21 st IG Meeting South Gas Regional Initiative. Madrid, 27 th February 2013. 21 st IG meeting SGRI- Agenda. II. Capacity Allocation Mechanisms Harmonization. II.1. Draft Roadmap in the Region II.2. CAM between Spain and Portugal: next auction . II. Capacity Allocation Mechanisms. - PowerPoint PPT Presentation
Citation preview
1
Madrid, 27th February 2013
21st IG Meeting South Gas Regional Initiative
2
21st IG meeting SGRI- Agenda
3
II. Capacity Allocation Mechanisms Harmonization
Area of work Responsible Starting Deadline
OSP France-Spain: annual allocation of short-term capacities
TSOs Nov. (yearly)
Dec. (yearly)
CAM harmonisation proposal between Spain and Portugal
NRAs-TSOs Jan. 2011 Jun. 2012
CAM harmonisation proposal in the whole region NRAs-TSOs Jan.2012 Dec.2013
Set up a common TSO Allocation Platform: Roadmap and Implementation
TSOs Jan.2014 Dec.2014
II.1. Draft Roadmap in the Region
II.2. CAM between Spain and Portugal: next auction
4
II. Capacity Allocation Mechanisms
II.1. Draft CAM Roadmap in the Region
(for information by Regulators)
5
II.1 Draft CAM Roadmap in the Region
Early implementation of the Draft CAM NC
Coordinated CAM in the Region FRANCE-PORTUGAL-SPAIN in 2014
PRODUCTSCALENDAR
REGULATORY NEEDS IT SYSTEMs
1 2 3
GOAL
In line with the CAM NC Roadmap in Europe, developing by ACER and ENTSOG
6
II.1 Draft CAM Roadmap in the Region
Capacity product definition and calendar (I)
• Definition of available bundled capacity for the next 15 years (Oct 2014...), agreement on the split of capacity (Q, yearly, 15 years)
• When will the capcity be allocated at VIP?
• Common criteria on: unbundled / interruptible / backhaul
• Monthly capacity products have been allocated by OSP until 31st March 2014
• Capacity products to be offered before March 2014 for the period April 2014-September 2014. Proposal: Maintain prorate or new CAM NC?
1
SPAIN-FRANCE (I)
7
II.1 Draft CAM Roadmap in the Region
1 Capacity product definition and calendar (II)
Proposal of Auctions:• Annual quarterly capacity auction in June 2014: first Q capacity
products from Oct 2014 to Sept 2015 (Q1-Q4) ---- common platform
• Rolling monthly auction in Sept 2014 ?• Daily auctions from October 2014 ?• Annual yearly capacity auction in March 2014: first yearly capacity
products from Oct 2014 (Y1-Y15)
SPAIN-FRANCE (II)
8
II.1 Draft CAM Roadmap in the Region
1 Capacity product definition and calendar (III)
• Definition of available bundled capacity for the next years (Oct 2014...), agreement on the split of capacity (Q, yearly, 15 years), Longest allocation period = 1 year ?
• VIP
• Common criteria on: unbundled / interruptible / backhaul
• Yearly and Monthly capacity products have been offered by auction in June 2012, from Oct 2012 to Sept 2013
• To be decided: Quarterly capacity product could be offered in June 2013 (Oct 2013-Sept 2014) the same methodology as last year?
SPAIN-PORTUGA L (I)
9
II.1 Draft CAM Roadmap in the Region
1 Capacity product definition and calendar (IV)
Proposal of Auctions:• Annual quarterly capacity auction in June 2014: Q capacity
products from Oct 2014 to Sept 2015 ----- common platform for the first time
• Rolling monthly capacity auction Sept 2014 ?• Daily auctions from October 2014 ?• Annual yearly capacity auction in March 2014/2015: first yearly
capacity products from Oct 2014/2015, for one year?
