About Us
LVL ENERGY FUND PLC
LVL Energy Fund Limited was incorporated in June 2006 as
a subsidiary of Lanka Ventures PLC with an initial capital of
Rs. 300 Mn. The main objective of the Company was to
invest in the form of equity and quasi equity in projects in
the power and energy sector in Sri Lanka and abroad.
Up to June 2016 the Company had several rounds of fund
raising which culminated in a total fund base of Rs. 2,636
Mn by 31st March 2017 prior to launching an IPO to raise
further capital of Rs. 1,200 Mn and obtaining a listing for
shares at the Colombo Stock Exchange.
The Company remains a well-diversified entity with
investments in renewable and thermal power projects in
Sri Lanka, Bangladesh and Nepal.
BANGLADESH
NEPAL
SRI LANKA
Our Locations
Our Projects
LVL ENERGY FUND PLC
HYDRO POWER WIND POWER THERMAL POWER
Run-Of-River Hydro Power Plant
begins at the weir which divert water
via a canal or pipeline to bring the
water to the power station. The water
is then fed into a high-pressure
penstock (or pipeline) which drives
the water under high pressure into
the powerhouse, where it is
connected to an installed turbine
driving the generator. The amount of
power a hydro station can generate is
dependent on the head and flow of
the water. At the outlet of the
turbines, the water is discharged back
to the river via a tailrace.
Wind power is the use of air flow
through wind turbines to provide the
mechanical power to turn electric
generators. Wind farms consist of
many individual wind turbines, which
are connected to the electric power
transmission network. The energy that
can be captured by wind turbines is
highly dependent on the local average
wind speed. The speed of the wind
rotates the blades of a rotor,
producing kinetic energy. The rotor
then drives the generator that
converts the mechanical energy into
electricity.
A thermal power plant is a power
station in which heat energy is
converted to electric power. Usually
the turbine is steam-driven. The steam
is produced in high pressure in the
steam boiler from burning of fuel in
boiler furnaces This steam is further
super heated in a super heater. This
superheated steam then enters into
the turbine and rotates the turbine
blades which drives an electric
generator. After it passes through the
turbine, the steam is condensed in a
condenser and recycled to where it
was heated.
SOLAR POWER
Solar power generation systems collect
and concentrate sunlight to produce
the useable electricity. The solar panels
consist of photovoltaic cells, known as
PV or solar cells, to directly convert
sunlight into usable electricity. These
panels are made from semiconductor
materials, usually some form of silicon.
When photons from sunlight hit the
semiconductor material free electrons
are generated which can then flow
through the material to produce a
direct electrical current. The DC current
then needs to be converted to
alternating current (AC) using an
inverter before it can be directly used
or fed into the electrical grid.
LVL ENERGY FUND PLC
Belihul Oya
Extended PPA
Expiry
Location
Belihul Oya
Catchment Area
21.5 km2
Rainfall
2,638 mm per year
Design Flow
1.5 m3/s
Capacity
2.2 MW
Commissioned Date
May
2002
Gross Heads
178 m
April
2022
Nividu (Pvt) Ltd
Equipment Supplier
Wasserkraft,
Germany
46%
70%
23% 18%
0%
10%
20%
30%
40%
50%
60%
70%
80%
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Plant Factor (Quarterly)
LVL ENERGY FUND PLC
Belihul Oya Plant Factor
6,976
8,406
9,927 10,283 9,988
3,552
6,695
9,893
36%
44%
52% 53%
52%
18%
35%
51%
-
2,000
4,000
6,000
8,000
10,000
12,000
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
0%
10%
20%
30%
40%
50%
60%
Plant Factor (Annual)
Plant Factor Generation (MWh)
* Plant generation had been affected due to the drought condition prevailed in the year 2016 and 2017.
12
18
6 5
4
8
(2)
(3) -5
0
5
10
15
20
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Profitability (Quarterly)
LVL ENERGY FUND PLC
Belihul Oya Profitability
Revenue (Mn) Profit (Mn)
73
87
116
160 157
52
41
53
185
167
206
249
209
125
180
19 -
50
100
150
200
250
300
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
PROFITABILITY (ANNUAL)
*Net profit is higher than the revenue due to dividend income under other income, from its 100% owned subsidiary Nividu Assupiniella.
