Page 1 of 25
Attachment to Detailed NIT of tender for Implementation of ERP Solution in MPPGCL
Ref NIT No : NIT No.- 07-01/Project e-Genco/628 dtd. 18th Jun’20
E-Tender No 2020_MPPGC_93149
RFP No CE-PRG/MPPGCL/PROJECT e-GENCO/2020/ERP/01
Part A :
Qualifying requirements for the OEM Authorized ERP Implementation Partners/ OEM Authorized System Integrators of COTS ERP Products, i.e., the Bidder (Lead Partner in case of a consortium)
S.No Criteria Mandatory Documents to be
submitted
A Organizational Parameters
1. Should be a registered Proprietary firm or
partnership firm or private or LLP or Ltd.
Company and a company incorporated in India
under the Companies Act, 1956/Limited
Liability Partnership Act 2008 and subsequent
amendments and should be in existence for the
last 5 Years in the areas of ERP software
solution selling & its implementation as on the
date of issue of NIT.
Certificate of Registration/ Certificate of
Incorporation for the mentioned criteria
must be provided by the bidder, self-
attested by the authorized signatory of
the bidder.
2. Should have valid PF Code, IT PAN, GST
Registration Certificate.
All the supporting documentary
evidences for the mentioned criteria
must be provided by the bidder, self-
attested by the authorized signatory of
the bidder.
Page 2 of 25
S.No Criteria Mandatory Documents to be
submitted
3. The Bidder should be a certified/authorized
partner of the respective OEM of offered COTS
ERP Product and the Bolt On Module (if any).
The bidder should have valid
authorization/certification from and active
relationship with the respective OEM(s) as on
the as on the date of issue of NIT.
Required Certificate(s)/ Authorization(s)
from the respective OEM(s) have to be
submitted in Form # 20.
[ Note:- The Form # 20 should be filled
and submitted separately for each OEM]
4. The Bidder should have an Average Annual
Turnover of at least INR 1000 crores with
positive Net Worth for last 3 financial years (FY
2016-17, FY 2017-18, FY 2018-19). as per
Audited Annual Accounts.
The Turnover of the Bidder from ERP Product
selling and/or its Implementation shall be at
least INR 100 Crores per year in the last three
financial years (FY 2016-17, FY 2017-18, FY
2018-19).
Audited Annual Accounts Statements
(Relevant Schedules and Annexures,
Statement of Asset and Liabilities &
Profit and Loss Account) for last 3 years
(FY 2016-17, FY 2017-18, FY 2018-19)
along with duly filled in Form # 14 and
Form # 15.
Audited Annual Accounts Statements
(Relevant Schedules and Annexures,
Statement of Asset and Liabilities &
Profit and Loss Account)duly filled in
Form # 14 indicating the Annual
turnover of the Bidder from ERP Product
selling and/or its Implementation in last
3 years (FY 2016-17, FY 2017-18, FY
2018-19) should also be submitted.
5. The bidder must have a valid CMMI level 5
Certification.
Relevant CMMI certificate, self-attested
by the authorized signatory of the
bidder.
6. Any direct Contract Agreement of the bidder
with MPPGCL should not have been terminated
in last five (5) years as on the date of the issue
of the NIT.
Self-Declaration/Certification by the
authorized signatory of the bidder in the
attached Form # 16.
Page 3 of 25
S.No Criteria Mandatory Documents to be
submitted
7. The Bidder shall not be under declaration of
ineligibility for corrupt or fraudulent practices or
blacklisted or debarred in last five years by any
Department / Agency / PSU/ Organization of
the Government of India or any State
Government in India for non-satisfactory past
performance, corrupt, fraudulent or any other
unethical business practices.
Self-Declaration/Certification by the
authorized signatory of the bidder in the
attached Form # 18 .
B Human Capital Strength
1. The Bidder should have a well-established
presence in India with a support base to
provide implementation and support for the
proposed COTS ERP solution & services along
with the ability to provide timely response and
service to the owner.
Declaration letter signed by the
authorized signatory along with
adequate documentary evidences in
respect of submission of the bidder to be
enclosed.
2. The bidder must have at least 150 full time ERP
professionals of the proposed COTS ERP
system on its payroll in India.
Certificate from firm’s HR department to
be submitted (Form # 22).
C General
1. Compatibility - The offered COTS ERP product
should be compatible with both IPv4 and IPv6.
Self-Declaration/Certification by the
authorized signatory of the OEM of
proposed COTS ERP and by the
authorized signatory of the bidder along
with all appropriate supporting
documentary evidences for the
mentioned criteria must be provided by
the bidder.