SPAIN-PORTUGA L (II)
10
II.1 Draft CAM Roadmap in the Region
1 Capacity product definition and calendar
Proposal of Auctions:
INSIDE FRANCE
11
1
Annual yearly auctions: 1st Monday of March / Y1: 1st Oct-31st SeptAnnual quarterly auctions: 1st Monday of June / Q1: 1st Oct-1st Jan.Monthly capacity auctions: 3rd Monday of each monthDaily auctions: 16.30 CET D-1
… 2013 2014 2015 2016 2029 …
Se Oc No De Ja Fe Ma Ap Ma Ju Ju Au Se Oc No De Ja Fe Ma Ap Ma Ju Ju Ag Se Oc
Prorata allocation
SP -FR
Annual yearly capacity auctions
Annual quarterly capacity auctions
Rolling monthly capacity auctions
Rolling day ahead capacity auctions
Within -day capacity auctions
AuctionSP -PT
II.1 Draft CAM Roadmap in the Region
12
Regulatory needs (I)Auction mechanism as a default CAM in the interconnectionsMoving towards bundled and virtual capacityHarmonizing the capacity products and timeframesNew regulation need to be consistent with European NC:
• CMP NC • Balancing NC
o Agreement on nomination and renomination schemes• Interoperability and Data Exchange NC
o Harmonization of gas day / gas year- 2014o Temperature to measure gas- 2014o Units used to allocate capacity and sign contracts- 2014
• Tariffs NC:o Reserve priceo Price to be paid by subscribers during all the contract life
2
II.1 Draft CAM Roadmap in the Region
13
Regulatory needs (II)To be discussed:
• Shipper license to participate in auctions process, allowing the same shipper to book unbundled capacity. Qualification steps.
• Price steps definition and allocation of revenues arising from the auction among TSOs
• Release of information to the market. Calendar• Capacity contracts: obligation to subscribe the capacity allocated
in the auction, timing, financial deposit...• Responsibilities of TSOs (implementation) and NRAs
(supervision)• Secondary capacity market: bundled virtual capacity to remain as
allocated in the auction• Coexistence of old and new contracts
2
II.1 Draft CAM Roadmap in the Region
14
IT System
To develop a single platform to allocate capacity: Best available technologies, functionalities, secure, smooth exchange of information
Calendar to join existent platforms by TSOs in the SGRI: European Capacity Platform / others
TSOs to develop its own IT system to integrate the information from the capacity auctions
TSOs to collaborate bilaterally to develop IT systems for nomination and renomination of bundled capacity, CMP implementation, exchange information for balancing process.
3
II.1 Draft CAM Roadmap in the Region
Joint European CAM platform
15
Way forward
Public consultation of this document with Stakeholders- along this week: to be
launched in ACER website, comments will be welcome until 19th March
2013. (by regulators)
Final CAM Roadmap of the SGRI – March 2013 (approval by regulators)
Discussions and definition of the capacity products, available capacity and IT
systems– March/May 2013 (to be proposed by TSOs)
Start of the development of IT systems –Summer 2013 (by TSOs)
National regulation modification – Starting summer 2013 (by regulators)
II.1 Draft CAM Roadmap in the Region
Discussion and definition of CAM process
May 2013
Start development of IT SystemStart analysis regulation
changesSummer 2013
IT readyRegulation in place
Draft MOUsDecember 2013
16
Way forward (cont.)
Available capacity, Products, and IT systems. First draft to be presented in the next SG meeting (24th April). Available capacity in all borders, for the next 15 years, and proposal of capacity split
for the different auctions, from October 2014: virtual Point between Spain and Portugal, physical/virtual point between France and Spain, and inside France ( to be sent by TSOs to regulators before 15th March) .
IT development (to be sent by TSOs before 29th March)
Capacity allocation platform utilisation: what capabilities...
TSOs IT systems: what need to be developed and when, interface to support primary and secondary capacity markets, nomination and renomination schemes...
II.1 Draft CAM Roadmap in the Region
17
Way forward (cont.) Available capacity, Products, and IT systems. First draft to be presented in the next SG meeting (24 th
April). Products:
•Long term vision of the whole process: ( proposals to be sent by TSOs before 24th April)• Bundled, virtual auctions simultaneously conducted in the whole region• Definition of the auction mechanism ( reserve price, price steps, rounds, allocation of revenues...)
• Decision to be made prior to the auction announcement ( financial deposit, obligation to subscribe capacity, contracts, shippers licence...)
• Interruptible capacity• Unbundled capacity offer?
•Short – term decisions on the initial products and the calendar ( proposals to be sent by TSOs before 10th May)
• Interoperability amendments needed: (gas day, gas year, amendment of gas quality measurement and calendar)
• Decision on the Larrau capacity to be sold before March 2014, in two quarters, from April 2014 to September 2014. Pilot of the IT system in late 2013, early 2014?
• Allocation of yearly capacity in all borders in March 2014, quarterly capacity in June 2014, monthly capacity in September 2014...
