44
Engineering Safety & Productivity Luxicon Pro Trainin g Guid e

Luxicon Pro Training Guide_RD

Embed Size (px)

Citation preview

Page 1: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 1/44

Engineering Safety & Productivity 

Luxicon Pro Training Guide

Page 2: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 2/44

TABLE OF CONTENTS

Welcome to Luxicon Pro ........................................................................................................................................................3

Getting Started .......................................................................................................................................................................4

Simple Interior Lighting Project ..............................................................................................................................................6

Advanced Interior Lighting Project .......................................................................................................................................12

mport and Export of DWG and DXF Files ...........................................................................................................................27

nterior Lighting Project with Emergency Lighting................................................................................................................32

Page 3: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 3/44

The Software Standard for Calculating Lighting Layouts

Welcome to Luxicon Pro

This lighting software package is powered by DIALux. This CD-ROM includes the software, the Plugin for all Cooper Cro

Hinds lighting products and a PDF of the complete training guide.

The Cooper Crouse-Hinds Plugin includes the complete photometric database of Cooper Crouse-Hinds, CEAG and Paulu

 brands of lighting products which will allow you to quickly create effective lighting designs, produce point by point footca

or lux calculations and create realistic visualizations.

Overview of Features: Visualization.

Planning with LED luminaires and other colored light sources, color filters and colored materials

Interactive 3D visualization allows you to wander around the room

Film the camera run through the photorealistic visualization of your planning and send film by email

Realistic textures 

Integrated ray tracing module for photorealistic presentation

Using the software.

Simple light planning step by step examples

 Assistants help on request with the planning of indoor and street lighting

Drag and drop for simple insertion of furniture, surfaces (textures) and luminaires into the room

 Automatic positioning of the right number of luminaires on the walls and in the room

Intelligent building components always place the wall lights correctly on the wall and the computer on the tableWith one click  luminaires are aligned to the illumination point

Step by step guides help with special questions on light planning

Functional highlights.

The latest calculation methods now even faster and always accurate

Integration of 3DS objects in the light planning

Import and export of DWG and DXF files which can be read in and exported with the results after light planning is compl

  (without additional software)

False colors supply quantitative analyses in complex geometries at a glance

Emergency lighting according to EN1838; positioning of the correct number of luminaires

Installation from CD:To install the software using the CD, insert disc and a welcome screen will automatically open. Follow the on-screen

prompts to Install.

If an installation screen does not appear, use Windows Explorer to navigate to the CD-ROM drive and double click on

Luxicon-PRO-Setup.exe to start program installation.

NOTE: If you have already installed the DIALux program on your PC, you only need to install the Cooper Crouse-Hinds

Plugin. The Cooper Crouse-Hinds Plugin will work with the standard DIALux lighting software program.

To install the Plugin (photometric data) for Cooper Crouse-Hinds products, use Windows Explorer to navigate to the

CD-ROM drive and double click on CCH-PlugIn.exe. Follow the on-screen instructions to complete installation.

Page 4: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 4/44

This section will cover some of the basic setup elements of the Luxicon Pro program.

Install Luminaire DataThe Luxicon Pro CD-ROM contains luminaire data (called a Plugin) for all Cooper Crouse-Hinds products.

 After you install the DIALux program, you need to install the complete luminaire database tree for the Cooper

Crouse-Hinds Plugin by clicking on the Luminaire tab and then double clicking on the Cooper Crouse-Hinds logo

on the left side of your screen. The program will then load the complete Cooper Crouse-Hinds database into your

project (see Figure 1).

Figure 1.

Online Update of Luminaire CatalogsYou can update the list of Plugins easily online without the need to install the latest version of Luxicon Pro. To

proceed with an online update, click Luminaire Selection under the Project Manager and select either Luminaire

Catalogs or Not Installed Catalogs. Next, select Refresh List from the opening context menu. Luxicon Pro will ask

if you agree to connect with the Internet (see Figure 2).

Lamp PluginsLuxicon Pro includes a lamp Plugin interface. After selecting a luminaire from the luminaire catalog, you can select

the alternate lamps as required. Luminaire Plugins only offer standard equipment data for the luminaires. The

numerous variations of the same lamp type make it necessary to select the exact lamp type which will be used in the

installation.

Some of the luminaire Plugins offer the option to select the correct lamps from a lamp Plugin for the desired

luminaire. If this feature is not integrated into the luminaire Plugin, the lamp Plugin can be started directly from

Luxicon Pro. Lamp Plugins have to be installed by the user much like the luminaire Plugins.

Getting Started

Page 5: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 5/44

Figure 2.

Configuration SettingsYou will want to set Luxicon Pro first to your needs.

