13
Ref: NR/SP/OHS/00102 Issue: 03 Date: June 2005 Page 1 of 13 Network Rail Work Activity Risk Assessment Work Activity Assessed: Transit of OTP under Live OLE Ref. No. NR/L3/ MTC/ WARA/LW08 Function: Maintenance Discipline or Department: All Disciplines Location/site of work activity: Generic Date Assessment carried out: January 2008 Groups at risk: Maintenance staff Previous assessments superseded: Various from former IMC’s Name: Positions: Nigel Edwards Programme Manager – NST Standards Process and Procedures Persons carrying out assessment: Reviewed and Approved by: R.Staughton R.Cameron Safety Procedures Engineer Head of Maintenance Workforce Safety Date of acceptance and publication: 22/01/2008 Planned review date: 22/01/2008

LW08-Movement Under Live OLE

Embed Size (px)

DESCRIPTION

Movement Under Live OLE

Citation preview

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 1 of 13

    Network Rail Work Activity Risk Assessment

    Work Activity Assessed:

    Transit of OTP under Live OLE Ref. No. NR/L3/ MTC/ WARA/LW08

    Function:

    Maintenance Discipline or Department:

    All Disciplines

    Location/site of work activity:

    Generic Date Assessment carried out:

    January 2008

    Groups at risk:

    Maintenance staff Previous assessments superseded:

    Various from former IMCs

    Name: Positions: Nigel Edwards Programme Manager NST Standards Process and

    Procedures

    Persons carrying out assessment:

    Reviewed and Approved by:

    R.Staughton R.Cameron

    Safety Procedures Engineer Head of Maintenance Workforce Safety

    Date of acceptance and publication:

    22/01/2008 Planned review date:

    22/01/2008

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 2 of 13

    Network Rail Work Activity Risk Assessment

    Ref. No. LW08

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Working on or near the line

    Trains Fatality Major Injury

    Rule Book RIMINI Plan See GH1

    5 2 7

    Working on or near the line

    Electrocution

    Fatality Major Injury

    See GH06 (OLE) See GA20 (DC Areas) Insulated tools and shields must be used in vicinity of conductor rails

    5 2 7

    Working on or near the line

    Wet weather leading to: Poor underfoot conditions Flooding

    NR RB Module M4 Floods & Snow Flood action procedure (Including action plans) CE/P/002 for structures

    5 1 6

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 3 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Working on or near the line

    Biological

    INFORMATION SOURCES Reference COSHH Manual Legionella Biological Hazards Leptospirosis Company procedure for disposal of sharps Other Controls Pre-work briefing Good personal hygiene Cover any cuts/abrasions Wash exposed skin prior to eating, smoking or drinking Adequate washing facilities Local managers to run showers at HOT FOR 5 MINUTES WEEKLY to eliminate legionella See GH07

    3 1 4

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 4 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Working on railway infrastructure

    Underfoot conditions:

    On snow or icy conditions On track On stairs Over objects On oil/grease From vehicle steps On poor walking routes

    Where snow covers lineside, check proposed walking route with a stick or implement to ensure sound footing ahead Sand/grit to be used where available Extra caution to be taken when walking on snow or icy conditions Do not walk on sleepers (Rule Book Module G) Approved safety footwear Use appropriate lighting Use non slip surfaces where possible Survey pegs to be painted Good house keeping Authorised walking routes through work site/access points Take extra care in and around S & C; Lubricators, signals and stations Do not step from moving vehicles (Rule book module G) Group Standard GC/RSO 128-Specification for cess walkways

    3 3 6

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 5 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Working on or near the line

    Darkness

    Hit by train by darkness Objects/debris blown onto and hanging from live OLE

    GREEN ZONE WORKING ONLY INFORMATION SOURCES Modular Rule Book Sec G high visibility Modular Rule Book sec G Pee Wee/TOWS Modular Rule Book sec G Hand lamp (Working in Darkness/Tunnel) Temporary site lighting broadsheets Ensure adequate lighting Caution to be taken following and during windy conditions Report any objects or debris hanging from OLE to electrical Control Room immediately- DO NOT APPROACH!!!

    5 1 6

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 6 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Movement under Live OLE

    Electrocution

    Death/Major Injury

    The equipment shall have the appropriate VAB approval for Transiting under live OLE and a copy of the Engineering Acceptance Certificate or grandfather rights letter must be on the vehicle.

    The equipment shall be inspected prior to use in accordance with the machine controllers checklist and should have a current maintenance /inspection certificate.

    5 1 6

    Movement under Live OLE

    Electrocution

    Death / Major Injury

    SRS Machine: Extendable platforms and the access ladder to the platform must remain locked in the safe/ stowed position until the machine is in an area covered by a Form C Permit To Work.

    SRS Machine: Keys shall be retained in a safe place and under Machine Controller control prior to travel.

    5

    1

    6

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 7 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Movement under Live OLE

    Encroachment Contact Wire To High/Low

    Death/ Major Injury

    Minimum contact wire height shall be confirmed in the area to be transited to ensure that sufficient clearance is available to safely transit the machine under live OLE.

