Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
1
ESDS Software
Solution Pvt. Ltd.,
Nashik
2.1.3
The bidder in case of single company or the prime
bidder in case of joint venture/consortium should have
CMM/PCMM/CMMi level 3 or above certification
ESDS Software Solution Pvt. Ltd. Is an ISO 9001:2008
company. In most of the cases, ISO 9001:2008 is considered in
place of CMM/PCMM/CMMi level 3 certification. We will
appreciate if you can relax this clause.
In case of Consortium, Vendor responsible for
Software Application development should be
CMM/PCMM/CMMi L3 or higher. Prime Bidder
may be ISO 9001:2008 certified
Yes 2.1.3
2 ITI Ltd., Bhopal 2.1.3
The bidder in case of single company or the prime
bidder in case of joint venture/consortium should have
CMM/PCMM/CMMi level 3 or above certification
This may be relaxed to ISO 9001:2008. Already addressed
3 ITI Ltd., Bhopal 2.1.2
The bidder in case of single company or the prime
bidder in case of joint venture/consortium should have
a minimum cumulative turnover of Rs. 25 crores in the
last 3 financial years in providing IT Solutions,
minimum networth of Rs. 50 crores and should have
made profits in the last 2 financial years.
Exemption from "Profitability clause" based on CVC guidelines
for PSU's.
Public Sector Units shall be exempted from the
Profitability clause.Yes 2.1.2
4EnterpriseDB
Corporation, PuneAnnexure III - Pt. 35
The database has load balancing mechanisms and
native, active-active clustering with objectives of
scalability and availability. The solution to provide
single image of database concurrently accessed by
multiple database servers, without repartitioning or
changes to the database
The 2nd criteria is not open to all database and is more
proprietory to single commerical database.
The database should provide mechanism for
failover clustering and load balancing with
objectives of scalability and availability. The
solution should be designed in a manner to
achieve or exceed the desired level of uptime
and performance SLA as indicated in the RFP
YesAnnexure III - Pt.
35
5EnterpriseDB
Corporation, Pune
Format for Original
Equipment
Manufacturer's
Authorization Form
We hereby extend our full guarantee and warranty as
per terms and conditions of the tender and the
contract for the equipment and services offered
against invitation for tender offer by the above firm.
Does warranty clause is restrict to only on hardware as warranty
terminology used for hardware component only. If it is also
applicable for Server OS/DATABASE or any other server
system software than kindly clarify by including OEM will provide
the security updates, patches, hot fixes & support for entire
period of the project.
Since this is on a PPP mode for 5 years, it is
understood that the SI has to provide these
supports to the dept.
No
6EnterpriseDB
Corporation, Pune Additional Server Operating System
Server Operating System is one of major system software for
any mission critical project success. Since no specification of
server operating system is mentioned in the RFP . Request to
consider below mentioned for general conditions for server OS
to avoid any free ware or unsupported system softwares.
No
7EnterpriseDB
Corporation, PuneAdditional Server Operating System
1.Proposed system software should be OEM supported ,
Enterprise level Industry Standard , Open Standard, IRP clause
compliance.
No
8EnterpriseDB
Corporation, PuneAdditional Server Operating System
2.Proposed system software OEM must be present directly in
India from at least last 5years with full fledged office and must
have own full fledged support center in India.
No
9EnterpriseDB
Corporation, PuneAdditional Server Operating System
3.Proposed system software should have longer product life
cycle minimum project period plus 2 years (at least 7 years)
includes security updates, upgrades hotfix for bugs and patches
to avoid non-availability of various device driver (current and
future) support.
No
10EnterpriseDB
Corporation, Pune Additional Server Operating System
4.Proposed Operating system must be registered with Rate
Contract e.g DGSnD.No
11EnterpriseDB
Corporation, PuneAdditional Server Operating System
5.The System software including operating system should be
certified for different types of hardware and should have
adequate security, availability, manageability, adaptability, and
different languages especially Hindi (Unicode) language support
and must be being used in any large e Governance project.
No
It is SI's responsibility to select the OS for server
that would deliver the best performance of the
database that fulfil the requirements, SLA's
stated in the RFQ document. Performance
degradation will only result in successful vendor
not being able to meet the SLA's thereby
resulting in penalty.
Commissioner Land Records Settlement, Madhya Pradesh Page 1 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
12EnterpriseDB
Corporation, Pune Additional End of life clause for Server System Software
Software technology charges very fast and 5 years is too large
period for any software technology for end of life. To avoid any
such situation please consider below general condition to have
proper/latest technology with customer. "No Server System
Software proposed under the bidding document should be
marked for „end of life‟ till the tenure of the project. Any
software for which support (Security update, patches & hotfixes
for bugs) by the OEM has been withdrawn will have to be
replaced with an equivalent or higher product, software with
OEM support during the project life cycle All proposed server
system software should be available from the OEM till the
tenure of the Project"
This is understood since bidder has to provide
operation and maintenance for 5 years along
with updates to existing solution. Refer Sec
4.23.2
No
13EnterpriseDB
Corporation, Pune Additional High Availability of Server System Software
Is proposed solution / server system software must be
redundant for high availability. If yes please clarify.
It is SI's responsibility to select the OS for server
that would deliver the best performance of the
database that fulfil the requirements, SLA's
stated in the RFQ document. Performance
degradation will only result in successful vendor
not being able to meet the SLA's thereby
resulting in penalty.
No
14EnterpriseDB
Corporation, Pune
Annexure IV - Sec
1.4, Pt. 18
Must take Hot-Online SAN based Backup for the
proposed database platform as well as other major
RDBMS like Oracle, DB2, SQL Server, etc. on
different platforms
Request incorporation of PostGreSQL before the word "etc."
Not possible to mention all names in the hence
the word "etc" inserted to solve the purpose.
Additionally, It is SI's lookout to choose a DB
that shall fulfil the requirements and objectives
stated in RFP document.
No
15IBM Corporation,
BhopalAnnexure III - Pt. 7 The solution has adherence to GoI fonts standards
Please clarify which components of the solution these refer too
like RDBMS,GIS TOOL or application.
RDBMS, Application and services through the
applicationNo
16IBM Corporation,
BhopalAnnexure III - Pt. 8
The solution has adherence to Land Region
Cartographic Codification Standards
Please clarify which components of the solution these refer to
like RDBMS, GIS TOOL or application.
RDBMS, Application and services through the
applicationNo
17IBM Corporation,
BhopalAnnexure III - Pt. 30
Properly commented complete source code of the
components designed and custom developed by the
vendor for CLR based on this RFP will be supplied
Hope this is restricted to the source code of the application
developed by the vendor not of the OEM components like OS,
RDBMS etc.
Already clarified in the RFP. Refer Sec 4.24 -
Transfer of solution and Sec 5.3.16 for clarity on
this question.
No
18IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The proposed solution should support R-Tree index support and
the R-Tree should not emulated with recursive SQL Queries,
Reason:
Recursive SQL degrades the performance, consume machine resources
which is more evident when we perform complicated queries or query on
large data. R-Tree indexing should optimally use machine resources and
follows the bounding box concept for indexing which gives excellent
performance. It should eliminates the need to examine objects outside the
area of interest which otherwise would need to evaluate every object to find
those that match the query criteria. The Spatial indexes should not require
the grid size to be set, to determine the granularity of the data because if the
character of the data changes it generally have to rebuild it but R-Tree
implementation himself should be smart enough to readjust its internal
structures and optimize paths, as the data changes
The proposed solution should support R-Tree
index support and the R-Tree should not
emulated with recursive SQL Queries.
YesAnnexure III - Pt.
42
19IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
In the proposed solution Spatial data type implementation
should be as actual data type and not as nested numeric array
in large object.
Reason:
The spatial being actual data type makes it easier to manipulate data and
write simple SQL queries. This should enable the end user to make use of
the Spatial data types just like standard data types, as part of the SQL's (
queries, functions and procedures ) without any special consideration.
It is SI's responsibility to select the database that
would fulfil the requirements and meet the SLA's
stated in the RFP document. Performance
degradation will only result in successful vendor
not being able to meet the SLA's thereby
resulting in penalty.
No
Commissioner Land Records Settlement, Madhya Pradesh Page 2 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
20IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
In the proposed solution.
Reason:
Replication of spatial data should be supported in all editions of the
database.This is required for a tree structure system implementations to
make the solution most cost effective. The leaf nodes should also be
Replication of spatial data enable but a light edition will make the cost more
effective as the leaf nodes does not always require large system and
database load.
No change in RFP No
21IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
In the proposed solution Automatic validation of spatial data
should be there without requiring separate functions to be
executed to check the validity of inserted data.
Reason:
This helps in ensuring the data consistency thought the data life cycle.
Which also ensures that the data inserted at any node will be replicated
immediately only if it is valid data.Which means, it ensures the data
consistency across all nodes all time without any extra efforts.
Refer Annexure III - Pt. 12 for more clarity: "The
solution has data input validations including
topology checks".
No
22IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have Content Manager with web
2.0 based UI with drag and drop features of adding docs to the
content repository
Reason: In Land Record System, Documents need to added at
any point of time in any account, if it is not web 2.0 based UI,
then it is very much chance to add wrong document or working
is not easy for user.
Drag and drop features for adding docs to the
content repository shall be mentioned in the
RFP.
Yes
Sec 5.3.13 and
Annexure III - Pt.
39
23IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveContent Manager should
provide deep integration with MS Office which includes viewing
the content repository folder structure in MS Office App and also
should provide initiate and view linear tasks
Reason: While adding the documents in Existing folder , if folder
hierarchy is not visible then in huge volume of document
accuracy maintenance is a problem
If the solution being offered by the vendor
requires deep integration with MS Office, then it
shall be the vendor's responsibility to provide it
at no additional cost. However, Folder hierarchy
is a must while viewing the documents
Yes Sec 5.3.13
24IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveAll the basic document
management capabilities to be part of the content manager like
search, add, access, security, versioning
Reason: This is the basic requirement of any DMS System
Refer Sec 5.3.13.2 for more clarity. These have
already been included.No
25IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveContent duplication to be
checked at the content repository level.
Reason:At the time of merging of the repository from different
location, this should be required
It is clear that the successful vendor shall have
to do data porting from 342 record rooms to
centralized location. As such, avoiding
duplication of data is a pre-requisite condition
during this activity and this criteria shall be
mentioned in RFP.
Yes Sec 5.3.13.2.20
26IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have CMIS support for the
content repository, new std which will help in integration of the
DMS with the other LOB applications.
Reason:Land record system required to integrate with different
Department, then this capability of product is essential
The solution should have CMIS support for the
content repositoryYes Sec 5.3.13.2.22
27IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThis content Manager
repository should be well integrated with all the standard
databases like DB2/Oracle/MS-Sql Server.
Reason:At the time of merging of the repository from different
location, this should be required
The application solution must be in a position to
port data from 342 Record Room locations that
may have housed data and client based DMS
application on different Databases like
DB2/Oracle/SQL Server etc.
Yes Sec 5.3.13.2.21
28IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should have workflows subscription to launch / initiate workflows
when the content is added in the content manager.
Reason:In Land Record System, document flows from different dept, which
requires different kind work flow
The solution should have workflows software to
launch / initiate workflows when the content is
added in the content manager
YesAnnexure
III_pt.40
Commissioner Land Records Settlement, Madhya Pradesh Page 3 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
29IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows should be
part of the same content platform and infrastructure pre-
integrated.
Reason:If workflows is not part of Content Platform then
designing and execution of workflows would be easy and error
less
The workflows should be part of the same
content platform and infrastructure pre-
integrated
YesAnnexure
III_pt.41
30IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should take input from visio as XML file
Reason:Land record system required to integrate with different
Department, then this capability of product is essential
No change in RFP No
31IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should have email alerts, escalations, send mail triggers all out
of the box.
Reason:This days official communication is through mails so this
is a must requirement
The workflows software should have email
alerts, escalations, send mail triggers all out of
the box
YesAnnexure III - Pt.
40
32IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should have content exception handling capabilities like wait for
condition without writing code
Reason:Workflows should be so easy configurable, so Work
should be help due to workflows creation
No change in RFP No
33IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should have out of the box 20+ workflows reports with process
analyzer. Reason:This
is required to automate the Land record work flow, which needs
to easily configurable
No change in RFP No
34IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveRecords Manager should
support electronic, physical and hybrid records
Reason:Record Manager needs to keep tracks of records.
Records can be any form , it can be digital, physical or hybrid.
Application should be handle these kind of records
35IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveRecords Manager should
support zero click records declarations
Reason:In a huge volume of land record docs, it is very difficult
to marks documents as records. It should be policy driven
36IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have Records Manager should
allow addition of box / barcode information
Reason:It is required to complete the solution. Bar Code
required for record management
37IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have Records Manager should
support integration with the physical records manager company
like Iron Mountain
Reason:This is a must requirement for land record kind of
system
No change in RFP No
Yes Sec 5.3.13.2.23
The solution should have Records Manager
supporting electronic, physical and hybrid
records. Records Manager should also allow
addition of barcode information and support zero-
click records declaration
Commissioner Land Records Settlement, Madhya Pradesh Page 4 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
38IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have The proposed
Enterprise Content Management (ECM) solution should be
platform independent and available on 3-tier architecture with
each tier fully independent Reason:Land
record is a huge application , which need to integrated with
different Dept. Application and it also required to get the
information from different dept. Business requirement also
changes very frequently. If application tier is not a separate
layer then it is very difficult
Already mentioned that the Solution must be on
3-tier architecture or above. No
39IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
he proposed solution should support for the communication
protocols such as Lightweight Direct Access Protocol (LDAP),
Hypertext Transport Protocol (HTTP), SOAP, WSDL, XPDL,
BPMN, IIOP, Web2.0, MTOM, CMIS, DITA etc.
Reason:Business demands changes frequently, if application is not
standard based then applicable of changes are difficult
It is SI's responsibility to select the best
software/hardware for the proposed solution that
can meet and exceed the requirements and
SLA mentioned in the RFP
No
40IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The proposed solution should support for both vertical &
horizontal scalable solution. It should support for Sever Farm &
Server Cluster to provide High Availability (HA) & Disaster
Recovery (DR) solution
Reason:Application like land record system , which is base application
for different dept. So it should be well protected with DR and HA
Already mentioned in Annexure III - Pt. 35 -
"native, active-active clustering with objectives
of scalability and availability"
No
41IBM Corporation,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The solution should have the single user interface for all
integrated Enterprise Content Management applications like
Content Manager, Business Process Manager, Record
Manager and eForm solution and the user interface should
have standards-based (HTML, WebDAV) with zero download.
Also it should integrate with office desktop applications,
rendition engine (PDF & HTML) and messaging as out of the
box.
Reason:Land record is a huge application , which need to
integrated with different Dept. Application and it also required to
get the information from different dept. Business requirement
also changes very frequently. If application tier is not a separate
layer then it is very difficult
The proposed solution is an integrated solution
for Web based GIS application to be built on a 3-
tier SOA architecture.
No
42IBM Corporation,
Bhopal5.3.6.2, Pg 45 The GIS user interface should be user friendly.
What is the application for GIS? If customized, what is the
platform on which the application will be developed (eg, JAVA,
etc.)?
Refer Sec 6.1.2 for details. No
43IBM Corporation,
Bhopal5.3.6.12.4.1, Pg 47
An encrypted pdf file with “CLR” Number as filename
should be automatically generated and saved to the
server.
By encryption of pdf, is it meant that the pdf will be digitally
signed or will it be stored in the system with an encryption key
and decryption key will be provided to read the pdf?
It should be stored in the system with an
encryption key and decryption key needs to be
provided to read the pdf
No
44IBM Corporation,
Bhopal5.3.6.14.1, Page 49
The vendors are required to make facility for Payment
Gateway so that payments using online net-
banking/debit card/cash card are incorporated in the
solution
Is there any existing payment gateway? If not, is the solution
required to bid by the bidder? What are the details of payment
interface and what all systems that payment interface need to
be integrated with?
No existing payment gateways present. Already
stated the same in Sec 5.3.3. Details to be
decided during SRS. Refer flowcharts for
various modules and payment terms for clarity
on systems where payment interface would be
needed.
No
45IBM Corporation,
Bhopal5.3.11.8, Page 54 Complete process management of mutation
The process need to be hard coded or is it expected to be
delivered through Business Process Management (BPM) tool?
Similarly, for other processes.
SI can propose either hard-coded method or
through a BPM tool.No
Commissioner Land Records Settlement, Madhya Pradesh Page 5 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
46IBM Corporation,
Bhopal1.1, 3 point, Page 126
Blade Server must have 2 x Quad Core Nehalem
based (5500 series) Xeon 2.80GHz Processor or
higher
For the complete solution, how many servers are being
considered? What will be the usage of the hardware stated here
in this point? Is there any provision for application server? What
is the hardware configuration for application server? Is high
availability required?
It is SI's responsibility to carry out sizing of the
requirement based on which Actual no. of
servers need to be deployed. High availability is
required. Refer 6.6.8 for some clarity on the
conceptual design.
No
47IBM Corporation,
Bhopal
Annexure IV - 1.3,
Row 3
Must be configured on full Fiber Channel end-to-end of
4Gbps or latest
4Gbps end-to-end connectivity is older technology. The industry
now offers newer, better technology, wherein front-end
connectivity is 8Gbps FC, and back-end connectivity is 6Gbps
SAS. Most of the leading storage vendors are already offering
this. Is there any specific reason why 4Gbps end-to-end
connectivity is required? With existing specifications, vendors
can opt to offer older technology. Suggested specification:
SAN Storage should be configured with at least 4 numbers of 8
Gbps Fiber channel (FC) front-end ports per controller (i.e. a
total of at least 8x 8Gbps FC front end ports across Dual
controllers) for front-end host connectivity.
Must be configured on full Fiber Channel end-to-
end of 8Gbps or latestYes
Annexure IV -
1.3, Row 3
48IBM Corporation,
Bhopal
Annexure IV - 1.3,
Row 4
Must be switched Fiber Disks with each disk
connected to 2 separate ports on the switched Fabric
For the back-end connectivity, please allow SAS connectivity as
well. Suggested specification:
Must use FC or SAS connectivity with at least 2 ports /controller.
Must use FC or SAS connectivity with at least 2
ports /controllerYes
Annexure IV -
1.3, Row 4
49IBM Corporation,
Bhopal
Annexure IV - 1.3,
Row 9Must be configured for min. of 40,000 IOPS
Is the IOPS specification for disk IOPS or for cache IOPS?
Please specify. Suggested Specification:
Must be configured for minimum of 400000 cache IOPSDisk IOPS Yes
Annexure IV -
1.3, Row 9
50IBM Corporation,
Bhopal
Annexure IV - 1.3,
Row 22
Must have 32 Nos. of 4Gbps 146GB 15,000 RPM
Fiber Channel Drives with 8 Disks on RAID 0+1, 1 as
Global Hot Spare and remaining configured as RAID 5
groups
Please allow both FC and SAS disks. Suggested Specification:
146GB or higher; 15,000 RPM; FC or SAS drives
Must have 32 Nos. of 4Gbps 300GB, 15,000
RPM Fiber Channel/SAS Drives with 8 Disks on
RAID 0+1, 1 as Global Hot Spare and remaining
configured as RAID 5 groups
YesAnnexure IV -
1.3, Row 22
51IBM Corporation,
Bhopal
Annexure IV - 1.3,
Row 23
System must be expandable up to 100 nos. of 4Gbps
146GB 15,000 RPM Fiber Channel Drives
Please allow both FC and SAS disks. Suggested Specification:
146GB or higher; 15,000 RPM; FC or SAS drives
System must be expandable up to 100 nos. of
4Gbps 146GB or higher, 15,000 RPM Fiber
Channel/SAS Drives
YesAnnexure IV -
1.3, Row 23
52IBM Corporation,
Bhopal
1.4 Tape Library
Backup - Row 3
Min. 4 Nos. of Generation 4 LTO Drives or latest
supporting min. of 800 GB uncompressed capacity
should support min. of 6 drives
With LTO tapes, LTO5 is the newer technology, which enables
higher capacity per cartridge, and faster backup speeds. Also,
LTO5 tape drives can also read-write LTO4 cartridges.
Suggested Specification:
Min. 4 number of Gen 5 LTO drives, supporting a min. of 1.5TB
uncompressed capacity
Min. 4 Nos. of Generation 5 LTO Drives or latest
supporting min. of 800GB uncompressed
capacity should support min. of 6 drives
Yes1.4 Tape Library
Backup
53IBM Corporation,
Bhopal
1.4 Tape Library
Backup - Row 7Must Support LTO, SDLT, DLT, etc. Tape drives
It is recommended to not mix different tape technologies in the
same tape device. It is recommended to go for LTO5 only;
specifically, LTO5 as it is the newer technology. Suggested
specification:
Must support LTO tape drives
Must support LTO tape drives Yes1.4 Tape Library
Backup
54IBM Corporation,
Bhopal
1.4 Tape Library
Backup - Row 8
Configured for automatic tape loading for backup and
restore
Backup and restore features also depend on the functionality of
the backup software
Understood. However, desired feature needs to
be provided.No
55IBM Corporation,
Bhopal
1.4 Tape Library
Backup - Row 9
Should have min. data transfer rate of 80Mbps per
drive
With LTO5 technology, we can get data transfer rates of up to
140Mbps. Suggested specification:
Should support data transfer rate of 140Mbps
Should support data transfer rate of 140Mbps or
betterYes
1.4 Tape Library
Backup
56Oracle India Pvt. Ltd.,
Gurgaon
Clause 5.1.4, (page
42)
Supply and maintenance of SAN based Data Mirroring
software between SDC and DR Site is required to be
done by the vendor.
Bidder should also be allowed to propose any data replication
technology other than the data mirroring which can effectively
meet the disaster recovery data protection requirements as per
given in clause 5.1.3
SAN Based Data Mirroring software is preferable
owing to the fact that in case of replication of
data to an offsite location, only systems need to
be restored or synchronized and not the data.
No
Commissioner Land Records Settlement, Madhya Pradesh Page 6 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
57Oracle India Pvt. Ltd.,
Gurgaon
Annexure III
Compliance Matrix,
Sr. No. 6 ( page 121)
The solution has adherence to OGC (Open GIS
Consortium) Standards
As the database is integral part of the solution, should the data
types used for storing the spatial data be also certified and
adhered to OGC standards ?
Database platform, GIS platform and services
should have adherance to OGC StandardsYes
Annexure III - Sr.
No. 6
58Oracle India Pvt. Ltd.,
Gurgaon
AnnexureIII
Compliance Matrix,
Sr. No. 9 ( page 122)
The solution has support to store and use spatial
features in the database platform proposed
Spatial features of database are critical for application
performance and to reduce the complexity hence we suggest
that database should specifically provide support for vector and
raster spatial data formats, Network data model, Topology data
model, Linear referencing system, Spatial analytic functions,
Geocoding engine, Routing engine, 3D geometrics and point
clouds.
The database has support to store and use
spatial features in the database platform
proposed
Yes
AnnexureIII
Compliance
Matrix, Sr. No. 9
59Oracle India Pvt. Ltd.,
Gurgaon
Annexure III
Compliance Matrix,
Sr. No. 12 ( page 122)
The solution has data input validations including
topology checks and building network models and
support Triangulated Irregular Network (TIN) data type
For performance and to reduce the complexity of the solution we
suggest that the mentioned features should be supported by
the database which can be used by the application.
No change in the RFP No
60Oracle India Pvt. Ltd.,
Gurgaon
AnnexureIII
Compliance Matrix,
Sr. No. 32 ( page 123)
The solution has data encryption capabilities
should database provide functionality to transparently encrypt
sensitive/ desired data (column, tablespace,etc. level) without
application required to encrypt/ decrypt?
The Database has data encryption capabilities Yes
AnnexureIII
Compliance
Matrix, Sr. No. 32
61Oracle India Pvt. Ltd.,
Gurgaon
Annexure III
Compliance Matrix,
Sr. No. 33 ( page 123)
The database supports partitioning
To make partitioning more effective and meet the performance
of the system, it is suggested that database should support on
data range, data value and hash function based partitioning,
further it should support partitioning on combinations.
It is SI's responsibility to select the database that
would fulfil the requirements and meet the SLA's
stated in the RFQ document. Performance
degradation will only result in successful vendor
not being able to meet the SLA's thereby
resulting in penalty.
No
62Oracle India Pvt. Ltd.,
Gurgaon
Compliance Matrix,
Sr. No. 34 ( page 123)
The database has fault tolerance mechanisms to
quickly recover human error such as data corruption,
dropped table, etc and should be able to recover
tables, transactions to a previous point in time.
we understand that recovery from error , dropped table, etc.
should be possible with a command without restoration of
database.
Both are OK provided the SI meets the SLA
criteria in failover and downtime.No
63Oracle India Pvt. Ltd.,
Gurgaon
Annexure III
Compliance Matrix,
Sr. No. 35 ( page 124)
The database has load balancing mechanisms and
native, active-active clustering with objectives of
scalability and availability. The solution to provide
single image of database concurrently accessed by
multiple database servers, without repartitioning or
changes to the database
As the database high availability , load balancing and scalability
are critical requirements, it is suggested that there should be
some previous successful implementation of the proposed
solution in central/ state government in India.
It is SI's responsibility to select the database that
would fulfil the requirements and meet the SLA's
stated in the RFQ document. Previous
experiences/implementation shall be covered
during technical evaluation.
No
64Oracle India Pvt. Ltd.,
Gurgaon
Annexure IV
(General)
Compliance Matrix for Infrastructure (Suggestion for
Incorporation)
As the project requires significant database computation, we
request you to allow bidder to propose solution / database
appliance that can meet and exceed the SLA and requirement
of the project such as concurrency, response time, query
throughput, usable storage capacity, hence bidders should not
restricted to the database server specifications, storage
specifications and Interconnect network specifications as laid in
the RFP. The pre integrated platform will provide tighter
integration and optimization of all Database components
including Servers, Storage, Interconnect, OS and Database
Software and Options
No Change in RFP. Bidders must note that the
proposed appliance including DB, GIS platform,
Architecture is compatible with the proposed
infrastructure for SDC.
No
65Oracle India Pvt. Ltd.,
Gurgaon
Annexure IV
(General)
Compliance Matrix for Infrastructure (Suggestion for
Incorporation)
There is no separate UAT environment/ server, development
environment specified in the RFP, kindly provide/clarify.No Change in RFP No
66Scanpoint Geomatics
Ltd., Ahmedabad
Clause 5.1.4, (page
42)
Supply and maintenance of SAN based Data Mirroring
software between SDC and DR Site is required to be
done by the vendor.
Bidder should also be allowed to propose any data replication
technology other than the data mirroring which can effectively
meet the disaster recovery data protection requirements as per
given in clause 5.1.3
SAN Based Data Mirroring software is preferable
owing to the fact that in case of replication of
data to an offsite location, only systems need to
be restored or synchronized and not the data.
No
Commissioner Land Records Settlement, Madhya Pradesh Page 7 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
67Scanpoint Geomatics
Ltd., Ahmedabad
Annexure III
Compliance Matrix,
Sr. No. 6 ( page 121)
The solution has adherence to OGC (Open GIS
Consortium) Standards
As the database is integral part of the solution, should the data
types used for storing the spatial data be also certified and
adhered to OGC standards ?
Already addressed
68Scanpoint Geomatics
Ltd., Ahmedabad
AnnexureIII
Compliance Matrix,
Sr. No. 9 ( page 122)
The solution has support to store and use spatial
features in the database platform proposed
Spatial features of database are critical for application
performance and to reduce the complexity hence we suggest
that database should specifically provide support for vector and
raster spatial data formats, Network data model, Topology data
model, Linear referencing system, Spatial analytic functions,
Geocoding engine, Routing engine, 3D geometrics and point
clouds.
Already addressed
69Scanpoint Geomatics
Ltd., Ahmedabad
Annexure III
Compliance Matrix,
Sr. No. 12 ( page 122)
The solution has data input validations including
topology checks and building network models and
support Triangulated Irregular Network (TIN) data type
For performance and to reduce the complexity of the solution we
suggest that the mentioned features should be supported by
the database which can be used by the application.
Already addressed
70Scanpoint Geomatics
Ltd., Ahmedabad
AnnexureIII
Compliance Matrix,
Sr. No. 32 ( page 123)
The solution has data encryption capabilities
should database provide functionality to transparently encrypt
sensitive/ desired data (column, tablespace,etc. level) without
application required to encrypt/ decrypt?
Already addressed
71Scanpoint Geomatics
Ltd., Ahmedabad
Annexure III
Compliance Matrix,
Sr. No. 33 ( page 123)
The database supports partitioning
To make partitioning more effective and meet the performance
of the system, it is suggested that database should support on
data range, data value and hash function based partitioning,
further it should support partitioning on combinations.
Already addressed
72Scanpoint Geomatics
Ltd., Ahmedabad
Compliance Matrix,
Sr. No. 34 ( page 123)
The database has fault tolerance mechanisms to
quickly recover human error such as data corruption,
dropped table, etc and should be able to recover
tables, transactions to a previous point in time.
we understand that recovery from error , dropped table, etc.
should be possible with a command without restoration of
database.
Already addressed
73Scanpoint Geomatics
Ltd., Ahmedabad
Annexure III
Compliance Matrix,
Sr. No. 35 ( page 124)
The database has load balancing mechanisms and
native, active-active clustering with objectives of
scalability and availability. The solution to provide
single image of database concurrently accessed by
multiple database servers, without repartitioning or
changes to the database
As the database high availability , load balancing and scalability
are critical requirements, it is suggested that there should be
some previous successful implementation of the proposed
solution in central/ state government in India.
