1
A Pl W A ve si sc St 8 Stg. x 18,75 x 28cm 8 Stg. x 18,75 x 28cm 1A 2A 3 3 D E F 1 2 2 A1 B1 C1 D1 D2 E1 F1 G1 1A 2A 1 G B C A 12 Stg. x 18,43 x 28cm 9 Stg. x 17,89 x 28 cm 9 Stg. x 17,89 x 28 cm 10 Stg. x 17,89 x 28cm 12 Stg. x 18,43 x 28cm 10 Stg. x 17,89 x 28cm 92.86° 90.00° 87.14° 87.14° 87.14° 87.14° 87.14° 87.14° 87.14° 87.14° 90.00° DS-U01-6 3x Schöck BOLE 12/200-3/A420-CV25 DS-U02-1 DS-U02-2 8x Schöck BOLE 12/200-3/A420-CV25 DS-U02-2 8x Schöck BOLE 12/200-3/A420-CV25 Stahlbetonstütze C35/45 40/ 40 cm 3x Schöck BOLE 12/200-3/A420-CV25 DS-U02-1 12 48 7.50 5 6.99 6.99 6.99 6.99 6.99 7.50 5 30 4.03 5 19 5 20 5 15 31 5 8 5 1 5 14 5 15 5 28 5 DD 80/20 DD 35/20 DD 35/20 DD 35/100 1.00 DD 35/100 DD 100/35 27 5 20 9 26 DD 20/20 DD 36/30 1.80 3 40 BRH 150 BRH 150 4.03 5 36 1.01 2.13 5 6 20 5.06 5 BRH 160 BRH 160 Stahlbetonstütze C35/45 30/ 30 cm Stahlbetonstütze C35/45 30/ 60 cm DD 35/110 DD 20/28 34 38 24 12 36 51 1.10 6 28 2.08 5 DD 160/113 DD 160/113 Stahlbetonstütze C35/45 30/ 30 cm 4.05 2.02 5 2.02 5 Kranloch 1, 405/405 cm 41 25 2.25 22 DD 127/22 30 2.48 5 DD 200/42.5 20 20 DD 85/20 4.81 5 30 5.54 18 2.31 5 DS-U01-1 3x Schöck BOLE 12/200-4/A560-CV25 30 1.84 5 17 BRH 160 BRH 160 Stahlbetonstütze C35/45 40/ 40 cm Stahlbetonstütze C35/45 40/ 40 cm 35 24 1.71 30 2.57 30 1.03 1.58 91 2.31 5 85 23 1.01 2.13 5 2.06 5 1.60 80 4.10 30 1.65 30 1.83 35 4.95 5 20 4.73 1.37 35 25 5 5.69 5 5.67 40 1.48 40 5.51 5 40 5.96 60 3.64 60 3.64 60 5.96 40 4.61 17 5 73 40 1.48 40 5.67 30 28 5 3.10 5 4.05 1.04 5 40 6.58 5 80 3.11 5 35 0 5 29 5 20 2.67 5 8.20 40 Stahlbetonstütze C35/45 40/ 40 cm Stahlbetonstütze C35/45 40/ 40 cm Stahlbetonstütze C35/45 40/ 40 cm wandartiger Träger im EG wandartiger Träger im EG wandartiger Träger im EG wandartiger Träger im EG wandartiger Träger im EG wandartiger Träger im EG wandartiger Träger im EG 19 5 20 5 Stahlbetonstütze C35/45 40/ 40 cm 2.26 5 40 4.14 40 TL-UG-1 TL-UG-2 TL-EG-1 Stb. Podest d= 20cm 1.19 5 20 1.19 5 OK +0.20 UK -0.05 20 5 15 6.65 5 40 TL-UG-1 TL-UG-2 Stb. Podest d= 20cm 30 1.68 27 1.84 30 2.57 8.66 5 Deckensprung, +55cm Stb. Decke über TG d= 25cm C35/45 wandartiger Träger im EG Deckensprung, +15cm Deckensprung, +15cm Stahlbetonstütze C35/45 40/ 40 cm ÜZ C35/45, b/h= 30/90cm; 50cm o.D. OK= +0,30m Deckensprung, +15cm Stahlbetonstütze C35/45 40/ 40 cm ÜZ C35/45, b/h= 30/90cm; 50cm o.D. OK= +0,30m 15 16 16 15 15 15 Deckensprung, +35cm 1.03 30 2.57 30 1.71 24 1 5 12.5cm Dämmung WLG 042 12.5cm Dämmung WLG 042 17 97 37 1.27 2.73 20 1.26 5 3.18 5 65 2.58 5 18 Deckensprung, +20cm Deckensprung, +20cm Stb.-Wand C35/45, XC1,WO Stb.-Wand C35/45, XC1,WO Stb.-Wand C35/45, XC1,WO Einbauteile Aufzug gem. Aufzugsplanung d. Herstellers Einbauteile Aufzug gem. Aufzugsplanung d. Herstellers Stb.-Wand C35/45, XC1,WO 12.5cm Dämmung WLG 042 Stb.-Wand C35/45, XC1,WO Stb.-Wand C35/45, XC1,WO 12.97 6.66 12.80 5 10 68 5 10.46 5 30 1.62 30 26 Betonfertigteil d=10cm Betonfertigteil d=10cm Betonfertigteil d=10cm Betonfertigteil d=10cm Betonfertigteil d=10c Betonfertigteil d=10cm Betonfertigteil d=10cm Betonfertigteil d=10cm Betonfertigteil d=10cm 15 1.60 15 3.50 3.50 15 1.60 15 1.77 5 15 1.13 15 1.77 5 15 1.13 15 8.20 40 20 20 20 20 49.96 Detail T1 Detail T2 Detail T1 Detail T4 15 21 2 2 3 5 6 6 4 DD 55/15 DD 55/15 DD 55/15 wandartiger Träger im EG WD 70/20 OK.= 15 UKRD WD 105/40 OK.= 65 UKRD 70 66 5 DS-U01-1 3x Schöck BOLE 12/200-4/A560-CV25 WD 70/20 OK.= 15 UKRD BRH 140 BRH 140 1.97 5 92 5 17 5 1.15 21 5 WD 40/20 OK.= 15 UKRD Stb.-Wand C35/45, XC1,WO WD 110/40 OK.= UKRD 3 1.10 WD 110/30 OK.= UKRD 32 5 50 2.03 5 65 WD 50/30 OK.= 20 UKRD WD 65/30 OK.= 30 UKRD Schwelle h=10cm 20 3.17 5 26 DD 20/26 Stb.-Wand C35/45, XC1,WO Stb.-Wand C35/45, XC1,WO BRH 200 Stb.-Wand C35/45, XC1,WO WD 50/20 OK.= 15 UKRD 2.43 1 5 DD 32.5/244.5 32 5 6.84 5 42 5 WD d=20 RA= 20 UKRD BRH 140 BRH 200 BRH 150 Stb.-Wand C35/45-WU, XC3,XF1,WF 50 3.79 1.70 4.71 5 WD 170/20 OK.