LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT PRIORITY PROGRAM FISCAL YEAR 2016-2017

LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Embed Size (px)

Citation preview

Page 1: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

LOUISIANA AIRPORT CONSTRUCTION

AND DEVELOPMENT PRIORITY

PROGRAM

FISCAL YEAR 2016-2017

Page 2: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

within a thirty-minute drive of a public-use airport

Data Source: Draft Louisiana State Aviation System Plan

Commercial Airports

11.1 Million

93% Population Served

1.49 Million

General Aviation Airports

Aviation System Overview

1.8billion$

Annual Payroll

3.6 Million visitors utilize the 69 Airports to travel to Louisiana

Passengers ServedCalendar Year 2013

Annual OperationsCalendar Year 2013

Page 3: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Air Carrier Funded

2016-2017

Page 4: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2016-2017

Air Carrier Capital Outlay

1 LAFAYETTE REGIONAL AIRPORT Taxiway F Safety Improvements - Southend $0.00 $2,885,000.00 $20,000.00 $2,905,000.00

2 LAKE CHARLES REGIONAL AIRPORT Runway Protection Zone - Land Acquisition - Phase II $0.00 $250,000.00 $0.00 $250,000.00

3 ALEXANDRIA INTERNATIONAL AIRPORT Property Acquisition for Obstruction Removal to

Approaches for Runway 14 & 18 - Phase I

$0.00 $169,146.00 $0.00 $169,146.00

4 BATON ROUGE METROPOLITAN AIRPORT Taxiway F Reconstruction and Extension - Phase II

(Construction)

$6,000,000.00 $3,033,472.00 $20,000.00 $9,053,472.00

5 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Terminal Construction Project - Phase III $18,960,000.00 $5,528,000.00 $3,792,000.00 $28,280,000.00

6 LAKE CHARLES REGIONAL AIRPORT Wildlife Hazard Mitigation - Perimeter Fencing Phase

III

$0.00 $1,250,000.00 $20,000.00 $1,270,000.00

7 LAKE CHARLES REGIONAL AIRPORT Rehabilitate ARFF Vehicle $0.00 $500,000.00 $0.00 $500,000.00

8 LAFAYETTE REGIONAL AIRPORT Runway 11/29 Safety Area Improvements - Phase II $13,498,662.00 $1,499,851.00 $0.00 $14,998,513.00

9 SHREVEPORT REGIONAL AIRPORT Airfield Drainage Rehabilitation - Southeast Airfield $0.00 $514,899.00 $0.00 $514,899.00

10 LAKE CHARLES REGIONAL AIRPORT Rehabilitate Airfield Lighting - Phase II $1,732,500.00 $192,500.00 $0.00 $1,925,000.00

11 ALEXANDRIA INTERNATIONAL AIRPORT Airfield Electrical Rehabilitation - Phase IV $355,000.00 $39,444.00 $0.00 $394,444.00

12 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate Runway 14/32 - Phase II $180,000.00 $20,000.00 $0.00 $200,000.00

Wednesday, January 13, 2016 Page 1 of 7Air Carrier Capital Outlay

Page 5: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2016-2017

Air Carrier Capital Outlay

13 ALEXANDRIA INTERNATIONAL AIRPORT Airfield Electrical Rehabilitation - Phase IV $0.00 $600,000.00 $0.00 $600,000.00

14 ALEXANDRIA INTERNATIONAL AIRPORT North Ramp Rehabilitation - Phase IA $4,343,184.00 $482,576.00 $0.00 $4,825,760.00

15 ALEXANDRIA INTERNATIONAL AIRPORT Taxiway B Rehabilitation - Engineering for Phase II $36,000.00 $4,000.00 $0.00 $40,000.00

16 MONROE REGIONAL AIRPORT Airfield Drainage Rehabilitation (Design and

Construction)

$1,080,000.00 $120,000.00 $0.00 $1,200,000.00

17 SHREVEPORT REGIONAL AIRPORT Extend Runway 6 & Taxiway C - Environmental Study $315,000.00 $35,000.00 $0.00 $350,000.00

18 ALEXANDRIA INTERNATIONAL AIRPORT Part 150 Noise Mitigation Program $6,000,000.00 $666,667.00 $0.00 $6,666,667.00

19 SHREVEPORT REGIONAL AIRPORT Taxiway K Relocation - Design and Environmental $540,000.00 $60,000.00 $0.00 $600,000.00

20 SHREVEPORT REGIONAL AIRPORT Action Plan Update $225,000.00 $25,000.00 $0.00 $250,000.00

$17,875,555.00 $3,852,000.00 $74,992,901.00Air Carrier Capital Outlay Totals $53,265,346.00

Wednesday, January 13, 2016 Page 2 of 7Air Carrier Capital Outlay

Page 6: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

General Aviation Funded

2016-2017

Page 7: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2016-2017

General Aviation Capital Outlay

1 SHREVEPORT DOWNTOWN AIRPORT Obstruction Removal and Mitigation $0.00 $75,000.00 $0.00 $75,000.00

2 RUSTON REGIONAL AIRPORT Obstruction Removal - Phase III $0.00 $250,000.00 $0.00 $250,000.00

3 EUNICE AIRPORT Mitigate Obstructions - Phase II (Construction) $0.00 $350,000.00 $0.00 $350,000.00

4 LOUISIANA REGIONAL AIRPORT South Apron Expansion - Phase I

(Environmental/Design/Mitigation)

$0.00 $675,000.00 $20,000.00 $695,000.00

5 ST TAMMANY REGIONAL AIRPORT Mitigate Obstructions - West Transitional Phase II $0.00 $660,000.00 $0.00 $660,000.00

6 GEORGE R. CARR MEMORIAL AIRPORT Obstruction Clearing - North $468,000.00 $52,000.00 $0.00 $520,000.00

7 RED RIVER PARISH AIRPORT Removal of Obstructions on East Side of Airfield $0.00 $150,000.00 $0.00 $150,000.00

8 SHREVEPORT DOWNTOWN AIRPORT Rehabilitate Taxiways A, J, Q, M, D - Phase II

(Construction)

$1,890,000.00 $210,000.00 $0.00 $2,100,000.00

9 SHREVEPORT DOWNTOWN AIRPORT South T-Hangar and Shadeport Taxilane and Apron

Rehabilitation

$0.00 $430,000.00 $0.00 $430,000.00

10 JENA AIRPORT Obstruction Removal - Phase II $0.00 $175,000.00 $0.00 $175,000.00

11 HAMMOND NORTHSHORE REGIONAL AIRPORT

Airfield Drainage Improvements - Phase III

(Construction)

$0.00 $725,000.00 $0.00 $725,000.00

12 ST LANDRY PARISH-AHART FIELD Obstruction Removal (Runway 18) - Phase I $0.00 $50,556.00 $0.00 $50,556.00

Wednesday, January 13, 2016 Page 3 of 7General Aviation Capital Outlay

Page 8: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2016-2017

General Aviation Capital Outlay

13 HAMMOND NORTHSHORE REGIONAL AIRPORT

Rehabilitate Runway 18/36 & 13/31 - Phase III

(Construction)

$4,950,000.00 $550,000.00 $0.00 $5,500,000.00

14 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Obstruction Removal - Runway 18 Approach Phase I

(Acquisition)

$0.00 $60,000.00 $0.00 $60,000.00

15 EUNICE AIRPORT Obstruction Removal (Approach and RSA) - Phase I $0.00 $55,000.00 $0.00 $55,000.00

16 NEW ORLEANS LAKEFRONT AIRPORT Upgrade Lighting Vault - Phase II (Construction) $0.00 $1,000,000.00 $0.00 $1,000,000.00

17 SPRINGHILL AIRPORT Obstruction Removal - Phase II $0.00 $300,000.00 $0.00 $300,000.00

18 MARKSVILLE MUNICIPAL AIRPORT Runway Reconstruction - Phase II (Design) $121,500.00 $13,500.00 $0.00 $135,000.00

19 WINNSBORO MUNICIPAL AIRPORT Obstruction Removal - Phase III $90,000.00 $10,000.00 $0.00 $100,000.00

20 GEORGE R. CARR MEMORIAL AIRPORT Obstruction Removal North End - Land Acquisition

Phase I (Environmental)

$0.00 $140,000.00 $0.00 $140,000.00

21 ESLER REGIONAL AIRPORT Obstruction Removal $45,041.00 $5,005.00 $0.00 $50,046.00

22 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 18R/36L - Phase I $270,000.00 $30,000.00 $0.00 $300,000.00

23 CHENNAULT INTERNATIONAL AIRPORT Airfield Lighting Rehabilitation - Phase I (Runway) $0.00 $1,000,000.00 $700,000.00 $1,700,000.00

24 LOUISIANA REGIONAL AIRPORT Taxiway Connector - Phase II (Construction) $0.00 $325,000.00 $0.00 $325,000.00

Wednesday, January 13, 2016 Page 4 of 7General Aviation Capital Outlay

Page 9: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2016-2017

General Aviation Capital Outlay

25 ACADIANA REGIONAL AIRPORT Apron Rehabilitation - Phase II $0.00 $82,000.00 $0.00 $82,000.00

26 ST LANDRY PARISH-AHART FIELD Runway 18-36 Rehabilitation - PCC $745,706.00 $82,856.00 $0.00 $828,562.00

27 CHENNAULT INTERNATIONAL AIRPORT Runway 15/33 Rehabilitation - Phase II (Design &

Construction)

$5,850,000.00 $650,000.00 $0.00 $6,500,000.00

28 HOUMA-TERREBONNE AIRPORT Partial Parallel Taxiway - Phase II (Construction) $305,766.00 $33,974.00 $0.00 $339,740.00

29 CHENNAULT INTERNATIONAL AIRPORT Taxiway Widening - Phase IV (cont.) $1,470,960.00 $163,440.00 $0.00 $1,634,400.00

30 GEORGE R. CARR MEMORIAL AIRPORT Partial Parallel Taxiway - Phase II Final Design $110,250.00 $12,250.00 $0.00 $122,500.00

31 ACADIANA REGIONAL AIRPORT Taxiway A Improvements - Phase I (Design) $90,000.00 $10,000.00 $0.00 $100,000.00

32 JENNINGS AIRPORT Rehabilitate Runway 13/31 - Phase I (Design) $76,500.00 $8,500.00 $0.00 $85,000.00

33 VICKSBURG-TALLULAH REGIONAL AIRPORT Perimeter Fence & Security Upgrades - Phase II $405,000.00 $45,000.00 $0.00 $450,000.00

34 ST JOHN THE BAPTIST PARISH AIRPORT Taxiway and Drainage Improvements - Design $0.00 $91,000.00 $0.00 $91,000.00

35 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Taxiway Lighting - Phase I (Design) $128,160.00 $14,240.00 $0.00 $142,400.00

36 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Construct T-Hangar Taxilane (Phase I - Design) $19,350.00 $2,150.00 $0.00 $21,500.00

Wednesday, January 13, 2016 Page 5 of 7General Aviation Capital Outlay

Page 10: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2016-2017

General Aviation Capital Outlay

37 THIBODAUX MUNICIPAL AIRPORT Obstruction Removal and Perimeter Fencing - Phase I

(Design and Environmental)

$150,000.00 $16,667.00 $0.00 $166,667.00

38 FALSE RIVER REGIONAL AIRPORT Small Scale Master Plan Update $202,500.00 $22,500.00 $0.00 $225,000.00

39 UNION PARISH AIRPORT Construct Taxiway Reconfiguration/Safety Area

Improvements - Phase II

$540,000.00 $60,000.00 $0.00 $600,000.00

40 VICKSBURG-TALLULAH REGIONAL AIRPORT Design to Construct Access Road Rehabilitation $45,000.00 $5,000.00 $0.00 $50,000.00

41 JOHN H.HOOKS JR. MEMORIAL Design and Construction of Runway Rehabilitation $450,000.00 $50,000.00 $0.00 $500,000.00

$8,640,638.00 $720,000.00 $27,784,371.00General Aviation Capital Outlay Totals $18,423,733.00

