Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann, Frank Zimmermann, Giulia Papotti) See LSWG presentations of MD teams and the ATS MD notes for details!

Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Embed Size (px)

Citation preview

Page 1: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Machine development - results and plans – critical results, what’s to be done?

R. Assmann15/07/2011

R. Assmann

for the LHC MD coordination team (R. Assmann, Frank Zimmermann, Giulia Papotti)

See LSWG presentations of MD teams and the ATS MD notes for details!

Page 2: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

http://www.cern.ch/lhc-md

R. Assmann15/07/2011

LHC-MD web site holds detailed info, ATS MD notes by the teams, MD requests, LSWG minutes and presentations, ...

Here I will be generic, focusing on issues relevant for this meeting!

Page 3: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

MD Results: Bunch Intensity and Emittance

R. Assmann15/07/2011

Page 4: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

MD Results: Bunch Intensity and Emittance

R. Assmann15/07/2011

Isolumi lines give luminosity per colliding bunch in IP1/5 (3.5 TeV, 1.5m beta*) Multiply with number of colliding bunches to get total peak luminosity!

Page 5: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Reached: Luminosity per coll. Bunch (IP1/5)

R. Assmann15/07/2011

1.00E+11 1.10E+11 1.20E+11 1.30E+110.5

1

1.5

Bunch Intensity

Lu

min

osi

ty p

er c

oll

idin

g b

un

ch

[103

0 cm

-2 s

-1]

Page 6: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Reached: Luminosity per coll. Bunch (IP1/5)

R. Assmann15/07/2011

1.00E+11 1.10E+11 1.20E+11 1.30E+110.5

1

1.5

Bunch Intensity

Lu

min

osi

ty p

er c

oll

idin

g b

un

ch

[103

0 cm

-2 s

-1]

Iso-luminosity („isolumi“) lines calculated based on this performance!

Page 7: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

MD Results: Bunch Intensity and Emittance

R. Assmann15/07/2011

Collimation MD‘s: Very high bunch charges OK at 3.5 TeV for up to 2808 bunches. No limit on number of bunches!

Page 8: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

MD Results: Bunch Intensity and Emittance

R. Assmann15/07/2011

WP‘s ~OK in LHC.Can be used with same machine configuration... Also OK for long-range beam-beam!

Page 9: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

MD Results: Bunch Intensity and Emittance

R. Assmann15/07/2011

25ns requires further commissioning work

Page 10: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Assume 1.2 mm mrad minimum emittance

R. Assmann15/07/2011

Not feasible

Page 11: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Optimal performance improvement

R. Assmann15/07/2011

Movement orthogonal to isolumi lines looks optimal!

Page 12: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Optimal performance improvement

R. Assmann15/07/2011

Small emittance could be used to later reduce beta* to 1m and to gain further.

Page 13: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Injection limit on high emittance

R. Assmann15/07/2011

Page 14: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Robustness limit from TCDQ

R. Assmann15/07/2011

Page 15: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Intensity Limit for Smallish Emittance

R. Assmann15/07/2011

Page 16: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Exclude Region with Lower Luminosity

R. Assmann15/07/2011

Page 17: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Room for Improvements

R. Assmann15/07/2011

Page 18: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Room for Improvements (LHC only)

R. Assmann15/07/2011

Page 19: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Room for Improvements (with injector limit)

R. Assmann15/07/2011

Bettina‘s talk

Page 20: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Room for Improvements (LHC only)

R. Assmann15/07/2011

Most efficient in view of limits: Increase bunch intensity for the same emittance. Gain of factor 4 is possible!

Page 21: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Room for Improvements: Beta*

Optics MD‘s (90m, ATS) very successful: Demonstrates efficiency in increasing/reducing beta*. Optics errors small and controllable. No major problem from non-linearities even for very small beta* (0.3m

with ATS) reduces overhead for squeezing further. Beta* can be reduced to 1m ( Roderik). Smaller beta* requires tight collimation settings:

Machine in a different regime (impedance). Would be useful to test this year to see whether this is workable with

high intensity. If successful, could use it as baseline for 2012.

