KEY Maine Terrace, DECEPTION BAY Project Overview - Summary Plan Road rehabilitation of approximately 660m between Bailey Road and Bay Avenue. 1 1 1 2 2 2 3 3 3 3 3 4 4 4 6 6 6 6 6 5 5 7 7 New roundabouts to provide traffic calming and provision for streetscaping. Rationalisation of carparking to provide improved spacings and layout. 2m wide concrete footpath on southern side of Maine Tce to match existing footpaths on Bay Ave. and the eastern end of Maine Tce. from Bay Ave, to The Esplanade. New landscaping and trees to provide shade amenity for pedestrians, and narrow the road providing traffic calming. Upgraded pedestrian crossings to provide safe pedestrian access and traffic calming. Intersection narrowing to create rain gardens to improve stormwater quality, drainage and traffic calming. Figure 1 - Artists Impression of new pedestrian crossing east of King Street Shade trees Shrubs and groundcovers 2m wide coloured concrete footpath New zebra crossing Landscaped roundabout Existing trees LEGEND N

Maine Terrace, DECEPTION BAY - Moreton Bay Regional … · Maine Terrace, DECEPTION BAY ... • Revitalise and improve the existing pathway, ... • Impr ov e th e sa fe ty and pr

Embed Size (px)

Citation preview

KEY

Maine Terrace, DECEPTION BAYProject Overview - Summary Plan

Road rehabilitation of approximately 660m between Bailey Road and Bay Avenue.

1

11

2

2

2

3

3 33

3

4

4 4

6

66 6 6

5

5

7

7

New roundabouts to provide traffi c calming and provision for streetscaping.

Rationalisation of carparking to provide improved spacings and layout.

2m wide concrete footpath on southern side of Maine Tce to match existing footpaths on Bay Ave. and the eastern end of Maine Tce. from Bay Ave, to The Esplanade.

New landscaping and trees to provide shade amenity for pedestrians, and narrow the road providing traffi c calming.

Upgraded pedestrian crossings to provide safe pedestrian access and traffi c calming.

Intersection narrowing to create rain gardens to improve stormwater quality, drainage and traffi c calming.

Figure 1 - Artists Impression of new pedestrian crossing east of King Street

Shade trees

Shrubs and groundcovers

2m wide coloured concrete footpath

New zebra crossing

Landscaped roundaboutExisting trees

LEGEND

N

About the ProjectConcept Masterplan - Holborn Street - Bay Avenue (Not To Scale)

MAINE TERRACE

The overall objectives of the project is to:

• Provide active transport facilities,• Revitalise and improve the existing pathway,

landscaping, street furniture and fi nishes for the project area,

• Improve the public realm and overall amenity of the project area,

• Improve the safety and priority of pedestrians along the corridor by providing higher quality pedestrian priority crossing facilities and traffi c calming,

• Strengthen the pedestrian connectivity to the Deception Bay State School from surrounding areas,

• Improve the streetscape by planting street trees, introducing kerb build outs, implementing bio retention gardens to improve starmwater quality, improving lighting, and

• Improve the safety of the road for pedestrians and cyclists by slowing the speed environment and making other users more aware of their existence within the corridor.

About the ProjectConcept MaMasterplan - Holbornrn Streett - Baay y Avenue (Not Tt o Scale)

MAINE TEERRACE

The overall objectives of the project is to:

• Provide active transport facilities,• Revitalise and improve the existing pathway,

lalandscaping, street furniture and fi nishes for the prrojo ect area,

• Imprprove the public realm and overall amenity of the projecct area,

• Improvee the safety and priority of pedestrians along the corriddor by providing higher quality pedestrian priority croosss ing facilities and traffi c calming,

• Strengthen ttheh pedestrian connectivity to the Deception Bay y State School from surrounding areas,

• Improve the streeete scape by planting street trees,introducing kerb bbuild outs, implementing bio retention gardens toto improve starmwater quality, improving lighting, annd

• Improve the safety of ththe road for pedestrians and cyclists by slowing the sppeee d environment andmaking other users more aaware of their existence within the corridor.Figure 2 - Artists Impression of new pedestrian crossing east of King Street

Existing Conditions.

Maine Terrace, DECEPTION BAY

N

Concept Masterplan - Bailey Road - Holborn Street (Not To Scale)

MAINE TERRACE

Conccepe t Masterplan - BBaia ley RoRoadd - Holborn Streeet (Not To S Scale)

MAINEN TERTE RACE

Section A-A Existing Conditions

Verge4m

Traffi c Lane3.5m

Traffi c Lane4m

90 Degree Parking 5.5m

Pathway1.5m

Verge1.5m

Parking Lane3.2m

A

A

Verge4m4m4m4m4m4m4m4m4m4m4m444mm4mm4mm4mmm4

Traffi c Lane3.5m

TrafT fi c Lane4m

90 Degree e Parking5.5m

Pathway1.5m

Verge1.5m

Parking Lane3.2m

Section A-A Artist Impression

Verge / Parking lane5.4m

Traffi c Lane3.2m

Traffi c Lane4m

Parking5.5m

Pathway2m

Verge1m

Maine Terrace, DECEPTION BAY

N

Figure 3 - Artists Impression of new roundabout on Summer Street