Wednesday, January 13, 2016 Page 6 of 7General Aviation Capital Outlay

Page 11: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2016-2017

General Aviation Capital Outlay

Total AC / GA Funded $ 26,516,193

NAVAIDS Program

GA Maintenance Reimbursement Program

$ 975,000

$ 300,000

$ 28,491,1932016-2017 AVIATION PRIORITY PROGRAM TOTAL

Total GA Program $ 9,915,638

Total AC Program $ 18,575,555

AC Maintenance Reimbursement Program $ 700,000

Wednesday, January 13, 2016 Page 7 of 7General Aviation Capital Outlay

Page 12: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Air Carrier Unfunded

2017-2018

Page 13: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

Air Carrier Capital Outlay

1 ALEXANDRIA INTERNATIONAL AIRPORT

Airfield Electrical Rehabilitation - Phase V $0.00 $1,200,000.00 $0.00 $1,200,000.00

2 ALEXANDRIA INTERNATIONAL AIRPORT

Property Acq. for Obstruction Removal to Approaches for Runway 14 & 18 - Phase II

$0.00 $70,729.00 $0.00 $70,729.00

3 ALEXANDRIA INTERNATIONAL AIRPORT

Wildlife Hazard Removal - Phase V $0.00 $396,574.00 $0.00 $396,574.00

4 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Terminal Construction Project - Phase IV $23,790,000.00 $6,172,000.00 $4,758,000.00 $34,720,000.00

5 SHREVEPORT REGIONAL AIRPORT Improve Runway 32 RPZ $0.00 $400,000.00 $0.00 $400,000.00

6 SHREVEPORT REGIONAL AIRPORT Airfield Lighting Rehabilitation - Phase IV $0.00 $1,200,000.00 $0.00 $1,200,000.00

7 ALEXANDRIA INTERNATIONAL AIRPORT

Wildlife Mitigation Approach to Runway 18 $0.00 $225,000.00 $0.00 $225,000.00

8 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road $11,000,000.00 $4,202,222.00 $20,000.00 $15,222,222.00

9 SHREVEPORT REGIONAL AIRPORT Runway 14/32 Pavement Preservation - Design & Construction

$0.00 $1,500,000.00 $0.00 $1,500,000.00

10 ALEXANDRIA INTERNATIONAL AIRPORT

North Ramp Rehabilitation- Phase II $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

11 LAFAYETTE REGIONAL AIRPORT Terminal Infrastructure - Design - Phase II (Schematic/Functional)

$6,579,356.00 $731,040.00 $0.00 $7,310,396.00

12 ALEXANDRIA INTERNATIONAL AIRPORT

Taxiway B Rehabilitation - Construction for Phase II $360,000.00 $40,000.00 $0.00 $400,000.00

13 MONROE REGIONAL AIRPORT Rehabilitate Runway 4/22 Blast Pads $117,000.00 $13,000.00 $0.00 $130,000.00

14 LAKE CHARLES REGIONAL AIRPORT Wildlife Hazard Mitigation - Perimeter Fencing Phase IV $0.00 $750,000.00 $0.00 $750,000.00

Wednesday, January 13, 2016 Page 1 of 16Air Carrier Capital Outlay

00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
Page 14: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

Air Carrier Capital Outlay

15 MONROE REGIONAL AIRPORT Rehabilitate Taxiway A $81,000.00 $19,000.00 $0.00 $100,000.00

16 MONROE REGIONAL AIRPORT Rehabilitate Runway 14/32 Markings $0.00 $308,730.00 $0.00 $308,730.00

17 SHREVEPORT REGIONAL AIRPORT Extend Runway 6 & Taxiway C - Design $0.00 $640,000.00 $0.00 $640,000.00

18 LAKE CHARLES REGIONAL AIRPORT South Apron Expansion - Phase I (Design) $0.00 $150,000.00 $0.00 $150,000.00

19 LAFAYETTE REGIONAL AIRPORT Terminal Infrastructure - Airside - Phase I & II $8,723,695.00 $3,000,000.00 $0.00 $11,723,695.00

20 MONROE REGIONAL AIRPORT Upgrade Airfield Lighting Controls $180,000.00 $20,000.00 $0.00 $200,000.00

21 ALEXANDRIA INTERNATIONAL AIRPORT

Rehabilitate Runway 14/32 & 18/36 Safety Areas - Phase I

$808,775.00 $89,864.00 $0.00 $898,639.00

22 ALEXANDRIA INTERNATIONAL AIRPORT

Master Drainage Rehabilitation - Phase II $346,500.00 $653,500.00 $0.00 $1,000,000.00

23 ALEXANDRIA INTERNATIONAL AIRPORT

Rehabilitation of Runway 32 and Taxiway A Safety Area $0.00 $160,000.00 $0.00 $160,000.00

24 ALEXANDRIA INTERNATIONAL AIRPORT

Master Drainage Rehabilitation - Phase I $699,275.00 $77,697.00 $0.00 $776,972.00

25 LAKE CHARLES REGIONAL AIRPORT Wildlife Mitigation - Sanitary Sewer Connection $1,000,000.00 $111,111.00 $0.00 $1,111,111.00

26 SHREVEPORT REGIONAL AIRPORT Security Rennovations - Phase II $0.00 $200,000.00 $0.00 $200,000.00

27 ALEXANDRIA INTERNATIONAL AIRPORT

Rehabilitation of Taxiway E & Terminal Ramp - Phase I $495,000.00 $55,000.00 $0.00 $550,000.00

28 ALEXANDRIA INTERNATIONAL AIRPORT

Rehabilitate Runway 36 $250,000.00 $1,527,778.00 $0.00 $1,777,778.00

29 MONROE REGIONAL AIRPORT Upgrade Windcone to LED $0.00 $38,000.00 $0.00 $38,000.00

Wednesday, January 13, 2016 Page 2 of 16Air Carrier Capital Outlay

00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
Page 15: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

Air Carrier Capital Outlay

30 LAFAYETTE REGIONAL AIRPORT Terminal Infrastructure Design - Phase I - (EA & Conceptual)

$3,699,356.00 $411,040.00 $3,000,000.00 $7,110,396.00

31 LAKE CHARLES REGIONAL AIRPORT Bury Utility Lines - Phase I (Design) $0.00 $150,000.00 $0.00 $150,000.00

32 LAKE CHARLES REGIONAL AIRPORT ATCT Study $0.00 $250,000.00 $0.00 $250,000.00

33 MONROE REGIONAL AIRPORT Improve Perimeter Road - Phase I $720,000.00 $80,000.00 $0.00 $800,000.00

34 ALEXANDRIA INTERNATIONAL AIRPORT

Wildlife Hazard Safety Mitigation - Fence Rehabilitation $906,188.00 $100,688.00 $0.00 $1,006,876.00

35 MONROE REGIONAL AIRPORT Acquire ARFF Vehicle $0.00 $775,000.00 $0.00 $775,000.00

36 MONROE REGIONAL AIRPORT Acquire Runway Sweeper $0.00 $225,000.00 $0.00 $225,000.00

37 ALEXANDRIA INTERNATIONAL AIRPORT

Emergency Response Vehicle $0.00 $300,000.00 $0.00 $300,000.00

38 ALEXANDRIA INTERNATIONAL AIRPORT

GIS Development - Phase II $0.00 $500,000.00 $0.00 $500,000.00

39 MONROE REGIONAL AIRPORT Acquire Mass Casualty Vehicle $0.00 $550,000.00 $0.00 $550,000.00

40 MONROE REGIONAL AIRPORT Upgrade Taxiway Lighting, Signs, and REILS to LED $2,340,000.00 $260,000.00 $0.00 $2,600,000.00

$27,852,973.00 $7,778,000.00$100,427,118.00Air Carrier Capital Outlay Totals $64,796,145.00

Wednesday, January 13, 2016 Page 3 of 16Air Carrier Capital Outlay

00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
00289164
Typewritten Text
Page 16: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

General Aviation Unfunded

2017-2018

Page 17: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

General Aviation Capital Outlay

1 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Obstruction Removal - Runway 18 Approach Phase II (Construction)

$0.00 $100,000.00 $0.00 $100,000.00

2 ST LANDRY PARISH-AHART FIELD Obstruction Removal (Runway 18-36) - Phase II $0.00 $108,884.00 $0.00 $108,884.00

3 ALLEN PARISH AIRPORT Obstruction Removal - Phase II (Mitigation of Obstructions)

$0.00 $400,000.00 $0.00 $400,000.00

4 MINDEN AIRPORT Remove Transitional Surface Obstructions $0.00 $150,000.00 $0.00 $150,000.00

5 ST TAMMANY REGIONAL AIRPORT Mitigate Obstructions Phase V - Relocate Airport Access Road (Design)

$0.00 $142,000.00 $0.00 $142,000.00

6 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitation of Drainage - Phase II (Design) $315,000.00 $35,000.00 $0.00 $350,000.00

7 THIBODAUX MUNICIPAL AIRPORT Obstruction Removal - Runway 8 and 26 $100,000.00 $11,111.00 $0.00 $111,111.00

8 MARKSVILLE MUNICIPAL AIRPORT Obstruction Removal Runway 22 Approach - Phase II $0.00 $113,000.00 $0.00 $113,000.00

9 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 18R/36L - Phase II (Construction) $2,610,000.00 $290,000.00 $0.00 $2,900,000.00

10 CONCORDIA PARISH AIRPORT Obstruction Removal $0.00 $100,000.00 $0.00 $100,000.00

11 SLIDELL AIRPORT Runway 18 Threshold Recovery - Phase II (Obstruction Mitigation)

$270,000.00 $30,000.00 $0.00 $300,000.00

12 FRANKLINTON AIRPORT Obstruction Removal - Phase II $0.00 $75,000.00 $0.00 $75,000.00

13 MARKSVILLE MUNICIPAL AIRPORT Runway Reconstruction - Phase III (Construction) $1,890,000.00 $210,000.00 $0.00 $2,100,000.00

14 GEORGE R. CARR MEMORIAL AIRPORT Land Acquisition - Northwest Runway 18 $0.00 $350,000.00 $0.00 $350,000.00

15 LEESVILLE AIRPORT Obstruction Removal - RSA East $0.00 $25,000.00 $0.00 $25,000.00

16 COLUMBIA AIRPORT Obstruction Removal - Phase I $0.00 $100,000.00 $0.00 $100,000.00

Wednesday, January 13, 2016 Page 4 of 16General Aviation Capital Outlay

00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
Page 18: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

General Aviation Capital Outlay

17 ALLEN PARISH AIRPORT Obstruction Removal - Phase I (Environmental & Mitigation Credits)

$0.00 $520,000.00 $0.00 $520,000.00

18 LE MAIRE MEMORIAL AIRPORT Obstruction Removal - Phase II $0.00 $150,000.00 $0.00 $150,000.00

19 DE QUINCY INDUSTRIAL AIRPARK Obstruction Removal $180,000.00 $20,000.00 $0.00 $200,000.00

20 SHREVEPORT DOWNTOWN AIRPORT Design Northwest Ramp Rehabilitation $0.00 $100,000.00 $0.00 $100,000.00

21 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 9/27 $0.00 $200,000.00 $0.00 $200,000.00

22 LOUISIANA REGIONAL AIRPORT South Apron Expansion - Phase II (Construction) $0.00 $920,000.00 $0.00 $920,000.00

23 SHREVEPORT DOWNTOWN AIRPORT Design New Taxiway Edge Lighting $0.00 $86,000.00 $0.00 $86,000.00

24 ST LANDRY PARISH-AHART FIELD Runway 18-36 Rehabilitation - Asphalt $0.00 $461,265.00 $0.00 $461,265.00

25 ESLER REGIONAL AIRPORT Rehabilitate Runway 9/27 (Construction) $1,659,510.00 $184,390.00 $0.00 $1,843,900.00

26 HOUMA-TERREBONNE AIRPORT Construct Partial Parallel Taxiway - Phase III (Construction)

$900,000.00 $100,000.00 $0.00 $1,000,000.00

27 NATCHITOCHES REGIONAL AIRPORT Construct Drainage Improvements $0.00 $225,000.00 $0.00 $225,000.00

28 JENNINGS AIRPORT Construct Runway 8-26 Exit Taxiway $0.00 $582,000.00 $20,000.00 $602,000.00

29 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Drainage - Phase II (Design) $0.00 $50,000.00 $0.00 $50,000.00

