2006 July 24 to July 27
International Boiler and Pressure Vessel Seminar
Continuing Education DeptMaine Maritime Academy
Castine Maine 207 326 2211
Program Dir./Coordinator Prof Kaveh Haghkerdar
2006 Boiler&Pressure Vessel Seminar MAINE MARITIME ACADEMY July 24 25 26 27
ThursdayWednesdayTuesdayMondayPresentations timeCompressorsAutomation IINBIC CODEHRSG 8:00 Trask & DecrowVALVE OPS IISafety ReviewChemistry
Maine MaritimeNatinal BoardAshland Chemicals 9:00 Prof. KavehR. ScheulerK. Randum
PumpsSmart ValvesState of Maine10:00 SulzerMasoneilanJ. Burpee R. MorgensternL. Hughes11:00
LUNCHLUNCHLUNCHLUNCH12:00 PumpsSmart ValvesNBIC CODEGAS TURBINE Sulzer KentrolR. ScheulerFlow Acc Corosion 1:00J. MarchiP. ZirokaJ. BurpeeMaine Maritime
Automation IP. SarnackiI 2:00General VALVE OPS IDuke Energy PanelMaine MaritimeMaine MaritimeC. Dube 3:00ReviewLab coordinatorProf. Kaveh FeedbackMr. Markley 4:00
5:00
TOPICS
Advanced Valve Diagnostics Seminar Masoneilan L.Hughes & Kentrol (Mr.Pat Ziroka)
BIW STEAM LAB COORDINATOR MR. Jerry Markley
TOPICSTrask & Decrow
Compressor Presentation
The basic compressed air system and componentsBasic rotary screw compressor types and fixed speed
controlsEquipment & controls to reduce energy consumption• Constant pressure VFD compressors• Storage & intermediate controls• Air dryer controls• Central system controls• Demand side savings, leak surveys and point of use
Methods of evaluating system savings• Supply side audit• Demand side auditWhat is the Efficiency Maine program?Project evaluation, payback & ROIProject implementation
TOPICSSulzer Pump
pump fundamentalsBoiler feed pumpsBoiler feed pumps high energyMachinery Condition AnalysisUnderstanding Vibration& PhaseVibration signature Analysis
Bob Morgenstern & Jay Marchi
TOPICS
Mr. Robert SchuelerNational Boiler Board Representative
&Mr.John Burpee
State of Maine Chief Boiler Inspector
National & State of Maine Codes
TOPICS
Mr. Kai Rondum of Ashland ChemicalsConcerns With Heat Recovery Steam Generators (HRSG)
-Fatigue Corrosion - FAC - Weld Failures- High Speed Erosion Cycling HRSGs- System Damage - Impact on Water Chemistry Inspection, Nondestructive Test
methods High Pressure Boiler Cycle Chemistry - Programs and Control
2006 Boiler&Pressure Vessel Seminar WELDING SEMINAR
MAINE MARITIME ACADEMY July 24 25 26 27
ThursdayWednesdayTuesdayMondayPresentations timeWelding SeminarWelding SeminarWelding SeminarWelding Seminar 8:00 Sperko EngineeringSperko EngineeringSperko EngineeringSperko Engineering
W.Sperko P.E. W.Sperko P.E. W.Sperko P.E. W.Sperko P.E. 9:00 L. Loziuk P.E.L. Loziuk P.E.L. Loziuk P.E.L. Loziuk P.E.