Already addressed
74Scanpoint Geomatics
Ltd., Ahmedabad
Annexure IV
(General)
Compliance Matrix for Infrastructure (Suggestion for
Incorporation)
As the project requires significant database computation, we
request you to allow bidder to propose solution / database
appliance that can meet and exceed the SLA and requirement
of the project such as concurrency, response time, query
throughput, usable storage capacity, hence bidders should not
restricted to the database server specifications, storage
specifications and Interconnect network specifications as laid in
the RFP. The pre integrated platform will provide tighter
integration and optimization of all Database components
including Servers, Storage, Interconnect, OS and Database
Software and Options
Already addressed
75Scanpoint Geomatics
Ltd., Ahmedabad
Annexure IV
(General)
Compliance Matrix for Infrastructure (Suggestion for
Incorporation)
There is no separate UAT environment/ server, development
environment specified in the RFP, kindly provide/clarify.Already addressed
76Scanpoint Geomatics
Ltd., AhmedabadSec 2.1.3
The bidder in case of single company or the prime
bidder in case of joint venture/consortium should have
CMM/PCMM/CMMi Level 3 or above certification.
Incase of joint venture/consortium only software firm should
have required CMM/PCMM/CMMi Level3 or above certification.Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 8 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
77Red Hat India Pvt.
Ltd., JaipurAnnexure III - Pt. 38
Domain should be configured using Windows Active
Directory Services for User Authentication, Policies
and Client Access Control
With such compliance matrix does the department want to
restrict/implies the SIs to quote only Microsoft solution as Active
Directory Service is proprietary to Microsoft and restrict other
directory services. By considering Windows Directory Services /
LDAP department is making vendor neutral specification.
Request to change it to Domain should be configured using
Windows Directory Services /LDAP for User Authentication,
Policies and Client Access Control
This shall be considered in the RFP YesAnnexure III - Pt.
38
78Red Hat India Pvt.
Ltd., Jaipur
1.22 Wide Format Flat
Bed Scanner (MAF
Required)-Point-19
Must support Windows Platform
With such statement department want to restrict the SIs to quote
only Microsoft solution. By considering OEM supported LINUX
platform department is making vendor neutral specification
Request to change it to Must support Windows /OEM supported
Linux platform.
Section Deleted. This item is not required for this
project. Yes
Annexure IV -
Sec 1.22
79Red Hat India Pvt.
Ltd., Jaipur
1.25 Desktop Video
Conferencing
Equipment Point -14
Should be configured for PC System with; USB Port;
MS Windows XP Professional OS
Video Conferencing is also available with OEM supported
Linux desktop OS. This statement restricts the SI to quote
Microsoft only, By considering OEM supported LINUX desktop
OS too not only department is making vendor neutral
specification but also getting Office Suite/office tools bundle with
OS at no extra cost.
Section Deleted. This item is not required for this
project.Yes
Annexure IV -
Sec 1.25
80Red Hat India Pvt.
Ltd., Jaipur
1.25 Desktop Video
Conferencing
Equipment-Point -19
Solution is integrated with Active Directory Services.
With such compliance does the department want to restrict the
SIs to quote only Microsoft solution as Active Directory Service
is proprietary to Microsoft and restrict other directory services.
By considering Windows Directory Services / LDAP
department is making vendor neutral specification. Request to
change it to Domain should be configured using Windows
Directory Services /LDAP for User Authentication, Policies and
Client Access Control
Section Deleted. This item is not required for this
project.Yes
Annexure IV -
Sec 1.25
81Red Hat India Pvt.
Ltd., Jaipur
Format for Original
Equipment
Manufacturer's
Authorization Form
We hereby extend our full guarantee and warranty as
per terms and conditions of the tender and the
contract for the equipment and services offered
against invitation for tender offer by the above firm.
Does warranty clause is restrict to only on hardware as warranty
terminology used for hardware component only. If it is also
applicable for Server OS/DATABASE or any other server
system software than kindly clarify by including OEM will provide
the security updates, patches, hot fixes & support for entire
period of the project.
Since this is on a PPP mode for 5 years, it is
understood that the SI has to provide these
supports to the dept.
No
82Red Hat India Pvt.
Ltd., JaipurAdditional Server Operating System
Server Operating System is one of major system software for
any mission critical project success. Since no specification of
server operating system is mentioned in the RFP . Request to
consider below mentioned for general conditions for server OS
to avoid any free ware or unsupported system softwares.
Already addressed
83Red Hat India Pvt.
Ltd., JaipurAdditional Server Operating System
1.Proposed system software should be OEM supported ,
Enterprise level Industry Standard , Open Standard, IRP clause
compliance.
Already addressed
84Red Hat India Pvt.
Ltd., JaipurAdditional Server Operating System
2.Proposed system software OEM must be present directly in
India from at least last 5years with full fledged office and must
have own full fledged support center in India.
Already addressed
85Red Hat India Pvt.
Ltd., JaipurAdditional Server Operating System
3.Proposed system software should have longer product life
cycle minimum project period plus 2 years (at least 7years )
includes security updates, upgrades hotfix for bugs and patches
to avoid non-availability of various device driver(current and
future) support.
Already addressed
86Red Hat India Pvt.
Ltd., JaipurAdditional Server Operating System
4.Proposed Operating system must be registered with Rate
Contract e.g DGSnD.Already addressed
87Red Hat India Pvt.
Ltd., JaipurAdditional Server Operating System
5.The System software including operating system should be
certified for different types of hardware and should have
adequate security, availability, manageability, adaptability, and
different languages especially Hindi (Unicode) language support
and must be being used in any large e Governance project.
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 9 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
88Red Hat India Pvt.
Ltd., JaipurAdditional End of life clause for Server System Software
Software technology charges very fast and 5 years is too large
period for any software technology for end of life. To avoid any
such situation please consider below general condition to have
proper/latest technology with customer. "No Server System
Software proposed under the bidding document should be
marked for „end of life‟ till the tenure of the project. Any
software for which support (Security update, patches & hotfixes
for bugs) by the OEM has been withdrawn will have to be
replaced with an equivalent or higher product, software with
OEM support during the project life cycle All proposed server
system software should be available from the OEM till the
tenure of the Project"
Already addressed
89Red Hat India Pvt.
Ltd., JaipurClause No. 4.12 Intellectual Property Rights
The clause talks about for form or format designed of DATA only
. Clause does not talks any IPR compliance for any System
Software supplied under the project. This may allow SI's to offer
you NON-IPR compliance system software under the project
Server OS has been added to the existing
statement.Yes Sec 4.12
90Red Hat India Pvt.
Ltd., JaipurAdditional Industry Standard Clause
As per the RFP Industry Standard clause compliance only
limited to BROWSER ( at page no. 64/5.3.13.2.16) , GIS &
DATABASE (at page no. 80/6.1.2) ,APPLICATION
DEVELOPMENT PLATEFORM (at page no. 80/6.1.3.1) and for
ANTI-VIRUS- Enterprise Editions (at page no. 85/6.6.3) but RFP
does not talks about Industry Standard & Enterprise level server
operating system as well as any application server/middle ware
requirement. As above mentioned clauses are mandatory
condition in all government tender which also avoid any legal
issue
No change to be made in existing clause No
91 NIIT GIS, New Delhi 1.3.5
Quality checks, validation and porting of the spatial
and non-spatial data to the developed system and
integration of Spatial and Non-Spatial Data. This
includes existing spatial and non-spatial data supplied
by CLR as well as spatial and nonspatial data
developed and supplied by CLR from time to time.
1) Is the existing GIS data required to be directly ported into the
system or needs modification before porting? 2) What is the
time line to complete spatial data development?
For Pt. 1, Refer to Sec 5.5. For Pt. 2, Refer to
Sec 4.26 for Milestones for commissioning of
solution at Pilot locations and all 342 locations
along with Sec 5.6.8.2 for timeline during
Operation period of 5 yrs.
No
92 NIIT GIS, New Delhi 5.3.1
The scope includes system study, requirement
analysis, design, development, testing,
implementation, commissioning, running and
maintenance of Enterprise Web based GIS application
with facility for editing the spatial and attribute data
over web browser and having options to perform day
to day mutation, modification, updates, reports,
generation and printing of demand notes, collection
receipts, online retrieval and storage of old/legacy data
and all other activities of the department related to
maintenance and use of land records
What is the no. of concurrent GIS users need facility for editing
the spatial and attribute data over web browser?Answered for Wipro Ltd. No
93 NIIT GIS, New Delhi 6.3.1.1.3 Map Editing UsersWhat is the no. of concurrent GIS users need facility for editing
the spatial and attribute data over web browser?Answered for Wipro Ltd. No
94 NIIT GIS, New Delhi 5.3.10.2
The information on details/fields and the type of
records to be provided via SMS services shall be
decided and finalized by CLR at the time of finalization
of SRS/SDD.
We understand that GIS Functionality is NOT required in the
mobile application. Please confirm?
Not required. Only attribute details pertaining to
Khasra shall be required like Owner Name,
Father's name, Area etc. The same has already
been stated in the RFP
No
95 NIIT GIS, New Delhi Annexure III - Pt. 7 The solution has adherence to GoI fonts standards Please share the GoI Font Standards Can be referred on http://egovstandards.gov.in No
96 NIIT GIS, New DelhiAnnexure IV - Sec 1.8
- Pt. 8High Availability with no single point of failure Is web GIS application desired as High Available
The proposed solution is desired as high
available and appropriate SLA's for response
time criteria have been mentioned in Sec 7.6
No
Commissioner Land Records Settlement, Madhya Pradesh Page 10 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
97 NIIT GIS, New Delhi Sec 5.3.6.8 General GIS Spatial queriesWhat are the desired spatial queries from the proposed system
with specific reference to no. of queries?
List of actual GIS spatial queries shall be
finalized at the time of SRS. Eg: List out Govt.
Lands within a tehsil, Thematic mapping etc.
No
98 NIIT GIS, New Delhi Sec 5.3.11.4
Tools for editing map data with user permissions
authentication with audit trails, undo options and
versioning. Easy to use editing tools should be
available for example: split/divide the parcels based on
selected criteria like equal area or using lines drawn
(with snapping to intersections or edges)
Since land record editing requires highest level of accuracy and
authorization before accepting the change, we suggest having
this functionality on desktop at administrative level for data
updation. Please clarify?
No. These features shall be done from the
Solution developed and available over the web
browser and not as Client-based.
No
99 NIIT GIS, New Delhi Section 5.3.15 Additional Requirements for special external usersWhat are the modules that will have GIS interface for external
users
Flow charts mentioned in RFP is self-
explanatoryNo
100 NIIT GIS, New Delhi Additional Mobile GIS Requirement
Is it desired to access the desired web GIS application on
mobile smart phones. If "Yes", 1) How many concurrent users
will access the application on mobiles 2) Is the spatial and non-
spatial updation desired in on-line or off-line modes.
Mobile GIS is not required in this project. No
101
Microsoft
Corporation,
Gurgaon
Annexure - III, Pt. 35
The database has load balancing mechanisms and
native, active-active clustering with objectives of
scalability and availability. The solution to provide
single image of database concurrently accessed by
multiple database servers, without repartitioning or
changes to the database
The current specification details the internal working of the
database (which can be little different across the industry
standard databases that exists today), whereas the foucs
should be to meet the desired scalability and availability SLA
requirements. This restricts the bidder to propose a suitable,
cost effective and managable solution. It is requested you to
change the same to -
"The database should provide mechanism for failover clustering
and load balancing with objectives of scalability and availability.
The solution should be designed in a manner to achieve the
desired level of uptime and performance SLA as indicated in the
RFP."
Already addressed
102
Microsoft
Corporation,
Gurgaon
Page no 120,
ANNEXURE III:
COMPLIANCE
MATRIX FOR
ENTERPRISE
APPLICATION
SOFTWARE
The tender asks about requirements of reporting, report builder
and integration of data at multiple places (some references can
be found at page 64, section 5.3.13.2.12, Page 11 section 1.3.2,
1.3.11, Page 44 section 5.3.1).
Pls clarify if it is required for the bidder to include the following
components as well as part of the solution -
1. Report Builder (with adhoc report builder) and extensive
Reporting Capabilites
2. ETL (Extract, Transform, Load) for data level integration
No Change in RFP No
103
Microsoft
Corporation,
Gurgaon
Annexure III Suggestions for DMS Should support Virtualization. No
104
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould support roles based access and authentication via
directory services such as Active Directory.No
105
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSMust provide support for database level failover without the
requirement of any shared storage such as SAN etc.No
106
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould support Backup & Restore of Content Database where
documents and other contents are stored.No
107
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should support customization of Look & Feel of the Portal. No
Please note that proposed DMS is an additional
module within the Web GIS application. As such,
role based access and authentication, backup
and restore, data mirroring and all other features
etc. already made available in web-GIS
application shall also be usable for this module.
Commissioner Land Records Settlement, Madhya Pradesh Page 11 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
108
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS
Should support broad range of standards like HTML, HTTP,
HTTPS, ODBC , ODF (IS26300) , Open XML (IS29500),
OpenSearch, PDF 1.7, PDF/A, RTF, RSS, ATOM, SOAP, SVG,
REST, UDDI, Unicode, URI/URN, W3C XML Schema, WCAG
2.0, WebDAV, WSDL, WSRP, XHTML, XML, XML Web
Services, XPATH, XPS, XSLT etc.
No
109
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould integrate with any other Portal through open standards
such as HTML, XML, RSS, Web Services and WSRP.No
110
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould support Content Management Interoperability Standards
(CMIS).Already addressed.
111
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should be XHTML 1.0/WCAG 2.0 AA compliant. No
112
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should provide Cross Platform, Zero Footprint Client Access.. No
113
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should support Multilingual Operation. No
114
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should support scaling to 100 Million Documents or Higher. No
115
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould support multiple roles (e.g. editor, facilitator, community
manager, moderator) with associated access controls.No
116
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Support for “Drag & Drop” File Upload. Already addressed
117
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSSupport for document version control (major/minor versions),
check in / check out & audit trails.Already mentioned in RFP. No
118
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should support Managed Metadata. No
119
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould provide support for Policies/Guidelines for Document
Retention, Disposition, Expiration etc.No
120
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould support Document sets and Document IDs (unique ID
for each document).No
121
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should support Records Management. Already addressed
Please note that proposed DMS is an additional
module within the Web GIS application. As such,
role based access and authentication, backup
and restore, data mirroring and all other features
etc. already made available in web-GIS
application shall also be usable for this module.
Please note that proposed DMS is an additional
module within the Web GIS application. As such,
role based access and authentication, backup
and restore, data mirroring and all other features
etc. already made available in web-GIS
application shall also be usable for this module.
Minimum specifications have been stated in
RFP. Bidder's responsibility to select the best
solution to meet or exceed the SLAs and
requirements stated in the RFP.
Commissioner Land Records Settlement, Madhya Pradesh Page 12 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
122
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should support Digital Asset Management. No
123
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should provide support for Document tagging and ratings. No
124
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should support Content Archiving Capabilities.
125
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould provide support for Web Browsers including Internet
Explorer, Safari, Firefox etc.
DMS is an internal module in Web Based GIS
application. Hence, Pt. 4 in Annexure III is
applicable here.
No
126
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould provide support for standard Web Browser Technologies
like HTML, JavaScript, CSS etc.No
127
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould provide support for viewing/creating/editing for popular
office productivity document in Web Browser.No
128
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS
Should provide support for Document Lifecycle Management
with stages like Draft, Approval In Progress, Approved,
Published etc.
No
129
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould support document linking capabilities (static, dynamic,
and/or other)No
130
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould support collaboration with external users beyond the
firewall.No
131
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should support Email for Records Management. No
132
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should provide active policy management approach for email. No
133
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould provide support for full text indexing of documents
(Microsoft Office Documents, PDF, TIFF etc.)No
134
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should support metadata search, attachment. No
135
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMSShould be able to search Document Libraries, Web Sites, File
Shares, Exchange Server etc.No
136
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS
Should be able to search Line of Business Systems like SAP,
SQL Server Database, Oracle Database etc. so that these
systems are crawled and searched with integrated relevance
and results in a single user interface.
No
Minimum specifications have been stated in
RFP. Bidder's responsibility to select the best
solution to meet or exceed the SLAs and
requirements stated in the RFP.
Minimum specifications have been stated in
RFP. Bidder's responsibility to select the best
solution to meet or exceed the SLAs and
requirements stated in the RFP.
Commissioner Land Records Settlement, Madhya Pradesh Page 13 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
137
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should support federated search. No
138
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS Should provide capability to customize search. No
139
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DMS
Should be in Leader’s Quadrant in Gartner Report on Enterprise
Content Management Platforms and Information Access
Segment.
No Change in RFP No
140
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DatabaseSupport for High Availability Clusters to provide for a fail over
environmentAlready mentioned in RFP No
141
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database
The database platform must have benchmarks available at
www.tpc.org such as TPC-E and TPC-H. The TPC-E
benchmark, introduced in February 2007 to measure OLTP
performance while TPC-H benchmark is a decision support
benchmark.
No
142
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database
Database should have received the security certification from
the International Common Criteria for Information Technology
Security Evaluation.
No
143
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DatabaseShould have built-in multi-server management and policy based
management capabilities.No
144
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database
Database should provide High availability & Disaster recovery
using cost effective option of automatically synchronizing the
transaction data to disaster site, which in case of fail over the
other node provides the availability of all data.
No
145
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DatabaseMust provide support for database level failover without the
requirement of any shared storage such as SAN etc.No
146
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database
The database software proposed should be from an OEM with
presence in India (and easy availability of skilled resources for
the product in India) and should not restrict department from
using the application or data or database structure in any future
requirement.
No
147
Microsoft
Corporation,
Gurgaon
Additional Suggestions for DatabaseThe database should have inbuilt functionality and licenses for
following given capabilities:No
148
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database a. Advanced Web Based Reporting Services No
149
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database b. Data warehousing and Analysis Services. No
150
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database c. Business Intelligence No
151
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database d. Complete ETL functionality No
152
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database e. Performance Management Tools and Resource Governors No
Minimum specifications have been stated in
RFP. Bidder's responsibility to select the best
solution to meet or exceed the SLAs and
requirements stated in the RFP.
It is SI's responsibility to select the database that
would fulfil the requirements and meet the SLA's
stated in the RFQ document.
Commissioner Land Records Settlement, Madhya Pradesh Page 14 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
153
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database f. Clustering Tools No
154
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database g. Tuning and Diagnostics Tools No
155
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database h. Spatial Database Capabilities No
156
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database i. Database Compression and Encryption Tools No
157
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database j. Replication Technologies for Failover to Remote Sites. No
158
Microsoft
Corporation,
Gurgaon
Additional Suggestions for Database k. Database security such as Transparent Data Encryption No
159
Trimax IT
Infrastructure &
Services, Mumbai
2.1.3
The bidder in case of single company or the prime
bidder in case of joint venture/consortium should have
CMM/PCMM/CMMi Level 3 or abovevcertification.
As per the RFP document consortium/joint venture is allowed,
request you to please consider that CMM/PCMM/CMMi Level 3
should be of any of the partner/member in case of Joint Venture/
Consortium. Because by specifying such certification only of
prime bidder in case of joint ventur / consortium will restrict the
good and healthy competition to those SI's who does not
possess such certification but having other certification and also
vast experience to execute multi million project in Government
Domain. So, It is our humble request to consider our request.
Already addressed
160
Trimax IT
Infrastructure &
Services, Mumbai
2.3.1Certifications for quality (of Prime bidder in case of
Consortium/Joint Venture)
As per the RFP document consortium is allowed, request you to
please consider that CMM/ PCMM/ CMMi Level 3 should be of
any of the partner/ member in case of Joint Venture/Consortium.
Already addressed
161Rolta India Ltd.,
MumbaiGeneral
Please state whether desktop GIS is required? IF yes kindly
mention number of desktop GIS users, editing seats required?
No. This is a web-based application wherein GIS
usage shall be done over a web browser.No
162Rolta India Ltd.,
Mumbai
Please specify whether the digitized cadastral maps are
seamless for entire State?Mosaiced maps available upto village level only No
163Rolta India Ltd.,
MumbaiAre the digitized cadastral maps geo-referenced?
Not geo-referenced. Clearly mentioned in Sec
5.5.1 as "local coordinates"No
164Rolta India Ltd.,
Mumbai
Please specify the source of geo-referencing the cadastral
maps?Not applicable No
165Rolta India Ltd.,
Mumbai
Please clarify if any DGPS survey has been done for geo-
referencing of the cadastral maps?Not applicable No
166Rolta India Ltd.,
Mumbai
Please specify the projection system for the data to be
integrated in the Web GIS?
Current data as per Sec 5.5.1 shall be imported
as it is. New data generated through survey
(another project) shall be in UTM-WGS84 and
would replace the current data in the web GIS
as and when made available
No
167Rolta India Ltd.,
MumbaiWhat positional accuracy is required while projecting the data?
The current data shall be projected as it is on
the basis of its local coordinates. New data
generated through Survey in UTM WGS84
should match the exact positional accuracy as
per the data available.
No
It is SI's responsibility to select the database that
would fulfil the requirements and meet the SLA's
stated in the RFQ document.
CLR has the village levels cadastral maps in digitized
format in local coordinates in AutoCAD dwg format
for the complete jurisdiction of Madhya Pradesh.
Separate attribute data is already computerized and
available in MS-SQL format.
Sec 5.5.1
Commissioner Land Records Settlement, Madhya Pradesh Page 15 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
168Rolta India Ltd.,
MumbaiSec 5.5.2
The scope of work of the successful bidder includes
performing quality checks and validation of spatial as
well as non-spatial data in terms of correctness and
completeness as well as bringing the data into the
usable condition in the Enterprise Web based solution
provided by the bidder.
Please specify whether the computerized attribute data has
been standardized / codified for linking with the GIS layer.
Yes. Codification present based on Khasra IDs.
However, the fonts currently used in SQL data
are not in UNICODE.
No
169Rolta India Ltd.,
MumbaiGeneral
Please specify the procedure for validating the discrepancies
found in the attribute data while GIS integration.
Refer Sec 5.5.5, 5.5.6 and 5.3.11.7 for more
clarity. No
170Rolta India Ltd.,
Mumbai5.1.4
Supply and maintenance of SAN based Data Mirroring
software between SDC and DR Site is required to be
done by the vendor
Please elaborate on SAN requirement for data mirroring. Already answered for Oracle India No
171Rolta India Ltd.,
Mumbai5.2
Vendors have to establish IT Centers at all department
user locations (342 in number at each Tehsil Level)
Please clarify whether the Specification mentioned in Annexure
IV for establishing the IT centers are the final requirements to be
provided by the bidder. If there are any additions please specify
in details
Specifications given in Annexure IV and
requirements stated in RFP are minimum
specifications for all hardware items needed for
single IT centre. Interested vendors are
suggested to do a site visit to get a clearer idea.
No
172Rolta India Ltd.,
Mumbai5.3.6.13.2
It should also be noted that, demand may also arise to
increase the number of locations of IT Centres
(Currently 342) due to changes in administrative
divisions or due to any other administrative reasons.
The solution should have consideration for the same
at no additional cost other than the bidder‟s share for
transactions as mentioned under the section 4.27 -
“Payment Terms” (Pg. 35).
Please clarify to what extent the number locations of IT centers
(currently 342) may increase.Already addressed
173Rolta India Ltd.,
Mumbai5.5.1
2. State of the data Digitized in AutoCAD as well as
ESRI Shape format
Please clarify whether the present cadastral Maps (AutoCad and
Shape files ) should bring in common GIS platform
Vendor is being informed that data is available in
2 formats for their information. 1 data format
shall be loaded into the system after which
subsequent changes to map data shall take
place through the Web GIS application.
No
174Rolta India Ltd.,
Mumbai5.4
The vendors shall provide functional training as well as
administrative training to all the stakeholders of the
system in manageable batches at each location.
However, the batch size should be limited to a
maximum of 10 persons at a time.
Please specify the number of functional officials and
administrative officials at each center for assessing the number
of training sessions required.
Refer Sec 5.4.7 for details on indicative total no.
across the state based on which no. of training
sessions required can be assessed. Staff at
individual centres cannot be ascertained at this
stage.
No
175Rolta India Ltd.,
Mumbai6.3.1.1.3.1
Map Editing Users: These users use the GIS
application to view the spatial and/or attribute data.
There should be map navigation options and query
options.
For creating a user friendly web site with good navigational
structure, please clarify the navigation structure and levels?Basic navigation structure specified in 5.3.6.3 No
176Rolta India Ltd.,
Mumbai5.3.6.13.1
The application should have facility to take care the
changes resulting from formation of new
administrative boundaries (like formation/change of
Districts / Tehsils / RI Circle /Patwari Halka etc.). It also
should have back track facility.
Please clarify whether the stated requirement can be done at
the state data centre as this will require advanced spatial
operations.
Ok. No
177Rolta India Ltd.,
Mumbai2.1.4
The bidder in case of single company or the prime
bidder in case of joint venture/consortium should have
an office in Gwalior, Madhya Pradesh or should agree
to open an office in Gwalior, Madhya Pradesh within 2
weeks from the date of Signing of Contract Agreement
in the event of awarding the project to them and
operate it till completion of this project.
Request you to relax period of the opening of office from 2
weeks to 8 weeks in Gwalior, MPPeriod of opening of office extended to 8 weeks. Yes 2.1.4
Commissioner Land Records Settlement, Madhya Pradesh Page 16 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
178Rolta India Ltd.,
Mumbai5.3.5.4
In order to provide an indicative idea to the bidders
about the volume of data entry to be done,
approximately 1,00,000 data sheets are available with
the department for the entire State of Madhya Pradesh
with each sheet having a matrix of 1 row x 20
columns. A sample copy of the data sheet shall be
provided to the bidders upon written request. Bidders
should note that the figure mentioned above is merely
indicative and is subject to change.
Please provide us the sample document for estimation.Dept. shall try to scan and upload a copy of the
said document on its website at the earliest.
179
Silver Touch
Technologies,
Ahmedabad
5.3.5.4
In order to provide an indicative idea to the bidders
about the volume of data entry to be done,
approximately 1,00,000 data sheets are available with
the department for the entire State of Madhya Pradesh
with each sheet having a matrix of 1 row x 20
columns. A sample copy of the data sheet shall be
provided to the bidders upon written request. Bidders
should note that the figure mentioned above is merely
indicative and is subject to change.
Please provide us the sample document for estimation. Already addressed
180
Silver Touch
Technologies,
Ahmedabad
SECTION 6:
TECHNICAL
REQUIREMENTS,
6.6 System Security
Design Requirements,
Point 6.6.1
The Solution should have stringent multi-level system
security design to prevent infected clients
As in security design stringent multi-level system security
design, please advice if you are looking for dedicate security
appliance (Firewall & IPS) at perimeter for internet and intranet
at DC & DR, If yes please correct the BoQ given in RFP ?
Existing IPS/IDS for SDC to be used. Refer
Annexure VIII for specs.Yes Annexure VIII
181
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 24
Port Giga Switch
4 Nos. GBIC ports with support for 1000 Base
SX/LX/LH/ZX. Vendor must configure ports for
commissioning
Please amend this to : 4 Nos. GBIC/SFP ports with support for
1000 Base SX/LX/LH. Vendor must configure ports for
commissioning
Shall be amended in the RFP. Yes
ANNEXURE IV:
24 Port Giga
Switch
182
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Switch control module with 2 GE (GBIC)
ports fully configured
Please amend this to : Should have switch control module with
500+ Gbps of switching backplane
Item removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
183
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
point 6 : Must have min. 6 GE Ports fully configured;
point 7 : Must have min. 32 10/100/1000 Ethernet
ports and point 9 : Must have min. of two 2-Port GE
I/O Module
Please amend this to : Must Have minimum 48 x 10/100/1000 G
ports
Item removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
184
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have SSL Termination
Please amend this to : Should have 3000 SSL TPS from day
one and should be upgradeable to 30,000 SSL TPS via
software license upgrade without any change in hardware
Item removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
185
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have min. of two session accelerator modules
Please amend this to : Should have hardware based HTTP
compression built in for application acceleration supporting
1Gbps compression from day one and should be upgradeable
to 6 Gbps via software license without any change in hardware
Item removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
186
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Active-Active layer 5 ASRPlease amend this to : Should support stateful failover between
two SLB units without any change required in network topology
Item removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
187
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have VIP redundancy Please remove this clauseItem removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
188
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Aggregate Bandwidth 20 Gbps
Please amend this to : Should support 4 Gbps L4/L7 throughput
from day one and should be upgradeable to 16 Gbps via
software license without any change in hardware
Item removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
189
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must support WebNS 8.10 Features Please remove this clauseItem removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
Commissioner Land Records Settlement, Madhya Pradesh Page 17 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
190
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Hotspare Feature Please remove this clauseItem removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
191
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Auto Discovery and addition and removal
of Server resources without disrupting servicePlease remove this clause
Item removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
192
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Load Balancing Predicator : Least Connection +
Server Response TimePlease remove this clause
Item removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
193
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Global Server Load Balancing Feature Please remove this clauseItem removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
194
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Please AddShould support HTTP deep packet inspection (HTTP header,
URL, and payload)
Item removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
195
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Please Add Should support Virtual connection state for UDPItem removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.7
196
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Must support OPSEC or Equivalent Please remove this clauseItem removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.8
197
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Should support Virtual Router Redundancy Protocol Please remove this clauseItem removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.8
198
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Content filtering, URL filtering support, SPAM mails
filteringPlease remove this clause
Item removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.8
199
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Please add The firewall should support SSL VPNItem removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.8
200
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Please add The security appliance should support virtual firewalls contexts
for logical segregation of traffic flows.
Item removed. Existing infrastructure at SDC to
be used.Yes
ANNEXURE IV:
1.8
201
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE,
1.9 24 Port
Manageable Switch
1U Rack-Mount
24 Nos. 10/100Mbps RJ-45 MDI-X ports,
2-port Single Mode 1000BaseX(SX) module port
(inbuilt)
Vendor shall configure the 1000BaseX Port for
connectivity to multimode Fiber Optic Cable
Please amend this to : 1U Rack-Mount
24 Nos. 10/100Mbps RJ-45 MDI-X ports,
2-port Multimode Mode 1000BaseX(SX) module port (inbuilt)
Vendor shall configure the 1000BaseX Port for connectivity to
multimode Fiber Optic Cable
Item removed. Existing infrastructure at SDC to
be used. For DR site and IT Centres, the
specifications proposed/implemented for SDC
should be used.