= 15 UKRD WD 50/20 OK.= 15 UKRD Stb.-Wand C35/45, XC1,WO 20 90 1.20 80 4.31 1.20 80 94 25 2.85 25 4.45 1.40 40 23 5 88 5 2.13 5 27 5 24 4.86 20 8.45 30 12.5cm Dämmung WLG 042 WD 50/20 OK.= 15 UKRD 50 2.33 Detail T4 TL-EG-1 1.19 5 20 1.19 5 Detail T3 5 WD 40.5/20 OK.= 15 UKRD DD 40/100 DD 40/40 1.00 43 40 1 Stb.-Wand C35/45, XC1,WO BRH 140 BRH 140 BRH 140 BRH 150 WD d=25 RA= 32.5 UKRD 72 5 3.16 3.30 14 WD d=20 RA= 66 UKRD DD ø 16 DD ø 16 2.61 5 68 3.46 5 DD ø 16 1.85 3.20 1.25 65 65 2.14 5 2.14 5 60 WD d=15 RA= 65.5 UKRD 15 35 1.65 BRH 140 BRH 140 1.71 35 12.5cm Dämmung WLG 042 12.80 5 6.66 12.97 30 3.98 5 20 14.32 27 5 WD d=20 RA= 29 UKRD Rückbiegeanschlüsse Comax Typ 110- 8/15 Rückbiegeanschlüsse Comax Typ 190- 8/15 Rückbiegeanschlüsse Comax Typ 190- 8/15 Rückbiegeanschlüsse Comax Typ 190- 8/15 Rückbiegeanschlüsse Comax Typ 240- 8/15 Rückbiegeanschlüsse Comax Typ 240- 8/15 Rückbiegeanschlüsse Comax Typ 220- 8/15 Rückbiegeanschlüsse Comax Typ 140- 8/15 Rückbiegeanschlüsse Comax Typ 140- 8/15 Rückbiegeanschlüsse Comax Typ 140- 8/15 Rückbiegeanschlüsse Comax Typ 140- 8/15 OKRD -0.20 UKRD -0.45 2.73 5 28 5 11.55 5 24 3.96 24 17 5 73 40 1.48 40 5.67 20 30 1 5 98 5 2.09 36 DD 40/180 OK -1.55 9 UK -1.75 9 OK -1.55 9 UK -1.75 9 UKST. - 0.86 5 Stb.-Wand C35/45, XC1,WO 1.76 30 Rückbiegeanschlüsse Comax Typ 220- 8/15 5.78 24 2.61 24 1.88 15 1.45 15 95 40 7.34 5 40 5.75 40 7.23 5 24 4.68 20 2.61 30 5.72 30 UKST. - 0.67 4.24 30 3.21 5 98 5 20 5.16 5 1.26 2.13 5 27 5 20 Rückbiegeanschlüsse Comax Typ 240- 8/15 UKST. - 0.76 5 90.00° 1.27 38 BRH 140 druckwasserdichte Kabeldurchführungen 3x6 UK.= +1.60 OK.= +2.24 ü. OKRF BRH 140 9.38 1.00 1.15 4.44 5 1.00 1.15 2.82 5 1.20 1.15 9.36 1.00 1.15 2.31 1.40 40 2.26 1.00 1.05 12.21 5 30 Perimeterdämmung 1.00 DD 91/20 12.5cm Dämmung WLG 042 12.5cm Dämmung WLG 042 12.5cm Dämmung WLG 042 3.55 5 88 5 2.13 5 1.18 5 1.01 2.13 5 4.21 30 7.36 UKST. - 0.86 5 UKST. - 0.67 UKST. - 0.86 5 UKST. - 0.86 5 Deckenöffnung 318.5/258.5cm 40 5 1.14 2.39 10 5 30 48 5 1.01 2.13 5 33 5 10cm Dämmung WLG 042 10cm Dämmung WLG 042 1.44 5 1.01 2.28 5 13 5 68 2.61 5 3.46 5 Rückbiegeanschlüsse Comax Typ 110- 8/15 1 5 5.60 40 2.80 40 2.80 40 2.80 40 5.60 1 5 WD 25/30 OK.= 15 UKRD 40 5 1.58 5 25 1.38 Rückbiegeanschlüsse Comax Typ 190- 8/15 85 1.70 3.79 50 52 5 5 20 DD 20/20 1.10 88 5 2.28 5 3.04 1.01 2.13 5 63 5 35 1.80 4 3 12.5cm Dämmung WLG 042 12 5 TRH sh. Schalpl. M20_5_TWP_SP_TH2_-_01_ TRH sh. Schalpl. M20_5_TWP_SP_TH2_-_01_ Stb.-Wand C35/45, XC1,WO UZ. 25/65cm OK. = +0.20 60 3.26 5 84 ÜZ. 15/120cm, OK. +0.60m (umlaufend) ÜZ. 15/120cm, OK. +0.60m (umlaufend) DD ø 16 4.11 5 DD ø 25 12 80 DS-U01-4 3x Schöck BOLE 12/200-6/A840-CV25 Stahlbetonstütze C35/45 40/ 80 cm Stahlbetonstütze C35/45 40/ 80 cm Stahlbetonstütze C35/45 40/ 80 cm DS-U01-4 3x Schöck BOLE 12/200-6/A840-CV25 3.73 5 80 8 5 55 20 35 2.03 5 14 5 20 20 5 55 DD 20/35 1.06 5 20 20 5 20 2x WD 20/40 OK.= UKRD DD 20/20 20 10 5 1.00 20 15 63 5 10 10 WD 115/30 OK.= 18 UKRD WD 10/15 OK.= 15 UKRD WD 158/35 OK.= 37.5 UKRD Rückbiegeanschlüsse Comax Typ 240- 8/15 Deckensprung, +40cm 4x Haufftechnik HSI 150-4x1-K2-EW/300 RA= 32.5 UKRD 30 1.44 5 1.01 2.28 5 13 5 20 25 Deckensprung, +40cm UKST. - 0.86 5 75 19 DD 75/25 8 1.05 35 40 14 5 35 WD 40/30 OK.= 70 UKRD WD 35/20 OK.= 52.5 UKRD 1.10 4 31 DD 31/110 1.90 KB 25 Lage nach örtlichen Gegebenheiten KB 35 Lage nach örtlichen Gegebenheiten WD 170/20 OK.= 15 UKRD DD 190/38 28 35 20 89 5 40 1.10 DD 20/35 1.53 26 5 73 5 DD 75/26.5 75 35 50 2.00 wandartiger Träger im EG Stb.-Wand C35/45, XC1,WO 30 12 5 1.37 DD 35/30 35 2.51 40 4.14 40 2.11 5 70 24 WAT im EG 96 26 35 49 DD 96/35 DD 35/35 8 5 8 5 30 89 15 3.59 5 15 76 5 30 Detail T2 20 5 15 DD ø 13 15 21 Detail T3 DD ø 25 OKRD +0.20 UKRD -0.05 8 60 1.45 5 50 22 5 55 30 23 5 88 5 2.13 5 16 17 5 1.31 5 88 5 2.13 5 33 20 1.95 1.01 2.13 5 98 WD 50/20 OK.= 15 UKRD WD 60/20 OK.