2. The offered COTS ERP product must support
Service Oriented Architecture (SOA) and should
have the capability to support growth in
Self-Declaration/Certification by the
authorized signatory of the OEM of
proposed COTS ERP and by the
Page 4 of 25
S.No Criteria Mandatory Documents to be
submitted
geographical locations running on the same
instance.
authorized signatory of the bidder along
with all appropriate supporting
documentary evidences for the
mentioned criteria must be provided by
the bidder.
3. Audit Trail:- Proposed ERP Product must have
in-built “Audit Trail” functionality.
Self-Declaration/Certification by the
authorized signatory of the OEM of
proposed COTS ERP and by the
authorized signatory of the bidder along
with all appropriate supporting
documentary evidences for the
mentioned criteria must be provided by
the bidder.
4. The ERP product must be the country specific
version for India with statutory requirements
incorporated and should have a localization
support in terms of Income Tax, GST etc.
specific to India.
Self-Declaration/Certification by the
authorized signatory of the OEM of
proposed COTS ERP and by the
authorized signatory of the bidder along
with all appropriate supporting
documentary evidences for the
mentioned criteria must be provided by
the bidder.
5. The OEM of proposed COTS ERP should have
at least one training center of its own or an
authorized training center in India with a
training capacity of at least 50 trainees.
Self-Declaration/Certification by the
authorized signatory of the OEM of
proposed COTS ERP and by the
authorized signatory of the bidder along
with all appropriate supporting
documentary evidences for the
mentioned criteria must be provided by
the bidder.
Page 5 of 25
S.No Criteria Mandatory Documents to be
submitted
Address and contact details of Training
Center(s) in India should also be
submitted.
6. The Bidder should furnish certificates from
respective OEM of offered COTS ERP Product
and the Bolt On Module (if any) to provide
technical support for the offered COTS ERP and
the Bolt On module (if any) in terms of
updates, repairs, patches and upgrades for the
next minimum seven years from the date of
supply.
All the appropriate supporting
documentary evidences for the
mentioned criteria must be provided by
the bidder. OEM’s Confirmatory letters to
be enclosed.
[Note:- Confirmatory letters should be
filled and submitted separately for each
of the OEMs]
D Presence of ERP solution OEM in India
1. The OEM of proposed COTS ERP shall have SLA
based 24/7 x 365 days local Technical
Assistance Centers (TAC)/Support Center
based in India with minimum 100 team
members for offering post-sales support. The
ERP OEM should have its own TAC in India
manned with its own engineers/professionals.
Self-Declaration/Certification by the
authorized signatory of the OEM of
proposed COTS ERP and by the
authorized signatory of the bidder along
with all appropriate supporting
documentary evidences for the
mentioned criteria must be provided by
the bidder. Address and contact details
of TAC in India should also be submitted.
2. The ERP solution OEM should have at least five
independent System Integrators, registered
and operating in India, as certified partners to
implement and provide maintenance & support
services for the ERP solution. These system
integrators should be the active partners of the
OEM for at least last 5 years.
Self-Declaration/Certification by the
authorized signatory of the OEM of
proposed COTS ERP and by the
authorized signatory of the bidder along
with all appropriate supporting
documentary evidences for the
mentioned criteria must be provided by
the bidder.
Page 6 of 25
S.No Criteria Mandatory Documents to be
submitted
3. The OEM of the offered COTS ERP should have
an Average Annual Turnover of at least INR
1000 Crores with positive Net Worth for last 3
financial years (FY 2016-17, FY 2017-18, FY
2018-19) as per Audited Annual Accounts.
The Turnover of the ERP OEM from ERP
Product selling and/or its Implementation shall
be at least INR 100 Crores per year in the last
three financial years (FY2016-17, FY 2017-18,
FY 2018-19).
Audited Annual Accounts Statements
(Relevant Schedules and Annexures,
Statement of Asset and Liabilities &
Profit and Loss Account) for last 3 years
(FY 2016-17, FY 2017-18, FY 2018-19)
along with duly filled in Form # 14 and
Form # 15.
Audited Annual Accounts Statements(
Relevant Schedules and Annexures,
Statement of Asset and Liabilities &
Profit and Loss Account) duly filled in
Form # 14 indicating the Annual
turnover of the ERP OEM from ERP
Product selling and/or its
Implementation in last 3 years (FY 2016-
17, FY 2017-18, FY 2018-19) should also
be submitted.
