    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS

    (HENSEL CAT

    NO.)

    CABLE

    GLANDS QTY

    CABL

    T

    1 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-1 MOTORP-M319 3C X 2.5 Cu. 1 102 102 1555.25.1.17 2 CP

    2 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-1 LPBSC-M319 5C X 1.5 Cu. 1 102 102 1555.25.1.17 2 CP

    3 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-1 LIMIT SWITCHC-M319-2 7C X 1.5 Cu. 1 102 102 1555.25.1.17 2 CP

    4 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-2 MOTOR

    P-M320 3C X 2.5 Cu. 1 117 117 1555.25.1.17 2 CP

    5 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-2 LPBSC-M320 5C X 1.5 Cu. 1 117 117 1555.25.1.17 2 CP

    6 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-2 LIMIT SWITCHC-M320-2 7C X 1.5 Cu. 1 117 117 1555.25.1.17 2 CP

    7 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-3 MOTORP-M321 3C X 2.5 Cu. 1 104 104 1555.25.1.17 2 CP

    8 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-3 LPBSC-M321 5C X 1.5 Cu. 1 104 104 1555.25.1.17 2 CP

    9 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-3 LIMIT SWITCH C-M321-2 7C X 1.5 Cu. 1 104 104 1555.25.1.17 2 CP

    10 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-4 MOTORP-M322 3C X 2.5 Cu. 1 119 119 1555.25.1.17 2 CP

    11 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-4 LPBSC-M322 5C X 1.5 Cu. 1 119 119 1555.25.1.17 2 CP

    12 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-4 LIMIT SWITCHC-M322-2 7C X 1.5 Cu. 1 119 119 1555.25.1.17 2 CP

    13 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-5 MOTORP-M323 3C X 2.5 Cu. 1 106 106 1555.25.1.17 2 CP

    14 BOILER MCC-01LONG RETRACTABLE SOOT

    BLOWER-5 LPBSC-M323 5C X 1.5 Cu. 1 106 106 1555.25.1.17 2 CP

    R

    BOILER MCC-01

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    ISGEC JOHN THOMPSON NOTE :-

    POWER & CONTROL CABLE SCHEDULE FOR BOILER-01,02 & ASH HANDLING MCC

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    2/34

    DOC.

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS

    (HENSEL CAT

    NO.)

    CABLE

    GLANDS QTY

    CABL

    TY

    R

    0

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    ISGEC JOHN THOMPSON NOTE :-

    POWER & CONTROL CABLE SCHEDULE FOR BOILER-01,02 & ASH HANDLING MCC

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    19 BOILER MCC-01RAV FOR ECONOMISER HOPPER-1

    MOTORP-M427 3C X 2.5 Cu. 1 100 100 1555.25.1.17 2 CP

    20 BOILER MCC-01RAV FOR ECONOMISER HOPPER-1

    LPBSC-M427 5C X 1.5 Cu. 1 100 100 1555.25.1.17 2 CP

    21 BOILER MCC-01RAV FOR ECONOMISER HOPPER-2

    MOTORP-M428 3C X 2.5 Cu. 1 102 102 1555.25.1.17 2 CP

    22 BOILER MCC-01RAV FOR ECONOMISER HOPPER-2

    LPBSC-M428 5C X 1.5 Cu. 1 102 102 1555.25.1.17 2 CP

    23 BOILER MCC-01 RAV FOR ECONOMISER HOPPER-3MOTOR P-M429 3C X 2.5 Cu. 1 104 104 1555.25.1.17 2 CP

    24 BOILER MCC-01RAV FOR ECONOMISER HOPPER-3

    LPBSC-M429 5C X 1.5 Cu. 1 104 104 1555.25.1.17 2 CP

    25 BOILER MCC-01 RAV FOR MDC HOPPER-1 MOTOR P-M430 3C X 2.5 Cu. 1 116 116 1555.25.1.17 2 CP

    26 BOILER MCC-01 RAV FOR MDC HOPPER-1 LPBS C-M430 5C X 1.5 Cu. 1 116 116 1555.25.1.17 2 CP

    27 BOILER MCC-01 RAV FOR MDC HOPPER-2 MOTOR P-M431 3C X 2.5 Cu. 1 110 110 1555.25.1.17 2 CP

    28 BOILER MCC-01 RAV FOR MDC HOPPER-2 LPBS C-M431 5C X 1.5 Cu. 1 110 110 1555.25.1.17 2 CP

    29 BOILER MCC-01FORCED DRAFT FAN-1 VFD

    PANELP1-M439 3C X 70 Cu. 1 127 127 1555.40.1.33 2 CUS

    30FORCED DRAFT FAN-1

    VFD PANELFORCED DRAFT FAN-1 MOTOR P2-M439 3C X 70 Cu. 1 127 127 1555.40.1.33 2 CUS

    31FORCED DRAFT FAN-1

    VFD PANELFORCED DRAFT FAN-1 LPBS C-M439 10C X 1.5 Cu. 1 127 127 1555.32.1.25 2 CP

    32FORCED DRAFT FAN-1

    VFD PANELFORCED DRAFT FAN-1 SP.HEATER P-M439-2 2C X 1.5 Cu. 1 127 127 1555.25.1.17 2 CP

    33FORCED DRAFT FAN-1

    VFD PANELFORCED DRAFT FAN-1 RPM C-439-2 2C X 1.5 Cu.Sc. 1 127 127 1555.25.1.17 2 CP

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    3/34

    DOC. N

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS

    (HENSEL CAT

    NO.)