= 15 UKRD Decke, h=25cm C35/45 WD 35/30 OK.= 30.5 UKRD 1 55 59 5 35 7 5 OK +0.20 UK -0.05 Rückbiegeanschlüsse Comax Typ 190- 8/15 WD 55/20 OK.= 55 UKRD 2.18 60 60 5 50 OKRD -0.20 UKRD -0.45 Deckensprung, +20cm Rückbiegeanschlüsse Comax Typ 240- 8/15 Stb.-Wand C35/45, XC1,WO 18 75 43 WD 75/25 OK.= 27.5 UKRD DD ø 18 DD ø 18 DD ø 18 DD ø 18 24 1.58 30 76 5 15 3.59 5 15 89 30 WD d=20 RA= 25.5 UKRD WD d=20 RA= 30 UKRD 17 Stb.-Wand C35/45, XC1,WO WD 70/20 OK.= 55 UKRD WD 40/40 OK.= 62.5 UKRD WD 30/15 UK.= OKRD WD 40/40 OK.=62.5 UKRD 80 1.10 2.00 WD d=15 RA= 35 UKRD WD d=20 RA= 45 UKRD WD d=30 RA= 43 UKRD WD d=20 RA= 50 UKRD Stb.-Wand C35/45-WU, XC3,XF1,WF 2x WD d=20 RA= 35 UKRD RA= 65 UKRD 60 6.28 5 22 5 12 WD d=20 RA= 25 UKRD WD d=30 RA= 20 UKRD Deckensprung, +20cm WD d=25 RA= 35 UKRD WD d=25 RA= 45 UKRD WD d=30 RA= 35 UKRD 19 19 2x WD d=35 RA= 40 UKRD Stb.-Wand C35/45-WU, XC3,XF1,WF WD d=30 RA= 40 UKRD UZ C35/45, b/h= 24/45cm UK= -0,65m WD d=25 RA= 50 UKRD 2x WD d=20 RA= 38 UKRD RA= 70 UKRD WD 200/48 OK.= UKRD WD 80/45 OK.= UKRD WD d=20 RA= 55 UKRD UKST. - 0.65 WD d=25 RA= 37 UKRD Stb. Decke über TG d= 25cm C35/45 Stb.-Wand C35/45, XC1,WO OKRD -0.20 UKRD -0.45 WD d=20 RA= 28 UKRD WD d=30 RA= 20 UKRD Stahlbetonstütze C35/45 30/ 60 cm WD d=15 RA= 26 UKRD WD d=25 RA= 35 UKRD WD d=30 RA= 40 UKRD 2x WD d=35 RA= 40 UKRD Stb.-Wand C35/45-WU, XC3,XF1,WF 40 6.46 5 12 80 3.11 5 30 1.20 80 80 5.28 5 Rückbiegeanschlüsse Comax Typ 140- 8/15 WD 30/15 UK.= OKRD WD 35/20 OK.= 35 UKRD WD 60/20 OK.= 35 UKRD WD 50/20 OK.= 35 UKRD Aufzug 2 Aufzug 1 Rückbiegeanschlüsse Comax Typ 190- 8/15 BRH 150 24 1.76 5 17 5 2.02 24 7.00 30 3.15 41 13 24 11 25 87 5 20 33 17 5 13 5 21 21 21 40 10 5 2 5 40 16 15 5 14 5 8 5 8 5 DD ø 13 2 5 2 5 95 25 16 5 25 10 5 30 10 25 1.10 35 10 35 40 5 30 44 30 31 20 38 20 4 22 5 20 15 5 16 5 Stb.-Decke, h=25cm C35/45 WD d=20 RA= 30 UKRD WD d=16.5 RA= 100 UKRD 42 5 2.73 5 25 Betonfertigteil d=10cm 30 1.62 30 26 31 10 Betonfertigteil d=10cm 31 10 Betonfertigteil d=10cm 7.67 5 10 3.21 10 3.58 10 2.71 10 3.10 10 7.87 10 2.36 10 90 10 2.45 10 88 10 1.86 10 11.69 5 31 10 77 77 5 40 52 5 38 40 50 30 40 5 1.14 2.39 10 5 30 48 5 1.01 2.28 5 34 5 30 10 1.01 2.28 5 10.37 Stahlbetonstütze C35/45 40/ 50 cm Stahlbetonstütze C35/45 40/ 50 cm 50 6.60 5 1 20 25 5 20 23 1.01 2.13 5 2.06 5 1.60 80 4.10 19 5 DD 25.5/20 WD 35/35 UK.= 10 OKRD 15 35 1.40 70 2x Haufftechnik HSI 150-2x1-K2-EW/300 RA= 32.5 UKRD RA= 46 UKRD 2x WD d=10 RA= 32.5 UKRD 4.28 1.50 Stb.-Decke über TG, h=25cm C35/45 OKRD -0.20 UKRD -0.45 70 21 12.5cm Dämmung WLG 042 WD 70/20 OK.= 15 UKRD WD 40/40 OK.= 12.5 UKRD WD 40/40 OK.= 12.5 UKRD OKRD -0.40 UKRD -0.65 WD d=30 RA=100 UKRD WD d=30 RA=100 UKRD 25 1.08 20 84 35 10 25 7 5 30 41 30 32 20 41 5 14 5 20 84 20 1.08 25 80 15 15 35 10 WD 50/20 OK.= UKRD WD 40/40 OK.= UKRD WD 40/40 OK.= UKRD 13 5 50 4 35 WD 35/35 OK.= 37.5 UKRD KB nach Bedarf Lage nach örtlichen Gegebenheiten KB nach Bedarf Lage nach örtlichen Gegebenheiten WD 40/40 OK.= 60 UKRD DD ø 16 Stahlbetonstütze C35/45 60/ 30 cm 6 70 15 5 55 3.19 36 5 88 5 2.13 5 43 27 48 5 1.01 2.13 5 5.64 20 WD 70/20 OK.= 15 UKRD 25 1.70 48 2.03 5 WD 55/30 OK.= UKRD 6 70 16 1.14 33 5 56 90 1.10 WD 114/44 OK.= UKRD WD 56/25 OK.= 15 UKRD WD 170/25 OK.=12.5 UKRD 2.73 5 4.50 5 1.00 1.15 5.15 5 1.00 1.15 52 71 1.15 4.40 5 1.80 1.00 4.58 1.80 1.00 3.77 5 10 2.30 10 3.73 5 10 1.78 10 90 10 3.62 5 10 2.48 10 3.92 10 2.48 2.48 10 3.92 10 2.30 18 10 62 10 1.19 10 1.19 10 3.08 1.15 10 2.48 10 8.86 5 1.80 1.00 4.58 1.80 1.00 1.52 5 50 1.15 82 5 90 1.15 4.90 1.80 1.15 9.30 27 5 36 5 76 DD 20/36.5 20 DD 55/15 1 25 5 20 35 +67.53 10x Schöck BOLE 20/290-4/A840-CV25 Deckenöffnung für Differenztreppe im EG 3 Stg.x 13,33x 33cm 22 22 M. 1:50 Grundriss Schalplan Decke über UG - Teil 3 Anschluss sh. Plan : M20_5_TWP_SP_-01_XXXX_02_ Schnitte und Details sh. Plan : M20_5_TWP_SP_-01_XXXX_04 M20_5_TWP_SP_-01_XXXX_05