E Implementations of COTS ERP Product
1. The customer base of proposed COTS ERP in
India should be of at least 10 customers where
the proposed COTS ERP has been successfully
implemented and are live (as on the last date
of online submission of Bid documents), out of
which at least three (3) customers should be
organizations of Govt. of India / State Govt. /
PSUs having user base of minimum 500
transactional users each with multiple modules
implemented and covering multiple locations.
Self-Declaration/Certification by the
authorized signatory of the OEM of
proposed COTS ERP and by the
authorized signatory of the bidder along
with all appropriate supporting
documentary evidences (such as order
copies/completion certificates) for the
mentioned criteria must be provided by
the bidder.
Bidder shall have to provide access to
the Owner/ Consultant (within 7 days of
Page 7 of 25
S.No Criteria Mandatory Documents to be
submitted
request from the Owner/ Consultant) for
validation from the customer's
authorized signatory (including valid
contact details) so as to enable the
Owner to verify such information as
required above.
2. The Bidder should have successfully executed
at least 10 implementations of COTS ERP out
of which 2 implementations should be in India
each having more than 500 users across
multiple modules.
All the appropriate supporting
documentary evidences for the
mentioned criteria must be provided by
the bidder such as:-
• Work Order + Completion Certificates
from the client;
OR
• Work Order + Self Certificate of
Completion (Certified by Authorized
Signatory of the bidder),
OR
• In case where, due to Non-Disclosure
Agreements with the client, providing
the work order copy is not possible then,
Completion Certificate from the client
OR
Self-Certificate of project completion by
the bidder’s Authorized signatory,
mentioning the scope of work and the
project value, should be submitted. In
this case the bidder should, however,
mention the reason for not being able to
submit copy of the Work Order in the
Page 8 of 25
S.No Criteria Mandatory Documents to be
submitted
Self Certificate issued by the Statutory
Auditor/Company Secretary.
Bidder shall have to provide access to
the Owner/ Consultant (within 7 days of
request from the Owner/ Consultant) for
validation from the customer's
authorized signatory (including valid
contact details) so as to enable the
Owner to verify such information as
required above.
Bidder shall also submit the Form # 3
alongwith aforesaid documents
3. The Bidder should have successfully
implemented proposed COTS ERP in at least
one large Govt. Power Utility in India /Private
Power Utility in India/Large Public Sector
Undertaking (PSU) in India/Power Generation
Utility in India or Global/Large Process Industry
in India or Global where at least 3 out of the
following 6 core modules (functional areas)
have been implemented and the so
implemented ERP solution should be live with
minimum 500 users (as on the last date of
online submission of Bid documents):-
Finance & Accounts Management, Material
Management, Project Management, Plant
Operations and Maintenance, Fuel
Management and HR & Payroll Management.
All the appropriate supporting
documentary evidences for the
mentioned criteria must be provided by
the bidder such as:-
• Work Order + Completion Certificates
from the client;
OR
• Work Order + Self Certificate of
Completion (Certified by Authorized
Signatory of the bidder),
OR
• In case where, due to Non-Disclosure
Agreements with the client, providing
the work order copy is not possible then,
Completion Certificate from the client
OR
Page 9 of 25
S.No Criteria Mandatory Documents to be
submitted
Self Certificate of project completion by
the bidder’s Authorized Signatory,
mentioning the scope of work and the
project value, should be submitted. In
this case the bidder should, however,
mention the reason for not being able to
submit copy of the Work Order in the
Self Certificate issued by the Statutory
Auditor/Company Secretary.
Bidder shall have to provide access to
the Owner/ Consultant (within 7 days of
request from the Owner/ Consultant) for
validation from the customer's
authorized signatory (including valid
contact details) so as to enable the
Owner to verify such information as
required above.
Bidder shall also submit the Form # 3
alongwith aforesaid documents
F Team Composition (For Implementation Phase) – The bidder should have following
minimum personnel with requisite experience for deployment during the implementation
phase. As such, following details must be submitted :
1. Details of Personnel to be deployed for
the implementation phase
Details to be submitted in the attached
Form # 4, 4A .
2. Minimum Resource /Personnel
i. Project Manager
Bidder should have minimum One (1)
Personnel of following criteria: -
CVs of the Personnel to Be
Deployed/Team Members to be
submitted in the attached Form# 5.
