Macquarie ASEAN Conference 2018

August 2018

ECONPILE

HOLDINGS BERHAD (Co. No. 101764-M)

IR Adviser

Page 2: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Corporate Profile

Recent Developments

Financial Highlights

Growth Strategies

Investment Merits

Appendix

CONTENTS

2

Page 3: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Corporate Profile

3

Page 4: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Established in 1987 Started with driven piling

Advanced to bored piling

Delivered more than

RM2 billion worth of

projects

Notable projects

Accredited with ISO

9001: 2008, Econpile

holds a

Grade “7” license

❑ The Troika @ Jalan

Binjai

❑ Putrajaya

administrative centre

❑ Port Dickson and

Manjung power plants

❑ Klang Valley Mass

Rapid Transit (MRT)

❑ Pavillion shopping

centre (Phases 1 and 2)

allows participation

in tenders for

projects with

unlimited values.

BACKGROUND

An established and integrated player in the domestic piling and foundation services industry…

Services complemented

by workshop in

Bukit Beruntung,

Rawang for machinery

repair and maintenance

4

Highly experienced management leads a

500-strong workforce Econpile Holdings Berhad(1017164-M)

Econpile (M) Sdn BhdProvision of foundation and piling

services, including civil engineering and related activities

Tropical Broadway Sdn BhdProperty development

Platinum Production Sdn BhdProperty investment, rental of machinery

and sales of goods

Corporate Structure

Page 5: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Bored piles are used mostly for large commercial and industrial

developments and transport infrastructure projects.

- Able to support very high load capacity

- Low noise and vibration

- Able to core into hard rock

BORED PILING

Bored piles are the deep foundation of choice for high-rise buildings in urban areas…

5

Page 6: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

6 BORED PILING

Vast experience in bored piling in infrastructure and property projects…

Completed bored piling works for

Package V1 and Package V6 for Sungai

Buloh-Kajang Mass Rapid (MRT) Line

Installed large diameter bored piles

with diameter up to 3.0m and length

exceeding 100m for Oxley Towers

KLCC

Page 7: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Simultaneous construction

of superstructure and

basement

Base

ment

Supers

tructu

re

For conventional bottom-up construction, excavation

is firstly carried out through to designed depth. Floor

slabs are constructed sequentially from lowest level

of basement.

Top-down construction method is often used for

large-scale projects with limited construction time in

congested areas. Structure is constructed downwards

from ground level.

Top-down construction method enables faster construction progress…

BASEMENT CONSTRUCTION7

Page 8: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

8

Completed Piling and substructure works for

Elite Pavilion with 6-storey basement at Jalan

Bukit Bintang, Kuala Lumpur

Completed Substructure and basement works

for MAS Building with 6-storey basement at

Jalan Sultan Ismail, Kuala Lumpur

Recognized expertise in deep basement construction…

BASEMENT CONSTRUCTION

Page 9: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Econpile has one of the largest and mostadvanced arrays of piling equipment inMalaysia.

➢ Majority of rigs owned aremanufactured by Bauer

➢ Complemented by customised tools,accessories and vibratory hammers

40 units of vibro hammers

80 units of crawler cranes

60 units of drilling rigs

Renowned expertise in undertaking technically-challenging and large-scale piling and substructure works…

PLANT AND MACHINERY

We maintain a wide range of ancillaryequipment too

➢ Crawler cranes with lifting capacityfrom 50T-150T

➢ Various excavators, some of whichwith long reach capability which areideal for basement

9

The fleet consists of more than:

Page 10: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Incorporation of

Econpile,

principally

involved in

driven piling

Engaged for

bored piling

and

substructure

works for

Putrajaya

development

Breached RM300m

mark in revenue

Engaged for

basement works

for W Hotel &

Residences and

Elite Pavilion

Contracted for

The Troika, first

deep basement

project in

Kuala Lumpur that

involved the partial

top-down

construction

method

Received first

bored piling

project for

2 blocks of

20-storey

condominium in

Petaling Jaya

Subcontracted

for foundation

piling works

for Pavilion

Kuala Lumpur

Breached RM150m

mark in revenue

Secured basement

project for

Menara Prestige.

