THE CONSTRUCTION TECHNOLOGY CONSULTANTS
UNITED ARAB EMIRATES
AUSTRALIA UNITED KINGDOM UNITED STATES OF AMERICA
Lowther-Rolton Services DMCC
3202 HDS Tower Jumeirah Lakes Towers
PO Box 454983 Dubai
United Arab Emirates
Lowther-Rolton Pty Ltd
21 Captain Court Wanannup, 6210 Western Australia
Australia
Lowther-Rolton International Ltd
International House Midland Road
Higham Ferrers Northamptonshire, NN10 8DN
United Kingdom
Lowther-Rolton LLC
4314 Tarlton Way Sugar Land
Texas, 77478 USA
Tel: +971 (4) 375 8050 Fax: +971 (4) 429 0558
Tel: +44 (0)1933 411837 Fax: +44 (0)1933 411887
Tel: +44 (0)1933 411837 Fax: +44 (0)1933 411887 [email protected]
Tel: +1 713 314 0683
Contact: Mal Coates Contact: Bob Dodd Contact: Bob Dodd Contact: Doug Ferguson
www.lowther-rolton.com
LowtherRolton
www.lowther-rolton.com 2
LowtherRolton
THE COMPANY: Lowther-Rolton was formed in 1987 to provide Clients with an independent engineering service in construction technology by concentrating on the construction techniques, planning, design and 3rd
party Technical Auditing to enhance safe construction and engineering activities, fundamental to a project.
Our company, as professional consultants, uniquely specialises in engineering the load movement of all types of pre-assembled/pre-cast structures in the fields of petrochemical, energy, nuclear and fossil power, bridge construction and specialist structures.
The expertise applied by our Directors and staff originates from the wealth of experience gained previously as contractors and designers. Our team of highly experienced engineers cover the disciplines of civil and structural engineering, providing a full range of design services. We offer our expertise and services worldwide together with the provision of suitably qualified and experienced staff to integrate into a Client’s project team.
We pride ourselves on the ability to design load movement schemes (transportation and lifting) and permanent or temporary structures that are innovative, practical, economic and safe to construct. Our ‘hands-on’ experience of construction equipment for load movement is comprehensive and unique. Thereby the company provides a professional engineering based service as an independent alternative to load movement contractors and suppliers.
The company has been appointed to numerous major construction projects around the world. Our head office is in the UK with regional offices globally located in Australia, UAE and USA.
We also offer marine engineering and Marine Warranty services for movement of loads by sea and/or inland waterways, together with HSE services, as consultants through our expanded network. We ensure a dedicated, seamless, high quality and comprehensive on-shore and off-shore engineering service that is second to none.
THE SERVICE: We aim to provide the highest possible quality of commitment and service to our Clients, which is achieved by:
Ensuring that our Clients receive personal attention from our directors and managers
Understanding our Clients’ objectives and requirements to achieve their targets
Providing Clients with world class performance in engineering, design, management and HSE
Providing our highest level of expertise, advice and commitment to our Clients
Employing motivated engineers of the highest calibre and providing them with the necessary training and facilities enabling them to reach their maximum potential as designers and managers
Providing correctly engineered solutions
Maintaining our independence with no conflict of interest
Operating an internal quality assurance system that targets the activities directly related to the quality of product and service that our Clientsdemand and deserve
MARKET SECTORS:
We offer the combined skills of experienced construction staff and engineers for:
Bridge design and construction
Gas processing plant construction
Geotechnical advice and interpretative reports
Load movement transport and lifting
Modular construction
Off-shore construction
Plant/Refinery outages, revamps and upgrades
Power plant construction (fossil and nuclear)
Refinery construction
Structural assessment of existing structures
Structural design and construction
www.lowther-rolton.com 3
LowtherRolton
CONSTRUCTION MANAGEMENT: Our team of experienced construction engineers and managers can integrate into a Client’s project team at any stage however, involving us at the earliest opportunity will maximise benefits. To date we have provided this service on projects up to a value of $2.5bn, offering construction management combined with design and draftingfacilities:
Bridge construction
Building construction
Gas processing plant construction
Load movement activities
Off-shore construction
Outages/turnarounds
Power/energy plant construction
Refinery construction
DESIGN: We offer a comprehensive design and detailing service for permanent or temporary structures:
Bridges
Cranes
Foundations
Jack and slide systems
Jacking tower systems and masts
Lifting equipment
Load movement schemes
Modules
Process structures
Shell structures
Static and travelling formwork
Transportation units
CONSTRUCTION PLANNING:
Our staff are highly experienced in their chosen fields and our early involvement as part of a project planning team can assist to optimise:
Constructability
Contingencies against schedule overrun
Economy
Flexibility
Modularisation
Safety
We offer technical advice to our Client and their design/construction team on construction techniques and specifically the engineering supporting modularisation. To fully realise the cost and time benefits of this modern and proven technique of construction it is imperative that experienced advice on the issues affecting design, assembly, transportation and installation of Modules and Vessels is sought at an early stage. Our advice, being independent, shall consider a range of equipment options which is not influenced by contractors’ specific preference.
