TOTAL COST OF OWNERSHIP ANALYSIS VERSION: 4.025/25/10 11:11 Reference No.
ANALYSIS DESCRIPTION QuickCalc APPLICATION DESCRIPTION DUTY CYCLEEnglish or Metric Units EnglishAnalysis Period, Life Cycle (yrs) 25Electrical Power Frequency 60 Hz
0 0%Cost of Electricity ($/KWH) 0.100New or Retrofit RetrofitFully Burdened Maintenance Rate ($/Hour) 350Annual Operating Hours 4,380Process Downtime Cost ($/Hour) 1,0003-Yr Load/Motor Seizure Event Frequency None (0)Repair Cost for Each Motor Seizure, ( ) 15,000
Company Cost of Capital 12%
ANALYSIS OUTPUT Coupling Technology MagnaGuardMGE/FGC
MagnaGuard
MGD
MagnaGuard
MGTLFlexible Rigid Fluid
Prices/Costs in US, Dollar ($). Manufacturer MagnaDrive MagnaDrive MagnaDrive Thomas TB Woods Voith
Coupling/Model Size MGE-15 16/125 16/125
Baseline Baseline
Coupling Service Life (years) 20 20 20 4 2 5
Coupling Purchases During 25 Year Life Cycle 2 2 2 7 13 5
Coupling Initial Cost (Product, Install & Infrastructure) 10,300 13,080 14,050 1,268 954 6,200
Total Period Product & Infrastructure Costs 20,600 26,160 28,100 8,876 12,396 29,000
Total Period Energy Costs 877,507 859,599 859,599 895,415 895,415 898,336
Non-Energy Operating & Maintenance (Bearing/Seal/Align/Motor/Load/Drive) Costs 242,578 218,320 218,320 1,047,938 1,164,375 970,313Total Period Downtime Costs 6,250 6,250 6,250 28,125 37,500 46,875
Total Cost of Ownership over 25 Years 1,146,935 1,110,329 1,112,269 1,980,354 2,109,686 1,944,524
Total Life Cycle Savings Compared to Baseline 0 833,419 870,025 868,085 - (129,332) 35,830
NPV of Savings Compared to Baseline 257,001 267,193 266,133 Baseline (40,438) 8,482
Internal Rate of Return of Savings Compared to Baseline 374% 301% 278% No Return 40%
Average Annual Savings Compared to Baseline 32,868 34,110 33,954 (5,314) 1,292
Cashflow Breakeven Years of Savings Compared to Baseline 0.27 0.33 0.36 No PayBack 2.20
Total Product Investment Compared to Baseline 11,724 17,284 19,224 3,520 20,124
Simple Return on Investment Compared to Baseline 280% 197% 177% No Return 6%
Simple Payback Years Compared to Baseline 0.36 0.51 0.57 No PayBack 15.57
Advanced Energy
Technologies, Inc.
Patten/Cat
Elmhurst, IL.
10AET009
Service Load Factor
% of Time
Duty Cycle
LimitsIndustry Description
Application Type
Water / Wastewater
Pumps
1.3
Baseline Drive Type Flexible
90-100% 100%
80-90%
< 80%
0%
0%
Total 100%
Constant or Variable Constant Torque
Motor Nameplate RPM
Motor Nameplate Hp
1,800
100