30 SHREVEPORT DOWNTOWN AIRPORT Security Fencing Upgrades $0.00 $100,000.00 $0.00 $100,000.00

31 C.E. (RUSTY) WILLIAMS AIRPORT Obstruction Removal (North End Parallel Taxiway) $0.00 $100,000.00 $0.00 $100,000.00

32 MARKSVILLE MUNICIPAL AIRPORT Runway 22 Obstruction removal $0.00 $155,000.00 $0.00 $155,000.00

Wednesday, January 13, 2016 Page 5 of 16General Aviation Capital Outlay

00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
Page 19: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

General Aviation Capital Outlay

33 JENNINGS AIRPORT Rehabilitate Runway 13/31 - Phase II (Construction) $729,000.00 $81,000.00 $0.00 $810,000.00

34 ACADIANA REGIONAL AIRPORT Taxiway A Improvements - Phase II (Construction) $900,000.00 $100,000.00 $0.00 $1,000,000.00

35 SLIDELL AIRPORT Runway 18 Threshold Recovery - Phase I (Survey and Design)

$105,300.00 $11,700.00 $0.00 $117,000.00

36 ST TAMMANY REGIONAL AIRPORT Airfield Lighting and NAVAIDS Improvements - Phase II (Construction)

$709,335.00 $78,815.00 $0.00 $788,150.00

37 SHREVEPORT DOWNTOWN AIRPORT Runway 5/23 Extension/Shift- EA and Feasibility Study $0.00 $150,000.00 $0.00 $150,000.00

38 ESLER REGIONAL AIRPORT Rehabilitate Runway 9/27 (Design) $0.00 $156,100.00 $0.00 $156,100.00

39 SHREVEPORT DOWNTOWN AIRPORT Runway 5/23 Extension/Shift- Design $180,000.00 $20,000.00 $0.00 $200,000.00

40 LE GROS MEMORIAL AIRPORT Rehabilitate Airfield Drainage Phase II - Design $0.00 $56,000.00 $0.00 $56,000.00

41 JENA AIRPORT Obstruction Removal $0.00 $20,000.00 $0.00 $20,000.00

42 HAMMOND NORTHSHORE REGIONAL AIRPORT

Drainage Improvements Phase IV $0.00 $550,000.00 $0.00 $550,000.00

43 LEESVILLE AIRPORT RSA Improvements South - Phase II (Construction) $567,000.00 $63,000.00 $0.00 $630,000.00

44 HOUMA-TERREBONNE AIRPORT Runway and Taxiway Marking $0.00 $750,000.00 $0.00 $750,000.00

45 SLIDELL AIRPORT Apron Expansion - Phase I $0.00 $480,000.00 $0.00 $480,000.00

46 HARRY P. WILLIAMS MEMORIAL AIRPORT

Rehabilitate Pump Station - Phase II $0.00 $300,000.00 $0.00 $300,000.00

47 SHREVEPORT DOWNTOWN AIRPORT Design New Taxiways $0.00 $100,000.00 $0.00 $100,000.00

48 LE GROS MEMORIAL AIRPORT Terminal Apron Overlay - Phase II (Construction) $360,810.00 $40,090.00 $0.00 $400,900.00

Wednesday, January 13, 2016 Page 6 of 16General Aviation Capital Outlay

00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
00289164
Typewritten Text
Page 20: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

General Aviation Capital Outlay

49 BUNKIE MUNICIPAL AIRPORT Airport Lighting & Navaid Rehabilitation - Phase II $0.00 $253,411.00 $0.00 $253,411.00

50 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Rehabilitate Main Hangar $0.00 $275,000.00 $50,000.00 $325,000.00

51 HART AIRPORT Reconstruct Runway Phase II (Construction) $0.00 $700,000.00 $0.00 $700,000.00

52 LE MAIRE MEMORIAL AIRPORT Obstruction Removal - Phase III $0.00 $100,000.00 $0.00 $100,000.00

53 ST JOHN THE BAPTIST PARISH AIRPORT

Drainage Improvements - Phase I $0.00 $78,000.00 $10,000.00 $88,000.00

54 C.E. (RUSTY) WILLIAMS AIRPORT Construct Runway Rehabilitation $0.00 $350,000.00 $100,000.00 $450,000.00

55 LOUISIANA REGIONAL AIRPORT Runway and Taxiway Overlay - Phase I (Design) $135,000.00 $15,000.00 $0.00 $150,000.00

56 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Taxiway Lighting - Phase II (Construction) $712,800.00 $79,200.00 $0.00 $792,000.00

57 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Terminal Design $0.00 $150,000.00 $50,000.00 $200,000.00

58 VIVIAN AIRPORT Construct Teacup Taxiways $990,000.00 $110,000.00 $0.00 $1,100,000.00

59 HOUMA-TERREBONNE AIRPORT West Apron Fill $0.00 $1,000,000.00 $0.00 $1,000,000.00

60 GEORGE R. CARR MEMORIAL AIRPORT Construct Parallel Taxiway - Phase II $2,009,700.00 $223,300.00 $0.00 $2,233,000.00

61 MINDEN AIRPORT Construct Parallel Taxiway from Apron to Runway 36 Approach

$867,600.00 $96,400.00 $0.00 $964,000.00

62 RUSTON REGIONAL AIRPORT Obstruction Removal - Phase II $0.00 $250,000.00 $0.00 $250,000.00

63 TENSAS PARISH AIRPORT Lighting Rehabilitation (Phase II - Construction) $0.00 $500,000.00 $0.00 $500,000.00

Wednesday, January 13, 2016 Page 7 of 16General Aviation Capital Outlay

00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
00289164
Typewritten Text
Page 21: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

General Aviation Capital Outlay

64 FALSE RIVER REGIONAL AIRPORT 7 Row T-Hangars $0.00 $430,000.00 $20,000.00 $450,000.00

65 BYERLEY AIRPORT Obstruction Removal Phase III $0.00 $250,000.00 $0.00 $250,000.00

66 CONCORDIA PARISH AIRPORT Construct 5-Box Hangars $0.00 $300,000.00 $20,000.00 $320,000.00

67 RUSTON REGIONAL AIRPORT Rehabilitate Runway & Taxiways $0.00 $500,000.00 $0.00 $500,000.00

68 WELSH AIRPORT Obstruction Removal/Avigation Easements $0.00 $150,000.00 $0.00 $150,000.00

69 CHENNAULT INTERNATIONAL AIRPORT Reconstruct Blast Pad for Runway 33 $360,000.00 $40,000.00 $0.00 $400,000.00

70 RED RIVER PARISH AIRPORT Construct East Airfield Perimeter Fence Replacement $0.00 $350,000.00 $0.00 $350,000.00

71 ST JOHN THE BAPTIST PARISH AIRPORT

Runway 17 Threshold Recovery/Runway Widening/Runway Overlay - Phase I (Design)

$155,700.00 $17,300.00 $0.00 $173,000.00

72 BYERLEY AIRPORT Rehabilitate Runway 17/35 $0.00 $130,000.00 $0.00 $130,000.00

73 TENSAS PARISH AIRPORT Fuel Farm $0.00 $100,000.00 $20,000.00 $120,000.00

74 ESLER REGIONAL AIRPORT Rehabilitate Taxiways (Design) $0.00 $39,700.00 $0.00 $39,700.00

75 JENNINGS AIRPORT Construct Entrance Taxiway - Runway 13 $0.00 $276,000.00 $10,000.00 $286,000.00

76 C.E. (RUSTY) WILLIAMS AIRPORT Design Airfield Lighting Improvements and Construct New Vault

$0.00 $500,000.00 $500,000.00 $1,000,000.00

77 ACADIANA REGIONAL AIRPORT Construct Blast Pad $0.00 $350,000.00 $0.00 $350,000.00

78 SOUTHLAND FIELD Fuel Farm- Phase II $0.00 $225,000.00 $50,000.00 $275,000.00

79 EUNICE AIRPORT Sealcoat GA Apron - Phase I (Design) $45,000.00 $5,000.00 $0.00 $50,000.00

Wednesday, January 13, 2016 Page 8 of 16General Aviation Capital Outlay

00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
Page 22: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

General Aviation Capital Outlay

80 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Lighting on Runway 17/35 $0.00 $100,000.00 $0.00 $100,000.00

81 SOUTHLAND FIELD Rehabilitate Parallel Taxiway $150,000.00 $16,667.00 $0.00 $166,667.00

82 JOHN H.HOOKS JR. MEMORIAL Construct Hangar Access Taxiway Phase II $540,000.00 $60,000.00 $0.00 $600,000.00

83 ESLER REGIONAL AIRPORT Drainage Rehabilitation of Safety Areas and Midfield $0.00 $361,777.00 $0.00 $361,777.00

84 SLIDELL AIRPORT Taxilane Widening and Overlay $0.00 $168,000.00 $0.00 $168,000.00

85 ST JOHN THE BAPTIST PARISH AIRPORT

Obstruction Mitigation - Runway 17 Phase I (Environmental/Design)

$0.00 $250,000.00 $0.00 $250,000.00

86 SOUTHLAND FIELD Rehabilitate Apron $150,000.00 $16,667.00 $0.00 $166,667.00

87 GEORGE R. CARR MEMORIAL AIRPORT Localized Runway Repairs $0.00 $120,000.00 $0.00 $120,000.00

88 LEESVILLE AIRPORT Rehabilitate Runway $0.00 $350,673.00 $0.00 $350,673.00

89 BEAUREGARD REGIONAL AIRPORT Rehabilitate Taxiway Pavement - Sealcoat and Marking $0.00 $150,000.00 $0.00 $150,000.00

90 CONCORDIA PARISH AIRPORT Rehabilitate Runway $1,350,000.00 $150,000.00 $0.00 $1,500,000.00

91 ST JOHN THE BAPTIST PARISH AIRPORT

Taxiway Extension $0.00 $660,000.00 $0.00 $660,000.00

92 HARRY P. WILLIAMS MEMORIAL AIRPORT

Dredge and Stabilize Seaway - Phase I (Design) $0.00 $100,000.00 $0.00 $100,000.00

93 TENSAS PARISH AIRPORT Rehabilitate Runway $0.00 $200,000.00 $0.00 $200,000.00

94 BUNKIE MUNICIPAL AIRPORT Runway Sealcoat $0.00 $170,379.00 $0.00 $170,379.00

95 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Terminal Building - Phase I (Design) $0.00 $72,450.00 $8,050.00 $80,500.00

Wednesday, January 13, 2016 Page 9 of 16General Aviation Capital Outlay

00289164
Typewritten Text
00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
Page 23: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

General Aviation Capital Outlay

96 BEAUREGARD REGIONAL AIRPORT Rehabilitate Apron and Repair Drainage - Phase I (Design)

$0.00 $80,000.00 $0.00 $80,000.00

97 JACKSON AIRPORT Rehabilitate Runway $0.00 $356,800.00 $0.00 $356,800.00

98 BUNKIE MUNICIPAL AIRPORT Airfield Lighting and Navaid Rehabilitation - Phase I $0.00 $36,890.00 $0.00 $36,890.00

99 PINEVILLE MUNICIPAL AIRPORT Construct Seaplane Ramp and Dock $0.00 $179,291.00 $0.00 $179,291.00

100 RUSTON REGIONAL AIRPORT Construct Runway Extension - Phase I (Design) $405,000.00 $45,000.00 $0.00 $450,000.00

101 HAMMOND NORTHSHORE REGIONAL AIRPORT

Master Plan Update $0.00 $225,000.00 $0.00 $225,000.00

102 JONESVILLE MUNICIPAL AIRPORT Rehabilitate Aprons - Phase II $332,500.00 $36,944.00 $0.00 $369,444.00

103 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Runway LED Upgrades $0.00 $50,000.00 $0.00 $50,000.00

104 CONCORDIA PARISH AIRPORT Relocate Signage/Markings $0.00 $25,000.00 $0.00 $25,000.00

105 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Construct T-Hangar Taxilane (Phase II - Construction) $222,300.00 $24,700.00 $0.00 $247,000.00