    CABLE

    GLANDS QTY

    CABLE

    TYP

    REV

    01

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    ISGEC JOHN THOMPSON NOTE :-

    POWER & CONTROL CABLE SCHEDULE FOR BOILER-01,02 & ASH HANDLING MCC

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    37 BOILER MCC-01 MOV DB - 01 DB-01 4C X 4 Cu. 1 100 100 1555.25.1.17 2 CUS-

    38 MOV DB - 01

    ISO. VALVE AT UPSTREAM OF

    100% FEED CONTROL VALVE

    (BB308)

    P-M301 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CPI-

    39 MOV DB - 01

    ISO. VALVE AT UPSTREAM OF

    100% FEED CONTROL BYPASS

    (BB3100)

    P-M302 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CPI-

    40 MOV DB - 01ISO. VALVE AT UPSTREAM OF 30%

    FEED CONTROL VALVE (BB311)

    P-M303 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CPI-

    41 MOV DB - 01ISO. VALVE AT ECONOMISER

    INLET (BB323)P-M304 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CPI-

    42 MOV DB - 01CONTINEOUS BLOW DOWN

    VALVE (DD359)P-M309 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CPI-

    43 MOV DB - 01INTERMITTENT BLOW DOWN

    VALVE (DD374)P-M310 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CPI-

    44 BOILER MCC-01 MOV DB -02 DB-02 4C X 2.5 Cu. 1 100 100 1555.25.1.17 2 CPI-

    45 MOV DB -02ISO. VALVE AT ECONOMISER

    BYPASS INLET (BB324)P-M313 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CPI-

    46 MOV DB -02

    ISO. VALVE AT UPSTREAM OF

    TEAM TRAP FOR SOOT BLOWER

    (FF307)

    P-M314 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CPI-

    47 MOV DB -02ISO. VALVE AT USTREAM OF

    TCV301(BB377)

    P-M315 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CPI-

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    4/34

    DOC.

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS

    (HENSEL CAT

    NO.)

    CABLE

    GLANDS QTY

    CABLE

    TY

    RE

    0

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    ISGEC JOHN THOMPSON NOTE :-

    POWER & CONTROL CABLE SCHEDULE FOR BOILER-01,02 & ASH HANDLING MCC

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    51 BOILER MCC-01HP DOSING TANK AGITATOR

    MOTORP-M501 3C X 2.5 Cu. 1 112 112 1555.25.1.17 2 CPI

    52 BOILER MCC-01HP DOSING TANK AGITATOR

    LPBSC-M501 5C X 1.5 Cu. 1 112 112 1555.25.1.17 2 CPI

    53 BOILER MCC-01LP DOSING TANK AGITATOR

    MOTORP-M502 3C X 2.5 Cu. 1 118 118 1555.25.1.17 2 CPI

    54 BOILER MCC-01 LP DOSING TANK AGITATOR LPBS C-M502 5C X 1.5 Cu. 1 118 118 1555.25.1.17 2 CPI

    55 BOILER MCC-01 HP DOSING PUMP-1 MOTOR P-M503 3C X 2.5 Cu. 1 109 109 1555.25.1.17 2 CPI

    56 BOILER MCC-01 HP DOSING PUMP-1 LPBS C-M503 5C X 1.5 Cu. 1 109 109 1555.25.1.17 2 CPI

    57 BOILER MCC-01HP DOSING PUMP-2 (STAND BY)

    MOTORP-M504 3C X 2.5 Cu. 1 110 110 1555.25.1.17 2 CPI

    58 BOILER MCC-01HP DOSING PUMP-2 (STAND BY)

    LPBSC-M504 5C X 1.5 Cu. 1 110 110 1555.25.1.17 2 CPI

    59 BOILER MCC-01 LP DOSING PUMP-1 MOTOR P-M505 3C X 2.5 Cu. 1 115 115 1555.25.1.17 2 CPI

    60 BOILER MCC-01 LP DOSING PUMP-1 LPBS C-M505 5C X 1.5 Cu. 1 115 115 1555.25.1.17 2 CPI

    61 BOILER MCC-01LP DOSING PUMP-2 (STAND BY)

    MOTORP-M506 3C X 2.5 Cu. 1 116 116 1555.25.1.17 2 CPI

    62 BOILER MCC-01LP DOSING PUMP-2 (STAND BY)

    LPBSC-M506 5C X 1.5 Cu. 1 116 116 1555.25.1.17 2 CPI

    63 BOILER MCC-01 MOV DB - 03 DB-03 4C X 4 Cu. 1 100 100 1555.25.1.17 2 CUS

    64 MOV DB - 03START UP VENT ISOLATION

    VALVE (GG514)P-M507 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CPI

    MAIN STEAM STOP VALVE

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    5/34

    DOC.

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS

    (HENSEL CAT

    NO.)

    CABLE

    GLANDS QTY

    CABLE

    TY

    RE

    0

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    ISGEC JOHN THOMPSON NOTE :-

    POWER & CONTROL CABLE SCHEDULE FOR BOILER-01,02 & ASH HANDLING MCC

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    68 MOV DB - 03ISO. VALVE AT PRDS STEAM LINE

    FOR D/A START UP (GG537)P-M511 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CP

    69 MOV DB - 03ISO. VALVE AT PRDS STEAM LINE

    FOR TURBO FEED PUMP (GG561)P-M512 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CP