LVL ENERGY FUND PLC
Location
Assupini Ella
Catchment Area
27 km2
Rainfall
2,134 mm per year
Capacity
4.0 MW
Commissioned Date
November
2005
Nividu Assupini Ella (Pvt) Ltd
Equipment Supplier
VA Tech,
Germany October 2020 * Extendable for another 20 years
Design Flow
2.2 m3/s
Gross Heads
210 m
PPA Expiry
Assupini Ella
LVL ENERGY FUND PLC
Assupini Ella Plant Factor
52%
61%
10%
16%
0%
10%
20%
30%
40%
50%
60%
70%
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1- June 2019
Plant Factor (Quarterly)
12,467
14,918 14,415
18,452 16,657
4,622
14,249 14,009
36%
43% 41%
53%
48%
13%
41% 40%
0%
10%
20%
30%
40%
50%
60%
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
-
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
20,000
Plant Factor (Annual)
Plant Factor Generation (MWh)
* Plant had to be shut down on 15th May 2016 due to part of the channel (approximately 30m) been damaged following a flash flood and earth slip. The plant was re-commissioned in September 2016 after repairs.
LVL ENERGY FUND PLC
Assupini Ella Profitability
129
150
168
260 258
74
193
224
87 98
109
179
184
11
126 144
0
50
100
150
200
250
300
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
Profitability (Annual)
61
73
46
23
44
47
27
10
0
10
20
30
40
50
60
70
80
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1- June 2019
Profitability (Quarterly)
Revenue (Mn) Profit (Mn)
LVL ENERGY FUND PLC
Kadawala
PPA Expiry
Location
Ginigathhena
Catchment Area
26 km2
Rainfall
4,406 mm per year
Design Flow
5.2 m3/s
Capacity
6 MW
Gross Heads
132 m
Commissioned Date
March
2008 February
2023
Unit Energy Lanka (Pvt) Ltd
* Extendable for another 20 years
Equipment Supplier
Voith Siemens, Germany
40%
27%
3%
11%
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Plant Factor (Quarterly)
LVL ENERGY FUND PLC
Kadawala Plant Factor
8,284 10,107
3,701
15,925
14,015
11,635
14,306 12,713
16%
19%
7%
30%
27%
22%
27%
24%
-
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
0%
5%
10%
15%
20%
25%
30%
35%
Plant Factor (Annual)
Plant Factor Generation (MWh)
72
48
36
23
38
22
14
5 0
10
20
30
40
50
60
70
80
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Profitability (Quarterly)
84 97
46
239
216
167
196 203
11 16
(38)
113 105
78 95
87
-50
0
50
100
150
200
250
300
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
Profitability (Annual)
LVL ENERGY FUND PLC
Kadawala Profitability
Revenue (Mn) Profit (Mn)
*On 13th May 2013, the plant went under water due to a flash flood following heavy rains in the area affecting other nearby hydro power plants as well. This incident caused damage to few anchor supports and electrical equipment including control panels.
LVL ENERGY FUND PLC
Neluwa
PPA Expiry
Location
Gin Ganga
Catchment Area
304 km2
Rainfall
3,973 mm per year
Design Flow
40 m3/s
Capacity
2.2 MW
Commissioned Date
January
2008
Gross Heads
6 m
December
2023
Neluwa Cascade Hydro Power (Pvt) Ltd
* Extendable for another 20 years
Equipment Supplier
Gugler Hydro
Energy, Austria
20%
40%
16%
27%
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Plant Factor (Quarterly)
LVL ENERGY FUND PLC
Neluwa Plant Factor
5,687
6,602
5,338
6,264 5,878
4,277 4,910
5,874
30%
34%
28%
33% 31%
22%
25%
30%
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
0%
5%
10%
15%
20%
25%
30%
35%
40%
Plant Factor (Annual)
Plant Factor Generation (MWh)
LVL ENERGY FUND PLC
Neluwa Profitability
Revenue (Mn) Profit (Mn)
58
[VALUE] 65
93 92
67 69
70
16 20
19
50
42
16
14
33
0
10
20
30
40
50
60
70
80
90
100
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
Profitability (Annual)
13
26 26
21
(0)
13
16
9
-5
0
5
10
15
20
25
30
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Profitability (Quarterly)
LVL ENERGY FUND PLC
Theberton
PPA Expiry
Location
Kiriwaneliya
Village
Catchment Area
10 km2
Rainfall
4,086 mm per year
Design Flow
1.950 m3/s
Capacity
1.3 MW
Commissioned
Date
September
2015
Gross Heads
90 m
October
2035
Sapthakanya Hydro Electric Company
(Pvt) Ltd
Equipment
Supplier
• Fuchun Industry
Development Co,
China
• Hongya Power
Generating
Equipment, China
56%
[VALUE]
7%
18%
0%
10%
20%
30%
40%
50%
60%
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Plant Factor (Quarterly)
LVL ENERGY FUND PLC
Theberton Plant Factor
1,867
3,339
4,398 4,077
28% 29%
39%
36%
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
2015/16 2016/17 2017/18 2018/19
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
Plant Factor (Annual)
Plant Factor Generation (MWh)
* First year of commercial operation.