Installed 3m

diameter bored pile

Started

offering

complete

piling and

substructure

services

Breached RM50m

in revenue

Set up a full-

fledged workshop

to undertake the

repair and

maintenance of

machinery in

house

Successfully

listed on the

Main Market of

Bursa Malaysia

Clinched piling

and substructure

contracts above

RM100m:

8 Conlay

Kuala Lumpur

(RM180m) and

Menara FELCRA

(RM120m)

Secured two

contracts above

RM200m:

Maju KL (RM280m)

and Oxley Tower

KLCC (RM208m)

1987

1993

1994

1998

2002

2004

2005

2008

2012

2014

2015

2016

Renowned expertise in undertaking technically-challenging and large-scale piling and substructure works…

CORPORATE MILESTONES

New contract

wins exceed

RM1b, includes

single-largest

contract of

Pavilion

Damansara

Heights

(RM570m)

2017

10

2018

Awarded first

contract for LRT

as well as for

Malaysian

Resources

Corporation

Berhad (MRCB)

Page 11: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Recent Development

11

Page 12: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Recently-awarded contract for Pavilion Damansara Heights proves ability to continue winning jobs despite challenging market…

RECENT DEVELOPMENTS12

• RM122.0 mil contract to undertake bored piling for

Pavilion Damansara Heights (Phase 2)

➢ 13-month duration

➢ Previous contracts for same development:

▪ Phase 1: RM570 mil for piling and basement

substructure works

▪ Phase 2: RM18 mil for contiguous bored piling

• RM30.1 mil contract to undertake piling and substructure

works for Jalan Kia Peng high-rise

➢ 14-month works for repeat customer Hap Seng

Consolidated

Notable contracts secured recently

464.1

662.4

1,193.2

487.9

183.0

FY2015 FY2016 FY2017^ FY2018 FY2019 -YTD

New Contract Wins (RM ‘mil)

Pavilion Damansara Heights

Mixed development featuring 10 corporate office

towers, 5 residential towers and a retail mall

^ Includes RM570 mil contract for Pavilion Damansara Heights Phase 1; Group’s single-largest contract

Page 13: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Financial Highlights

13

Page 14: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

418.7

429.0

462.1

581.9

424.2

536.1

14.8%

18.7%

23.9%22.4% 23.0%

18.8%

FY2014 FY2015 FY2016 FY2017 9M17 9M18

Group Revenue (RM ‘mil) & Gross Margin (%)

Revenue Gross Margin

Aiming to maintain double-digit growth and returns…

FINANCIAL TRENDS14

31.0

46.6

67.5

80.8

59.9

67.6

14.6%

18.9%

24.3% 23.6% 23.8%

20.6%

7.4%

10.9%

14.6% 13.9% 14.1%12.6%

FY2014 FY2015 FY2016 FY2017 9M17 9M18

EBITDA, PAT & Margins (RM ‘mil)

PAT Tax expenses

Finance Cost (less finance income) Depreciation

EBITDA Margin PAT Margin

101.1

110.6

122.1

128.4

114.1

147.9

162.3

157.7

168.9

162.2

205.0

1Q16 2Q16 3Q16 4Q16 1Q17 2Q17 3Q17 4Q17 1Q18 2Q18 3Q18

Quarterly Revenue (RM 'mil)

19.9

22.4

24.0

25.2

22.0

29.1

32.0

28.5

29.1

30.4

28.2

19.7% 20.3% 19.7% 19.7% 19.3% 19.7% 19.7% 18.1% 17.2% 18.7%

13.7%

1Q16 2Q16 3Q16 4Q16 1Q17 2Q17 3Q17 4Q17 1Q18 2Q18 3Q18

Quarterly PBT (RM 'mil) & PBT Margin (%)

14.5

16.5

17.9

18.6

16.4

21.4

22.1

20.9

21.2

22.7

23.7

14.3% 14.9% 14.7% 14.5% 14.4% 14.4% 13.6% 13.2% 12.5%14.0%

11.6%

1Q16 2Q16 3Q16 4Q16 1Q17 2Q17 3Q17 4Q17 1Q18 2Q18 3Q18

Quarterly PATMI (RM 'mil) & Net Margin (%)

Page 15: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Higher portion of infrastructure works in 9M18…property-relatedprojects will still form majority going forward

