Upload
maarten-hermans
View
231
Download
1
Embed Size (px)
DESCRIPTION
Short portfolio to be used as quick reference and for mailing out.
Citation preview
by Maarten HerMans
maarten.hermans @ alumni.chalmers.semaarten.hermans @ telenet.be
+46 (0) 762 411690 last updated: 2010/ 11/ 14
Portfolio _(short)
Dress tHe roaD
Urban art InstallatIon
groupwork / 3 studentspart time / 3 weeks
artworkpublic space
Horizontal Vertigo
Into tHe WooDs
Used areas(concentrating)
Urban Gradient(man vs nature)
Infiltration matrix(adaptation)
Fingers(preserving trees)
Common garden(not so wild)
Roads(the edge)
Eliodoro Bigi / Maarten Hermans / Valérie Thomas / Anna Sundin
HOUSE TYPE 2
( 20 m HOUSE )
INTO THE WOODS
SECTIONscale 1: 200
HOUSE TYPE 2(20m drop)
DETAILscale 1: 20
PLANscale 1: 100
South Facadescale 1: 100
1.
2.4.
5.
3.7.
6. 8.
9. 10.1. Living area2. Kitchen3. Storage4. Toilet5. Entrance6. Terras7. Bathroom8. Laundry room9. Double bedroom10. Double bedroom11. Patio12. Storage
12.11.
Water thight layerGypsum board 13mmLight beam 400mm
Gypsum board 13mmAir cavity 22mmWoodpanelling 22mm
Wooden facade 22mmAir cavity 22mmGypsum board 13mmLight beam 400mm
Gypsum board 13mmVapour barrierAir caivtyGypsum board 9mm
Eliodoro Bigi / Maarten Hermans / Valérie Thomas / Anna Sundin
The house standing on the edge of the steepest cliff on the site.The most appealing views were selected and framed. A path - within
spaces and emotional experiences.0m 0.2 0.5 1
0m 1 2 5
0m 2 5 10
VIrgIn area DeVelopment
House type 2(south facade)
groupwork / 4 studentsfull time / 3 weeks
detailingsustainability
housing public space
Uppegärde1:2
Urban DevelopMent project
DensIfIcatIon of cIty centre
Apartment type 2
individualpart time / 6 weeks
detailing
housingworkplaces
UDP
scHool searcHes arcHItectUre
expansIon anD re-bUIlD of kInDergarten anD hIghschool
(supporting) (stabilizing)(cross-bracing)(bridging)
individualpart time / 12 weeks
detailingworkplaces
SZA