    70 BOILER MCC-01SCREW CONVEYO R 3 AT BANK

    ZONE HOPPER MOTORP-M919 3C X 2.5 Cu. 1 85 85 1555.25.1.17 2 CP

    71 BOILER MCC-01

    SCREW CONVEYOR 3 AT BANK

    ZONE HOPPER LPBS C-M919 5C X 1.5 Cu. 1 85 85 1555.25.1.17 2 CP

    72 BOILER MCC-01 UPS-1 3C X 4 Cu. 1 40 40 1555.25.1.17 2 CUS

    73 BOILER MCC-01 WELDING SOCKET 4C X 16 Cu. 1 60 60 1555.32.1.25 2 CUS

    74 BOILER MCC-02PNEUMATIC SPREADER DAMPER-1

    MOTORP-M413 3C X 2.5 Cu. 1 94 94 1555.25.1.17 2 CP

    75 BOILER MCC-02

    PNEUMATIC SPREADER DAMPER-1

    LPBS C-M413 5C X 1.5 Cu. 1 94 94 1555.25.1.17 2 CP

    76 BOILER MCC-02PNEUMATIC SPREADER DAMPER-2

    MOTORP-M414 3C X 2.5 Cu. 1 98 98 1555.25.1.17 2 CP

    77 BOILER MCC-02PNEUMATIC SPREADER DAMPER-2

    LPBSC-M414 5C X 1.5 Cu. 1 98 98 1555.25.1.17 2 CP

    78 BOILER MCC-02RAV FOR RIDDILING HOPPER-1

    MOTORP-M421 3C X 2.5 Cu. 1 82 82 1555.25.1.17 2 CP

    79 BOILER MCC-02RAV FOR RIDDILING HOPPER-1

    LPBSC-M421 5C X 1.5 Cu. 1 82 82 1555.25.1.17 2 CP

    80 BOILER MCC-02RAV FOR RIDDILING HOPPER-2

    MOTORP-M422 3C X 2.5 Cu. 1 86 86 1555.25.1.17 2 CP

    81 O R CC 02RAV FOR RIDDILING HOPPER-2

    C 422 C 1 C 1 86 86 1 2 1 1 2 CP

    BOILER MCC-02

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    6/34

    DOC

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS

    (HENSEL CAT

    NO.)

    CABLE

    GLANDS QTY

    CABL

    TY

    R

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    ISGEC JOHN THOMPSON NOTE :-

    POWER & CONTROL CABLE SCHEDULE FOR BOILER-01,02 & ASH HANDLING MCC

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    85 BOILER MCC-02RAV FOR AIR-HEATER HOPPER-1

    LPBSC-M448 5C X 1.5 Cu. 1 82 82 1555.25.1.17 2 CP

    86 BOILER MCC-02RAV FOR AIR-HEATER HOPPER-2

    MOTORP-M449 3C X 2.5 Cu. 1 85 85 1555.25.1.17 2 CP

    87 BOILER MCC-02RAV FOR AIR-HEATER HOPPER-2

    LPBSC-M449 5C X 1.5 Cu. 1 85 85 1555.25.1.17 2 CP

    88 BOILER MCC-02RAV FOR AIR-HEATER HOPPER-3

    MOTORP-M450 3C X 2.5 Cu. 1 88 88 1555.25.1.17 2 CP

    89 BOILER MCC-02 RAV FOR AIR-HEATER HOPPER-3LPBS

    C-M450 5C X 1.5 Cu. 1 88 88 1555.25.1.17 2 CP

    90 BOILER MCC-02 AUXILIARY OIL PUMP-1 MOTOR P-M916 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CP

    91 BOILER MCC-02 AUXILIARY OIL PUMP-1 LPBS C-M916 5C X 1.5 Cu. 1 50 50 1555.25.1.17 2 CP

    92 BOILER MCC-02ADDITION AUXILIARY OIL PUMP-2

    (STAND BY) MOTORP-M917 3C X 2.5 Cu. 1 52 52 1555.25.1.17 2 CP

    93 BOILER MCC-02ADDITION AUXILIARY OIL PUMP-2

    (STAND BY) LPBSC-M917 5C X 1.5 Cu. 1 52 52 1555.25.1.17 2 CP

    94 BOILER MCC-02 FUEL FEEDER VFD PANEL P-FF-VFD 3C X 25 Cu. 1 40 40 1555.32.1.25 2 CU

    95 FUEL FEEDER VFD PANEL(DRUM FEEDER)FUEL FEEDER -1

    MOTORP-M407 3C X 2.5 Cu. 1 102 102 1555.25.1.17 2 CP

    96 FUEL FEEDER VFD PANEL(DRUM FEEDER)FUEL FEEDER -1

    LPBSC-M407-01 10C X 1.5 Cu. 1 102 102 1555.32.1.25 2 CP

    97 FUEL FEEDER VFD PANEL(DRUM FEEDER)FUEL FEEDER -1

    RPMC-M407-02 2C X 1.5 Cu.Sc. 1 102 102 1555.25.1.17 2 CP

    98 FUEL FEEDER VFD PANEL

    (DRUM FEEDER)FUEL FEEDER -2

    MOTOR P-M408 3C X 2.5 Cu. 1 104 104 1555.25.1.17 2 CP

    (DRUM FEEDER)FUEL FEEDER -2

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    7/34

    DOC

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS

    (HENSEL CAT

    NO.)

    CABLE

    GLANDS QTY

    CAB

    T

    R

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    ISGEC JOHN THOMPSON NOTE :-