1. Start the program and close the welcome window that first appears. Click on File -> Settings -> General Options.

2. Select the Global Tab. Under the Units section, you have the option to select the Metric or Imperial system by using

drop down menu. Next to Lighting, you can set Luxicon Pro to measure light in lux or footcandles.3. Explore the other default settings. Click on the Contact tab and enter in your Name, Company Name, Phone Numbe

etc. This information will be saved and will appear on the lighting analysis reports automatically for you. Click OK  w

finished (see Figure 3).

Figure 3.

Page 6: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 6/44

Simple Interior Lighting ProjectThis project will guide you through the steps to set up a quick Interior Lighting Layout. With the help of this wizard it is

possible to complete lighting designs quickly and simply. You will also be able to run full lighting calculations in either lux or

ootcandles (depending on your configuration settings) and produce professional quality reports. Finally, you can export your

project to the Luxicon Pro program for further analysis or modifications.

Double click on the DIALux Light icon on your desktop (or click on Start -> All Programs -> DIALux -> DIALux Light. After

tarting, you are welcomed by a startup window (see Figure 1). To move to the next window click on Next.

Figure 1.

Step 1. Enter Project Information

n the Project Information Window (see Figure 2), you can enter the data about the project and about your client. This

nformation will appear later in your printout reports.

 A. In this example, enter the following data:

Project:  XYZ Warehouse Lighting

Room:  Chemical Drum Storage Room

Project Description:  Acme Chemical Co.

B. On the right side of this window, you should already see the name, company name, etc. that you entered

during the Configuration of DIALux program (see page 5 for additional information). You can change any of this

data as necessary.

C. You can add your company logo to your report. Click the Select Image button and locate a BMP or JPG

image file to insert into your report.

D. Click the Next button when finished.

Page 7: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 7/44

Figure 2.

Step 2. Enter Room Dimensions and Reflectance Values

The next window is for Data Input (see Figure 3) where you specify the room geometry on the left hand side. By def

Luxicon Pro produces a rectangular room. If you check the box Use L-Shaped Room, Luxicon Pro shows an L-shap

room. You can also change the reflectance values used for the ceiling, walls and floor as necessary.

For this project, we will create an L-Shaped Room

  A. Place a check in the box next to Use L-Shaped Room

  B. Enter the following data:

  Length (a):  20.00m

  Width (b): 15.00m

  Height: 4.00m

  (c): 10.00m

  (d): 40.00m

  C. For Reflectance Factors, Light Loss Factors, and Work Plane enter the following data:

  Ceiling:  50%

  Walls:  50%

  Ground:  20%

  Light Loss Factor: 0.77

  Work Plane Height: 0.5m

  Wall Zone: 0.5m

  D. On the right side of this window, click on the Catalogs button to open up the luminaire database. Once

the Cooper Crouse-Hinds database window loads (see Figure 3), you should see the name, company name,

that you entered during the configuration of Luxicon Pro (see page 5 for additional information). You can chan

any of this data as necessary.

Page 8: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 8/44

E. You can add your company logo to your report. Click on the Select Image button and locate a BMP or JPG

image file to insert into your report.

F. Click Next when finished.

Figure 3.

Step 3. Choose Luminaires

A. On the right side of this window, click on the Catalogs button to open up the luminaire database. Once the

Cooper Crouse-Hinds Database window loads (see Figure 4), select the eLLK92036-36 and then click on the Add

Selected Products to DIALux icon.

B. Close the Cooper Crouse-Hinds window when finished.

Figure 4.

Page 9: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 9/44

Step 4. Calculation and Results

In the Calculation and Results window, Luxicon Pro calculates the number of luminaires by the efficiency method you n

to achieve the desired illuminance.

 A. Under calculation parameters, enter 300 lux next to Planned Em. On the right side of the screen, you will see

Plan View of the recommended layout from Luxicon Pro.

  B. To rotate the luminaires position, change the arrangement parameters to 0.

  C. By default, the luminaires will mount directly to the ceiling. For this project, the client wants to suspend

the lights just off the ceiling. Use the drop down menu to change the Luminaire Mounting to User Defined and

enter a suspension height of 0.20m.

  D. Notice that some of the luminaires are outside the room. The program does not consider these luminaires

in the calculations (these are only shown for reference purposes). By using the entry Horizontal arrangement or

 Vertical arrangement you can change the distances of the luminaires to each other as well as the wall as necessa

  E. Click the Calculate icon and the program will start the point by point calculations (see Figure 5).

Figure 5.

  F. Once the calculations are finished, the Light Wizard will display the results in a figure of isolux lines and a table

of lux (or footcandle) values for the work plane (see Figure 6).

Page 10: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 10/440

Figure 6.