106 VICKSBURG-TALLULAH REGIONAL AIRPORT

Rehabilitate Taxiway $184,500.00 $20,500.00 $0.00 $205,000.00

107 DAVID G. JOYCE AIRPORT Design Apron Rehabilitation $0.00 $40,000.00 $0.00 $40,000.00

108 HART AIRPORT Design and Construct Apron Overlay $0.00 $200,000.00 $0.00 $200,000.00

109 JENA AIRPORT Fuel Farm Installation $0.00 $65,000.00 $20,000.00 $85,000.00

110 ST LANDRY PARISH-AHART FIELD Security Fencing - Northeast end $0.00 $70,150.00 $0.00 $70,150.00

Wednesday, January 13, 2016 Page 10 of 16General Aviation Capital Outlay

00289164
Typewritten Text
00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
Page 24: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

General Aviation Capital Outlay

111 JENNINGS AIRPORT Relocate Wind Cone and Construct Segmented Circle $0.00 $96,000.00 $0.00 $96,000.00

112 ST TAMMANY REGIONAL AIRPORT Extend Runway 18/36 - Phase I (Environmental) $180,000.00 $20,000.00 $0.00 $200,000.00

113 ST JOHN THE BAPTIST PARISH AIRPORT

Expand Auto Parking $464,540.00 $51,616.00 $0.00 $516,156.00

114 KELLY-DUMAS Instrument Approach Survey $0.00 $85,000.00 $0.00 $85,000.00

115 NATCHITOCHES REGIONAL AIRPORT Install New Perimeter Fence and Repair Existing Fence $360,000.00 $40,000.00 $0.00 $400,000.00

116 HARRY P. WILLIAMS MEMORIAL AIRPORT

Upgrade Perimeter Fence and Security System $0.00 $100,000.00 $0.00 $100,000.00

117 MOREHOUSE MEMORIAL AIRPORT Apron Rehabilitation $292,500.00 $32,500.00 $0.00 $325,000.00

118 JONESBORO AIRPORT Fuel Farm $0.00 $110,000.00 $20,000.00 $130,000.00

119 ACADIANA REGIONAL AIRPORT ARFF Station Relocation - Phase I (Design) $288,000.00 $32,000.00 $0.00 $320,000.00

120 ACADIANA REGIONAL AIRPORT Construct Hangar $0.00 $350,000.00 $0.00 $350,000.00

121 NATCHITOCHES REGIONAL AIRPORT Replace AWOS III P/T $0.00 $200,000.00 $0.00 $200,000.00

122 HART AIRPORT Design Runway Extension $0.00 $160,000.00 $0.00 $160,000.00

123 PINEVILLE MUNICIPAL AIRPORT Small Scope Master Plan - Phase II $0.00 $56,000.00 $0.00 $56,000.00

124 CONCORDIA PARISH AIRPORT Runway Extension - Preliminary $60,750.00 $6,750.00 $0.00 $67,500.00

125 JACKSON AIRPORT Construct Taxiway and Apron $0.00 $256,250.00 $0.00 $256,250.00

126 PINEVILLE MUNICIPAL AIRPORT Relocate Hangars Behind Building Restriction Line $0.00 $752,512.00 $0.00 $752,512.00

Wednesday, January 13, 2016 Page 11 of 16General Aviation Capital Outlay

00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
Page 25: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

General Aviation Capital Outlay

127 MOREHOUSE MEMORIAL AIRPORT Rehabilitate Runway - Phase I $57,000.00 $6,333.00 $0.00 $63,333.00

128 COLUMBIA AIRPORT Construct Runway - Preliminary $0.00 $175,000.00 $0.00 $175,000.00

129 BUNKIE MUNICIPAL AIRPORT Perimeter Fencing - Phase I $0.00 $82,900.00 $0.00 $82,900.00

130 SPRINGHILL AIRPORT Construct Perimeter Fencing $405,000.00 $45,000.00 $0.00 $450,000.00

131 ARCADIA-BIENVILLE AIRPORT Construct Perimeter Fencing $0.00 $500,000.00 $0.00 $500,000.00

132 NATCHITOCHES REGIONAL AIRPORT Construct Agricultural Ramp & Wash Rack $0.00 $325,000.00 $0.00 $325,000.00

133 DE QUINCY INDUSTRIAL AIRPARK Perimeter Fencing - Phase I $31,500.00 $3,500.00 $0.00 $35,000.00

134 HART AIRPORT Design & Construct Perimeter Fencing $0.00 $350,000.00 $0.00 $350,000.00

135 LE GROS MEMORIAL AIRPORT Installation of Runway 13-31 Lighting $0.00 $383,600.00 $0.00 $383,600.00

136 PINEVILLE MUNICIPAL AIRPORT Expand Automobile Parking Lot $0.00 $125,802.00 $0.00 $125,802.00

137 CONCORDIA PARISH AIRPORT Taxiway Extension - Preliminary $60,750.00 $6,750.00 $0.00 $67,500.00

138 DE QUINCY INDUSTRIAL AIRPARK Replace Rotating Beacon $0.00 $50,000.00 $0.00 $50,000.00

139 LEESVILLE AIRPORT GA Development Area - Taxilanes and Drainage $0.00 $217,100.00 $0.00 $217,100.00

140 COLUMBIA AIRPORT Construct AG Apron $0.00 $231,000.00 $0.00 $231,000.00

141 TENSAS PARISH AIRPORT Apron Expansion - Phase I $0.00 $55,000.00 $0.00 $55,000.00

142 JOHN H.HOOKS JR. MEMORIAL Design & Environmental for Runway & Taxiway Extension

$152,000.00 $16,889.00 $0.00 $168,889.00

Wednesday, January 13, 2016 Page 12 of 16General Aviation Capital Outlay

00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
Page 26: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

General Aviation Capital Outlay

143 KELLY-DUMAS Construct Three Box Hangars $0.00 $350,000.00 $0.00 $350,000.00

144 ARCADIA-BIENVILLE AIRPORT Design Agriculture Apron, Taxilane, and Entrance Road $0.00 $85,000.00 $0.00 $85,000.00

145 ESLER REGIONAL AIRPORT Construct T-Hangars $0.00 $373,258.00 $0.00 $373,258.00

146 JONESBORO AIRPORT Design to Construct Agriculture Apron $51,319.00 $5,702.00 $0.00 $57,021.00

147 VICKSBURG-TALLULAH REGIONAL AIRPORT

Design to Construct Hangar $0.00 $75,000.00 $0.00 $75,000.00

148 ESLER REGIONAL AIRPORT Small Scale Airport Master Plan $0.00 $150,000.00 $0.00 $150,000.00

149 ARCADIA-BIENVILLE AIRPORT Construct Agriculture Apron, Taxilane, and Entrance Road

$0.00 $600,000.00 $0.00 $600,000.00

150 LE GROS MEMORIAL AIRPORT Construct Aviation Fuel System $0.00 $194,000.00 $0.00 $194,000.00

151 DAVID G. JOYCE AIRPORT Rehabilitate Airfield Lighting $0.00 $325,000.00 $0.00 $325,000.00

152 DE QUINCY INDUSTRIAL AIRPARK Hangar Rehabilitation $0.00 $300,000.00 $0.00 $300,000.00

153 RED RIVER PARISH AIRPORT Airport Action Plan $0.00 $125,000.00 $0.00 $125,000.00

154 ARCADIA-BIENVILLE AIRPORT Construct Hangar $0.00 $500,000.00 $0.00 $500,000.00

155 VIVIAN AIRPORT Environmental Assessment to Construct New Runway 9/27

$0.00 $150,000.00 $0.00 $150,000.00

156 ARCADIA-BIENVILLE AIRPORT Design Hangar $0.00 $120,000.00 $0.00 $120,000.00

157 HART AIRPORT Airport Action Plan $0.00 $125,000.00 $0.00 $125,000.00

158 ARCADIA-BIENVILLE AIRPORT Action Plan/ALP $0.00 $125,000.00 $0.00 $125,000.00

Wednesday, January 13, 2016 Page 13 of 16General Aviation Capital Outlay

00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
Page 27: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

General Aviation Capital Outlay

159 ARCADIA-BIENVILLE AIRPORT Design Terminal and Fuel Farm $0.00 $90,000.00 $0.00 $90,000.00

160 HOMER MUNICIPAL AIRPORT Construct Runway Safety Area Improvements $0.00 $831,600.00 $0.00 $831,600.00

161 HOMER MUNICIPAL AIRPORT Design Runway Safety Area Improvements $0.00 $105,000.00 $0.00 $105,000.00

162 MARKSVILLE MUNICIPAL AIRPORT Northeast Apron Improvements - Phase I (Design) $0.00 $47,000.00 $0.00 $47,000.00

163 JACKSON AIRPORT Temporary Runway Lighting $0.00 $51,600.00 $0.00 $51,600.00

164 JONESBORO AIRPORT Construct Hangars $0.00 $292,000.00 $8,000.00 $300,000.00

165 DAVID G. JOYCE AIRPORT Rehabilitate Apron - South Section $0.00 $460,000.00 $0.00 $460,000.00

166 VICKSBURG-TALLULAH REGIONAL AIRPORT

Runway Extension (Feasibility Study) $0.00 $39,670.00 $0.00 $39,670.00

167 BEAUREGARD REGIONAL AIRPORT Airport Layout Plan Update $0.00 $60,000.00 $0.00 $60,000.00

168 MOREHOUSE MEMORIAL AIRPORT Construct Hangars $315,000.00 $35,000.00 $0.00 $350,000.00

169 VICKSBURG-TALLULAH REGIONAL AIRPORT

Construct Access Road Rehabilitation $90,000.00 $10,000.00 $0.00 $100,000.00

170 JOHN H.HOOKS JR. MEMORIAL Construct Hangar AccessTaxiway Phase I $58,500.00 $6,500.00 $0.00 $65,000.00

171 KELLY-DUMAS Install AWOS $0.00 $200,000.00 $0.00 $200,000.00

172 BUNKIE MUNICIPAL AIRPORT Update Airport Layout Plan $0.00 $50,000.00 $0.00 $50,000.00

173 FRANKLINTON AIRPORT Perimeter Fencing - Phase I $0.00 $135,000.00 $0.00 $135,000.00

174 WELSH AIRPORT Rehabilitate Airfield Lighting - Phase I (Design) $0.00 $80,000.00 $0.00 $80,000.00

Wednesday, January 13, 2016 Page 14 of 16General Aviation Capital Outlay

00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
Page 28: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

General Aviation Capital Outlay

175 JONESBORO AIRPORT Construct Agriculture Apron $450,000.00 $50,000.00 $0.00 $500,000.00

176 WELSH AIRPORT Runway Rehabilitation $0.00 $180,000.00 $0.00 $180,000.00

177 UNION PARISH AIRPORT Land Acquisition for Taxilanes/Hangar Development $0.00 $150,000.00 $0.00 $150,000.00

178 DELHI MUNICIPAL AIRPORT Runway Rehabilitation $0.00 $100,000.00 $0.00 $100,000.00

179 LE MAIRE MEMORIAL AIRPORT Ramp Expansion $0.00 $400,000.00 $0.00 $400,000.00

180 KELLY-DUMAS Rehabilitate Access Road $150,000.00 $350,000.00 $0.00 $500,000.00

181 JONESVILLE MUNICIPAL AIRPORT Rehabilitate Aprons - Phase I $0.00 $65,000.00 $0.00 $65,000.00

182 DELHI MUNICIPAL AIRPORT Perimeter Fencing - Phase I $0.00 $40,000.00 $0.00 $40,000.00

183 UNION PARISH AIRPORT Update ALP $0.00 $75,000.00 $0.00 $75,000.00

184 HOMER MUNICIPAL AIRPORT Airport Master Plan $0.00 $173,250.00 $0.00 $173,250.00

185 TENSAS PARISH AIRPORT Land Acquisition (Phase I) $0.00 $250,000.00 $0.00 $250,000.00

186 FRANKLINTON AIRPORT Update Airport Layout Plan $0.00 $100,000.00 $0.00 $100,000.00

187 DELHI MUNICIPAL AIRPORT Perimeter Fencing - Phase II $0.00 $50,000.00 $0.00 $50,000.00

188 DELHI MUNICIPAL AIRPORT Perimeter Fence - Phase III $0.00 $330,000.00 $0.00 $330,000.00

189 EUNICE AIRPORT Land Acquistion - West $0.00 $300,000.00 $0.00 $300,000.00

190 JENA AIRPORT Land Acquisition $0.00 $200,000.00 $0.00 $200,000.00

191 OLLA AIRPORT Perimeter Fencing $0.00 $400,000.00 $0.00 $400,000.00

Wednesday, January 13, 2016 Page 15 of 16General Aviation Capital Outlay

00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
Page 29: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project DescriptionFederal Funds State Match Local Other Total Funds