    POWER & CONTROL CABLE SCHEDULE FOR BOILER-01,02 & ASH HANDLING MCC

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    103 FUEL FEEDER VFD PANEL(DRUM FEEDER)FUEL FEEDER -3

    RPMC-M409-02 2C X 1.5 Cu.Sc. 1 106 106 1555.25.1.17 2 C

    104 FUEL FEEDER VFD PANEL(DRUM FEEDER)FUEL FEEDER -4

    MOTORP-M410 3C X 2.5 Cu. 1 108 108 1555.25.1.17 2 C

    105 FUEL FEEDER VFD PANEL(DRUM FEEDER)FUEL FEEDER -4

    LPBSC-M410-01 10C X 1.5 Cu. 1 108 108 1555.32.1.25 2 C

    106 FUEL FEEDER VFD PANEL(DRUM FEEDER)FUEL FEEDER -4

    RPMC-M410-02 2C X 1.5 Cu.Sc. 1 108 108 1555.25.1.17 2 C

    107 FUEL FEEDER VFD PANEL(DRUM FEEDER)FUEL FEEDER -5

    MOTOR P-M411 3C X 2.5 Cu. 1 110 110 1555.25.1.17 2 C

    108 FUEL FEEDER VFD PANEL(DRUM FEEDER)FUEL FEEDER -5

    LPBSC-M411-01 10C X 1.5 Cu. 1 110 110 1555.32.1.25 2 C

    109 FUEL FEEDER VFD PANEL(DRUM FEEDER)FUEL FEEDER -5

    RPMC-M411-02 2C X 1.5 Cu.Sc. 1 110 110 1555.25.1.17 2 C

    110 FUEL FEEDER VFD PANEL(DRUM FEEDER)FUEL FEEDER -6

    MOTORP-M412 3C X 2.5 Cu. 1 112 112 1555.25.1.17 2 C

    111 FUEL FEEDER VFD PANEL(DRUM FEEDER)FUEL FEEDER -6

    LPBSC-M412-01 10C X 1.5 Cu. 1 112 112 1555.32.1.25 2 C

    112 FUEL FEEDER VFD PANEL(DRUM FEEDER)FUEL FEEDER -6

    RPMC-M412-02 2C X 1.5 Cu.Sc. 1 112 112 1555.25.1.17 2 C

    113 FUEL FEEDER VFD PANEL(STOKER PLANETORY GEAR

    DRIVE)FUEL FEEDER -7 MOTORP-M419 3C X 2.5 Cu. 1 91 91 1555.25.1.17 2 C

    114 FUEL FEEDER VFD PANEL(STOKER PLANETORY GEAR

    DRIVE)FUEL FEEDER -7 LPBSC-M419-01 10C X 1.5 Cu. 1 91 91 1555.32.1.25 2 C

    115 FUEL FEEDER VFD PANEL(STOKER PLANETORY GEAR

    DRIVE)FUEL FEEDER -7 RPMC-M419-02 2C X 1.5 Cu.Sc. 1 91 91 1555.25.1.17 2 C

    116 FUEL FEEDER VFD PANEL (STOKER PLANETORY GEARDRIVE)FUEL FEEDER -8 MOTOR

    P-M420 3C X 2.5 Cu. 1 93 93 1555.25.1.17 2 C

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    8/34

    DOC

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS

    (HENSEL CAT

    NO.)

    CABLE

    GLANDS QTY

    CABL

    TY

    R

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    ISGEC JOHN THOMPSON NOTE :-

    POWER & CONTROL CABLE SCHEDULE FOR BOILER-01,02 & ASH HANDLING MCC

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    121 BOILER MCC-02RAV FOR BOILER BANK HOPPER-2

    MOTORP-M452 3C X 2.5 Cu. 1 78 78 1555.25.1.17 2 CP

    122 BOILER MCC-02RAV FOR BOILER BANK HOPPER-2

    LPBSC-M452 5C X 1.5 Cu. 1 78 78 1555.25.1.17 2 CP

    123 BOILER MCC-02RAV FOR BOILER BANK HOPPER-3

    MOTORP-M453 3C X 2.5 Cu. 1 80 80 1555.25.1.17 2 CP

    124 BOILER MCC-02RAV FOR BOILER BANK HOPPER-3

    LPBSC-M453 5C X 1.5 Cu. 1 80 80 1555.25.1.17 2 CP

    125 BOILER MCC-02RAV FOR BOILER BANK HOPPER-4

    MOTOR

    P-M454 3C X 2.5 Cu. 1 82 82 1555.25.1.17 2 CP

    126 BOILER MCC-02RAV FOR BOILER BANK HOPPER-4

    LPBSC-M454 5C X 1.5 Cu. 1 82 82 1555.25.1.17 2 CP

    127 BOILER MCC-02 MOV DB - 04 DB-04 4C X 2.5 Cu. 1 100 100 1555.25.1.17 2 CP

    128 MOV DB - 04 FEED PUMP-1 DISCHARGE (AA219) P-M207 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CP

    129 MOV DB - 04 FEED PUMP-2 DISCHARGE (AA234) P-M208 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CP

    130 MOV DB - 04 FEED PUMP-3 DISCHARGE (AA249) P-M209 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CP

    131 MOV DB - 04 FEED PUMP-4 DISCHARGE (AA262) P-M210 3C X 2.5 Cu. 1 50 50 1555.25.1.17 2 CP

    132 BOILER MCC-02FORCED DRAFT FAN-2 VFD

    PANELP1-M441 3C X 70 Cu. 1 123 123 1555.40.1.33 2 CU

    133FORCED DRAFT FAN-2

    VFD PANELFORCED DRAFT FAN-2 MOTOR P2-M441 3C X 70 Cu. 1 123 123 1555.40.1.33 2 CU

    134FORCED DRAFT FAN-2

    VFD PANEL

    FORCED DRAFT FAN-2 LPBS C-M441 10C X 1.5 Cu. 1 123 123 1555.32.1.25 2 CP

    135FORCED DRAFT FAN-2 FORCED DRAFT FAN-2

    P M441 2 2C X 1 5 Cu 1 123 123 1555 25 1 17 2 CP

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    9/34

    DOC.

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS

    (HENSEL CAT

    NO.)

    CABLE

    GLANDS QTY

    CABLE

    TY

    RE

    0

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    ISGEC JOHN THOMPSON NOTE :-

    POWER & CONTROL CABLE SCHEDULE FOR BOILER-01,02 & ASH HANDLING MCC

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    140 BOILER MCC-02 RACK AND PINION GATE-4 P-M404 3C X 2.5 Cu. 1 100 100 1555.25.1.17 2 CP