REVENUE SEGMENTATION15

69%

93% 98% 91% 92%76%

31%

7% 2% 9% 8%24%

Revenue Segmentation

Infrastructure andOthers

Property Development

2014 2015 2016 2017 9M17 9M18

Property Development 289.1 399.8 450.9 532.3 391.7 406.9

Infrastructure & Others 129.6 29.2 11.2 49.6 32.5 129.2

Total Revenue 418.7 429.0 462.1 581.9 424.2 536.1

Page 16: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

(RM ‘mil) % (RM ‘mil) % (RM ‘mil) % (RM ‘mil) % (RM ‘mil) % (RM ‘mil) %

Property Development 57.6 93% 77.8 97% 108.9 99% 126.5 97% 94.1 97% 85.3 84%

Infrastructure & Others 4.3 7% 2.3 3% 1.4 1% 3.6 3% 3.4 3% 15.8 16%

Total 61.9 100% 80.1 100% 110.3 100% 130.1 100% 97.5 100% 101.1 100%

9M18FY2017 9M17FY2016Gross Profit by End-User

Industries

FY2014 FY2015

19.9%21.5%

24.2% 23.8% 24.0%

21.0%

FY2014

FY2015

FY2016

FY2017

9M

17

9M

18

GP Margin: Property Development

3.3%

22.8%

12.5% 7.3%

11.6% 12.2%

FY2014

FY2015

FY2016

FY2017

9M

17

9M

18

GP Margin: Infrastructure & Others

GROSS PROFIT SEGMENTATION16

Margins slightly dampened by higher steel prices and project mix…61.9

80.2

110.3

130.1

97.5

101.1

14.8%

18.7%

23.9%22.4% 23.0%

18.8%

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

0.000

100.000

FY2014

FY2015

FY2016

FY2017

9M

17

9M

18

Group Gross Profit & Margin

Page 17: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Balance Sheet

(RM’ mil)30.06.17

(audited)

31.03.18

(unaudited)Remarks

Property, Plant and

Equipment98.1 111.1 Larger machinery fleet

Current Assets 403.4 494.4

Includes higher trade

receivables from

larger-value projects and

retention sum

Current Liabilities 185.3 230.1

Higher working capital to

finance to finance larger

order book

Non-Current

Liabilities24.9 28.4

Slightly higher borrowings

for machinery

Shareholders’ Equity 304.0 363.6 On higher retained earnings

Net Gearing Net Cash 0.01xMaintaining healthy

financial position

Strong financial position with minimal net gearing of 0.01x...

BALANCE SHEET HIGHLIGHTS17

166.8

200.0

247.3

304.0

363.6

29.9

23.2

30.9 45.9

54.57

4.2

31.5 5

2.6

53.8

49.3

0.01

FY2014 FY2015 FY2016 FY2017 9M18

Shareholders Equity

Gross Borrowings

Cash & Cash Equivalents

Gearing (Net of Cash) (times) 12.5%15.0%

18.1% 17.4% 17.2% 15.9%

24.3% 25.4%

30.2% 29.3% 29.0%27.0%

FY2014 FY2015 FY2016 FY2017 9M17* 9M18*

Average ROE & ROA

ROA ROE* Annualised

Page 18: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

18.7 24.1 21.4

27.7% 29.8% 31.6%

FY2016 FY2017 9M18

Dividend Payout

Dividend (RM 'mil) Dividend Payout Ratio

Econpile has a dividend policy of distributing minimum 20% of net profit to shareholders

Dividends declared in respect of FY2018❖ 1st interim dividend of 0.6* sen/share

• Paid on 21 December 2017❖ 2nd interim dividend of 1.0 sen/share

• Paid on 26 June 2018

1.4 1.8 1.6

FY2016* FY2017* 9M18*

Net Dividend Per Share (sen)

Minimum

20%

dividend

policy

DIVIDEND HISTORY18

Paid interim dividends of 1.6 sen in respect of FY2018… Econpile has minimum 20% dividend policy

*: Adjusted for 1-for-2 share split and 1-for-4 bonus issue

Page 19: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Growth Strategies

19

Page 20: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Details of Selected Projects Value

(RM’m)

FY17

Jul 16 -

Jun 17

1Q18

Jul-

Sep 17

2Q18

Oct-

Dec 17

3Q18

Jan-

Mar 18

4Q18

Apr-

Jun 18

FY19

Jul 18 -

Jun 19

FY20

Jul 19 -

Jun 20

FY21

Jul 20 -

Jun 21

1) Oxley Tower KLCC 208.0

2) KVMRT 2 – Package V202 43.5

3) Pavilion D’sara Heights (Phase 1) 570.4

4) SUKE Highway – Package CA3 158.3

5) PHB mixed development @ Conlay 48.5

6) Pavilion D’sara Heights

(Phase 2: 1st Package)18.0

7) 9Seputeh – Parcel B 48.0

8) LRT3 - Package GS04 208.7

9) Majestic Maxim Cheras 32.8

10) TNB mixed development 119.1

11) Redevelopment of TMC 25.9

12) KL Gateway (Phase 2) 20.5

13) Pavilion D’sara Heights

(Phase 2: 2nd Package)122.0

14) Jalan Kia Peng Development 30.1

Robust order book of RM1.1 billion to sustain at least two years…

ORDER BOOK 20

* tentativeInfrastructure Property Development Note: Contract periods do not include approved extension of time