TECHNICAL AUDITING:
A significant amount of our work is the 3rd party independent Technical Auditing of contractors’load movement proposals. This particular service is a risk management strategy for the Client,determining that operations can be completed safely with minimum risk to personnel and plant. Acting on behalf of our Client we undertake a comprehensive analysis of contractors’ proposed procedures, perform independent design checks of the associated engineering aspects thereby addressing any interfaces. This continues to the operational locations to monitor the contractors’compliance with accepted procedures.
Throughout our analysis we carefully consider the contingency plans that may be provided against a failure in performance, or supply, of equipment. Our objective is to assist in the development of operational planning, this being made as efficient as practicable, which has minimum risk of schedule overrun and maximises safety while complying with all relevant statutory regulations, engineering codes and good working practices.
www.lowther-rolton.com 4
LowtherRolton
Acai Project - Camaçari Petrochemical Complex, Brazil Client: BASF
Contracted by BASF/Worley Parsons as independent Technical Auditors and advisors for the movement of a 65m long Condensation Tower for BASF’s Acai Project at Camaçari, Bahia, Brazil. The total weight of the transport was 730Te. The move was particularly challenging as the 50km delivery route featured numerous overhead obstructions, width restrictions, gradients, junctions and weak bridges. Due to imposed axle weight restrictions while crossing bridges, the transport operation required in total 60 transporter axles (120 suspension units), together with turntables, which were required for manoeuvrability. Lowther-Rolton undertook a Technical Audit of the route surveys and transportation engineering aspects together with site attendance, providing oversight during the road transportation.
NIPSCO Dry FGD Retrofit Project - Indiana, USA Client: NIPSCO/Graycor Industrial Contractors Inc
Conceptual and detailed design of stowage plans and sea-fastenings for multiple shipments of process equipment items for transportation by flat top barge.
Blacktip Platform Jacket and Topside Load-out Project - Henderson, WA, Australia Client: Eni-Saipem/Tutt Bryant Project Services
Load movement engineering for the transportation and Ro/Ro load-out operations of the Blacktip Platform’s Jacket and Topside structures, weighing 1,203Te and 585Te respectively, from the fabrication facility on to sea-going barges, including trailer and marine engineering. On-site verification and technical assistance to ensure all requirements of the transportation and load-out studies were implemented.
www.lowther-rolton.com 5
LowtherRolton
BP Whiting Refinery Modernization Project - Whiting, Indiana, USA Client: BP Products North America Inc
Contracted to BP as independent 3rd party Technical Auditors and advisors for all transportation and heavy lifting proposals together with the associated engineering aspects, including attendance at the operationallocations. This ensured compliance with the accepted procedures and requirements of the transportationand lifting studies were implemented prior to the load movement, with constant monitoring during the operations. Our role comprised of independent 3rd party assurance (Technical Audit) for the loading/transhipment/off-loading, transportation and installation of approximately 1,000 process equipment items, up to 950Te, Modules, up to 560Te and included Pump Foundation Modules complete with Pumps.
Carson Refinery Coker Power and DCS Project - California, USAClient: Tesoro Refining & Marketing Company Ltd
When a US West Coast Refinery carried out an upgrade to their Coker Unit, the required electrical building had to be constructed using the modular approach due to the congested nature of the existing Refinery Unit. Although each of the four sections, which comprised the two story building,were each relatively light, weighing approximately 28Te, the characteristics of the lift over live services and existing buildings determined that a comprehensive in depth study was required. Fortunately the owner’s project team identified this requirement early in the project and Lowther-Rolton were contracted to provide 3rd party Technical Audit services. Over a 12 month period Refinery, engineering and contractor personnel together with Lowther-Rolton ensured that the installation plan was thoroughly and accurately engineered, planned and risk assessed, leading to a flawless lift and installation operation using a 400Te capacity hydraulic mobile crane.
www.lowther-rolton.com 6
LowtherRolton
Caspian Azeri Project - Phase 1 Central Azeri Platform - Baku, Azerbaijan Client: BP Exploration/Azerbaijan International Operating Company (AIOC)
Independent Technical Audit for installation of a DES and DSM Module each up to 1,200Te, onto the main Central Azeri Platform using 4 cranes to raise each Module then crawl approximately 20m and lift approximately 15m to above the installation level. Crawl again 10m with 4 cranes and land each Module’s leading edge on the platform, remove the leading 2 cranes and subsequently skid each Module, while crawling with 2 cranes the remaining 25m suspending the rear of each Module.
ConocoPhillips Darwin LNG Project - Darwin, NT, Australia Client: ConocoPhillips
Lowther-Rolton were appointed by WorleyParsons to undertake a Technical Audit of the land transportation, laydown dressing support and installation of an Absorber Column weighing up to 595Te dressed, including lifting/tailing attachments, together with the design check of the associated engineering aspects and operational attendance during transportation and lifting operations.