II.1 Draft CAM Roadmap in the Region
18
II. Capacity Allocation Mechanisms
II.2. CAM between Spain-Portugal. Next auction
(for information by TSOs)
19
II.2 CAM between Spain-Portugal. Next auction
ENAGÁS and REN are developing the procedure of the 2nd annual auction
Issues already decided:
• Capacity Products to be offered for the gas year 1st Oct 2013 to 30th Sept 2014:
Firm yearly products
Firm quarterly products
Interruptible products if more than 95% of firm capacity has been allocated at the previous firm products auctions
Issues to be decided: IT system to allocate capacity?
To be proposed by TSOs by mid March
20
II.2 CAM between Spain-Portugal. Next auction
National regulations to be approved in advance in order stakeholders will be timely informed:
• Resolución CNE on methodology for the coordinated capacity allocation at the IP between Spain and Portugal.
• Mecanismo de atribuição de capacidade da RNTGN - ERSE
• Information Memorandum and Standard Contracts: to be elaborated by TSOs describing the procedures for the annual auction (following the Draft CAM NC): rules, price steps, reserve price, capacity offered, application form, contract information, calendar…. To be approved by NRAs.
21
II.2 CAM between Spain-Portugal. Next auction
CALENDAR for the 2nd annual auction between Spain and Portugal
2013Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
27: 21thIG
24: 20thSG
12: 22thIG
Stakeholders involvement
Issues to be decided
Development of National
regulations
Info Memo
Coordination NRASTSOs
NRAs/TSOs
REGULATION APPROVAL
IT system: development/ tests/formation/implementation
3rd June 2013 (first Monday-quarterly auctions)
22
III. Congestion Management Procedures
III.1. Draft CMP Roadmap in the Region
Area of work Responsible Starting Deadline
CMP harmonization in the whole region
NRAs-TSOs Oct. 2012 Oct. 2013
CMP harmonization in the whole region (including UIOLI firm ST)
NRAs-TSOs Oct. 2012 Jul. 2016
23
III. Congestion Management Procedures
III.1. Draft CMP Roadmap in the Region
• RCC meeting to discuss CMP the 13th March
• IG meeting at the end of March to share main ideas regarding CMPs. TSOs to propose preliminary Roadmap (videoteleconference)
• TSOs to send a final CMP Roadmap agreed by the four TSOs in May
24
IV. Investment
Area of work Responsible
Starting Deadline
Regular update and publication in CEER website of project status of OS 2013 and 2015
TSOs-NRAs Dec. (yearly) Jun. (yearly)
Drafting of the South Regional Investment Plan 2012 TSOs Jul. 2011 Jan. 2012 (COMPLETED)
Feedback to ENTSO-G on contents and methodology of the regional investment plan
NRAs Jan. 2012Jul. 2012(COMPLETED)
Input to ENTSO-G for the Community-wide TYNDP 2013
TSOs Jan. 2012 Apr. 2013
Creation of a working group in the region in order to test the process of PCI identification NRAs -TSOs Mar. 2012 March 2013
Drafting of the South Regional Investment Plan 2014 TSOs Jan. 2013 Apr. 2014
IV.1. Update on PCI Identification
IV.2. 2013 Gas Regional Investment Plan (GRIP)
25
IV. Investment
IV.1. Update on PCI Identification
(for information by Regulators)
26
IV.1. Update on PCI Identification
6th meeting held on 18 January: Previous meeting organized by EC with NRAs with the aim to know NRAs’ opinion. Summary on NRAS’ opinion on impact areas
• Main rule: a project must impact on at least two Member States to be eligible
• Clusters: projects considered in a cluster represent just one PCI.
• Presentation of analysis of qualitative and quantitative assessment carried out by consultants, as well as a preliminary PCIs list
• Main comments from attendants: impact areas, quantitative assessment (formulas application, parameters used, inputs, etc.). As a result, new calculations are being considered and a new list will be elaborated
• Participants were given time to send their opinion on impact areas and clusters
Next meeting to be held on 7th March 2013.
