46
INTHAI MINING LIMITED THAILAND NATURAL DOLOMITE LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Embed Size (px)

Citation preview

Page 1: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

INTHAI MINING LIMITED

THAILAND NATURAL DOLOMITE

LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Page 2: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

• Inthai Mining Limited : Overview• Our Mines Locations : Khao-in Mines , Tha-U-Tae Mines &

Tiptanapan Mines• Our Crushing Plants location : Khlong Lang• Transportation of Dolomite from Mines to Plant and Port• Production details• Dolomite Specification• Our Port details and operations• Analysis Certificates• Contacts

Index

Page 3: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

INTHAI MINING LIMITED, a JV between Singh Group and Santhad Group Company, is one of the best quality and low silica natural Dolomite producer and supplier with 30 years experience in the mining industry, having annual turnover of 350 million.

We are sourcing partner for high quality Dolomite to Integrated steel industries in Asian countries, specially in India , Japan & Korea.

Our annual production of dolomite, in different sizes, is about 2.7 million MT and have capacity to increase our production depending upon demand-supply.

We attribute our success to our high quality of products, customer centricity, meeting & exceeding client expectations & dedicated teams.

Inthai Mining Limited : An overview

Page 4: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Singh Imperial Export Import Co.

Ltd.Santhad Group Co.

Ltd.

Inthai Mining Limited Sumpun Mining

Limited

Tiptanapan Mining Ltd 40% Equity

Exclusive Marketing Rights

50 %

50 %

100 %

60 %

Page 5: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Inthai Mining Limited is a JV Company with 50:50 % partnership between Singh Imperial Export Import Co. Ltd and Santhad Group Co. Ltd.

Sumpun Mining Ltd (SML) owning Dolomite mines, is owned by Santhad Group Ltd and has given exclusive marketing rights to Santhad Group Co .Ltd who inturn has endorsed these rights to Inthai Mining Limited.

Tiptanapan Mining Ltd. owning Dolomite mines is 40% held by Inthai Mining Limited.

The companies mentioned here above have common directors

Page 6: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Our Dolomite Mines Locations

Page 7: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Ore Reserves- 18 Million Ton

Tha-U-Tae Mine

Page 8: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

569600 569700 569800 569900 570000 570100 570200 570300 5704001012200

1012300

1012400

1012500

1012600

1012700

1012800

1012900

1013000

0 50 100 150 200

S cale 1 : 4,000

m .

Tha U Tae Dolomite Mine

Minable ore reserve Area (188,729 sqm .)

Total Ore reserve Area (262,060 sqm .)

ML.No. 23174/14322

ML.No. 30217/15577

ML.No. 30234/15664

M L.23174/14322 38-2-96 ra i(69,984 m 2)

M L.30217/15577 100-0-39 ra i(160,156 m 2)M L.30234/15864 25-2-72 ra i(41,088 m 2)

Total Area 164-1-37 rai(271,228 m2)

Page 9: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Ore Reserves- 40 Million Ton

Khao-In Mine

Page 10: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

579900 580000 580100 580200 580300 580400 580500 580600 580700 580800 5809001007400

1007500

1007600

1007700

1007800

1007900

1008000

1008100

1008200

1008300

1

2

3

45

6

7

8

9

10

1112

13

14

15

1

0 50 100 150 200

S cale 1 : 5,000

m .

Khao In Dolomite Mine

Total Dolomite Ore reserve Area (262,200 sqm.)

ML.No. 23225/14814Area 188-2-7 rai(301,628 m2)

Khao In Dolomite Mines

Page 11: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Ore Reserves- 40 Million Ton

Tiptanapan Mine

Page 12: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

575900 576000 576100 576200 576300 576400 576500 576600 576700 576800 576900 5770001005200

1005300

1005400

1005500

1005600

1005700

1005800

1005900

1006000

1

2

34

5

6

7

8

9

10

11

1

S cale 1 : 5,000

m .

Mr. Term Dolomite Mine

Minable ore reserve Area (252,186 sqm.)

Total Ore reserve Area (278,976 sqm.)

ML.No. 23185/14418

0 50 100 150 200

TiptanapanDolomite Mines

Page 13: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Dolomite Crushing Flowchart Dolomite Crushing Flowchart

Our Dolomite Crushing UnitProduction Details

Page 14: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Khlong Lang Crushing Plant

Page 15: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Loading at our crusher plant…

Page 16: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Transportation : Mines to Plant & Port

KHLONG LANG KHANOM PORT

THA-U-TAE Mine (SPM) Kanchana Dit 27 47KHAO IN Mine (SPM) Kanchana Dit 20 40TIPTANAPAN MINES Kanchana Dit 25 45

DISTANCE TO (Km.)NAME OF DEPOSITS LOCATION

Page 17: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Our Dolomite Specification…

1. CaO 30 % min 2. MgO 20 % min.

3. SiO2 0.50 % max. 4. Al2O3 0.50 % max

5. Alkali 0.20 % max 6. Moisture 2 % max

7.Phosphorous 0.1 % max 8. Sulphur 0.1 % max.