Page 10 of 25
S.No Criteria Mandatory Documents to be
submitted
a. Minimum Qualification: B.E/ B.Tech. / M
Tech
b. Mandatory Professional qualification: i)
ERP Certification in at least one functional
module of the proposed COTS ERP, ii)
Certification in PMP/ TOGAF/Prince2
c. Minimum Required Experience:
Minimum10 years of experience,
including ERP Program Management
experience of minimum 5 Projects (end to
end and of more than 8 months each) in
the proposed COTS ERP Projects and
implementation experience in minimum 5
ERP implementation lifecycles (end to end
and of more than 8 months each) of the
proposed COTS ERP which includes at
least 1 similar implementation experience
in Power Utilities Sector/ Large Process
Industry (other than Power Utility)/ Large
Public Sector Undertaking (PSU) (other
than Power Utility and Large Process
Industry) in India as Project Manager.
d. Desired Professional qualification:- MBA
[ Note:- The Form # 5 should be filled
and submitted separately for each
Personnel]
ii. Power Generation Utility Industry Experts
Bidder should have minimum Two (2)
Personnel of following criteria:-
a. Minimum Qualification: B.E/ B.Tech. /
M.Tech
b. Minimum Required Experience: Minimum
10 years of power generation utility
industry experience along with process
improvement experience and ERP
CVs of the Personnel to Be
Deployed/Team Members to be
submitted in the attached Form # 5.
Note:- The Form # 5 should be filled
and submitted separately for each
Personnel
Page 11 of 25
S.No Criteria Mandatory Documents to be
submitted
implementation experience in minimum 1
similar ERP implementation lifecycle of the
proposed COTS ERP (end to end and of
more than 8 months) in power generation
utilities sector in India.
c. Desired Professional qualification:- MBA/
BEE Certified Energy Auditors,
d. Desired Professional qualification:- ERP
Certification in the relevant functional
module of the proposed COTS ERP.
Note :- For above required manpower
bidder may propose third party
personnels fulfilling the above
requirement. However, assignment
engagement documents including the
engagement contract for the entire
duration of implementation phase along-
with CV shall be submitted by the bidder
with the bidding documents. Further,
implementation responsibility
whatsoever and engagement of such
personnel shall lie with the bidder.
iii. Functional Lead
Bidder should have minimum Eighteen (18)
Personnel of following criteria:-
a. Minimum Qualification: B.E/ B.Tech. / M.
Tech./MBA/ CA/ ICWA/MCA
b. Mandatory Professional qualification: ERP
Certification in the relevant functional
module of the proposed COTS ERP for which
the resource has been proposed
c. Minimum Required Experience: Minimum 8
years of professional experience including
Functional Lead experience of minimum 2
ERP implementation projects (end to end
and of more than 8 months each) of the
proposed COTS ERP and implementation
experience of minimum 3 ERP
implementation lifecycles (end to end and of
more than 8 months each) of the proposed
COTS ERP. The experience should include at
least one (1) similar implementation of
CVs of the Personnel to Be
Deployed/Team Members to be
submitted in the attached Form # 5.
[Attachment 31]
Note:- The Form # 5 should be filled
and submitted separately for each
Personnel
Page 12 of 25
S.No Criteria Mandatory Documents to be
submitted
country specific version of the proposed
COTS ERP in India in the relevant module,
for which the resource has been proposed,
in Power Utility Sector / Large Process
Industry (other than Power Utility)/ Large
Public Sector Undertaking (PSU) (other than
Power Utility and Large Process Industry)/
Large Govt. of India organizations, in India
as Functional Lead.
iv. Technical Lead
Bidder should have minimum Six (6)
Personnel of following criteria: -
a. Minimum Qualification: B.E/ B.Tech. /
M.Tech
b. Mandatory Professional qualification:
ERP Certification in the relevant
technical module of the proposed COTS
ERP for which the resource has been
proposed
c. Minimum Required Experience:
Minimum 8 years of experience in the
technical domain including Technical
Lead experience of minimum 2 ERP
implementation projects (end to end
and more than 8 months each) of the
proposed COTS ERP and
implementation experience of minimum
3 ERP implementation lifecycle (end to
end and more than 8 months each) of
the proposed COTS ERP. The
experience should include minimum 1
similar ERP project implementation in
CVs of the Personnel to Be
Deployed/Team Members to be
submitted in the attached Form # 5.
Note:- The Form # 5 should be filled
and submitted separately for each
Personnel
Page 13 of 25
S.No Criteria Mandatory Documents to be
submitted
Large Public Sector Undertaking
(PSU)/Power Utility Sector/ Large Govt.
of India organizations/ BFSI in India as
Technical Lead.
Note:
1. All self-certificates and documents must be signed, sealed & dated by the
Authorized signatory in original, unless specified otherwise.
2. Technical upgrades and rollouts of the COTS ERP or its modules shall not be
considered as implementation experience for COTS ERP.
3. Internal implementation including implementation in subsidiary companies of the
bidder will not be considered as required qualifying credentials.