G. Click Next to continue to Step 5.

Step 5. Print Report and Export to DIALux

n the Result Output window you have the option to print the results or save them in electronic format as a PDF file.

By using the check boxes next to the printout symbols you can control which outputs are actually printed out. By default

all outputs are checked. If you would like to provide only a short overview, check the box only for the Summary page ( seeFigure 7). If you would like to present the results to your client, you may wish to activate all outputs.

A. Click on the Save as DIALux Project button to save your project for further analysis. Note the location of

this file. Luxicon Pro will always name projects with a .dlx file extension. We will open this same project in the full

Luxicon Pro program next.

B. Click Next and then click Finish to close the program.

Figure 7. Results Output Window 

Page 11: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 11/44

Figure 8. Sample Project Summary Page

Page 12: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 12/442

Advanced Interior Lighting ProjectThis project will build upon the XYZ Warehouse completed in Project #1. You will learn how to add objects, move luminaires

round and add additional calculation grids.

Double click on the DIALux icon on your desktop - or click Start -> All Programs -> DIALux. You will be welcomed by a

tartup window (see Figure 1).

Figure 1. DIALux Start Menu

PART I. Exploring The Program

The User Interface:

t will be helpful to take a few minutes to become familiar with the main screen. The user interface is divided into three main

ections (see Figure 2):

1. CAD window2. Project Manager with Inspector

3. The Guide

Page 13: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 13/44

Figure 2.

The right mouse button is very important. Depending on the selected object, the program mode and the working are

different important options can be accessed.

The CAD Window (Center Section of Screen)

The sample project shown here opens up with a Plan View (shown in Figure 2). You can also switch views and review

Ground Plan View, Side and Front View. The CAD window is used for the interactive lighting design. With the mouse,

can graphically rotate, zoom, move, and roam the room, the street or the exterior scene.

In the secondary tool bar are some icons that help you navigate views:

• The arrow pointer allows you to select objects, luminaires, walls, etc. in your CAD view; this makes it

possible to add, delete, or change as necessary

• The magnifying glass allows you to zoom in and out of the CAD view

• The double arrow allows you to rotate the view

• The hand allows you to move the entire view around

• The footsteps allow you to zoom in and out

Page 14: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 14/444

The arrow pointer (selection tool) is powerful. It allows you to move, scale, rotate or select objects or features of the project

Right click to access a context menu.

n the primary toolbar, you should see 5 icons that allow you to change/add CAD views. Hover your mouse over each icon to

ee what each one will do. You have a choice of 3D view, CAD (Plan) view, front, side, and raytrace views. You can change

o another view via the tabs at the top of the screen.

Project Manager (Left Side of Screen)

The Project Manager enables a fast workflow with the elements used in your lighting design. Each individual element can be

elected and its properties can be viewed and modified. In this example, the Project Manager allows you to expand each

ection to show luminaires used, rooms, walls, luminaire arrangement, objects, etc.

Luxicon Pro organizes the global project information such as the name and address of the operator and the customer, as wel

s all rooms, exterior scenes, streets and luminaires. In the Luminaires Used section you can access a list of all luminaires

hat are being used in the project.

 A. The room consists of the following sub-objects: room defining surfaces (floor, ceiling, walls), work plane, furniture

and luminaire arrangements

B. An exterior scene consists of the sub-objects: ground element, furniture and luminaire arrangements

C. A street consists of the sub-objects: street elements (roadways and lanes, parking lanes, sidewalk, grass strip,

bicycle lane and emergency lane) and the luminaire arrangement

f you select one of these elements (left click), its properties are displayed. A right click opens the context menu for that

object, just as it does in the CAD view.

Along the bottom left side, you will see several tabs (also called “trees”) that allow you to focus on one section of your

project.

There are separate tabs that cover Project, Objects, Colors, Luminaire Selection, and Output. Try left clicking on each of

hese to see how the Project Manager Menu will change. Each will be explained next:

Luminaire Selection

Click on the Luminaire Selection tab. This will display the current luminaires available (see Figure 3). The display at the

bottom shows the current luminaires used for this project. To add additional luminaires to the project, you can double click

on the Cooper Crouse-Hinds icon to open up the photometric database (see Figure 4).

Page 15: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 15/44

Figure 3.

Figure 4.

Page 16: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 16/446

My Database

You can build your own database of luminaires and also import IES or LDT (Eulumdat) files into Luxicon Pro.

1. Click on the Luminaire Selection tab under Project Manager.

2. Double click on My Database under Project Manger (see Figure 5).

Figure 5.

3. A new window will open that will also allow you to build your own database (see Figure 6). You can also click on

the Import button to import external IES files into your project.

Figure 6.