10:00
11:00
LUNCHLUNCHLUNCHLUNCH12:00Welding SeminarWelding SeminarWelding SeminarWelding Seminar Sperko EngineeringSperko EngineeringSperko EngineeringSperko Engineering 1:00 W.Sperko P.E. W.Sperko P.E. W.Sperko P.E W.Sperko P.E.L. Loziuk P.E.L. Loziuk P.E.L. Loziuk P.EL. Loziuk P.E. 2:00General Panel 3:00Review Feedback 4:00
5:00
Day 1 Welding
• Overview of Piping Codes• Historical Development of Codes for
Pressure Piping• Current ASME B31 Codes• ASME B31.1 and B31.3 Comparison• Design Methods—Pressure Design• Code Requirements• Allowable Stress Basis• Pressure Design• Flow Rate and Diameter Considerations
More Day 1 Welding
•Piping System Analysis/Static Loading—Part 1• Types of Static Loads• System Expansion• Simplified Manual Analysis• Equipment Nozzle Loads• Flexibility Methods• Application to an Actual System•Piping System Analysis/Static Loading—Part 2•Weight Analysis• Wind Loading• Supports• Application to an Actual System
Day 2 Welding
Piping System Analysis/Dynamic Loading—Part 1
• Nature of Dynamic Loads• Seismic Loads • Application to an Actual System
Piping System Analysis/Dynamic Loading—Part 2
• Hydraulic Transients• Relief Valves• Application to an Actual System•Piping Deadweight and Thermal Analysis Using
PC-Based Software
Day 3 Welding
• Piping System Materials• High Temperature and Low Temperature• Corrosion• Materials Specifications• Fabrication Practices• Cutting• Bending• Welding Processes• Heat Treatment• Cleaning• Painting• Storage• Pressure Testing
Day 4 Welding
• Inspection Practices• Visual Inspection• Liquid Penetrant• Magnetic Particle• Radiographic• Ultrasonic Examination• Cost Effectiveness of Examination Methods• Comparison of Fabrication Requirements• Review of Variations Between Codes Regarding Fabrication and Examination Requirements and Accept/Reject Criteria
Larry A. Loziuk, P.E. is President of Piping Technology Consultants, Inc., a consulting firm specializing in the design, analysis and trouble shooting of piping systems. Over his career of more than 30 years, he worked for a number of large Consulting Engineering firms including Duke Engineering & Services, ABB Impell, Sargent & Lundy, and GDS Associates. Mr. Loziuk served as the Chairman of the ASME Working Group on Fiberglass Pipe and was a member of ASME Section III Subgroup on Design and ASME QME Working Group on Dynamic Restraints. He is a member of the B31.9 Building Services Piping committee. He holds six patents related to WEAR™ (Wire Energy Absorbing Rope) Pipe Restraint.
Walter J. Sperko, P.E. founded Sperko Engineering Services, Inc. in 1981. He has extensive experience in welding engineering, metallurgical engineering, design, failure analysis, and quality assurance. Mr. Sperko’sindustrial experience primarily involves piping, pressure vessels, storage tanks and structural steel. Mr. Sperko worked for Ebasco Services in the Materials Engineering and QA group, for ITT Grinnell Industrial Piping as manager of Piping Fabrication Technology and Standards, and for Richmond Engineering Company as Corporate Welding Engineer and branch plant Quality Control Manager. He is a member of the ASMEBoiler and Pressure Vessel Code, Subcommittee IX, Welding and Brazing Qualifications and several of its subgroups: Subgroup on Materials, Fabrication and Examination of Subcommittee III, Nuclear Components; the American Welding Society Committee D-10, Welding of Piping and Tubing and Chairman of the B31.9 Building Services Piping committee. He holds four U.S. patents and has published articles in the Welding Journal, Welding Design and Fabrication and The Fabricator, and co-authored the Piping Design Section of the Standard Handbook of Plant Engineering with Mr. Loziukand The Fabricator, and co-authored the Piping Design Section of the Standard Handbook of Plant Engineering with Mr. Loziuk. Walt Walter J. Sperko, P.E. Sperko Engineering Services, Inc. 4803 Archwood Drive Greensboro, NC 27406
www.sperkoengineering.com336-674-0600 FAX 336-674-0202
[email protected] Dimpler Corporation
2006July 24 to July 27
International Boiler and Pressure Vessel Seminar
Continuing Education DeptMaine Maritime Academy
Castine Maine 207 326 2211
INTERNATIONAL BOILER AND PRESSURE VESSEL SEMINAR
JULY 24 – 27, 2006
Maine Maritime AcademyContinuing Education Department
Castine, ME 04420(207) 326-22211
Name___________________________________________ SS# XXX-XX-__________(Last 4 digits)
Mailing Address_________________________________________________________
_____________________________________________Zip___________
Work #_____________________________ Home #_____________________________
E-mail_________________________________________________________________
Company/Employer_______________________________________________________
Credit Card Number _____________________________________ Exp._____/_____Only applied if requested. Used to hold spot in seminar.
10% of cost will be charged for any no-shows.
Credit Card Billing Address________________________________________________
_______________________________________Zip___________
LODGING AT MMA: YES / NO (For reservation purposes.)
Will anyone be joining you that will not be attending the seminar? YES / NO
If yes, please list who and if they will be eating with you.
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
Seminar cost is $ 900.00. Tuition, room, and board are included.Additional persons: $ 10 rooming per night.
Meals are paid at the food court with cash.