    141 BOILER MCC-02 RACK AND PINION GATE-5 P-M405 3C X 2.5 Cu. 1 102 102 1555.25.1.17 2 CP

    142 BOILER MCC-02 RACK AND PINION GATE-6 P-M406 3C X 2.5 Cu. 1 104 104 1555.25.1.17 2 CP

    143 BOILER MCC-02SCREW CONVEYOR 4 AT BANK

    ZONE HOPPER MOTORP-M920 3C X 2.5 Cu. 1 85 85 1555.25.1.17 2 CP

    144 BOILER MCC-02SCREW CONVEYOR 4 AT BANK

    ZONE HOPPER LPBSC-M920 5C X 1.5 Cu. 1 85 85 1555.25.1.17 2 CP

    145 BOILER MCC-02SHORT RETRACTABLE SOOT

    BLOWER-1 BANK ZONE MOTORP-M325 3C X 2.5 Cu. 1 112 112 1555.25.1.17 2 CP

    146 BOILER MCC-02SHORT RETRACTABLE SOOT

    BLOWER-1 BANK ZONE LPBSC-M325 5C X 1.5 Cu. 1 112 112 1555.25.1.17 2 CP

    147 BOILER MCC-02

    SHORT RETRACTABLE SOOT

    BLOWER-1 BANK ZONE LIMIT

    SWITCH

    C-M325-2 7C X 1.5 Cu. 1 112 112 1555.25.1.17 2 CP

    148 BOILER MCC-02SHORT RETRACTABLE SOOT

    BLOWER-2 ECO ZONE MOTORP-M326 3C X 2.5 Cu. 1 95 95 1555.25.1.17 2 CP

    149 BOILER MCC-02SHORT RETRACTABLE SOOT

    BLOWER-2 ECO ZONE LPBSC-M326 5C X 1.5 Cu. 1 95 95 1555.25.1.17 2 CP

    150 BOILER MCC-02

    SHORT RETRACTABLE SOOT

    BLOWER-2 ECO ZONE LIMIT

    SWITCH

    C-M326-2 7C X 1.5 Cu. 1 95 95 1555.25.1.17 2 CP

    151 BOILER MCC-02SHORT RETRACTABLE SOOT

    BLOWER- 3 ECO ZONE MOTORP-M327 3C X 2.5 Cu. 1 97 97 1555.25.1.17 2 CP

    152 BOILER MCC-02SHORT RETRACTABLE SOOT

    BLOWER- 3 ECO ZONE LPBS

    C-M327 5C X 1.5 Cu. 1 97 97 1555.25.1.17 2 CP

    SHORT RETRACTABLE SOOT

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    10/34

    DOC.

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS

    (HENSEL CAT

    NO.)

    CABLE

    GLANDS QTY

    CABLE

    TY

    RE

    0

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    ISGEC JOHN THOMPSON NOTE :-

    POWER & CONTROL CABLE SCHEDULE FOR BOILER-01,02 & ASH HANDLING MCC

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    156 ASH HANDLING MCCSCREW CONVEYOR AT RIDDLING

    HOPPER-1 MOTORP-M424 3C X 2.5 Cu. 1 88 88 1555.25.1.17 2 CPI

    157 ASH HANDLING MCCSCREW CONVEYOR AT RIDDLING

    HOPPER-1 LPBSC-M424 5C X 1.5 Cu. 1 88 88 1555.25.1.17 2 CPI

    158 ASH HANDLING MCCSCREW CONVEYOR AT RIDDLING

    HOPPER-2 MOTORP-M425 3C X 2.5 Cu. 1 90 90 1555.25.1.17 2 CPI

    159 ASH HANDLING MCCSCREW CONVEYOR AT RIDDLING

    HOPPER-2 LPBSC-M425 5C X 1.5 Cu. 1 90 90 1555.25.1.17 2 CPI

    160 ASH HANDLING MCCSCREW CONVEYOR AT RIDDLING

    HOPPER-3 MOTORP-M426 3C X 2.5 Cu. 1 92 92 1555.25.1.17 2 CPI

    161 ASH HANDLING MCCSCREW CONVEYOR AT RIDDLING

    HOPPER-3 LPBSC-M426 5C X 1.5 Cu. 1 92 92 1555.25.1.17 2 CPI

    162 ASH HANDLING MCCSCREW CONVEYOR AT BANK

    ZONE HOPPER MOTORP-M901 3C X 2.5 Cu. 1 82 82 1555.25.1.17 2 CPI

    163 ASH HANDLING MCCSCREW CONVEYOR AT BANK

    ZONE HOPPER LPBSC-M901 5C X 1.5 Cu. 1 82 82 1555.25.1.17 2 CPI

    164 ASH HANDLING MCC

    SCREW CONVEYOR AT

    ECONOMISER HOPPER MOTOR P-M902 3C X 2.5 Cu. 1 93 93 1555.25.1.17 2 CPI

    165 ASH HANDLING MCCSCREW CONVEYOR AT

    ECONOMISER HOPPER LPBSC-M902 5C X 1.5 Cu. 1 93 93 1555.25.1.17 2 CPI

    166 ASH HANDLING MCCSCREW CONVEYOR AT PDC

    HOPPER MOTORP-M903 3C X 2.5 Cu. 1 103 103 1555.25.1.17 2 CPI

    167 ASH HANDLING MCCSCREW CONVEYOR AT PDC

    HOPPER LPBSC-M903 5C X 1.5 Cu. 1 103 103 1555.25.1.17 2 CPI

    168 ASH HANDLING MCCSCREW CONVEYOR AT ESP

    HOPPER-1 MOTORP-M904 3C X 2.5 Cu. 1 42 42 1555.25.1.17 2 CPI

    169 ASH HANDLING MCCSCREW CONVEYOR AT ESP

    HOPPER-1 LPBSC-M904 5C X 1.5 Cu. 1 42 42 1555.25.1.17 2 CPI

    ASH HANDLING MCC

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    11/34

    DOC

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS

    (HENSEL CAT

    NO.)

    CABLE

    GLANDS QTY

    CABL

    TY

    R

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    ISGEC JOHN THOMPSON NOTE :-

    POWER & CONTROL CABLE SCHEDULE FOR BOILER-01,02 & ASH HANDLING MCC

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    170 ASH HANDLING MCCSCREW CONVEYOR AT ESP

