LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

LUNCH

Page 2: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

The State of Future Education: Preparing for Accelerating Change with Buildings that Don’t

Mark Mistur, AIA

Dean

College of Architecture and Environmental Design

Kent State University

Page 3: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Lane Beougher, FAIA, FCSI, NCARB, DBIA, LEED BD+C

Energy Program Manager

OFCC Update: Contracts!

Page 4: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Change Order Fee Allowance(August 2016)

• Agreement 2.3.1 Change Order Fee Allowancerow deleted from Additional Services table

• T&C 6.2.2 Additional Services in connection with Change Order Work paragraph deleted from Additional Services Fees section

• T&C 10.1.3 Change Order Fee Allowancedeleted from Defined Terms and Abbreviations section

4

Page 5: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Not Boycotting Language(May 2017)

• Agreement 5.2.5 / 6.3.5 Pursuant to ORC Section 9.76(B), the A/E or Contractor or CM or DB warrants that it is not boycotting any jurisdiction with whom the State of Ohio can enjoy free trade, including Israel, and will not do so during the term of this Agreement or Contract.

5

Page 6: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

CM at Risk Revisions(Coming Soon)

• GC 4.7 Self Performed Work becomes a defined term and must be provided by the CM’s or CM Affiliated Entity’s direct employees

• GC 6.22.1.1 Revises CM’s obligation to correct Defective Work and recover schedule deficiencies from “begin to correct … and recover” to “promptly commence and diligently pursue correction …”

6

Page 7: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

CM at Risk Revisions(Coming Soon)

• GC 6.27.1.2 Revises obligation to notify insurers providing property insurance for the Project from “A/E with the assistance of the Owner” to “Owner with the assistance of the CM and A/E”

• GC 9.2.3.2 Modifies payment of CM’s Fee from “percent complete basis” to “earned Cost of the Work on the basis of the CM’s Fee percentage identified in the Agreement”

7

Page 8: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

CM at Risk Revisions(Coming Soon)

• GC 9.2.8 Requires CM to develop Alternates during Preconstruction and permits Owner to use “buy-out savings” to add them to Project

• GC 10.1.5 Requires CM to deliver the new “Acknowledgement of Surety” form as evidence Surety received notice of increase

• GC 10.4 Certified copy of complete builder’s risk insurance policy is a condition precedent to payment of any portion of Contract Sum

8

Page 9: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Hybrid DB/Performance Contract(May 2017)

• Uses appropriate aspects of each delivery method to benefit both the State and ESCOs

• Two-step best value selection process from Design-Build: RFQ to shortlist 3 firms for RFP

• Best value from performance contract: 70% qualifications, 20% savings, and 10% cash flow

• Pricing transparency from DB: Fee + Design Fee + Cost of Work (Project Development Compen-sation instead of Preconstruction Compensation

9

Page 10: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Contact Information

Lane Beougher

[email protected]

Page 11: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Operations/Sustainability

Page 12: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

F. Jeffrey Murray, FAIA

CH2M

Using the Building Performance Framework to Manage Complexity

Page 13: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Navigating the Complexity of Modern Facilities

13

RESOURCE SUSTAINABILITY

OCCUPANT EXPERIENCE

SYSTEM RESILIENCE

ADVANCED TECHNOLOGY

4 workshops with stakeholders to identify relative importance:

Page 14: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Managing Complexity: The Building Performance Framework

14

Page 15: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Occupant Experience• Primary Activities• Supporting Activities• Character and

Culture• Tech Interface• Comfort & Wellness• Amenities

15

RS

SR

OE

IT

Page 16: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

System Resilience

• Reliability

• Flexibility

• Redundancy

• Preparedness

• Maintenance

• Security

16

Page 17: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Resource Sustainability

• Site

• Energy

• Water

• Materials

• Space

• Time

17

Page 18: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Advanced Technology

• Facility Applications

• Occupancy Analytics

• Asset Management

• Communication

• IT Infrastructure

• Smart Materials

18

RS

SR

OE

IT

Embedded versus Cyber-physical Systems

Page 19: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Contact Information

F Jeffrey [Jeff] Murray, FAIA

[email protected]

Page 20: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Stephen J. Cooper, RRO, CDT

Aadvanced Building Products/Carlisle Syntec

Strengthening LEED

Page 21: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17 21

Heating & Cooling Degree DaysHeating vs.