General Aviation Capital Outlay

192 JONESVILLE MUNICIPAL AIRPORT Airport Layout Plan $67,500.00 $7,500.00 $0.00 $75,000.00

193 DELHI MUNICIPAL AIRPORT Land Acquisition $0.00 $95,000.00 $0.00 $95,000.00

194 NATCHITOCHES REGIONAL AIRPORT Upgrade Localizer $0.00 $450,000.00 $0.00 $450,000.00

195 DELHI MUNICIPAL AIRPORT Update Airport Layout Plan (ALP) $0.00 $40,000.00 $0.00 $40,000.00

196 WINNSBORO MUNICIPAL AIRPORT Site Selection & EA for new Airport $270,000.00 $30,000.00 $0.00 $300,000.00

197 BYERLEY AIRPORT Construct New Shade Ports $450,000.00 $50,000.00 $0.00 $500,000.00

198 CONCORDIA PARISH AIRPORT Construct Segmented Circle $0.00 $30,000.00 $0.00 $30,000.00

199 COLUMBIA AIRPORT Construct Access Taxilane $0.00 $290,400.00 $0.00 $290,400.00

200 JENA AIRPORT Taxiway A Extension - North - Phase III (Construction) $0.00 $400,000.00 $0.00 $400,000.00

201 JENA AIRPORT Taxiway A Extension - Phase I $0.00 $180,000.00 $0.00 $180,000.00

202 JENA AIRPORT T-hangar Apron $0.00 $75,000.00 $0.00 $75,000.00

203 JENA AIRPORT Taxiway A Extension - South - Phase II (Construction) $0.00 $1,275,000.00 $0.00 $1,275,000.00

204 JENA AIRPORT Taxiway Lighting $0.00 $25,000.00 $0.00 $25,000.00

$38,575,536.00 $906,050.00 $63,822,000.00General Aviation Capital Outlay Totals $24,340,414.00

Wednesday, January 13, 2016 Page 16 of 16General Aviation Capital Outlay

00289164
Typewritten Text
Airport Construction and Development Priority Program Unfunded 2017-2018
00289164
Typewritten Text
Page 30: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Air Carrier Unfunded

2018-2021

Page 31: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

1 BATON ROUGE METROPOLITAN AIRPORT

Reconstruct Runway 4R/22L & Taxiway E - Phase II (Design & Construction)

$0.00 $2,980,000.00 $20,000.00 $3,000,000.00

2 SHREVEPORT REGIONAL AIRPORT WHA Mitigation Drainage Project $2,400,000.00 $266,667.00 $0.00 $2,666,667.00

3 BATON ROUGE METROPOLITAN AIRPORT

Airfield Perimeter Security Improvements $2,187,243.00 $243,027.00 $0.00 $2,430,270.00

4 BATON ROUGE METROPOLITAN AIRPORT

Construct EMAS Replacement $5,000,000.00 $555,556.00 $0.00 $5,555,556.00

5 LAFAYETTE REGIONAL AIRPORT Obstruction Removal $0.00 $100,000.00 $0.00 $100,000.00

6 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Terminal Construction Project - Phase VI $2,080,000.00 $3,277,333.00 $416,000.00 $5,773,333.00

7 BATON ROUGE METROPOLITAN AIRPORT

North General Aviation Development - Phase II $0.00 $2,980,000.00 $20,000.00 $3,000,000.00

8 BATON ROUGE METROPOLITAN AIRPORT

North General Aviation Development - Phase III $2,160,000.00 $3,220,000.00 $20,000.00 $5,400,000.00

9 ALEXANDRIA INTERNATIONAL AIRPORT Install Emergency Generators for Navigational Aids $0.00 $300,000.00 $0.00 $300,000.00

10 BATON ROUGE METROPOLITAN AIRPORT

Reconstruct Runway 4R/22L & Taxiway E - Phase III $0.00 $2,980,000.00 $20,000.00 $3,000,000.00

11 BATON ROUGE METROPOLITAN AIRPORT

GA Runway 4R/22L Reconstruction Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00

12 BATON ROUGE METROPOLITAN AIRPORT

Reconstruct Runway 4R/22L & Taxiway E - Phase IV $0.00 $1,480,000.00 $20,000.00 $1,500,000.00

Wednesday, January 13, 2016 Page 1 of 42Air Carrier Capital Outlay

Page 32: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

13 BATON ROUGE METROPOLITAN AIRPORT

GA Runway 4R/22L Reconstruction Phase III $0.00 $3,000,000.00 $0.00 $3,000,000.00

14 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert - Phase III $0.00 $1,480,000.00 $0.00 $1,480,000.00

15 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert - Phase IV $0.00 $1,480,000.00 $0.00 $1,480,000.00

16 BATON ROUGE METROPOLITAN AIRPORT

Wildlife Hazard Mitigation - Phase VII $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

17 LAFAYETTE REGIONAL AIRPORT Rehabilitate North General Aviation Apron - Phase V of V $0.00 $3,000,000.00 $0.00 $3,000,000.00

18 BATON ROUGE METROPOLITAN AIRPORT

Wildlife Hazard Mitigation - Phase III $5,788,580.00 $643,176.00 $0.00 $6,431,756.00

19 BATON ROUGE METROPOLITAN AIRPORT

Wildlife Hazard Mitigation - Phase V $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

20 BATON ROUGE METROPOLITAN AIRPORT

Wildlife Hazard Mitigation - Phase VI $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

21 BATON ROUGE METROPOLITAN AIRPORT

Wildlife Hazard Mitigation - Phase IV $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

22 BATON ROUGE METROPOLITAN AIRPORT

Air Carrier Apron Rehabilitation - Phase II $1,977,943.00 $219,771.00 $0.00 $2,197,714.00

23 MONROE REGIONAL AIRPORT Airfield Drainage Rehabilitation - Phase II (Construction) $0.00 $800,000.00 $0.00 $800,000.00

24 BATON ROUGE METROPOLITAN AIRPORT

GA Runway to Taxiway Conversion - Phase II $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

Wednesday, January 13, 2016 Page 2 of 42Air Carrier Capital Outlay

Page 33: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

25 SHREVEPORT REGIONAL AIRPORT Widen & Extend Taxiways E & K - Construction $2,880,000.00 $320,000.00 $0.00 $3,200,000.00

26 MONROE REGIONAL AIRPORT Runway 14/32 Extension - Phase II $1,300,000.00 $3,014,444.00 $0.00 $4,314,444.00

27 SHREVEPORT REGIONAL AIRPORT Airfield Drainage Rehabilitation - Design & Construction Phase III

$0.00 $2,000,000.00 $0.00 $2,000,000.00

28 SHREVEPORT REGIONAL AIRPORT Widen & Extend Taxiways E & K - Design $0.00 $250,000.00 $0.00 $250,000.00

29 BATON ROUGE METROPOLITAN AIRPORT

North Airport Development - Phase II $0.00 $900,000.00 $0.00 $900,000.00

30 MONROE REGIONAL AIRPORT Replace Airfield Regulators $0.00 $60,000.00 $0.00 $60,000.00

31 BATON ROUGE METROPOLITAN AIRPORT

Airfield Drainage Improvements - Phase II Construction $5,519,500.00 $613,278.00 $0.00 $6,132,778.00

32 BATON ROUGE METROPOLITAN AIRPORT

Taxiway F Reconstruction and Extension - Phase IV $5,415,000.00 $601,667.00 $0.00 $6,016,667.00

33 ALEXANDRIA INTERNATIONAL AIRPORT Thermoplast Hold Lines and Markings - Phase II $0.00 $400,000.00 $0.00 $400,000.00

34 LAFAYETTE REGIONAL AIRPORT Rehabilitate North General Aviation Apron - IV of V $0.00 $3,000,000.00 $0.00 $3,000,000.00

35 LAKE CHARLES REGIONAL AIRPORT Construct Perimeter Road - Phase II (Construction) $1,000,000.00 $111,111.00 $0.00 $1,111,111.00

36 LAKE CHARLES REGIONAL AIRPORT Runway 5/23 Rehabilitation $0.00 $1,884,000.00 $0.00 $1,884,000.00

Wednesday, January 13, 2016 Page 3 of 42Air Carrier Capital Outlay

Page 34: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

37 LAKE CHARLES REGIONAL AIRPORT Bury Utiltiy Lines on Airport - Phase III $0.00 $1,002,000.00 $0.00 $1,002,000.00

38 MONROE REGIONAL AIRPORT Rehabilitate Runway 04/22 Markings $0.00 $308,730.00 $0.00 $308,730.00

39 MONROE REGIONAL AIRPORT Wildlife Hazard Mitigation $337,500.00 $37,500.00 $0.00 $375,000.00

40 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Rehabilitate Taxiways E, S, & F $3,431,250.00 $381,250.00 $762,500.00 $4,575,000.00

41 BATON ROUGE METROPOLITAN AIRPORT

Taxiway F Reconstruction and Extension - Phase III $7,999,000.00 $888,778.00 $0.00 $8,887,778.00

42 BATON ROUGE METROPOLITAN AIRPORT

GA Runway to Taxiway Conversion - Phase I $4,680,000.00 $520,000.00 $0.00 $5,200,000.00

43 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Apron Expansion $4,750,000.00 $527,778.00 $0.00 $5,277,778.00

44 SHREVEPORT REGIONAL AIRPORT Extend Runway 6 & Taxiway C - Construction $9,360,000.00 $1,040,000.00 $0.00 $10,400,000.00

45 LAKE CHARLES REGIONAL AIRPORT North Apron Expansion for Development - Phase I (Construction)

$0.00 $1,500,000.00 $0.00 $1,500,000.00

46 LAKE CHARLES REGIONAL AIRPORT Construct Middle Ramp $0.00 $701,000.00 $0.00 $701,000.00

47 MONROE REGIONAL AIRPORT Improve Security Fence $0.00 $400,000.00 $0.00 $400,000.00

48 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Rehabilitate Runway 1/19 $1,571,808.00 $174,645.00 $349,291.00 $2,095,744.00

Wednesday, January 13, 2016 Page 4 of 42Air Carrier Capital Outlay

Page 35: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

49 LAFAYETTE REGIONAL AIRPORT Rehabilitate Perimeter Fence $2,000,000.00 $222,222.00 $0.00 $2,222,222.00

50 BATON ROUGE METROPOLITAN AIRPORT

Runway 4L Drainage & Perimeter Road Improvements $4,200,000.00 $466,667.00 $0.00 $4,666,667.00

51 BATON ROUGE METROPOLITAN AIRPORT

ARFF PH II (AIP) $511,936.00 $56,882.00 $0.00 $568,818.00

52 ALEXANDRIA INTERNATIONAL AIRPORT Runway Rubber Removal and Striping $630,000.00 $70,000.00 $0.00 $700,000.00

53 ALEXANDRIA INTERNATIONAL AIRPORT Install LED Runway Lighting $0.00 $750,000.00 $0.00 $750,000.00

54 ALEXANDRIA INTERNATIONAL AIRPORT Master Drainage Rehabilitation - Phase III $900,000.00 $100,000.00 $0.00 $1,000,000.00

55 MONROE REGIONAL AIRPORT Thermoplastic Markings $498,150.00 $55,350.00 $0.00 $553,500.00

56 ALEXANDRIA INTERNATIONAL AIRPORT Install LED Taxiway Sign Fixtures $0.00 $375,000.00 $0.00 $375,000.00

57 MONROE REGIONAL AIRPORT Runway 14/32 Extension - Phase I (Environmental Assessment)

$382,500.00 $42,500.00 $0.00 $425,000.00

58 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate FBO Apron - Phase II (Construction) $1,537,957.00 $170,884.00 $1,634,544.00 $3,343,385.00