4. The documentary evidences for Man power required and submitted under part F
of the qualification requirement as mentioned above i.e. Form 4, Form 4A, Form
5 and any other relevant document as submitted by bidders shall be considered
for evaluation for both PQR qualification and Techno Commercial Evaluation.
Page 14 of 25
Part B:
Qualifying requirements of the Bidder/Partner (in case of a Consortium) for the ICT Infrastructure:-
S.No. Criteria Mandatory Documents to be
submitted.
A. Organizational Parameters
1. Should be a registered Proprietary firm or
partnership firm or private or LLP or Ltd. Company
and a company incorporated in India under the
Companies Act, 1956/Limited Liability Partnership
Act 2008 and subsequent amendments and should
be in existence for the last 5 Years as on the date
of issue of NIT in the areas of supply,
implementation, operation and maintenance of
Data Centre related ICT Infrastructure solution for
large integrated solution such as ERP.
Certificate of Registration/ Certificate
of Incorporation for the mentioned
criteria must be provided by the
bidder, self-attested by the authorized
signatory of the bidder.
2. Should have valid PF Code, IT PAN, GST
Registration Certificate.
All the supporting documentary
evidences for the mentioned criteria
must be provided by the bidder, self-
attested by the authorized signatory
of the bidder.
3 The Bidder/Consortium Partner should be an OEM
certified/authorized System
Integrator/Implementation Partner for the
proposed Core ICT Infrastructure Hardware and
Software Products. The System
Integrator/Implementation Partner should have
valid authorization/certification from the respective
OEM(s) and have active relationship with the
respective OEM(s). OEMs Authorization for Servers,
Network equipment, SAN Storage, Backup Solution,
EMS, etc., are to be submitted.
Required
Certificate(s)/Authorization(s) from
the OEM(s) have to be submitted in
Form # 20.
[ Note:- The Form # 20 should be
filled and submitted separately for
each OEM]
Page 15 of 25
S.No. Criteria Mandatory Documents to be
submitted.
4. The Bidder/Consortium Partner should have an
Average Annual Turnover of Rs. 150 Crore or more
for last three (3) financial years (FY 2016-17, FY
2017-18, FY 2018-19) with positive Net Worth for
each of last three (3) financial years (FY 2016-17,
FY 2017-18, FY 2018-19).
Out of the total Annual Turnover, the Annual
Turnover from supply, installation, testing &
commissioning followed by operation &
maintenance of Data Centre related ICT
Infrastructure, other ICT Infrastructure and
associated packaged software, etc., should be at
least Rs. 50 Crore per year in the last three financial
years (FY 2016-17, FY 2017-18, FY 2018-19).
Audited Annual Accounts for last 3
years (FY 2016-17, FY 2017-18, FY
2018-19) along with duly filled in
Form # 23 and Form # 24.
Audited Annual Accounts
Statements (Relevant Schedules and
Annexures, Statement of Asset and
Liabilities & Profit and Loss Account)
with duly filled in Form # 23
indicating the Annual turnover of the
bidder/consortium partner from ICT
Infrastructure solution selling and its
implementation in last 3 years (FY
2016-17, FY 2017-18, FY 2018-19)
should also be submitted.
5. Any direct Contract Agreement of the proposed
bidder/consortium partner for ICT Infrastructure
with MPPGCL should not have been terminated in
last five (5) years.
Self-Declaration/Certification by the
authorized signatory of the
Implementation Partner and the
authorized signatory of the Bidder in
the attached Form #25.
6. The Bidder/Consortium Partner shall not be under
declaration of ineligibility for corrupt or fraudulent
practices or blacklisted or debarred in last five years
by any Department / Agency / PSU/ Organization
of the Government of India or any State
Government in India for non-satisfactory past
performance, corrupt, fraudulent or any other
unethical business practices.
Self-Declaration /Certification by the
authorized signatory of the
Implementation Partner and by the
authorized signatory of the Bidder in
the attached (Form # 18).
7. The Bidder/Consortium Partner should hold a valid
ISO ISO 27001:2013 (or its latest release)
Certifications.
Copies of the required valid
certifications to be submitted duly
self-attested by the authorized
Page 16 of 25
S.No. Criteria Mandatory Documents to be
submitted.
signatory of the ICT Infrastructure
Implementation Partner and the
Bidder.
B Human Capital Strength
1. The Bidder/Consortium Partner should have on its
own payroll at least 100 technically qualified ICT
Infrastructure professionals for providing technical
services related to supply, installation, testing &
commissioning followed by operation &
maintenance of Data Center ICT Infrastructure,
other ICT Infrastructure and associated packaged
software, etc., out of which at least 30 employees
should have minimum three (3) years of experience
of working in data center environment and
experience of successful implementation, operation
and maintenance of data center ICT infrastructure
including servers, SAN Storage, Backup Solution,
Data Center Networking, EMS Solution, etc.