*
28
16
7 9
15
2
(9)
(3)
-10
-5
0
5
10
15
20
25
30
35
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Profitability (Quarterly)
28
58
77 75
13
5
25
20
0
10
20
30
40
50
60
70
80
2015/16 2016/17 2017/18 2018/19
Profitability (Annual)
LVL ENERGY FUND PLC
Theberton Profitability
Revenue (Mn) Profit (Mn)
LVL ENERGY FUND PLC
Campion
PPA Expiry
Location
Bogawantalawa
Catchment Area
27 km2
Rainfall
2,384 mm per year
Design Flow
2.1 m3/s
Capacity
1.2 MW
Commissioned Date
May
2017
Gross Heads
76 m
April
2037
Campion Hydro Power (Pvt) Ltd
Equipment
Supplier
Hongya Power
Generating
Equipment,
China
43%
64%
14% 11%
0%
10%
20%
30%
40%
50%
60%
70%
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Plant Factor (Quarterly)
LVL ENERGY FUND PLC
Campion Plant Factor
3,103
4,627
32%
44%
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
2017/18 2018/19
-
1,000
2,000
3,000
4,000
5,000
Plant Factor (Annual)
Plant Factor Generation (MWh)
20
29
7 5
4
13
(10)
(11)
-15
-10
-5
0
5
10
15
20
25
30
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Profitability (Quarterly)
56
81
(7)
16
-10
0
10
20
30
40
50
60
70
80
90
2017/18 2018/19
Profitability (Annual)
LVL ENERGY FUND PLC
Profitability
Revenue (Mn) Profit (Mn)
Campion
LVL ENERGY FUND PLC
PPA Expiry
Location
Across Uma Oya
in Bambarapana
Catchment Area
180.5 km2
Rainfall
1,650-1,880 mm per year
Design Flow
6.5 m3/s
Capacity
2.5 MW
Commissioned Date
February
2018
Gross Heads
46 m
Bambarapana
January
2038
Bambarapana Hydro Power (Pvt) Ltd
Equipment Supplier
Global Hydro
Energy, Austria
47 45
55
31
16
11
17
(3)
-10
0
10
20
30
40
50
60
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Profitability (Quarterly)
50% 47%
[VALUE]
[VALUE]
0%
10%
20%
30%
40%
50%
60%
70%
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Plant Factor (Quarterly)
LVL ENERGY FUND PLC
Bambarapana Plant Factor & Profitability
Revenue (Mn) Profit (Mn) Plant Factor
LVL ENERGY FUND PLC
Hydro Plants Generation (MWh)
Project 2015/16 2016/17 2017/18 2018/19 2019 YTD
Belihul Oya 9,988 3,552 6,695 9,893 1,974
Assupini Ella 16,657 4,622 14,249 14,009 2,278
Kadawala 14,015 11,635 14,306 12,713 1,796
Neluwa 5,878 4,277 4,910 5,874 2,076
Theberton 1,867 3,339 4,398 4,077 724
Campion - - 3,103 4,627 669
Bamabarapana - - - 11,825 4,926
LVL ENERGY FUND PLC
Pawan Danavi
Location
Kalpitiya
Commissioned Date
August
2012
10.2 MW
Capacity
12 Turbines
Turbines
65 m
Hub Height
58 m
Rotor Diameter
July 2032
PPA expiry
7-7.5 m/s
Average wind speed
Equipment Supplier
Gamesa, Spain
Pawan Danavi (Pvt) Ltd
LVL ENERGY FUND PLC
Pawan Danavi Plant Factor
52%
7% 10%
38%
0%
10%
20%
30%
40%
50%
60%
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Plant Factor (Quarterly)
31,012
25,562 24,246 25,541 26,352 22,544
36%
30% 28%
30% 31%
26%
-
5,000
10,000
15,000
20,000
25,000
30,000
35,000
2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
0%
5%
10%
15%
20%
25%
30%
35%
40%
Plant Factor (Annual)
Plant Factor Generation (MWh)
LVL ENERGY FUND PLC
Pawan Danavi Profitability
Revenue (Mn) Profit (Mn)
784
651 619 654
689
596
416
341 342 341 360
263
0
100