The Absorber arrived at East Arm Wharf Darwin, where it was discharged by ship’s gears onto a Goldhofer draw-bar trailer for onward transportation to ConocoPhillips’ Darwin LNG facility at Wickham Point. It was subsequently self-offloaded and jacked approximately 1.8m by Goldhofer trailer onto support stools for final dressing. On completion of dressing the Absorber was tailed by LR11350 (main) and M18000 (tail) crane and subsequently installed by LR11350, configured with 430Te superlift counterweight.
Anzac Class Frigate Load-in Project - Henderson, WA, Australia Client: AMC/Tutt Bryant Project Services
Lowther-Rolton provided professional engineering services to undertake a detailed design review of land transportation proposals issued by AMC/TBPS for the transfer phase of the docking operation for the 3,500Te, 118m long ANZAC class Frigates at the AMC Facility at Henderson, WA. The transfer operation utilized 129 axles (258 suspension units) of SPMT trailers configured in a 6 file arrangement.
www.lowther-rolton.com 7
LowtherRolton
1,500Te SWL Modular Jacking Tower System - Taiwan, ROC Client: Formosa Heavy Industries Corp
Conceptual and detailed design and production of fabrication drawings for a 1,500Te SWL 76m high twin tower strand jacking system for the installation of petrochemical Vessels up to 1,500Te and 120m long.Each tower being 71m high and capped by a 5m deep U frame that bridged between the tower tops. The U frame allowed Vessels taller than the towers to be installed and used to resist tower top eccentric loadings and to portalise the towers for stability.
BP Zhuhai PTA #2 and PTA #3 Projects - Zhuhai, China Client: BP Chemicals Ltd
Independent Technical Audit, including site attendance, for the transportation and installation of 21 Process Vessels and Modules.
The heaviest item to be installed at BP Zhuhai was the CT232 Dehydration Tower, weighing 655Te and a height of approximately 58.4m. Prior to installation, the Tower was tailed from the horizontal to the vertical using two cranes,
Terex-Demag CC8800-1 main crane and Terex-Demag CC5800 tail crane. Once the Tower reached vertical, the tail crane was released and the main crane, configured with 600Te of superlift counterweight,completed the installation. During the installation, the Tower was required to be carefully manoeuvred above and between existing structures with minimal clearances on 3 sides of the Tower foundations.
Prior to the installation of Silo Cone CF610, weighing 352Te, the Silo Cone was required to be rotatedvertically through 180° using two cranes, Sany SCC16000 main crane and Terex-Demag CC2800 tail crane. Once rotated to vertical, the tail crane was released and the main crane, configured with 560Te of superlift counterweight, completed the installation into the Silo structure, hoisting the Silo Cone to a height of approximately 98m.
www.lowther-rolton.com 8
LowtherRolton
Finite Element Modelling to Determine Shell Stresses Around Lifting Attachments
We routinely use Finite Element (FE) modelling to determine shell stresses around lifting attachments where the shell geometry or lifting attachment details fall outside the design provisions of the pressure Vesselcodes. In the following example a 125Te pressure Vessel is to be lifted by trunnions, which are welded to the shell via compensation plates close to the torispherical end.
In-house Computer Programs for the Analysis of Transportation and Heavy Lifting Operations
We have developed a specialist range of in-house programs for the detailed analysis of transportation and lifting operations. These include programs for the analysis of transportation by trailer and ship, the tailing of petrochemical Columns and the dynamic behaviour of load movement. These programs are used to check stability during the operation and provide design forces for loaded structural elements.
Berkeley Nuclear Power Station - Berkeley, UK Client: Hewden Stuart Heavy Lifting Ltd
Decommissioning of 390Te Heat Exchangers. Detailed design of a lifting collar and Finite Element Analysis of the Vessel shell to check stresses during lifting and support in saddles.
www.lowther-rolton.com 9
LowtherRolton
Tsing Ma Suspension Bridge - Hong Kong Client: John Gibson Agencies Ltd
Detailed design of steel jacking towers, incorporating strand jacks, for the erection of prefabricated steel side span units weighing up to 1,450Te. The side span units were lifted from ground level to top of pier level, a vertical distance of 56m, and skidded sideways on the pier tops into final position.
BHP Hot Briquetted Iron Project - Port Hedland, WA, Australia Client: BHP-Direct Reduced Iron Pty Ltd
Construction engineers for the Hot Briquetted Iron Project at Port Hedland, WA, which involved the modular construction of the 2 major structures up to 100m high and a Gas Generation Plant. Lowther-Rolton were responsible for the concept, development and engineering of the modular construction technique for the major structures, engineering and management of all transport and heavy lift activities and Technical Audit of all contractors’ associated load movement proposals. The structures included 15,000Te of structural steel, 24 heavy process equipment items, numerous heavy presses and rotating equipment. The Gas Generation Plant comprised 27 Modules, up to 480Te each, 6 major Columns, further Vessels and a 100m high common Flue Stack.
www.lowther-rolton.com 10
LowtherRolton
LOWTHER-ROLTON PROJECTS
CONSTRUCTION MANAGEMENT AND PLANNING:
ARABIAN PETROCHEMICAL COMPANY Olefins III Plant - Al-Jabail, Saudi Arabia
Client: Kinetics Technology International BV Detailed structural analysis of 4 No 2,500Te Furnace Modules, to conceive a land transportation scheme by SPMT incorporating a hydraulic load balancing system between each Module and the SPMT, to evenly distribute the Module’s self weight over its 44 support points, with minimal strengthening steelwork.