    HOPPER-2 MOTORP-M905 3C X 2.5 Cu. 1 40 40 1555.25.1.17 2 CP

    171 ASH HANDLING MCCSCREW CONVEYOR AT ESP

    HOPPER-2 LPBSC-M905 5C X 1.5 Cu. 1 40 40 1555.25.1.17 2 CP

    172 ASH HANDLING MCCSUB MERGED BELT CONVEYOR

    DRIVE MOTORP-M906 3C X 2.5 Cu. 1 99 99 1555.25.1.17 2 CP

    173 ASH HANDLING MCCSUB MERGED BELT CONVEYOR

    DRIVE LPBSC-M906 5C X 1.5 Cu. 1 99 99 1555.25.1.17 2 CP

    174 ASH HANDLING MCC COMMON FLY ASH BELTCONVEYOR MOTOR P-M907 3C X 2.5 Cu. 1 216 216 1555.25.1.17 2 CP

    175 ASH HANDLING MCCCOMMON FLY ASH BELT

    CONVEYOR LPBSC-M907 5C X 1.5 Cu. 1 216 216 1555.25.1.17 2 CP

    176 ASH HANDLING MCCSCREW CONVEYOR AT ESP

    HOPPER-3 MOTORP-M908 3C X 2.5 Cu. 1 34 34 1555.25.1.17 2 CP

    177 ASH HANDLING MCCSCREW CONVEYOR AT ESP

    HOPPER-3 LPBSC-M908 5C X 1.5 Cu. 1 34 34 1555.25.1.17 2 CP

    178 ASH HANDLING MCCSCREW CONVEYOR AT AIR

    HEATER HOPPER MOTORP-M909 3C X 2.5 Cu. 1 89 89 1555.25.1.17 2 CP

    179 ASH HANDLING MCCSCREW CONVEYOR AT AIR

    HEATER HOPPER LPBSC-M909 5C X 1.5 Cu. 1 89 89 1555.25.1.17 2 CP

    180 ASH HANDLING MCCSCREW CONVEYOR AT BANK

    ZONE HOPPER MOTORP-M910 3C X 2.5 Cu. 1 83 83 1555.25.1.17 2 CP

    181 ASH HANDLING MCCSCREW CONVEYOR AT BANK

    ZONE HOPPER LPBSC-M910 5C X 1.5 Cu. 1 83 83 1555.25.1.17 2 CP

    182 ASH HANDLING MCC ASH CONDITIONER MOTOR P-M911 3C X 2.5 Cu. 1 200 200 1555.25.1.17 2 CP

    183 ASH HANDLING MCC ASH CONDITIONER LPBS C-M911 5C X 1.5 Cu. 1 200 200 1555.25.1.17 2 CP

    184 ASH HANDLING MCCRAV FOR FLY ASH SILO OUTLET

    MOTORP-M912 3C X 2.5 Cu. 1 220 220 1555.25.1.17 2 CP

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    12/34

    DOC. NO.

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS

    (HENSEL CAT

    NO.)

    CABLE

    GLANDS QTY

    CABLE LUG

    TYPE

    REV.

    01

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    ISGEC JOHN THOMPSON NOTE :-

    POWER & CONTROL CABLE SCHEDULE FOR BOILER-01,02 & ASH HANDLING MCC

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    188 ASH HANDLING MCC ROOT BLOWER-1 MOTOR P-M914 3C X 10 Cu. 1 100 100 1555.32.1.25 2 CUS-547

    189 ASH HANDLING MCC ROOT BLOWER-1 LPBS C-M914 5C X 1.5 Cu. 1 100 100 1555.25.1.17 2 CPI-17

    190 ASH HANDLING MCCROOT BLOWER-2 (STAND BY)

    MOTORP-M915 3C X 10 Cu. 1 100 100 1555.32.1.25 2 CUS-547

    191 ASH HANDLING MCC ROOT BLOWER-2 (STAND BY) LPBS C-M915 5C X 1.5 Cu. 1 100 100 1555.25.1.17 2 CPI-17

    192 ASH HANDLING MCCFAN FOR VENT FILTER AT ASH

    SILO MOTORP-M918 3C X 2.5 Cu. 1 218 218 1555.25.1.17 2 CPI-18

    193 ASH HANDLING MCC FAN FOR VENT FILTER AT ASHSILO LPBS

    C-M918 5C X 1.5 Cu. 1 218 218 1555.25.1.17 2 CPI-17

    194 TG MCC PANEL TURBINE SUPERVISORY PANEL 4C x 2.5 Cu. 1 50 1555.25.1.17 2 CPI-18

    195TURBINE SUPERVISORY

    PANELAUXILIARY OIL PUMP 4C x 2.5 Cu. 1 50 1555.25.1.17 2 CPI-18

    196TURBINE SUPERVISORY

    PANELAUTO AUXILIARY OIL PUMP 4C x 2.5 Cu. 1 50 1555.25.1.17 2 CPI-18

    TCP PANEL

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    13/34

    32

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    14/34

    32

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    15/34

    32

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    16/34

    32

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    17/34

    32

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    18/34

    32

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    19/34

    32

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    20/34

    32

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    21/34

    32

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    22/34

    32

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    23/34

    32

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    24/34

    32

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    25/34

    DOC. NO. :

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS /TER.