Cooling Ratio

9x

8x

5x

6x

11x

9x

12x

Page 22: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

DOE’s Roof Savings CalculatorR-20, post 1990 construction, mid-efficiency, 10,000 SF office with Gas Heat

City Cooling benefit with White

Heating Penalty with Black

Annual Net Penalty with White

Energy Efficient Color

Akron $174 $371 $197 Black

Cleveland $160 $357 $198 Black

Columbus $161 $402 $241 Black

Dayton $148 $388 $240 Black

Mansfield $152 $360 $208 Black

Toledo $121 $334 $213 Black

Youngstown $105 $396 $291 Black

22

Page 23: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

RCI Interface Article – Oct 2013Preliminary Analysis of Energy Consumption for Cool Roofing Measures

23

Page 24: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Stanford Study Cool roofs may contributeto global warming

• Effects of Urban Surfaces and White Roofs on Global and Regional Climate– 20 yr. simulation of converting all roofs to white– Results showed local cooling of 0.02K however:

• Global temperatures increased by 0.07K• White roofs reflect heat back up into the

atmosphere where it mixes with black and brown soot particles to increase global warming

24

Page 25: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Weathering Performance

• Xenon Arc TestingkJ/m2

– 60-mil EPDM Black 41,580 – 60-mil EPDM Black Rein 35,320 – 60-mil EPDM White 25,200

– 60-mil Thermoplastic 20,160

– 1,260 kJ/m2 = 1 year exposure in Miami to see surface cracking under 7x magnification

25

Page 26: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Unified Facilities Guide Spec 2012

• ”Standards such as LEED® promote the use of cool roofing, and increased energyconservation through additional insulation. Consider that when cool roofing is used withinsulation R-Values greater than 24, the “cool roof” surface has little if no influence on theenergy performance of the building. Additionally,

• Condensation on the underside of mechanically-fastened systems can result in ice build-up inwinter, mold growth, on the facers, moisture dripping into the interior, and replacement of theroofs with less than four years of service.

• Poor design of cool roofs in ASHRAE climate zones 4 and higher have resulted in the— a result of the material’s

inability to warm and drive moisture downward. Roofs that experience this condensation havehad to be replaced.”

26

Page 27: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Contact Information

Stephen J. Cooper

[email protected]

Page 28: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Scanning/Testing

Page 29: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Chad Knutson & Alex Rayis

Gilbane Building Company

Structured Light Scans vs. Lidar (Laser Scan): Differentiating the Value Streams

Page 30: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Scanning Explained

30

Page 31: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

LIDAR Scanning

31

Page 32: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

LIDAR Scanning – Case Study

32

Page 33: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Structured Light Scanning

33

Page 34: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

SLS – Case Study

34

Page 35: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

LIDAR Value SLS Value

• Accuracy / Survey Grade

• Use in Prefabrication

• Complicated Models

• Industry Standard

35

• Accessibility/Online

• Communication and Understanding

• Virtual As-Built

• Simple Models

• Faster/ Mores Scans

Page 36: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Contact Information

Chad Knutson

[email protected]

Alex Rayis

[email protected]

Page 37: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Mark LaBell Jr

SSOE Group

Reducing Waste Through Reality Capture

Really?!?

I have a HDD full of scans, 30% is due by the end of the week.

Page 38: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

What is Lean?

Lean means creating more value for customers with fewer resources. A lean organization understands customer value and focuses its key processes to continuously increase it.