AMC/TUTT BRYANT Docking of ANZAC Class Frigate Project - Henderson, WA, Australia
Client: AMC/Tutt Bryant Project Services Docking and transportation of a 3,500Te Naval Frigate. See page 6.
Docking of Volxox Anglia Dredging Barge - Henderson, WA, Australia Client: AMC/Tutt Bryant Project Services Preparation of engineering calculations and detailed drawings for the docking transfer of the 1,540Te dredging barge and support cradles from the floating dock utilizing 129 of SPMT axles.
Utah Point Berth Project - Henderson, WA, Australia Client: AMC/Tutt Bryant Project Services Preparation of engineering calculations and detailed drawings for the transportation of 56m high Shiploader using 36 axle lines of SPMTs with a total payload of 648Te.
BHP Hot Briquetted Iron Project - Port Hedland, WA, Australia
Client: BHP-Direct Reduced Iron Pty Ltd Construction engineers for the HBI Project. See page 9.
BP OIL FCC Stages 1 and 2 Projects - Grangemouth Refinery, UK
Client: BP Oil Grangemouth Refinery Ltd Construction engineers appointed for construction concept, tender, engineering, Technical Auditing and operational attendance during all transportation and lifting operations, on behalf of BP.
LPG Storage Upgrade, TAR94, TAR98, TAR08 and TAR12 Projects - Kwinana Refinery, WA, Australia Client: BP Kwinana Refinery Pty Ltd Operational attendance for Turnaround, including installation of a 230Te Fractionation Column pre-turnaround. Detailed design of lifting scheme for decommissioning of existing Columns and Fractionator.
BP CHEMICALS SECCO Project - Shanghai, China
Client: BP Chemicals China Technical assistance for a load-in facility to deliver process equipment items for new refining facility.
DAVY JOHN BROWN Mogas Project - Kwinana Refinery, WA, Australia
Client: Davy John Brown Pty Ltd Operational attendance, engineering advice and management for installation of Vessels up to 165Te.
ENI-SAIPEM/TUTT BRYANT Blacktip WHP Loadout Project - Henderson, WA, Australia
Client: Eni-Saipem/Tutt Bryant Project Services Load movement engineering for the 1,203Te and 585Te Platform Jacket and Topside. See page 4.
FAIRFIELD MABEY Bridge and Monorail Construction Projects - UK and Dominican Republic
Client: Fairfield Mabey Ltd Operational attendance, engineering advice and management for various bridge erection projects.
FOSTER WHEELER Clark Refinery Project - Port Arthur, Texas, USA
Client: Foster Wheeler Construction Inc Site attendance, engineering advice and management of installation projects for Foster Wheeler in Port Arthur, Texas.
Exxon Singapore Aromatics Project - Singapore Client: Foster Wheeler Eastern Pte Appointment to Foster Wheeler Eastern for provision of transportation and heavy lift engineer and co-ordinator during the construction phase for installation of approximately 200 Modules.
RCCU Project - Stanlow Refinery, UK Client: Foster Wheeler Energy Ltd Operational attendance, engineering advice and management for installation of Reactor, Regenerator, and Fractionator weighing up to 670Te.
www.lowther-rolton.com 11
LowtherRolton
HATCH INCO Nickel Project - New Caledonia
Client: Bechtel/Technip/Hatch JV Technical assistance and planning during the Bankable Feasibility study for modular construction of Nickel Processing Plant for INCO. Technical assistance to the JV for load movement operations covering sea and land transportation of pre-defined Modules.
LINDE AG CWHE Replacement Project - Algeria
Client: Linde AG Engineering Division Preparation of conceptual lifting studies for the replacement of a 127Te Main Cryogenic Heat Exchanger.
MOBIL OIL Isomerisation Unit , 92 and 94 Turnaround Projects - Coryton Refinery, UK
Client: Mobil Oil Company Ltd Operational supervision, on behalf of Mobil, of all craneage operations. Comprising numerous lifts and utilising up to 43 cranes on site at one time. Operational attendance for the transportation and installation of 11 PAUs, 7 PARs and 8 Columns.
NIPPON EXPRESS PTE Nippon Express, Seraya 2 Project - Singapore
Client: Nippon Express (Singapore) Pte Operational attendance, engineering advice and management for installation of Vessels.
ORINOCO IRON Hot Briquetted Iron Project - Puerto Ordaz, Venezuela
Client: Orinoco Iron CA Construction engineers for the HBI Project, similar to that in Australia.
