44
LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and Beyond M.Annadurai Deviprasad Karnik Indian Space Research Organisation LEAG-ILEWG-SRR 28 TH OCTOBER 2008

LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

LUNAR EXPLORATION EFFORTSBy ISRO

Chandrayaan-1 and Beyond

M.AnnaduraiDeviprasad Karnik

Indian Space Research Organisation

LEAG-ILEWG-SRR28TH OCTOBER 2008

Page 2: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Chandrayaan-1:Mission Objective• Design, develop and launch a spacecraft in a lunar polar orbit.

• Develop expertise for planning and execution of mission and ground systems for future planetary exploration missions.

• Chemical and mineralogical mapping of lunar surface to understand the origin and evolution of the moon.

• Systematic topographic mapping of the whole surface of the moon.

• To establish capability of planetary data analysis and also data archival and dissemination.

• To enhance India’s image in the international scene by being part of a select group having capability for Planetary Missions.

Page 3: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Chandrayaan-1, Payloads

SARA

Page 4: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

• To prepare a 3-dimensional atlas with high spatial and altitude resolution• Swath 20km and Resolution 5m Spectral Range 0.5 to 0.6 µm range

Terrain Mapping Camera (TMC)- From ISRO(produce a high-resolution map of the Moon.)

Page 5: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

•perform mineralogical mapping•Spectral range 0.4 to 0.95 µm range ; 64 Bands• 80m resolution•40km Swath

Hyper Spectral Imager (HySI)HySI) – From SAC/ISRO

Page 6: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

LASER BEAM

10Hz 10mJ

BEAM EXPANDER

Nd YAG LASER

POWER SUPPLY & THERMAL INERFACE

ATTITUDE & POSITION

RANGE RECEIVER & DATA ACQUISITION

Lunar Laser Ranging Instrument (LLRI) from LEOS/ISRO

Determine Global Determine Global Topographic Field of Topographic Field of Moon (Surface Moon (Surface topography)topography)

●● Supplement TMC and HySISupplement TMC and HySI●● Improved model of lunar gravity fieldImproved model of lunar gravity field

Page 7: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

●● Volatile Transport on Moon through detection of 46.5 keV line from Pb-210

●● Th and U map of Polar and U-Th-rich regions

Basic Features

Detector: Cd-Zn-Te Array

Energy Range: 20-250 keV

Energy Resolution: ≤6% @60keV

FOV: 40km x 40km

Active Anticoincidence Shielding: CsI(Tl)+PMT

High Energy X- γ Ray Spectrometer(HEX) PAYLOAD – ISAC/ISRO

Page 8: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

X-ray fluorescence spectrometer (C1XS)(collaboration between Rutherford Appleton laboratory, U.K, ESA and ISRO)

Objective : Chemical mappingmap the abundance of Mg, Al, Si, Ca, Ti, & Fe at the surface, and will monitor the solar flux

Energy range :1 – 10kev

Used in conjunction with Solar X-ray monitor

Page 9: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Moon Impact probe (MIP)developed by ISRO

will be ejected once it reaches 100 km orbit around moon, to impact on the moon. MIP carries three more instruments namely, a high resolution mass

spectrometer, an S-Band altimeter and a video camera.

Page 10: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Moon Mineralogy Mapper – M3 (From JPL/NASA )

- imaging spectrometer operating in 0.4 to 3.0 µm range

- 256 bands of 10nm resolutions - Objective :surface mineral composition.

Page 11: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

MiniSAR (From APL/NASA)

•To detect Lunar polar water Ice• S-Band synthetic Aperture Radar• 75m resolution in SAR mode• 500m resolution in Scatterometer mode

Page 12: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

CENA - Chandrayaan Energetic Neutral Analyzer

Jointly From Sweden, Norway, Japan and India)

To image the Moon surface using low energy neutral atoms in the range 10eV-2keV

• To study Moon’s surface composition• To map lunar magnetic anomalies and• To study Space Weathering

Page 13: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

SWIM-Solar Wind Monitor( From Sweden /Japan/Norway/INDIA)

SWIM TMSWIM FMTo image Solar wind – Lunar Surface

Interaction

Page 14: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

near infrared spectrometer (SIR-2)from ESA Max Planck Institute for Solar System Research, Polish

Academy of Science and University of BergenObjective: Mineral MappingSpectral range 0.9 to 2.7 µm

map the mineral composition using an infrared grating spectrometer.

Page 15: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

RADOM-Radiation Dose Monitor(From Bulgaria)

To measure Radiation Environment both in Lunar Orbit and Enroute to the moon

Attractive mass and power:180gm and 200mW

Page 16: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Summary of Chandrayaan-1 Wavelength range coverage

Page 17: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Chandrayaan-1 : International Participation

Page 18: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Probe & Orbiter

Orientation Maneuver Separation, Spin Up & De-orbit

Imaging,altimeter,MS data during descent

Impact Probe Mission Profile100 km X 100 km

490

5

Back

Page 19: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

18m TerminalAdequate for Chandrayaan-1

Indian Deep Space Network(IDSN)

32m TerminalCater to future interplanetary Missions beyond Moon

Both are Co-located near Bangalore

Indian Deep Space Network (IDSN), Mission Operations Complex (MOX)and Indian Space Science Data Centre (ISSDC).