    KIT

    CABLE

    GLANDS/TE

    R.KIT. QTY

    CABLE LUGS

    TYPE

    4.16 HT PANEL ISOLATOR-1 6P1-M201 3C X 120 Cu. HT 1 33 33 3C X 120 HT KIT 2 -

    ISOLATOR-1 CONV. TRAFO 6P2-M201 3C X 120 Cu. HT 1 10 10 3C X 120 HT KIT 2 -

    CONV. TRAFO BFP-1 HT VFD PANEL 6P3-M201 3C X 120 Cu. HT 2 10 20 3C X 120 HT KIT 4 -

    ISOLATOR-1 630A VCB BYPASS 6P4-M201 3C X 120 Cu. HT 1 8 8 3C X 120 HT KIT 2 -

    BFP-1 HT VFD PANEL ISOLATOR-2 6P5-M201 3C X 120 Cu. HT 1 9 9 3C X 120 HT KIT 2 -

    630A VCB BYPASS ISOLATOR-2 6P6-M201 3C X 120 Cu. HT 1 13 13 3C X 120 HT KIT 2 -

    ISOLATOR-2 BFP-1 MOTOR 6P7-M201 3C X 120 Cu. HT 1 95 95 3C X 120 HT KIT 2 -

    BOILER MCC-01 BFP-1 HT VFD PANEL 6P8-M201 3C X 4 Cu. 1 38 38 1555.25.1.17 2 CUS-543

    BFP-1 HT VFD PANELLPBS(START/STOP/SPU

    P/SPDN)C-M201-01 10C X 1.5 Cu. 1 95 95 1555.32.1.25 2 CPI-17

    BFP-1 HT VFD PANEL SP. HEATER P-M201 2C X 1.5 Cu. 1 95 95 1555.25.1.17 2 CPI-17

    BFP-1 HT VFD PANEL RPM METER C-M201-02 2C X 1.5 Cu.Sc. 1 95 95 1555.25.1.17 2 CPI-17

    4.16 HT PANEL ISOLATOR-1 6P1-M202 3C X 120 Cu. HT 1 40 40 3C X 120 HT KIT 2 -

    ISOLATOR-1 CONV. TRAFO 6P2-M202 3C X 120 Cu. HT 1 10 10 3C X 120 HT KIT 2 -

    CONV. TRAFO BFP-2 HT VFD PANEL 6P3-M202 3C X 120 Cu. HT 2 10 20 3C X 120 HT KIT 4 -

    ISOLATOR-1 630A VCB BYPASS 6P4-M202 3C X 120 Cu. HT 1 8 8 3C X 120 HT KIT 2 -

    BFP-2 HT VFD PANEL ISOLATOR-2 6P5-M202 3C X 120 Cu. HT 1 9 9 3C X 120 HT KIT 2 -

    630A VCB BYPASS ISOLATOR-2 6P6-M202 3C X 120 Cu. HT 1 13 13 3C X 120 HT KIT 2 -

    ISGEC JOHN THOMPSON NOTE :-

    REV.

    01

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    HT POWER & ASSOCIATED CONTROL CABLE SCHEDULE

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    1

    2

    DOC NO : IKE IJT IRC51 DO

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    26/34

    DOC. NO. : IKE-IJT-IRC51-DO

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS /TER.

    KIT

    CABLE

    GLANDS/TE

    R.KIT. QTY

    CABLE LUGS

    TYPE

    CABLE LUGS

    QTY

    ISGEC JOHN THOMPSON NOTE :-

    REV.

    01

    DATE

    16.05.2013

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    HT POWER & ASSOCIATED CONTROL CABLE SCHEDULE

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    BFP-2 HT VFD PANEL RPM METER C-M202-02 2C X 1.5 Cu.Sc. 1 98 98 1555.25.1.17 2 CPI-17 4

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    27/34

    DOC. NO. :

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS /TER.

    KIT

    CABLE

    GLANDS/TE

    R.KIT. QTY

    CABLE LUGS

    TYPE

    ISGEC JOHN THOMPSON NOTE :-

    REV.

    01

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    HT POWER & ASSOCIATED CONTROL CABLE SCHEDULE

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    4.16 HT PANEL ISOLATOR-1 6P1-M203 3C X 120 Cu. HT 1 45 45 3C X 120 HT KIT 2 -

    ISOLATOR-1 CONV. TRAFO 6P2-M203 3C X 120 Cu. HT 1 10 10 3C X 120 HT KIT 2 -

    CONV. TRAFO BFP-3 HT VFD PANEL 6P3-M203 3C X 120 Cu. HT 2 10 20 3C X 120 HT KIT 4 -

    ISOLATOR-1 630A VCB BYPASS 6P4-M203 3C X 120 Cu. HT 1 8 8 3C X 120 HT KIT 2 -

    BFP-3 HT VFD PANEL ISOLATOR-2 6P5-M203 3C X 120 Cu. HT 1 9 9 3C X 120 HT KIT 2 -

    630A VCB BYPASS ISOLATOR-2 6P6-M203 3C X 120 Cu. HT 1 13 13 3C X 120 HT KIT 2 -

    ISOLATOR-2 BFP-3 MOTOR 6P7-M203 3C X 120 Cu. HT 1 101 101 3C X 120 HT KIT 2 -

    BOILER MCC-01 BFP-3 HT VFD PANEL 6P8-M203 3C X 4 Cu. 1 44 44 1555.25.1.17 2 CUS-543

    BFP-3 HT VFD PANELLPBS(START/STOP/SPU

    P/SPDN)C-M203-01 10C X 1.5 Cu. 1 101 101 1555.32.1.25 2 CPI-17

    BFP-3 HT VFD PANEL SP. HEATER P-M203 2C X 1.5 Cu. 1 101 101 1555.25.1.17 2 CPI-17

    BFP-3 HT VFD PANEL RPM METER C-M203-02 2C X 1.5 Cu.Sc. 1 101 101 1555.25.1.17 2 CPI-17

    4.16 HT PANEL ISOLATOR-1 6P1-M435 3C X 120 Cu. HT 1 44 44 3C X 120 HT KIT 2 -

    ISOLATOR-1 CONV. TRAFO 6P2-M435 3C X 120 Cu. HT 1 10 10 3C X 120 HT KIT 2 -

    CONV. TRAFO ID FAN-1 HT VFD PANE 6P3-M435 3C X 120 Cu. HT 2 10 20 3C X 120 HT KIT 4 -

    ISOLATOR-1 630A VCB BYPASS 6P4-M435 3C X 120 Cu. HT 1 8 8 3C X 120 HT KIT 2 -

    ID FAN-1 HT VFD PANEL ISOLATOR-2 6P5-M435 3C X 120 Cu. HT 1 9 9 3C X 120 HT KIT 2 -

    630A VCB BYPASS ISOLATOR-2 6P6-M435 3C X 120 Cu. HT 1 13 13 3C X 120 HT KIT 2 -

    3

    4

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    28/34

    DOC. NO. :

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS /TER.

    KIT

    CABLE

    GLANDS/TE

    R.KIT. QTY

    CABLE LUG

    TYPE

    ISGEC JOHN THOMPSON NOTE :-

    REV.