Page 17: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 17/44

Importing IES Files

1. When the Import window opens, click Import to search for the file you want to import. Use the drop down

menu to change to All Files (see Figure 7).

2. Right click and select Import into DIALux Project. Or you can import into your database for use later (see

Figure 6). Luxicon Pro will add the luminaire to your project and close the two windows when finished. You may

be asked to insert a luminaire size and light emitting surface. (Reason: Some older IES files are missing this

information).

Figure 7.

When the program is running in the background, you can search any desired directories for luminaire data and insert them

into the current project (see Figure 8). You can also insert them into your own database by right clicking on the file. Luxic

Pro supports the following formats:

 

• Eulumdat (ldt) • CIBSE TM14

  • IES (all variations) • LTLi

Figure 8.

Page 18: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 18/448

Lamp Plugins

After selecting a luminaire, you have the option to install a Lamp Plugin database to find alternate lamps that fit into

he luminaire. The lamp Plugin provides all the technical and marketing data needed, including photometric files and

maintenance factors.

f a luminaire Plugin is not yet prepared, the lamp Plugin selection can be started within Luxicon Pro instead. In the Technical

Data section of the Property page, there is a button with three dots beside the lamp type drop down list. Clicking on this

button opens a selection list of all installed lamp Plugins. A Plugin has to be selected to find the correct equipment according

o the requirements of the lighting layout and the fittings.

The Object Tree

This tab provides options to insert objects into your project such as windows, doors, furniture, and other room elements.

This section also allows you to add calculation grids to your project using a simple “drag and drop” method with your mouse

see Figure 9).

Click on the + sign to open up each section to explore all the different options you have.

The Colors Tree

You can use the Colors tree (see Figure 10) to modify the properties of surfaces via drag and drop - similar to inserting

urniture into a room. In the Textures tree you find predefined textures (surface pictures), RAL colors and the option to

organize your own textures. You can move and copy textures from one folder/directory to another. Also, you can create new

olders and delete existing ones. All this is available by right clicking on the texture or the folder.

Figure 9. Object Tree Figure 10. Colors Tree

Page 19: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 19/44

The Output Tree

This section allows you to create your own custom reports and include only the data you need to present to your client.

can open it by clicking on the Output Configuration tab in the Project Manager or by selecting the icon in The Guide.

Some default pages are already selected for you (with a green check mark). Some of the output types which are not

highlighted can only be obtained after the calculation has been completed (see Figure 11).

The Guide (Right Side of Screen)The Guide section includes some common shortcut icons to assist with your project planning. It provides a connecting

thread and helps you achieve your aims quickly (see Figure 12).

  Figure 11. Output Tree Figure 12. The Guide

Page 20: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 20/440

Edit Mode

When certain options are used, the program switches to an Edit mode. For example, this happens in the following situations:

1. Free input of a new room

2. Changing room dimensions at a later stage

3. Editing a ground element in an exterior scene

4. Editing a calculation surface

5. Editing an extrusion volume

To switch to the Edit mode, go to the Project Manager, select the object you want to edit and right click to Edit Room

Geometry , Edit Ground Element or Edit Calculation Surface. Alternatively, you can select the options from the Edit menu.

A third way is to click on Edit Room Geometry  in The Guide. It is advisable to modify the room geometry in the ground plan

iew.

PART II. Continuation of Project – XYZ Warehouse

Step 1. Open Project

Click on the Open Project icon, and navigate to where you saved the “XYZ Warehouse Project” and click Open to load the

project. Luxicon Pro will load all the information about the project for you (see Figure 13).

Figure 13.

Step 2. Add Objects to the Project

 A. Open the project (if not already done).

Page 21: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 21/44

  B. Under Project Manager, click the Floor Plan icon:

C. Click on the Objects tab to open up the tree. Click and Drag the Vertical Cylinder over to the Plan View and d

it in place. We will edit the column properties next (see Figure 14).

 

D. Notice under Project Manager, you have several tabs available now to edit the column you just added to your

project:

  1. Name (default is “Vertical Cylinder”)  2. Geometry – position, size, and rotation

Figure 14.

  E. Click on the Room-3D view to see how you can change the object properties. Change the size of the cylinder

  (L) Length: 1.50m  (B) Width:  1.50m

  (H) Height:  2.50m

  F. Notice that the cylinder is now floating above the floor. To place it back on the floor, change the position of the

cylinder to 1.25m (which is always equal to half the height of the object).

You can also change the objects’ location/properties in the Room View. Once an object has been inserted into a room, it

context menu can also be accessed with a right click (see Figure 15). The red rotation point enables a rotation around the

axis. Likewise, the blue and green rotation points enable rotations around the blue and green axis respectively. Please k

in mind that the object has its own coordinate system. The object can be moved by clicking and pulling on the arrow cro

Page 22: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 22/442

Figure 15.

