1 Madison Beltline Public Involvement Meeting July 2019 Project ID: 1206-06-08 US 12: Whitney Way to I-39/90

Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

1

Madison BeltlinePublic Involvement Meeting

July 2019

Project ID: 1206-06-08US 12: Whitney Way to I-39/90

Page 2: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

2

- Beltline Purpose and Need- Project Alternatives

- Alt 1: Resurfacing- Alt 2: Resurfacing w/ Dynamic Part-Time Shoulder Use (DPTSU)

- DPTSU Concept- Project Schedule- Open Discussion

Agenda

Page 3: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

3

Beltline Maintenance Projects 2012 - Present

2012 2013 2014 2015 2016 2017 2018

Fish Hatchery Rd Interchange

Fish Hatchery Rd to I-39/90

Ongoing Pavement & Bridge Preventative Maintenance Projects

Gammon to Whitney Whitney Way to Seminole Hwy

Bridge Painting

2012 - 2018

Beltline PEL Focus = Long-Term Solutions

WisDOT Study / Engineering

Overlay Projects

2019 - 2021

Yahara Bridge Joints

Yahara Bridge Polymer Overlay

Yahara Bridge Pile Protection Fish Hatchery Rd to I-39/90

Pavement Patches

2019: Seminole to I-39/90 Pavement2020: South Towne Bridge2021: Whitney Way to I-39/90 Pavement

- Alt 1: Resurfacing- Alt 2: Resurfacing with DPTSU

Note: Alts each include barrier and drainage improvements

Page 4: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

4

Project Purpose: - Address deteriorating needs in the pavement structure and median areas

- Address operational issues during weekday peak periods and unexpected congestion

Project Purpose and Need

Page 5: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

5

Project Needs:- Existing Pavement Condition- Median Barrier Condition- Roadway Drainage System- Operational Issues

- Crashes- Travel Time and Level of Service- Travel Time Reliability

Project Purpose and Need

Page 6: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

Lake Mendota

Lake Monona

Madison Monona

FitchburgVerona

Middleton

Sun Prairie

Cottage Grove

McFarland

NORTH

Whi

tney

Way

Study Limits

6

About 10 miles and 12 interchanges

Project Termini

Project Location

Page 7: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

7

Alt 1: Resurfacing

Seminole Highway to I-39/90:- Resurfacing- Median Barrier Improvements- Drainage Improvements

Project AlternativesAlt 2: Resurfacing with DPTSU

Seminole Highway to I-39/90:- Resurfacing- Median Barrier Improvements- Drainage Improvements

Whitney Way to I-39/90:- DPTSU Infrastructure and Pavement

Restriping

Page 8: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

Median Barrier & DrainageModifications

Alt 2: Resurfacing w/ DPTSU

RemovingRumble Strips

Lane-Usage and Drainage

8

No-Build Alternative

Median Barrier & DrainageModifications

Alt 1: Resurfacing

Page 9: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

9

Cross SectionTypical Existing (No-Build) and Resurfacing (Alt 1) Beltline Cross Section

Outside Shoulder

Outside Shoulder

GP Lane GP Lane GP Lane Median Shoulder

Median Shoulder

GP Lane GP Lane GP Lane

GP = General Purpose

Westbound Eastbound

Page 10: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

10

Cross SectionTypical Existing (No-Build) and Resurfacing (Alt 1) Beltline Cross Section

Typical Resurfacing with Dynamic Part-time Shoulder Use (Alt 2) Beltline Cross SectionWestbound Eastbound

Outside Shoulder

Outside Shoulder

GP Lane GP Lane GP LanePart-time

Shoulder UsePart-time

Shoulder Use GP Lane GP Lane GP Lane

Outside Shoulder

Outside Shoulder

GP Lane GP Lane GP Lane Median Shoulder

Median Shoulder

GP Lane GP Lane GP Lane

GP = General Purpose

Cross section fits within the existing width (each direction)

Westbound Eastbound

OverlayExisting Pavement / Joints

Proposed Pavement Marking

Page 11: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

11

Dynamic Part-Time Shoulder Use NationallyPart-time shoulder use is being used effectively around the country, including the Midwest, to address recurring congestion.

Image: I-35W in Minnesota

Page 12: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

12

Part-time Shoulder Use in the United States

Page 13: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

13

DPTSU stands for “Dynamic Part-time Shoulder Use”- Also known as “Hard Shoulder Running”- Use of shoulders part-time for travel during busiest hours- Cost-effective interim solution to address recurring congestion- Can be classified as:

- A Transportation System Management and Operations Strategy- A Performance-Based Practical Design approach, used by FHWA & WisDOT

Reference: https://ops.fhwa.dot.gov/publications/fhwahop15023/ch1.htm

What is DPTSU?