Certificate from firm’s HR department
to be submitted (Form # 26 ), duly
self-attested by the authorized
signatory of Partner and the
authorized signatory of Bidder.
2. The Bidder/Consortium Partner should have a well-
established presence in India with a support base
to provide implementation and support for the
proposed ICT Infrastructure solution & services
along with the ability to provide timely response and
service to the owner.
Declaration letter signed by the
authorized signatory of Partner and
the authorized signatory of Bidder
along with adequate documentary
evidences in respect of submission to
be enclosed.
C. General
1. The ICT Infrastructure solution OEM(s) whose
products have been offered in the bid should be a
registered firm or a company in India and should be
in existence in India for last five (5) Years in the
areas of selling of Data Centre related ICT
All the appropriate supporting
documentary evidences for the
mentioned criteria must be provided
by the ICT Solution Implementation
Partner and the Bidder.
Page 17 of 25
S.No. Criteria Mandatory Documents to be
submitted.
Infrastructure solution(s), other ICT Infrastructure
and associated packaged software, etc.
2. OEMs of ICT Infrastructure solution whose products
have been offered in the bid shall have SLA based
24/7 x 365 days local Technical Assistance Centers
(TAC)/Support Center based in India with minimum
50 team members for offering post-sales support.
OEMs should have its own TAC in India manned
with its own engineers/professionals.
Self-Declaration/Certification by the
authorized signatory of the OEM(s) of
proposed ICT Infrastructure solution
and by the authorized signatory of the
partner & the bidder along with all
appropriate supporting documentary
evidences for the mentioned criteria
must be provided by the bidder.
Address and contact details of TAC
Centers in India should also be
submitted.
3. The Bidder/Consortium Partner should submit valid
authorization letters from each of the OEMs of the
offered ICT Infrastructure related Hardware and
Software, confirming that the products meet the
technical & functional requirements asked for in the
RFP document and that the Products quoted are of
latest version / specification and are not at the end
of sale, end of life and end of support.
OEM’s confirmatory letters to be
enclosed by the ICT Infrastructure
Implementation Partner and the
bidder, along with duly filled up Form
# 20.
[ Note:- The Form # 20 should be
filled and submitted separately for
each OEM]
4. The Bidder/Consortium Partner should furnish
certificates from each of the OEMs of the offered
ICT Infrastructure related Hardware and Software
to provide technical support for the offered ICT
Infrastructure elements in terms of spares,
replacement, repairs, patches and upgrades for the
next minimum seven years from the date of supply.
All the appropriate supporting
documentary evidences for the
mentioned criteria must be provided
by the ICT Infrastructure
Implementation Partner and the
bidder. OEM’s Confirmatory letters to
be enclosed.
Page 18 of 25
S.No. Criteria Mandatory Documents to be
submitted.
5. The offered products and the OEMs of any of the
offered products should not be under declaration of
ineligibility for any cyber security or information
security threat by any Sovereign Government.
Self-Declaration /Certification by the
authorized signatory of the
Implementation Partner and by the
authorized signatory of the Bidder
along with self-declaration of the
authorized signatory of the respective
product OEMs in the attached Form #
33.
[ Note:- The Form # 33 should be
filled and submitted separately for
each OEM]
D. Implementation Experience
1. The Bidder/Consortium Partner should have
successfully implemented or is implementing similar
ICT Infrastructure projects for ERP implementations
or large integrated software solutions in India
involving dispersed locations including supply,
installation, testing & commissioning followed by
operation & maintenance of Data Centre related ICT
Infrastructure, other ICT Infrastructure and
associated packaged software, etc., in State Govt.
Departments/ Central Govt. Departments/ PSUs/
Power Generating Companies/ Power Utilities/Large
Process Industries/Large Industrial Enterprises/
BFSI, during last 10 years and having project values
as specified below:-
i.One similar project having the ICT
Infrastructure component of total value of at
least Rs. 10 Cr (Rs. Ten Crore), OR
ii. Two similar projects having the ICT
Infrastructure component of total value of at
least Rs. 5 Cr. (Rs. Five Crore) each, OR
All the appropriate supporting
documentary evidences for the
mentioned criteria must be provided
by the ICT Infrastructure
Implementation Partner and the
bidder. The satisfactory performance
certificate should be in the form of :-
• Work Order + Completion
Certificates from the client;
OR
• Work Order +Self Certificate of
Completion (Certified by the
Authorized Signatory of the bidder);
OR
• Work Order + Phase Completion
Certificate (Pilot Go-Live/ Roll-Out/
Stabilization/ Enterprise wide Go-
Live) from the client;
OR
Page 19 of 25
S.No. Criteria Mandatory Documents to be
submitted.
iii. Three similar projects having the ICT
Infrastructure component of total value of at
least Rs.4 Cr. (Rs. Four Crore) each.