G. Try it out. Click the Room Floor Plan tab, then click on the center of the cylinder and drag it to another part

of the room. Notice that the position coordinates will change to reflect your movement of the cylinder.

H. You can also copy the cylinders using the right click tool. Move your mouse over the center of the cylinder and

then right click to open the Tools menu and then left click Copy . Next, move your mouse to another part of the

room and right click again to open the menu. Left click Paste to add an identical cylinder to your project.

Experiment with this by copying a few more objects to your project.

Step 3. Add A Calculation Grid

 A. Under the Objects tree, click on the Calculation Grid icon. Then click and drag a Calculation Grid over to the

Plan View (see Figure 16).

Figure 16.

Page 23: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 23/44

 

B. Click and stretch the grid so that it covers the entire room (for now, the grid will extend beyond the exact outlinof the room (see Figure 17). Steps to resize the grid will be addressed later in the Training Guide.

Figure 17.

  C. Under Project Manager, you should check and edit the properties of the grid you created including Position,

Number of Points and Height of Grid Above Floor. Click on the Geometry  tab to show this information. For tproject, we want to show lux (or footcandle) levels on the floor, so be sure the Z value is set to “0” (see Figure 18)

Figure 18.

Page 24: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 24/444

D. Under Project Manager, click on the Calculation Grid tab and then click on the radio button to change from

 Automatic to Manual. Change the number of Calculation Points to:

x: 20

 y: 20

This adds more points to the grid (see Figure 19).

E. Notice that some of the points are outside the room. These need to be removed. Reposition the grid to conform

to the room by following this procedure:

1. Move your mouse over one of the points on the grid and then right click once to open the dialog menu

(NOTE: the grid points will turn from blue to red in color if you do this correctly). Left click on Convert for

Editing so that you can enter into the Edit mode (see Figure 19).

Figure 19.

2. Move your mouse over one of the grid points a 2nd time and then right click once to open the dialog menu. Left click on Edit Grid Points (see Figure 20).

 Figure 20.

Page 25: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 25/44

3. When you are in Edit mode, select the grid points you want to edit/move/delete. Select them individu

or mark several of them by drawing a frame around them. Right click once and then left click and selDelete to remove the points (see Figure 21).

Figure 21.

  F. Next, click on the Display  tab. Place a check mark in the box next to Display Values. The program will now

display the estimated lux values for all points on the grid (see Figure 22).

Figure 22.

  G. Change the Light Loss Factor: This is a factor to derate the light output based on lamp lumen loss due to

aging and dirt depreciation. Together these are usually called Light Loss Factor (LLF). Click on the Room Eleme

icon. Then click on Plan View to highlight the room. On the left side under Project Manager, several tabs will op

to allow you to make changes to the room. Click on the Maintenance Plan Method tab. The default is 0.77 for

LLF. Change this to 0.70 and hit Enter on your keyboard.

Page 26: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 26/446

H. Change Room Surfaces: Click on the Room Surfaces tab under Project Manager. The current reflectance

values for the ceiling, walls and floor are shown and also colors of the walls (shades of gray). Here you can changethese percentages and also change the colors of the ceiling walls and floor as necessary.

Step 4. Run Calculations and View Results

 A. Under the main menu, click on Output and Start Calculations. When the Calculation window opens, make sure

to place a check in the box next to Include Luminaires in Calculations and then click OK  (see Figure 23). Luxicon

Pro will start to run point by point calculations for your grid(s). This may take a few minutes depending on the

complexity of your project.

Figure 23.

B. View and Print Output:  Under Project Manager, click the Output tab. Here you have many options on the

type of reports to send to the client. In this example, place a check in the boxes next to: Project Cover, Summary ,

Input Protocol, Luminaires (coordinates list). Open the Calculation Grid 1 folder and place a check in the box next

to Value Chart (E, Perpendicular) (see Figure 24).

  Figure 24.

C. Select File -> Print Preview to see all the pages of the report you have generated. Save a PDF or print a hard

copy of your report as necessary and save your project.

Page 27: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 27/44

Import and Export of DWG and DXF FilesThis section reviews an example of steps required to import DWG and DXF drawings and use them for your work. After y

finished your planning you can export the room geometry, room elements, luminaires and furniture into your CAD drawing

DWG and DXF Import

First you must create an empty rectangular room, or if you work on an exterior scene, create that before you import the C

drawing.

Figure 1. DIALux CAD Import Wizard 

Example #1. Interior Lighting Project

Start the program, and click on the New Interior Project icon from the Welcome menu. (Hint: It is helpful to know the

 approximate size of the area represented in the CAD drawings before you import in the next step). In this example, the C

drawing is for a room that measures 11 ft. x 21 ft. x 9 ft. high.

