21
guire Group Design Qualificatio Academic: K-

Maguire's K-12 Design Capabilities

Embed Size (px)

DESCRIPTION

Maguire's Architecture and Design for elementary, middle and high schools throughout New England.

Citation preview

Maguire Group Design QualificationsAcademic: K-12

• Introductions / Overview

• Who We Are / What We Do

• Design Approach

• K-12 School Experience

Agenda

Introductions: Academic Design Team

Tony DiLuzioVice President, Director Architecture Services

Dave Morrow VP Regional Manager

Tom Cousineau, AIA, NCARB, LEED APVice President, Director Architecture

George Delegas, AIAPrincipal Architect Architecture

Lynn Stapleton, AIA, NCARB, LEED AP Project Manager Architecture

Kevin Sullivan, PE, LEED APDirector Buildings Engineering

Firm Overview

• Maguire Group is a national, award-winning full-service A/E/P and construction project management firm

• Six East Coast offices staffed with experienced people backed by specialized resources

• Offers full complement of services through its Architecture & Buildings Engineering, Emergency Management, Land Development/ Environmental, OPM, Transportation and Water Resources units

• In 2009, became part of the Metric Engineering Group which extends the firm’s service capabilities

Multi-disciplinary setup offers advantages for clients seeking

a multitude of services—an enormous asset for clients with needs

from simple, task-based

responses to complex solutions.

Agenda

• Introductions / Overview

• Who We Are / What We Do

• Design Approach

• K-12 School Experience

• Architecture• Structural• Mechanical / HVAC • Electrical• Plumbing / Fire Protection• Project Management• Project Administrative Support

• Registered architects• Professional engineers• Licensed site professionals• LEED AP staff in each discipline• MCCPO-certified staff in each

discipline

Maguire Buildings / Architecture & Engineering Services

Maguire Group School Building / Planning Capabilities

• Architecture / Design

• Engineering Structural Geotechnical HVAC Electrical Plumbing Fire Protection Environmental Traffic Water Wastewater

• Building assessment surveys • Feasibility studies• Design and engineering• Building information modeling (BIM)• New construction / renovations / additions• Adaptive reuse• Cost estimating• MTC / MA CHPS• Construction administration• CM@Risk / Design-Build experience

Agenda

• Introductions

• Who We Are / What We Do

• Design Approach

• K-12 School Experience

Design Approach

• Innovative yet practical design

• Contextual integration of schools within their environs

• Design within budget

• Implementation of sustainability / energy conservation measures

• Ability to integrate prototypical designs

Maguire Group Design Approach

Design Approach

• Building Information Modeling (BIM)

• Sustainability• MTC / MA CHPS• LEED-led design for certification or

other goals• Energy conservation measures (ECM)

• Lifecyle Analysis• Value engineering

• Design Integration• Accessibility• Seismic design• Energy

Evolving Design / Engineering

Agenda

• Introductions / Overview

• Who We Are / What We Do

• Design Approach

• K-12 School Experience

• Damage assessment report

• Cost estimating for insurance mitigation

• Insurance negotiation

• Demolition and hazardous materials abatement project

• Renovation planning and design

• Schematic Design Summer 2010

Current School Project

East Somerville Community School

School Experience

• Full building condition evaluation• Completed renovation in 26 classrooms• Accelerated design schedule and

phased construction • New academic wing was completed first

and then occupied• Contractor then could access remainder

of building / site• Construction completed in 18 months

with no disruption to school schedule

Ahern Middle School Renovation / Addition

Foxborough, MA

School Experience

Renovation included:

Completely new gas-fired heating system

Addition of air conditioning to permit year-round operation

Entirely new electrical system

Entire exterior skin was replaced or reconstructed including roof, walls, windows and doors

Ahern Middle SchoolFoxborough, MA

School Experience

• Conducted existing building evaluation studies to determine the school's space needs for compliance with RI Dept. of Education and future enrollment requirements

• Designed new addition / renovations to existing high school

• Additions / renovations provide 235,000 SF of enhanced educational space for grades 9 -12 and serve as resource hub for Foster-Glocester Regional School District

Ponaganset Middle SchoolFoster-Glocester, RI

School Experience

Design / engineering includes: onsite water system biomass features energy efficiencies new gymnasium enlarged cafeteria new media/library center renovations to the science

classrooms upgrades to the music facilities new connector to the old middle

school to create a new high school complex

Ponaganset Middle SchoolFoster-Glocester, RI

School Experience

• Prepared plans for conversion of 40-year-old high school to middle school

• Worked with Bldg Committee to define scope and keep within target budget

• Conducted conditions assessment and developed associated cost estimates

• Identified construction that could be reduced/eliminated and incorporated code-related accessibility requirements

• Phased planning/construction allowed relocation of classes / minimal disruption to school schedule

Bellingham Middle School Conversion

Bellingham, MA

School Experience

• Fast-track, 7-month Design-Build project due to the projected demand on the school system and the need for many new classrooms

• Design of this $9M project started in February

• Accelerated effort on Maguire’s part and a close working relationship with the contractor resulted in construction completed by Labor Day

B. Jae Clanton Design-BuildProvidence, RI

School Experience

Design included:

• Many energy efficient elements, including high-efficiency boilers

• Instead of conventional classroom unit ventilators, fan-coil units were selected with no outside air feature

• Central fresh air system: a single heating / cooling unit provided conditioned air to all occupied areas

• A 2-pipe changeover system was selected and served by high-efficiency boilers and a 200-ton air cooled chiller

• All controls were DDC-based

B. Jae Clanton Design-BuildProvidence, RI

School Experience

Maguire is more than you know.

For more information, visitwww.maguiregroup.com

Architects / Engineers / Planners

A Metric Engineering Group Company