200
300
400
500
600
700
800
900
2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
PROFITABILITY (ANNUAL)
294
40 61
222 209
(47) (17)
139
-50
0
50
100
150
200
250
300
350
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
PROFITABILITY (QUARTERLY)
LVL ENERGY FUND PLC
Nala Danavi
Location
Kalpitiya
Commissioned Date
June
2013
5.1 MW
Capacity
6 Turbines
Turbines
65 m
Hub Height
58 m
Rotor Diameter
7-7.5 m/s
Average wind speed
May 2033
PPA expiry Equipment Supplier
Gamesa, Spain
Nala Danavi (Pvt) Ltd
LVL ENERGY FUND PLC
Nala Danavi Plant Factor
53%
7%
13%
41%
0%
10%
20%
30%
40%
50%
60%
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Plant Factor (Quarterly)
10,457
13,660 13,104 13,838
14,991
11,977
30%
32% 31%
33%
36%
28%
-
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
0%
5%
10%
15%
20%
25%
30%
35%
40%
Plant Factor (Annual)
Plant Factor Generation (MWh)
LVL ENERGY FUND PLC
Nala Danavi Profitability
Revenue (Mn) Profit (Mn)
217
287 277
292
322
261
78
119 108
94
131
83
0
50
100
150
200
250
300
350
2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
PROFITABILITY (ANNUAL)
121
16 30
95
77
(27) (13)
50
-40
-20
0
20
40
60
80
100
120
140
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
PROFITABILITY (QUARTERLY)
LVL ENERGY FUND PLC
Rajshahi
Location
Rajshahi district Bangladesh
Commissioned Date
January 2014
Heavy
Furnace Oil
Main Fuel
Diesel
Backup Fuel
52.2 MW
Capacity
6 HFO / Gas based
Reciprocating
engines
Engines
Equipment Supplier
Wartsila, Finland
Raj Lanka Power Company Ltd
LVL ENERGY FUND PLC
Rajshahi Plant Factor
Plant Factor Generation (MWh)
66%
41%
63%
39%
0%
10%
20%
30%
40%
50%
60%
70%
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Plant Factor (Quarterly)
23,193
195,309
162,575
201,466
246,951 243,301
20%
43%
36%
44%
54% 53%
-
50,000
100,000
150,000
200,000
250,000
300,000
2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
0%
10%
20%
30%
40%
50%
60%
Plant Factor (Annual)
* First year of commercial operation.
*
LVL ENERGY FUND PLC
Rajshahi Profitability
Revenue (BDT Mn) Profit (BDT Mn)
847
641
860
577
(2)
75 31 35
-100
100
300
500
700
900
1100
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
PROFITABILITY (QUARTERLY)
536
3,369
2,928
2,655 2,720
2,980
37 93 124 124 101 181 0
500
1000
1500
2000
2500
3000
3500
4000
2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
PROFITABILITY (ANNUAL)
LVL ENERGY FUND PLC
Comilla
Location
Comilla district Bangladesh
Commissioned Date
January 2015
Heavy
Furnace Oil
Main Fuel
Diesel
Backup Fuel
52.2 MW
Capacity
6 HFO / Gas based
Reciprocating
engines
Engines
Equipment Supplier
Wartsila, Finland
Lakdhanavi Bangla Power Ltd
LVL ENERGY FUND PLC
Comilla Plant Factor
Plant Factor Generation (MWh)
16%
12%
3%
46%
0%
10%
20%
30%
40%
50%
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
Plant Factor (Quarterly)
32,463
152,489 146,466
92,847
54,889
28%
33% 32%
20%
12%
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
2014/15 2015/16 2016/17 2017/18 2018/19
0%
5%
10%
15%
20%
25%
30%
35%
40%
Plant Factor (Annual)
* First year of commercial operation.