R. Assmann15/07/2011

Page 22: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Addressing LHC limits in MD‘s I

Small transverse emittance and bunch length emittance growth can become limiting: Mechanisms for emittance growth in the LHC Longitudinal instabilities Understanding diffusion process, when beams are brought into

collision. IBS, longer bunch length, noise of transverse damper, ...

High bunch charge effects: Instabilities Emittance growth versus bunch intensity Luminosity lifetime

Many of these issues only seen in long stable physics fills

Beneficial to push bunch intensity and emittance early to learn about the most important problems. Then study in MD!

R. Assmann15/07/2011

Page 23: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Addressing LHC limits in MD‘s II

Beam-beam limits: Not yet for head-on. Continue exploring it. Study as function of noise? Further tests on long-range beam-beam, versus emittance and bunch

spacing, … Tight collimation settings and impedance:

High current MD with robust (CFC) collimators moving in Most efficient: end of fill MD go to adjust mode after end of long,

high intensity physics fill Lower beta*:

Tight collimation settings, low beta* and protection can be tested (partly) in MD (no new collimation setup)

More bunches 25 ns: Longer trains, e-cloud, beam-beam effects, ... Goal: Firm plan and time line for 25 ns scrubbing run

R. Assmann15/07/2011

Page 24: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Addressing LHC limits in MD‘s III

Beam instrumentation: Smaller emittance requires better calibration, for example to be sure

about emittance growth Intensity dependent effects Bunch by bunch variation stronger close to limit

Quench limits: Tests at 3.5 TeV to further determine quench limit in dispersion-

suppressors and maximum BLM threshold. Tests at injection conclusive or more

Heating effects: Determine longest acceptable bunch length in LHC. Dependence of heating effects on size of “cavity” (can be studied with

movable collimator jaws).

R. Assmann15/07/2011

Page 25: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Addressing LHC limits in MD‘s IV

UFO mechanism: Understand mechanism at the injection kickers, which have 100 times

higher rate than other locations UFO’s faster than gravity acceleration towards beam (really?) or

evidence for EM effect? Injection limits:

Extracting beam with Q20 optics in SPS and inject into LHC long-term program

R. Assmann15/07/2011

Page 26: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Addressing LHC limits in HiRadMat

Robustness limits of LHC collimators and protection devices: Cannot be addressed in the LHC with beam tests. Very expensive to learn about damage limits by trial and error in the

LHC. This is why the HiRadMat test facility was proposed and constructed.

HiRadMat tests for addressing robustness limits in LHC: TCT limits for catastrophic damage propose to equip one spare

TCT for a destructive test in HiRadMat. CFC and C collimators: HiRadMat beam parameters allow to test with

higher power densities than in 2004 and 2006. Push test intensity to gain margin!

TCDQ: ?

R. Assmann15/07/2011

Page 27: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Comments and Feedbacks Welcome...

Outcome of Mini-Chamonix will impact plans for next MD‘s Start discussing draft plan for end-of-August MD next week...

R. Assmann15/07/2011

Page 28: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Reached: Number of bunches

R. Assmann15/07/2011

0

500

1000

1500

Date

Nu

mb

er

of

bu

nc

he

s [

p]

Page 29: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Reached: Bunch intensity

R. Assmann15/07/2011

0.00E+00

2.00E+10

4.00E+10

6.00E+10

8.00E+10

1.00E+11

1.20E+11

1.40E+11

Date

Bu

nc

h I

nte

ns

ity

[p

]

Page 30: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Reached: Peak luminosity

R. Assmann15/07/2011

0

500

1000

1500

Date

Pe

ak

Lu

min

os

ity

[1

03

0 c

m-2

s-1

]

Page 31: Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,

Reached: Stored energy

R. Assmann15/07/2011

0.00

20.00

40.00

60.00

80.00

100.00

Date

Sto

red

En

erg

y [

MJ

]