North-South Gas Interconnections in Western Europe
27
North-South interconnections in Western Europe
1º G82 TWINNING OF SOUTHWEST SCOTLAND ONSHORE SYSTEM Interconnection2º G58 REVERSE FLOW SWITZERLAND-FRANCE SECTION Interconnection3º G56 REVERSE CAPACITY FROM FRANCE TO BELGIUM Interconnection4º G48 MERGING OF GRTGAZ NORTH AND SOUTH ZONES Internal project5º G103 CONNECTION OF MALTA TO THE EUROPEAN GAS NETWORK Interconnection6º G61 NEW IP TO LUXEMBOURG Interconnection7º G136 PHYSICAL REVERSE FLOW AT MOFFAT INTERCONNECTION POINT Interconnection
8º G133+135 Physical reverse flow from Northern Ireland to Great Britain and Republic of Ireland via Scotland to Northern Ireland pipeline Interconnection
9º G114 3RD INTERCONNECTION POINT PORTUGAL-SPAIN Interconnection10º G45 ARC DE DIERREY Internal project11º G6 BRETELLA (GERMANY
‐BELGIUM) Interconnection
12º G5 RERVERSE FLOW (SOUTH
‐NORTH) FROM SWITZERLAND TO GERMANY Interconnection
13º G44 NEW LINE BETWEEN CHEMERY AND DIERREY Internal project14º G7&8 LNG TERMINAL ZEEBRUGGE
‐ CAPACITY EXTENSION & 2ND JETTY LNG
15º G60 IBERIAN-FRENCH CORRIDOR: EASTERN AXIS-MIDCAT PROJECT Interconnection
Order according to total score Project Code Project Name Type
IV.1. Update on PCI Identification
28
North-South interconnections in Western Europe
16º G10 BELGIUM/ LUXEMBOURG Interconnection17º G91 CROSS BORDER BI-DIRECTIONAL FLOWS (ITALY - SWITZERLAND) Interconnection18º G96 BAGNOLO MELLA GAS STORAGE Storage19º G104 GAS COMPRESSOR OPTIMISATION PROGRAM IN NETHERLANDS Interconnection20º G47 DEVELOPMENT OF ENTRY CAPACITIES IN THE SOUTH ZONE OF FRANCE Internal project21º G93 GALSI PROJECT(Gazoduc Algérie – Italie) Interconnection22º G59 REVERSE FLOW FR-DE Interconnection23º G28 Monaco Pipeline Interconnection24º G85 OLT OFFSHORE LNG TOSCANA SPA LNG25º G94 BORDOLANO Storage26º G57 NORTH-SOUTH FRANCE TO SWITZERLAND CAPACITY INCREASE Interconnection27º G88 PORTO EMPEDOCLE LNG TERMINAL LNG28º G79 SOUTHWEST KINSALE GAS STORAGE EXPANSION PROJECT Storage29º G144 CARRIÇO UGS DEVELOPMENT (REN-C8 E REN-C10) Storage30º G53 LNG MONTOIR TERMINAL EXPANSION LNG
Order according to total score Project Code Project Name Type
IV.1. Update on PCI Identification
29
North-South interconnections in Western Europe
31º G87 LNG Medgas Terminal LNG32º G52 LNG Fos Faster LNG33º G92 CORNEGLIANO UGS Storage34º G51 LNG FOS CAVAOU TERMINAL EXPANSION LNG35º G81 PHYSICAL REVERSE FLOW ON SOUTH NORTH PIPELINE (UK - IRELAND) Interconnection36º G78 KING STREET GAS STORAGE Storage37º G50 SALINS DES LANDES Storage38º G140 LES PINASSES UNDERGROUND GAS STORAGE Storage39º G80 Shannon LNG terminal LNG40º G54 Stublach storage Storage41º G113 UNDERGROUND STORAGE (UGS) CARRIÇO Storage42º G138 IBERIAN CORRIDOR: CROSS-BORDER OPTIMIZATION: EBRO VALLEY PROJECT Interconnection43º G46 ERIDAN Internal project44º G49 CONNECTING CORSICA TO GALSI (CYRENEE) Interconnection
Order according to total score Project Code Project Name Type
G55 Peckensen storage Storage
G139 PROJECT STUDY ON THE INTEGRATION OF POWER TO GAS (PTG) FACILITIES INTO THE GAS TRANSMISSION SYSTEM Storage
Main projects affecting the Region
Non eligible projects
IV.1. Update on PCI Identification
30
IV. Investment
IV.2. 2013 Gas Regional Investment Plan (GRIP)
(for information by TSOs)
31
V. AOB and next meetings
32
Meetings calendar for the first semester 2013
Next meetings:• 25th March, 15:00 CET , 22th IG (videoconference)• 24th April: 20th SG• 12th June: 23th IG