YesANNEXURE IV:
1.9
202
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must support hardware assisted VPN encryption
modules
Please amend this to : Must have hardware assisted VPN
encryption modules/ onboard from Day 1
Item removed. Routers to be provided by
MPSEDCYes
ANNEXURE IV:
2.2
Commissioner Land Records Settlement, Madhya Pradesh Page 18 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
203
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must support 256Kbps onwards and up to 24Mbps or
more bandwidth
Please amend this to : Must support 256Kbps onwards and up
to 4 Mbps or more bandwidth
Item removed. Routers to be provided by
MPSEDCYes
ANNEXURE IV:
2.2
204
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must Support FirewallPlease amend this to : The Router should be able to support a
Stateful and Zone Based Firewall.
Item removed. Routers to be provided by
MPSEDCYes
ANNEXURE IV:
2.2
205
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement
The router should support adaptive routing adjustments by
doing routing path selection based upon advanced criteria like
Response time, packet loss, delay, jitter, MOS, path availability,
traffic load and cost policies to intelligently control the traffic to
maximize the quality of the user experience.
Item removed. Routers to be provided by
MPSEDCYes
ANNEXURE IV:
2.2
206
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement Should support hierarchical QoS for voice and video Item removed. Routers to be provided by
MPSEDCYes
ANNEXURE IV:
2.2
207
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement
Should support detailed performance monitoring tools to
measure state of the network in real time. The SLA operations
shall provide information on TCP/UDP delay, jitter, application
response time, VoIP MOS score, Packet Loss etc.
Item removed. Routers to be provided by
MPSEDCYes
ANNEXURE IV:
2.2
208
Silver Touch
Technologies,
Ahmedabad
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE,
1. Indicative quantities
for IT Infrastructure
Point 50 : Router
Please clarify if you have asked the same specification for the
DC & DR router as of IT center router? Further you have asked
only 4 router each at DC &DR, presuming these are 2 each for
WAN and internet, still router for the replication among DC & DR
are missing?
Existing router at SDC being provided by
MPSEDC to be used. Same specifications to be
adopted for DR site.
Yes Annexure VIII
209
Silver Touch
Technologies,
Ahmedabad
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE,
1. Indicative quantities
for IT Infrastructure
Multi-protocol Router for SAN Based Mirroring Please advice with the specifications for this product
Existing router at SDC being provided by
MPSEDC to be used. Same specifications to be
adopted for DR site.
Yes Annexure VIII
210
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE;
1.5 24 Port SAN
Switch
Must be activated and fully configured for 24- PORTS
along with required SAN Host Connectivity and
licenses
Please amend this to : Must be activated and fully configured for
24- PORTS along with required SAN Host Connectivity and
licenses and additional 2 Nos of dedicated 10 Gbps FC ports
for a high speed stacking or linking.
No change in RFP No
Commissioner Land Records Settlement, Madhya Pradesh Page 19 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
211
Silver Touch
Technologies,
Ahmedabad
SECTION 6:
TECHNICAL
REQUIREMENTS
Requirement of Core Router for connecting DC and
DR ?
As per the RFP BOQ "ANNEXURE VI: INDICATIVE
QUANTITIES FOR IT INFRASTRUCTURE" Requirement of
Core Router for connecting State data centre to Disaster
Recovery has not been mentioned Kindly clarify on that
Existing router at SDC being provided by
MPSEDC to be used. Same specifications to be
adopted for DR site.
Yes Annexure VIII
212
Silver Touch
Technologies,
Ahmedabad
SECTION 6:
TECHNICAL
REQUIREMENTS
Desktop based Video Conferencing
Are you looking for looking for a Software Based/Server Based
solution only or are you looking for hardware based VC solution
with centralized MCU
Section Deleted. This item is not required. YesAnnexure IV:
1.25
213
Silver Touch
Technologies,
Ahmedabad
SECTION 6:
TECHNICAL
REQUIREMENTS
Desktop based Video Conferencing
As L&R department have 342 locations IT Centers, 1 Ho and
DC & DR , Please clarify how many multiparty connectivity on
video conferencing is department looking for to connect
simultaneously or concurrently
Section Deleted. This item is not required. YesAnnexure IV:
1.25
214
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.25
Desktop Video
Conferencing
Equipment
Dialing Capabilities; Directory Service; Internet Locator
Service (ILS) support; H.323 external gatekeeper,
gateway and MCU support
Please clarify if H.323 based solution or will the SIP based
solution also accepted as the features desired can be fulfilled by
SIP based solutions
Section Deleted. This item is not required. YesAnnexure IV:
1.25
215
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.25
Desktop Video
Conferencing
Equipment
Instance messaging and presence is provided
Are you looking for software based solution which can provide a
client and web camera solution at the spoke location and a
server which can cater to video capabilities at the DC / DR
Location
Section Deleted. This item is not required. YesAnnexure IV:
1.25
216
Silver Touch
Technologies,
Ahmedabad
ANNEXURE IV: 1.25
Desktop Video
Conferencing
Equipment
Internal Processor Based Please clarify what does this statement means, what is expected Section deleted. YesAnnexure IV:
1.25
217
Silver Touch
Technologies,
Ahmedabad
2.1.2
The bidder in case of single company or the prime
bidder in case of joint venture/consortium should have
a minimum cumulative turnover of Rs. 25 Crores in
the last 3 financial years in providing IT solutions,
minimum networth of Rs. 50 Crores and it should have
made profits in the last 2 financial years
Please clarify whether the net worth asked of Rs. 50 crores is for
last year/ Single year or it is cumulative for last 3 years. Besides
this Net worth of Rs. 50 Crore is too high and not in line and
anywhere in comparison to asked cumulative turnover of Rs. 25
Crores in the last 3 financial years. Please clarify and reduce the
asked Networth to Rs. 10 Crore cumulative in last 3 Years.
Already addressed
218Emerson Network
Power, Thane1.29 - Page No. 150 30Kva UPS Modular Rack Mountable UPS System Request for Generalise the specifications
Section Deleted. Existing infrastructure at SDC
to be used.Yes
Annexure III -
1.29
219Emerson Network
Power, Thane
1.40 - Page No. 165 &
166Precision Air Conditioning for Server Room Specifications need elobration
Existing infrastructure at SDC to be used.
Specifications stated in RFP to be used for DR
Site only
YesAnnexure III -
1.30
220Emerson Network
Power, Thane2.10 - Page No. 174 1.0Kva UPS Specifications need elobration Item description not seen in RFP. No
221Emerson Network
Power, Thane1.29 - Page No. 150 30Kva UPS Modular Rack Mountable UPS System
The module rating asked is vendor specific . Each OEM has a
different module sizing. Hence request to remove this point
Section Deleted. Existing infrastructure at SDC
to be used.Yes
Annexure III -
1.29
222 RMSI Pvt. Ltd., Noida 1.3.3 Only space shall be provided by the departmentWe assume that “space” means constructed space with basic
structure (walls, windows, floor, roof, door etc.). Please confirm.
Yes. Indicative work for IT centres can be
referred to in Annexure - IVNo
223 RMSI Pvt. Ltd., Noida 1.3.5
Quality checks, validation and porting of the spatial
and non-spatial data to the developed system and
integration of Spatial and Non-Spatial Data
We request to provide sample and representative dataKindly arrange to submit a written request to
CLR office in this regard.No
224 RMSI Pvt. Ltd., Noida 1.3.10Provision of SMS Gateway for applicants to receive
and view the records through SMS.
We assume that through SMS, the sender need to view only
very basic attribute data of the records (below text information
pulled from up to 5 fields containing total character length below
255) and not detailed records or spatial data. Please confirm.
Only Basic Attribute information like Owner's
Name, Father's name, Area etc shall be
required. Spatial data or detailed records are not
required. Actual fields and character lengths to
be finalized during SRS.
No
225 RMSI Pvt. Ltd., Noida 1.4.1 Digitization of Cadastral Maps Requesting to provide representative sample dataKindly arrange to submit a written request to
CLR office in this regard.No
226 RMSI Pvt. Ltd., Noida 1.4.2 Non-spatial Khasra data Requesting to provide representative sample dataKindly arrange to submit a written request to
CLR office in this regard.No
Commissioner Land Records Settlement, Madhya Pradesh Page 20 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
227 RMSI Pvt. Ltd., Noida 1.4.4 Network
What is minimum and average bandwidth that shall be made
available exclusively for this project at user locations? (a)
Between DC and DR (b) Between DC and 342 IT Centre
Locations
Minimum 2 Mbps connectivity to be provided
through SWAN inclusive for all projects.
However, this is expandable as per requirement.
Yes Sec 1.4.4
228 RMSI Pvt. Ltd., Noida 1.4.5Conversion of Existing Record Rooms to Cyber
Record Rooms
If the Record Room Project got delayed due to any reason and
did not get completed before the implementation schedule of
this project, the scope to connect to the Record room will have
to be removed from the scope without affecting any financials
including no commitment from the vendor’s side to include this
at a later stage as part of this RFP.
Scope pertaining to DMS shall not be removed
in event of any delay from another project.
Vendor shall not be penalized for any delay from
the other project.
No
229 RMSI Pvt. Ltd., Noida 1.4.5.2
As part of this RFP, the Enterprise GIS Solution
vendor is required to develop modules for
management & easy retrieval of data /documents….
Does it mean that vendor needs to create fresh modules for
document management system in an enterprise environment
irrespective of the fact that the department is already developing
a document management system for the record rooms in a
desktop/local level?
Yes provided the vendor selected for this project
is different from the one selected for
implementing DMS at Record Room Locations
through another project. Incase the vendor
selected is the same, he can opt for
upgrading/integrating his desktop based DMS
application into the proposed Enterprise Web
Based GIS Solution
No
230 RMSI Pvt. Ltd., Noida 1.4.5.2
Vendor is required to develop modules for
management & easy retrieval of data/ documents as
well as for providing citizen services (through the IT
centers specified in this RFP) pertaining to record
rooms as an integral part of its solution in an
enterprise level
No share to vendor is mentioned for retrieving and delivering
copies of records from the Record Room through the solution
provided. Requesting to add share to vendor in 4.27 Payment
Terms
Already mentioned clearly in Sec 4.27 - Pt. 5,6
and 7. Refer to terms "Current/Old records"No
231 RMSI Pvt. Ltd., Noida 4.23.2.4
Any minor modifications/ enhancements required
and/or requested by CLR in the Enterprise Web
Based GIS solution
What is considered as minor? Please mention the maximum
number of man hours to be committed by the vendor as part of
this clause.
Any enhancements /modifications required to
ensure proper functionality of the developed
web-based solution. As such, manhours cannot
be laid down by the department.
No
232 RMSI Pvt. Ltd., Noida 4.27 Payment Terms - 9. SMS Gateway
At the given rate of Rs 2/-, it is difficult to provide copy of land
records (Khasra/ B1/Map/Record Room Document) to the
applicant. We request to restrict supply of very basic details
about the land parcel in a reply SMS mode instead of supply of
full copy of Land Records to the applicant for the requests
received through SMS
Refer Sec 5.3.10 for details pertaining to scope
of work for this activity. Basic details has already
been stated in the RFP.
Yes Sec 5.3.10
233 RMSI Pvt. Ltd., Noida 5.1Establishment, Running and Maintenance of State
Data Centre and Disaster Recovery Site
What is the current status of State Data Centre and Disaster
Recovery Site? Are they already operational? Please provide
the inventory of existing hardware, software, IT systems,
facilities and functional features already available and planned
during the duration of the project?
Vendors are suggested to conduct a site visit to
SDC, IT Centres to have a clearer picture of the
existing H/w, S/w and other facitilites currently
available. Refer Annexure VIII for existing
infrastructure at SDC. Bidders can also refer to
the tender document floated by MPSEDC for the
said activity for better understanding.
No
234 RMSI Pvt. Ltd., Noida 5.3.4
The complete business process re-engineering (BPR)
of the activities pertaining to the land records offices is
required to be done by the vendor in discussion with
the department
We request to restrict the scope of Business Process Re-
Engineering (BPR) to process and procedural changes within
the purview of existing rules, regulation and laws. We request to
keep the legal changes away from the scope as it is not in the
vendor’s control.
No change to be made in the existing clause No
235 RMSI Pvt. Ltd., Noida 5.3.5A sample copy of the data sheet shall be provided to
the bidders upon written request
Please provide us representative sample copies of Nazul and
Diverted Land Information and other related documents
This shall be put up on the departmental website
along with the Tender corrigendum.No
236 RMSI Pvt. Ltd., Noida 5.3.6.13.2
demand may also arise to increase the number of
locations of IT Centres (Currently 342) due to changes
in administrative divisions or due to any other
administrative reasons
Kindly provide the expected rate of increase in every 5 years.
Formation of new tehsils is an administrative
process and as such, a timeframe or number
cannot be guaranteed
No
Commissioner Land Records Settlement, Madhya Pradesh Page 21 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
237 RMSI Pvt. Ltd., Noida 5.3.9Issue of owner-wise smart card i.e. e-Bhu Adhikar
avam Krin Pustika to owners
A specification of the smart card has been given. Please provide
specifications of Card Reader also. Or can the vendor choose a
reader suitable to his solution meeting the functional
requirements irrespective of barriers of any minimum
specifications?
Basic minimum specifications has been laid
down in the RFP for Smart card reader. Yes
Annexure IV: 5 -
Smart Card
Reader
238 RMSI Pvt. Ltd., Noida 5.3.10.4.4
The SMS Solution must allow Government
Department to send messages, in both single and / or
bulk mode
While sending SMS by the department, no share to vendor is
mentioned. Requesting to add the same in 4.27 Payment Terms
No share to be given to vendor while sending
SMS by the department in both single and /or
bulk mode. The same has been clarified in the
Corrigendum
Yes Sec 5.3.10
239 RMSI Pvt. Ltd., Noida 5.3.13.1.3
The vendor is required to correct the issues (if any) in
the input data. Major issues in the data will have to be
intimated to CLR in the form of a quality check report
It is understood that this vendor need to correct only minor
technical issues (like topological). Major issues only need to be
intimated to the department and this vendor need not correct
them. CLR will get the data corrected and supply back the same
to this vendor for porting within a time period, which will not
affect the overall progress of the project
All technical issues to be corrected by the
vendor. Any issues related to missing
attributes/feature, incorrect attributes need to be
handed over to Dept. in the form of a quality
report and shall have to be rectified by the
vendor based on directives from the dept.
No
240 RMSI Pvt. Ltd., Noida 5.3.13.2.15
The scope under this RFP includes porting of this data
into the centralized storage system at State Data
center as well as Disaster Recovery Center and linking
of the settlement records to the corresponding Khasra
record from the latest data available on the GIS
application solution
Please confirm that in order to link the new and the old data,
there will be unique linking field or combination of fields
Old data and new data shall be linked through
the parent Khasra number before subsequent
mutations took place.
No
241 RMSI Pvt. Ltd., Noida 5.3.13.3Establishing Connectivity between SWAN PoP and
LAN
What is the status of SWAN project? How many Tehsils are
connected already? Please specify whether all locations in the
Pilot Districts are already connected?
Currently 316 locations have been connected
across MP. Work activity at remaining locations
expected to be completed by May 2012.
No
242 RMSI Pvt. Ltd., Noida 5.3.15Additional Requirements for special external users :
Registration Dept.
The implementation of the condition “Till the removal of flag, the
property cannot be sold / transferred again” is not feasible
through the solution supplied through this RFP as registration
process and solution are independent and the vendor has no
role in the registration process. It is requested that the CLR
department will intimate and ask registration department to
impose this condition
Registration dept shall flag and insert comments
against a property and they only shall have the
right to remove it, through the special login from
this application
No
243 RMSI Pvt. Ltd., Noida 5.5.1CLR has the village levels cadastral maps in digitized
format in local coordinates in AutoCAD dwg format for the
complete jurisdiction of Madhya Pradesh
It means, the existing digital data is not geo-referenced? Yes. Not Geo-referenced No
244 RMSI Pvt. Ltd., NoidaPage 29, Clause 4.12,
Page 33, Clause 4.25Intellectual Property Rights & Transfer of Solution
Bidder shall remain the sole owner of the Technological
knowhow and methodology used for creating the final
deliverables for CLR. Please confirm.
Bidder can use the technology know-how if it
wants to replicate in other depts./states in India.
However, bidder must provide the CLR with
proper source code and all related
documentation during the transfer of solution.
No
245 RMSI Pvt. Ltd., Noida Page 29, Clause 4.13 Indemnity
Vendor would only indemnify CLR in case the loss is caused by
its own negligence and not otherwise. Also this clause should be
made mutual. Please confirm.
No change to be made in existing RFP No
246 RMSI Pvt. Ltd., Noida
Page 91, Clause
7.4.1, Page 95,
Clause 7.8.3, 7.10
There is no upper cap on the penalty. Please insert an upper cap on the penalty amount. Already mentioned in Sec 7.10 No
Commissioner Land Records Settlement, Madhya Pradesh Page 22 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
247 RMSI Pvt. Ltd., NoidaRequest for
IncorporationLimitation of Liability:
Except for causes of action giving rise to any indemnification
obligations, each Party’s liability to the other Party, whether in
contract, tort, negligence, strict liability or by statute or otherwise,
arising out of or relating to formation and performance of this
Agreement will not exceed the fees payable to vendor for work
which gave rise to the cause of action. All liability is cumulative
and not per incident. This limitation will apply notwithstanding
any failure of essential purpose of any limited remedy provided
herein. The foregoing limitation of liability does not limit either
Party’s liability for any cause of action for death, bodily injury, or
damage to tangible property. The Parties stipulate and agree
that Section was part of the consideration for any agreed-upon
fees.
No change to be made in existing RFP No
248 RMSI Pvt. Ltd., NoidaRequest for
IncorporationIntellectual Property Rights:
Notwithstanding anything contained hereinabove, vendor shall
own all Intellectual Property Rights towards the underlying
methodologies, know-how and research and development used
in providing such deliverables to CLR.
No change to be made in existing RFP No
249 RMSI Pvt. Ltd., NoidaRequest for
IncorporationTermination at Convenience:
Notwithstanding anything contained anywhere in the
Agreement, vendor retains the right to terminate the Agreement
without any cause by providing an advance written notice of 30
days to the other party.
No change to be made in existing RFP No
250 RMSI Pvt. Ltd., NoidaRequest for
IncorporationIndemnification
a. Each party will indemnify, hold harmless and defend the
other party, its officers, agents and employees against any and
all damages, suits, actions, claims, liabilities, losses, judgments,
costs and expenses arising out of or relating to (i) any personal
or bodily injury (including death) or property damage caused by
the indemnifying party’s negligent, unlawful or willful acts or
omissions or breach of this Agreement or (ii) infringement of
third party intellectual property rights.
No change to be made in existing RFP No
251 RMSI Pvt. Ltd., NoidaRequest for
Incorporation
b. For all indemnification obligations, the indemnified Party will
give the indemnifying Party (i) prompt written notice of any actual
or alleged Claim; (ii) sole control of the defense and settlement
of such Claim; and (iii) all information, reasonable assistance,
and authority to fully defend and settle such Claim. The
indemnifying Party may not compromise or settle any Claim or
consent to the entry of any judgment without the indemnified
Party’s prior written consent, provided that the indemnified Party
will not unreasonably withhold or delay giving consent.
No change to be made in existing RFP No
252 RMSI Pvt. Ltd., NoidaRequest for
IncorporationWarranty
a. Vendor represents and warrants that the Work will be
performed in a professional and workmanlike manner.No change to be made in existing RFP No
253 RMSI Pvt. Ltd., NoidaRequest for
Incorporation
b. Vendor’s sole liability and Client’s sole remedy for Services
not meeting the warranty is for Contractor to (i) repair the non-
conforming Services; (ii) replace or modify the non-conforming
Services with Services conforming substantially to the applicable
warranty; or if, in Vendor’s sole discretion, (i) and (ii) are not
commercially reasonable, then (iii) promptly refund to Client the
amount paid for any non-conforming Services.
No change to be made in existing RFP No
254 RMSI Pvt. Ltd., NoidaRequest for
Incorporation
Except as otherwise expressly stated herein all Services are
provided “AS IS,” without any warranty of any kind. Vendor
disclaims any other express or implied warranty, including but
not limited to the implied warranties of non-infringement,
merchantability, and fitness for a particular purpose.
No change to be made in existing RFP No
Commissioner Land Records Settlement, Madhya Pradesh Page 23 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
255
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
SECTION 6:
TECHNICAL
REQUIREMENTS,
6.6 System Security
Design Requirements,
Point 6.6.1
The Solution should have stringent multi-level system
security design to prevent infected clients
As in security design stringent multi-level system security
design, please advice if you are looking for dedicate security
appliance (Firewall & IPS) at perimeter for internet and intranet
at DC & DR, If yes please correct the BoQ given in RFP ?
Already addressed.
256
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 24
Port Giga Switch
4 Nos. GBIC ports with support for 1000 Base
SX/LX/LH/ZX. Vendor must configure ports for
commissioning
Please amend this to : 4 Nos. GBIC/SFP ports with support for
1000 Base SX/LX/LH. Vendor must configure ports for
commissioning
Already addressed.
257
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Switch control module with 2 GE (GBIC)
ports fully configured
Please amend this to : Should have switch control module with
500+ Gbps of switching backplaneAlready addressed.
258
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
point 6 : Must have min. 6 GE Ports fully configured;
point 7 : Must have min. 32 10/100/1000 Ethernet
ports and point 9 : Must have min. of two 2-Port GE
I/O Module
Please amend this to : Must Have minimum 48 x 10/100/1000 G
portsAlready addressed.
259
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have SSL Termination
Please amend this to : Should have 3000 SSL TPS from day
one and should be upgradeable to 30,000 SSL TPS via
software license upgrade without any change in hardware
Already addressed.
260
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have min. of two session accelerator modules
Please amend this to : Should have hardware based HTTP
compression built in for application acceleration supporting
1Gbps compression from day one and should be upgradeable
to 6 Gbps via software license without any change in hardware
Already addressed.
261
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Active-Active layer 5 ASRPlease amend this to : Should support stateful failover between
two SLB units without any change required in network topologyAlready addressed.
262
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have VIP redundancy Please remove this clause Already addressed.
263
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Aggregate Bandwidth 20 Gbps
Please amend this to : Should support 4 Gbps L4/L7 throughput
from day one and should be upgradeable to 16 Gbps via
software license without any change in hardware
Already addressed.
264
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must support WebNS 8.10 Features Please remove this clause Already addressed.
265
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Hotspare Feature Please remove this clause Already addressed.
266
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Auto Discovery and addition and removal
of Server resources without disrupting servicePlease remove this clause Already addressed.
267
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Load Balancing Predicator : Least Connection +
Server Response TimePlease remove this clause Already addressed.
268
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Global Server Load Balancing Feature Please remove this clause Already addressed.
269
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Please AddShould support HTTP deep packet inspection (HTTP header,
URL, and payload)Already addressed.
270
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Please Add Should support Virtual connection state for UDP Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 24 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
271
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Must support OPSEC or Equivalent Please remove this clause Already addressed.
272
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Should support Virtual Router Redundancy Protocol Please remove this clause Already addressed.
273
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Content filtering, URL filtering support, SPAM mails
filteringPlease remove this clause Already addressed.
274
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Please add The firewall should support SSL VPN Already addressed.
275
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Please add The security appliance should support virtual firewalls contexts
for logical segregation of traffic flows.Already addressed.
276
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 1.9
24 Port Manageable
Switch
1U Rack-Mount
24 Nos. 10/100Mbps RJ-45 MDI-X ports,
2-port Single Mode 1000BaseX(SX) module port
(inbuilt)
Vendor shall configure the 1000BaseX Port for
connectivity to multimode Fiber Optic Cable
Please amend this to : 1U Rack-Mount
24 Nos. 10/100Mbps RJ-45 MDI-X ports,
2-port Multimode Mode 1000BaseX(SX) module port (inbuilt)
Vendor shall configure the 1000BaseX Port for connectivity to
multimode Fiber Optic Cable
Already addressed.
277
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must support hardware assisted VPN encryption
modules
Please amend this to : Must have hardware assisted VPN
encryption modules/ onboard from Day 1Already addressed.
278
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must support 256Kbps onwards and up to 24Mbps or
more bandwidth
Please amend this to : Must support 256Kbps onwards and up
to 4 Mbps or more bandwidthAlready addressed.
279
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must Support FirewallPlease amend this to : The Router should be able to support a
Stateful and Zone Based Firewall. Already addressed.
280
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement
The router should support adaptive routing adjustments by
doing routing path selection based upon advanced criteria like
Response time, packet loss, delay, jitter, MOS, path availability,
traffic load and cost policies to intelligently control the traffic to
maximize the quality of the user experience.
Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 25 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
281
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement Should support hierarchical QoS for voice and video Already addressed.
282
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement
Should support detailed performance monitoring tools to
measure state of the network in real time. The SLA operations
shall provide information on TCP/UDP delay, jitter, application
response time, VoIP MOS score, Packet Loss etc.
Already addressed.
283
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE,
1. Indicative quantities
for IT Infrastructure
Point 50 : Router
Please clarify if you have asked the same specification for the
DC & DR router as of IT center router? Further you have asked
only 4 router each at DC &DR, presuming these are 2 each for
WAN and internet, still router for the replication among DC & DR
are missing?
Already addressed.
284
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE,
1. Indicative quantities
for IT Infrastructure
Multi-protocol Router for SAN Based Mirroring Please advice with the specifications for this product Already addressed.
285
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE;
1.5 24 Port SAN
Switch
Must be activated and fully configured for 24- PORTS
along with required SAN Host Connectivity and
licenses
Please amend this to : Must be activated and fully configured for
24- PORTS along with required SAN Host Connectivity and
licenses and additional 2 Nos of dedicated 10 Gbps FC ports
for a high speed stacking or linking.
Already addressed.
286
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
SECTION 6:
TECHNICAL
REQUIREMENTS
Requirement of Core Router for connecting DC and
DR ?
As per the RFP BOQ "ANNEXURE VI: INDICATIVE
QUANTITIES FOR IT INFRASTRUCTURE" Requirement of
Core Router for connecting State data centre to Disaster
Recovery has not been mentioned Kindly clarify on that
Already addressed.
287
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
SECTION 6:
TECHNICAL
REQUIREMENTS
Desktop based Video Conferencing
Are you looking for looking for a Software Based/Server Based
solution only or are you looking for hardware based VC solution
with centralized MCU
Already addressed.
288
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
SECTION 6:
TECHNICAL
REQUIREMENTS
Desktop based Video Conferencing
As L&R department have 342 locations IT Centers, 1 Ho and
DC & DR , Please clarify how many multiparty connectivity on
video conferencing is department looking for to connect
simultaneously or concurrently
Already addressed.
289
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE,
1. Indicative quantities
for IT Infrastructure;
1.25 Desktop Video
Conferencing
Equipment
Dialing Capabilities; Directory Service; Internet Locator
Service (ILS) support; H.323 external gatekeeper,
gateway and MCU support
Please clarify if H.323 based solution or will the SIP based
solution also accepted as the features desired can be fulfilled by
SIP based solutions
Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 26 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
290
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE,
1. Indicative quantities
for IT Infrastructure;
1.25 Desktop Video
Conferencing
Equipment
Instance messaging and presence is provided
Are you looking for software based solution which can provide a
client and web camera solution at the spoke location and a
server which can cater to video capabilities at the DC / DR
Location
Already addressed.
291
Prithvi Information
Solutions Pvt. Ltd.,
Hyderabad
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE,
1. Indicative quantities
for IT Infrastructure;
1.25 Desktop Video
Conferencing
Equipment
Internal Processor Based Please clarify what does this statement means, what is expected Already addressed.
292Dimension Data India
Ltd.
SECTION 6:
TECHNICAL
REQUIREMENTS,
6.6 System Security
Design Requirements,
Point 6.6.1
The Solution should have stringent multi-level system
security design to prevent infected clients
As in security design stringent multi-level system security
design, please advice if you are looking for dedicate security
appliance (Firewall & IPS) at perimeter for internet and intranet
at DC & DR, If yes please correct the BoQ given in RFP ?
Already addressed.
293Dimension Data India
Ltd.
ANNEXURE IV: 24
Port Giga Switch
4 Nos. GBIC ports with support for 1000 Base
SX/LX/LH/ZX. Vendor must configure ports for
commissioning
Please amend this to : 4 Nos. GBIC/SFP ports with support for
1000 Base SX/LX/LH. Vendor must configure ports for
commissioning
Already addressed.
294Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Switch control module with 2 GE (GBIC)
ports fully configured
Please amend this to : Should have switch control module with
500+ Gbps of switching backplaneAlready addressed.
295Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
point 6 : Must have min. 6 GE Ports fully configured;
point 7 : Must have min. 32 10/100/1000 Ethernet
ports and point 9 : Must have min. of two 2-Port GE
I/O Module
Please amend this to : Must Have minimum 48 x 10/100/1000 G
portsAlready addressed.
296Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have SSL Termination
Please amend this to : Should have 3000 SSL TPS from day
one and should be upgradeable to 30,000 SSL TPS via
software license upgrade without any change in hardware
Already addressed.
297Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have min. of two session accelerator modules
Please amend this to : Should have hardware based HTTP
compression built in for application acceleration supporting
1Gbps compression from day one and should be upgradeable
to 6 Gbps via software license without any change in hardware
Already addressed.
298Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Active-Active layer 5 ASRPlease amend this to : Should support stateful failover between
two SLB units without any change required in network topologyAlready addressed.
299Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have VIP redundancy Please remove this clause Already addressed.
300Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Aggregate Bandwidth 20 Gbps
Please amend this to : Should support 4 Gbps L4/L7 throughput
from day one and should be upgradeable to 16 Gbps via
software license without any change in hardware
Already addressed.
301Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must support WebNS 8.10 Features Please remove this clause Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 27 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
302Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Hotspare Feature Please remove this clause Already addressed.
303Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Auto Discovery and addition and removal
of Server resources without disrupting servicePlease remove this clause Already addressed.
304Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Load Balancing Predicator : Least Connection +
Server Response TimePlease remove this clause Already addressed.
305Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Global Server Load Balancing Feature Please remove this clause Already addressed.
306Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Please AddShould support HTTP deep packet inspection (HTTP header,
URL, and payload)Already addressed.
307Dimension Data India
Ltd.
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Please Add Should support Virtual connection state for UDP Already addressed.
308Dimension Data India
Ltd.
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE,
1. State Data Centre
and Disaster
Recovery Site; 1.8
Firewall, Intrusion
Detection and
Prevention System
Must support OPSEC or Equivalent Please remove this clause Already addressed.
309Dimension Data India
Ltd.
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE,
1. State Data Centre
and Disaster
Recovery Site; 1.8
Firewall, Intrusion
Detection and
Prevention System
Should support Virtual Router Redundancy Protocol Please remove this clause Already addressed.
310Dimension Data India
Ltd.
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE,
1. State Data Centre
and Disaster
Recovery Site; 1.8
Firewall, Intrusion
Detection and
Prevention System
Content filtering, URL filtering support, SPAM mails
filteringPlease remove this clause Already addressed.
311Dimension Data India
Ltd.
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE,
1. State Data Centre
and Disaster
Recovery Site; 1.8
Firewall, Intrusion
Detection and
Prevention System
Please add The firewall should support SSL VPN Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 28 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
312Dimension Data India
Ltd.
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE,
1. State Data Centre
and Disaster
Recovery Site; 1.8
Firewall, Intrusion
Detection and
Prevention System
Please add The security appliance should support virtual firewalls contexts
for logical segregation of traffic flows.Already addressed.
313Dimension Data India
Ltd.
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE,
1.9 24 Port
Manageable Switch
1U Rack-Mount
24 Nos. 10/100Mbps RJ-45 MDI-X ports,
2-port Single Mode 1000BaseX(SX) module port
(inbuilt)
Vendor shall configure the 1000BaseX Port for
connectivity to multimode Fiber Optic Cable
Please amend this to : 1U Rack-Mount
24 Nos. 10/100Mbps RJ-45 MDI-X ports,
2-port Multimode Mode 1000BaseX(SX) module port (inbuilt)
Vendor shall configure the 1000BaseX Port for connectivity to
multimode Fiber Optic Cable
Already addressed.
314Dimension Data India
Ltd.
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE,
2. IT Centers 342
User Locations (at
Tehsil Level); 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must support hardware assisted VPN encryption
modules
Please amend this to : Must have hardware assisted VPN
encryption modules/ onboard from Day 1Already addressed.
315Dimension Data India
Ltd.
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE,
2. IT Centers 342
User Locations (at
Tehsil Level); 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must support 256Kbps onwards and up to 24Mbps or
more bandwidth
Please amend this to : Must support 256Kbps onwards and up
to 4 Mbps or more bandwidthAlready addressed.
316Dimension Data India
Ltd.
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE,
2. IT Centers 342
User Locations (at
Tehsil Level); 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must Support FirewallPlease amend this to : The Router should be able to support a
Stateful and Zone Based Firewall. Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 29 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
317Dimension Data India
Ltd.
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE,
2. IT Centers 342
User Locations (at
Tehsil Level); 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement
The router should support adaptive routing adjustments by
doing routing path selection based upon advanced criteria like
Response time, packet loss, delay, jitter, MOS, path availability,
traffic load and cost policies to intelligently control the traffic to
maximize the quality of the user experience.
Already addressed.
318Dimension Data India
Ltd.
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE,
2. IT Centers 342
User Locations (at
Tehsil Level); 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement Should support hierarchical QoS for voice and video Already addressed.
319Dimension Data India
Ltd.
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE,
2. IT Centers 342
User Locations (at
Tehsil Level); 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement
Should support detailed performance monitoring tools to
measure state of the network in real time. The SLA operations
shall provide information on TCP/UDP delay, jitter, application
response time, VoIP MOS score, Packet Loss etc.
Already addressed.
320Dimension Data India
Ltd.
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE,
1. Indicative quantities
for IT Infrastructure
Point 50 : Router
Please clarify if you have asked the same specification for the
DC & DR router as of IT center router? Further you have asked
only 4 router each at DC &DR, presuming these are 2 each for
WAN and internet, still router for the replication among DC & DR
are missing?
Already addressed.
321Dimension Data India
Ltd.
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE
Multi-protocol Router for SAN Based Mirroring Please advice with the specifications for this product Already addressed.
322Dimension Data India
Ltd.
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE;
1.5 24 Port SAN
Switch
Must be activated and fully configured for 24- PORTS
along with required SAN Host Connectivity and
licenses
Please amend this to : Must be activated and fully configured for
24- PORTS along with required SAN Host Connectivity and
licenses and additional 2 Nos of dedicated 10 Gbps FC ports
for a high speed stacking or linking.
Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 30 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
323Dimension Data India
Ltd.
SECTION 6:
TECHNICAL
REQUIREMENTS
Requirement of Core Router for connecting DC and
DR ?
As per the RFP BOQ "ANNEXURE VI: INDICATIVE
QUANTITIES FOR IT INFRASTRUCTURE" Requirement of
Core Router for connecting State data centre to Disaster
Recovery has not been mentioned Kindly clarify on that
Already addressed.
324Dimension Data India
Ltd.
SECTION 6:
TECHNICAL
REQUIREMENTS
Desktop based Video Conferencing
Are you looking for looking for a Software Based/Server Based
solution only or are you looking for hardware based VC solution
with centralized MCU
Already addressed.
325Dimension Data India
Ltd.
SECTION 6:
TECHNICAL
REQUIREMENTS
Desktop based Video Conferencing
As L&R department have 342 locations IT Centers, 1 Ho and
DC & DR , Please clarify how many multiparty connectivity on
video conferencing is department looking for to connect
simultaneously or concurrently
Already addressed.
326Dimension Data India
Ltd.
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE,
1.25 Desktop Video
Conferencing
Equipment
Dialing Capabilities; Directory Service; Internet Locator
Service (ILS) support; H.323 external gatekeeper,
gateway and MCU support
Please clarify if H.323 based solution or will the SIP based
solution also accepted as the features desired can be fulfilled by
SIP based solutions
Already addressed.
327Dimension Data India
Ltd.
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE,
1.25 Desktop Video
Conferencing
Equipment
Instance messaging and presence is provided
Are you looking for software based solution which can provide a
client and web camera solution at the spoke location and a
server which can cater to video capabilities at the DC / DR
Location
Already addressed.
328Dimension Data India
Ltd.
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE,
1.25 Desktop Video
Conferencing
Equipment
Internal Processor Based Please clarify what does this statement means, what is expected Already addressed.
329Spanco Ltd, New
Delhi
SECTION 6:
TECHNICAL
REQUIREMENTS,
6.6 System Security
Design Requirements,
Point 6.6.1
The Solution should have stringent multi-level system
security design to prevent infected clients
As in security design stringent multi-level system security
design, please advice if you are looking for dedicate security
appliance (Firewall & IPS) at perimeter for internet and intranet
at DC & DR, If yes please correct the BoQ given in RFP ?
Already addressed.
330Spanco Ltd, New
Delhi
ANNEXURE IV: 24
Port Giga Switch
4 Nos. GBIC ports with support for 1000 Base
SX/LX/LH/ZX. Vendor must configure ports for
commissioning
Please amend this to : 4 Nos. GBIC/SFP ports with support for
1000 Base SX/LX/LH. Vendor must configure ports for
commissioning
Already addressed.
331Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Switch control module with 2 GE (GBIC)
ports fully configured
Please amend this to : Should have switch control module with
500+ Gbps of switching backplaneAlready addressed.
332Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
point 6 : Must have min. 6 GE Ports fully configured;
point 7 : Must have min. 32 10/100/1000 Ethernet
ports and point 9 : Must have min. of two 2-Port GE
I/O Module
Please amend this to : Must Have minimum 48 x 10/100/1000 G
portsAlready addressed.
333Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have SSL Termination
Please amend this to : Should have 3000 SSL TPS from day
one and should be upgradeable to 30,000 SSL TPS via
software license upgrade without any change in hardware
Already addressed.
334Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have min. of two session accelerator modules
Please amend this to : Should have hardware based HTTP
compression built in for application acceleration supporting
1Gbps compression from day one and should be upgradeable
to 6 Gbps via software license without any change in hardware
Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 31 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
335Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Active-Active layer 5 ASRPlease amend this to : Should support stateful failover between
two SLB units without any change required in network topologyAlready addressed.
336Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have VIP redundancy Please remove this clause Already addressed.
337Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Aggregate Bandwidth 20 Gbps
Please amend this to : Should support 4 Gbps L4/L7 throughput
from day one and should be upgradeable to 16 Gbps via
software license without any change in hardware
Already addressed.
338Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must support WebNS 8.10 Features Please remove this clause Already addressed.
339Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Hotspare Feature Please remove this clause Already addressed.
340Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Auto Discovery and addition and removal
of Server resources without disrupting servicePlease remove this clause Already addressed.
341Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Load Balancing Predicator : Least Connection +
Server Response TimePlease remove this clause Already addressed.
342Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Global Server Load Balancing Feature Please remove this clause Already addressed.
343Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Please AddShould support HTTP deep packet inspection (HTTP header,
URL, and payload)Already addressed.
344Spanco Ltd, New
Delhi
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Please Add Should support Virtual connection state for UDP Already addressed.
345Spanco Ltd, New
Delhi
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Must support OPSEC or Equivalent Please remove this clause Already addressed.
346Spanco Ltd, New
Delhi
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Should support Virtual Router Redundancy Protocol Please remove this clause Already addressed.
347Spanco Ltd, New
Delhi
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Content filtering, URL filtering support, SPAM mails
filteringPlease remove this clause Already addressed.
348Spanco Ltd, New
Delhi
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Please add The firewall should support SSL VPN Already addressed.
349Spanco Ltd, New
Delhi
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Please add The security appliance should support virtual firewalls contexts
for logical segregation of traffic flows.Already addressed.
350Spanco Ltd, New
Delhi
ANNEXURE IV: 1.9
24 Port Manageable
Switch
1U Rack-Mount
24 Nos. 10/100Mbps RJ-45 MDI-X ports,
2-port Single Mode 1000BaseX(SX) module port
(inbuilt)
Vendor shall configure the 1000BaseX Port for
connectivity to multimode Fiber Optic Cable
Please amend this to : 1U Rack-Mount
24 Nos. 10/100Mbps RJ-45 MDI-X ports,
2-port Multimode Mode 1000BaseX(SX) module port (inbuilt)
Vendor shall configure the 1000BaseX Port for connectivity to
multimode Fiber Optic Cable
Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 32 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
351Spanco Ltd, New
Delhi
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must support hardware assisted VPN encryption
modules
Please amend this to : Must have hardware assisted VPN
encryption modules/ onboard from Day 1Already addressed.
352Spanco Ltd, New
Delhi
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must support 256Kbps onwards and up to 24Mbps or
more bandwidth
Please amend this to : Must support 256Kbps onwards and up
to 4 Mbps or more bandwidthAlready addressed.
353Spanco Ltd, New
Delhi
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must Support FirewallPlease amend this to : The Router should be able to support a
Stateful and Zone Based Firewall. Already addressed.
354Spanco Ltd, New
Delhi
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement
The router should support adaptive routing adjustments by
doing routing path selection based upon advanced criteria like
Response time, packet loss, delay, jitter, MOS, path availability,
traffic load and cost policies to intelligently control the traffic to
maximize the quality of the user experience.
Already addressed.
355Spanco Ltd, New
Delhi
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement Should support hierarchical QoS for voice and video Already addressed.
356Spanco Ltd, New
Delhi
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement
Should support detailed performance monitoring tools to
measure state of the network in real time. The SLA operations
shall provide information on TCP/UDP delay, jitter, application
response time, VoIP MOS score, Packet Loss etc.
Already addressed.
357Spanco Ltd, New
Delhi
ANNEXURE VI:
Indicative quantities
for IT Infrastructure
Point 50 : Router
Please clarify if you have asked the same specification for the
DC & DR router as of IT center router? Further you have asked
only 4 router each at DC &DR, presuming these are 2 each for
WAN and internet, still router for the replication among DC & DR
are missing?
Already addressed.
358Spanco Ltd, New
Delhi
ANNEXURE VI: 1.
Indicative quantities
for IT Infrastructure
Multi-protocol Router for SAN Based Mirroring Please advice with the specifications for this product Already addressed.
359Spanco Ltd, New
Delhi
ANNEXURE IV: 1.5
24 Port SAN Switch
Must be activated and fully configured for 24- PORTS
along with required SAN Host Connectivity and
licenses
Please amend this to : Must be activated and fully configured for
24- PORTS along with required SAN Host Connectivity and
licenses and additional 2 Nos of dedicated 10 Gbps FC ports
for a high speed stacking or linking.
Already addressed.
360Spanco Ltd, New
Delhi
SECTION 6:
TECHNICAL
REQUIREMENTS
Requirement of Core Router for connecting DC and
DR ?
As per the RFP BOQ "ANNEXURE VI: INDICATIVE
QUANTITIES FOR IT INFRASTRUCTURE" Requirement of
Core Router for connecting State data centre to Disaster
Recovery has not been mentioned Kindly clarify on that
Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 33 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
361Spanco Ltd, New
Delhi
SECTION 6:
TECHNICAL
REQUIREMENTS
Desktop based Video Conferencing
Are you looking for looking for a Software Based/Server Based
solution only or are you looking for hardware based VC solution
with centralized MCU
Already addressed.
362Spanco Ltd, New
Delhi
SECTION 6:
TECHNICAL
REQUIREMENTS
Desktop based Video Conferencing
As L&R department have 342 locations IT Centers, 1 Ho and
DC & DR , Please clarify how many multiparty connectivity on
video conferencing is department looking for to connect
simultaneously or concurrently
Already addressed.
363Spanco Ltd, New
Delhi
ANNEXURE VI: 1.25
Desktop Video
Conferencing
Equipment
Dialing Capabilities; Directory Service; Internet Locator
Service (ILS) support; H.323 external gatekeeper,
gateway and MCU support
Please clarify if H.323 based solution or will the SIP based
solution also accepted as the features desired can be fulfilled by
SIP based solutions
Already addressed.
364Spanco Ltd, New
Delhi
ANNEXURE VI: 1.25
Desktop Video
Conferencing
Equipment
Instance messaging and presence is provided
Are you looking for software based solution which can provide a
client and web camera solution at the spoke location and a
server which can cater to video capabilities at the DC / DR
Location
Already addressed.
365Spanco Ltd, New
Delhi
ANNEXURE VI: 1.25
Desktop Video
Conferencing
Equipment
Internal Processor Based Please clarify what does this statement means, what is expected Already addressed.
366 Dataworld, Noida 2.1.3
The bidder in case of single company or the prime
bidder in case of joint venture/consortium should have
CMM/PCMM/CMMi Level 3 or above certification
Data World is an ISO certified company with over 15 years of
international experience in GIS, Application Development.
Request to relax on CMM/PCMM/CMMi Level 3 certification for
qualification
Already addressed
367
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.2.2
Supply, Installation, Testing, Configuration,
Commissioning and Maintenance of all hardware and
all software required for integrated biometric
validations, while posting the edits to the server
What type of biometric validation required. Refer Sec 6.2 for clarity No
368
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.2.2
Supply, Installation, Testing, Configuration,
Commissioning and Maintenance of all hardware and
all software required for integrated biometric
validations, while posting the edits to the server
DO the department expects the system to store biometric
information or the biometric information will come from some
other system
The developed system should be in a position to
store the biometric information.No
369
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.6.3
The user should be able to select and load the map at
Tehsil level using the drill down option using combo
boxed in the following sequence District Tehsil ……
Is the map data available to the Khasra level ? If yes , IS it
mapped with the attribute data? In which format is it available ?
Yes, Maps have been digitized for all Khasra
parcels with their IDs stored as an attribute.
Ownership data for that Khasra is present in the
form of an SQL database. Both these data need
to be ported into the developed solution and
linked.
No
370
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.6.12.3
In case the applicant applies for the land record online
and pays the fee via payment gateway, then after
realization of his payment by the bank
Considering the system will allow Net banking, do the state have
preference /restriction to a particular type of bank or it's free for
all
Preference would be for Nationalized banks and
also some Co-operative banks having a good
presence in MP.
No
371
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.6.11 Online help DO the department expects the online help to be available in
Hindi also?The solution has online help in Hindi and English Yes
Annexure III: Pt.
28
372
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.6.12.4
Vendor shall have to generate a state-wide unique
number called “CLR” Number for all the records
currently stored in the database
DO the Department has a existing format for "CLR"? No. This shall be decided during the SRS phase No
373
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.6.12.4.1
An encrypted pdf file with “CLR” Number as filename
should be automatically generated and saved to the
server.
Any preference of 'CLR' encryption methodology? Already addressed No
Commissioner Land Records Settlement, Madhya Pradesh Page 34 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
374
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.6.13 Formation of New Administrative Boundaries
DO the state wishes to have the back tracking history facility to
be available from the formation of the state (since
independence) or from the time the state wishes to use the
system?
1) Map data that would be imported initially
during implementation of this solution shall be
treated as base data and back tracking facility
need to be made available from the time, the
system goes live. 2) Archival records as part of
Record Rooms need to be linked with the
current khasra record, thus backtracking facility
would be available since the time the records
were originally generated.
No
375
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.9 Issuance of smart card
DO the state expects the application to generate the smart card
i.e. write data in the applicant's smart card? Or issuance of
smart card will be handled by some other third party
Specs for Smart card reader has been included
in the RFP for writing down the data in the
Applicant's smart card.
Yes
Annexure IV: 5 -
Smart Card
Reader
376
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.9 Issuance of smart card Will the smart card hold any bio metric information?Necessary details already mentioned in RFP
Sec 5.3.9No
377
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.8.4 Integration the Accounts Department
Considering Accounts department has several activities ,What
type of integration with Accounts is expected with the proposed
system.
Billing details of different types of transaction
conducted through the developed solution.No
378
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.10.4.3 SMS solution The RFP ask for multilingual SMS format from the system.
Please provide the language list.English and Hindi only. Yes 5.3.10.5.4
379
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.11 Spatial Data Considering spatial data is available , in which format is the data
available , raster or vector or grid or any other format.
Currently, spatial data is in form of Vector data.
Raster data (Scanned images of toposheets)
used for generation of vector data is also
available. Additionally, Raster data
(Orthophotos) would be expected through new
Survey project.
No
380
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.11 Spatial Data To access the spatial data do the application need to interact
with any other system
Successful vendor needs to develop and
provide a Web Based GIS Solution that would
integrate the existing MIS data with GIS data
and provide a common platform for subsequent
web-based editing along with other requirements
as stated in RFP.
No
381
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.11 Spatial Data
DO the existing spatial data already linked to the attribute data. It
is considered that the link up is out of the scope of the
application
Already mentioned that this is in scope. Refer
Sec 5.5 for detailsNo
382
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
5.3.11.8 Mutation SystemIs there any existing system to handle the mutation process? If
yes , is it online or standalone
No online system. All is being done using ink
and paper. Refer flowchart for existing process
flow. Business Process Re-engineering (BPR)
also included in scope of vendor.
No
383
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
General Industrial land DO Managing of industrially use land is In-scope ? The RFP do
not mention about it
Agriculture and Village Abadi land. Urban Area
may be included in near future. No
384
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
6.1 Technical platformDO the State has any preference for any GIS S/W. DO the state
has any license for S/W like ArcGIS, MAPinfo ?
GIS S/w must be having OGC Compliance and
must conform to Compliance matrix as
mentioned in Annexure III along with providing
the stated requirements in RFP.
No
385
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
6.1 Technical platformWill the Hardware, Infrastructure and Hosting (including cost) be
taken care of by MP department of Revenue?No. Bidder's scope No
386
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
General Workflow
Do we know the number of workflows that needs to be
implemented in the system? If yes, then what will be the ratio in
terms of very Complex/Complex/High/Medium/Low complexity
workflows?
Flowcharts stated in RFP are self-explanatory No
Commissioner Land Records Settlement, Madhya Pradesh Page 35 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
387
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
General Existing SolutionWhat are the existing software/hardware that can be leveraged
for the solution?
Sec 4.31 stating the "Use of Existing Hardware
of the department has been deleted". Yes Sec 4.31
388
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
General Mobile AccessibilityOur understanding is the solution need not be exposed over
mobile ( blackberry, phone etc ). Please confirm.
Solution need not be exposed over mobile.
However, citizen services through SMS need to
be made available as detailed under Sec 5.3.10
No
389
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
General Reports
What is the number of reports that needs to be generated from
the system? Can you provide sample report templates? What is
the ratio of complexity in terms of very
Complex/Complex/High/Medium/Low? What are the various
formats that needs to be supported?
Already stated in RFP that this shall be finalized
during SRS, SDD.No
390
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
General Integration
Is there any requirement to integrate with any existing or
external system to achieve the requirements of the Department?
If yes, what are the details of the existing applications? What are
the technology / databases that have been used? Is it possible
to get the API documentation for those applications?
Refer Sec 5.3.15 wherein access shall be
provided for external users from designated
departments.
No
391
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
General Formation of Consortium Is consortium allowed for the proposed solution? Yes. Details mentioned in Sec 2.1 No
392
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
General Legacy System existence Is there any existing legacy system used by the Department? Yes. Details mentioned in Sec 1.4.5 No
393
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
General MigrationIs there any data digitization or migration requirement? Is it
needed to migrate data from existing systems?
1) Refer Sec 1.4.1 for data digitization. No such
requirement. 2) Refer Sec 5.5 for Data migration
requirement.
No
394
Pricewaterhouse
Coopers Pvt. Ltd,
Gurgaon
General Post Deployment and post warranty supportDoes the Federation needs any post warranty Support? If yes,
what is the expected timeframe?
5 yrs of O&M to cover all warranty after
deployment and to be handed to Dept. as per
Sec 4.24 -Transfer of Solution in good working
condition.
395Wipro Ltd.,
Bangalore5.3.13.2.2 / Page 63
The solution should be integrated with barcode reader,
barcode printer (including auto-generation of barcode
for a new document) and biometric fingerprint
authentication device.
Will the department provide barcode readers and printers for
this purpose or is the vendor expected to supply these devices?Refer amended sec 5.3.13.2.2 No
396Wipro Ltd.,
Bangalore5.3.17 / Page 68
Project Flow, Development Stages and
Implementation of the
Enterprise Web Based Application
How long will the department take for the approval process in
each phase such as Project Plan, SRS, SDD etc.
This shall be intimated to the Successful vendor
upon awardment of project and during the
subsequent project plan submission from the
vendor.
No
397Wipro Ltd.,
Bangalore5.5.2 / Page 76
The scope of work of the successful bidder includes
performing quality checks and validation of spatial as
well as non-spatial data in terms of correctness and
completeness as well as bringing the data into the
usable condition in the Enterprise Web based solution
provided by the bidder. This includes existing spatial
and non-spatial data supplied by CLR as well as
spatial and non-spatial data developed and supplied
by CLR from time to time.
Is the vendor expected to procure any satellite imageries or do
field survey to ensure accuracy / completeness of existing data
during the quality checking and validation? If so, please specify
the amount of satellite imagery to be procured and % of field
verification required.
Procurement of imagery, field survey of existing
data is not in the scope of the vendor. No
Commissioner Land Records Settlement, Madhya Pradesh Page 36 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
398Wipro Ltd.,
Bangalore
6.3.1.3.1 & 6.3.2.3.1 /
Page 83
On an average, each location shall have 7
departmental users (1No Supervisory user, 1No
System Administrator and 5Nos. normal users). There
are 342 locations currently.
It is to be noted that, the vendors are required to
procure and supply digital signatures for all the
department users and integrate to the same with the
supplied solution at their cost and at no cost to the
department. This includes all department users
including all patwaris (Approximately 25,000 in
number).
Considering 342 IT centers at Tehsil level, the total number of
users add up to approximately 2400 users. Please clarify, if the
remaining users (out of 25,000) are going to be Patwaris?
Please clarify, from the above mentioned number of users
approximate 25,000), how many are to be considered as
Concurrent Users and how are they divided in terms of :
• View only users
• Attribute Editing Users
• Map Editing Users
• Administrative Users
• Super User
Please confirm if all 25000 users need biometric access along
with digital signatures also?
• The remaining users out of 25,000 shall be
Patwaris and departmental staff (CLR dept.,
Statistics dept. and other depts.).
• View only users (public users) need not
required biometric access and digital signatures.
Remaining user types (2400 + 25000) would
require both.
• In generic terms, View only users can be
considered as public users while Attribute
editing. Map editing, administrative and super
users can be assumed to be 2x2x1 at each IT
location, since these activities shall be done
from IT Centres. In future, patwaris may be
provided with Laptops with which they can carry
out the work without having the need to visit IT
Centre. This will increase the no. of concurrent
users substantially.
No
399Wipro Ltd.,
Bangalore6.3.2.6 / Page 83
Number of concurrent view only users (including
department users and public users) considered for
design shall be 3000. However, the vendor is required
to scale his architecture at his cost to handle any
increase in number of users to
meet the required service levels.
Number of concurrent view only users to be considered are
3000, please specify concurrency for other user types such as
Attribute Editing Users, Map Editing Users, Administrative
users?
Already addressed
400Wipro Ltd.,
Bangalore
Annexure III:
Compliance Matrix
For Enterprise
Application
Software (Item# 8)
There as a mention of the solution having adherence
to land region cartographic codification standards. Please provide these standards
Can be downloaded from
http://egovstandards.gov.in Final decision to be
made during SRS/SDD phase.
No
401Wipro Ltd.,
Bangalore
Annexure III:
Compliance Matrix
For Enterprise
Application
Software (Item# 12)
There is a mention of solution supporting Triangulated
Irregular Network (TIN) data type
Please clarify if TIN data type will be used for representing
Topography / Terrain / height (Z) information.
For current data, height information not
available. No. In future, yes. No
402Wipro Ltd.,
Bangalore
ANNEXURE IV: 1.6
24 Port Giga Switch
(MAF Required), pg
no 133 Sr. no. 4
4 Nos. GBIC ports with support for 1000 Base
SX/LX/LH/ZX. Vendor must configure ports for
commissioning
Pls mention type of fiber transcivers required for configuring the
portsAlready addressed
403Wipro Ltd.,
Bangalore
ANNEXURE IV: 1.6
24 Port Giga Switch
(MAF Required), pg
no 133
New clause Addition
"Switch OEM should be in top 5 of the Magic Quadrant of latest
Gartner report"
Reason: This shows the capability of an OEM in terms of
reliability, deployment, research Which is required for such huge
deployment.
Not mandatory No
404Wipro Ltd.,
Bangalore
ANNEXURE IV: 1.9
24 Port Manageable
Switch (MAF
Required), pg no 137
New clause Addition
"Switch OEM should be in top 5 of the Magic Quadrant of latest
Gartner report"
Reason: This shows the capability of an OEM in terms of
reliability, deployment, research Which is required for such huge
deployment.
Section Deleted. Existing infrastructure at SDC
to be used. Same specifciations to be used for
DR site and at all IT Centres
YesAnnexure III -
1.29
405Wipro Ltd.,
Bangalore
ANNEXURE IV: 1.8,
pg no 135 Sr. No. 3Must support OPSEC or Equivalent
"Must support OPSEC/ICSA"
Reason: OPSEC is vendor specific. ICSA is a industry standard
certification which firewall,IPS OEM adhere to.
Section Deleted. Existing infrastructure at SDC
to be used.
406Wipro Ltd.,
Bangalore
ANNEXURE IV: 1.8,
pg no 135 Sr. No. 32Must have redundant power supply
"delete this clause"
Reason: As the devices are going to work in HA (High
Availibility) mode we request you to delete this clause
Section Deleted. Existing infrastructure at SDC
to be used.Yes
Annexure III -
1.29
Commissioner Land Records Settlement, Madhya Pradesh Page 37 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
407Wipro Ltd.,
Bangalore
ANNEXURE IV: 1.8,
pg no 135New clause Addition
The proposed internal/external IPS should support up to
6,500,000 concurrent network sessions and 115,000 connection
per seconds with security context for up to 1,200,000 sessions.
System IPS throughput should be upto 750Mbps
Section Deleted. Existing infrastructure at SDC
to be used.Yes
Annexure III -
1.29
408Wipro Ltd.,
Bangalore
ANNEXURE IV: 1.8,
pg no 135New clause Addition
The proposed internal/external IPS must support zero power
external bypass module which taps power from IPS for
operation with upport full stateful redundancy solution (Active-
Passive, Active-Active)
Section Deleted. Existing infrastructure at SDC
to be used.Yes
Annexure III -
1.29
409Wipro Ltd.,
Bangalore
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms LAN/Inter-
building fibre, pg no
177 Sr. No. 18
Must support for NAT, ACLs, 3DES, IPSEC, L2TP,
Integrated Firewall, IDS Support, Time based
Access List, CRTP
"Remove IDS".
Reason: IDS/IPS features are already asked in a separate
appliance and hence not required on the router. This will add
unnecessary investment.
Section Deleted. Existing infrastructure at SDC
to be used.Yes
Annexure III -
1.29
410Wipro Ltd.,
Bangalore
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms LAN/Inter-
building fibre, pg no
176/177
New clause Addition
"Router should support interfaces like Wi-Fi, 3G on the router
itself"
Reason: For scalability, flexibility in deployment and future
investment protection.
Section Deleted. Existing infrastructure at SDC
to be used.Yes
Annexure III -
1.29
411Wipro Ltd.,
Bangalore
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms LAN/Inter-
building fibre, pg no
176/177
New clause Addition
"Router should have EAL2 certification at the time of bidding"
Reason: This shows the capability of an OEM in terms of
reliability, deployment, research Which is required for such huge
deployment.