Page 14: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

14

Static

Static vs. Dynamic Part-time Shoulder Use

Dynamic

In Operation

Not in OperationExample in

Massachusetts

Generally paired with static signing

No Dynamic (changeable) Signing Component

Page 15: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

IHSDM = Interactive Highway Safety Design Model

15

Safety- Experience in the U.S. to date has not identified major safety issues with part-time bus, static, or dynamic shoulder use that led to discontinuation.- The best available predictive crash analysis tool (IHSDM) was used for this project’s safety analysis.- The relative analysis showed that with the activation of DPTSU, the number of predicted crashes is not anticipated to increase compared to a No-Build condition.

Page 16: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

16Note: Field-measured travel times may be longer for a variety of reasons (incidents, disabled vehicles, weather, etc.).

Average Travel Time During AM and PM Peak Hours: Whitney Way to I-39/90

Travel Time

AM Westbound

Modeled Travel Times

AM Eastbound PM Westbound PM Eastbound

Tim

e (m

inut

es)

Aver

age

Trav

el T

ime

(min

utes

)

Modeled Average Travel TimesExisting (2017) Conditions

Projected (2032) No-Build Conditions

Projected (2032) DPTSU Conditions

Page 17: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

17

Travel Time Reliability

Graphic Source: https://ops.fhwa.dot.gov/publications/tt_reliability/brochure/ttr_brochure.pdf

Page 18: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

18

Travel Time Reliability

Graphic Source: https://ops.fhwa.dot.gov/publications/tt_reliability/brochure/ttr_brochure.pdf

Travel time reliability measures the extent of this unexpected delay

Example: Getting to Work

Page 19: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

19

Reported

PerceivedAfter

PerceivedBefore

Project Feasibility: Travel Time Reliability

Project

Reliability measures capture the benefits of traffic management

Timeframe vs. Project

Graphic Source: https://ops.fhwa.dot.gov/publications/tt_reliability/brochure/ttr_brochure.pdf

Note: This diagram shows a general display of the travel time reliability concept and is not intended to reflect traffic data for the Beltline corridor.

Page 20: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

20

SHOULDER USEPERMITTED ONGREEN ARROW

ONLY

Dynamic Part-time Shoulder Use cross section fits within the

existing width (each direction)

System Overview

Page 21: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

21

Dynamic SigningActive Management Sample DMS Messaging

LEFT SHOULDEROPEN

TO TRAFFIC

LEFT SHOULDEREMERGENCY

STOPPING ONLY

In Operation

Not in Operation

Approaching lane drop or for use in closure scenarios

Digital Blank-out Sign indicating lane drop at ends of the system

Page 22: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

22

Dynamic Signing

Peak Period Operation

• Dynamic Shoulder Signing• Dynamic Message Signing• Regulatory/Static signing

SHOULDER USEPERMITTED ONGREEN ARROW

ONLY

Page 23: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

23

Dynamic Signing

Peak Period Operation

• Dynamic Shoulder Signing• Dynamic Message Signing• Regulatory/Static signing

Page 24: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

24

Operations – Off-Peak

Off-Peak Operation

Page 25: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

25

Operations – Closure

Unplanned Closure !Incident

Page 26: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

26

Operations – Lane Drop

Merge Location

Page 27: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

SHOULDER USE PERMITTED ON GREEN ARROW

ONLY

Page 28: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

SHOULDER USE PERMITTED ON GREEN ARROW

ONLY

General Purpose Lanes Open

24 Hours

Page 29: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

SHOULDER USE PERMITTED ON GREEN ARROW

ONLY

Dynamic Part-Time

Shoulder Use

General Purpose Lanes Open

24 Hours

Page 30: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

30

Project Schedule

Planning

Design

2021

Construction

- Alt 2 Only

2020 20222019

Alt 1 or Alt 2

Alt 1 or Alt 2

Alt 1 or Alt 2Resurfacing

System Operational

Public Meeting

System Testing

Alt 1: ResurfacingAlt 2: Resurfacing with DPTSUNote: Alts each include barrier and drainage improvements

Concept Outreach &

Education

Page 31: Madison Beltline Public Involvement Meeting€¦ · GP Lane GP Lane GP Lane Median Shoulder Median Shoulder GP Lane GP Lane GP Lane GP = General Purpose Westbound Eastbound. 10 Cross

31

Please provide your input by:•Filling out the comment form,•Talking with project staff,and/or

•Email: [email protected]

Comments and Discussion