LQS03 Readiness Review, Feb 21, 2012 Introduction – G. Ambrosio 11
IntroductionGiorgio Ambrosio
LQS03 Readiness Review LBNL
February 21, 2012
BNL - FNAL - LBNL - SLAC
LQS03 Readiness Review, Feb 21, 2012 Introduction – G. Ambrosio 22
Charge
Goals:
Evaluate the readiness of coils, structure, assembly and test plan for LQS03
Committee:
G. Ambrosio, H. Felice, A. Ghosh.
Location:
LBNL video-meeting room
BNL and FNAL through video-mtg link IP#: 8852771 (back-up#: 8552771)
Date and Time:
February 21, 2012 from 8:30am to 2:30pm (Pacific Time)
Link to talks:
https://plone.uslarp.org/MagnetRD/longquad/meetings/fy12/lqs03rr/
Format:
Internal review; everybody is invited to ask questions and make comments.
LQS03 Readiness Review, Feb 21, 2012 Introduction – G. Ambrosio 33
Agenda (Pacific time)
Introduction and chargeo Time: 8:30-8:40 (Giorgio Ambrosio)
Conductor: strands, cabling, insulation, and witness sampleso Time: 8:40-9:00 (Dan Dietderich)o Time: 9:00-9:20 (Arup Ghosh)o Time: 9:20-9:40 (Vito Lombardo)
Coffee break: 9:40-10:00 Coils: fabrication data and tests – Coils #15, #17, and #19.
o Time: 10:00-10:30 (Fred Nobrega) Coils: fabrication data and tests – Coils #16 and #18.
o Time: 10:30-11:00 (Jesse Schmalzle) Coils: All coils qualification tests and heater connections
o Time: 11:00-11:30 (Ray Hafalia, Maxim Martchevskii) Discussion of conductor and coils data
o Time: 11:30-12:00 Lunch: 12:00-1:30 Structure and assembly plans
o Time: 1:30-2:00pm (Helene Felice) Test preparation and test plan
o Time: 2:00-2:30pm (Guram Chlachidze)