M20 5 TWP SP -01 XXXX 03 FRE H 11 - MaNidus...A1 B1 C1 D1 D2 E1 F1 G1 1A 2A 1 G B A 12 Stg. x 18,43 x 28cm 9 Stg. x 17,89 x 28 cm 9 Stg. x 17,89 x 28 cm 10 Stg. x 17,89 x 28cm 12 Stg

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: M20 5 TWP SP -01 XXXX 03 FRE H 11 - MaNidus...A1 B1 C1 D1 D2 E1 F1 G1 1A 2A 1 G B A 12 Stg. x 18,43 x 28cm 9 Stg. x 17,89 x 28 cm 9 Stg. x 17,89 x 28 cm 10 Stg. x 17,89 x 28cm 12 Stg

Ausführungsplanung Architektur + TGA:

Wagner-Régeny-Straße 10 12489 BerlinT+49 30 65803-0 I F+49 30 65803-25 I [email protected]

Plannummer:

Maßstab: Datum:

Projekt-Nr: Format:Bearbeiter:

Genehmigungsplanung:

Projekt:

Bauteile:

Status:

Niebuhrstraße 2, 10629 BerlinT +49-30-8892100

± 0,00 m = +35,30 m ü. NHN

Bauherr:Premium Mühlenstraße GmbHKurfürstendamm 38/39, 10719 BerlinT+49 30 889-210-0

M20 Wohn- und GeschäftsgebäudeMühlenstraße 20-2310243 Berlin

Index:

Mühlenstraße

Mild

red-

Harn

ack-

Stra

ße

Tragwerksplanung:Ingenieurbüro Rüdiger Jockwer GmbHPfuelstr. 5 (Aufgang IV), 10997 BerlinT+49 30 617-765-10

Generalübernehmer:Schrobsdorff Bau AGCicerostr. 37/38, 10709 BerlinT+49 30 896-661-00

Hemprich Tophof Gesellschaft von Architekten mbH

Datum: Anmerkung: Bearb.

19004.5CAD.

Ausführungsplanung

Alle Maße sind am Bau zu prüfen. Maßunstimmigkeiten sind sofort mit dem Planer zu klären. Für Maßfehler haftet allein der Auftragnehmer. Detail- u. Werkpläne gelten nur mit Genehmigungsvermerk des Architekten. Der Auftragnehmer ist verpflichtet, Zeichnungen in technischer Hinsicht verantwortlich zu prüfen. Konstruktions- u. fertigungstechnische Bedenken sind dem Architekten u. der Bauleitung rechtzeitig vor Ausführungsbeginn schriftlich mitzuteilen und zu begründen.