Page 18: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Our DolomiteProduction Details

Page 19: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Sl. No Name of the Crushing Unit MT/day MT/month MT/Year

1 Khalong Lang Crushing Plant #1 1,200 30,000 360,000

2 Khalong Lang Crushing Plant #1 1,200 30,000 360,000

3 Tiptanapan Crushing Plant 1,500 37,500 450,000

4 Khao-In Crusing Unit 800 20,000 240,000

    Total 4,700 117,500

1,410,000

Production Report (SPM) For FY 2008 - 2009

Page 20: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Sl. No Name of the Crushing Unit MT/day MT/month MT/Year

1 Khalong Lang Crushing Plant #1 1,500 37,500 450,000

2 Khalong Lang Crushing Plant #1 1,500 37,500 450,000

3 Tiptanapan Crushing Plant 2,000 50,000 600,000

4 Khao-In Crusing Unit 1,200 30,000 360,000

    Total 6,200 155,000

1,860,000

Production Report (SPM) For FY 2009 - 2010

Page 21: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Sl. No Name of the Crushing Unit MT/day MT/month MT/Year

1 Khalong Lang Crushing Plant #1 1,500 37,500 450,000

2 Khalong Lang Crushing Plant #1 1,500 37,500 450,000

3 Tiptanapan Crushing Plant 2,000 50,000 600,000

4 Khao-In Crusing Unit 1,200 30,000 360,000

5 Mr. Term Crusing Unit 3,000 75,000 900,000

    Total 9,200 230,000 2,760,000

Production Report (SPM) For FY 2010 - 2011

Page 22: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

•ROM

•Jaw Crushers

•Grizzly (90 mm)+90 mm

- 90 mm Crushed Dolomite

Screening Plant

Production Method

Page 23: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Top Deck – 50mm

Middle Deck – 30mm

Lower Deck – 10mm

Screening Plant – Triple Deck

Page 24: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

SL Products Size Actual Size

1 Calcining Plant Grade Lumps -90 +50mm 40mm-80mm

2 BF Grade Lumps -50mm +30mm 20mm – 40mm

3 Sinter Grade Chips -30mm + 10mm 5mm-25mm

4 Fines For Sinter/Agriculture -10 mm -10mm

Post Screen Products

Page 25: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

40-80, 30%

20-40 , 30%

5-25, 25%

-10 , 15% 40mm -80mm

20mm-40mm

5mm-25mm

(-10 mm)

Finished Goods : Production Ratio

Page 26: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

828,000

690,000

414,000

40mm - 80mm20mm-40mm5mm-25mm-10 mm

828,000

Finished Material Production (MT/Yr.)

Page 27: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Production, Supply

Size Prodn. in MT/Yr Supply Surplus Remarks

40-80 mm 828,000 100,000 700,000This size is again re-crushed for smaller sizes as per market requirement.

20-40 mm 828,000 884,650 -56650 Japan

5 -25 mm 690,000 800,000 -110,000Japan / India (110,000 MT deficit is fulfilled by resizing 40-80 mm size )

-10 mm 414,000 414,000 0 Agriculture/ Construction and Local Market

Surplus

We have approx 533,350 MT of 40-80 mm Dolomite as surplus which can be resized and supplied to new client on continuous basis.

** The above production can be enhanced as per demand or business need.

Page 28: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

OUR KHANOM PORTNAKORN SRI THAMMARAT,

SOUTH OF THAILAND

Page 29: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

B.A. Chart No. 3963

Anchorage Position LAT 9๐ 12.5’ N / LONG 99๐ 54.5’ E Time Zone : GMT +7

Company KHANOM PORT Co.,Ltd. Berth Position About 1 mile from anchorage position. Name of berth Khanom Port

Jetties3 Jetties are available for loading

Khanom Port, Thailand

Page 30: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Jetty 1 : This is small jetty with depth 7 - 8.5 m. , Far from shore 70 m., Port width 40 m., mooring buoy 6 nos, loading rate 500 MT/Hour 3500 MT/Day by Conveyer Belts, Air draft 10.5 m. and Shipment size 10,000 - 15,000 MT

Jetty 2 : This is a big jetty with depth 9 - 10.5 m. , Far from shore 180 m., Port width 20 m., Mooring buoy 8 nos, Loading rate 500 MT/Hour 6000 MT/Day by Conveyer Belts, Air draft 10.5 m. and Shipment size 20,000 - 30,000 MT

Jetty 3 : This jetty is meant for loading into Barge and equipped with crane . Depth : 5 m. , Far from shore : 14 m, Port width : 28 m, Loading by crane : 20 MT/hour

Jetties at our Khanom Port, Thailand

Page 31: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Loading Rate : Hourly loading rate : 500 MTDaily loading rate : 6000 MT depending on stoppages for shifting

the vessel regularly and carefully checking of the draft.

Working Hours : 24 Hours AWWDSHINC inclusive of break and shift change time

Loading Rate at Khanom Port

Page 32: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Stockyard & Jetties location at Khanom Port

Page 33: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Inthai Mining Limited : Stockyard at port…

Page 34: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Loading at Stockyard at Khanom Port

Page 35: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Our Ground logistics…

Page 36: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Dumping into Hopper at Jetty

Page 37: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Loading Operation at our Khanom Port…

Page 38: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Sample collection by Inspection Agency…

Page 39: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Loading through conveyer at Jetty

Page 40: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Loading at our Khanom Port…

Page 41: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Loading operations at our port…

Page 42: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Certificate of Analysis…

Page 43: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

• Jindal Steel Works, India

• Ispat Industries Limited, India

• Bhushan Power & Steel Ltd., India

• Kobe Steel Limited, Tokyo, Japan

• Nippon Steel Corporation, Japan

• Sumitomo Metal Industries Limted,

Japan

• Pacific Metals Co. Ltd, Korea

We Source for…

Page 44: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS
Page 45: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

Head office : 210/5, Khu Bon RoadKhanna Yao, Bangkok 10220Thailand.Phone : +66 29433074+66 29433517E-Mail : [email protected] : www.singhgroup.net

Corporate Office:464, 2nd Floor,Ratchadapisek Road,Samsennok, Huay Kwang,Bangkok – 10310Thailand

Inthai Mining Limited : Contacts

Page 46: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS

“Measure not the work until the day's out and the labor done”