Source: www.lean.org

Page 39: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Value Proposition for scanning

• SSOE safety-always culture: zero incidents, zero exposures, and zero injuries

• Engineers spend more time engineering and less time measuring in field resulting in a better design

• Geographic dispersed teams can virtually tour a site

• SSOE returned $1.5M in VP to our clients

Page 40: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

• Standard of care on our retrofit projects

• Rely on vendor network

• Scan 2 BIM provides no value

How we approach scanning

Page 41: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Editing Point Clouds to create Deliverables

Page 42: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Case Studies

Industrial Project 2D As-built

Page 43: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Why Training is Important

Page 44: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Contact Information

Mark LaBell, [email protected]

Page 45: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

BREAK

Page 46: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Construction Apps

Craig Weise, OFCC

Page 47: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Lisa A. Laney, LEED AP, BD+C

Sustainability Administrator

Kasey Corbet, AIA, LEED AP

Garmann Miller Architects & Engineers

OFCC Update: LEED Version 4

Page 48: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

LEED Version 4

• LEED V3 Overview

– Applicable Standards

• LEED V4

– Initial Evaluation

– Comparison of V3 to V4

– Applicable Codes & OSDM

– Pilot Projects

48

Page 49: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

LEED Version 4

– LEED V4 Pilot Projects

• Documenting project credits and potential issues

• Working directly with GBCI & OFCC on credit issues

• OFCC to gather industry reps to discuss V4

– Final Evaluation for Customer Benefits

– OFCC Options

• Silver or Certified Under V4

• Different Environmental Rating System

• Incorporate V3 common school credits into OSDM

49

Page 50: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17 50

LEED for Schools Comparison

v 2009 v 4

7 Credit Categories 9 Credit Categories

10 Prerequisites 14 Prerequisites

110 Total Points 110 Total Points

40 – 49 Certified 50 – 59 Silver60 – 79 Gold 80 – 110 Platinum

58 Credits 52 Credits

Page 51: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Project Site

51

Page 52: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

➢ Changes to Credit Requirements

52

▪ Updated referenced standards▪ Additional requirements▪ Previously acceptable compliance

paths removed

➢ 16 Credits Combined or Split

➢ 3 Credits Removed

➢ 11 New Credits

LEED V4: It’s A New Rating System

Page 53: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17 53

Page 54: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Contact Information

Kasey Corbet

[email protected]

Lisa A. [email protected]

Page 55: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Bruce Ferguson

Cleveland State University

Upcoming Business Opportunities: Higher Education

Page 56: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Cleveland State University

Building County Total Project Budget

Delivery Method

A/E Solicitation

(date expected)

CMR/DB/GC/Bid Solicitation (date expected)

New Engineering Building – Phase 2

Cuyahoga $16,000,000 CMR N/ABialosky

Cleveland

N/AGilbane

School of Film, Television and Interactive Media

Cuyahoga $7,500,000 CMR N/A Van Auken

Akins Architects

N/AConstructAbilit

y, Inc.

Engaged Science Learning Labs

Cuyahoga $6,500,000 CMR N/AAECOM

N/ATurner

Total $30,000,000 56

Page 57: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Contact Information

Bruce Ferguson

[email protected]

Page 58: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Jeff Westhoven

Chief of Program Services

Upcoming Business Opportunities:OFCC

Page 59: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Audience Profile

Public Owner18%

Consulting8%

Architecture/ Design

24%

Engineering/ Surveying

13%Contracting/

Subcontracting32%

Other5%

Page 60: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Factors in pursuing projects

• Service needed

• Project size

• Location

• Timing

• Delivery model

• Owner

60

Page 61: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Known projects & timelines

61

Page 62: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Known projects & timelines

62

• Service needed

• Project size

• Location

• Timing

• Delivery model

• Owner

Page 63: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Types of opportunities

63

• A/E• CxA• Planning

Page 64: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Types of opportunities

64

• CMR• D-B• Energy PC

Page 65: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Types of opportunities

65

• GC• MP

Page 66: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Types of opportunities

66

• A/E• CxA• Owner Agent• Planning• Consulting

Page 67: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Consultant Lists

67

Type

No. of

FirmsContract

End

Max. $/

Biennium

Solici-

tation

Enhanced Commissioning Agents 9 6/30/19

Hazardous Materials Consultants 6 6/30/19 250,000

Owner Agent Services 12 6/30/19 250,000

Regional Program Management Consultants 4 6/30/19

Facilities Assessment / Master Planning

Consultant Services

9 6/30/19

Architect and Landscape Architect Services 141 6/30/19 250,000

Engineer, Surveying, and Energy Services 143 6/30/19 250,000

Pre-qualified Project Management Services 7 6/30/18 Mar-18

Neutral Facilitation Consultants 2 6/30/18 Mar-18

Project Auditing Services 2 6/30/18 Mar-18

Claims Evaluation Services 4 6/30/18 Mar-18

Educational Planning Consultants 4 6/30/18 Mar-18

Page 68: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Types of opportunities