PT PENI Heat Exchanger Replacement, Flare Derrick and Reactor Installation Projects - Merak, Indonesia
Client: PT Petrokimia Nusantara Interindo. Operational attendance for erection of a sub- assembled Flare stack derrick, 120m high. Independent technical check, safety audit, including site attendance, for the installation of a Reactor comprising two sections, the top weighing 190Te. The lift utilised a Manitowoc M4600 Ringer crane mounted on a piled foundation. The Technical Audit considered the Reactor, lifting equipment and geo-technical analysis of imposed ground loadings.
REDPATH DORMAN LONG/CLEVELAND BRIDGE Birmingham Convention Centre Project - Birmingham, UK
Client: Redpath Dorman Long (RDL)/Cleveland Bridge Construction engineers, engineering advice and management for constructing the Birmingham Convention Centre roof.
Building Erection Projects - London, UK Client: Redpath Dorman Long (RDL)/Cleveland Bridge Construction engineers, engineering advice and management for various building erection projects through London including Canary Wharf DF-7/FC-4, Cannon Street Station, Earls Court Station, Embankment Place, Victoria Station and News International Buildings.
SHELL REFINING FCCU Revamp Project - Clyde Refinery, Sydney, NSW, Australia
Client: Shell Australia Construction engineers for the removal/replacement of process equipment during the FCCU Revamp. Involvement from concept stage for the proposed removal through detailed engineering to operational attendance as heavy lift engineer for the project task team.
RCCU Shutdown Projects - Geelong Refinery, Vic, Australia Client: Shell Australia Construction engineers for the removal/replacement of process equipment during various RCCU and Unit Shutdowns since 1999. Involvement from concept stage for the proposed removal through detailed engineering to operational attendance as heavy lift engineer for the project task team.
TECHNIP BENELUX CCRU Project - Tarragona, Spain
Client: Technip Benelux Technical assistance, operational attendance, surveying and management for the construction and load movement of CCRU Modules from assembly to installed position.
TOTALFINAELF HDS-2 Revamp Project - Lindsey Oil Refinery, North Killingholme, UK
Client: TotalFinaElf Technical assistance from tender stage for transportation and lifting of 380Te Reactor into live plant.
Unit 31 Turnaround Project - Antwerpen Refinery, Belgium Client: TotalFinaElf Technical assistance from tender to completion for transportation and lifting of process equipment Columns and Modules during the Alkylation Turnaround.
www.lowther-rolton.com 12
LowtherRolton
DESIGN:
BANGKOK ELEVATED ROAD AND TRAIN SYSTEM - BANGKOK, THAILAND Client: Ove Arup and Partners Conceptual and tender design, including specification and detailing, of delivery/erection gantry crane system for transportation and erection of pre-cast concrete box girders up to 1,500Te and 45m in length.
BERKELEY NUCLEAR POWER STATION - BERKLEY, UK Client: Hewden Stuart Heavy Lifting Ltd Decommissioning of 390Te Heat Exchangers. See page 8.
BLACKTIP JACKET AND TOPSIDE - WA, AUSTRALIA Client: Tutt Bryant Project Services Load movement engineering for the 1,203Te and 585Te Platform Jacket and Topside. See page 4.
BRISBANE BICENTENNIAL BIKEWAY - QLD, AUSTRALIA Client: EPOCA Construction Pty Ltd Conceptual and detailed design of an erection method for 60Te pre-cast concrete deck beams over water. A single pile at each pier supports 4 No pre-cast beams by means of a cast in-situ diaphragm. Our work included the detailed design of a temporary erection frame, to lift and support the 4 No PC beams at each pile while casting the diaphragms.
CAIRNS CONVENTION CENTRE PHASE II - QLD, AUSTRALIA Client: J & R Rigging Pty Ltd/Abi Group Conceptual and detailed design of erection method for the roof structure, including the detailed analysis of the roof at all stages of erection, with particular attention to the effect of cyclone loading. We were responsible for the detailed design of the erection method including the temporary roof stability bracings, a temporary roof support system, crawler crane foundations and rigging systems.
CENTRAL MRT STATION - HONG KONG Client: Gammon Construction Ltd Conceptual and detailed design of temporary works for jack-up and lateral skid of two 900Te trussed roof structures. Each roof structure was lifted with 8 No 185Te SWL strand jacks, 2 No per corner, which were supported on cantilever steelwork stressed to temporary post tensioned concrete corbels. Lateral skid into final position utilised 4 No 36Te SWL 1m stroke rams.
DOCKSIDE CONTAINER CRANE, REPAIR AND RELOCATION - FELIXSTOWE, UK Client: Baldwins Industrial Services Ltd Conceptual and detailed design of all temporary works required for jack-up, repair and transportation of this 1,000Te by 30m long x 18m wide x 87m high dockside crane, which had suffered ship impact. Temporary works comprised a 36Te steel support frame, incorporating Mabey proprietary trestling, and local strengthening of the crane. Transportation was by self-propelled modular transporters (SPMT).
HADRIANS BRIDGE - CARLISLE, UK Client: Norwest Holst Construction Ltd Tender design of an erection method and permanent foundations for a two span ‘ribbon’ footbridge bridge with a main span of 108m and a side span of 46m at 34 degrees to the main span.