Bauteil Beton Expositionsklasse

*im Übergang zwischen horizontalen und vertikalen Bauteilen im Bereich der Tiefgarage und RampeAusbildung einer Hohlkehle sowie Beschichtung der ersten 50cm des aufgehenden Bauteils nach Heft 525 (Verhinderung des Eindringens von Chloriden im Sockelbereich)

Sohlplatte C 35/45-WU XC3 / XD3 / XF2/ WA

Rampenwände C 35/45 WU XC4 / XF1/ WAKelleraußenwände (TG) C 35/45 -WU XC3 / XF1/ WFInnenwände C 35/45 XC1 / W0

Stützen C 35/45 XC3 / XF1 / WFUnterzüge C 35/45 XC 1 / W0Decken über TG C 35/45 XC3 / XF4 / WF

Rampe C 35/45 XC4 / XD3/ XF4/ WA

Treppenläufe (Fertigteile) C 30/37 XC1 / W0

KS-R P 20-2,0 / DM

KSL- RP 12/1,4 / DM

KS- RP 20/2,2 / DM

aufgehende Massivbauteile Stahlbeton

aufgehende Massivbauteile MW

aufgehende Massivbauteile Stb.-WU

druckfeste Dämmung XPS WLS 40, d= 10 cmgem. Angabe d. Architekten

Stahlbeton -WU

Beton C25/30 unbewehrt

Stahlbetonbauteile

Magerbeton C12/15Sauberkeitsschicht 5cm C 8/10

Wasserstände:Bauzeitlicher Bemessungswasserstand: +32.60mNHNHöchster Grundwasserstand ( HGW / zeHGW ): +33.30mNHN

Index:Status:

1400 x 841

10.07.20191:50

8 Stg. x 18,75 x 28cm

8 Stg. x 18,75 x 28cm

1A

2A

33

D EF

1

2

2

A1B1

C1D1

D2E1

F1G1

1A

2A

1

G

BC

A

12 Stg. x 18,43 x 28cm 9 Stg. x 17,89 x 28 cm 9 Stg. x 17,89 x 28 cm

10 Stg. x 17,89 x 28cm

12 Stg. x 18,43 x 28cm

10 Stg. x 17,89 x 28cm

92.86°

90.00

°

87.14

°

87.14

°

87.14

°87.14

°87

.14°

87.14

°

87.14

°

87.1

90.00

°

DS-U01-6

3x Schöck BOLE 12/200-3/A420-CV25

DS-U02-1

DS-U02-28x Schöck BOLE 12/200-3/A420-CV25

DS-U02-28x Schöck BOLE 12/200-3/A420-CV25

Stahlbetonstütze C35/4540/ 40 cm

3x Schöck BOLE 12/200-3/A420-CV25

DS-U02-1

12 48

7.505

6.99

6.99

6.99

6.99

6.99

7.505

304.

035

195

205

15

31585

15

145

155

285

DD 80/20DD 35/20

DD 35/20

DD 3

5/10

0

1.00

DD 3

5/10

0

DD 100/35275

20

926

DD 20/20

DD 36/30

1.80

3

40

BRH

150

BRH

150

4.03

536

1.01

2.13

5

6

20

5.06

5

BRH 160 BRH 160

Stahlbetonstütze C35/4530/ 30 cm

Stahlbetonstütze C35/4530/ 60 cm

DD 3

5/11

0

DD 20/28

3438

24

12

36

511.

106

282.

085

DD 160/113 DD 160/113

Stahlbetonstütze C35/4530/ 30 cm

4.05

2.025 2.025

Kranloch 1, 405/405 cm

41

25

2.25

22DD 127/22

302.485

DD 200/42.5

2020 DD 85/20

4.81

530

5.54

18

2.31

5

DS-U01-13x Schöck BOLE 12/200-4/A560-CV25

301.

845

17

BRH

160

BRH

160

Stahlbetonstütze C35/4540/ 40 cm

Stahlbetonstütze C35/4540/ 40 cm

35

24 1.71 30 2.57 30 1.03 1.58

91 2.315 85

231.

012.

135

2.06

51.

60 804.

101.

60 804.

101.

60 804.

101.

60 802.

071.

012.

135

225

301.

6530

1.83

354.

955

204.

73

1.37 35 2555.695

5.67 40 1.48 40 5.515 40 5.96 60 3.64 60 3.64 60 5.96 40 4.61 17573 40 1.48 40 5.67 30 285

306.

5630

6.42

308.

2030

8.22

530

3.10

54.

051.

045

406.

585

803.

115

3505

295

20 2.675

308.

2040

Stahlbetonstütze C35/4540/ 40 cm

Stahlbetonstütze C35/4540/ 40 cm

Stah

lbeto

nstü

tze C

35/4

540

/ 40

cm

wan

darti

ger T

räge

r im

EG

wan

darti

ger T

räge

r im

EG

wandartiger Träger im EG wandartiger Träger im EG

wandartiger Träger im EG

wan

darti

ger T

räge

r im

EG

wan

darti

ger T

räge

r im

EG

195 205

Stah

lbeto

nstü

tze C

35/4

540

/ 40

cm

2.26

540

4.14

405.

4040

5.40

404.

1440

1.67

TL-UG-1

TL-UG-2

TL-EG-1

Stb.

Pode

std=

20cm

1.19

520

1.19

5

OK

+0.

20U

K -0

.05

20515

6.65

540

5.40

405.

4040

6.65

53.

5988

5

2.13

5

1.24

588

5

2.13

5

355

TL-UG-1

TL-UG-2

Stb.

Pode

std=

20cm

301.

6827

1.84

302.

578.

665

Deck

ensp

rung

, +55

cm

Stb.

Dec

ke ü

ber T

G d

= 25

cm

C35

/45

wandartiger Träger im EG

Deckensprung, +15cm Deckensprung, +15cmStahlbetonstütze C35/4540/ 40 cm

ÜZ C35/45, b/h= 30/90cm; 50cm o.D. OK= +0,30m

Deckensprung, +15cmStahlbetonstütze C35/4540/ 40 cm

ÜZ C35/45, b/h= 30/90cm; 50cm o.D. OK= +0,30m

15 161615

1515

Deck

ensp

rung

, +35

cm

1.03 30 2.57 30 1.71 24

15

12.5cm Dämmung WLG 042

12.5cm Dämmung WLG 042

17

97 37 1.27

2.73201.2653.18565

2.58

5

18

Deck

ensp

rung

, +20

cm

Deck

ensp

rung

, +20

cm

Stb.-WandC35/45, XC1,WO

Stb.

