Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
VIP
WV
D
E
WV
SS
Steam Tunnel Access
Steam Tunnel Access
Steam
Tunnel
Steam
Tunnel
Steam
Tunnel
1178.5
1179.0
1179.5
1178.0
1178.0
1178.5
1179.5
1178.5
1178.0
1178.5
1178.0
1177.5
1178. 5
1179.0
1179.5
1178.0
1180.01180.0
1180.0
1179.5
1180.0
1180.0
1177.0
1177.5
1177.0
1176.5
1177. 0
1177.0
1176.5
1177.0
1177.5
1179.5
1179.0
1178.0
1180.0
Keystone Retaining Wall
Keystone Retaining Wall
Keystone Retaining Wall
Keystone Retaining Wall
Brick RetainingWall
Concrete RetainingWall With Chain LinkFence
Sign
Cross
Metal Staircase
18"
24"
ConcreteSidewalk
ConcreteSidewalk
ConcreteSidewalk
Concrete
Sidewalk
Concrete
Sidewalk
Concrete
Sidewalk
Concrete
Sidewalk
ConcreteSidewalk
ConcretePavement
Asphalt Pavement
Asphalt Pavement
AsphaltCurbAnd Gutter
Concrete BarrierCurb
Concrete Curb andGutter
ConcretePavement
StoneCurb
StoneCurb
Asphalt Pavement
Asphalt PavementConcrete Driveway
Concrete Driveway
BrickPath
BrickPath
BrickPath
Brick PadFor BikeRack
Brick PadFor Bike
Rack
ConcreteSidewalk
ConcretePavement
0' Rear Yard Setback
Asphalt Pavement
Shed OnConcrete
Pad
BENCHMARK
#1Storm SewerManholeRim:1176.97RCP 12" FL:1172.53
Grate InletRim:1179.77
Flowline Unknown
BENCHMARK
#2Sanitary SewerManholeRim:1178.05VCP 8" FL:1167.65PVC 4" FL:1167.85
Sanitary Sewer ManholeRim:1177.29VCP 6" FL:1171.13
Galvanized 3/4"
Ductile4"
24"
NORTH 16TH STREET
5' Side Yard
Setback
14' Front Yard
Setback
5' Side Yard
Setback
120.08'(M)120.00'(D)
99.82'(M)
1 00.00'(D)
120.08'(M)120.00'(D)
99.98'(M)
1 00.00'(D)
Found 1" Pipe
Set 3/4"Bar
With Cap
Set Chiseled 'X'
in Brick W
all
with Concrete
NailSet 3
/4"
Bar
With Ca
p
UP
REMOVE EXISTING SIDEWALK
Copyright CLARK ARCHITECTURAL COLLABORATIVEC
March 18, 2019 A.1
Lutheran Center Renovation and Additions
1" = 10'-0"
Site Plan - Demolition
TO
BL
DG
.
7'-8"
Pop
Transformeron Conc Pad
TO
CU
RB
7'-6"
14'-0 1
/2"
18'-0"
3'-6"
9'-6"
9'-8" 9'-0" 9'-0"
21'-6 1
/2"
DN
DN
UP
DN
DNUP
Shed7'x9'
UP
Trash
Bench Height Retaining Wall
Bench
6"2'-0"
SE
TB
AC
K
5'-0"
SETBACK
5'-0"
SE
TB
AC
K
5'-0"
14'-0" SETBACK
@ E
XT
G
1'-2 3
/4"
NE
W C
ON
ST
RU
CT
.
11 5
/8"
NE
W C
ON
ST
RU
CT
.
2'-7 5
/8"
NEW EAST ADDITION
NEW WEST ADDITION
2'-8 3
/4"
NE
W C
ON
ST
RU
CT
ION
1'-10 7
/8"
Copyright CLARK ARCHITECTURAL COLLABORATIVEC
March 18, 2019 A.2
Lutheran Center Renovation and Additions
1" = 10'-0"
Site Plan - New Construction
0 20' 30' 40'10'
Graphic Scale: 1 inch = 10 feet
DiningMech.
Game Room
Elev Equip
M.
W.
Stair
Presentation Scheme
Circulation
Dining
Fellowship
Kitchen
Restrooms
Support
Calculating...
Elev
Kitchen
Chair &Table Stor.
Water/Fire
Storage
Cust.013
Corr.004
Relocate Elec Conduit
Copyright CLARK ARCHITECTURAL COLLABORATIVEC
March 18, 2019 A.3
Lutheran Center Renovation and Additions
1/8" = 1'-0"
Basement Floor Plan0' 4' 8' 16' 32'
Gross Square Feet:4,923 Existing Basement Renovation SF 250 New Basement Additions SF5,173 Gross Total Basement SF
Net Square Feet:4,509 Existing Basement Renovation SF 162 New Basement Additions SF4,671 Net Total Basement SF
Update 1.28.19
UP
UP
UP
UP
Conf.