Secured

in FY2018

Oct-18Aug-16

Oct-16

Jan-17

Mar-17

May-17

Sep-17

Oct-17

Nov-17

Jan-18

Oct-18

May-19

Mar-19

Aug-18

Apr-18

Apr-19

Sep-20*

Nov-18

Jan-18 Nov-19

Jan-18 Apr-19

Jun-18 Nov-19

May-18 Jun-19

Aug-18 Oct-19

Page 21: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Tendering for property-related projects• Still invited to participate in tenders for mixed development projects

• Eyeing opportunities in Pavilion Damansara Heights (Phase 2)

• Still keen to support Government’s infrastructure developments when

rolled out

Intending to maintain core competency to serve property-related projects in near term...

GROWTH STRATEGIES21

Continue to optimise fleet and workforce capability• Invested approximately RM30 million in machinery in FY2018

• Training workers and improving business processes to enhance overall

operational efficiency

Page 22: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Investment Merits

22

Page 23: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Share Price Performance

(20 August 2017 to 21 August 2018)

KLCI

MY:ECONBHD

Strong

track

record in

piling &

foundation services

Valuations to be

compressed with

enhanced earnings

Over RM1 bil

tender book

Sustained margins

from higher

efficiency

Minimum 20%

dividend policy

underpins

valuations;

also Shariah-

compliant

Current order book

of RM1.1 billion to

be recognized till

FY2021

Share Price (RM) 0.88

Market Cap (RM 'mil) 1,177.0

Trailing PE 13.3

Trailing PE (net of cash) 12.7

FY18 Dividend Yield 1.8%

Warrant Price (RM) 0.19

Warrant Market Cap (RM 'mil) 50.8

Valuations @ 21 August 2018

Leading specialist piling player with largest order book & healthy project mix…

INVESTMENT MERITS23

Page 24: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Appendix

24

Page 25: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Proven track record built on ideal combination of technical expertise, high-capability equipment and diverse project experience…

✓ Various works for Putrajaya administrative centre

(Government buildings and apartments)

✓ Piling & foundation works for Pavillion shopping centre

(incl. bored pile installation up to 92m deep)

✓ Piling, diaphragm, earthworks, substructure and basement

works for The Troika @ Jln. Binjai, Kuala Lumpur

✓ Piling & foundation works for apartments and basement

carpark @ Jalan Menerung and extension of shopping

complex in Jalan Maarof, Bangsar

✓ Bored piling for Package N3 of electrified double-tracking

project between Ipoh and Padang Besar

✓ Piling for infrastructure development at Tanjong Agas Oil &

Maritime Industrial Park, Pekan, Pahang

✓ Bored piling works for terminal approach (elevated) road

for new airport in Sepang, Selangor

✓ Piling, substructure, and basement works for the 30-sty

Menara Hap Seng 2, Kuala Lumpur

✓ Piling works for Klang Valley MRT (Packages V1 and V6)

Completed Projects (selected)

❑ Piling and basement works for Pavilion Damansara Heights

with 8-storey basement at Damansara City Centre

❑ Piling and basement works for Maju Kuala Lumpur at

Sungai Besi, Kuala Lumpur

❑ Foundation and substructure works for Oxley Towers at

Jalan Ampang, Kuala Lumpur

❑ Bored piling works for Package V202 and diaphragm wall

for Kampung Baru North Station for Klang Valley MRT 2

❑ Bored piling works for East Klang Valley Expressway (EKVE)

❑ Foundation, substructure and other ancillary works for

Sungai Besi – Ulu Kelang Elevated Expressway (SUKE)

Ongoing Projects (selected)

MAJOR PROJECTS25

Page 26: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Reputable brand

in the domestic

piling and

foundation

services sector

Established

track record

spanning

30 years

Industry-

renowned

service quality

and project

completion

track record

Long standing

relationship with

major property

developers and

construction

companies

Fleet of

machinery and

equipment to

undertake

various project

sizes

Extensive

equipment

fleet &

capabilities

Invested in

state-of-the-art

drilling

equipment;

extensive

inventory of

customized tools

Well equipped

and organized

maintenance

workshop to

support ongoing

operations

Proven

expertise in

bored piling;

capability to

construct and

install large-

diameter bored

piles

Strong

technical

expertise &

auxiliary

support

Proven

capability to

construct deep

underground

structures in

challenging

environment

Value

engineering and

alternative

design solutions

for complex

projects

Key management

strongly

grounded in

machinery and

technical

expertise

Highly-

qualified

management

team

Supported by

strong

management

team; collective

experience of

>100 years

Competent

project

tendering and

project

management

capabilities

Proven track record built on ideal combination of technical expertise, high-capability equipment and diverse project experience…

COMPETITIVE ADVANTAGES

Strengths

26

Page 27: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Vast experience across wide-ranging projects from key infrastructure to high-end residential and commercial property developments…

• Entails boring a hole into soil or rock to the required depth and

placing reinforcement and concrete into the bored hole.

