Ref: NR/SP/OHS/00102 Issue: 03 Date: June 2005 Page 1 of 13 Network Rail Work Activity Risk Assessment Work Activity Assessed: Live Working Under OLE – Use of Welding Umbrella Ref. No. NR/L3/ MTC/ WARA/LW03 Function: Maintenance Discipline or Department: All Disciplines Location/site of work activity: Generic Date Assessment carried out: January 2008 Groups at risk: Maintenance staff Previous assessments superseded: Various from former IMC’s Name: Positions: Nigel Edwards Programme Manager – NST Standards Process and Procedures Persons carrying out assessment: Reviewed and Approved by: R.Staughton R.Cameron Safety Procedures Engineer Head of Maintenance Workforce Safety Date of acceptance and publication: 22/01/2008 Planned review date: 22/01/2008

LW03-Use of Welding Umbrella

Embed Size (px)

DESCRIPTION

Use of Welding Umbrella

Citation preview

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 1 of 13

    Network Rail Work Activity Risk Assessment

    Work Activity Assessed:

    Live Working Under OLE Use of Welding Umbrella

    Ref. No. NR/L3/ MTC/ WARA/LW03

    Function:

    Maintenance Discipline or Department:

    All Disciplines

    Location/site of work activity:

    Generic Date Assessment carried out:

    January 2008

    Groups at risk:

    Maintenance staff Previous assessments superseded:

    Various from former IMCs

    Name: Positions: Nigel Edwards Programme Manager NST Standards Process and

    Procedures

    Persons carrying out assessment:

    Reviewed and Approved by:

    R.Staughton R.Cameron

    Safety Procedures Engineer Head of Maintenance Workforce Safety

    Date of acceptance and publication:

    22/01/2008 Planned review date:

    22/01/2008

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 2 of 13

    Network Rail Work Activity Risk Assessment

    Ref. No. LW03

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Working on or near the line

    Trains Fatality Major Injury

    Rule Book RIMINI Plan See GH1

    5 2 7

    Working on or near the line

    Electrocution

    Fatality Major Injury

    See GH06 (OLE) See GA20 (DC Areas) Insulated tools and shields must be used in vicinity of conductor rails

    5 2 7

    Working on or near the line

    Wet weather leading to: Poor underfoot conditions Flooding

    NR RB Module M4 Floods & Snow Flood action procedure (Including action plans) CE/P/002 for structures

    5 1 6

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 3 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Working on or near the line

    Biological

    INFORMATION SOURCES Reference COSHH Manual Legionella Biological Hazards Leptospirosis Company procedure for disposal of sharps Other Controls Pre-work briefing Good personal hygiene Cover any cuts/abrasions Wash exposed skin prior to eating, smoking or drinking Adequate washing facilities Local managers to run showers at HOT FOR 5 MINUTES WEEKLY to eliminate legionella See GH07

    3 1 4

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 4 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Working on railway infrastructure

    Underfoot conditions:

    On snow or icy conditions On track On stairs Over objects On oil/grease From vehicle steps On poor walking routes

    Where snow covers lineside, check proposed walking route with a stick or implement to ensure sound footing ahead Sand/grit to be used where available Extra caution to be taken when walking on snow or icy conditions Do not walk on sleepers (Rule Book Module G) Approved safety footwear Use appropriate lighting Use non slip surfaces where possible Survey pegs to be painted Good house keeping Authorised walking routes through work site/access points Take extra care in and around S & C; Lubricators, signals and stations Do not step from moving vehicles (Rule book module G) Group Standard GC/RSO 128-Specification for cess walkways

    3 3 6

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 5 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Working on or near the line

    Darkness

    Hit by train by darkness Objects/debris blown onto and hanging from live OLE

    GREEN ZONE WORKING ONLY INFORMATION SOURCES Modular Rule Book Sec G high visibility Modular Rule Book sec G Pee Wee/TOWS Modular Rule Book sec G Hand lamp (Working in Darkness/Tunnel) Temporary site lighting broadsheets Ensure adequate lighting Caution to be taken following and during windy conditions Report any objects or debris hanging from OLE to electrical Control Room immediately- DO NOT APPROACH!!!

    5 1 6

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 6 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Electrocution OLE Death Pre-Use inspection Before use the umbrella shall be inspected to confirm: a) The umbrella is numbered and has an approval certificate. b) The umbrella is in good condition. ECR notification The ECR shall be informed in writing that work is to take place inside 2.75 metres (9 feet) and notified on completion, to ensure that re-energisation is not initiated without consultation until the work is completed. Team Briefing The entire team shall be

    briefed that the OLE is Live and which Tools /Equipment, can be used,

    Approved welding umbrella, welding equipment, slewing bars and straight edges these shall not be raised above head height.

    All staff within the working party shall sign the briefing form and confirm understanding.

    5 1 6

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 7 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Lack of Competence

    OLE Major Injury The competence to use the umbrella under live OLE must be recorded in the welders competence record card.