*
LVL ENERGY FUND PLC
Comilla Profitability
Revenue (BDT Mn) Profit (BDT Mn)
361
314
207
659
90 79
60
116
0
100
200
300
400
500
600
700
Q2-Sep 2018 Q3-Dec 2018 Q4-Mar 2019 Q1-Jun 2019
PROFITABILITY (QUARTERLY)
551
2,600
2,062
1,440
1,217
23 76 232 268
316
-
500
1,000
1,500
2,000
2,500
3,000
2014/15 2015/16 2016/17 2017/18 2018/19
PROFITABILITY (ANNUAL)
Financial Indicators (as at Financial YTD 30th June 2019)
LVL ENERGY FUND PLC
Ownership
% Investment(Mn) Net Assets (Mn) Revenue (Mn) Profit (Mn)
HYDRO POWER
Belihul Oya SL 25% 120 219 5 68
Assupini Ella SL 100% Owned by Nividhu 159 23 10
Kadawala SL 58% 135 221 23 5
Neluwa SL 49% 59 271 21 9
Theberton SL 85% 143 159 9 (3)
Campion SL 84% 118 134 5 (11)
Bambarapana SL 40% 140 418 31 (3)
WIND POWER
Pawan Dhanavi SL 40% 424 1,464 223 139
Nala Dhanavi SL 49% 243 746 95 50
THERMAL POWER
Rajshahi BN 20% 387 1,726 (BDT) 577 (BDT) 35 (BDT)
Comilla BN 33% 653 1,686 (BDT) 659 (BDT) 120 (BDT)
Pupulaketiya Hydro Power (Pvt) Ltd
Location
Pupulaketiya.
Ratnapura
district
20 years
293 m
0.65 m3/s
1.4 MW
Capacity Gross Heads
Design Flow
Tenure of PPA
LVL ENERGY FUND PLC
Catchment Area
5 km2
Rainfall
3,320 mm
per year
• LKR 115 Mn of the IPO Proceeds was set
aside to fund for Pupulaketiya hydro
power project.
• At the time of the IPO, Pupulaketiya
plant was awaiting the extension of the
approval of Central Environmental
Authority (CEA) which had lapsed in
October 2016. Although we expected
such extension would be granted quickly,
it has not been the case.
• The LKR 115 million identified for
investment in the project remained
invested in fixed income securities.
Makari Gad Hydropower (Pvt) Ltd
Location
Darchula
district, Nepal
30 years
69.8 GWh
924 m
1.35 m3/s
December 2020
10 MW
Capacity Gross Head
Design Flow Energy Generation
Tenure of PPA Project
Commencement
LVL ENERGY FUND PLC
LKR Mn
Equity (30%)
LTL Holding (Pvt) Limited 687
LVL Energy Fund 465
Total Equity 1,152
Debt (70%) 2,700
Total Project Cost 3,852
• In January 2019 LVL Energy Fund
made its first equity disbursements of
LKR 117.0 Mn in respect of Makari
Gad.
• Further disbursements aggregating to
LKR 292.5 Mn was carried out in June
and July 2019.
• Thereby LKR 409.5 Mn out of the LKR
465.0 Mn earmarked for this project
has been disbursed.
Heavy Fuel Oil
based power plant Feni, Bangladesh
October 2019
114 MW capacity can be increased up to
120 MW • One Wartsila 20V32 Engine 9.8 MW
• Six Wartsila 18V50 Engine 18.4 MW
15 years
Project
Commencement Tenure of PPA
Capacity
Location Project
Feni Lanka Power Limited
• Feni Lanka Power Limited (FLPL) is an
investment of Lanka Energy International
(Private) Limited (LEI), a fully owned
subsidiary of LVL Energy Fund (PLC).
• In May 2019 LVL Energy Fund PLC made an
investments of USD 8.0 million to FLPL.
LVL ENERGY FUND PLC
LVL ENERGY FUND PLC
6 New Solar Power Projects
Project Partner
Total
capacity
of 6MW Capacity
First Energy SL (Pvt) Ltd
Project cost
Approx.
Rs. 1 Bn
Location
• 3MW Plant Maho
• 2MW Plant Pallekale
• 1MW Plant Mathugama
Project Implementation and
start up
Tenure of PPA
20 years for
each plant
6 months for approval.
6 months for construction.