-Wan

dC3

5/45

, XC1

,WO

Stb.-WandC35/45, XC1,WO

Einbauteile Aufzuggem. Aufzugsplanungd. Herstellers

Einbauteile Aufzuggem. Aufzugsplanungd. Herstellers

Stb.-WandC35/45, XC1,WO

12.5cm Dämmung WLG 042

Stb.-WandC35/45, XC1,WO

Stb.-WandC35/45, XC1,WO

12.9

76.

6612

.805

12.7

756.

727.

295

9.27

68.4

95

10 685

10.4

65

301.

6230

26

Beto

nfer

tigte

il d=1

0cm

Beto

nfer

tigte

il d=1

0cm

Beto

nfer

tigte

il d=1

0cm

Beto

nfer

tigte

il d=1

0cm

Beto

nfer

tigte

il d=1

0cm

Beto

nfer

tigte

il d=1

0cm

Beto

nfer

tigte

il d=1

0cm

Beto

nfer

tigte

il d=1

0cm

Betonfertigteil d=10cm

15 1.60 15 3.50 3.50 15 1.60 15

1.77

515

1.13

15

1.77

515

1.13

15

306.

4230

8.20

304.

125

4.10

308.

2040

2020 20 20

49.96

Detail T1

Detail T2

Detail T1

Detail T4

1521

2 2

3

566

4

DD 55/15

DD 55/15

DD 55/15

wandartiger Träger im EG

WD 70/20OK.= 15 UKRD

WD 105/40OK.= 65 UKRD

70 665

DS-U01-13x Schöck BOLE 12/200-4/A560-CV25

WD 70/20OK.= 15 UKRD

BRH

140

BRH 140

1.975 925 175

1.15

215

WD 40/20OK.= 15 UKRD

Stb.

-Wan

dC3

5/45

, XC1

,WO

WD 110/40OK.= UKRD

31.

10

WD 110/30OK.= UKRD

325 50 2.035 65

WD 50/30OK.= 20 UKRD

WD 65/30OK.= 30 UKRD

Schwelle h=10cm

20 3.175

26

DD 20/26Stb.-WandC35/45, XC1,WO

Stb.-WandC35/45, XC1,WO

BRH 200

Stb.

-Wan

dC3

5/45

, XC1

,WO

WD 50/20OK.= 15 UKRD

2.43

15

DD 3

2.5/

244.

5

325

6.84

5

425

WD d=20RA= 20 UKRD

BRH 140BRH 200

BRH 150

Stb.-WandC35/45-WU, XC3,XF1,WF 50

3.79

1.70

4.71

5

WD 170/20OK.= 15 UKRD

WD 50/20OK.= 15 UKRD

Stb.

-Wan

dC3

5/45

, XC1

,WO

20 90 1.2080

4.31 1.2080

94 25 2.85 25 4.45 1.4040

235885

2.135

275

24

4.86 20 8.45 30

12.5

cm D

ämm

ung

WLG

042

WD 50/20OK.= 15 UKRD

502.

33

Detail T4TL-EG-1

1.19

520

1.19

5

Detail T3

5WD 40.5/20OK.= 15 UKRD

DD 4

0/10

0

DD 40/40

1.00

4340

1

Stb.-WandC35/45, XC1,WO

BRH

140

BRH

140

BRH

140

BRH

150

WD d=25RA= 32.5 UKRD

725

3.16

3.30

14

WD d=20RA= 66 UKRD

DD ø 16

DD ø 16

2.615 68

3.46

5

DD ø 16

1.85

3.20

1.25

65 65

2.145 2.145

60

6.35

5

WD

d=15

RA=

65.5

UKR

D

15

35 1.65

BRH

140

BRH

140

1.71

35

12.5cm Dämmung WLG 042

9.27

7.29

56.

7212

.775

12.8

056.

6612

.97

3016

.145

256.

905

2525

.565

303.

985

2014

.32

275

WD d=20RA= 29 UKRD

Rüc

kbie

gean

schl

üsse

Com

ax T

yp 1

10- 8

/15

Rüc

kbie

gean

schl

üsse

Com

ax T

yp 1

90- 8

/15

RückbiegeanschlüsseComax Typ 190- 8/15

RückbiegeanschlüsseComax Typ 190- 8/15

RückbiegeanschlüsseComax Typ 240- 8/15

RückbiegeanschlüsseComax Typ 240- 8/15

RückbiegeanschlüsseComax Typ 220- 8/15

RückbiegeanschlüsseComax Typ 140- 8/15

RückbiegeanschlüsseComax Typ 140- 8/15

RückbiegeanschlüsseComax Typ 140- 8/15

RückbiegeanschlüsseComax Typ 140- 8/15

OKRD -0.20UKRD -0.45

2.73

528

511

.555

243.

9624

25.6

325

6.90

525

16.1

4530

17573 40 1.48 40 5.67

20 3015985 2.09 36

DD 4

0/18

0

OK

-1.5

59

UK

-1.7

59

OK

-1.5

59

UK

-1.7

59

UKST

. - 0

.865

Stb.-WandC35/45, XC1,WO

1.76

30

RückbiegeanschlüsseComax Typ 220- 8/15

5.78 24 2.61 24 1.88 15 1.45 15 95 40 7.345 40 5.75 40 7.235 24 4.68 20 2.61 30 5.72 30

UKST

. - 0

.67

4.24 30 3.215 985 20 5.165 1.262.135

275

20RückbiegeanschlüsseComax Typ 240- 8/15

UKST. - 0.765

90.00°

1.27 38

BRH 140

druckwasserdichteKabeldurchführungen3x6UK.= +1.60OK.= +2.24 ü. OKRF

BRH 140

9.381.001.15 4.445

1.001.15

2.8251.201.15 9.36

1.001.15

2.31 1.4040

2.26 1.001.05 12.215

30

Perimeterdämmung

1.00

DD 91/20

12.5cm Dämmung WLG 042

12.5

cm D

ämm

ung

WLG

042

12.5

cm D

ämm

ung

WLG

042

3.55

588

5

2.13

5

1.18

51.

012.

135

4.21

307.

