulator6. Filter / Adsorber7. Current

connection8. Puffing cylinder9. Diaphragm10. Erosion finger,

cylinder base,auxiliary nozzle,contact ring

11. nozzle12. contact finger,

finger retainer13. fixed contact pin

Pilotoverhaul – scope of work

Page 13: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 13, 1HC0088391_E01_AA

Maintenance of circuit-breaker

§ Significant lifetime extension§ Reduced failure risk§ Cost effective solution (compared to unplanned activities)§ Minimized and planned outage time§ Maintain the value of the circuit-breaker§ Maximize switchgear performance§ Identify problems at an early stage, prior to escalation

acquisition of background information for tailoredmaintenance activities through pilot overhaul

Advantages of planned maintenance

Page 14: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

SF6 Gas Insulated SwitchgearMaintenance of disconnector switch

Service High Voltage Products, Transmission GIS, January 2012

© ABB03/12/2013 | Slide 14

Page 15: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 15, 1HC0088391_E01_AA

Maintenance of disconnector switchAllocation of disconnector switches within GIS

Page 16: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 16, 1HC0088391_E01_AA

Maintenance of disconnector switchAllocation of disconnector switches within GIS

Disconnectoroperating mechanism(for 3 phases)

Disconnectorswitches

Connecting rod

Page 17: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 17, 1HC0088391_E01_AA

Maintenance of disconnector switch

§ Axial Disconnector§ TE

§ Cross Disconnector§ TX

§ Angle Disconnector§ TV

§ TW

Types of disconnector switches

Page 18: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 18, 1HC0088391_E01_AA

Maintenance of disconnector switchOverview of disconnector switch

disconnectoroperatingmechanism

disconnectorswitch

earthingswitch

bushingcircuit-breaker

Page 19: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 19, 1HC0088391_E01_AA

Maintenance of disconnector switch

§ If max. life time of dynamic sealings has been reached§ >20 years for indoor application§ >10 years for outdoor application

à Dynamic Sealing Kit

§ If max. number of operation have been reached§ Max number of close-open operation

(2’000 / 5’000 CO, exact figure is mentioned inoperational manual)

§ Max number of bus transfer current switching(100 CO @1600A / <40A exact figure is mentioned inoperational manual)

à Overhaul

When do you need to maintain?

Page 20: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 20, 1HC0088391_E01_AA

Maintenance of disconnector switch

§ De-commissioning of disconnector switch includes gas quality check, gasleakage check, motor current and running time measurement

§ Installation of Dynamic Sealing Kit§ Re-commissioning of disconnector switch includes gas quality check, gas

leakage check, motor current and running time measurement

Dynamic Sealing Kit – scope of work

Seal-ring

Seal strip

O-ring

Page 21: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 21, 1HC0088391_E01_AA

Maintenance of disconnector switch

§ De-commissioning of disconnector switch includes gas quality check, gasleakage check, motor current and running time measurement

§ Installation of Overhaul Kit§ Re-commissioning of disconnector switch includes gas quality check, gas

leakage check, motor current and running time measurement

Overhaul – scope of work

Seal-ring

Seal strip

O-ringFixed contact

Contact tubesupport

Page 22: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 22, 1HC0088391_E01_AA

Maintenance of disconnector switch

§ De-commissioning of disconnector switch includes gas quality check, gasleakage check, motor current and running time measurement

§ Installation of Overhaul Kit§ Re-commissioning of disconnector switch includes gas quality check, gas

leakage check, motor current and running time measurement§ Laboratory investigation of contacts§ Detailed laboratory report§ Maintenance recommendation for the rest of disconnectors within the GIS

Pilotoverhaul – scope of work

Seal-ring

Seal strip

O-ringFixed contact

Contact tubesupport

Page 23: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

SF6 Gas Insulated SwitchgearMaintenance of operating mechanismAHMA 4/8

Service High Voltage Products, Transmission GIS, January 2012

© ABB03/12/2013 | Slide 23

Page 24: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 24, 1HC0088391_E01_AA

Maintenance of operating mechanism AHMA 4/8

§ For overhaul the operating mechanism has to be removedfrom the circuit breaker

Overview

Circuit-breakerOperating mechanism

Page 25: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 25, 1HC0088391_E01_AA

Maintenance of operating mechanism AHMA 4/8

§ If max. life time of operating mechanism has beenreached§ >20 years for indoor application§ >10 years for outdoor application

à Overhaul

§ If max. number of operation have been reached§ Max number of close-open operation

(10’000 CO, exact figure is mentioned in operationalmanual)

à Overhaul

When do you need to maintain?