    Komatsu PC 95: The mechanical height limiter shall be set up in an area of safety to achieve a minimum clearance of 600 mm (2 feet) to minimum wire height.

    SRS Machine: Machine height is 3.650 metres (12 feet) from rail.

    Minimum wire height to be able to safely transit under live OLE is 4.3 metres (14 foot).

    SRS Machine: To allow maximum transit clearance the top front hand rail shall be removed and the top of the rear access gate lowered before transiting under live OLE.

    Confirm as GO NO GO and limits of transit area

    5 1 6

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 8 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Manual handling

    lifting moving or carrying tools/mtls/equipment

    1. insufficient employees/contractors to lift/move/carry

    2. insufficient lighting

    3. adverse weather conditions

    4. poor ground conditions

    5. contents likely to move during transit

    6. unknown weight

    7. sharp edges material may be

    hot/cold

    Manual Handling of Loads Operations Regs 1992 Management of Health and Safety at Work Regs 1999 Trained and competent personnel Use of mechanical lifting equipment Manual Handling training for employees Method statements & site specific briefing outlining hazards which may effect employees carrying, moving, and carrying including: Provide suitable lighting during periods of darkness Route to be taken is free from hazards were reasonably practicable Sharp edges are protected or staff have suitable PPE (gloves) Assess the load, weight contents likely to shift all to be known prior to lifting or a trial lift is carried out with sufficient resources to undertake the lift safely.

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 9 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    All Tasks Young person (16 18 years old)

    Inexperience Lack of awareness Immaturity

    See GA42

    All Tasks Lone workers

    See GA10

    All Tasks New and expectant mothers

    Fainting Miscarriage

    See GA43

    Disposal of equipment

    Legal Prosecution All redundant equipment to be removed from site and disposed of in accordance with the Network Rail Environmental Management System.

    1 1 2

    Testing and repairs to electrical equipment

    Electrocution

    Burns / death Isolate and test to ensure not live, use personal locks where necessary. Only competent staff to work on low voltage electrical installations

    5 2 7

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 10 of 13

    Network Rail Work Activity Risk Assessment

    Ref. No. LW08 Additional local condition factors that should be considered

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 11 of 13

    Manual Handling Operations Risk Assessment Filter

    Work Activity Risk Assessment Reference No. ..

    Activity Assessed Assessed by .. Component of Activity

    WARA risk classification

    1 2 3 4

    Y/N

    Further controls identified (carry back to WARA)

    Specialist MHO risk assessment required Y/N

    Lifting and Lowering Weight outside guidelines according to body zone?

    Y/N Y/N

    Repetitive lifting/lowering -more than twice per minute?

    Y/N Y/N

    Twisting motion - more than 45 degrees?

    Y/N Y/N

    Carrying Load supported some distance away from the body?

    Y/N Y/N

    Load carried more than 10m distance?

    Y/N Y/N

    Hands below knuckle height or above elbow height when carrying/lifting.?

    Y/N Y/N

    Pushing and Pulling Excessive force required to move load?

    Y/N Y/N

    Excessive force required to keep load in motion?

    Y/N Y/N

    Refer to Appendix D of NR/SP/OHS/00102 for guidance on completing this form

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 12 of 13

    Noise Risk Assessment Filter

    Work Activity Risk Assessment Reference No. ..

    Activity Assessed . Assessed by ..

    1 Component(s) of Activity

    2 WARA risk classification

    Manufacturers/Measurement Data (where available)

    3 Name of Tool/Equipment/Noise source

    4 Suppliers/Manufacturers/ Measurement Information available Y/N

    Y/N Y/N Y/N Y/N

    5 Continuous Noise Level dBA.

    6 Impact Noise Level dB(C) (if applicable)

    Listening Checks (where manufacturers/measurement data is not available)

    7 Difficulty being heard at 2m (85dB(A))

    8 Difficulty being heard at 1m (90dB(A))

    Estimation of Noise Exposure

    9 Estimated usage time (hrs.)

    10 Noise exposure points (from Table 1)

    11 Total noise exposure points

    12 Estimated Noise Exposure (dB) (from Table 2)

    Refer to Appendix D of NR/SP/OHS/00102 for guidance on completing this form

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 13 of 13

    Hand-Arm Vibration Risk Assessment Filter

    Work Activity Risk Assessment Reference No. ..

    Activity Assessed . Assessed by ..

    1 Component(s) of Activity

    2 WARA risk classification

    Manufacturers/Measurement Data (where available)

    3 Name of Tool/Equipment/Vibration source

    4 Suppliers/Manufacturers/ Field Measurement Information available Y/N

    Y/N Y/N Y/N Y/N

    5 Vibration Level (m/s2) from available information

    6 Source of information

    Estimation of Hand-Arm Vibration Exposure

    7 Estimated usage time (hrs.)

    8 HAV exposure points (from Table 1)

    9 Total HAV exposure points

    10 Estimated HAV Exposure (m/s2 A(8)) (from Table 2)

    Refer to Appendix D of NR/SP/OHS/00102 for guidance on completing this form