Section Deleted. Existing infrastructure at SDC
to be used.Yes
Annexure III -
1.29
412Wipro Ltd.,
BangaloreGeneral ________________________
Tentative Area details or layout is required for IT User locations
and Admin sites
Kindly arrange to submit a written request to
CLR office in this regard. Site visit for some IT
Centres is advisable
No
413Wipro Ltd.,
BangaloreGeneral ________________________
Requesting to provide the existing site layouts for SDC and DR
sites with dimensional details for distance calculations of power
cable etc.
Site visit to SDC is advisable. Tender
documents floated by MPSEDC can also be
referred for better understanding.
No
414Wipro Ltd.,
Bangalore
Annexure VI:
1. Indicative quantities
for IT Infrastructure:
Item No. 37 Rack PDU basic using zero U space,
vertical mount, 32A, 230V, 20 nos. of C13 and 4 nos.
C19 type sockets and IEC C20 input type ith minimum
10 ft
cable
As per the table Total PDUs are required as 4 nos for Data
Center and no qty is given for DR whereas 2nos. of server racks
are also required there. So pl confirm whether PDUs are
required for DR site or not.
Required at DR also. Specs for existing
infrastructure at SDC to be used for DR site.No
415Wipro Ltd.,
Bangalore
Annexure VI:
1. Indicative quantities
for IT Infrastructure:
Item No. 38 Rack PDU basic using zero U space,
vertical mount, 16A, 230V, 20 nos. of C13 and 4 nos.
of C19 type sockets and IEC C20 input type with
minimum 10 ft cable
As per the table Total PDUs are required as 2 nos for Data
Center and no qty is given for DR whereas 1nos. of Network
rack is also required there. So pl confirm whether PDUs are
required for DR site or not.
Required at DR also. Specs for existing
infrastructure at SDC to be used for DR site.No
416Wipro Ltd.,
Bangalore
Annexure VI:
1. Indicative quantities
for IT Infrastructure:
Item No 43 30 kVA N+1 Redundant, Modular and 42U
Rack mountable UPS
As per the table total 2nos. of modular UPS are required for DC
site in 2(n+1) whereas for DR site requirement is not mentioned
there. Pl confirm whether the UPS with qty are required for DR
site or not.
This shall be made available to the vendor at
DR site seperately.No
417Wipro Ltd.,
Bangalore
Annexure VI:
2. Indicative quantities
for IT Infrastructure:
2.1 Non-IT Infrastructure development for State Data
Centre and Admin Site
Requesting you to mention the qty and capacity of PAC
required.
Section Deleted. Existing infrastructure at SDC
to be used.No
418Wipro Ltd.,
Bangalore
Annexure VI:
2. Indicative quantities
for IT Infrastructure:
2.2 Non-IT Infrastructure development for Disaster
Recovery Site
Requesting you to mention the qty and capacity of PAC
required.
SI has to work out the Qty and capacity of PAC
required based on area needed as per their
proposed solution and infrastructure. Interested
bidders can conduct a site visit to have a better
understanding.
No
Commissioner Land Records Settlement, Madhya Pradesh Page 38 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
419Wipro Ltd.,
BangaloreGeneral ________________________
Power Tapping feeder for UPS from Data Center LT Panel to
UPS with cable will be in bidder's scope or customer's scope.Bidder's scope No
420Wipro Ltd.,
Bangalorepage 11 point 1.3.3
Design, Establishment, Installation, Configuration,
Commissioning, Running and Maintenance of IT
Centers at 342 user locations (at each Tehsil HQ
level) including all hardware, all software, all
networking, all running expenses like manpower,
electricity (including supply of meters), cleaning and
establishment and maintenance of all other
infrastructure required for running the Enterprise Web
based GIS application supplied by the bidder to meet
the required service levels. Only space shall be
provided by the department.
request the department to arrange for Main power with meter,
whereas bidder may arrange for UPS power supply. , will we get
a constructed room for the IT setup, What is the scope of Civil
work for setting up the IT center. Will the operator to work on the
GIS application to be provided by bidder for day to day activities.
1) Main Meter to be arranged by the Bidder. 2)
Constructed room shall be handed over to the
bidder for IT centre, however civil works may be
involved as mentioned in Annexure IV. 3) Bidder
to provide operator to work on GIS application
upon commissioning of the solution for a period
of 5 years. Refer Sec 5.6.3 for some clarity on
work during O&M Period
No
421Wipro Ltd.,
Bangalorepage 11 point 1.3.4
The scope includes supply of all equipments /
materials and establishment of LAN for IT Centre and
all other client machines except users in the Record
Room
Pls confirm the SWAN is and will be avialabel at each IT center,
bidder had to provide setup LAN inside the IT center and
connect to client machines the SWAN. How many client
machine are planned for each It center?
SWAN will provide single point connectivity at all
the offices. Rest of the LAN setup to be taken
care by Vendor. Deptt. Will provide the list of
offices and no. of client machines during the
project execution.
Yes Sec 5.2.3
422Wipro Ltd.,
BangalorePage 12 point 1.3.9
Issue of owner wise smart cards i.e. “e-Bhu Adhikar
avam Krin Pustika” on demand.
Is the issue of cards to Land owners part of this project. How
many Smart cards to be provided. what is the specifications of
the cards, do we need to do the card personalization also.
what data os planned to be stored in the cards
Smart cards to all land owners in MP. This shall
commence upon successful implementation and
go-live of solution at each location. Specification
of smart cards along with data to be stored
already stated in RFP.
No
423Wipro Ltd.,
Bangalorepage 12 point 1.3.10
Provision of SMS Gateway for applicants to receive
and view the records through SMS. Vendor‟s
responsibility also includes setting up with a service
provider capable of covering operations across the
country.
Who can send SMS and what information he can seek? Does
Bidder need to quote for SMS Gateway server, application etc.
Will the SMS be free for the user or can the service provider/
bidder charger the user for the SMS? How many Users will
have the SMS facility and how many SMS the user may be
allowed to send say for a period of 1 year
Any Public user can seek information for Khasra
pertaining to himself or another person. Bidder
need to quote for all s/w, h/w along with payment
gateway for setting up this facility. No charges to
be levied on the end user since bidder is already
being given a share as stated in Sec "4.27:
Payment Terms"
No
424Wipro Ltd.,
Bangalore
Page 13, point 1.4.1 &
1.4.2
CLR has already released order for digitization of
cadastral maps for the entire Madhya Pradesh State
Does that mean GIS map is already avialbe for entire state with
the data of land owners mentioned in the MAP?
MAP digitization is nearing completion with
almost 70% data ready. Data of land owners is
already available in form of SQL database.
No
425Wipro Ltd.,
Bangalorepage 13, point 1.4.3
The GIS application developed as per this tender shall
be capable shifting from old data (as mentioned in Sec
1.4.1) to new data with minimal efforts. In other words,
the application should work with the existing data as
well as any data prepared in future
Do the bidder need to develop a new MAP for the entire state?
Or
you mean the application to be developed for this RFP must use
the MAP data from the exisiting MAP with option to view, edit
and add it.
Bidder need not develop a new MAP. CLR office
shall supply new maps from the survey project
and they shall replace the existing map data for
the corresponding village in the developed
solution. The developed solution must use MAP
data from existing MAP and SQL data and
integrate it with option to view, edit, add etc.
No
426Wipro Ltd.,
BangalorePage 50, Point 5.3.9.5
The following details are required in the smart card :
Details of owner like Name, Father’s name, address
Digital photograph
Digital fingerprint
PAN (If available)
Details of all properties owned.
o Khasra (Parcel No) with village, RI Circle, Tehsil,
District etc.
o Area details of properties
o Encumbrances on properties
o Tax payable and paid details
Provision to update Country level Citizen Unique Id
1. Is the supply and personalization of the cards in the scope of
this RFP
2. Is the enrollment of the land owners ( finger print data) a part
of this RFP? How many enrollments with with restpect to each
location for enrollemnt ?
3. If yes? How many cards would be required and what would
be the specification of the cards.
1) Yes. Mentioned in Sec 5.3.9. 2) Yes.
Depends on no. of land owners across various
locations. 3) Bidders can assume card
requirement to match with the total number of
land owners in the state. Specifications of card
already stated in Annexure IV: 4 -Ownerwise
Smart Card.
No
Commissioner Land Records Settlement, Madhya Pradesh Page 39 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
427Wipro Ltd.,
Bangalore
Page 60, Point
5.3.11.18
Biometry (finger print) authentication while saving edits
to the spatial or attribute database to the server.
Scope includes supply and maintenance of all
equipments, hardware and software required for
biometric authentication.
What is the warrenty requiremnt for biometric devices
Bidder to operate and maintain for 5 yrs.
Transfer of solution after 5 yrs to take place as
per Sec 4.24 in good working condition. Hence,
post warranty clause is applicable till transfer of
solution for all items.
No
428Wipro Ltd.,
Bangalore
page 61, point
5.3.11.20.2
The details collected by Patwaris shall be fed in to the
system by vendor’s resources along with biometric
authentication by Patwaris. If the Patwaris are
comfortable by feeding the data themselves, the data
shall be fed and authenticated by Patwaris directly.
assumed the biometric authentication means fingerprint
authentication? Is the enrollment of fingerprint in the scope of
thie RFP if yes how may people to be enrolled and at what
location.
Yes, this is in the scope. All Dept. users
including patwaris. No
429Wipro Ltd.,
Bangalore
Page 63, point
5.3.13.2.11
Whenever a hardcopy document is taken out of the
record room, the information has to be fed in to the
system with document id (identified with barcode
reader), person taking the document (identified with
biometric fingerprint authentication), date and time
(taken from the server), contact details of the person,
expected return date etc.
Is the Biometric device and authentication using biometric
fingerprint to feed data in the system in the scope of this RFP
Record room shall be having its own biometric
authentication device. This shall be in use for
documents being taken out of record rooms.
No
430Wipro Ltd.,
Bangalore
Page 66 , Point
5.3.14.1.6
Any changes to the data including uploading of new
data or changes to the existing data or administrative
settings including security and user management shall
be done using authentication of authorized department
user using biometric authentication and digital
signature.
Normally login to the applicaion is done using biometric
fingerprint athentication, do you need each time a person (even
without logout to the application ) try to edit the data within the
applicion he should be asked to verify his fingerprint data.
Yes. All edits to be done after verification. No
431Wipro Ltd.,
BangalorePage 184 Biometric Fingerprint reader:- Resolution: >=480 dpi
Industry standers is 500 DPI or better, suggest to change to 500
DPI
No change to be made in the existing clause.
Bidders are free to propose anything over and
above the minimum stated specifications.
No
432Wipro Ltd.,
Bangalore
Page 83, Point
6.3.1.3.1
On an average, each location shall have 7
departmental users (1No Supervisory user, 1No
System Administrator and 5Nos. normal users). There
are 342 locations currently.
Can we assume their would be 7 computers to access the
application from the department. How many concerrent users at
any given time would access the application.
No. 7 User types are departmental staff at each
location. It is mentioned in RFP in Sec 6.3.2 that
minimum 2 resources need to be supplied for
each IT Centre. Bidder is bound to increase the
no. of resources and computers at no additional
cost in case of heavy workload.
No
433Wipro Ltd.,
Bangalore
Page 83, Point
6.3.2.3.1
It is to be noted that, the vendors are required to
procure and supply digital signatures for all the
department users and integrate to the same with the
supplied solution at their cost and at no cost to the
department. This includes all department users
including all patwaris (Approximately 25,000 in
number).
for login to the application do we need 1:25000 authentication or
can we do it 1:1 by first asking the user to type his user ID and
match if the fingeprint captured is matching with supplierd IP.
This shall be decided during project execution. No
434Wipro Ltd.,
BangaloreGeneral Smart Cards to land owners
Pls confirm the number of cards to be supplied wrt each city and
pls confirm if bidder has to quote for capture photograph,
fingerprint enrollemnet data entry etc for the land owner and
supply personalised card with printed information on the card?
What infomation to be prnterd on the card ? do we need to print
the image of the owner on the card
Details needed for smart card along with the
data to be stored inside the smart card already
is mentioned in Sec 5.3.9. Photograph of owner
must be present on the card. Bidder can
assume card requirement to correspond to no.
of land owners in the state.
No
435Wipro Ltd.,
BangaloreGeneral Smart Cards to land owners
Is the supply of Card reader in the scope of this RFP? Pls
provide specificaiton of card reader and Qty required.
Basic minimum specifications for card reader
has been laid down in the RFP. 1 Card reader
for each IT Centre.
Yes
Annexure IV: 5 -
Smart Card
Reader
436Wipro Ltd.,
Bangalore
Page 63, point
5.3.13.2.2
The solution should be integrated with barcode reader,
barcode printer (including auto-generation of barcode
for a new document) and biometric fingerprint
authentication device
Is the supply of Barcode reader & printer in the scope of this
RFP, If yes pls provide specifications and QtyAlready addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 40 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
437Wipro Ltd.,
Bangalore4.13 Indemnity
Vendor shall indemnify, protect and save CLR against
all claims, proceeding, liabilities, losses, costs
(including legal costs), damages, expenses and action
suits, resulting from infringement of any patent,
trademarks, copyrights, any other statutory
infringements in respect of all the hardware / software
supplied by him or expenses whatsoever arising out of
or resulting from any loss or damage to the property or
personnel of CLR, relating to the performance of the
Project whether or not such loss or damage is caused
or contributed to by negligence or other default of
Bidder or their Authorized User.
Seek deletion of- relating
to the performance of the Project No change to be made in the existing clause. No
438Wipro Ltd.,
Bangalore
4.16 Validity of
Licenses
Licenses supplied for all components including all
hardwares and softwares should be “Permanent and
Lifetime Licenses”, which should enable the
department to use the same without any restrictions
during the project as well as after the contract with the
selected bidder is over.
Software / hardware supplied under the project would be
governed by their respective License terms which custoemr will
have to sign directly.
No change to be made in the existing clause. No
439Wipro Ltd.,
Bangalore
4.2, Risk Purchase
Clause
In the event of the successful vendor fails to execute
the project as stipulated under Sec “4.26 – Work
Completion Requirements” (Pg. 34) in the delivery
schedule in the required qualities and/or
functionalities, CLR reserves the right to procure
similar services, in whole or in part, from any alternate
sources at the risk, cost and
responsibility of the vendor.
Request to restrict the liability to 5% of the total payment
received in last one year No change to be made in the existing clause. No
440Wipro Ltd.,
Bangalore
4.21 Termination for
convenience
CLR reserves the right to terminate the contract in
whole or in part if the bidder failed to execute the
project as per the scope of work with the required
performance levels at any stage of the project
assessed by the
department.
Plz add: CLR will make the payment of all unabsorbed amount
i.e Total capex and Opex minus payment already received in
case of termination of Agreement
Need a notice period of 90 days.
No change to be made in the existing clause.
Operating expenses till the termination of project
shall be paid based on number of transaction
and payment terms stated in RFP after
deducting penalties, if any. Capital expenditure
shall have to be recovered by vendor during the
O&M Period of 5 yrs. Notice period shall be
mentioned in the contract agreement with the
successful bidder.
No
441Wipro Ltd.,
Bangalore
4.24 Transfer of
Solution
After the completion of Operation and Maintenance
Period, the department may opt to take up the
Operations and Maintenance with its own staff or may
call open tenders to choose a vendor to take up the
Operations and Maintenance for another period
chosen by CLR. The bidder shall have the
responsibility to unconditionally transfer the entire
solution including all hardware, all software, all
infrastructures supplied by the bidder in good and
running condition at bidders cost. The software
components developed for CLR as part of this RFP
should be accompanied by duly commented source
code and documentation.
Transfer will take place after receipt of all the payments under
the contract .
No change in the existing clause. However, this
may be incorporated in the Contract agreement
upon decision of CLR.
No
442Wipro Ltd.,
Bangalore
4.25 Ownership of
resources suppliedOwnership of resources supplied It means Ownership transfer will take place immediately Yes. As and when supplied to the Dept. No
443Wipro Ltd.,
Bangalore
4.29 Conditions on
Payment TermsRef document
Payment is based on the number of transactions? What will be
the period for recovery of Opex and Capex expenses? What will
be the basis of payment in O&M period
Bidder to determine the "n" value to cover up his
Opex and Capex expenses based on the
Payment model and transactions statistics
stated in RFP. Basis of payment already
mentioned in Sec 4.29
No
Commissioner Land Records Settlement, Madhya Pradesh Page 41 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
444Wipro Ltd.,
Bangalore5.4.7 Training
The training locations and minimum number of
departmental staff to be trained shall be as follows.
Vendors should note that the number of people to be
trained may vary as per the decisions of CLR and
vendors are bound to train additional staff if requested
without additional cost
What is expected variation range here
Figures mentioned in RFP is approximate
number for bidders to have a basic idea. Upper
limit cannot be mentioned.
No
445Wipro Ltd.,
Bangalore5.4.6 Training
Every training session should be accompanied by
collection of end user/ administrator feedback related
to usability, scope of work compliance etc. The vendor
shall be bound to carry out re-training sessions if
found unsatisfactory
What will be basis for defining the training as SuccessfulUser competancy and feedback forms shall be
the main criteriaNo
446Wipro Ltd.,
BangaloreCovering letter
I have thoroughly examined and understood the terms
and conditions and details of the Tender Document,
Contract and Project to be undertaken and have
carefully noted the conditions of Contract and the
specification with all the stipulations, which I agree to
comply with. We shall be bound by the terms of these
documents. We undertake to complete the Project
within the period stipulated after receiving an intimation
of the acceptance of our Bid.
Subject to Deviations mentioned in the deviation sheet No change to be made in the existing RFP No
447Wipro Ltd.,
BangaloreNew addition Saving Clause
Wipro’s failure to perform its contractual responsibilities, to
perform the services, or to meet agreed service levels shall be
excused if and to the extent Wipro’s non-performance is caused
by Customer’s omission to act, delay, wrongful action, failure to
provide inputs, or failure to perform its obligations under this
Agreement.
Sec 7.5.1 has been amended to "For any delay
on vendor’s part in executing any of the
components shall attract a penalty at the rate of
Rs 25,000/- per week or part thereof. This is
applicable to each milestone deadlines"
Yes Sec 7.5.1
448Wipro Ltd.,
BangaloreNew addition SNR
Customer hereby agrees to make the site ready as per the
agreed specifications, within the agreed timelines. Customer
agrees that Wipro shall not be in any manner be liable for any
delay arising out of Customer's failure to make the site ready
within the stipulated period, including but not limited to levy of
liquidated damages for any delay in performance of Services
under the terms of this Contract. Further any idle time resulted
due to non available of site or infrastructure or data, Customer
shall make payment to Wipro for the same.
No change to be made in the existing RFP No
Commissioner Land Records Settlement, Madhya Pradesh Page 42 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
449Wipro Ltd.,
BangaloreAdditional Limitation of Liability - to be added as a new clause
Notwithstanding anything to the contrary elsewhere contained in
this or any other contract between the parties, neither party
shall, in any event, be liable for (1) any indirect, special, punitive,
exemplary, speculative or consequential damages, including,
but not limited to, any loss of use, loss of data, business
interruption, and loss of income or profits, irrespective of
whether it had an advance notice of the possibility of any such
damages; or (2) damages relating to any claim that arose more
than one year before institution of adversarial proceedings
thereon.
Subject to the above and notwithstanding anything to the
contrary elsewhere contained herein, the maximum aggregate
liability of Wipro for all claims under or in relation to this
Agreement, shall be, regardless of the form of claim(s), the
consideration actually received by Wipro under this Agreement.
Wipro’s failure to perform its contractual responsibilities, to
perform the services, or to meet agreed service levels shall be
excused if and to the extent Wipro’s non-performance is caused
by Company’s omission to act, delay, wrongful action, failure to
provide Inputs, or failure to perform its obligations under this
No change to be made in the existing clause No
450Wipro Ltd.,
Bangalore4.29.2 Payment
The payment to the bidder shall start after obtaining successful
project implementation certificate by CLR for 4 districts (Gwalior,
Jabalpur, Indore and Bhopal). As soon as the solution is
successfully implemented in all the Tehsils of a district other
than pilot districts, payments for that district will commence
Payment shall commence for the districts where
all tehsil locations have gone live. As per Work
Completion terms, revenue for 4 pilot locations
shall commence from 65 weeks
No
451Wipro Ltd.,
Bangalore
1.4 Tape Library
Backup, Point # 10
Hot swappable drives, power supply and cooling fans,
Redundant power supply and cooling fansPlease change to Hot Swappable/Pluggable Drives. Shall be amended in the RFP. Yes
1.4 Tape Library
Backup
452Wipro Ltd.,
Bangalore
1.4 Tape Library
Backup, Point #7 Must Support LTO, SDLT, DLT, etc. Tape drives
SDLT & DLT are earlier generation drives and are now END-OF-
LIFE, hence request you to please remove SDLT & DLT.Already addressed
453Wipro Ltd.,
Bangalore1.21 & sr. no. 9
MUST HAVE DUTY CYCLE - UPTO 2 LACS PAGES
PER MONTH
Duty cycle of a machine means maximum print that can be
taken out from a machine in a month once or twice in a year As
per industry norm in this category of machines, maximum
possible duty cycle can be 1,00,000 only.
No change in RFP No
454Wipro Ltd.,
Bangalore1.21 & sr. no. 20 MUST HAVE MINIMUM FAX MEMORY 250 MB
As per industry norm in this category of machines, maximum
possible memory for FAX can be 32MB onlyNo change in RFP No
455Wipro Ltd.,
Bangalore1.20 & sr. no. 10
MUST HAVE DUTY CYCLE - UPTO 2 LACS PAGES
PER MONTH
Duty cycle of a machine means maximum print that can be
taken out from a machine in a month once or twice in a year As
per industry norm in this category of machines, maximum
possible duty cycle can be 1,00,000 only.
No change in RFP No
456Wipro Ltd.,
Bangalore1.20 & sr. no. 21 MUST HAVE MINIMUM FAX MEMORY 250 MB
As per industry norm in this category of machines, maximum
possible memory for FAX can be 32MB onlyNo change in RFP No
457Wipro Ltd.,
Bangalore5.3.5.4
In order to provide an indicative idea to the bidders
about the volume of data entry to be done,
approximately 1,00,000 data sheets are available with
the department for the entire State of Madhya Pradesh
with each sheet having a matrix of 1 row x 20
columns. A sample copy of the data sheet shall be
provided to the bidders upon written request. Bidders
should note that the figure mentioned above is merely
indicative and is subject to change.
1. Are these sheets Available in the form of open sheets or bind
books.
2. Is the sheet Size unique or it varies? What is the sheet size?
3. Is the bidder expected to scan these records also?
Mostly in bind books. Scanning is not in scope.
Only data entry has to be done.No
Commissioner Land Records Settlement, Madhya Pradesh Page 43 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
458Wipro Ltd.,
Bangalore5.3.5.2
The data entry in both Hindi and English shall have to
be done at the respective IT Centre being established
by the successful vendor as part of this RFP
1. Will CLR provide the required seats, Power, desktop and
other required infrastructure for data entry or bidder is expected
to do the arrangements.
2. How many of the records are available in Hindi language?
1) Bidder to make the arrangements. CLR shall
provide the data to be entered. 2) Records are
in Hindi with numericals in English
No
459Wipro Ltd.,
Bangalore5.3.13.2.11
Whenever a hardcopy document is taken out of the
record room, the information has to be fed in to the
system with document id (identified with barcode
reader), person taking the document (identified with
biometric fingerprint authentication), date and time
(taken from the server), contact details of the person,
expected return date etc.
1. Are the physical copies of the data already labeled with the
barcodes?Currently not. But this is proposed to be done as
a part of another projectNo
460Wipro Ltd.,
Bangalore5.4.5
For the purpose of training, CLR shall provide only
basic infrastructure like space and basic furniture. All
other cost incurred in providing the training including
training material, desktops, LCD projector during the
training period, travelling to the training site and back,
boarding of the trainer etc is to be included in the GIS
application development cost.
What is the preferred language for training material Hindi or
English?
This shall be decide during the due course of the
projectNo
461Wipro Ltd.,
Bangalore5.4.7
The training locations and minimum number of
departmental staff to be trained shall be as follows.
Vendors should note that the number of people to be
trained may vary as per the decisions of CLR and
vendors are bound to train additional staff if requested
without additional cost:
This is an open statement, bidder request to set the upper
threshold for the number of users.Already addressed
462Wipro Ltd.,
Bangalore5.6.1
Supply of required manpower for operating the
solution with full functionalities at all locations including
State Data Centre, disaster recovery site and all user
locations. However, the super user shall be a
Government employee.
Operate solution with full functionalities at user location , bidder
request to explain the sentence. Is the bidder expected to do the
day to day activities of CLR department or only the
administration of the solution.
Administration of Solution and day-to-day
activities to be done through the developed
solution (eg: data editing, mutation, print-outs
etc) as mentioned in the RFP. Refer Sec 5.6 for
better clarity.
Yes Sec 5.6.3
463Wipro Ltd.,
Bangalore5.1.1, Pg 42
Design, Installation, Testing, Configuration,
Commissioning, Running and Maintenance of the
entire IT infrastructure required for the Enterprise Web
Based GIS Solution mentioned in this tender at the
State Data Centre facility provided by Government of
MP and Disaster Recovery Data Centre facility
provided by NIC
As SDC will be done by SI shortlisted by GoMP what will exact
scope of work in Design, Installation, Testing, Configuration,
Commissioning, Running and Maintenancein in SDC for CLR
RFP as the same work is of SI doing SDC for GoMP. Is SI
shortlisted for CLR RFP only suppose to do vendor
management with SDC SI?
Refer Annexure VIII for details Yes Annexure VIII
464Wipro Ltd.,
BangaloreGeneral Network Managemnt System
Bidder only need to quote for NMS agents as NMS will already
available in SDC. Pl share SDC NMS details.Refer Annexure VIII for details Yes Annexure VIII
465Wipro Ltd.,
BangaloreGeneral RTO/RPO Pl give details of RTO and RPO
RPO (Recovery Point Objective) should be 30
minutes. This means if at 10 AM data is
replicated and data center crashes at 10:29AM,
then all transactions between 10AM to 10:29AM
will be lost permanently and will have to be
manually reentered. However, data editing
should be done through SAN based Mirroring
s/q to ensure zero lag between data at SDC and
DR site.
No
466Sify Technologies,
BhopalAnnexure III - Pt. 7 The solution has adherence to GoI fonts standards
Please clarify which components of the solution these refer too
like RDBMS,GIS TOOL or application. Already addressed
467Sify Technologies,
BhopalAnnexure III - Pt. 8
The solution has adherence to Land Region
Cartographic Codification Standards
Please clarify which components of the solution these refer to
like RDBMS, GIS TOOL or application. Already addressed
468Sify Technologies,
BhopalAnnexure III - Pt. 30
Properly commented complete source code of the
components designed and custom developed by the
vendor for CLR based on this RFP will be supplied
Hope this is restricted to the source code of the application
developed by the vendor not of the OEM components like OS,
RDBMS etc.
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 44 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
469Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The proposed solution should support R-Tree index support and
the R-Tree should not emulated with recursive SQL Queries,
Reason:
Recursive SQL degrades the performance, consume machine resources
which is more evident when we perform complicated queries or query on
large data. R-Tree indexing should optimally use machine resources and
follows the bounding box concept for indexing which gives excellent
performance. It should eliminates the need to examine objects outside the
area of interest which otherwise would need to evaluate every object to find
those that match the query criteria. The Spatial indexes should not require
the grid size to be set, to determine the granularity of the data because if the
character of the data changes it generally have to rebuild it but R-Tree
implementation himself should be smart enough to readjust its internal
structures and optimize paths, as the data changes
Already addressed
470Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
In the proposed solution Spatial data type implementation
should be as actual data type and not as nested numeric array
in large object.
Reason:
The spatial being actual data type makes it easier to manipulate data and
write simple SQL queries. This should enable the end user to make use of
the Spatial data types just like standard data types, as part of the SQL's (
queries, functions and procedures ) without any special consideration.
Already addressed
471Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
In the proposed solution.
Reason:
Replication of spatial data should be supported in all editions of the
database.This is required for a tree structure system implementations to
make the solution most cost effective. The leaf nodes should also be
Replication of spatial data enable but a light edition will make the cost more
effective as the leaf nodes does not always require large system and
database load.
Already addressed
472Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
In the proposed solution Automatic validation of spatial data
should be there without requiring separate functions to be
executed to check the validity of inserted data.
Reason:
This helps in ensuring the data consistency thought the data life cycle.
Which also ensures that the data inserted at any node will be replicated
immediately only if it is valid data.Which means, it ensures the data
consistency across all nodes all time without any extra efforts.
Already addressed
473Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have Content Manager with web
2.0 based UI with drag and drop features of adding docs to the
content repository
Reason: In Land Record System, Documents need to added at
any point of time in any account, if it is not web 2.0 based UI,
then it is very much chance to add wrong document or working
is not easy for user.
Already addressed
474Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveContent Manager should
provide deep integration with MS Office which includes viewing
the content repository folder structure in MS Office App and also
should provide initiate and view linear tasks
Reason: While adding the documents in Existing folder , if folder
hierarchy is not visible then in huge volume of document
accuracy maintenance is a problem
Already addressed
475Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveAll the basic document
management capabilities to be part of the content manager like
search, add, access, security, versioning
Reason: This is the basic requirement of any DMS System
Already addressed
476Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveContent duplication to be
checked at the content repository level.
Reason:At the time of merging of the repository from different
location, this should be required
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 45 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
477Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have CMIS support for the
content repository, new std which will help in integration of the
DMS with the other LOB applications.
Reason:Land record system required to integrate with different
Department, then this capability of product is essential
Already addressed
478Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThis content Manager
repository should be well integrated with all the standard
databases like DB2/Oracle/MS-Sql Server.
Reason:At the time of merging of the repository from different
location, this should be required
Already addressed
479Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should have workflows subscription to launch / initiate workflows
when the content is added in the content manager.