36

UKST

. - 0

.865

UKST

. - 0

.67

UKST

. - 0

.865

UKST

. - 0

.865

Deckenöffnung318.5/258.5cm

405

1.14

2.39

105

3048

51.

012.

135

335

10cm

Däm

mun

g W

LG 0

42

10cm

Däm

mun

g W

LG 0

42

1.44

51.

012.

285

135

68 2.615

3.46

5

Rüc

kbie

gean

schl

üsse

Com

ax T

yp 1

10- 8

/15

155.60 40 2.80 40 2.80 40 2.80 40 5.60 15

WD 25/30OK.= 15 UKRD

405

1.58

525

1.38

RückbiegeanschlüsseComax Typ 190- 8/15

851.

703.

7950

52

5520

DD 20/20

1.10

885

2.28

5

3.04

1.01

2.13

5

635

351.

80

43

12.5

cm D

ämm

ung

WLG

042

125

TRH sh. Schalpl. M20_5_TWP_SP_TH2_-_01_

TRH sh. Schalpl. M20_5_TWP_SP_TH2_-_01_

Stb.

-Wan

dC3

5/45

, XC1

,WO

UZ. 25/65cmOK. = +0.20

60 3.265845.

515

ÜZ. 15/120cm, OK. +0.60m(umlaufend)

ÜZ. 15/120cm, OK. +0.60m(umlaufend)

DD ø 16

4.115

DD ø 25

1280 DS-U01-4

3x Schöck BOLE 12/200-6/A840-CV25

Stahlbetonstütze C35/4540/ 80 cm

Stahlbetonstütze C35/4540/ 80 cm

Stahlbetonstütze C35/4540/ 80 cm

DS-U01-43x Schöck BOLE 12/200-6/A840-CV25

3.735 80 8555 20 35 2.035 145

20

20555

DD 20/35

1.06

520

20520

2x WD 20/40OK.= UKRD

DD 20/20

20

105

1.00

2015635

10

10

WD

115/

30OK

.= 1

8 UK

RD

WD

10/1

5OK

.= 1

5 UK

RD

WD

158/

35OK

.= 3

7.5

UKRD

Rüc

kbie

gean

schl

üsse

Com

ax T

yp 2

40- 8

/15

Deckensprung, +40cm

4x HaufftechnikHSI 150-4x1-K2-EW/300RA= 32.5 UKRD

301.

445

1.01

2.28

5

135

20

25

Deck

ensp

rung

, +40

cm

UKST

. - 0

.865

75 19DD 75/25

8 1.05 35 40 14535

WD

40/3

0OK

.= 7

0 UK

RDW

D 35

/20

OK.=

52.

5 UK

RD

1.10

4

31DD

31/

110

1.90

KB 25Lage nach örtlichenGegebenheiten

KB 35Lage nach örtlichenGegebenheiten

WD 170/20OK.= 15 UKRD

DD 190/38

2835

20 895 401.10

DD 2

0/35

1.53

265

735

DD 75/26.575

35 50 2.00

wandartiger Träger im EG

Stb.-WandC35/45, XC1,WO

3012

51.

37

DD 35/30

35 2.51

315

1.01

2.28

5

1.52

524

2.11

540

4.14

405.

4040

5.40

404.

1440

2.11

570

24

WAT

im E

G

96 26 35 49

DD 9

6/35 DD 35/35

85

85

30 89 15 3.595 15 765 30

Detail T2

20515

DD ø 13

15 21

Detail T3

DD ø 25

OKRD +0.20UKRD -0.05

8601.45550225

5530

235

885

2.13

5

16

175

1.31

588

5

2.13

5

3320

1.95

1.01

2.13

5

98

WD 50/20OK.= 15 UKRD

WD 60/20OK.= 15 UKRD

Decke, h=25cm

C35/45WD 35/30OK.= 30.5 UKRD

1 55 595 35 75

OK +0.20UK -0.05

RückbiegeanschlüsseComax Typ 190- 8/15

WD 55/20OK.= 55 UKRD

2.18 60 605 50 OKRD -0.20UKRD -0.45

Deckensprung, +20cm

RückbiegeanschlüsseComax Typ 240- 8/15

Stb.-WandC35/45, XC1,WO

187543

WD 75/25OK.= 27.5 UKRD

DD ø 18DD ø 18

DD ø 18DD ø 18

24 1.58 30 765 15 3.595 15 89 30

WD

d=20

RA=

25.5

UKR

DW

D d=

20RA

= 30

UKR

D

17

Stb.-WandC35/45, XC1,WO

WD

70/2

0OK

.= 5

5 UK

RD

WD 40/40OK.= 62.5 UKRD

WD

30/1

5UK

.= O

KRD

WD 40/40OK.=62.5 UKRD

80 1.10 2.00

WD

d=15

RA=

35 U

KRD

WD

d=20

RA=

45 U

KRD

WD

d=30

RA=

43 U

KRD

WD

d=20

RA=

50 U

KRD

Stb.

-Wan

dC3

5/45

-WU,

XC3

,XF1

,WF

2x WD d=20RA= 35 UKRDRA= 65 UKRD

606.285

225

12

WD d=20RA= 25 UKRD

WD d=30RA= 20 UKRD

Deckensprung, +20cm

WD d=25RA= 35 UKRD

WD d=25RA= 45 UKRDWD d=30RA= 35 UKRD

1919

2x WD d=35RA= 40 UKRD

Stb.

-Wan

dC3

5/45

-WU,

XC3

,XF1

,WF

WD d=30RA= 40 UKRD

UZ C35/45, b/h= 24/45cm UK= -0,65m

WD d=25RA= 50 UKRD

2x WD d=20RA= 38 UKRDRA= 70 UKRD

WD 200/48OK.= UKRD

WD 80/45OK.= UKRD

WD d=20RA= 55 UKRD

UKST

. - 0

.65

WD d=25RA= 37 UKRD

Stb. Decke über TG d= 25cm

C35/45

Stb.

-Wan

dC3

5/45

, XC1

,WO

OKRD -0.20UKRD -0.45

WD d=20RA= 28 UKRD

WD d=30RA= 20 UKRD

Stahlbetonstütze C35/4530/ 60 cm

WD d=15RA= 26 UKRD

WD d=25RA= 35 UKRDWD d=30RA= 40 UKRD

2x WD d=35RA= 40 UKRDSt

b.-W

and

C35/

45-W

U, X

C3,X

F1,W

F40

6.46

512

803.