59 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road - Design $475,000.00 $52,778.00 $0.00 $527,778.00

60 LAFAYETTE REGIONAL AIRPORT Straighten Taxiway Bravo $2,403,000.00 $267,000.00 $0.00 $2,670,000.00

Wednesday, January 13, 2016 Page 5 of 42Air Carrier Capital Outlay

Page 36: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

61 LAFAYETTE REGIONAL AIRPORT Taxiway Delta Removal $382,500.00 $42,500.00 $0.00 $425,000.00

62 LAFAYETTE REGIONAL AIRPORT Taxiway Hotel Re-configuration $1,260,000.00 $140,000.00 $0.00 $1,400,000.00

63 ALEXANDRIA INTERNATIONAL AIRPORT GA Apron Rehabilitation $0.00 $110,000.00 $990,000.00 $1,100,000.00

64 LAFAYETTE REGIONAL AIRPORT Taxiway Kilo Removal $495,000.00 $55,000.00 $0.00 $550,000.00

65 ALEXANDRIA INTERNATIONAL AIRPORT North Apron Rehabilitation - Joint Seal and Spall Repair $382,500.00 $42,500.00 $0.00 $425,000.00

66 ALEXANDRIA INTERNATIONAL AIRPORT Southeast Apron Expansion $0.00 $8,000,000.00 $0.00 $8,000,000.00

67 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate Overrun Area Runway 18/36 $190,000.00 $21,111.00 $0.00 $211,111.00

68 ALEXANDRIA INTERNATIONAL AIRPORT Midfield Apron (N) New Construction North Ramp $0.00 $22,600,000.00 $0.00 $22,600,000.00

69 ALEXANDRIA INTERNATIONAL AIRPORT Midfield Apron (S) New Construction North Ramp $0.00 $34,000,000.00 $0.00 $34,000,000.00

70 LAKE CHARLES REGIONAL AIRPORT Terminal Loading Bridge $1,000,000.00 $111,111.00 $0.00 $1,111,111.00

71 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate Taxiway "F" $1,092,500.00 $121,389.00 $0.00 $1,213,889.00

72 ALEXANDRIA INTERNATIONAL AIRPORT Emergency Access Road Improvements - Phase II $900,000.00 $100,000.00 $0.00 $1,000,000.00

Wednesday, January 13, 2016 Page 6 of 42Air Carrier Capital Outlay

Page 37: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

73 BATON ROUGE METROPOLITAN AIRPORT

Airport Police Vehicle $0.00 $20,000.00 $0.00 $20,000.00

74 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase XIV $0.00 $1,500,000.00 $0.00 $1,500,000.00

75 BATON ROUGE METROPOLITAN AIRPORT

Emergency Drainage - Phase II Construction $6,359,300.00 $706,589.00 $0.00 $7,065,889.00

76 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase XII $0.00 $1,500,000.00 $0.00 $1,500,000.00

77 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase XI $0.00 $1,500,000.00 $0.00 $1,500,000.00

78 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase X $0.00 $1,500,000.00 $0.00 $1,500,000.00

79 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase IX $0.00 $1,500,000.00 $0.00 $1,500,000.00

80 SHREVEPORT REGIONAL AIRPORT F.A.R. Part 150 Land Acquisition $3,000,000.00 $333,333.00 $0.00 $3,333,333.00

81 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase VIII $0.00 $1,500,000.00 $0.00 $1,500,000.00

82 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase VII $0.00 $1,500,000.00 $0.00 $1,500,000.00

83 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00

84 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00

Wednesday, January 13, 2016 Page 7 of 42Air Carrier Capital Outlay

Page 38: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

85 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00

86 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00

87 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00

88 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase XV $0.00 $1,100,000.00 $0.00 $1,100,000.00

89 MONROE REGIONAL AIRPORT General Aviation Hangar Rehabilitation $0.00 $865,000.00 $0.00 $865,000.00

90 MONROE REGIONAL AIRPORT Construct General Aviation Hangars and Parking $0.00 $1,150,000.00 $0.00 $1,150,000.00

91 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase XIII $0.00 $1,500,000.00 $0.00 $1,500,000.00

92 MONROE REGIONAL AIRPORT Rehabilitate Maintenance Facility $0.00 $350,000.00 $0.00 $350,000.00

93 MONROE REGIONAL AIRPORT General Aviation Hangars $0.00 $700,000.00 $0.00 $700,000.00

94 ALEXANDRIA INTERNATIONAL AIRPORT Runway Blast Pads $0.00 $5,400,000.00 $0.00 $5,400,000.00

95 ALEXANDRIA INTERNATIONAL AIRPORT Runway 18 Extension: Environmental Assessment $0.00 $500,000.00 $0.00 $500,000.00

96 BATON ROUGE METROPOLITAN AIRPORT

Taxiway F Reconstruction and Extension - Phase V $2,660,000.00 $295,556.00 $0.00 $2,955,556.00

Wednesday, January 13, 2016 Page 8 of 42Air Carrier Capital Outlay

Page 39: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

97 ALEXANDRIA INTERNATIONAL AIRPORT Extend Runway 14/32 - Phase II $0.00 $765,000.00 $14,535,000.00 $15,300,000.00

98 MONROE REGIONAL AIRPORT Relocate Taxiway D Holding Position $0.00 $31,980.00 $0.00 $31,980.00

99 ALEXANDRIA INTERNATIONAL AIRPORT Extend Taxiway A $0.00 $5,850,000.00 $5,850,000.00 $11,700,000.00

100 MONROE REGIONAL AIRPORT Rehabilitate Entrance Road $360,000.00 $40,000.00 $0.00 $400,000.00

101 MONROE REGIONAL AIRPORT Rehabilitate General Aviation South Access Road $0.00 $950,000.00 $0.00 $950,000.00

102 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road $4,750,000.00 $527,778.00 $0.00 $5,277,778.00

103 MONROE REGIONAL AIRPORT Rehabilitate General Aviation North Access Road $0.00 $900,000.00 $0.00 $900,000.00

104 LAKE CHARLES REGIONAL AIRPORT Construct Perimeter Road - Phase I (Design) $0.00 $200,000.00 $0.00 $200,000.00

105 LAKE CHARLES REGIONAL AIRPORT Airport Entrance Improvements $0.00 $1,319,000.00 $0.00 $1,319,000.00

106 ALEXANDRIA INTERNATIONAL AIRPORT Large Southeast Apron Hangar & Delushe (100K S.F.) $0.00 $22,000,000.00 $0.00 $22,000,000.00

107 SHREVEPORT REGIONAL AIRPORT Construct West End AOA Perimeter Road - Phase II (Construction)

$0.00 $2,200,000.00 $0.00 $2,200,000.00

108 LAKE CHARLES REGIONAL AIRPORT Acquire Runway Sweeper $0.00 $200,000.00 $0.00 $200,000.00

Wednesday, January 13, 2016 Page 9 of 42Air Carrier Capital Outlay

Page 40: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

109 BATON ROUGE METROPOLITAN AIRPORT

North GA Terminal Facility $0.00 $2,980,000.00 $20,000.00 $3,000,000.00

110 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert $9,900,000.00 $1,100,000.00 $0.00 $11,000,000.00

111 MONROE REGIONAL AIRPORT Geographic Information System $270,000.00 $30,000.00 $0.00 $300,000.00

112 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase VIII $0.00 $500,000.00 $0.00 $500,000.00

113 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase VII $0.00 $1,500,000.00 $0.00 $1,500,000.00

114 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00

115 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00

116 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00

117 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00

118 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00

119 ALEXANDRIA INTERNATIONAL AIRPORT Install CAT 1 Approach - Runway 18/36 (Equipment Lighting)

$0.00 $2,500,000.00 $0.00 $2,500,000.00

120 SHREVEPORT REGIONAL AIRPORT East AOA Perimeter Road - Design & Environmental $0.00 $500,000.00 $0.00 $500,000.00

Wednesday, January 13, 2016 Page 10 of 42Air Carrier Capital Outlay

Page 41: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

121 ALEXANDRIA INTERNATIONAL AIRPORT ILS Upgrade $1,900,000.00 $211,111.00 $0.00 $2,111,111.00

122 ALEXANDRIA INTERNATIONAL AIRPORT Runway 18 Extension - Construction Phase II $1,765,275.00 $3,700,688.00 $4,540,913.00 $10,006,876.00

123 ALEXANDRIA INTERNATIONAL AIRPORT North Ramp Rehabilitation - Phase III $8,550,000.00 $950,000.00 $0.00 $9,500,000.00

124 ALEXANDRIA INTERNATIONAL AIRPORT Construct Holding Bay at Runway 36 End $1,900,000.00 $211,111.00 $0.00 $2,111,111.00

125 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert $9,000,000.00 $1,000,000.00 $0.00 $10,000,000.00

126 MONROE REGIONAL AIRPORT Electronic Airport Layout Plan $0.00 $400,000.00 $0.00 $400,000.00

127 ALEXANDRIA INTERNATIONAL AIRPORT Large Southeast Apron Hangar - Two $0.00 $19,200,000.00 $0.00 $19,200,000.00

128 ALEXANDRIA INTERNATIONAL AIRPORT Large Southeast Apron Hangar - Three $0.00 $19,200,000.00 $0.00 $19,200,000.00

129 ALEXANDRIA INTERNATIONAL AIRPORT 10 Unit T-hangar $0.00 $700,000.00 $0.00 $700,000.00

130 ALEXANDRIA INTERNATIONAL AIRPORT Runway 14 Parallel Taxiway Westside $0.00 $43,000,000.00 $0.00 $43,000,000.00

131 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate Terminal Access Roadway $0.00 $500,000.00 $0.00 $500,000.00

132 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road - Phase II (Construction) $7,125,000.00 $791,667.00 $0.00 $7,916,667.00

Wednesday, January 13, 2016 Page 11 of 42Air Carrier Capital Outlay

Page 42: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

133 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road - Phase I (Design) $475,000.00 $52,778.00 $0.00 $527,778.00

134 BATON ROUGE METROPOLITAN AIRPORT

South Entergy Pole Relocation $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

135 ALEXANDRIA INTERNATIONAL AIRPORT North Emergency Access Road Widening & Bridge Improvements

$0.00 $600,000.00 $5,400,000.00 $6,000,000.00

136 ALEXANDRIA INTERNATIONAL AIRPORT Relocate Fuel Farm - Phase IV (Demolition of Old Fuel Farm)

$665,000.00 $73,889.00 $0.00 $738,889.00

137 ALEXANDRIA INTERNATIONAL AIRPORT Westside Infrastructure Improvements (Electrical, Water, Sewer, Drainage and Access)

$0.00 $83,000,000.00 $0.00 $83,000,000.00

138 ALEXANDRIA INTERNATIONAL AIRPORT Property Acquisition for Industrial Park Development $0.00 $204,000.00 $0.00 $204,000.00

139 BATON ROUGE METROPOLITAN AIRPORT

Construct Hangar $5,400,000.00 $600,000.00 $0.00 $6,000,000.00

140 ALEXANDRIA INTERNATIONAL AIRPORT Emergency Access Road Improvements - Phase I $900,000.00 $100,000.00 $0.00 $1,000,000.00

141 BATON ROUGE METROPOLITAN AIRPORT

Hangar No.1 - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00

142 BATON ROUGE METROPOLITAN AIRPORT

Hangar No.1 - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00

143 BATON ROUGE METROPOLITAN AIRPORT

Hangar No.1 - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00

144 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00

Wednesday, January 13, 2016 Page 12 of 42Air Carrier Capital Outlay

Page 43: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

145 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00

146 ALEXANDRIA INTERNATIONAL AIRPORT Large Southeast Apron Hangar - One $0.00 $19,200,000.00 $0.00 $19,200,000.00

147 ALEXANDRIA INTERNATIONAL AIRPORT Southeast Apron N Two Large Hangars (100K S.F.) $0.00 $18,000,000.00 $0.00 $18,000,000.00

148 BATON ROUGE METROPOLITAN AIRPORT

RW 4R/22L Reconstruction - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00