• Supports higher vertical column loads; widely used for high-rise

buildings, bridge piers, etc.

• Reliable and economical solution for adverse ground conditions,

especially limestone bedrock areas.

Bored Piles

Driven Piles

• Uses pre-manufactured/precast piles which are driven into the

ground by hydraulic hammers

• Conventional method for medium rise buildings and structures.

Jack-in-Piles

• Involves pre-manufactured/precast piles being jacked into the

ground by exerting large force using hydraulic or mechanical

jack-in machine.

• Creates lesser vibrations and noise vs driven piles; suited for

densely-populated areas

Piling Solutions

BUSINESS ACTIVITY: Piling solutions27

Page 28: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Superior technical capabilities and management in foundation services… drawing on extensive experience in both piling and earthworks activities

• Bored piles constructed at close spacing, incorporated as

permanent structure for basement walls.

• Large diameter contiguous bored piles can be constructed to

enable a longer cantilever structure for ease of unobstructed

excavation works.

Continuous

bored pile

walls

Diaphragm

walls

• Rectangular reinforced concrete walls, incorporated as

permanent structure for basement walls.

• Can be installed in close proximity to existing building

structure, rendering it suitable for congested areas particularly

for deep basements.

Steel sheet

piled walls

• Commonly a temporary retaining wall, or an alternative to

diaphragm walls.

• Also used in remediation of contaminated soils, major

components in infrastructure construction (e.g. bridges, dams,

port facilities) and in supporting excavation works.

Earth Retaining Systems

BUSINESS ACTIVITY: Foundation services28

Page 29: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Earth retaining systems among the Group’s complementary services…

As excavation works go deeper, a lateral support system is required to prevent excessive

movements in the earth retaining systems.

This is to prevent the sinking of ground surface surrounding the excavation pit, which may cause

the collapse of the earth retaining system.

Ground

Anchors

• Constructed by drilling holes through the soil according to the

required depth. The holes are filed with cement ground.

• After the cement ground has gained strength, the steel strands

are stressed against an anchor block, which is constructed along

the retaining system.

Steel

strutting

• Steel H sections are used to brace the excavation pit by

extending over the excavation. The steel section will be

supported by vertical H beams or king post (central vertical

post).

• Multiple layers of steel strut are installed for deep excavation.

Earth Retaining Systems

Lateral Support System

BUSINESS ACTIVITY: Foundation services (cont)29

Page 30: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Earthworks services mainly to facilitate basement excavation…

Earthworks

Temporary Steel Platform

and Staging

Steel H sections are used to brace the excavation pit by extending over the excavation. The

steel section will be supported by vertical H beams or king post (central vertical post).

Multiple layers of steel strut are installed for deep excavation.

As excavation works go deeper, a lateral support system is required to prevent excessive

movements in the earth retaining systems.

This is to prevent the sinking of ground surface surrounding the excavation pit, which may cause

the collapse of the earth retaining system.

Excavation Works

BUSINESS ACTIVITY: Foundation services (cont)30

Page 31: Macquarie ASEAN Conference 2018...Kuala Lumpur that involved the partial top-down construction method Received first bored piling project for 2 blocks of 20-storey condominium in Petaling

Able to undertake top-down and bottom-up construction works for substructure and basement construction works…

Substructure & Basement Construction Works

Thick concrete slab constructed

above a group of installed piles

and acts as support to column

that supports superstructure

Pile Caps

Reinforced concrete floor where

its thickness depends on the load

it will bear

Basement Slabs

Conventional Construction

(Bottom-Up) Method

• Piles are exposed and sliced off before the pile cap

is casted. Casting is performed on the lowest

basement, column and subsequent basement slab in

this order.

• Work sequence starts from the lowest slab before

progressing upwards

Top-Down

Construction

• Structure is constructed downwards from ground

level; and is preferable in congested areas with

shorter construction periods.

• Enables utilization of upper floor slab as lateral

support to the retaining system, omitting the

construction of ground anchors or steel struts.

Substructure works consist of pile cap, basement floors and columns up to the ground floor level.

BUSINESS ACTIVITY: Foundation services (end)31