68

All types

Page 69: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Factors in pursuing projects

• Service needed

• Project size

• Location

• Timing

• Delivery model

• Owner

69

Page 70: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Capital Projects

• Service needed

• Project size

• Location

• Timing

• Delivery model

• Owner

70

Ohio General Assembly: Capital Projects by County, pp. 8-38

Page 71: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Capital Projects

• Service needed

• Project size

• Location

• Timing

• Delivery model

• Owner

71

Ohio General Assembly: Capital Appropriations by Agency Line Item and Fund, pp. 60-180

Page 72: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

In capital bill? Whose selection?

Project Type Funding SizeProcurement

(most common)Process

Capital

Bill?

K-12 SchoolState & Local Any OFCC & Local ORC 153 Yes

Local Any Local ORC 153 No

State Agency State<$1.5 M Agency ORC 153 Yes

>$1.5 M OFCC ORC 153 Yes

Higher EducationState

<$ 4 M Higher Ed ORC 153 Yes

>$ 4 MHigher Ed and/or

OFCCORC 153 Yes

Local Any Higher Ed ORC 153 No

Cultural Facilities State & Local Any Local ORC 123 Yes

Energy Performance

Contract

State Any OFCC ORC 156 No

K-12 Any Local ORC 3313 No

Page 73: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Upcoming Capital Projects:State Agency & Higher Education – thru Dec. 2017

Project

No. Department Project

Construction

Budget

Bid

Opening

A/E

Selection

DVS-

170002Veterans Services

Sandusky - Masonry renovation, ceiling,

lights and door replacements$9,620,000 Jan-18 Oct-17

EXP-

170001Ohio Expositions Celeste Hall Renovations $7,700,000 Nov-17

DYS-

170167Youth Services

Indian River Juvenile Correctional

Facility Resident Wing Roof Repairs$1,100,000 Nov-17

DYS-

160143Youth Services

Circleville Juvenile Correctional Facility

Program Building & Renovations$3,500,000 Apr-18 Nov-17

DOT-

170006Transportation Monroe FSMF $7,150,000 12/19/17

DOT-

170003Transportation Union FSMF $7,101,202 12/19/17

Page 74: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Project No. Department Project

Construction

BudgetBid Opening

DOT-

140011Transportation Washington FSMF $7,150,000 1/9/18

DOT-

170010Transportation Roberts Rd FSMF $7,101,202 1/9/18

DOT-

170004Transportation Dryden Rd FSMF $7,101,202 1/30/18

DOT-

170005Transportation Greene FSMF $7,101,202 1/30/18

DVS-

150001Veterans Services Sandusky - Windows Replacement $1,830,000 Jan-18

DMH-

150007

Mental Health &

Addiction Svcs.Heartland Patient area $2,360,000 Jan-18

Upcoming Capital Projects:State Agency & Higher Education – Jan. 2018

Page 75: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Project No. Department Project

Construction

BudgetBid Opening

DOT-

170002Transportation Perry FSMF $7,150,000 2/20/18

DOT-

160002Transportation

I-70 Preble County Eastbound Rest Area Bldg.

Replacement$2,400,000 2/20/18

COM-

170001Commerce

HVAC Upgrades and Forensics Stge.

/Maintenance Structure$3,658,000 Feb-18

CTI-170001 Columbus State Culinary and Hospitality School (CMR) $25,300,000 Mar-18

DYS-

170168Youth Services Cuyahoga Hills JCF General Renovations $400,000 Mar-18

DMH-

170021

Mental Health &

Addiction Svcs.Northwest Psychiatric Hospital $3,260,000 Apr-18

JSC-170002 Supreme Court Moyer Exterior Repairs $5,800,000 Apr-18

DOT- Transportation I-71 Warren Co NB & SB Rest Areas $6,000,000 Apr-18

DVS-

150002Veterans Services Sandusky - Veterans Hall HVAC Upgrade $4,780,000 Jun-18

Upcoming Capital Projects:State Agency & Higher Education – Feb/June 2018

Page 76: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Upcoming Capital Projects:Ohio Department of Rehabilitation and Correction