  A. Under Project Manager, select Room Editor. Change the default values for the room to the following and click

when finished.

 

Length = 11 ft.

  Width =  21 ft.

  Height = 9 ft.

Hint: In the Plan View, you may have to zoom out to see the entire room and then reposition by holding down the scroll

wheel on your mouse and dragging the room around your screen (see Figure 2).

Page 28: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 28/448

Figure 2.

B. From the main drop down menu, click on File -> Import -> DWG or DXF. The CAD Import Wizard window will

open (see Figure 3).

Figure 3.

C. Click Next to continue and then select Browse to navigate to the Luxicon Pro CD-ROM and locate the sample

 AutoCAD file (LightingCalc.dwg). Click Open -> Next. The CAD drawing and measurement units for the drawing wil

be displayed. Click Next to accept.

Page 29: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 29/44

Figure 4.

  D. This sample drawing was set up to measure distance in inches. Use the drop down menu to change the Unit

File to inch. Click Next to accept and click Next again to import the drawing.

  E. Click Next to finish and import the CAD drawing into the Plan View.

  F. Reset Origin Point. To move the room onto a certain point of the DWG/DXF ground plan, right click on the

desired point of the CAD view and use option Set DWG or DXF Origin Here.

  G. After you have moved one corner of the room to the origin of the DWG/DXF drawing, you can adjust the room

geometry if necessary. The easiest way is to drag the corners of your room after selecting Edit Room Geometry

from The Guide. Click OK  when finished.

  H. Add luminaires to your project. Click on the Luminaire Selection tab. Double click on the Cooper Crouse-H

Catalog to load the luminaire database. Search for the following model: eLLK92058-58. Click once to highlight

then select Add Selected Product to DIALux Project. Close the Cooper Crouse-Hinds Catalog when finished.

  I. The CAD drawing shows that the client is planning an arrangement of two rows of six lights and has asked for

lighting calculations at 2.5 ft. above the floor based on this layout. Under The Guide, select Insert Luminaire Fie

(see Figure 5).

 

Page 30: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 30/440

Figure 5.

J. Under the Mounting tab, change the rows to 3 and luminaires per row to 2. Click Insert when finished. Notice

that the luminaire array does not line up with the arrangement shown on the CAD drawing. To correct this, click once

on the field arrangement shown in Plan View. Under Project Manager, click on the Position tab and change the

Start Point and Distance as follows (see Figure 6).

Start Point: X: 3.5 ft. Y: 3.5 ft.

Distance: X: 4.0 ft. Y: 7.0 ft.

Figure 6.

K.  Add a Calculation Grid. Follow the same steps outlined in the previous section starting on Pages 22-26 to add

a Calculation Grid to this project.

L. Export to CAD. After calculations are completed, you can export your plan to DWG or DXF format. From

the main drop down menu, select File -> Export -> Save DWG or DXF file. The DWG and DXF Export window

will open. Here you have the option to select what information to export and also you can name the DWG file as

necessary (see Figure 7).

Page 31: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 31/44

Figure 7.

  M. The calculations are now in a separate drawing. To view the results, in AutoCAD, open the original CAD draw

Select Insert -> Insert Block.  Browse for the new DWG file that was exported. NOTE: You may have to set

 AutoCAD to show all layers to see the footcandle readings in Plan View (see Figure 8).

Figure 8.

Page 32: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 32/442

nterior Lighting Project with Emergency LightingThis project will guide you through the steps to set up a quick Interior Lighting Layout application with optional Emergency

Lighting. Double click on the DIALux icon on your desktop (or click Start -> All Programs -> DIALux ). After starting

DIALux you are welcomed by a startup window (see Figure 1). Click on New Interior Project icon to open.

Figure 1.

Step 1. Create A Room

On the left side under Project Manager, the program inserts some default room dimensions (see Figure 2).

 A. In this project, enter the following data and click OK  when finished:

 X =  20m

 Y =  10m

Z =  3.5m

In the Room 1 Floor Plan View, you may have to click on this once and then zoom out (with your wheel mouse) to

see the whole room in Plan View.

B. Under the General tab, rename this from Room 1 to Chemical Storage Room. Under the Maintenance Plan

Method tab, change the LLF (Light Loss factor) to 0.72. Under the Room Surfaces tab, change the Ceiling

Reflectance to 50%.

Page 33: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 33/44

Figure 2.

Step 2. Add Luminaires

There are several methods that can be used to add a luminaire to your project. In this example, we are using a Cooper

Crouse-Hinds NFL4232 (2 x32W T8) linear fluorescent light fitting. Alternately, you can search recently used luminaires u

the Luminaire Section drop down menu and selecting Previous Luminaires Used ( see Figure 3).

