6
Make the most of your energy Low Voltage Electrical Distribution Switchboard modernisation ECOFIT TM Upgrade your installation from Masterpact M to Masterpact NW and open the door to Energy Management PE90458

Low Voltage Electrical Distribution PE90458 … · by a new Masterpact NW device and its dedicated adaptation kit. Masterkit lets you optimise the performance of your installation,

Embed Size (px)

Citation preview

Make the most of your energy

Low Voltage Electrical DistributionSwitchboard modernisation

ECOFITTM

Upgrade your installation from Masterpact M to Masterpact NW and open the door to Energy Management

ECOFIT

PE

90458

Energyefficiencynow within your reach,

thanks to Plug & Play and Masterkit upgrade solutions

To counter rising energy

costs and cut greenhouse

gas emissions, we must

all find new ways to reduce

energy consumption.

Distributed energy metering

is a critical first step.

It will help you understand

exactly where, when,

and how much energy

is consumed throughout

your facilities, revealing

valuable opportunities

to improve your efficiency.

Buildings can achieve up to 30% energy savings with an Active Energy ManagementTM programme that includes an energy metering system!

The new Micrologic E, is the standard control unit for our upgrade

solutions, offering cost-effective protection and measurement features

to help you optimise your consumption.

The Micrologic P & H models deliver a higher level of information

including advanced protections and harmonics measurement.

NEW

PE

90456

PE

90457

If you need…

…our Plug&Playsolution is for you

Our Plug&Play solution lets you retrofit Masterpact M devices

with considerable reduction of on-site intervention time.

You conserve the existing Masterpact M chassis.

Busbar and cable connections are not disturbed, only the circuit

concerned needs to be isolated (for as little as 30 minutes*).

30minutes* and 2easy operations

11

The factory-modified and adapted «Plug and Play» Masterpact NW is designed for installation

in the original Masterpact M chassis. On-site upgrades are very simple:

Two new racks are

installed in place

of the original ones

in the Masterpact M

chassis.

1. Replacement

of original racks

All Masterpact NW

functions are pre-wired.

Our technician simply

connects the functions

required according

to the accessories fitted.

a fast and simple upgrade solution that keeps the original chassis

to cover current ratings from 800 up to 3200 A...and if you have limited access to your busbarsand cable connections

(*)Typical time for simple installations.

Masterpact M chassis

Masterpact NW

Masterpact M

PE

90451

PE

90452

PE

904512. Wire guide support

replacement

If you need…

Plug&Playsolution is for you … Masterkit

is your solution

With Masterkit, you have absolutely everything you need

to replace an old Masterpact M installation

by a new Masterpact NW device and its dedicated adaptation kit.

Masterkit lets you optimise the performance of your installation,

taking advantage of the advanced possibilities of Masterpact NW

with its monitoring and diagnostic functions.

2interchangeability throughout your entire installation

an installation-wide upgrade

to cover current ratings from 800 up to 6300A,fixed or drawout

standard, high extra-high breaking capacity in the most severe environments

Masterpact M chassis

Masterpact M

Masterpact NW

BUSBAR NOT MODIFIED

!

1 Extraction 2 Replacement

PE

90453

PE

90454

PE

90455

Thinking ahead

By upgrading Masterpact M using Plug&Play or Masterkit

solutions, you take an important first step toward higher

energy efficiency in a smart, safe and simple way.

And remember, Schneider Electric can help you go even

further to achieve maximum efficiency over your entire

installation.

We are the only global specialists in energy

management that provide an integrated approach

to help you meet your "efficiency targets".

30%Schneider Electric

can help deliver

up to 30%

energy savings

in industrial

and

commercial

buildings

Take your next step with

Schneider Electric

30%

All over the world

ECOFITTM

ECOFIT TM = tested, validated and certified by Schneider Electric

PE

90459

Schneider Electric nv/sa Dieweg 3

B-1180 Bruxelles/Brussel

Tél.: (02) 373 75 01 (FR)

Tél.: (02) 373 75 02 (NL)

Fax: (02) 373 40 02

[email protected]

www.schneider-electric.be

TVA/BTW: BE 0451.362.180

RPM Bruxelles/RPR Brussel

ING: 310-1110264-88

IBAN: BE 56 3101 1102 6488

SWIFT BIC: BBRU BE BB

Les produits décrits dans ce document peuvent être changés ou modi�és à

tout moment, soit d’un point de vue technique, soit selon leur exploitation ou

utilisation. Leur description ne peut en aucun cas être considérée comme

contractuelle.

De in dit document beschreven producten kunnen ten allen tijde veranderingen of wijzigingen ondergaan op technisch gebied dan wel op de manier waarop ze worden behandeld of gebruikt. Hun beschrijving kan geenszins contractueel worden beschouwd.

11/1132VP270EN