149 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00

150 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00

151 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert - Phase VII $0.00 $1,000,000.00 $0.00 $1,000,000.00

152 BATON ROUGE METROPOLITAN AIRPORT

Hangar No. 1 - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00

153 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase X $0.00 $1,500,000.00 $0.00 $1,500,000.00

154 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase IX $0.00 $1,500,000.00 $0.00 $1,500,000.00

155 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase VIII $0.00 $1,500,000.00 $0.00 $1,500,000.00

156 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00

Wednesday, January 13, 2016 Page 13 of 42Air Carrier Capital Outlay

Page 44: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

157 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00

158 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00

159 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Phase 3 - Cold Storage - Phase IV $0.00 $500,000.00 $0.00 $500,000.00

160 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Phase 3 - Cold Storage - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00

161 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Phase 3 - Cold Storage - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00

162 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00

163 BATON ROUGE METROPOLITAN AIRPORT

Property East Side of Plank Road - Phase V $0.00 $500,000.00 $0.00 $500,000.00

164 BATON ROUGE METROPOLITAN AIRPORT

Property South of Blount Road - Phase III $0.00 $1,099,450.00 $0.00 $1,099,450.00

165 BATON ROUGE METROPOLITAN AIRPORT

Property South of Blount Road - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00

166 BATON ROUGE METROPOLITAN AIRPORT

Property East Side of Plank Road - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00

167 BATON ROUGE METROPOLITAN AIRPORT

Property East Side of Plank Road - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00

168 BATON ROUGE METROPOLITAN AIRPORT

Property East Side of Plank Road - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00

Wednesday, January 13, 2016 Page 14 of 42Air Carrier Capital Outlay

Page 45: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

169 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00

170 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00

171 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00

172 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00

173 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00

174 BATON ROUGE METROPOLITAN AIRPORT

Green Building Initiative (Lighting, Mechanical Energy Management System) - Phase II

$0.00 $1,500,000.00 $0.00 $1,500,000.00

175 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00

176 BATON ROUGE METROPOLITAN AIRPORT

Green Building Initiative (Lighting, Mechanical Energy Management System) - Phase III

$0.00 $1,000,000.00 $0.00 $1,000,000.00

177 BATON ROUGE METROPOLITAN AIRPORT

Install USGS Survey Monuments Around Airport $0.00 $50,000.00 $0.00 $50,000.00

178 BATON ROUGE METROPOLITAN AIRPORT

Property South of Blount Road - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00

179 BATON ROUGE METROPOLITAN AIRPORT

Property East Side of Plank Road - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00

180 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements - Phase I $0.00 $0.00 $0.00 $0.00

Wednesday, January 13, 2016 Page 15 of 42Air Carrier Capital Outlay

Page 46: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021Air Carrier Capital Outlay

181 BATON ROUGE METROPOLITAN AIRPORT

Green Building Initiative (Lighting, Mechanical Energy Management System) - Phase I

$0.00 $1,500,000.00 $0.00 $1,500,000.00

182 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements $8,100,000.00 $900,000.00 $0.00 $9,000,000.00

$468,973,535.00 $34,598,248.00 $689,130,225.00Air Carrier Capital Outlay Totals $185,558,442.00

Wednesday, January 13, 2016 Page 16 of 42Air Carrier Capital Outlay

Page 47: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

General Aviation Unfunded

2018-2021

Page 48: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

1 SLIDELL AIRPORT Mitigate Obstructions $981,000.00 $109,000.00 $0.00 $1,090,000.00

2 SOUTHLAND FIELD Clear Airspace - Phase II (Land Acquisition/Easements) $346,500.00 $38,500.00 $0.00 $385,000.00

3 LOUISIANA REGIONAL AIRPORT Obstruction Removal - Phase I (SW Transitional) $0.00 $80,000.00 $0.00 $80,000.00

4 LOUISIANA REGIONAL AIRPORT Obstruction Removal - Phase II $0.00 $150,000.00 $0.00 $150,000.00

5 SLIDELL AIRPORT Obstruction Removal East Transition - Phase II $0.00 $250,400.00 $0.00 $250,400.00

6 SLIDELL AIRPORT Land Acquisition West Side $0.00 $375,000.00 $0.00 $375,000.00

7 SLIDELL AIRPORT Obstruction Removal West Side Transition Surface (30 Acres)

$0.00 $258,500.00 $0.00 $258,500.00

8 LOUISIANA REGIONAL AIRPORT Hangar Development - Phase II $0.00 $780,000.00 $20,000.00 $800,000.00

9 ACADIANA REGIONAL AIRPORT Obstruction Removal $0.00 $200,000.00 $0.00 $200,000.00

10 HAMMOND NORTHSHORE REGIONAL AIRPORT

Property Acquisition for Runway 18 Approach $902,000.00 $100,222.00 $0.00 $1,002,222.00

11 SLIDELL AIRPORT Apron Expansion - Phase II $675,000.00 $75,000.00 $0.00 $750,000.00

12 ESLER REGIONAL AIRPORT Obstruction Removal - Phase I $0.00 $21,000.00 $0.00 $21,000.00

Wednesday, January 13, 2016 Page 17 of 42General Aviation Capital Outlay

Page 49: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

13 CHENNAULT INTERNATIONAL AIRPORT Purchase ARFF Vehicle $1,170,000.00 $130,000.00 $0.00 $1,300,000.00

14 SOUTHLAND FIELD Clear Airspace - Phase 1 (Environmental) $99,000.00 $11,000.00 $0.00 $110,000.00

15 FALSE RIVER REGIONAL AIRPORT Obstruction Removal - Runway 18 Approach $0.00 $250,000.00 $0.00 $250,000.00

16 NATCHITOCHES REGIONAL AIRPORT Obstruction Removal $1,350,000.00 $150,000.00 $0.00 $1,500,000.00

17 SLIDELL AIRPORT Purchase of Avigation Easement for East Transition Surface

$0.00 $67,500.00 $0.00 $67,500.00

18 SLIDELL AIRPORT Rehabilitate Fuel System $0.00 $450,000.00 $50,000.00 $500,000.00

19 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Taxiway A - Phase II (Construction) $270,000.00 $30,000.00 $0.00 $300,000.00

20 SLIDELL AIRPORT Obstruction Mitigation (Runway 36 RPZ) $0.00 $101,400.00 $0.00 $101,400.00

21 HOUMA-TERREBONNE AIRPORT Improve 18/36 Runway Safety Area - Phase II $0.00 $750,000.00 $0.00 $750,000.00

22 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 18R/36L - Preliminary Study $0.00 $100,000.00 $0.00 $100,000.00

23 HOUMA-TERREBONNE AIRPORT Improve 18/36 Runway Safety Area - Phase III (Construction)

$0.00 $1,000,000.00 $0.00 $1,000,000.00

24 FELICIANA AIRPARK Obstruction Removal - North and West Runway 15 $0.00 $67,000.00 $0.00 $67,000.00

Wednesday, January 13, 2016 Page 18 of 42General Aviation Capital Outlay

Page 50: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

25 RUSTON REGIONAL AIRPORT Construct Taxilanes and T- Hangars - Phase II (Construction)

$270,000.00 $30,000.00 $0.00 $300,000.00

26 HOUMA-TERREBONNE AIRPORT Taxiway A Extension - Phase II (Construction) $900,000.00 $1,100,000.00 $0.00 $2,000,000.00

27 CONCORDIA PARISH AIRPORT Obstruction Relocation $0.00 $500,000.00 $0.00 $500,000.00

28 NATCHITOCHES REGIONAL AIRPORT Bury Powerlines Runway 7 $0.00 $575,000.00 $0.00 $575,000.00

29 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Rehabilitate Runway & Partial Taxiway (Phase II - Construction)

$1,064,700.00 $118,300.00 $0.00 $1,183,000.00

30 ACADIANA REGIONAL AIRPORT GA Taxiway Improvements Phase III $1,530,000.00 $170,000.00 $0.00 $1,700,000.00

31 ACADIANA REGIONAL AIRPORT GA Taxiway Rehabilitation - Phase II (Construction) $1,170,000.00 $380,000.00 $0.00 $1,550,000.00

32 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Taxiway A - Phase I (Design) $22,500.00 $2,500.00 $0.00 $25,000.00

33 ACADIANA REGIONAL AIRPORT Heavy Jet Apron Rehabilitation - Phase II of III (Construction)

$4,500,000.00 $500,000.00 $0.00 $5,000,000.00

34 ACADIANA REGIONAL AIRPORT Heavy Jet Apron Rehabilitation - Phase III of III (Construction)

$5,580,000.00 $620,000.00 $0.00 $6,200,000.00

35 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Rehabilitate Aprons, Taxilanes and & T-Hangar Areas (Phase II - Construction)

$890,550.00 $98,950.00 $0.00 $989,500.00

36 TENSAS PARISH AIRPORT Obstruction Removal (Phase III) $0.00 $125,000.00 $0.00 $125,000.00

Wednesday, January 13, 2016 Page 19 of 42General Aviation Capital Outlay

Page 51: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

37 LOUISIANA REGIONAL AIRPORT Land Acquisition North (T-Hangar Development) $0.00 $200,000.00 $20,000.00 $220,000.00

38 VIVIAN AIRPORT Obstruction Removal $0.00 $200,000.00 $0.00 $200,000.00

39 ACADIANA REGIONAL AIRPORT Seaway Lighting Rehabilitation - Phase II (Construction) $0.00 $450,000.00 $0.00 $450,000.00

40 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Airfield Lighting/Signs $0.00 $380,000.00 $0.00 $380,000.00

41 GEORGE R. CARR MEMORIAL AIRPORT Land Acquistion - North End (Runway Safety Area Improvements)

$1,080,000.00 $120,000.00 $0.00 $1,200,000.00

42 HOUMA-TERREBONNE AIRPORT Airport Perimeter Fencing and Control Gates - Phase II $0.00 $1,000,000.00 $0.00 $1,000,000.00

43 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Runway 17/35 Thresholds - Phase II (Construction)

$270,000.00 $30,000.00 $0.00 $300,000.00

44 SLIDELL AIRPORT Extend Runway 18/36 and Parallel Taxiway - Phase II (Construction)

$1,595,160.00 $177,240.00 $0.00 $1,772,400.00

45 SLIDELL AIRPORT Extend Runway 18/36 and Parallel Taxiway - Phase I (Design and EA)

$250,650.00 $27,850.00 $0.00 $278,500.00

46 HOUMA-TERREBONNE AIRPORT Improve 18/36 Runway Safety Area - Phase I $0.00 $750,000.00 $0.00 $750,000.00

47 ST TAMMANY REGIONAL AIRPORT Runway Rehabilitation - Phase II (Construction) $0.00 $184,760.00 $0.00 $184,760.00

48 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Runway Pavement Strengthening - Phase II (Construction) $0.00 $4,450,000.00 $0.00 $4,450,000.00

Wednesday, January 13, 2016 Page 20 of 42General Aviation Capital Outlay

Page 52: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

49 RUSTON REGIONAL AIRPORT Construct Runway Extension - Phase III (Construction) $3,330,000.00 $370,000.00 $0.00 $3,700,000.00

50 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Taxiway Pavement Strengthening - Phase II (Construction) $3,600,000.00 $400,000.00 $0.00 $4,000,000.00