Institution Project

Construction

Budget Method A/E Selection BVS/Bid

Lebanon/Warren &

Chillicothe/RossGeneral renovations $20,466,000 CMR 8/24/17

Statewide (multiple

Facilities)Emergency power upgrades $1,500,000 D-B

CA/E

Oct-17Jan-18

Mansfield Correctional Cell windows $1,450,000 D-BCA/E

Oct-17Jan-18

Southern Ohio

CorrectionalPlumbing upgrade $1,467,000 GC Mar-18

Marion Correctional Electrical switchgear $1,936,000 GC Mar-18

Southern Ohio

Correctional

Sanitary sewer and wastewater

treatment plant$2,752,000 GC

Study Sep-17

A/E Nov-17Apr-18

Page 77: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Kent State University

77

Building Total Project Budget

Building

Total Project Budget

MACC Annex Athletic Court Renovations $1,500,000

Eastway Center Dining Hall Renovations

$5,000,000

Tuscarawas Campus Entry Roadway

$3,100,000 Business Administration Building Starbucks Addition

$1,500,000

College of Podiatric Medicine Roof, Phase I

$600,000 College of Communication and Information Dean’s Suite

$800,000

Women’s Lacrosse Locker Room

$300,000

Page 78: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Contact Information

Michael Bruder

[email protected]

Page 79: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Bowling Green State University

79

Building Project

Construction

Budget Method

A/E

Selection BVS/Bid

Maurer Center $44,200,000 CMRTCI/P+W

selected

Late

2017

Harshman

Residence Hall

Demolition –

Engineering Services+ $2,000,000 CMR

Page 80: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Contact Information

Barbara Shergalis

[email protected]

Page 81: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Owner Contact InformationState Agency/Higher Educationofcc.ohio.gov/Opportunities/Owner-administered.aspx

Page 82: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

K-12 Project Status (2016)

82

Complete

Partial

Waiting for local $

Waiting for state $

Page 83: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

K-12 project spending by County

83

FY2015

Page 84: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

K-12 project spending by County

84

FY2016

Page 85: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

K-12 project spending by County

85

FY2017

Page 86: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17 86

New K-12 projects

Page 87: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17 87

New K-12 projects: FY17-18

District County Total BudgetDelivery Method

A/E Solicitation

CMR/DB/GC Solicitation

Carlisle Local School District Warren $ 42,178,974 CMR 8/22/17 9/22/17

Greenon Local School District Clark $ 44,374,067 CMR Aug-17 Sep-17

New Bremen Local School District Auglaize $ 12,339,532 CMR 8/25/17 Aug-17

Southwest Licking Local School District Licking $ 116,206,278 CMR 8/15/17 9/15/17

Warren Local School District Washington $ 53,430,964 CMR Aug-17 Sep-17

Canal Winchester Local School District Franklin $ 60,657,440 CMR 4/20/17 5/1/17

Minster Local School District Auglaize $ 18,025,762 MP-CMA 6/2/17 TBD

Toronto City School District Jefferson $ 9,940,120 DB TBD TBD

Clark-Shawnee Local School District Clark $ 49,906,908 TBD TBD TBD

Total $ 407,060,045

Page 88: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Business Opportunities

• Known projects/timelines – OFCC website

• How to find info on capital projects

• Who selects firms and contact information

• Upcoming state agency/higher ed projects

• Current state and spending on K-12 projects

• Upcoming K-12 projects

88

Page 89: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17 89

Jeff Westhoven

[email protected]

Contact Information

Page 90: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

Craig Weise, OFCC

Ask OFCC

Page 91: LUNCH - OFCCofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC Conference/2… · Cost of the Work on the basis of the CM’s Fee ... LEED Version 4 • LEED V3 Overview –Applicable

@OHFacilities / #OFCConf17

This concludes The American Institute of Architects Continuing Education Systems Course

Provider Name: Ohio Facilities Construction CommissionProvider #: G442Contact: [email protected]

Reminder: Pick up your Certificate of Participation at

the Registration desk.