Note:- Similar on-going/under implementation ICT
Infrastructure projects shall be considered
only in such cases where at least delivery and
installation of the ICT Infrastructure for the
required value have been completed.
• In case where, due to Non-
Disclosure Agreements with the
client, providing the work order copy
is not possible then, Completion
Certificate from the client
OR
Self Certificate of project completion
by the bidder’s Statutory Auditor/
Company Secretary, mentioning the
scope of work and the project value,
should be submitted. In this case the
bidder should, however, mention the
reason for not being able to submit
copy of the Work Order in the Self
Certificate issued by the Statutory
Auditor/ Company Secretary.
• For on-going/under implementation
projects where Phase Completion
Certificate from client are not
available however the delivery and
installation of the ICT Infrastructure
for the required value have been
completed then, Delivery challan of
ICT infrastructure delivered along
with Work Order + Certificate from
the client OR Self Certificate by the
bidder’s Statutory Auditor/Company
Secretary regarding completion of
delivery and installation of the ICT
Infrastructure of required value
should be submitted, clearly
mentioning the complete scope of
Page 20 of 25
S.No. Criteria Mandatory Documents to be
submitted.
work under the Order and the total
project value.
Bidder shall have to provide access to
the Owner/ Consultant (within 7 days
of request from the Owner/
Consultant) for validation from the
customer's authorized signatory
(including valid contact details) so as
to enable the Owner to verify such
information as required above.
Bidder shall also submit the Form #
3 alongwith aforesaid documents
2. The Bidder/Consortium partner should have
experience of at least one (1) year in successfully
providing similar O&M services during last Ten (10)
Years in State Govt. Departments/ Central Govt.
Departments/PSUs/ Power Generating
Companies/Power Utilities/Large Industrial
Enterprises/BFSI for Data Center related ICT
Infrastructure, other ICT Infrastructure and
associated packaged software, etc.
Note:- Similar on-going/under implementation ICT
Infrastructure projects shall be considered only in
such cases where at least delivery and installation
of the ICT Infrastructure for the project have been
completed and similar O&M services are being
provided successfully for at least one year.
All the appropriate supporting
documentary evidences for the
mentioned criteria must be provided
by the ICT Infrastructure
Implementation Partner and the
bidder. The satisfactory performance
certificate should be in the form of :-
• Work Order + Completion
Certificates from the client;
OR
• Work Order +Self Certificate of
Completion (Certified by the
Authorized Signatory of the
Bidder/Partner);
OR
• Work Order +Phase Completion
Certificate (Pilot Go-Live/ Roll-Out/
Stabilization/ Enterprise wide Go-
Live) from the client;
Page 21 of 25
S.No. Criteria Mandatory Documents to be
submitted.
OR
• In case where, due to Non-
Disclosure Agreements with the
client, providing the work order copy
is not possible then, Completion
Certificate from the client
OR
Self-Certificate of project completion
by the bidder’s Authorized Signatory,
mentioning the scope of work and
the project value, should be
submitted. In this case the bidder
should, however, mention the reason
for not being able to submit copy of
the Work Order in the Self Certificate
issued by the Authorized Signatory.
• For on-going/under implementation
projects where Phase Completion
Certificate from client are not
available however the delivery &
installation of the ICT Infrastructure
for the project have been completed
and similar O&M services are being
provided successfully for at least one
year then, Delivery challan of ICT
infrastructure delivered along with
Work Order + Certificate from the
client OR Self Certificate by the
bidder’s Authorized Signatory
regarding completion of delivery and
installation of the ICT Infrastructure
for the project and on-going O&M
Page 22 of 25
S.No. Criteria Mandatory Documents to be
submitted.
services should be submitted, clearly
mentioning the complete scope of
work under the Order and the total
project value. Invoices raised/phase
completion certificate should be
submitted as far as available.
Bidder shall have to provide access to
the Owner/ Consultant (within 7 days
of request from the Owner/
Consultant) for validation from the
customer's authorized signatory
(including valid contact details) so as
to enable the Owner to verify such
information as required above.