Figure 3.

 

Page 34: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 34/444

A. In this example, we will use the NFL4232. By left clicking on this once, it will highlight it in blue and add this

luminaire to your project.

B. In the Room 1 Floor Plan, right click once and then left click on Insert Luminaires -> Field Arrangement. Notice

that under Project Manager, the menu will now look like Figure 4.

C. Under the Mounting tab, change target lux level to 300 under Rough Calculation and click on the Suggestion

button. Luxicon Pro will automatically make a suggestion as to the arrangement and spacing of luminaires for you.

Figure 4.

D. Under the Arrangement tab, Individual Luminaire section, change the Z value from 90 to 0 (see figure 5). This

will reorient the luminaire field parallel to the long side of the room. Click Insert when finished.

Page 35: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 35/44

Figure 5.

In the Plan View, you should now see the room and luminaire layout (see Figure 6).

Figure 6.

Page 36: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 36/446

Step 3. Add Calculation Grid

A. Under Project Manager, click on the Objects tab (along the bottom of your screen) and select Calculation Grid to

open the menu.

B. In the Preview section, you will see three choices for grids. Click and drag the Calculation Grid over into the Plan

View of the room (see Figure 7).

Figure 7.

C. Left click to resize the grid so it covers the extent of the room (see Figure 8).

Figure 8. Calculation Grid Resized 

Page 37: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 37/44

  D. Under Project Manager, click on the Calculation Grid tab. The default is to have this grid with an Automatic

Number of Points. You can change the number of points or the distance between points (if necessary). For now

we will leave the grid as is.

 

E. Under the Display  tab, place a check mark in the box next to Display Values. The program will now show yo

the expected lux readings for all points on the grid (see Figure 9).

Figure 9.

Step 4. Run Calculations 

 A. In the upper right menu, click on the Start Calculation icon (see Figure 10).

Figure 10.

 

Page 38: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 38/448

B. Alternately, under The Guide, you can click on Start Calculations (see Figure 11). A new window will open.

Figure 11.

C. Place checks in all the boxes and click OK . The program will now compute point by point lux calculations. When

finished, you should see a 3D visualization of the room with all the lights on (see Figure 12).

Figure 12.

Page 39: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 39/44

Step 5. Print Output

   A. Click on the Output tab and click on the + sign next to Project 1 to display all the possible output reports you

can print. In this example, open up Room Surfaces -> Calculation Grids and place a check in the boxes next t

Summary , Value Chart, and Table (see Figure 13).

  Figure 13.

  B. Select File -> Print and click OK . You should now see a display of all the pages on your report.

Step 6. Create Emergency (Anti-Panic) Light Scene

   A. Click on Room 1 Floor Plan View. Currently, all the luminaires in the room are part of one large array. First, yo

will need to split up the array so that you can modify individual luminaires to be used for emergency lighting

purposes.

Page 40: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 40/440

B. Under Project Manager, click on the Project tab. Right click on the words Field Arrangement. Once you do this

the program will change the color of all luminaires in Plan View to red. Left click on Split. Click Yes when asked ifOK to proceed. All lights are now separate entities and can be modified individually. Under The Guide, open up the

Emergency Lighting section (see Figure 14).

Figure 14.

C. Under Project Manager, you can now edit each luminaire that will be used for emergency lighting. Click on one

of the luminaires. In the emergency lighting tab, place a check next to the box Use for Emergency Lighting. Try

repeating this for several luminaires in the room.

D. Under Project Manager, select Light Emergency Light Scene and rerun calculations again. Review output as

before. You should see calculations for this emergency light scene only (see Figure 15).

Page 41: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 41/44

Figure 15.

  E. To view which luminaires you selected for emergency lighting, click on View -> Display Light Scene Dimming

 Values in CAD (see Figure 16).

Figure 16.

Page 42: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 42/442

Candela - The International System (SI) unit of luminous intensity. One candela is one lumen per steradian.

Candlepower - Luminous intensity expressed in candelas.

Candlepower Distribution Curve - A curve, generally polar, which represents the luminous intensity of a lamp or luminaire

at measured horizontal and vertical angles.

Cavity Ratio - A number indicating cavity proportions from length, width and height. This value used in the coefficient of

utilization calculation for a given luminaire in a space with specified room reflectance and dimensions.

Coefficient of Utilization (CU) - The ratio of the luminous flux (lumens) from a luminaire calculated as received on the work-

plane to the luminous flux emitted by the luminaire’s lamps alone.