Page 20: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Challenges in Interfacing Science Instruments• Technical , Managerial and logistic :

• Trade off Studies, Alternatives, Schedule management

• Geographic Locations of Instrument teams: Time Difference

• Work culture: NASA, ESA, JAXA,BSA and Scientists

• Varying I/F requirements– Engineering units – Drawing Conventions and Formats– Mechanical : Mass , Volume , FOV , Access and Thermal– Electrical : TM,TC ,Power and data

• Varying Standards : RS232/ RS-422/CAN-Bus /1553/ Customised Interface– Data rate and volume– Handling Constraints– Cleanliness requirements– Safety issues

• Transportation • Post launch Data processing and Deriving science

Page 21: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Project : Interface Controls to Facilitate 2008 - Launch

•S/C Baseline Configuration: BUS

•Interface Control Documents

•P/L simulators

•Go for FM fabrication•Environment tests

• Launch •Ground System Readiness

•FM AIT in Phased Manner

•P/L systems Configuration

•S/C simulators•Interface Freez

• Emails• Telecons• Interface Meetings• FTP servers

• science data Centre

• Mission Plans

•Ground TTC & data downlink sys

2004 2005 -2006 2006

2006-20072008

2008 2008

A.O P/LsSelection

2004 - 2005

Lunar Science

P/L Mechanical Mockups Mechanical Mockup Assembly

2007-2008

Config. Review

PDR CDR

P/L PSRsS/C PSR

FRR

2005-2007

Page 22: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

A 0f O Enabled Co-operations• PDS training for Chandrayaan-1 science and data processing

team by ESA team

• SMART-1 tracking and orbit determination comparison exercise between ESOC and ISRO

• SPICE training for Chandrayaan-1 Mission and Science teams by JPL/NASA team

• APL 18m and NASA DSN support agreement

• NAV support discussions with NASA and ESA teams

• Thermal and calibration Support for CIXS hardware

• Calibration and Thermal support for SIR-2 and RADOM

• MLI support for SARA and RADOM

Page 23: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1
Page 24: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1
Page 25: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1
Page 26: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1
Page 27: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1
Page 28: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1
Page 29: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1
Page 30: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1
Page 31: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1
Page 32: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1
Page 33: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1
Page 34: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Chandrayaan-1 Orbit raising maneuver (26th Oct)

Page 35: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

LUNAR EXPLORATION EFFORTS

Beyond Chandrayaan-1

Page 36: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

CHANDRAYAAN-2(Lunar Orbiter, Lander, Rover,

Robotics)

GSLV

Mission Objective

● To design, realize and deploy a lunar Lander-rover capable of soft landing on a specified lunar site for in-situ studies. ● Carry payloads in the orbiter that will enhance and add to the scientific objectives of Chandrayaan-1.● Develop & demonstrate newer technologies, including those that will be useful for future planetary missions (e.g. Sample return).

Orbit management, Intelligent auto-navigation; Realization of Lander, Robotics and Rover; Energy Resources, Communication, sampling and in-situ analysis, Environment (thermal, vacuum …) compatibility

Technological Challenges:

Page 37: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Chandrayaan-1-Establish lunar polar orbiter

-Deep space Commn.

-Moon Probe landing:- Moon Probe Ejection- Inter satellite commn.- Landing in a targetted

Position -International

Co-operation

Page 38: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Chandrayaan-2

Chandrayaan-1-Establish lunar polar orbiter

-Deep space Commn.

-Moon Probe landing:o - Moon Probe Ejectiono - Inter satellite commn.o - Landing in a targetted

Position -International

Co-operation

Page 39: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Chandrayaan-1- Establish lunar polar orbiter-Deep space Commn.-Moon Probe landing:- Moon Probe Ejection- Inter satellite commn.- Landing in a targetted

Position- International Co-operation

Chandrayaan-2Soft Landing the ProbeSample analysisRobotic armReturn to Orbiter: Docking Sys

Earth Re-Entry

Page 40: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Chandrayaan-1- Establish lunar polar orbiter

-Deep space Commn.-Moon Probe landing:- Moon Probe Ejection- Inter satellite commn.- Landing in a targetted

Position

Chandrayaan-2Soft Landing the ProbeSample analysisRobotic armReturn to Orbiter: Docking Sys

Earth Re-Entry

Manned Lunar Mission- Human Habitate:

intl Co-Op

Page 41: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Chandrayaan-1- Establish lunar polar orbiter

-Deep space Commn.-Moon Probe landing:- Moon Probe Ejection- Inter satellite commn.- Landing in a targetted

Position

Chandrayaan-2Soft Landing the ProbeSample analysisRobotic armReturn to Orbiter: Docking Sys

Earth Re-Entry

Mars/planetary mission- Rover- Intl Co-operation

Manned Lunar Mission- Human Habitate:

intl Co-Op

Page 42: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Chandrayaan-1- Establish lunar polar orbier

-Deep space Commn.-Moon Probe landing:- Moon Probe Ejection- Inter satellite commn.- Landing in a targetted

Position

Chandrayaan-2Soft Landing the ProbeSample analysisRobotic armReturn to Orbiter: Docking Sys

Earth Re-Entry

Mars/planetary mission- Rover- Intl Co-operation

Manned Lunar Mission- Human Habitate:

intl Co-Op

Planetrary MissionFrom Moon

-Target other planet -from Moon

Nano satellites thrown toPlanets during Interplanetary

Voyage

Page 43: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1

Summary• Chandrayaan-1 has a purpose.

– Science, Technical and managerial

• Demonstrates International co-operation with India playing leading role – Meeting targeted science, technical, Budget and schedule challenges

• Provides Logical extension for Chandrayaan-2 – Lunar Lander with Rover and Future Planetary Missions– Chandrayaan-2 has been already approved by Govt. of India with the budget

allocation of 4.26billion Indian rupees ($ 100m)

• Provides an opportunity for India to work in future planetary missions while working with International partners.

Page 44: LUNAR EXPLORATION EFFORTS By ISRO Chandrayaan-1 and … · A 0f O Enabled Co-operations • PDS training for Chandrayaan-1 science and data processing team by ESA team • SMART-1