Chapel
Library
M. W.
Copy/ Work
Office 2 Office 3 Office 4 Office 5 Office 6
Office 1
Stair
Lounge
Narthex Vest.
Sacristy
Fellowship
Elev
Chancel
Presentation Scheme
Administration
Circulation
Fellowship
Meeting
Restrooms
Support
Worship
Calculating...
Corr.
Corr. Corr.
Clo.
Cust.
1' - 3 1/4"
10 1/8"
5"
10 1/8"
5"
0"
5'-1 7/8"
12 Rows @ 16 Seats = 192 Seats
31'-8 3/8" 5'-0"
3'-9"
13'-5"
5'-0"
13'-5"
3'-9"
TrashBins
PopMachines
Transformer
Shed
Copyright CLARK ARCHITECTURAL COLLABORATIVEC
March 18, 2019 A.4
Lutheran Center Renovation and Additions
1/8" = 1'-0"
First Floor Plan0' 4' 8' 16' 32'
Gross Square Feet:2,511 Existing 1st Floor Renovation SF2,453 Existing 1st Floor Chapel SF2,300 New 1st Floor Additions SF7,264 Gross Total First Floor SF
Net Square Feet:2,311 Existing 1st Floor Renovation SF2,275 Existing Chapel Renovation SF1,066 New 1st Floor East Addition SF 875 New 1st Floor West Addition SF 32 New 1st Floor South Infill SF6,559 Net Total First Floor SF
Update 1.29.19
Presentation Scheme
Bedroom
Circulation
Dining
Kitchen
Living
Restrooms
Support
Worship
Calculating...
Chapel
Unit 1 HC
Unit 2
Unit 10
Unit 9
Unit 8
Unit 7
Study
B9/10
B7/8
H.P. Living
Guest RR
Laundry
Mech.
Unit 6Unit 5Unit 4Unit 3
Mech.
Living
Dining
Kitchen
Stair
B3/4 B5/6
B1/2 HC
H.P. Bath
H.P. Bed
Elev
Chancel
Corr. Corr.
Corr.
Corr.
(Above)(Above)
DN
Cust.216A
Copyright CLARK ARCHITECTURAL COLLABORATIVEC
March 18, 2019 A.5
Lutheran Center Renovation and Additions
1/8" = 1'-0"
Second Floor Plan0' 4' 8' 16' 32'
Gross Square Feet:2,511 Existing 2nd Floor Renovation SF (excludes Chapel Clerestory)2,409 New 2nd Floor Additions SF4,920 Gross Total Second Floor SF
Net Square Feet:2,300 Existing 2nd Floor Renovation SF (excludes Chapel Clerestory)2,096 New 2nd Floor Additions SF4,396 Net Total Second Floor SF
Update 1.29.19
Copyright CLARK ARCHITECTURAL COLLABORATIVEC
March 18, 2019 A.6
Lutheran Center Renovation and Additions
1/8" = 1'-0"
Roof Plan
First Floor100' - 0"
First Floor100' - 0"
Extg Joist Brg123' - 4 1/2"
Extg Joist Brg123' - 4 1/2"
Second Floor112' - 1"
Second Floor112' - 1"
Basement90' - 1"
Basement90' - 1"
Pop
First Floor100' - 0"
First Floor100' - 0"
Extg Joist Brg123' - 4 1/2"
Extg Joist Brg123' - 4 1/2"
Second Floor112' - 1"
Second Floor112' - 1"
Basement90' - 1"
Basement90' - 1"
Light Fixture
First Floor100' - 0"
First Floor100' - 0"
Extg Joist Brg123' - 4 1/2"
Extg Joist Brg123' - 4 1/2"
Second Floor112' - 1"
Second Floor112' - 1"
Basement90' - 1"
Basement90' - 1"
First Floor100' - 0"
First Floor100' - 0"
Extg Joist Brg123' - 4 1/2"
Extg Joist Brg123' - 4 1/2"
Second Floor112' - 1"
Second Floor112' - 1"
Basement90' - 1"
Basement90' - 1"
H
AA
Copyright CLARK ARCHITECTURAL COLLABORATIVEC
March 18, 2019 A.7
Lutheran Center Renovation and Additions
1/8" = 1'-0"
North Exterior Elevation
1/8" = 1'-0"
East Exterior Elevation
1/8" = 1'-0"
South Exterior Elevation
1/8" = 1'-0"
West Exterior Elevation
Copyright CLARK ARCHITECTURAL COLLABORATIVEC
March 18, 2019 A.8
Lutheran Center Renovation and Additions
Perspective @ East Facade-Color Pres Perspective @ North Facade-Color Pres
Perspective @ Rooftop-Color PresPerspective @ Southwest Facade-Color Pres
Copyright CLARK ARCHITECTURAL COLLABORATIVEC
March 18, 2019 A.9
Lutheran Center Renovation and Additions
Perspective @ East Facade-BW PresPerspective @ North Facade-BW Pres
Perspective @ Rooftop-BW Pres
Perspective @ Southwest Facade-BW Pres