15
Magellan Director Report Personnel Observing Statistics Instrument Commissioning Instrument Development Publications Magellan SAC Meeting, March 16, 2013

Magellan Director Report

  • Upload
    jacoba

  • View
    29

  • Download
    0

Embed Size (px)

DESCRIPTION

Magellan Director Report. Personnel Observing Statistics Instrument Commissioning Instrument Development Publications. Magellan SAC Meeting, March 16, 2013. Personnel. Programmer Position Magellan programmer, Pablo Castro, was terminated in late-March 2012 - PowerPoint PPT Presentation

Citation preview

Page 1: Magellan  Director  Report

Magellan Director Report

• Personnel

• Observing Statistics

• Instrument Commissioning

• Instrument Development

• Publications

Magellan SAC Meeting, March 16, 2013

Page 2: Magellan  Director  Report

Personnel• Programmer Position

• Magellan programmer, Pablo Castro, was terminated in late-March 2012

• A search was organized, and LCO Electronics Engineer Juan Espoz was offered and accepted the position

• He began the transition to this new job in February

Page 3: Magellan  Director  Report

Personnel (cont.)• New Telescope Operator

• Long-time Magellan telescope operator Geraldo Valladares resigned effective January 2013 to pursue other interests

• A search was organized in advance of his departure so as to have a new operator ready to replace him

• An offer was made to SOAR Telescope operator Alberto Pastén, who accepted and began working in late-November

Page 4: Magellan  Director  Report

Personnel (cont.)• Magellan Site Manager

• Marc Leroy, the Magellan Site Manager, was terminated in January

• We are in the process of redefining this position and searching for a replacement

Page 5: Magellan  Director  Report

Observing Statistics:Instrument Usage

2012 Aug 9 – 2013 Feb 8 Instrument UsageIMACS 28%FIRE 16%MIKE 16%FourStar 9%MegaCam 8%LDSS3 7%MagE 6%MMIRS 5%PFS 5%

Page 6: Magellan  Director  Report

Observing Statistics: Long-Term Instrument

Usage

Page 7: Magellan  Director  Report

Observing Statistics:Downtime

2012 Aug 9 – 2013 Feb 8 Baade Clay

Open 88.6% 88.3%

Lost to Weather 10.2% 10.6%

Lost to Telescope 0.2% 0.4%

Lost to Instrument 0.4% 0.7%

Lost to Computer 0.6% 0.0%

Total Downtime 1.1% 1.1%

Page 8: Magellan  Director  Report

Observing Statistics: Long-Term Downtime

Page 9: Magellan  Director  Report

Observing Statistics: Instrument Downtime

2012 Aug 9 – 2013 Feb 8

MMIRS 3.9%

IMACS 0.7%

MegaCam 0.6%

MIKE 0.6%

LDSS3 0.3%

FIRE 0.2%

MagE 0.1%

FourStar 0.0%

PFS 0.0%

Page 10: Magellan  Director  Report

Instrument CommissioningInstrument First LightPFS* 2009 OctoberMegaCam 2009 OctoberMMIRS 2009 DecemberFIRE 2010 MarchFourStar 2010 DecemberIMACS Mosaic3 (f/4) 2011 OctoberAO (VisAO, Clio2) 2012 December

*P.I. Instrument

MegaCam, MMIRS, FIRE, FourStar have yet to be accepted by the Magellan Council as Facility Instruments

Page 11: Magellan  Director  Report

Instrument Development

Instrument First LightLDSS3 detector upgrade 2013AM2FS* 2013BPISCO* ?

What comes next? Will there be a new generation of Magellan instruments?

*P.I. Instrument

Page 12: Magellan  Director  Report

Publications

Page 13: Magellan  Director  Report

Publications (cont.)

Page 14: Magellan  Director  Report

Publications (cont.)

Crabtree 2012

Page 15: Magellan  Director  Report

¡Gracias!