Bidder shall also submit the Form #
3 alongwith aforesaid documents
E Team Composition (For Implementation Phase) – The bidder should have following
minimum personnel with requisite experience for deployment during the implementation
phase. As such, following details must be submitted :
1. Details of Personnel to be deployed for the
implementation phase
Details to be submitted in the
attached Form # 4, 4A .
2. Minimum Resource /Personnel
i. Project Manager
Bidder should have minimum One (1) Personnel of
following criteria: -
a. Minimum Qualification: B.E./B.Tech. /
M.Tech.
b. Minimum Required Experience: Minimum
ten (10) years of experience including
CVs of the Personnel to Be
Deployed/Team Members to be
submittedin the attached Form # 5.
Note:- The Form # 5 should be filled
and submitted separately for each
Personnel
Page 23 of 25
S.No. Criteria Mandatory Documents to be
submitted.
Program Management experience of
minimum five (5) Data Center related ICT
Infrastructure Projects as Project Manager
which includes at least three (3) similar Data
Center related ICT Infrastructure Projects
for ERP implementations or large integrated
software solutions and out of which one (1)
implementation experience is of similar
Data Center related ICT Infrastructure
Project for ERP implementation in Central
Govt. Department/State Govt. Department/
PSU/ Power Utility/Large Process Industry
(other than Power Utility)/ Large Industrial
Enterprises/ BFSI in India, as Project
Manager.
c. Mandatory Professional qualification:-
Certification in PMP/ TOGAF/Prince2
d. Desirable Professional qualification:- MBA
ii. ICT Solution Architect
Bidder should have minimum Two (2) Personnel of
following criteria:-
a. Minimum Qualification: B.E./B.Tech. /
M.Tech / MCA
b. Minimum Professional qualification: Valid
Design and Architect certifications from
OEMs such as Red Hat Certified Architect
(RHCA), Microsoft Certified Architect, and
other equivalent Certifications which are
relevant to platform and technology
proposed for the solution.
c. Minimum Required Experience: Minimum 8
years of experience including experience as
CVs of the Personnel to Be
Deployed/Team Members to be
submitted in the attached Form # 5.
Note:- The Form # 5 should be filled
and submitted separately for each
Personnel
Page 24 of 25
S.No. Criteria Mandatory Documents to be
submitted.
ICT Solution Architect in minimum 4 Data
Center related ICT Infrastructure Projects
which includes experience of minimum 2
similar Data Center related ICT
Infrastructure Projects for ERP solution
implementation or large integrated software
solutions (end to end, having at least 6
months of project duration each) as ICT
Solution Architect/Technical Lead out of
which at least one (1)implementation
experience is of the similar Data Center
related ICT Infrastructure Project for ERP
implementation in Central Govt.
Department /State Govt. Department/ PSU/
Power Utility/Large Process Industry (other
than Power Utility)/ Large Industrial
Enterprises/ BFSI in India, as ICT Solution
Architect.
iii. ICT Engineer
Bidder should have minimum Twelve (12)
Personnel of following criteria:-
a. Minimum Qualification: B.E./B.Tech. /MCA
b. Minimum Professional qualification: Valid
OEM certifications such as MCSA, MCSE,
RHCSA, RHCE certification, other
certifications which are relevant to platform,
product & technology proposed for solution
and for which the resource has been
proposed.
c. Minimum Required Experience: Minimum 3
years of experience as ICT Engineer in
minimum 2 Data Center related ICT
CVs of the Personnel to Be
Deployed/Team Members to be
submittedin the attached Form # 5.
Note:- The Form # 5 should be filled
and submitted separately for each
Personnel
Page 25 of 25
S.No. Criteria Mandatory Documents to be
submitted.
Infrastructure Projects which includes
experience of minimum 1 Data Center
related ICT Infrastructure Project for ERP
solution implementation or large integrated
software solution (end to end, having at
least 6 months of project duration each), as
ICT Engineer.
Note: 1. All self-certificates and documents must be signed, sealed and dated, in original,
by the Authorized signatories of the Implementation Partner and the Bidder,
unless specified otherwise.
2. Internal implementation including implementation in subsidiary companies of the
bidder/consortium partner will not be considered as required qualifying
credentials.
3. The documentary evidences for Man power required and submitted under part E
of the qualification requirement as mentioned above i.e. Form 4, Form 4A, Form
5 and any other relevant document as submitted by bidders shall be considered
for evaluation for both PQR qualification and Techno Commercial Evaluation.
The Bidder should have the credentials to meet all of the above mandatory criteria to
become eligible. In case any of the conditions listed above is not met, the Bidder will be
disqualified. Only proposals which meet all of the above Pre-qualification requirement
would be considered further for techno commercial stage.