Footcandle (fc) - A unit of illuminance when the foot is taken as the unit of length. It is the illuminance on a surface of one

square foot in area on which there is a uniformly distributed flux of one lumen, or the illuminance produced on a

surface all points of which are at a distance of one foot from a directionally uniform point source of one candela.General Lighting - Lighting designed to provide a substantially uniform level of illumination throughout an area, exclusive of

any provision for special local requirements.

Glare - The sensation produced by luminance within the visual field that is sufficiently greater than the luminance to which

the eyes are adapted to cause annoyance, discomfort, or loss in visual performance and visibility.

High Intensity Discharge Lamp - An electric discharge lamp, including groups of lamps known as mercury, metal halide

and high pressure sodium.

luminance - The density of the luminous flux incident on a surface; it is the quotient of the luminous flux by the area of the

surface when the latter is uniformly il luminated.

sofootcandle line - A line plotted on any appropriate set of coordinates to show all points on a surface where the

illuminance is the same. A series of such lines for various illuminance values is called an isofootcandle diagram.

Light Loss Factor - A factor used in calculating illuminances after a given period of time and under specified conditions.

It takes into account the dirt accumulation on luminaires and room surfaces, lamp depreciation, maintenance

procedures and atmosphere conditions.Lumen (lm) - International System (SI) unit of luminous flux. Radiometrically, it is determined from the radiant power.

Photometrically, it is the luminous flux emitted within a unit of solid angle (one steradian) by a point source having a

uniform luminous intensity of one candela.

Lumen Method - A lighting design procedure used for predetermining the relation between the number and types of lamps

or luminaires, the room characteristics, and the average illuminance on the workplane. It takes into account both

direct and reflected lux.

Luminaire - A complete lighting unit consisting of a lamp or lamps together with the parts designed to distribute the light, to

position and protect the lamps and to connect the lamp to the power supply.

Luminaire Dirt Depreciation Factor - The multiplier to be used in illuminance calculations to relate the initial illuminance

provided by a clean, new luminaire to the reduced illuminance due to dirt collection.

Luminaire Efficiency  - The ratio of luminous flux (lumens) emitted by a luminaire to that emitted by the lamp or lamps used

therein.

Lux (lx) - The International System unit of illuminance. One lux is one lumen per square meter.Photometry  - The measurement of quantities associated with light.

Point Method - A lighting design procedure for predetermining the illuminance at various locations in lighting installations,

by use of luminaire photometric data.

Task Lighting - Lighting directed to a specific surface or area that provides illumination for visual tasks.

Visual Comfort Probability (VCP) - A metric which assesses the impact of glare from direct luminaires on the visual comfort

of the occupants of a lighted space.

Visual Task - Conventionally designates those details and objects that must be seen for the performance of a given activity,

and includes the immediate background of the details or objects.

Workplane - The plane at which work usually is performed, and on which work usually is performed, and on which the

illuminance is specified and measured.

GLOSSARY OF TERMS

Page 43: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 43/44

Page 44: Luxicon Pro Training Guide_RD

8/20/2019 Luxicon Pro Training Guide_RD

http://slidepdf.com/reader/full/luxicon-pro-training-guiderd 44/44

Your Authorized Cooper Crouse-Hinds Distributor is:

U.S. (Global Headquarters):Cooper Crouse-Hinds

Wolf & Seventh North Streets

Syracuse, NY 13221

(866) 764-5454

FAX: (315) 477-5179

FAX Orders Only: (866) 653-0640

[email protected]

Europe (Germany):Cooper Crouse-Hinds GmbH

49 (0) 6271 806-500

49 (0) 6271 806-476

[email protected]

China:Cooper Crouse-Hinds Pte. Ltd.

86-21-2899-3600

FAX: 86-21-2899-4055

[email protected]

Canada:Cooper Crouse-Hinds CanadaToll Free: 800-265-0502FAX: (800) 263-9504

FAX Orders Only: (866) 653-0645

Middle East (Dubai):Cooper Crouse-Hinds LLC971 4 4272500FAX: 971 4 4298521

[email protected]

Korea:Cooper Crouse-Hinds Korea82 2 538 342582 2 538 [email protected]

Mexico/Latin America/Caribbean:Cooper Crouse-Hinds, S.A. de C.V.52-555-804-4000FAX: 52-555-804-4020

[email protected]

Singapore:Cooper Crouse-Hinds Pte. Ltd.65-6297-4849FAX: [email protected]

 Austra lia:Cooper Electrical Australia61-2-8787-2777FAX: [email protected]

www.crouse-hinds.com

Cooper Crouse-Hinds is a registered

trademark of Cooper Industries, Ltd.

©2012 Cooper Industries, Ltd.

For more information:

If further assistance is required, contact your local Cooper Crouse-Hinds Representative.

Call customer service at 866-764-5454, or email [email protected]