HAECO AIRCRAFT MAINTENANCE HANGAR ROOF - HONG KONG Client: Kvaerner Cleveland Bridge International Ltd Conceptual and detailed design of a strand jacking system and associated temporary works to lift 2 No 1,000Te hangar roof sections from ground level to final height.
HEAT EXCHANGER REPLACEMENT - MERAK, INDONESIA Client: PT Petrokimia Nusantara Interindo Conceptual and detailed design of a gantry system, incorporating a strand jack system, for the removal and replacement of two 60Te Exchangers from within an existing support and enclosure structure. Our brief included the design and detailing of the gantry system, modifications to the existing structures, supervision of the manufacture of the gantry system, provision of the strand jacks (on behalf of the Client) and site supervision for the removal and replacement operations.
HONG KONG CONVENTION AND EXHIBITION CENTRE PHASE II EXTENSION - HONG KONG Client: System Max Ltd Erection of main roof and link bridge structure. Detailed design of all temporary works for the erection of a 5,500Te trussed roof structure spanning 81m between supporting concrete diaphragm walls. The roof was erected by jacking braced pairs of trusses weighing up to 460Te from ground level to full height and skidded into final position. Detailed design and detailing all temporary works for the erection of a 4,250Te Link Bridge structure spanning 91.2m over a water channel between the new and old Convention Centres.
KAP SHUI MUN BRIDGE - HONG KONG Client: Yokogawa-Hitachi JV Detailed design of casting yard skidding system, incorporating 16No 100Te SWL hydraulic jacks, for transportation of 500Te main span deck units in Yokogawa-Hitachi JV casting yard onto barges. Up to 4 units skidded simultaneously in a continuous match cast operation. Conceptual design of mobile lifting gantries for the erection of 500Te main span deck units by strand jacks.
www.lowther-rolton.com 13
LowtherRolton
MEDWAY BRIDGE CHANNEL TUNNEL RAIL LINK - MEDWAY, UK Client: Norwest Holst Bilfinger+Berger JV Preparation of tender submission method statements, drawings and quantities for temporary works to construct a 1.26 km long concrete viaduct over the river Medway. Central spans are of cast in-situ balanced cantilever construction. Side spans are cast in sections behind the abutments and incrementally launched into final position.
NIPSCO DRY FGD RETROFIT PROJECT - INDIANA, USA Client: Northern Indiana Public Service Company (NIPSCO)/Graycor Industrial Constructors Inc Conceptual and detailed design of stowage plans and sea fastening details for multiple shipments of process equipment items by flat top barges up to 56Te each.
NOIDA BRIDGE - INDIA Client: Taylor Woodrow International Ltd Preparation of tender submission method statements, drawings and quantities for a self launching gantry to erect the 552.5m long 13 span pre-cast segmental bridge. Segments weighing up to 90Te were supported on an under slung truss system then glued and stressed together span by span.
REFUELLING CRANE DISMANTLING, NUCLEAR SUBMARINE REFIT COMPLEX - HMNB DEVONPORT, UK Client: Kier Construction Ltd Tender design of a dismantling method for a 1,450Te submarine refuelling pedestal crane inside an operational nuclear submarine refit facility. The dismantling method had to consider the presence of a nuclear submarine within the sweep path of the crane and carefully engineered to provide the best possible safety case for approval by the Nuclear Installations Inspectorate.
RENOVATION OF ST OLAVES BRIDGE - NORFOLK, UK Client: John Graham Construction Ltd St Olaves Bridge is a single span tied arch cable stayed steel bridge that required full replacement of deck and hangers being replaced in stages during short closures, whilst maintaining traffic flow over the bridge during the day. We were responsible for engineering a temporary bridging structure with ramps for traffic to pass over the section of deck being replaced during the day and preparing fabrication drawings of the new steelwork.
STAINLESS STEEL HEAT EXCHANGER - UK Client: Wykes Engineering Ltd Detailed design for Lloyds Register Plans Approval of a pressurised Heat Exchanger for food processing. Our work included non-linear Finite Element Analysis of the stainless steel drier disks.
STATOIL - DENMARK Client: Van Seumeren Ltd Detailed design for Van Seumeren of tailing frame for 6 No. petrochemical Vessels, weighing up to 105Te.
TING KAU BRIDGE, DECK ERECTION GANTRIES - HONG KONG Client: Ting Kau Contractors JV Conceptual and detailed design of self-launching gantries for the erection of steel deck frames weighing up to 90Te and the placing of 12Te pre-cast deck slab units on the erected deck frames, for this 1,177m long, 4 span, twin deck cable stayed bridge.
TSING MA SUSPENSION BRIDGE - HONG KONG Client: John Gibson Agencies Ltd Detailed design of steel jacking towers for the erection of prefabricated steel units weighing up to 1,450Te. See page 9.
WOODSIDE LNG IV PROJECT - WA, AUSTRALIA Client: WE SmithHudson Pty Ltd Design of sea and land transportation system, including redesign of others transportation beams, for Butted Kettles weighing up to 210Te.