Page 26: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 26, 1HC0088391_E01_AA

change over valve USR16 (167)plug (40)

guide bush(711, 713)

connecting rod (o)

pump motor (949)carbon brush (300)

bevel wheel (11)dowel pin (103, 104)screw type couplingwith protective cap (123)

non return valve (7)filter (82)

plug for lockingdevice (253)

guiding rod (o)working piston (o)

screw plug (49)

check valve (301)locking screw (119)

screw plug (251)

Maintenance of operating mechanism AHMA 4/8Overhaul – scope of work

Page 27: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 27, 1HC0088391_E01_AA

Maintenance of operating mechanism AHMA 4/8Overhaul – scope of work

Item Replaced Overhauled7 non-return valve for pump11 straight tooth bevel wheel40 plug49 screw plug82 filter103, 104 dowel pin119 locking screw123 screw type coupling with protective cap

167 change over valve251 screw plug253 plug for locking device300 carbon brush for pump motor301 check valve711, 713 guide bush800 sealings949 pump motor

working pistonconnecting rodsguiding rod

Page 28: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 28, 1HC0088391_E01_AA

Maintenance of operating mechanism AHMA 4/8Overhaul – scope of work

§ For outdoor application will be added following scope:

§ position indicator window (28)§ O-ring seal for position indicator (112)§ screws, washers (135, 136)§ rubber seal (171, 1171, 1280)§ sealing for cover (281)

Page 29: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

SF6 Gas Insulated SwitchgearMigration Modules

Service High Voltage Products, Transmission GIS, January 2012

© ABB03/12/2013 | Slide 29

Page 30: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

Retrofit Modules

© ABB GroupDecember 3, 2013 | Slide 30

Page 31: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

Retrofit Modules

© ABB GroupDecember 3, 2013 | Slide 31

Page 32: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

Retrofit Gascompartments

© ABB GroupDecember 3, 2013 | Slide 32

Page 33: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

Retrofit Bursting Disc

© ABB GroupDecember 3, 2013 | Slide 33

Page 34: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

Retrofit Disconnector

© ABB GroupDecember 3, 2013 | Slide 34

Page 35: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

Retrofit Disconnector

© ABB GroupDecember 3, 2013 | Slide 35

Page 36: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

SF6 Gas Insulated SwitchgearExample - Maintenance Philosophy

Service High Voltage Products, Transmission GIS, January 2012

© ABB03/12/2013 | Slide 36

Page 37: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 37, 1HC0088391_E01_AA

Example – Maintenance Philosophy

Switchgear A

year of installation: 1990circuit breaker: 1900 no of COcircuit breaker: 3 no of SCC(breaking current unknown)disconnector switch: 500 COearthing switches: 150 CO

Example

Switchgear B

year of installation: 1995circuit breaker: 2500 no of COcircuit breaker: 5 no of SCC(breaking current unknown)disconnector switch: 500 COearthing switches 150 CO

Process of data evaluation§ Collecting data from operational manual or on-site

§ Application outdoor or indoor indoor§ Type of breaker SN 211

§ Max. no of close-open operation 5000 CO§ Max. no of short circuit current 15 / 50kA

§ Max. no of operations for disconnector switch 2000 CO§ Max. no of operations for earthing switch 2000 CO

Page 38: Maintenance Philosophy ELK 1, 2, 3 - ABB Group 3, 2013 | Slide 2, 1HC0088391_E01_AA ... report * Information is ... Example – Maintenance Philosophy

© ABB GroupDecember 3, 2013 | Slide 38, 1HC0088391_E01_AA

Example – Maintenance Philosophy

Switchgear A

Circuit breaker: Dynamic Sealing Kit à age 21 yearsCircuit breaker drive: Overhaul à age 21 yearsDisconnector switch: Dynamic Sealing Kit à age 21 yearsEarthing switch: Dynamic Sealing Kit à age 21 yearsFast acting earthing switch: Dynamic Sealing Kit à age 21 years

Optional:Migration modules à improvements, if customers want it

for next 25 years

Exemplary solution

Switchgear B

Circuit breaker: Overhaul à combination of CO & SCCCircuit breaker drive: Overhaul à together with CBDisconnector switch: Dynamic Sealing Kit à not requiredEarthing switch: Dynamic Sealing Kit à not requiredFast acting earthing switch: Dynamic Sealing Kit à not required

Optional:Migration modules à not required