Reason:In Land Record System, document flows from different dept, which
requires different kind work flow
Already addressed
480Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows should be
part of the same content platform and infrastructure pre-
integrated.
Reason:If workflows is not part of Content Platform then
designing and execution of workflows would be easy and error
less
Already addressed
481Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should take input from visio as XML file
Reason:Land record system required to integrate with different
Department, then this capability of product is essential
Already addressed
482Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should have email alerts, escalations, send mail triggers all out
of the box.
Reason:This days official communication is through mails so this
is a must requirement
Already addressed
483Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should have content exception handling capabilities like wait for
condition without writing code
Reason:Workflows should be so easy configurable, so Work
should be help due to workflows creation
Already addressed
484Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should have out of the box 20+ workflows reports with process
analyzer. Reason:This
is required to automate the Land record work flow, which needs
to easily configurable
Already addressed
485Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveRecords Manager should
support electronic, physical and hybrid records
Reason:Record Manager needs to keep tracks of records.
Records can be any form , it can be digital, physical or hybrid.
Application should be handle these kind of records
Already addressed
486Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveRecords Manager should
support zero click records declarations
Reason:In a huge volume of land record docs, it is very difficult
to marks documents as records. It should be policy driven
Already addressed
487Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have Records Manager should
allow addition of box / barcode information
Reason:It is required to complete the solution. Bar Code
required for record management
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 46 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
488Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have Records Manager should
support integration with the physical records manager company
like Iron Mountain
Reason:This is a must requirement for land record kind of
system
Already addressed
489Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have The proposed
Enterprise Content Management (ECM) solution should be
platform independent and available on 3-tier architecture with
each tier fully independent Reason:Land
record is a huge application , which need to integrated with
different Dept. Application and it also required to get the
information from different dept. Business requirement also
changes very frequently. If application tier is not a separate
layer then it is very difficult
Already addressed
490Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
he proposed solution should support for the communication
protocols such as Lightweight Direct Access Protocol (LDAP),
Hypertext Transport Protocol (HTTP), SOAP, WSDL, XPDL,
BPMN, IIOP, Web2.0, MTOM, CMIS, DITA etc.
Reason:Business demands changes frequently, if application is not
standard based then applicable of changes are difficult
Already addressed
491Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The proposed solution should support for both vertical &
horizontal scalable solution. It should support for Sever Farm &
Server Cluster to provide High Availability (HA) & Disaster
Recovery (DR) solution
Reason:Application like land record system , which is base application
for different dept. So it should be well protected with DR and HA
Already addressed
492Sify Technologies,
Bhopal
Annexure III -
Compliance MatrixProposed Inclusion in the tender document
The solution should have the single user interface for all
integrated Enterprise Content Management applications like
Content Manager, Business Process Manager, Record
Manager and eForm solution and the user interface should
have standards-based (HTML, WebDAV) with zero download.
Also it should integrate with office desktop applications,
rendition engine (PDF & HTML) and messaging as out of the
box.
Reason:Land record is a huge application , which need to
integrated with different Dept. Application and it also required to
get the information from different dept. Business requirement
also changes very frequently. If application tier is not a separate
layer then it is very difficult
Already addressed
493Sify Technologies,
BhopalSection 6.6.6
If the vendor is using discrete components for related
items, it is preferred that they are from same OEM to
ensure native integration.
As per NSS/Major Security Audit report which specifically
mentions that solution of Firewall and IPS being from the same
OEM means that they have the same security
approach/database and if the firewall is compromised than
chances are that IPS too would be compromised because
attacker will try to exploit the NIPS with knowledge of Firewall
Vendor vulnerabilities. Hence as part of layered security
approach there should always be Firewall and IPS from different
OEM's.
If the vendor is using discrete components for
related items, it is preferred that they are from
same OEM to ensure native integration but no
compromise with intrusion vulnerability. Vendor
has to specify the reason if they are using
different OEM on native integration. SDC will
provide the Intrusion Prevention solution
Yes Sec 6.6.6
Commissioner Land Records Settlement, Madhya Pradesh Page 47 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
494Sify Technologies,
BhopalSection 6.6.6
If the vendor is using discrete components for related
items, it is preferred that they are from same OEM to
ensure native integration.
A dedicated NIPS solution should have the following features:
- IPS Device should have minimum 2 Gbps througput. The IPS
should have a provision to be upgraded to 3 Gbps throughput
with license upgrade without changing the hardware.
- IPS system should provide protection for minimum 6 Gigabit
segments in a single Device.
- IPS system should have ASIC based High performance
Hardware Architecture consisting of switched ASICs, string
search ASICs and dual CPU for scalability, deep packet
inspection and performance.
- IPS system should have all the Signatures including Virus,
worms & malwares signatures developed in-house to avoid
dependency on third party for signatures updates.
Existing IPS/IDS for SDC to be used. Refer
Annexure VIII for specs.Yes Annexure VIII
495Sify Technologies,
Bhopal
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE
Section 1.7: Hardware
Load Balancer
Point no. 4
Point no. 7
Must have 3 Module Slots
Must have min. 32 10/100/1000 Ethernet ports
This specification is specific to a single vendor. The connectivity
can be done using an L2 swicth between the servers and load
balancer and achive load balancing for the servers, hence
requirement of 32 10/100/1000 ethernet port should not be
minimum requirement. The specifications could be generic like:
-Should have multi-core CPU Architecture.
-Should have 6 x 10/100/1000 BaseT Ports plus 1x1000Base-Lx
Port.
-Should have option for dedicated 10/100/1000 BaseT port for
out-of-band management.
Section Deleted. Existing infrastructure at SDC
to be used.Yes Annexure VIII
496Sify Technologies,
Bhopal
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE
Section 1.7: Hardware
Load Balancer
Point no. 10
Must have min. of two session accelerator
modules
This specification is specific to a single vendor. The criteria
should be based on the compression capability of the appliance.
The specifications could be generic like:
- Should provide minimum 100Mbps server-side http
compression and should be scalable up to 1 GBPS.
Section Deleted. Existing infrastructure at SDC
to be used.Yes Annexure VIII
497Sify Technologies,
Bhopal
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE
Section 1.7: Hardware
Load Balancer
Point no. 13
Must have Aggregate Bandwidth 20 Gbps
This specification is specific to a single vendor. As per the
section 6.3.2.6. "Number of concurrent view only users
(including department users and public users) considered for
design shall be 3000. However, the vendor is required to scale
his architecture at his cost to handle any increase in number of
users to meet the required service levels".
An appliance with throughput of 1 Gbps can handle the traffic
effeciently, hence the specifications could be generic like:
- Should capable to handle 100,000 L4 connections per second
- Should provide minimum 1 Gbps Layer-7 throughput and can
be scalable to 4-Gbps throughput.
Section Deleted. Existing infrastructure at SDC
to be used.Yes Annexure VIII
498Sify Technologies,
Bhopal
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE
Section 1.7: Hardware
Load Balancer
Point no. 14
Must have 1 GB flash memory disk
Depending on the architecture of the load balancer, the flash
memory requirement could vary. The important consideration
should be the RAM available on the device which is intensively
used durig the traffic load processing. It is suggested to modify
this like:
- Should have minimum 4 GB RAM and upgrade-able
Section Deleted. Existing infrastructure at SDC
to be used.Yes Annexure VIII
Commissioner Land Records Settlement, Madhya Pradesh Page 48 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
499Sify Technologies,
Bhopal
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE
Section 1.7: Hardware
Load Balancer
Point no. 17
Must support WebNS 8.10 Features
WebNS terminology is specific to a single vendor. Similar server
load balancing features are available with other vendors as well.
It is suggested to change it to like:
- Should support content based Load balancing features like
>HTTP Header based redirection
>URL-Based Redirection
>Browser Type Based Redirection
>Preferential Treatment (Cookie-Based)
- Should Support session persistency Based on: IP, DNS,
Cookie-based, URL Parameters, SSL Session ID-based etc…
- Should support TCP optimization and TCP Multiplexing
Section Deleted. Existing infrastructure at SDC
to be used.Yes Annexure VIII
500Sify Technologies,
Bhopal
SECTION 6:
TECHNICAL
REQUIREMENTS,
6.6 System Security
Design Requirements,
Point 6.6.1
The Solution should have stringent multi-level system
security design to prevent infected clients
As in security design stringent multi-level system security
design, please advice if you are looking for dedicate security
appliance (Firewall & IPS) at perimeter for internet and intranet
at DC & DR, If yes please correct the BoQ given in RFP ?......
As per the STATE DATA Centre Architecture and security
Design , It is highly recommended to have Tiered security model
by having two sets of firewall for Perimeter Zone to protect from
Internet and two sets of firewall for Interior Zone to protect
datacenter
Already addressed
501Sify Technologies,
Bhopal
ANNEXURE IV: 24
Port Giga Switch
4 Nos. GBIC ports with support for 1000 Base
SX/LX/LH/ZX. Vendor must configure ports for
commissioning
Please amend this to : 4 Nos. GBIC/SFP ports with support for
1000 Base SX/LX/LH. Vendor must configure ports for
commissioning. …. The small form-factor pluggable (SFP) is a
compact, hot-pluggable transceiver used for both
telecommunication and data communications applications and
is latest in comparison to GBICs, so please amend the
requirement with GBIC/SFP.
Already addressed.
502Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Switch control module with 2 GE (GBIC)
ports fully configured
Please amend this to : Should have switch control module with
500+ Gbps of switching backplane….As the port requirement is
mentioned separately in LB specification, it is rather important to
ask performance of switch control module. Switching backplane
and traffic forwarding is need to be taken care not only for load
balanced traffic but intra server traffic as well
Already addressed.
503Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
point 6 : Must have min. 6 GE Ports fully configured;
point 7 : Must have min. 32 10/100/1000 Ethernet
ports and point 9 : Must have min. of two 2-Port GE
I/O Module
Please consolidate three different port requirement mentioned in
specification and ask 48 10/100/1000 Mbps ports. Please
amend this to : Must Have minimum 48 x 10/100/1000 G ports
Already addressed.
504Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have SSL Termination
For SSL termination performance prospective it is
recommended to mention the required SSL TPS. Please
amend this to : Should have 3000 SSL TPS from day one and
should be upgradeable to 30,000 SSL TPS via software license
upgrade without any change in hardware
Already addressed.
505Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have min. of two session accelerator modules
Please amend this to : Should have hardware based HTTP
compression built in for application acceleration supporting
1Gbps compression from day one and should be upgradeable
to 6 Gbps via software license without any change in hardware
Already addressed.
506Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Active-Active layer 5 ASRPlease amend this to : Should support stateful failover between
two SLB units without any change required in network topologyAlready addressed.
507Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have VIP redundancyPlease remove this clause. This requirement is covered with the
stateful failover featureAlready addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 49 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
508Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Aggregate Bandwidth 20 Gbps
Please amend this to : Should support 4 Gbps L4/L7 throughput
from day one and should be upgradeable to 16 Gbps via
software license without any change in hardware. It recommend
to ask for the requirement throughput as per the current
requirement and ask the provision of scalability in same
hardware for future growth
Already addressed.
509Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must support WebNS 8.10 FeaturesIt is specific OS for a specific platform, request you to please
remove thisAlready addressed.
510Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Hotspare FeaturePlease elaborate this requirement or request you to please
remove thisAlready addressed.
511Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Auto Discovery and addition and removal
of Server resources without disrupting service
There is different way to achieve this as part of Health
monitoring capability and once unit is configured properly same
can be achieved, so this is more of the deployment point of
view, request you to please remove from hardware specification
prospective
Already addressed.
512Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Load Balancing Predicator : Least Connection +
Server Response Time
Request you to please remove this, as there can be other
available predicator used for similar functionality achievementAlready addressed.
513Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Must have Global Server Load Balancing Feature
Global Server load balancing requires heavy resource & running
it on common hardware can lead to resource contention hence
its recommended to keep local server load balancing and global
server load balancing on separate hardware. Please rather
mention that these should be from same OEM and both
products can integrate seamlessly to provide entire solution.
Already addressed.
514Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Please Add
Should support HTTP deep packet inspection (HTTP header,
URL, and payload)…..The app LB is designed to serve as a last
line of defense for servers and applications in data centers. The
data center security protects against protocol and denial-of-
service (DoS) attacks and encrypts mission-critical content. The
App LB data center security capabilities protect the data center
and critical applications from malicious traffic so the mentioned
features are very important
Already addressed.
515Sify Technologies,
Bhopal
ANNEXURE IV: 1.7 -
Hardware Load
Balancer
Please Add Should support Virtual connection state for UDP Already addressed.
516Sify Technologies,
Bhopal
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Must support OPSEC or EquivalentOPSEC is specific to certain OEM ,Request you to remove this
line to accommodate competitionAlready addressed.
517Sify Technologies,
Bhopal
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Should support Virtual Router Redundancy Protocol
VRRP is the Redundancy protocol used mainly in the Router for
High Availability .Firewall High availability is achieved using
Active/Active or Active/Standby . Support for VRRP is specific
to certain OEMs ,Hence we request you to remove this line to
accommodate competition
Already addressed.
518Sify Technologies,
Bhopal
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Content filtering, URL filtering support, SPAM mails
filtering
Content filtering, Spam mail filtering,URL filtering etc are very
very resource intensive. It is generally observed that whenever
this feature is enabled on non dedicated device the overall
performance reduces and impacts the network performance.
Hence we request you bring these features on dedicated device
Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 50 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
519Sify Technologies,
Bhopal
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Please add
The firewall should support SSL VPN….The firewall should have
capability to act as SSL VPN gateway so that users can connect
to intranet application securely through internet
Already addressed.
520Sify Technologies,
Bhopal
ANNEXURE IV: 1.8
Firewall, Intrusion
Detection and
Prevention System
Please add
The security appliance should support virtual firewalls contexts
for logical segregation of traffic flows………...Each Virtual
Firewall security context acts as a separate firewall with its own
security policy, interfaces and configuration, this helps
businesses to deploy virtual firewalls within an appliance to
enable compartmentalized control of security policies on a
departmental level.
Already addressed.
521Sify Technologies,
Bhopal
ANNEXURE IV: 1.9
24 Port Manageable
Switch
1U Rack-Mount
24 Nos. 10/100Mbps RJ-45 MDI-X ports,
2-port Single Mode 1000BaseX(SX) module port
(inbuilt)
Vendor shall configure the 1000BaseX Port for
connectivity to multimode Fiber Optic Cable
Please correct the statement, as in same statement you are
asking single and multimode transreceivers. As you mentioned
SX, so please mention multimode. Please
amend this to : 1U Rack-Mount
24 Nos. 10/100Mbps RJ-45 MDI-X ports,
2-port Multimode Mode 1000BaseX(SX) module port (inbuilt)
Vendor shall configure the 1000BaseX Port for connectivity to
multimode Fiber Optic Cable
Already addressed.
522Sify Technologies,
Bhopal
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must support hardware assisted VPN encryption
modules
Please amend this to : Must have hardware assisted VPN
encryption modules/ onboard from Day 1Already addressed.
523Sify Technologies,
Bhopal
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must support 256Kbps onwards and up to 24Mbps or
more bandwidth
As mentioned in the clause 6.3.1.3.1 of RFP, on an average
each record room would have not more then 7 users and even
after taking 100% scalability and considering concurrent users, 4
Mbps of bandwidth at each of the remote node would be
sufficient. So considering the optimal use of infrastructure
request you to reduce the bandwidth support upto 12 Mbps.
Please amend this to : Must support 256Kbps onwards and up
to 4 Mbps or more bandwidth
Already addressed.
524Sify Technologies,
Bhopal
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Must Support FirewallPlease amend this to : The Router should be able to support a
Stateful and Zone Based Firewall. Already addressed.
525Sify Technologies,
Bhopal
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement
The router should support adaptive routing adjustments by
doing routing path selection based upon advanced criteria like
Response time, packet loss, delay, jitter, MOS, path availability,
traffic load and cost policies to intelligently control the traffic to
maximize the quality of the user experience.
Already addressed.
526Sify Technologies,
Bhopal
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement Should support hierarchical QoS for voice and video Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 51 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
527Sify Technologies,
Bhopal
ANNEXURE IV: 2.2
Router for IT Centres
as well as for
connecting Record
Rooms
LAN/Inter-building
fibre
Please add in Router Functional Requirement
Should support detailed performance monitoring tools to
measure state of the network in real time. The SLA operations
shall provide information on TCP/UDP delay, jitter, application
response time, VoIP MOS score, Packet Loss etc.. This
feature will enable you assure new business-critical IP
applications, as well as IP services that utilize data, voice, and
video, in an IP network. By provisioning this, users can verify
service guarantees, increase network reliability by validating
network performance, proactively identify network issues, and
increase Return on Investment (ROI) by easing the deployment
of new IP services. IP SLAs uses active monitoring to generate
traffic in a continuous, reliable, and predictable manner, thus
enabling the measurement of network performance and health.
Already addressed.
528Sify Technologies,
Bhopal
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE,
1. Indicative quantities
for IT Infrastructure
Point 50 : Router
Please clarify if you have asked the same specification for the
DC & DR router as of IT center router? Further you have asked
only 4 router each at DC &DR, presuming these are 2 each for
WAN and internet, still router for the replication among DC & DR
are missing?
Already addressed.
529Sify Technologies,
Bhopal
ANNEXURE VI:
INDICATIVE
QUANTITIES FOR IT
INFRASTRUCTURE,
1. Indicative quantities
for IT Infrastructure
Multi-protocol Router for SAN Based MirroringWe are not able to find out the specification for this product.
Please clarify ?Already addressed.
530Sify Technologies,
Bhopal
ANNEXURE IV:
COMPLIANCE
MATRIX FOR
INFRASTRUCTURE;
1.5 24 Port SAN
Switch
Must be activated and fully configured for 24- PORTS
along with required SAN Host Connectivity and
licenses
Please amend this to : Must be activated and fully configured for
24- PORTS along with required SAN Host Connectivity and
licenses and additional 2 Nos of dedicated 10 Gbps FC ports
for a high speed stacking or linking.
No change in RFP
531Sify Technologies,
Bhopal
SECTION 6:
TECHNICAL
REQUIREMENTS
Requirement of Core Router for connecting DC and
DR ?
As per the RFP BOQ "ANNEXURE VI: INDICATIVE
QUANTITIES FOR IT INFRASTRUCTURE" Requirement of
Core Router for connecting State data centre to Disaster
Recovery has not been mentioned Kindly clarify on that
Already addressed.
532Sify Technologies,
Bhopal
SECTION 6:
TECHNICAL
REQUIREMENTS
Desktop based Video Conferencing
Are you looking for looking for a Software Based/Server Based
solution only or are you looking for hardware based VC solution
with centralized MCU
Already addressed.
533Sify Technologies,
Bhopal
SECTION 6:
TECHNICAL
REQUIREMENTS
Desktop based Video Conferencing
As L&R department have 342 locations IT Centers, 1 Ho and
DC & DR , Please clarify how many multiparty connectivity on
video conferencing is department looking for to connect
simultaneously or concurrently
Already addressed.
534Sify Technologies,
Bhopal
ANNEXURE VI: 1.
Indicative quantities
for IT Infrastructure;
1.25 Desktop Video
Conferencing
Equipment
Dialing Capabilities; Directory Service; Internet Locator
Service (ILS) support; H.323 external gatekeeper,
gateway and MCU support
Please clarify if H.323 based solution or will the SIP based
solution also accepted as the features desired can be fulfilled by
SIP based solutions
Already addressed.
535Sify Technologies,
Bhopal
ANNEXURE VI: 1.
Indicative quantities
for IT Infrastructure;
1.25 Desktop Video
Conferencing
Equipment
Instance messaging and presence is provided
Are you looking for software based solution which can provide a
client and web camera solution at the spoke location and a
server which can cater to video capabilities at the DC / DR
Location
Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 52 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
536Sify Technologies,
Bhopal
ANNEXURE VI: 1.
Indicative quantities
for IT Infrastructure;
1.25 Desktop Video
Conferencing
Equipment
Internal Processor Based Please clarify what does this statement means, what is expected Already addressed.
537HP India Sales Pvt.
Ltd, Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.6 24 Port Giga
Switch (MAF
Required), pg no 133
Sr. no. 4
4 Nos. GBIC ports with support for 1000 Base
SX/LX/LH/ZX. Vendor must configure ports for
commissioning
Pls mention type of fiber transcivers required for configuring the
portsAlready addressed.
538HP India Sales Pvt.
Ltd, Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.6 24 Port Giga
Switch (MAF
Required), pg no 133
New clause Addition
"Switch OEM should be in top 5 of the Magic Quadrant of latest
Gartner report"
Reason: This shows the capability of an OEM in terms of
reliability, deployment, research Which is required for such huge
deployment.
Already addressed.
539HP India Sales Pvt.
Ltd, Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.9 24 Port
Manageable Switch
(MAF Required), pg
no 137
New clause Addition
"Switch OEM should be in top 5 of the Magic Quadrant of latest
Gartner report"
Reason: This shows the capability of an OEM in terms of
reliability, deployment, research Which is required for such huge
deployment.
Already addressed.
540HP India Sales Pvt.
Ltd, Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.8, pg no 135 Sr. No.
3
Must support OPSEC or Equivalent
"Must support OPSEC/ICSA"
Reason: OPSEC is vendor specific. ICSA is a industry standard
certification which firewall,IPS OEM adhere to.
Already addressed.
541HP India Sales Pvt.
Ltd, Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.8, pg no 135 Sr. No.
32
Must have redundant power supply
"delete this clause"
Reason: As the devices are going to work in HA (High
Availibility) mode we request you to delete this clause
Already addressed.
542HP India Sales Pvt.
Ltd, Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.8, pg no 135
New clause Addition
The proposed internal/external IPS should support up to
6,500,000 concurrent network sessions and 115,000 connection
per seconds with security context for up to 1,200,000 sessions.
System IPS throughput should be upto 750Mbps
Already addressed.
Commissioner Land Records Settlement, Madhya Pradesh Page 53 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
543HP India Sales Pvt.
Ltd, Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.8, pg no 135
New clause Addition
The proposed internal/external IPS must support zero power
external bypass module which taps power from IPS for
operation with upport full stateful redundancy solution (Active-
Passive, Active-Active)
Already addressed.
544HP India Sales Pvt.
Ltd, Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
2.2 Router for IT
Centres as well as for
connecting Record
Rooms LAN/Inter-
building fibre, pg no
177 Sr. No. 18
Must support for NAT, ACLs, 3DES, IPSEC, L2TP,
Integrated Firewall, IDS Support, Time based Access List, CRTP
"Remove IDS".
Reason: IDS/IPS features are already asked in a separate
appliance and hence not required on the router. This will add
unnecessary investment.
Already addressed.
545HP India Sales Pvt.
Ltd, Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
2.2 Router for IT
Centres as well as for
connecting Record
Rooms LAN/Inter-
building fibre, pg no
176/177
New clause Addition
"Router should support interfaces like Wi-Fi, 3G on the router
itself"
Reason: For scalability, flexibility in deployment and future
investment protection.
Already addressed.
546HP India Sales Pvt.
Ltd, Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
2.2 Router for IT
Centres as well as for
connecting Record
Rooms LAN/Inter-
building fibre, pg no
176/177
New clause Addition
"Router should have EAL2 certification at the time of bidding"
Reason: This shows the capability of an OEM in terms of
reliability, deployment, research Which is required for such huge
deployment.
Already addressed.
547HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.2
page no 127
Must have media tray at the front with a DVD drive, one
USB port, and a system-status panel.
Suggested change: Chassis should be supplied with DVD drive/virtual media
capability sharable across all the blade servers; One USB port and system status
panel.
Reason: "Media Tray at the front with a DVD drive " is specific to particular OEM(s);
Others may provide virtual media OR external DVD drive.
Chassis should be supplied with DVD
drive/virtual media capability sharable across all
the blade servers; One USB port and system
status panel.
Yes Annexure IV- 1.2
548HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.2
page no 127
Must have four hot swap power module bays with two
power modules populated
Suggested Change: Must be provided with fully populated power
supplies and fully populated fan/blower modules.
Reason: "Four Hot swap power module bays" is specific to particular OEM. No of
power supply and fans/blowers may vary for different OEMs. Mentioning fully
populated will serve the purpose.
Must be provided with fully populated power
supplies and fully populated fan/blower modulesYes Annexure IV- 1.2
549HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.2
page no 127Must be configured management software
Suggested change" Must be configured with management
software; Fully working license for the whole chassis is
required".
No change in RFP No
550HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.3
page no 128Must be configured for min. of 40,000 IOPS
Question: Is it Disk IOPS desired or cache IOPS desired ?
Please clarifyMust be configured for min. of 40,000 Disk IOPS Yes Annexure IV- 1.3
Commissioner Land Records Settlement, Madhya Pradesh Page 54 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
551HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.3
page no 128
Must be configured for intermix of FC and SATA HDDs
under the same pair of controllers
Suggested Change: "Must be configured for intermix of FC and
SATA/FATA HDDs under the same pair of controllers".
HP Provides FATA hard disks which are equivalent or better to
SATA hard disks.
Must be configured for intermix of FC and
SATA/FATA HDDs under the same pair of
controllers
Yes Annexure IV- 1.3
552HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.3
page no 128
Storage System must support Windows 2000, 2003,
HPUX, Sun Solaris, IBM AIX, UNIX, Linux and Novel
operating system in a heterogeneous SAN
environment
Suggestion: Please remove Windows 2000 as Windows 2000 is
out of support.
Storage System must support Windows Server
2007 or latest, HPUX, Sun Solaris, IBM AIX,
UNIX, Linux and Novel operating system in a
heterogeneous SAN environment
Yes Annexure IV- 1.3
553HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.3
page no 129
Must have 32 Nos. of 4Gbps 146GB 15,000 RPM
Fiber Channel Drives with 8 Disks on RAID 0+1, 1 as
Global Hot Spare and remaining configured as RAID 5
groups
Suggested change: Must have 32 Nos. of 4Gbps 300 GB
15,000 RPM Fiber Channel Drives with 8 Disks on RAID 0+1, 1
as Global Hot Spare and remaining configured as RAID 5
groups"
Reason: 146 GB 15k rpm FC HDD is End of life
Must have 32 Nos. of 4Gbps 300 GB 15,000
RPM Fiber Channel Drives with 8 Disks on RAID
0+1, 1 as Global Hot Spare and remaining
configured as RAID 5 groups
Yes Annexure IV- 1.3
554HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.3
page no 129
Storage Management Software
Must be GUI as well as CLI, centrally manage the
complete range of arrays over the network, support for
web based management, tracking and recording of
actions on the system. Software license should be
provided for unlimited expansion over SAN. The
management software should have the features such
as Dynamic RAID level migration, Dynamic capacity &
volume expansion, Dynamic Segment size expansion,
Monitoring and reporting of alarm conditions,
Diagnostic tools for subsystems and recovery, LUN
Masking, Performance Monitoring, Generation of Mails
and SNMP alerts, Point in time copy functionality and
Disk system should be capable of Remote copying
Suggestion:Please remove Dynamic Segment size expansion.
Reason: This is OEM specific. HP Storage does automatic
segment sizng based on incoming I/O pattern.
Deleted "Dynamic Segment Size expansion"
from the existing clauseYes Annexure IV- 1.3
555HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.4
page no 130
Min. 4 Nos. of Generation 4 LTO Drives or latest
supporting min. of 800 GB uncompressed capacity
should support min. of 6 drives
Suggested Change: Min. 4 Nos. of Generation 5 LTO Drives or
latest supporting min. of 800 GB uncompressed capacity should
support min. of 6 drives either by expanding or cascading.
Reason: LTO5 is the latest generation
Already addressed
556HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.4
page no 130
Interface of Min. 4Gbps to connect to Fiber Switch.
Each set of 2 drives should be on a separate SAN
Interface
Suggestion: Clause Needs to be removed
Reason: Each LTO 4/5 Drive has its own native FC interface. Already addressed
557HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.4
page no 130Must Support LTO, SDLT, DLT, etc. Tape drives
Suggestion: Clause Needs to be removed.
Reason: Tape library supports only LTO generation cartridgeAlready addressed
558HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.4
page no 130
Should have min. data transfer rate of 80Mbps per
drive
Sugegsted Change: Should have min. data transfer rate of
140MBps per drive
Reason : As per LTO5 standards.
Already addressed
559HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.5
page no 133
Must be configured to support distance of 35KMS and
more.
Suggested Change: Must be configured to support distance of
30 KMS or more.
Reason: 35Kms or more is specific to particular OEM. Others
certify it at 30 Kms or more
Must be configured to support distance of
30KMS and more.Yes Annexure IV- 1.3
560HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.5
page no 133
Must allow creation of hardware based isolation
environments within a single SAN Fabric or switch.
Each Virtual Fabric must have independent fabric
services, zoning database, name servers and FSPF
process
Suggestion: Clause Needs to be removed.
Reason: OEM specificSection deleted. Yes Annexure IV- 1.3
Commissioner Land Records Settlement, Madhya Pradesh Page 55 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
561HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.3
page no 133
Must be configured for RADIUS, TACACS, AAA, port
security, fabric binding, Secure FTP, SSHv2, SN M
Pv3.
Suggestion: Please remove RADIUS, TACACS, port security,
Fabric Binding
Reason: OEM Specific. Different OEMS have different protocol
support for authentication and authorization.
No change in RFP No
562HP India Sales Pvt.
Ltd, Gurgaon
Annexure IV- 1.3
page no 134Switch must have role based administration Suggestion: Please remove: OEM specific. No change in RFP No
563Vayam Tech,
Gurgaon
Annexure IV - 1.3,
Row 3
Must be configured on full Fiber Channel end-to-end of
4Gbps or latest
4Gbps end-to-end connectivity is older technology. The industry
now offers newer, better technology, wherein front-end
connectivity is 8Gbps FC, and back-end connectivity is 6Gbps
SAS. Most of the leading storage vendors are already offering
this. Is there any specific reason why 4Gbps end-to-end
connectivity is required? With existing specifications, vendors
can opt to offer older technology. Suggested specification:
SAN Storage should be configured with at least 4 numbers of 8
Gbps Fiber channel (FC) front-end ports per controller (i.e. a
total of at least 8x 8Gbps FC front end ports across Dual
controllers) for front-end host connectivity.