    4 1 5

    Loss of Control / Encroachment

    High wind speeds/ gusts

    or Train drafts

    Major Injury Wind strength. An assessment of weather conditions should be made prior to erection and during use, including weather forecasts to assess the effect high winds may have - do not use if wind is strong or gusting

    4 2 6

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 8 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    Manual handling

    lifting moving or carrying tools/mtls/equipment

    1. insufficient employees/contractors to lift/move/carry

    2. insufficient lighting

    3. adverse weather conditions

    4. poor ground conditions

    5. contents likely to move during transit

    6. unknown weight

    7. sharp edges material may be

    hot/cold

    Manual Handling of Loads Operations Regs 1992 Management of Health and Safety at Work Regs 1999 Trained and competent personnel Use of mechanical lifting equipment Manual Handling training for employees Method statements & site specific briefing outlining hazards which may effect employees carrying, moving, and carrying including: Provide suitable lighting during periods of darkness Route to be taken is free from hazards were reasonably practicable Sharp edges are protected or staff have suitable PPE (gloves) Assess the load, weight contents likely to shift all to be known prior to lifting or a trial lift is carried out with sufficient resources to undertake the lift safely.

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 9 of 13

    1 2 3 4 5 6 7 8 9 10 11 12 Component of Activity

    Hazards Consequences Existing Controls S L R Additional Controls S L R Specialised Risk Assessment

    All Tasks Young person (16 18 years old)

    Inexperience Lack of awareness Immaturity

    See GA42

    All Tasks Lone workers

    See GA10

    All Tasks New and expectant mothers

    Fainting Miscarriage

    See GA43

    Disposal of equipment

    Legal Prosecution All redundant equipment to be removed from site and disposed of in accordance with the Network Rail Environmental Management System.

    1 1 2

    Testing and repairs to electrical equipment

    Electrocution

    Burns / death Isolate and test to ensure not live, use personal locks where necessary. Only competent staff to work on low voltage electrical installations

    5 2 7

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 10 of 13

    Network Rail Work Activity Risk Assessment

    Ref. No. LW03 Additional local condition factors that should be considered

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 11 of 13

    Manual Handling Operations Risk Assessment Filter

    Work Activity Risk Assessment Reference No. ..

    Activity Assessed Assessed by .. Component of Activity

    WARA risk classification

    1 2 3 4

    Y/N

    Further controls identified (carry back to WARA)

    Specialist MHO risk assessment required Y/N

    Lifting and Lowering Weight outside guidelines according to body zone?

    Y/N Y/N

    Repetitive lifting/lowering -more than twice per minute?

    Y/N Y/N

    Twisting motion - more than 45 degrees?

    Y/N Y/N

    Carrying Load supported some distance away from the body?

    Y/N Y/N

    Load carried more than 10m distance?

    Y/N Y/N

    Hands below knuckle height or above elbow height when carrying/lifting.?

    Y/N Y/N

    Pushing and Pulling Excessive force required to move load?

    Y/N Y/N

    Excessive force required to keep load in motion?

    Y/N Y/N

    Refer to Appendix D of NR/SP/OHS/00102 for guidance on completing this form

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 12 of 13

    Noise Risk Assessment Filter

    Work Activity Risk Assessment Reference No. ..

    Activity Assessed . Assessed by ..

    1 Component(s) of Activity

    2 WARA risk classification

    Manufacturers/Measurement Data (where available)

    3 Name of Tool/Equipment/Noise source

    4 Suppliers/Manufacturers/ Measurement Information available Y/N

    Y/N Y/N Y/N Y/N

    5 Continuous Noise Level dBA.

    6 Impact Noise Level dB(C) (if applicable)

    Listening Checks (where manufacturers/measurement data is not available)

    7 Difficulty being heard at 2m (85dB(A))

    8 Difficulty being heard at 1m (90dB(A))

    Estimation of Noise Exposure

    9 Estimated usage time (hrs.)

    10 Noise exposure points (from Table 1)

    11 Total noise exposure points

    12 Estimated Noise Exposure (dB) (from Table 2)

    Refer to Appendix D of NR/SP/OHS/00102 for guidance on completing this form

  • Ref: NR/SP/OHS/00102 Issue: 03

    Date: June 2005

    Page 13 of 13

    Hand-Arm Vibration Risk Assessment Filter

    Work Activity Risk Assessment Reference No. ..

    Activity Assessed . Assessed by ..

    1 Component(s) of Activity

    2 WARA risk classification

    Manufacturers/Measurement Data (where available)

    3 Name of Tool/Equipment/Vibration source

    4 Suppliers/Manufacturers/ Field Measurement Information available Y/N

    Y/N Y/N Y/N Y/N

    5 Vibration Level (m/s2) from available information

    6 Source of information

    Estimation of Hand-Arm Vibration Exposure

    7 Estimated usage time (hrs.)

    8 HAV exposure points (from Table 1)

    9 Total HAV exposure points

    10 Estimated HAV Exposure (m/s2 A(8)) (from Table 2)

    Refer to Appendix D of NR/SP/OHS/00102 for guidance on completing this form