115

301.

2080 80

5.28

5

RückbiegeanschlüsseComax Typ 140- 8/15

WD 30/15UK.= OKRD

WD 35/20OK.= 35 UKRD WD 60/20

OK.= 35 UKRD

WD 50/20OK.= 35 UKRD

Aufzug 2 Aufzug 1

Rüc

kbie

gean

schl

üsse

Com

ax T

yp 1

90- 8

/15

BRH

150

241.

765

175

2.02

247.

0030

3.15

4113

2411

2587

520

3317

5

135

21

21

21

4010

5

2540

16

155

145

85

85

DD ø 13

25

25

9525

165

2510

530

1025

1.10

3510

3540

530

4430

3120

3820 4

225

20

155

165Stb.-Decke, h=25cm

C35/45

WD

d=20

RA=

30 U

KRD

WD d=16.5RA= 100 UKRD

4252.735

25

Betonfertigteil d=10cm

301.

6230

26 3110

Betonfertigteil d=10cm

3110

Betonfertigteil d=10cm7.675

103.21 10

3.58 102.71 10

3.10 107.87

102.36 10 90 10

2.45 10 88 10 1.86 10

11.695

3110

77 775 40 525 38

4050

30

405

1.14

2.39

105

3048

51.

012.

285

345

3010

1.01

2.28

5

10.3

7

Stahlbetonstütze C35/4540/ 50 cmStahlbetonstütze C35/45

40/ 50 cm

6.60

550

5.30

505.

3050

6.60

5

1

20

255

20

231.

012.

135

2.06

51.

60 804.

101.

60 804.

101.

60 804.

055

80 80

241.

012.

135

2480 80

1.86

205

195

DD 2

5.5/

20

WD

35/3

5UK

.= 1

0 OK

RD

15 35 1.40 70

2x HaufftechnikHSI 150-2x1-K2-EW/300RA= 32.5 UKRDRA= 46 UKRD

2x W

D d=

10RA

= 32

.5 U

KRD

4.281.50Stb.-Decke über TG, h=25cm

C35/45OKRD -0.20UKRD -0.45 70 21

12.5

cm D

ämm

ung

WLG

042

WD 70/20OK.= 15 UKRD

WD 40/40OK.= 12.5 UKRD

WD 40/40OK.= 12.5 UKRD

OKRD -0.40UKRD -0.65WD d=30

RA=100 UKRDWD d=30RA=100 UKRD

251.

0820

84

3510

2575

3041

3032

2041

514

520

8420

1.08

2580

1515

3510

WD 50/20OK.= UKRD

WD 40/40OK.= UKRD

WD 40/40OK.= UKRD 135

50 4 35 WD 35/35OK.= 37.5 UKRD

KB nach BedarfLage nach örtlichenGegebenheiten

KB nach BedarfLage nach örtlichenGegebenheiten

WD 40/40OK.= 60 UKRD

DD ø 16

2.40

3.11

5

Stahlbetonstütze C35/4560/ 30 cm

670

155

55

3.19

365

885

2.13

5

4327

485

1.01

2.13

5

5.64

20

WD 70/20OK.= 15 UKRD

25 1.70 48

2.035

WD 55/30OK.= UKRD

670

161.

1433

556

901.

10

WD 114/44OK.= UKRD

WD 56/25OK.= 15 UKRD

WD 170/25OK.=12.5 UKRD

2.73

54.

505

1.00

1.15

5.15

51.

001.

1552

71 1.15

4.40

51.

801.

004.

581.

801.

004.

801.

801.

004.

801.

801.

0012

.885

1.00

1.00

751.

60 407.

371.

001.

002.

48

3.77

510

2.30

103.

735

101.

7810

9010

3.62

510

2.48

103.

9210

2.48

103.

805

11 10

2.48

103.

9210

2.48

103.

385

6.72

2.19

510

1.52

102.

3810

905.

1310

2.48

101.

46

1.51

102.

4810

5.08

9010

2.38

101.

5210

2.19

56.

723.

385

102.

4810

3.92

102.

4810 11

3.80

510

2.48

103.

9210

2.30

18

10

6210

1.19

101.

1910

3.08

1.15

102.

4810

8.86

5

2.48

1.00

1.00

7.37

1.60 40

751.

001.

0012

.89

1.80

1.00

4.80

1.80

1.00

4.80

1.80

1.00

4.58

1.80

1.00

1.52

550 1.15

825

90 1.15

4.90

1.80

1.15

9.30

275

365

76

DD 2

0/36

.5

20

DD 55/15

1

255

2035

+67.53

10x Schöck BOLE 20/290-4/A840-CV25

Deckenöffnung fürDifferenztreppe im EG

3 Stg.x 13,33x 33cm 2222

M. 1:50

Grundriss

H/B = 841 / 1400 (1.18m²) Allplan 2015

Schalplan Decke über UG - Teil 3

Schalplan Decke über UG - Teil 3Grundriss Achse A-G/1-3

A CAD.12.08.2019PRÜ

B 28.08.2019 CAD.CAD.PRÜ C 02.09.2019

PRÜ Freigabe des Architekten vom 23.08.2019

Anschluss sh. Plan : M20_5_TWP_SP_-01_XXXX_02_

Schnitte und Details sh. Plan : M20_5_TWP_SP_-01_XXXX_04_ M20_5_TWP_SP_-01_XXXX_05_

M20_5_TWP_SP_-01_XXXX_03

Änderungen vom Architekten (siehe Wolken)

CAD.PRÜ Änderungen vom Architekten (siehe Wolken)D 19.09.2019

CAD.PRÜ E 27.09.2019 Anpassung DD und WD (siehe Wolken)

Anmerkungen Architekt eingearbeitet

FRE H

CAD.F Anpassung DD und WD (siehe Wolken)11.10.2019PRÜ

CAD.G 24.10.2019 Freigabe des Architekten vom 21.10.2019CAD.Treppendarstellung für Differenzreppe ergänzt

FREFRE 01.11.2019H