Must be configured on full Fiber Channel end-to-
end of 8Gbps or latestYes
Annexure IV -
1.3
564Vayam Tech,
Gurgaon
Annexure IV - 1.3,
Row 4
Must be switched Fiber Disks with each disk
connected to 2 separate ports on the switched Fabric
For the back-end connectivity, please allow SAS connectivity as
well. Suggested specification:
Must use FC or SAS connectivity with at least 2 ports /controller.Already addressed
565Vayam Tech,
Gurgaon
Annexure IV - 1.3,
Row 9Must be configured for min. of 40,000 IOPS
Is the IOPS specification for disk IOPS or for cache IOPS?
Please specify. Suggested Specification:
Must be configured for minimum of 400000 cache IOPSAlready addressed
566Vayam Tech,
Gurgaon
Annexure IV - 1.3,
Row 22
Must have 32 Nos. of 4Gbps 146GB 15,000 RPM
Fiber Channel Drives with 8 Disks on RAID 0+1, 1 as
Global Hot Spare and remaining configured as RAID 5
groups
Please allow both FC and SAS disks. Suggested Specification:
146GB or higher; 15,000 RPM; FC or SAS drivesAlready addressed
567Vayam Tech,
Gurgaon
Annexure IV - 1.3,
Row 23
System must be expandable up to 100 nos. of 4Gbps
146GB 15,000 RPM Fiber Channel Drives
Please allow both FC and SAS disks. Suggested Specification:
146GB or higher; 15,000 RPM; FC or SAS drivesAlready addressed
568Vayam Tech,
Gurgaon
1.4 Tape Library
Backup - Row 3
Min. 4 Nos. of Generation 4 LTO Drives or latest
supporting min. of 800 GB uncompressed capacity
should support min. of 6 drives
With LTO tapes, LTO5 is the newer technology, which enables
higher capacity per cartridge, and faster backup speeds. Also,
LTO5 tape drives can also read-write LTO4 cartridges.
Suggested Specification:
Min. 4 number of Gen 5 LTO drives, supporting a min. of 1.5TB
uncompressed capacity
Already addressed
569Vayam Tech,
Gurgaon
1.4 Tape Library
Backup - Row 7Must Support LTO, SDLT, DLT, etc. Tape drives
It is recommended to not mix different tape technologies in the
same tape device. It is recommended to go for LTO5 only;
specifically, LTO5 as it is the newer technology. Suggested
specification:
Must support LTO tape drives
Already addressed
570Vayam Tech,
Gurgaon
1.4 Tape Library
Backup - Row 8
Configured for automatic tape loading for backup and
restore
Backup and restore features also depend on the functionality of
the backup softwareNo change in RFP.
571Vayam Tech,
Gurgaon
1.4 Tape Library
Backup - Row 9
Should have min. data transfer rate of 80Mbps per
drive
With LTO5 technology, we can get data transfer rates of up to
140Mbps. Suggested specification:
Should support data transfer rate of 140MbpsAlready addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 56 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
572Vayam Tech,
Gurgaon
Pg. -11, Para 1.3.1;
Pg. 194, para 2.1
(Non-IT Infrastructure
development)
1. Design, supply and co-locate the entire IT
infrastructure required for the Enterprise Web Based
GIS Solution mentioned in this tender at the State
Data Centre facility provided by the Government of
MP at Bhopal and Disaster Recovery Data Centre
provided by NIC at Hyderabad for Managing Land
Records.
2. Precision Air Conditioning System for Server Room
1. Kindly clarify what all facilities will be provided at the SDC and
DRC site?
2. Generally Air Conditioning System and other Civil works at
SDC and DR site (provided by 3rd party) are provided by the
Owner of the Location whereas in the tender document the
same is desired to be done by the bidder. Kindly elaborate.
Refer Annexure VIII for details Yes Annexure VIII
573Vayam Tech,
GurgaonPg. -11, Para 1.3.1;
Design, Establishment, Installation, Configuration,
Commissioning,
Running and Maintenance of IT Centers at 342 user
locations
Please elaborate on the desired Infrastructure at each of the
342 Locations.
Whether workstation / Computer is to be provided at at the
locations.
Refer to Annexure IV for proposed infrastructure
at IT Centres along with minimum specificationsNo
574Vayam Tech,
GurgaonPg. - 11, Para 1.3.4
State Wide Area Network (SWAN)
connectivity………….SWAN PoP through supply and
installation of all equipment/materials required at the
vendor‟s cost.
Kindly share technical details of the existing LAN Infrastructre to
access requirements and compatibility with the envisaged
system.
LAN has to be set up by the Bidder. No
575Vayam Tech,
GurgaonPg-11 Para 1.3.2
Design, Establishment……Only space shall be
provided by the department
Client has mentioned about meter installation. How many
electric meters have to be procured and installed?
Vendor is supposed to suggest it in his solution.
A site visit is advised.No
576Vayam Tech,
GurgaonPg-12 Para 1.3.5 Existing data What is the total quantity of data that has to be checked? Refer Sec 5.5 for clarity No
577Vayam Tech,
GurgaonPg-14 Para 1.4.5.1
Conversion of Existing Record Rooms to Cyber
Record Rooms
What is the volume of the data that has to be digitally
converted?
Refer 1.4.5.2 for clarity. Digital Conversion of
data at Record Rooms is part of another projectNo
578Vayam Tech,
GurgaonPg.-30, Para 4.16
Licenses supplied for all components including all
hardwares and softwares should be “Permanent and
Lifetime Licenses”,
Kindly Elaborate
What would be the expected lifetime of the licenses as the same
will affect the commercial bid?
Specification given is self-explanatory. No
579Vayam Tech,
GurgaonPg. 40, Para 4.31 Use of existing Hardware of the department
Pls elaborate.
Kindly provide technical details on the existing hardwares
Section deleted. No existing hardware to be
made available to the bidderYes Sec 4.31
580Vayam Tech,
GurgaonPg-50 Para 5.3.9.1
Receive application for issue of smart card…..and
proof of ownership
How many smart cards have to be issued? Will all be issued
together?Already addressed
581Vayam Tech,
GurgaonPg-50 Para 5.3.9.1
Receive application for issue of smart card…..and
proof of ownershipCard readers required? If yes, how many? Already addressed
582Vayam Tech,
GurgaonPg. 71, Para 5.3.17.7
Security Audit by Govt. of India approved Security
Auditor
1. Whether the Department has a security plan in place or the
successful bidder has to develop the plan.
2. Whether any certifications pertaining to security viz. ISMS
needs to be done by the successful bidder before the security
Audit.
1) Successful bidder has to develop the plan
and seek certification after getting goahead from
CLR. 2) This shall be handy for the vendor but at
his own cost, before commencing security audit
No
583Vayam Tech,
GurgaonPg 74, Para 5.4
The vendors shall provide functional training as well as
administrative training to all the stakeholders of the
system in manageable batches at each location
Due to cost implication & managebility of the training exercise, It
is recommended that the training should be done either at a
central location or at district headquarters
No change in the existing clause. Anyhow,
vendor has to provide operations at all 342
centres, so it doesn't matter having training
sessions at 342 centres.
No
584Vayam Tech,
GurgaonPg-83 Para 6.3.2.6
Number of concurrent view only users……to meet the
required service levels.
Will a Viewer View only his Tehsil area or the entire State Data
on the Web Viewer?Already mentioned the answer in Sec 5.3.6 No
585Vayam Tech,
GurgaonPg-83 Para 6.3.2.2 At each IT Centre, the vendor……for Data Editing
Client has asked to provide 2 resources for each IT Centre. Will
these Resources' role be limted to - GIS Data editing, Customer
interface and Data Editing? How many resources are required
for the Data Centre?
Editing + Customer interface are primary roles.
Data maintenance + Storage/backup/ network
admin/DBA etc shall also have to be decided by
the Vendor especially at SDC, DR. Resources
specificed is minimum. Vendor is bound to
increase the resources as per need and
requirement of work.
No
Commissioner Land Records Settlement, Madhya Pradesh Page 57 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
586Vayam Tech,
GurgaonPg-152 Para 1.25 Desktop Video Conferencing Equipment
LCD Plasma has to be provided? Where will be the Space for
this?Refer to Pt. 14 in that same section for clarity No
587Vayam Tech,
GurgaonPg-187 Para 4 & 5 Role
The number of Software Testing Expert and Database Expert
required for the Project not given in RFP
It is SI's responsibility to mention how many
resources are being made available for the
proposed role.
No
588Vayam Tech,
Gurgaon
Pg-194 Para
2.1,2.2,2.3
Non-IT Infrastructure development for State Data
Centre and Admin Site, Non-IT Infrastructure
development for Disaster Recovery Site, Non-IT
Infrastructure development for each of the IT Centres
at
user locations
Indicative Quantities for AC, Furniture not mentioned. For the
commercial bid, We request you to kindly provide details on the
area of the said Data Centre, Disaster Recovery Site and IT
Centres at user Location.
1) Quantities for AC, Furniture not mentioned as
it is dependent on site area at each centre,
SDC, DR based on hardware and infrastructure
being set up by the bidder and floor area being
covered for the same. 2) Bidders may submit a
written request to CLR for conducting a site visit
to SDC, IT Center for better understanding.
No
589Vayam Tech,
Gurgaon
Pg. 194, Para 2.1,
2.2, and 2.3Indicative Non-IT Infrastructure development
Please elaborate the nature of civil and electrical works required
at each of the locations.
Site visit is advisable. Specifications for Civil and
Electrical works stated in Annexure IV.No
590Vayam Tech,
GurgaonPg 195, Para 2.4 Digital Certificates The Scope is not Clear. Please elaborate.
The vendors are required to procure, supply and
integrate digital certificates in the solution for all
departmental users at their cost.
No
591Vayam Tech,
Gurgaon
Pg 135 Para 1.7
Hardware load
balancer
Must have 3 Module Slots
request for deletion of this stipulation to make specs generic
and allow other OEM's to participate. 3 module slots are specific
to one OEM.
Item removed. Existing infrastructure at SDC to
be used.Yes Annexure VIII
592Vayam Tech,
Gurgaon
Pg 135 Para 1.7
Hardware load
balancer
Must have Switch control module with 2 GE (GBIC)
ports fully configured Specs are proprietary to one OEM, Item removed. Existing infrastructure at SDC to
be used.Yes Annexure VIII
593Vayam Tech,
Gurgaon
Pg 135 Para 1.7
Hardware load
balancer
Must have min. 32 10/100/1000 Ethernet ports
keeping various deployment under consideration (inline, single
arm tec with cluster.) load balancer integration will not require
more than 6-10 ports.
Item removed. Existing infrastructure at SDC to
be used.Yes Annexure VIII
594Vayam Tech,
Gurgaon
Pg 135 Para 1.7
Hardware load
balancer
Must have min. of two session accelerator modules Specs are proprietary to one OEM, Item removed. Existing infrastructure at SDC to
be used.Yes Annexure VIII
595Vayam Tech,
Gurgaon
Pg 135 Para 1.7
Hardware load
balancer
Must have Aggregate Bandwidth 20 Gbps
throughput, concurrent connection, request per second, SSL
TPS are the key performance indicator and also Primarily bing
used by most of the OEM's for appropriate sizing of appliance.
Item removed. Existing infrastructure at SDC to
be used.Yes Annexure VIII
596Vayam Tech,
Gurgaon
Pg 135 Para 1.7
Hardware load
balancer
Must support WebNS 8.10 Features
WebNS module is used for SSL acceleration and HTTP
compression and is proprietary to specific OEM. Item removed. Existing infrastructure at SDC to
be used.Yes Annexure VIII
597Vayam Tech,
Gurgaon
Pg 135 Para 1.7
Hardware load
balancer
Must have Active-Active layer 5 ASR ASR is proprietary specification, Item removed. Existing infrastructure at SDC to
be used.Yes Annexure VIII
598Vayam Tech,
Gurgaon1.4.1, Pg 13 Spatial data availability/ migration
Will the data be available at the SDC or needs to be collected
from other sources as well
Data shall be made available to the vendor by
CLR.No
599Vayam Tech,
Gurgaon1.3.13, Pg 13 Training
1. Please advise if the personnel to be trained for specific
trainings are computer literate.
2. Please advise if the training will be fixed training hrs based on
approved training materials OR
3. Based on user competency
1) Some are. Mostly not. 2) Training will be fixed
training hrs based on approved training
materials. However, if user competancy is not
seen, the sessions will have to be
repeated/extended at no additional cost.
No
600Vayam Tech,
Gurgaon1.4, Pg 13 Data Inputs
Please advise who will be responsible for procuring/providing
Satellite imagery from NRSC - CLR office or the SI
Procurement of imagery is not in scope of
project. No
601Vayam Tech,
Gurgaon1.4, Pg 13 Data Inputs
The spatial data provided would be a village level data how to
resolve edge matching issues, who would authorize the same
Tehsil level data has been mentioned as base
data for project. As part of survey project,
District level data is to be generated and used in
the developed system
No
Commissioner Land Records Settlement, Madhya Pradesh Page 58 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
602Vayam Tech,
Gurgaon1.4.3, Pg 13 Data Inputs
The re-survey data which would be integrated into the system
should have the same database schema as the existing data in
order to allow a smooth transaction
Database Schema proposed for Survey shall be
designed in consultation with the WebGIS
application vendor so that this problem shall not
arise.
No
603Vayam Tech,
Gurgaon1.4.3, Pg 13 Data Inputs
We understand that when the survey/ re-survey data will be
received, the same will replace the existing data on as is basis.
Pl. confirm
Yes. No
604Vayam Tech,
Gurgaon5.1.2 & 4, Pg 42 Database Servers
We understand that all data edits should be made parallel in
both SDC & DR servers, pl. clarify why would SAN based
database mirroring be required in this case
Already addressed
605Vayam Tech,
Gurgaon5.1.2 & 4, Pg 42 Database Servers
Will the DR site server also have the spatial data replica or only
the textual dataDR site shall be a complete replica of SDC. No
606Vayam Tech,
Gurgaon5.1.2 & 4, Pg 42 Database Servers
Are the raster images to be stored in the database or file based
server, is there any special preference for the same
No preference. However, database must
support for Vector and Raster data. Refer Pts.
24, 25 in Annexure III.
No
607Vayam Tech,
Gurgaon5.2.3, Pg 43 IT Centers
Is the SWAN connectivity based on MPLS VPN or point to Point
lease line.No
608Vayam Tech,
Gurgaon5.2.3, Pg 43 IT Centers
Incase of Point to point connectivity then how tehsils will be
connected to the DR site in case of any actual disaster at SDCNo
609Vayam Tech,
Gurgaon5.3.9, Pg 50 Smart Card What are the specifications of the smart card to be issued
Already stated in RFP. Refer Annexure IV: 4 -
Ownerwise Smart cardNo
610Vayam Tech,
Gurgaon5.5.1, Pg 75 Data Validation
Is there any common link between un-referenced spatial data
and the digital attribute data
Yes. Through Khasra ID as they are unique in
village level maps.No
611Vayam Tech,
Gurgaon
Annexure IV- 1.2 pg
127
Must have media tray at the front with a DVD drive, one
USB port, and a system-status panel.
Requested change: Chassis should be supplied with DVD drive/virtual
media capability sharable across all the blade servers; One USB port and
system status panel.
Reason: "Media Tray at the front with a DVD drive " is specific to particular
OEM(s); Others may provide virtual media OR external DVD drive.
Already addressed
612Vayam Tech,
Gurgaon
Annexure IV- 1.2 pg
127Must be configured management software
Requested change " Must be configured with management
software; Fully working license for the whole chassis is
required".
Already addressed
613Vayam Tech,
Gurgaon
Annexure IV- 1.3 pg
128Must be configured for min. of 40,000 IOPS
Question: Is it Disk IOPS desired or cache IOPS desired ?
Please clarifyAlready addressed
614Vayam Tech,
Gurgaon
Annexure IV- 1.3 pg
128
Storage System must support Windows 2000, 2003,
HPUX, Sun Solaris, IBM AIX, UNIX, Linux and Novel
operating system in a heterogeneous SAN
environment
Suggestion: Please remove Windows 2000 as Windows 2000 is
out of support. Windows server can be included 2008Already addressed
When the DC is down, the application should
have options to replace the DC location (url) with
DR url. So the writting will be directly to DR. In
normal scenarion of one of the server or any
single hardware is down and becase of this, the
DC services are not available, still the
connectivity with DC and DR will be active and
the application will write to DR through DC. If the
connectivity is also down, we will have to use the
first option
Commissioner Land Records Settlement, Madhya Pradesh Page 59 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
615Vayam Tech,
Gurgaon
Annexure IV- 1.3 pg
129
Must have 32 Nos. of 4Gbps 146GB 15,000 RPM
Fiber Channel Drives with 8 Disks on RAID 0+1, 1 as
Global Hot Spare and remaining configured as RAID 5
groups
Requested change: Must have 32 Nos. of 4Gbps 300 GB
15,000 RPM Fiber Channel Drives with 8 Disks on RAID 0+1, 1
as Global Hot Spare and remaining configured as RAID 5
groups"
Reason: 146 GB 15k rpm FC HDD is End of life
Already addressed
616Vayam Tech,
Gurgaon
Annexure IV- 1.3 pg
130
Min. 4 Nos. of Generation 4 LTO Drives or latest
supporting min. of 800 GB uncompressed capacity
should support min. of 6 drives
Suggested Change: Min. 4 Nos. of Generation 5 LTO Drives or
latest supporting min. of 800 GB uncompressed capacity should
support min. of 6 drives either by expanding or cascading.
Reason: LTO5 is the latest generation
Already addressed
617Vayam Tech,
Gurgaon
Annexure IV- 1.3 pg
130
Interface of Min. 4Gbps to connect to Fiber Switch.
Each set of 2 drives should be on a separate SAN
Interface
Requested change: Clause can be removed
Reason: Each LTO 4/5 Drive has its own native FC interface. Already addressed
618Vayam Tech,
Gurgaon
Annexure IV- 1.3 pg
130Must Support LTO, SDLT, DLT, etc. Tape drives
Suggestion: Clause can be removed.
Reason: Tape library supports only LTO generation cartridgeAlready addressed
619Vayam Tech,
Gurgaon
Annexure IV- 1.3 pg
130
Should have min. data transfer rate of 80Mbps per
drive
Requested change: Should have min. data transfer rate of
140MBps per drive
Reason : As per LTO5 standards.
Already addressed
620Vayam Tech,
Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.6 24 Port Giga
Switch (MAF
Required), pg no 133
Sr. no. 4
4 Nos. GBIC ports with support for 1000 Base
SX/LX/LH/ZX. Vendor must configure ports for
commissioning
Pls mention type of fiber transcivers required for configuring the
portsAlready addressed
621Vayam Tech,
Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.6 24 Port Giga
Switch (MAF
Required), pg no 133
New clause Addition
"Switch OEM should be in top 5 of the Magic Quadrant of latest
Gartner report"
Reason: This shows the capability of an OEM in terms of
reliability, deployment, research Which is required for such huge
deployment.
Already addressed
622Vayam Tech,
Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.9 24 Port
Manageable Switch
(MAF Required), pg
no 137
New clause Addition
"Switch OEM should be in top 5 of the Magic Quadrant of latest
Gartner report"
Reason: This shows the capability of an OEM in terms of
reliability, deployment, research Which is required for such huge
deployment.
Already addressed
623Vayam Tech,
Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.8, pg no 135 Sr. No.
3
Must support OPSEC or Equivalent
"Must support OPSEC/ICSA"
Reason: OPSEC is vendor specific. ICSA is a industry standard
certification which firewall,IPS OEM adhere to.
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 60 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
624Vayam Tech,
Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.8, pg no 135 Sr. No.
32
Must have redundant power supply
"delete this clause"
Reason: As the devices are going to work in HA (High
Availibility) mode we request you to delete this clause
Already addressed
625Vayam Tech,
Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.8, pg no 135
New clause Addition
The proposed internal/external IPS should support up to
6,500,000 concurrent network sessions and 115,000 connection
per seconds with security context for up to 1,200,000 sessions.
System IPS throughput should be upto 750Mbps
Already addressed
626Vayam Tech,
Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.8, pg no 135
New clause Addition
The proposed internal/external IPS must support zero power
external bypass module which taps power from IPS for
operation with upport full stateful redundancy solution (Active-
Passive, Active-Active)
Already addressed
627Vayam Tech,
Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
2.2 Router for IT
Centres as well as for
connecting Record
Rooms LAN/Inter-
building fibre, pg no
177 Sr. No. 18
Must support for NAT, ACLs, 3DES, IPSEC, L2TP,
Integrated Firewall, IDS Support, Time based
Access List, CRTP
"Remove IDS".
Reason: IDS/IPS features are already asked in a separate
appliance and hence not required on the router. This will add
unnecessary investment.
Already addressed
628Vayam Tech,
Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
2.2 Router for IT
Centres as well as for
connecting Record
Rooms LAN/Inter-
building fibre, pg no
176/177
New clause Addition
"Router should support interfaces like Wi-Fi, 3G on the router
itself"
Reason: For scalability, flexibility in deployment and future
investment protection.
Already addressed
629Vayam Tech,
Gurgaon
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
2.2 Router for IT
Centres as well as for
connecting Record
Rooms LAN/Inter-
building fibre, pg no
176/177
New clause Addition
"Router should have EAL2 certification at the time of bidding"
Reason: This shows the capability of an OEM in terms of
reliability, deployment, research Which is required for such huge
deployment.
Already addressed
630Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/200
Must have 3 Module SlotsSpecification is specific to one OEM should be deleted and allow
other OEM's to participateAlready addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 61 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
631Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/201
Must have Switch control module with 2 GE (GBIC)
ports fully configured
ASIC is more appropriate and generalized technology and
hence specification should be changed to "Must be ASIC based
appliance with backplane capacity of 52 Gbps
Already addressed
632Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/202
Must have min. 32 10/100/1000 Ethernet ports
keeping multisegment load balancing and scalability
requirement under consideration not more than 8 interfaces are
required. load balancer must have 12 *10/100/1000 copper and
4 fiber ports
Already addressed
633Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/203
Must have Active-Active layer 5 ASRProprietary to one OEM and should be deleted and allow other
OEM's to participate as well.Already addressed
634Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/204
Must have Aggregate Bandwidth 20 Gbps
Performance metrics of load balancers are throughput,
concurrent connections and connection per second rather than
bandwidth. It is requested to change performance metric from
bandwidth to throughput. "Must have 4Gbps of layer 7
throughput and 4M concurrent connections"
Already addressed
635Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/205
Must have Virtual Internet ProtocolProprietary to one OEM and should be deleted and allow other
OEM's to participate as well.Already addressed
636Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/206
Must support WebNS 8.10 FeaturesProprietary to one OEM and should be deleted and allow other
OEM's to participate as well.Already addressed
637Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/207
Must have Global Server Load Balancing Feature
Integrated GSLB module on load balancer may impact the
performance of overall application infrastructure. It is suggested to
have global server load balancer as dedicated appliance for transparent
site failover
Already addressed
638Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/208
Must have min. of two session accelerator modulesSpecs are in favor of one OEM. Its is suggested solution " must
have application acceleration modules on same appliance"Already addressed
639Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/209
New specs - Application Acceleration Must have 20,000 SSL TPS and 2 Gbps of SSL throughput Already addressed
640Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/210
New specs - Application AccelerationMust have support for hardware / software compression module
with 2Gbps of compression throughput.Already addressed
641Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/211
New specs - Global server load balancer
Must Provide a scalable, dedicated hardware platform to help
ensure that all applications (Web-based applications, e-mail,
etc.) are always available, by detecting site outages or site
congestion and rerouting client requests
Already addressed
642Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/212
New specs - Global server load balancer The appliance should have 2 Gbps of system throughput. Already addressed
643Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/213
New specs - Global server load balancer
Should support global round robin, VIP based weighted global
round robin (VWGRR), Global connection overflow (GCO),
Global least connection (GLC) and IP overflow (IPO) GSLB
algorithms.
Already addressed
644Vayam Tech,
Gurgaon
Section 1.7 Hardware
load balancer page
135/214
New specs - Global server load balancer
· Should Tightly integrates with SLB devices without sacrificing
the ability to work in a heterogeneous environment of DNS-
capable networking products
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 62 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
645Vayam Tech,
Gurgaon
Annexure IV- 3.2
page no 184/Page 81Minimum Finger print imaging area: 12mm *16 mm
For Better finger print capture we recommed Minimum 26mm X
18mm
No change to be made in the existing clause.
Bidders are free to propose anything over and
above the minimum stated specifications.
No
646Vayam Tech,
Gurgaon
Annexure IV- 3.3
page no 184/page 81Resolution: >=480 dpi Standard Minimum Resolutions Should be: 500 DPI No change in RFP No
647Vayam Tech,
Gurgaon
Annexure IV- 3.7
page no 184/Page 81Capable of handling finger print angular Variability
Angular variability is available in Hand held models which
requires functionality like additonal processing power ,
supporting Algorithms etc
No change in RFP No
648Vayam Tech,
Gurgaon
Annexure IV- 2.12
page no 183Access Control
We recommend the following suggestion to Biometry Finger
Print based Access Control Devices
* Devices must have IP64 Rating
*Allowable Finger Rotation:+/- 45 Degree
*I/O power: POE fully 802.3 af compliant
*Operating Temp: -20 deg C to 70 Deg C
*Contact and contactless card Reader
* Certification like FCC, CE, FIPS 201 PIV, ROHS Compliant
No change in RFP No
649Vayam Tech,
Gurgaon
Annexure IV- 1.2
page no 127
Must have four hot swap power module bays with two
power modules populated
Suggested Change: Must be provided with fully populated power
supplies and fully populated fan/blower modules.
Reason: "Four Hot swap power module bays" is specific to particular OEM.
No of power supply and fans/blowers may vary for different OEMs.
Mentioning fully populated will serve the purpose.
Already addressed
650Vayam Tech,
Gurgaon
Annexure IV- 1.3
page no 128
Must be configured for intermix of FC and SATA HDDs
under the same pair of controllers
Suggested Change: "Must be configured for intermix of FC and
SATA/FATA HDDs under the same pair of controllers".
HP Provides FATA hard disks which are equivalent or better to
SATA hard disks.
Already addressed
651Vayam Tech,
Gurgaon
Annexure IV- 1.3
page no 129
Storage Management Software
Must be GUI as well as CLI, centrally manage the
complete range of arrays over the network, support for
web based management, tracking and recording of
actions on the system. Software license should be
provided for unlimited expansion over SAN. The
management software should have the features such
as Dynamic RAID level migration, Dynamic capacity &
volume expansion, Dynamic Segment size expansion,
Monitoring and reporting of alarm conditions,
Diagnostic tools for subsystems and recovery, LUN
Masking, Performance Monitoring, Generation of Mails
and SNMP alerts, Point in time copy functionality and
Disk system should be capable of Remote copying
Suggestion:Please remove Dynamic Segment size expansion.
Reason: This is OEM specific. HP Storage does automatic
segment sizng based on incoming I/O pattern.
Already addressed
652Vayam Tech,
Gurgaon
Annexure IV- 1.3
page no 133
Must be configured to support distance of 35KMS and
more.
Suggested Change: Must be configured to support distance of
30 KMS or more.
Reason: 35Kms or more is specific to particular OEM. Others
certify it at 30 Kms or more
Already addressed
653Vayam Tech,
Gurgaon
Annexure IV- 1.3
page no 133
Must allow creation of hardware based isolation
environments within a single SAN Fabric or switch.
Each Virtual Fabric must have independent fabric
services, zoning database, name servers and FSPF
process
Suggestion: Clause Needs to be removed.
Reason: OEM specificAlready addressed
654Vayam Tech,
Gurgaon
Annexure IV- 1.3
page no 133
Must be configured for RADIUS, TACACS, AAA, port
security, fabric binding, Secure FTP, SSHv2, SN M
Pv3.
Suggestion: Please remove RADIUS, TACACS, port security,
Fabric Binding
Reason: OEM Specific. Different OEMS have different protocol
support for authentication and authorization.
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 63 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
655Vayam Tech,
Gurgaon
Annexure IV- 1.3
page no 134Switch must have role based administration Suggestion: Please remove: OEM specific. Already addressed
656 CMC Ltd., Bhopal Annexure III - Pt. 7 The solution has adherence to GoI fonts standardsPlease clarify which components of the solution these refer too
like RDBMS,GIS TOOL or application. Already addressed
657 CMC Ltd., Bhopal Annexure III - Pt. 8The solution has adherence to Land Region
Cartographic Codification Standards
Please clarify which components of the solution these refer to
like RDBMS, GIS TOOL or application. Already addressed
658 CMC Ltd., Bhopal Annexure III - Pt. 30
Properly commented complete source code of the
components designed and custom developed by the
vendor for CLR based on this RFP will be supplied
Hope this is restricted to the source code of the application
developed by the vendor not of the OEM components like OS,
RDBMS etc.
Already addressed
659 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The proposed solution should support R-Tree index support and
the R-Tree should not emulated with recursive SQL Queries,
Reason:
Recursive SQL degrades the performance, consume machine resources
which is more evident when we perform complicated queries or query on
large data. R-Tree indexing should optimally use machine resources and
follows the bounding box concept for indexing which gives excellent
performance. It should eliminates the need to examine objects outside the
area of interest which otherwise would need to evaluate every object to find
those that match the query criteria. The Spatial indexes should not require
the grid size to be set, to determine the granularity of the data because if the
character of the data changes it generally have to rebuild it but R-Tree
implementation himself should be smart enough to readjust its internal
structures and optimize paths, as the data changes
Already addressed
660 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
In the proposed solution Spatial data type implementation
should be as actual data type and not as nested numeric array
in large object.
Reason:
The spatial being actual data type makes it easier to manipulate data and
write simple SQL queries. This should enable the end user to make use of
the Spatial data types just like standard data types, as part of the SQL's (
queries, functions and procedures ) without any special consideration.