CC4800 QUICK RELEASE SLEW RING ADAPTER - UK Client: Baldwins Industrial Services Ltd Detailed design and detailing of a quick release slew ring adapter for the Demag CC4800 crawler crane. The adapter was designed to be permanently inserted between the slew ring and the car body, replacing the standard site connection of torqued bolts with pins.
1,500TE SWL JACKING TOWER SYSTEM - TAIWAN, ROC Client: Formosa Heavy Industries Corp Conceptual and detailed design for a 1,500Te SWL 76m high twin tower strand jacking system. See page 7.
1,500TE SWL MODULAR JACKING TOWER SYSTEM - ABU DHABI, UNITED ARAB EMIRATES Client: Abnormal Load Engineering Ltd Conceptual and detailed design of a 1,500Te SWL, 106m high modular jacking tower system, incorporating strand jacks. This required development of a 4 tower system with internal bracing offering the full height and load capabilities without the requirement for external guys.
www.lowther-rolton.com 14
LowtherRolton
TECHNICAL AUDITING: Lowther-Rolton’s comprehensive independent checking procedure (Technical Audit) for sea/land transportation and lifting activities, including all associated engineering aspects, culminating in attendance at operational locations were appointed to the following projects, these being a small range from our full list.
BASF/WORLEYPARSONS Acai Project - Camaçari Petrochemical Complex, Brazil
Client: BASF South America
BHP Hot Briquetted Iron Project - Port Hedland, WA, Australia
Client: BHP-Direct Reduced Iron Pty Ltd
BP CHEMICALS CAPCO #6 Project - Taiwan
Client: BP Chemicals Ltd Ethylene 4 Project - Grangemouth Refinery, UK
Client: BP Chemicals Grangemouth Ltd Zhuhai PTA #2 and PTA #3 Projects - Zhuhai, China
Client: BP Chemicals Ltd
BP EXPLORATION Caspian Azeri Phase 1 and Shah Deniz Projects - Baku, Azerbaijan
Client: BP Exploration/Azerbaijan International Operating Company (AIOC) In-Salah Gas and In-Amenas Projects - Algeria
Client: BP Exploration/Sonatrach JV Kinneil Terminal Expansion Project - Kinneil, UK
Client: BP Exploration Ltd Nam Con Son Gas Project - Vietnam
Client: BP Exploration Vietnam Sullom Voe Terminal Expansion Project - Sullom Voe, UK
Client: BP Exploration Ltd Tangguh LNG Project - Indonesia
Client: BP Exploration Ltd
BP OIL AARRP and FCCU Major Items Replacement Projects - Bulwer Refinery, Qld, Australia
Client: BP Bulwer Island Refinery Pty Clean Fuels (Diesel and Gasoline) Project - Coryton Refinery, UK
Client: BP Oil Coryton Refinery Ltd FCCU Reactor Replacement Project - Coryton Refinery, UK
Client: BP Oil Coryton Refinery Ltd/International Alliance Group (IAG) HDS Revamp Clean Fuels Project - Lavera Refinery, France
Client: BP Lavera/Innovene Manufacturing France SAS LPG Storage, TAR94, TAR98, TAR08 and TAR12, Projects - Kwinana Refinery, WA, Australia
Client: BP Kwinana Refinery Pty Ltd Mogas Project - Kwinana Refinery, WA, Australia
Client: BP Kwinana Refinery Pty Ltd/Davy John Brown Pty Ltd NHDS & Reformer Project - Cherry Point Refinery, Washington, USA
Client: BP West Coast Products LLC OCC Whiting Refinery Modernization Project - Whiting Refinery, Indiana, USA
Client: BP Products North America Inc RCCU Expansion Project - SRC Refinery, Singapore
Client: BP Singapore Pte Reformer, Hydrofiner and FCCU Projects - Grangemouth Refinery, UK
Client: BP Oil Grangemouth Refinery Ltd TSS & HSS, Isomerisation Unit, 93 and 97 Turnaround Projects - Coryton Refinery, UK
Client: Mobil Oil Co Ltd/BP Oil Coryton Refinery Ltd
BP PIPELINES AND LOGISTICS Liquid Slug Mitigation Project - BP Destin Pipeline, Mississippi, USA
Client: BP US Pipelines and Logistics
www.lowther-rolton.com 15
LowtherRolton
CALTEX DHTU-2 Project - Lytton Refinery, Brisbane, Qld, Australia
Client: Caltex/SheddonUhde FCCU Event 2010 Project - Lytton Refinery, Brisbane, Qld, Australia
Client: Caltex
CESKA RAFINERSKA FCCU Project - Kralupy Refinery, Czech Republic
Client: Ceska Rafinerska AS/Conoco/Shell