    01

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    HT POWER & ASSOCIATED CONTROL CABLE SCHEDULE

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    4.16 HT PANEL ISOLATOR-1 6P1-M437 3C X 120 Cu. HT 1 49 49 3C X 120 HT KIT 2 -

    ISOLATOR-1 CONV. TRAFO 6P2-M437 3C X 120 Cu. HT 1 10 10 3C X 120 HT KIT 2 -

    CONV. TRAFO ID FAN-2 HT VFD PANE 6P3-M437 3C X 120 Cu. HT 2 10 20 3C X 120 HT KIT 4 -

    ISOLATOR-1 630A VCB BYPASS 6P4-M437 3C X 120 Cu. HT 1 8 8 3C X 120 HT KIT 2 -

    ID FAN-2 HT VFD PANEL ISOLATOR-2 6P5-M437 3C X 120 Cu. HT 1 9 9 3C X 120 HT KIT 2 -

    630A VCB BYPASS ISOLATOR-2 6P6-M437 3C X 120 Cu. HT 1 13 13 3C X 120 HT KIT 2 -

    ISOLATOR-2 ID FAN-2 6P7-M437 3C X 120 Cu. HT 1 142 142 3C X 120 HT KIT 2 -

    BOILER MCC-02 ID FAN-2 HT VFD PANE 6P8-M437 3C X 4 Cu. 1 45 45 1555.25.1.17 2 CUS-543

    ID FAN-2 HT VFD PANELLPBS(START/STOP/SPU

    P/SPDN)C-M437-01 10C X 1.5 Cu. 1 142 142 1555.32.1.25 2 CPI-17

    ID FAN-2 HT VFD PANEL SP. HEATER P-M437 2C X 1.5 Cu. 1 142 142 1555.25.1.17 2 CPI-17

    ID FAN-2 HT VFD PANEL RPM METER C-M437-02 2C X 1.5 Cu.Sc. 1 142 142 1555.25.1.17 2 CPI-17

    4.16 HT PANEL ISOLATOR-1 6P1-M445 3C X 120 Cu. HT 1 54 54 3C X 120 HT KIT 2 -

    ISOLATOR-1 CONV. TRAFO 6P2-M445 3C X 120 Cu. HT 1 10 10 3C X 120 HT KIT 2 -

    CONV. TRAFO SA FAN-1 HT VFD PANE 6P3-M455 3C X 120 Cu. HT 2 10 20 3C X 120 HT KIT 4 -

    ISOLATOR-1 630A VCB BYPASS 6P4-M445 3C X 120 Cu. HT 1 8 8 3C X 120 HT KIT 2 -

    SA FAN-1 HT VFD PANEL ISOLATOR-2 6P5-M445 3C X 120 Cu. HT 1 9 9 3C X 120 HT KIT 2 -

    630A VCB BYPASS ISOLATOR-2 6P6-M445 3C X 120 Cu. HT 1 13 13 3C X 120 HT KIT 2 -6

    5

    DOC NO IKE IJT

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    29/34

    DOC. NO. : IKE-IJT-

    SL.

    NO.FROM TO CABLE TAG NO.

    CABLE SIZE

    (mm2)

    CABLE

    RUNS

    LENGTH/

    RUN

    TOTAL LENGTH

    (Mtr.)

    CABLE

    GLANDS /TER.

    KIT

    CABLE

    GLANDS/TE

    R.KIT. QTY

    CABLE LUGS

    TYPE

    CABL

    Q

    ISGEC JOHN THOMPSON NOTE :-

    REV.

    01

    DA

    16.05

    CONSULTANT :----------

    EPC ELECTRICAL CONTRACTOR : M/s. IKE ELECTRIC PVT LTD, PUNE, MAHARASHTRA (INDIA)

    SERVICE : 1x159 TPH, BI DRUM, WATER TUBE, TRAVELLING GRATE BOILER

    HT POWER & ASSOCIATED CONTROL CABLE SCHEDULE

    CLIENT : M/s. INGENIO RISARALDA S. A., COLOMBIA

    4.16 HT PANEL ISOLATOR-1 6P1-M447 3C X 120 Cu. HT 1 45 45 3C X 120 HT KIT 2 -

    ISOLATOR-1 CONV. TRAFO 6P2-M447 3C X 120 Cu. HT 1 10 10 3C X 120 HT KIT 2 -

    CONV. TRAFO SA FAN-2 HT VFD PANE 6P3-M447 3C X 120 Cu. HT 2 10 20 3C X 120 HT KIT 4 -

    ISOLATOR-1 630A VCB BYPASS 6P4-M447 3C X 120 Cu. HT 1 8 8 3C X 120 HT KIT 2 -

    SA FAN-2 HT VFD PANEL ISOLATOR-2 6P5-M447 3C X 120 Cu. HT 1 9 9 3C X 120 HT KIT 2 -

    630A VCB BYPASS ISOLATOR-2 6P6-M447 3C X 120 Cu. HT 1 13 13 3C X 120 HT KIT 2 -

    ISOLATOR-2 SA FAN-2 6P7-M447 3C X 120 Cu. HT 1 101 101 3C X 120 HT KIT 2 -

    BOILER MCC-02 SA FAN-2 HT VFD PANE 6P8-M447 3C X 4 Cu. 1 52 52 1555.25.1.17 2 CUS-543

    SA FAN-2 HT VFD PANELLPBS(START/STOP/SPU

    P/SPDN)C-M447-01 10C X 1.5 Cu. 1 101 101 1555.32.1.25 2 CPI-17

    SA FAN-2 HT VFD PANEL SP. HEATER P-M447 2C X 1.5 Cu. 1 101 101 1555.25.1.17 2 CPI-17

    SA FAN-2 HT VFD PANEL RPM METER C-M447-02 2C X 1.5 Cu.Sc. 1 101 101 1555.25.1.17 2 CPI-17

    7

    C-030

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    30/34

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

    C-030

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    31/34

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

    C-030

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    32/34

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

    C-030

    PREPARED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    33/34

    PREPARED BY

    GMC

    KBD

    REMARKS

    APPROVED BY

  • 7/28/2019 Lt Ht Power Control Cable Schedule-r1-16 05 2013 Irsa

    34/34