Already addressed
661 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
In the proposed solution.
Reason:
Replication of spatial data should be supported in all editions of the
database.This is required for a tree structure system implementations to
make the solution most cost effective. The leaf nodes should also be
Replication of spatial data enable but a light edition will make the cost more
effective as the leaf nodes does not always require large system and
database load.
Already addressed
662 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
In the proposed solution Automatic validation of spatial data
should be there without requiring separate functions to be
executed to check the validity of inserted data.
Reason:
This helps in ensuring the data consistency thought the data life cycle.
Which also ensures that the data inserted at any node will be replicated
immediately only if it is valid data.Which means, it ensures the data
consistency across all nodes all time without any extra efforts.
Already addressed
663 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have Content Manager with web
2.0 based UI with drag and drop features of adding docs to the
content repository
Reason: In Land Record System, Documents need to added at
any point of time in any account, if it is not web 2.0 based UI,
then it is very much chance to add wrong document or working
is not easy for user.
Already addressed
664 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveContent Manager should
provide deep integration with MS Office which includes viewing
the content repository folder structure in MS Office App and also
should provide initiate and view linear tasks
Reason: While adding the documents in Existing folder , if folder
hierarchy is not visible then in huge volume of document
accuracy maintenance is a problem
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 64 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
665 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveAll the basic document
management capabilities to be part of the content manager like
search, add, access, security, versioning
Reason: This is the basic requirement of any DMS System
Already addressed
666 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveContent duplication to be
checked at the content repository level.
Reason:At the time of merging of the repository from different
location, this should be required
Already addressed
667 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have CMIS support for the
content repository, new std which will help in integration of the
DMS with the other LOB applications.
Reason:Land record system required to integrate with different
Department, then this capability of product is essential
Already addressed
668 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThis content Manager
repository should be well integrated with all the standard
databases like DB2/Oracle/MS-Sql Server.
Reason:At the time of merging of the repository from different
location, this should be required
Already addressed
669 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should have workflows subscription to launch / initiate workflows
when the content is added in the content manager.
Reason:In Land Record System, document flows from different dept, which
requires different kind work flow
Already addressed
670 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows should be
part of the same content platform and infrastructure pre-
integrated.
Reason:If workflows is not part of Content Platform then
designing and execution of workflows would be easy and error
less
Already addressed
671 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should take input from visio as XML file
Reason:Land record system required to integrate with different
Department, then this capability of product is essential
Already addressed
672 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should have email alerts, escalations, send mail triggers all out
of the box.
Reason:This days official communication is through mails so this
is a must requirement
Already addressed
673 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should have content exception handling capabilities like wait for
condition without writing code
Reason:Workflows should be so easy configurable, so Work
should be help due to workflows creation
Already addressed
674 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveThe workflows software
should have out of the box 20+ workflows reports with process
analyzer. Reason:This
is required to automate the Land record work flow, which needs
to easily configurable
Already addressed
675 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveRecords Manager should
support electronic, physical and hybrid records
Reason:Record Manager needs to keep tracks of records.
Records can be any form , it can be digital, physical or hybrid.
Application should be handle these kind of records
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 65 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
676 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should haveRecords Manager should
support zero click records declarations
Reason:In a huge volume of land record docs, it is very difficult
to marks documents as records. It should be policy driven
Already addressed
677 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have Records Manager should
allow addition of box / barcode information
Reason:It is required to complete the solution. Bar Code
required for record management
Already addressed
678 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have Records Manager should
support integration with the physical records manager company
like Iron Mountain
Reason:This is a must requirement for land record kind of
system
Already addressed
679 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The Proposed Solution should have The proposed
Enterprise Content Management (ECM) solution should be
platform independent and available on 3-tier architecture with
each tier fully independent Reason:Land
record is a huge application , which need to integrated with
different Dept. Application and it also required to get the
information from different dept. Business requirement also
changes very frequently. If application tier is not a separate
layer then it is very difficult
Already addressed
680 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
he proposed solution should support for the communication
protocols such as Lightweight Direct Access Protocol (LDAP),
Hypertext Transport Protocol (HTTP), SOAP, WSDL, XPDL,
BPMN, IIOP, Web2.0, MTOM, CMIS, DITA etc.
Reason:Business demands changes frequently, if application is not
standard based then applicable of changes are difficult
Already addressed
681 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The proposed solution should support for both vertical &
horizontal scalable solution. It should support for Sever Farm &
Server Cluster to provide High Availability (HA) & Disaster
Recovery (DR) solution
Reason:Application like land record system , which is base application
for different dept. So it should be well protected with DR and HA
Already addressed
682 CMC Ltd., BhopalAnnexure III -
Compliance MatrixProposed Inclusion in the tender document
The solution should have the single user interface for all
integrated Enterprise Content Management applications like
Content Manager, Business Process Manager, Record
Manager and eForm solution and the user interface should
have standards-based (HTML, WebDAV) with zero download.
Also it should integrate with office desktop applications,
rendition engine (PDF & HTML) and messaging as out of the
box.
Reason:Land record is a huge application , which need to
integrated with different Dept. Application and it also required to
get the information from different dept. Business requirement
also changes very frequently. If application tier is not a separate
layer then it is very difficult
Already addressed
683 CMC Ltd., Bhopal 5.3.6.2, Pg 45 The GIS user interface should be user friendly.
What is the application for GIS? If customized, what is the
platform on which the application will be developed (eg, JAVA,
etc.)?
Already addressed
684 CMC Ltd., Bhopal 5.3.6.12.4.1, Pg 47
An encrypted pdf file with “CLR” Number as filename
should be automatically generated and saved to the
server.
By encryption of pdf, is it meant that the pdf will be digitally
signed or will it be stored in the system with an encryption key
and decryption key will be provided to read the pdf?
Already addressed
685 CMC Ltd., Bhopal 5.3.6.14.1, Page 49
The vendors are required to make facility for Payment
Gateway so that payments using online net-
banking/debit card/cash card are incorporated in the
solution
Is there any existing payment gateway? If not, is the solution
required to bid by the bidder? What are the details of payment
interface and what all systems that payment interface need to
be integrated with?
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 66 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
686 CMC Ltd., Bhopal 5.3.11.8, Page 54 Complete process management of mutation
The process need to be hard coded or is it expected to be
delivered through Business Process Management (BPM) tool?
Similarly, for other processes.
Already addressed
687 CMC Ltd., Bhopal 1.1, 3 point, Page 126
Blade Server must have 2 x Quad Core Nehalem
based (5500 series) Xeon 2.80GHz Processor or
higher
For the complete solution, how many servers are being
considered? What will be the usage of the hardware stated here
in this point? Is there any provision for application server? What
is the hardware configuration for application server? Is high
availability required?
Already addressed
688 CMC Ltd., BhopalAnnexure IV - 1.3,
Row 3
Must be configured on full Fiber Channel end-to-end of
4Gbps or latest
4Gbps end-to-end connectivity is older technology. The industry
now offers newer, better technology, wherein front-end
connectivity is 8Gbps FC, and back-end connectivity is 6Gbps
SAS. Most of the leading storage vendors are already offering
this. Is there any specific reason why 4Gbps end-to-end
connectivity is required? With existing specifications, vendors
can opt to offer older technology. Suggested specification:
SAN Storage should be configured with at least 4 numbers of 8
Gbps Fiber channel (FC) front-end ports per controller (i.e. a
total of at least 8x 8Gbps FC front end ports across Dual
controllers) for front-end host connectivity.
Already addressed
689 CMC Ltd., Bhopal
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.6 24 Port Giga
Switch (MAF
Required), pg no 133
Sr. no. 4
4 Nos. GBIC ports with support for 1000 Base
SX/LX/LH/ZX. Vendor must configure ports for
commissioning
Pls mention type of fiber transcivers required for configuring the
portsAlready addressed
690 CMC Ltd., Bhopal
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.8, pg no 135 Sr. No.
3
Must support OPSEC or Equivalent
"Must support OPSEC/ICSA"
Reason: OPSEC is vendor specific. ICSA is a industry standard
certification which firewall,IPS OEM adhere to.
Already addressed
691 CMC Ltd., Bhopal
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
2.2 Router for IT
Centres as well as for
connecting Record
Rooms LAN/Inter-
building fibre, pg no
177 Sr. No. 18
Must support for NAT, ACLs, 3DES, IPSEC, L2TP,
Integrated Firewall, IDS Support, Time based
Access List, CRTP
"Remove IDS".
Reason: IDS/IPS features are already asked in a separate
appliance and hence not required on the router. This will add
unnecessary investment.
Already addressed
692 CMC Ltd., Bhopal
Section 1.7 Hardware
load balancer page
135/200
Must have 3 Module SlotsSpecification is specific to one OEM should be deleted and allow
other OEM's to participateAlready addressed
693 CMC Ltd., Bhopal
Section 1.7 Hardware
load balancer page
135/201
Must have Switch control module with 2 GE (GBIC)
ports fully configured
ASIC is more appropriate and generalized technology and
hence specification should be changed to "Must be ASIC based
appliance with backplane capacity of 52 Gbps
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 67 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
694 CMC Ltd., Bhopal
Section 1.7 Hardware
load balancer page
135/202
Must have min. 32 10/100/1000 Ethernet ports
keeping multisegment load balancing and scalability
requirement under consideration not more than 8 interfaces are
required. load balancer must have 12 *10/100/1000 copper and
4 fiber ports
Already addressed
695 CMC Ltd., Bhopal
Section 1.7 Hardware
load balancer page
135/203
Must have Active-Active layer 5 ASRProprietary to one OEM and should be deleted and allow other
OEM's to participate as well.Already addressed
696 CMC Ltd., Bhopal
Section 1.7 Hardware
load balancer page
135/204
Must have Aggregate Bandwidth 20 Gbps
Performance metrics of load balancers are throughput,
concurrent connections and connection per second rather than
bandwidth. It is requested to change performance metric from
bandwidth to throughput. "Must have 4Gbps of layer 7
throughput and 4M concurrent connections"
Already addressed
697 CMC Ltd., Bhopal
Section 1.7 Hardware
load balancer page
135/205
Must have Virtual Internet ProtocolProprietary to one OEM and should be deleted and allow other
OEM's to participate as well.Already addressed
698 CMC Ltd., Bhopal
Section 1.7 Hardware
load balancer page
135/206
Must support WebNS 8.10 FeaturesProprietary to one OEM and should be deleted and allow other
OEM's to participate as well.Already addressed
699 CMC Ltd., Bhopal
Section 1.7 Hardware
load balancer page
135/208
Must have min. of two session accelerator modulesSpecs are in favor of one OEM. Its is suggested solution " must
have application acceleration modules on same appliance"Already addressed
700Inspira Enterprise,
Mumbai
Annexure IV- 1.2 pg
127
Must have media tray at the front with a DVD drive, one
USB port, and a system-status panel.
Requested change: Chassis should be supplied with DVD drive/virtual
media capability sharable across all the blade servers; One USB port and
system status panel.
Reason: "Media Tray at the front with a DVD drive " is specific to particular
OEM(s); Others may provide virtual media OR external DVD drive.
Already addressed
701Inspira Enterprise,
Mumbai
Annexure IV- 1.2 pg
127Must be configured management software
Requested change " Must be configured with management
software; Fully working license for the whole chassis is
required".
Already addressed
702Inspira Enterprise,
Mumbai
Annexure IV- 1.3 pg
128Must be configured for min. of 40,000 IOPS
Question: Is it Disk IOPS desired or cache IOPS desired ?
Please clarifyAlready addressed
703Inspira Enterprise,
Mumbai
Annexure IV- 1.3 pg
128
Storage System must support Windows 2000, 2003,
HPUX, Sun Solaris, IBM AIX, UNIX, Linux and Novel
operating system in a heterogeneous SAN
environment
Suggestion: Please remove Windows 2000 as Windows 2000 is
out of support. Windows server can be included 2008Already addressed
704Inspira Enterprise,
Mumbai
Annexure IV- 1.3 pg
129
Must have 32 Nos. of 4Gbps 146GB 15,000 RPM
Fiber Channel Drives with 8 Disks on RAID 0+1, 1 as
Global Hot Spare and remaining configured as RAID 5
groups
Requested change: Must have 32 Nos. of 4Gbps 300 GB
15,000 RPM Fiber Channel Drives with 8 Disks on RAID 0+1, 1
as Global Hot Spare and remaining configured as RAID 5
groups"
Reason: 146 GB 15k rpm FC HDD is End of life
Already addressed
705Inspira Enterprise,
Mumbai
Annexure IV- 1.3 pg
130
Min. 4 Nos. of Generation 4 LTO Drives or latest
supporting min. of 800 GB uncompressed capacity
should support min. of 6 drives
Suggested Change: Min. 4 Nos. of Generation 5 LTO Drives or
latest supporting min. of 800 GB uncompressed capacity should
support min. of 6 drives either by expanding or cascading.
Reason: LTO5 is the latest generation
Already addressed
706Inspira Enterprise,
Mumbai
Annexure IV- 1.3 pg
130
Interface of Min. 4Gbps to connect to Fiber Switch.
Each set of 2 drives should be on a separate SAN
Interface
Requested change: Clause can be removed
Reason: Each LTO 4/5 Drive has its own native FC interface. Already addressed
707Inspira Enterprise,
Mumbai
Annexure IV- 1.3 pg
130Must Support LTO, SDLT, DLT, etc. Tape drives
Suggestion: Clause can be removed.
Reason: Tape library supports only LTO generation cartridgeAlready addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 68 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
708Inspira Enterprise,
Mumbai
Annexure IV- 1.3 pg
130
Should have min. data transfer rate of 80Mbps per
drive
Requested change: Should have min. data transfer rate of
140MBps per drive
Reason : As per LTO5 standards.
Already addressed
709Inspira Enterprise,
Mumbai
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.6 24 Port Giga
Switch (MAF
Required), pg no 133
Sr. no. 4
4 Nos. GBIC ports with support for 1000 Base
SX/LX/LH/ZX. Vendor must configure ports for
commissioning
Pls mention type of fiber transcivers required for configuring the
portsAlready addressed
710Inspira Enterprise,
Mumbai
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.6 24 Port Giga
Switch (MAF
Required), pg no 133
New clause Addition
"Switch OEM should be in top 5 of the Magic Quadrant of latest
Gartner report"
Reason: This shows the capability of an OEM in terms of
reliability, deployment, research Which is required for such huge
deployment.
Already addressed
711Inspira Enterprise,
Mumbai
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.9 24 Port
Manageable Switch
(MAF Required), pg
no 137
New clause Addition
"Switch OEM should be in top 5 of the Magic Quadrant of latest
Gartner report"
Reason: This shows the capability of an OEM in terms of
reliability, deployment, research Which is required for such huge
deployment.
Already addressed
712Inspira Enterprise,
Mumbai
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.8, pg no 135 Sr. No.
3
Must support OPSEC or Equivalent
"Must support OPSEC/ICSA"
Reason: OPSEC is vendor specific. ICSA is a industry standard
certification which firewall,IPS OEM adhere to.
Already addressed
713Inspira Enterprise,
Mumbai
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.8, pg no 135 Sr. No.
32
Must have redundant power supply
"delete this clause"
Reason: As the devices are going to work in HA (High
Availibility) mode we request you to delete this clause
Already addressed
714Inspira Enterprise,
Mumbai
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.8, pg no 135
New clause Addition
The proposed internal/external IPS should support up to
6,500,000 concurrent network sessions and 115,000 connection
per seconds with security context for up to 1,200,000 sessions.
System IPS throughput should be upto 750Mbps
Already addressed
715Inspira Enterprise,
Mumbai
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
1.8, pg no 135
New clause Addition
The proposed internal/external IPS must support zero power
external bypass module which taps power from IPS for
operation with upport full stateful redundancy solution (Active-
Passive, Active-Active)
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 69 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
716Inspira Enterprise,
Mumbai
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
2.2 Router for IT
Centres as well as for
connecting Record
Rooms LAN/Inter-
building fibre, pg no
177 Sr. No. 18
Must support for NAT, ACLs, 3DES, IPSEC, L2TP,
Integrated Firewall, IDS Support, Time based
Access List, CRTP
"Remove IDS".
Reason: IDS/IPS features are already asked in a separate
appliance and hence not required on the router. This will add
unnecessary investment.
Already addressed
717Inspira Enterprise,
Mumbai
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
2.2 Router for IT
Centres as well as for
connecting Record
Rooms LAN/Inter-
building fibre, pg no
176/177
New clause Addition
"Router should support interfaces like Wi-Fi, 3G on the router
itself"
Reason: For scalability, flexibility in deployment and future
investment protection.
Already addressed
718Inspira Enterprise,
Mumbai
ANNEXURE IV:
COMPLIANCE
MATRIX
FOR
INFRASTRUCTURE,
2.2 Router for IT
Centres as well as for
connecting Record
Rooms LAN/Inter-
building fibre, pg no
176/177
New clause Addition
"Router should have EAL2 certification at the time of bidding"
Reason: This shows the capability of an OEM in terms of
reliability, deployment, research Which is required for such huge
deployment.
Already addressed
719Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/200
Must have 3 Module SlotsSpecification is specific to one OEM should be deleted and allow
other OEM's to participateAlready addressed
720Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/201
Must have Switch control module with 2 GE (GBIC)
ports fully configured
ASIC is more appropriate and generalized technology and
hence specification should be changed to "Must be ASIC based
appliance with backplane capacity of 52 Gbps
Already addressed
721Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/202
Must have min. 32 10/100/1000 Ethernet ports
keeping multisegment load balancing and scalability
requirement under consideration not more than 8 interfaces are
required. load balancer must have 12 *10/100/1000 copper and
4 fiber ports
Already addressed
722Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/203
Must have Active-Active layer 5 ASRProprietary to one OEM and should be deleted and allow other
OEM's to participate as well.Already addressed
723Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/204
Must have Aggregate Bandwidth 20 Gbps
Performance metrics of load balancers are throughput,
concurrent connections and connection per second rather than
bandwidth. It is requested to change performance metric from
bandwidth to throughput. "Must have 4Gbps of layer 7
throughput and 4M concurrent connections"
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 70 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
724Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/205
Must have Virtual Internet ProtocolProprietary to one OEM and should be deleted and allow other
OEM's to participate as well.Already addressed
725Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/206
Must support WebNS 8.10 FeaturesProprietary to one OEM and should be deleted and allow other
OEM's to participate as well.Already addressed
726Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/207
Must have Global Server Load Balancing Feature
Integrated GSLB module on load balancer may impact the
performance of overall application infrastructure. It is suggested to
have global server load balancer as dedicated appliance for transparent
site failover
Already addressed
727Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/208
Must have min. of two session accelerator modulesSpecs are in favor of one OEM. Its is suggested solution " must
have application acceleration modules on same appliance"Already addressed
728Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/209
New specs - Application Acceleration Must have 20,000 SSL TPS and 2 Gbps of SSL throughput Already addressed
729Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/210
New specs - Application AccelerationMust have support for hardware / software compression module
with 2Gbps of compression throughput.Already addressed
730Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/211
New specs - Global server load balancer
Must Provide a scalable, dedicated hardware platform to help
ensure that all applications (Web-based applications, e-mail,
etc.) are always available, by detecting site outages or site
congestion and rerouting client requests
Already addressed
731Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/212
New specs - Global server load balancer The appliance should have 2 Gbps of system throughput. Already addressed
732Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/213
New specs - Global server load balancer
Should support global round robin, VIP based weighted global
round robin (VWGRR), Global connection overflow (GCO),
Global least connection (GLC) and IP overflow (IPO) GSLB
algorithms.
Already addressed
733Inspira Enterprise,
Mumbai
Section 1.7 Hardware
load balancer page
135/214
New specs - Global server load balancer
· Should Tightly integrates with SLB devices without sacrificing
the ability to work in a heterogeneous environment of DNS-
capable networking products
Already addressed
734Inspira Enterprise,
Mumbai
Annexure IV- 3.2
page no 184/Page 81Minimum Finger print imaging area: 12mm *16 mm
For Better finger print capture we recommed Minimum 26mm X
18mmAlready addressed
735Inspira Enterprise,
Mumbai
Annexure IV- 3.3
page no 184/page 81Resolution: >=480 dpi Standard Minimum Resolutions Should be: 500 DPI Already addressed
736Inspira Enterprise,
Mumbai
Annexure IV- 3.7
page no 184/Page 81Capable of handling finger print angular Variability
Angular variability is available in Hand held models which
requires functionality like additonal processing power ,
supporting Algorithms etc
Already addressed
737Inspira Enterprise,
Mumbai
Annexure IV- 2.12
page no 183Access Control
We recommend the following suggestion to Biometry Finger
Print based Access Control Devices
* Devices must have IP64 Rating
*Allowable Finger Rotation:+/- 45 Degree
*I/O power: POE fully 802.3 af compliant
*Operating Temp: -20 deg C to 70 Deg C
*Contact and contactless card Reader
* Certification like FCC, CE, FIPS 201 PIV, ROHS Compliant
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 71 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
738Inspira Enterprise,
Mumbai
Annexure IV- 1.2
page no 127
Must have four hot swap power module bays with two
power modules populated
Suggested Change: Must be provided with fully populated power
supplies and fully populated fan/blower modules.
Reason: "Four Hot swap power module bays" is specific to particular OEM.
No of power supply and fans/blowers may vary for different OEMs.
Mentioning fully populated will serve the purpose.
Already addressed
739Inspira Enterprise,
Mumbai
Annexure IV- 1.3
page no 128
Must be configured for intermix of FC and SATA HDDs
under the same pair of controllers
Suggested Change: "Must be configured for intermix of FC and
SATA/FATA HDDs under the same pair of controllers".
HP Provides FATA hard disks which are equivalent or better to
SATA hard disks.
Already addressed
740Inspira Enterprise,
Mumbai
Annexure IV- 1.3
page no 129
Storage Management Software
Must be GUI as well as CLI, centrally manage the
complete range of arrays over the network, support for
web based management, tracking and recording of
actions on the system. Software license should be
provided for unlimited expansion over SAN. The
management software should have the features such
as Dynamic RAID level migration, Dynamic capacity &
volume expansion, Dynamic Segment size expansion,
Monitoring and reporting of alarm conditions,
Diagnostic tools for subsystems and recovery, LUN
Masking, Performance Monitoring, Generation of Mails
and SNMP alerts, Point in time copy functionality and
Disk system should be capable of Remote copying
Suggestion:Please remove Dynamic Segment size expansion.
Reason: This is OEM specific. HP Storage does automatic
segment sizng based on incoming I/O pattern.
Already addressed
741Inspira Enterprise,
Mumbai
Annexure IV- 1.3
page no 133
Must be configured to support distance of 35KMS and
more.
Suggested Change: Must be configured to support distance of
30 KMS or more.
Reason: 35Kms or more is specific to particular OEM. Others
certify it at 30 Kms or more
Already addressed
742Inspira Enterprise,
Mumbai
Annexure IV- 1.3
page no 133
Must allow creation of hardware based isolation
environments within a single SAN Fabric or switch.
Each Virtual Fabric must have independent fabric
services, zoning database, name servers and FSPF
process
Suggestion: Clause Needs to be removed.
Reason: OEM specificAlready addressed
743Inspira Enterprise,
Mumbai
Annexure IV- 1.3
page no 133
Must be configured for RADIUS, TACACS, AAA, port
security, fabric binding, Secure FTP, SSHv2, SN M
Pv3.
Suggestion: Please remove RADIUS, TACACS, port security,
Fabric Binding
Reason: OEM Specific. Different OEMS have different protocol
support for authentication and authorization.
Already addressed
744Inspira Enterprise,
Mumbai
Annexure IV- 1.3
page no 134Switch must have role based administration Suggestion: Please remove: OEM specific. Already addressed
745ILFS Technologies,
Gurgaon1.4.1, Pg 13 Spatial data availability/ migration
Will the data be available at the SDC or needs to be collected
from other sources as wellAlready addressed
746ILFS Technologies,
Gurgaon1.3.13, Pg 13 Training
1. Please advise if the personnel to be trained for specific
trainings are computer literate.
2. Please advise if the training will be fixed training hrs based on
approved training materials OR
3. Based on user competency
Already addressed
747ILFS Technologies,
Gurgaon1.4, Pg 13 Data Inputs
Please advise who will be responsible for procuring/providing
Satellite imagery from NRSC - CLR office or the SIAlready addressed
748ILFS Technologies,
Gurgaon1.4, Pg 13 Data Inputs
The spatial data provided would be a village level data how to
resolve edge matching issues, who would authorize the sameAlready addressed
749ILFS Technologies,
Gurgaon1.4.3, Pg 13 Data Inputs
The re-survey data which would be integrated into the system
should have the same database schema as the existing data in
order to allow a smooth transaction
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 72 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
750ILFS Technologies,
Gurgaon1.4.3, Pg 13 Data Inputs
We understand that when the survey/ re-survey data will be
received, the same will replace the existing data on as is basis.
Pl. confirm
Already addressed
751ILFS Technologies,
Gurgaon5.1.2 & 4, Pg 42 Database Servers
We understand that all data edits should be made parallel in
both SDC & DR servers, pl. clarify why would SAN based
database mirroring be required in this case
Already addressed
752ILFS Technologies,
Gurgaon5.1.2 & 4, Pg 42 Database Servers
Will the DR site server also have the spatial data replica or only
the textual dataAlready addressed
753ILFS Technologies,
Gurgaon5.1.2 & 4, Pg 42 Database Servers
Are the raster images to be stored in the database or file based
server, is there any special preference for the sameAlready addressed
754ILFS Technologies,
Gurgaon5.2.3, Pg 43 IT Centers
Is the SWAN connectivity based on MPLS VPN or point to Point
lease line.Already addressed
755ILFS Technologies,
Gurgaon5.2.3, Pg 43 IT Centers
Incase of Point to point connectivity then how tehsils will be
connected to the DR site in case of any actual disaster at SDCAlready addressed
756ILFS Technologies,
Gurgaon5.3.9, Pg 50 Smart Card What are the specifications of the smart card to be issued Already addressed
757ILFS Technologies,
Gurgaon5.5.1, Pg 75 Data Validation
Is there any common link between un-referenced spatial data
and the digital attribute dataAlready addressed
758ILFS Technologies,
Gurgaon
Annexure IV- 1.2 pg
127
Must have media tray at the front with a DVD drive, one
USB port, and a system-status panel.
Requested change: Chassis should be supplied with DVD drive/virtual
media capability sharable across all the blade servers; One USB port and
system status panel.
Reason: "Media Tray at the front with a DVD drive " is specific to particular
OEM(s); Others may provide virtual media OR external DVD drive.
Already addressed
759ILFS Technologies,
Gurgaon
Annexure IV- 1.2 pg
127Must be configured management software
Requested change " Must be configured with management
software; Fully working license for the whole chassis is
required".
Already addressed
760ILFS Technologies,
Gurgaon
Annexure IV- 1.3 pg
128Must be configured for min. of 40,000 IOPS
Question: Is it Disk IOPS desired or cache IOPS desired ?
Please clarifyAlready addressed
761ILFS Technologies,
Gurgaon
Annexure IV- 1.3 pg
128
Storage System must support Windows 2000, 2003,
HPUX, Sun Solaris, IBM AIX, UNIX, Linux and Novel
operating system in a heterogeneous SAN
environment
Suggestion: Please remove Windows 2000 as Windows 2000 is
out of support. Windows server can be included 2008Already addressed
762ILFS Technologies,
Gurgaon
Annexure IV- 1.3 pg
129
Must have 32 Nos. of 4Gbps 146GB 15,000 RPM
Fiber Channel Drives with 8 Disks on RAID 0+1, 1 as
Global Hot Spare and remaining configured as RAID 5
groups
Requested change: Must have 32 Nos. of 4Gbps 300 GB
15,000 RPM Fiber Channel Drives with 8 Disks on RAID 0+1, 1
as Global Hot Spare and remaining configured as RAID 5
groups"
Reason: 146 GB 15k rpm FC HDD is End of life
Already addressed
763ILFS Technologies,
Gurgaon
Annexure IV- 1.3 pg
130
Min. 4 Nos. of Generation 4 LTO Drives or latest
supporting min. of 800 GB uncompressed capacity
should support min. of 6 drives
Suggested Change: Min. 4 Nos. of Generation 5 LTO Drives or
latest supporting min. of 800 GB uncompressed capacity should
support min. of 6 drives either by expanding or cascading.
Reason: LTO5 is the latest generation
Already addressed
764ILFS Technologies,
Gurgaon
Annexure IV- 1.3 pg
130
Interface of Min. 4Gbps to connect to Fiber Switch.
Each set of 2 drives should be on a separate SAN
Interface
Requested change: Clause can be removed
Reason: Each LTO 4/5 Drive has its own native FC interface. Already addressed
765ILFS Technologies,
Gurgaon
Annexure IV- 1.3 pg
130Must Support LTO, SDLT, DLT, etc. Tape drives
Suggestion: Clause can be removed.
Reason: Tape library supports only LTO generation cartridgeAlready addressed
766ILFS Technologies,
Gurgaon
Annexure IV- 1.3 pg
130
Should have min. data transfer rate of 80Mbps per
drive
Requested change: Should have min. data transfer rate of
140MBps per drive
Reason : As per LTO5 standards.
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 73 of 74
Clarifications on the queries received for Pre-Bid meeting held on Aug 24, 2011 RFP: Development on an Enterprise Web Based GIS Application
Sr.
No.
Vendor Name and
Address
RFP Section
Reference No.
Subject Clarification Sought Clarification by the Department Amendment
necessary in RFP
Section in RFP
767ILFS Technologies,
Gurgaon
Annexure IV- 1.2
page no 127
Must have four hot swap power module bays with two
power modules populated
Suggested Change: Must be provided with fully populated power
supplies and fully populated fan/blower modules.
Reason: "Four Hot swap power module bays" is specific to particular OEM.
No of power supply and fans/blowers may vary for different OEMs.
Mentioning fully populated will serve the purpose.
Already addressed
Commissioner Land Records Settlement, Madhya Pradesh Page 74 of 74