CNOOC AND SHELL PETROCHEMICALS COMPANY CSPC Nanhai LOP Project - Nanhai, China
Client: JGC Corp
CONOCOPHILLIPS/WORLEYPARSONS CO2 Absorber Corrosion Rectification Project - Darwin LNG, NT, Australia
Client: ConocoPhillips
DUQM REFINERY AND PETROCHEMICAL INDUSTRIES COMPANY Duqm Refinery - Sultanate of Oman
Client: Duqm Refinery and Petrochemical Industries Company (DPIC)/Technip E&C Ltd
ESSO/EXXONMOBIL APH, Powerformer, Reactor, TCV Revamps and Residfiner Projects - Fawley Refinery, UK
Client: ExxonMobil Ltd ESP Olefins Recovery Project - Torrance Refinery, USA
Client: ExxonMobil Oil Corp MEK AC3 D681 Replacement and WCHD F104X Materials Upgrade Projects - Fawley Chemicals, UK
Client: ExxonMobil Chemicals Ltd SPT Olefins Recovery Project - Singapore Refinery
Client: ExxonMobil Chemical Asia Pacific Pte Ltd
FORTESCUE METALS GROUP AP5 Project - Port Hedland, WA, Australia
Client: Fortescue Metals Group Ltd Pty
FOSTER WHEELER/SOFCON Propylene Oxide Project - Sadara Chemicals Company, Jubail, Saudi Arabia
Client: Foster Wheeler Arabia Ltd/SOFCON
INEOS KG Flex Project - Grangemouth Facility, UK
Client: INEOS Manufacturing Scotland Ltd S5-TGT Project - Lavera Refinery, France
Client: INEOS Manufacturing France SAS W-T-06 Project - Grangemouth Facility, UK
Client: INEOS Manufacturing Scotland Ltd/Jacobs
LINDE AG Sakhalin II Phase 2 LNG Plant Project - Sakhalin, Russia
Client: Linde AG Engineering Division
MOBIL NORTH SEA SAGE ‘B’ Gas Plant Project - St Fergus, UK
Client: Mobil North Sea Ltd
MURCO 2010 T&I Preparation Project – Milford Haven Refinery, UK
Client: Murphy Oil Corp
NORTH WEST SHELF VENTURE LNG Train III Revamp Project - Karratha, WA, Australia
Client: Woodside Energy Ltd LNG Phase IV Expansion Project - Karratha, WA, Australia
Client: Kelloggs/JGC/Kaiser JV LNG Phase V Expansion Project - Karratha, WA, Australia
Client: Woodside Energy Ltd
ORINOCO IRON Hot Briquetted Iron Project - Puerto Ordaz, Venezuela
Client: Orinoco Iron CA
www.lowther-rolton.com 16
LowtherRolton
PT PENI Flare Derrick Erection and Reactor Installation Projects - Merak Refinery, Indonesia
Client: PT Petrokimia Nusantara Interindo
SAKHALIN ENERGY INVESTMENT COMPANY Sakhalin II LNG Project - Sakhalin, Russia
Client: CTSD Ltd (Chiyoda/Toyo Engineering JV)
SANTOS Ballera Gas Centre Phase 4 Expansion Project - Ballera Gas Plant, Qld, Australia
Client: Santos Ltd
SARAS REFINERY Mild Hydrocracker (MHC2) Expansion Project - Sardinia, Italy
Client: Parsons International
SHELL CHEMICALS Seraya Chemicals Expansion Project - Singapore
Client: Shell Chemicals Singapore Pte Ltd
SHELL OIL Hydrocracker Complex, Naptha Minus Complex and Reactor Dismantling Projects - Haven Refinery, UK
Client: Shell Oil UK Ltd CD Hydro, Gas Tails, RCCU II Reactor Revamp and ROMP Projects - Stanlow Refinery, UK
Client: Shell Oil UK Ltd
SHELL REFINING FCCU Revamp and Mogas Projects - Clyde Refinery, Sydney, NSW, Australia
Client: Shell Australia Pty Ltd Mogas, RCCU Revamp 99, 07 and RCCU Shutdown 97, 04, 07 Projects - Geelong Refinery, Vic, Australia
Client: Shell Australia Pty Ltd LRCC Project - Port Dickson Refinery, Malaysia
Client: Shell Refining Co-Malaysia/JGC Corp
SIEMENS Generator/Stator and Rotor Replacement Projects - ANO, Braidwood, Comanche Peak, Darlington,
McGuire, Pecem, Redhawk, Robinson and White Water Power/Nuclear Plants, Brazil and USA Client: Siemens Energy Inc
TECHNIP BENELUX CCRU Project - Tarragona, Spain
Client: Technip Benelux
TESORO Coker Power and DCS Project - Carson Refinery, California, USA
Client: Tesoro Refining & Marketing Company Ltd
TEXACO I&T 2001, 2003 and ULSG Projects - Pembroke Cracking Complex, UK
Client: Texaco Ltd
TOTALFINAELF Alkylation Turnaround and Unit 31 FCCU Turnaround Projects - Antwerpen Refinery, Belgium
Client: TotalFinaElf HDS-2 Revamp Project - Lindsey Oil Refinery, North Killingholme, UK
Client: TotalFinaElf
TRAFIGURA EF90 - TEXAS, USA EF90 Storage Terminal and LPG Tank Projects - Corpus Christi, Texas, USA
Client: EF90 LLC