51 RUSTON REGIONAL AIRPORT Construct Apron Expansion - Phase II (Construction) $675,000.00 $75,000.00 $0.00 $750,000.00

52 HAMMOND NORTHSHORE REGIONAL AIRPORT

Construct 5 Hangars $0.00 $500,000.00 $0.00 $500,000.00

53 RUSTON REGIONAL AIRPORT Construct Apron Expansion - Phase III $990,000.00 $110,000.00 $0.00 $1,100,000.00

54 JENNINGS AIRPORT North Apron Development - Phase II (Construction) $680,400.00 $75,600.00 $0.00 $756,000.00

55 VICKSBURG-TALLULAH REGIONAL AIRPORT

Taxiway Lighting - Phase II $0.00 $275,000.00 $0.00 $275,000.00

56 NEW ORLEANS LAKEFRONT AIRPORT Extend Runway 18L/36R $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

57 CONCORDIA PARISH AIRPORT Rehabilitate Southwest Apron - Phase II $475,000.00 $52,778.00 $0.00 $527,778.00

58 LOUISIANA REGIONAL AIRPORT Land Acquisition for MALSAR $0.00 $365,000.00 $0.00 $365,000.00

59 LEESVILLE AIRPORT Extend Runway 18/36 - Phase II (Construction) $1,080,000.00 $120,000.00 $0.00 $1,200,000.00

60 HAMMOND NORTHSHORE REGIONAL AIRPORT

Taxiway A Realignment $1,679,625.00 $186,625.00 $0.00 $1,866,250.00

Wednesday, January 13, 2016 Page 21 of 42General Aviation Capital Outlay

Page 53: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

61 JENNINGS AIRPORT 8-Unit T-Hangars $0.00 $262,500.00 $262,500.00 $525,000.00

62 SHREVEPORT DOWNTOWN AIRPORT Construct 10-Unit T-Hangar $0.00 $500,000.00 $0.00 $500,000.00

63 LEESVILLE AIRPORT Construct Parallel Taxiway - Phase II $1,260,000.00 $140,000.00 $0.00 $1,400,000.00

64 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Rehabilitate Runway & Partial Taxiway (Phase I - Design) $55,800.00 $6,200.00 $0.00 $62,000.00

65 LOUISIANA REGIONAL AIRPORT South Apron Expansion - Phase III (Design/Construction) $0.00 $750,000.00 $0.00 $750,000.00

66 GEORGE R. CARR MEMORIAL AIRPORT Design Parallel Taxiway - Phase III $171,000.00 $19,000.00 $0.00 $190,000.00

67 GEORGE R. CARR MEMORIAL AIRPORT Construct Parallel Taxiway - Phase III $990,000.00 $110,000.00 $0.00 $1,100,000.00

68 HAMMOND NORTHSHORE REGIONAL AIRPORT

Runway 13/31 Obstruction Removal $0.00 $100,000.00 $0.00 $100,000.00

69 GEORGE R. CARR MEMORIAL AIRPORT Design Parallel Taxiway - Phase II and III $154,299.00 $17,144.00 $0.00 $171,443.00

70 LOUISIANA REGIONAL AIRPORT Midfield Apron Expansion - Phase II (Construction) $0.00 $540,000.00 $0.00 $540,000.00

71 HOUMA-TERREBONNE AIRPORT Construct and Extend East Aircraft Parking Apron - Phase I $6,176,016.00 $686,224.00 $0.00 $6,862,240.00

72 ACADIANA REGIONAL AIRPORT GA Taxiway Rehabilitation - Phase I (Design) $0.00 $100,000.00 $0.00 $100,000.00

Wednesday, January 13, 2016 Page 22 of 42General Aviation Capital Outlay

Page 54: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

73 ST TAMMANY REGIONAL AIRPORT Apron Extension - Phase II (Construction) $0.00 $1,149,591.00 $0.00 $1,149,591.00

74 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

T-Hangars $0.00 $500,000.00 $300,000.00 $800,000.00

75 NEW ORLEANS LAKEFRONT AIRPORT ARFF Truck $675,000.00 $75,000.00 $0.00 $750,000.00

76 HOUMA-TERREBONNE AIRPORT Airport Perimeter Fencing - Phase I $0.00 $750,000.00 $0.00 $750,000.00

77 VICKSBURG-TALLULAH REGIONAL AIRPORT

Runway Extension - Phase II $5,355,000.00 $595,000.00 $0.00 $5,950,000.00

78 HOMER MUNICIPAL AIRPORT Rehabilitate Runway - Phase III $1,016,325.00 $112,925.00 $0.00 $1,129,250.00

79 ACADIANA REGIONAL AIRPORT Peimeter/Emergency Access Road - Phase II (Construction)

$675,000.00 $75,000.00 $0.00 $750,000.00

80 VICKSBURG-TALLULAH REGIONAL AIRPORT

Runway Extension - Phase I $378,000.00 $42,000.00 $0.00 $420,000.00

81 ALLEN PARISH AIRPORT Install Perimeter Fence - Phase II (Construction) $0.00 $588,000.00 $0.00 $588,000.00

82 NEW ORLEANS LAKEFRONT AIRPORT Reconstruct North Seawall - Phase I $5,700,000.00 $633,333.00 $0.00 $6,333,333.00

83 NEW ORLEANS LAKEFRONT AIRPORT Construct Perimeter Road (around Runway 27 ) with AOA Fence Relocation

$187,105.00 $20,789.00 $0.00 $207,894.00

84 NEW ORLEANS LAKEFRONT AIRPORT Reconstruct West Seawall - Phase I $4,750,000.00 $527,778.00 $0.00 $5,277,778.00

Wednesday, January 13, 2016 Page 23 of 42General Aviation Capital Outlay

Page 55: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

85 HAMMOND NORTHSHORE REGIONAL AIRPORT

Taxiway Connector A3 Rehab $0.00 $410,000.00 $0.00 $410,000.00

86 SHREVEPORT DOWNTOWN AIRPORT Runway 5/23 Extension/Shift- Construction Phase II $13,500,000.00 $1,500,000.00 $0.00 $15,000,000.00

87 RUSTON REGIONAL AIRPORT Construct Taxilanes and T Hangars - Phase III (Construction)

$0.00 $400,000.00 $0.00 $400,000.00

88 LOUISIANA REGIONAL AIRPORT Runway & Taxiway Overlay - Phase II (Construction) $2,340,000.00 $260,000.00 $0.00 $2,600,000.00

89 HARRY P. WILLIAMS MEMORIAL AIRPORT MALSR Grading & Drainage Improvement $0.00 $150,000.00 $0.00 $150,000.00

90 PINEVILLE MUNICIPAL AIRPORT Construct Hangars $0.00 $332,850.00 $0.00 $332,850.00

91 HARRY P. WILLIAMS MEMORIAL AIRPORT Runway Safety Area Improvements $150,000.00 $16,667.00 $0.00 $166,667.00

92 HARRY P. WILLIAMS MEMORIAL AIRPORT Rehab Public Heliport $0.00 $40,000.00 $0.00 $40,000.00

93 ST LANDRY PARISH-AHART FIELD Runway 18-36 Lighting Rehabilitation $360,000.00 $40,000.00 $0.00 $400,000.00

94 ST JOHN THE BAPTIST PARISH AIRPORT Construct South Aircraft Parking Apron $427,282.00 $47,476.00 $0.00 $474,758.00

95 CONCORDIA PARISH AIRPORT Rehabilitate Runway $0.00 $175,000.00 $0.00 $175,000.00

96 HART AIRPORT Construct T-Hangars $0.00 $280,000.00 $20,000.00 $300,000.00

Wednesday, January 13, 2016 Page 24 of 42General Aviation Capital Outlay

Page 56: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

97 C.E. (RUSTY) WILLIAMS AIRPORT T-Hangars $0.00 $800,000.00 $0.00 $800,000.00

98 HAMMOND NORTHSHORE REGIONAL AIRPORT

Rehab MITL $243,000.00 $27,000.00 $0.00 $270,000.00

99 CHENNAULT INTERNATIONAL AIRPORT Apron Rehab - PCI Upgrade $285,000.00 $31,667.00 $0.00 $316,667.00

100 NATCHITOCHES REGIONAL AIRPORT Construct 10-Unit T-Hangar & Box Hangar $0.00 $650,000.00 $0.00 $650,000.00

101 ACADIANA REGIONAL AIRPORT Runway 17/35 Extension - Phase I (Design) $0.00 $500,000.00 $0.00 $500,000.00

102 HARRY P. WILLIAMS MEMORIAL AIRPORT Runway Rehabilitation $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

103 HARRY P. WILLIAMS MEMORIAL AIRPORT Rehabilitate North Apron - Phase I (Design) $0.00 $35,000.00 $0.00 $35,000.00

104 HAMMOND NORTHSHORE REGIONAL AIRPORT

Taxiway E Improvements - Phase I (Design) $0.00 $75,000.00 $0.00 $75,000.00

105 LOUISIANA REGIONAL AIRPORT North T-Hangar Development - Phase I (Environmental) $0.00 $100,000.00 $0.00 $100,000.00

106 SLIDELL AIRPORT LED Lighting Conversion $570,000.00 $63,333.00 $0.00 $633,333.00

107 HAMMOND NORTHSHORE REGIONAL AIRPORT

Taxiway E Improvements $0.00 $445,000.00 $0.00 $445,000.00

108 SHREVEPORT DOWNTOWN AIRPORT Construct Seaplane Lane & Taxiway $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

Wednesday, January 13, 2016 Page 25 of 42General Aviation Capital Outlay

Page 57: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

109 SHREVEPORT DOWNTOWN AIRPORT Design Sea Lane and Sea Taxiway $0.00 $150,000.00 $0.00 $150,000.00

110 ESLER REGIONAL AIRPORT Rehabilitate Runway 14/32 (Construction) $492,840.00 $54,760.00 $0.00 $547,600.00

111 NEW ORLEANS LAKEFRONT AIRPORT Runway 36L/18R Extension $18,000,000.00 $2,000,000.00 $0.00 $20,000,000.00

112 ST JOHN THE BAPTIST PARISH AIRPORT East Side Levee Relocation - Phase I (Environmental) $241,200.00 $26,800.00 $0.00 $268,000.00

113 MARKSVILLE MUNICIPAL AIRPORT Runway 4/22 Extension - Phase II (Environmental) $0.00 $155,000.00 $0.00 $155,000.00

114 MARKSVILLE MUNICIPAL AIRPORT Runway 4/22 Extension - Phase III (Construction) $1,692,000.00 $188,000.00 $0.00 $1,880,000.00

115 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Taxiway A $2,115,000.00 $235,000.00 $0.00 $2,350,000.00

116 C.E. (RUSTY) WILLIAMS AIRPORT Access Road and Parking $0.00 $100,000.00 $0.00 $100,000.00

117 CHENNAULT INTERNATIONAL AIRPORT Install SSALR Approach Lighting System $0.00 $1,000,000.00 $0.00 $1,000,000.00

118 DE QUINCY INDUSTRIAL AIRPARK Rehabilitate Runway $1,710,000.00 $190,000.00 $0.00 $1,900,000.00

119 HART AIRPORT Construct T-Hangar $0.00 $300,000.00 $36,000.00 $336,000.00

120 BUNKIE MUNICIPAL AIRPORT Runway Rehabilitation $0.00 $400,000.00 $0.00 $400,000.00

Wednesday, January 13, 2016 Page 26 of 42General Aviation Capital Outlay

Page 58: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

121 C.E. (RUSTY) WILLIAMS AIRPORT Seal Coat Runway and Taxiways $0.00 $150,000.00 $0.00 $150,000.00

122 SPRINGHILL AIRPORT Acquire Hangar $0.00 $85,000.00 $85,000.00 $170,000.00

123 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Access Road - Phase II $0.00 $400,000.00 $0.00 $400,000.00

124 NEW ORLEANS LAKEFRONT AIRPORT Construct New East Apron $3,600,000.00 $400,000.00 $0.00 $4,000,000.00

125 PINEVILLE MUNICIPAL AIRPORT Mill & Overlay Aircraft Apron $0.00 $565,141.00 $0.00 $565,141.00

126 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Taxiway Pavement Strengthening - Phase I (Design) $270,000.00 $30,000.00 $0.00 $300,000.00

127 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Flood Wall $18,000,000.00 $2,000,000.00 $0.00 $20,000,000.00

128 ST JOHN THE BAPTIST PARISH AIRPORT Airport Security/Wildlife Fence $540,000.00 $60,000.00 $0.00 $600,000.00

129 JENNINGS AIRPORT Install Taxiway Lighting $429,300.00 $47,700.00 $0.00 $477,000.00

130 C.E. (RUSTY) WILLIAMS AIRPORT Corporate Hangar $0.00 $2,000,000.00 $0.00 $2,000,000.00

131 NATCHITOCHES REGIONAL AIRPORT Repair Hangar Taxilanes $0.00 $125,000.00 $0.00 $125,000.00

132 JONESBORO AIRPORT Parallel Taxiway - Phase II (Construction) $405,000.00 $45,000.00 $0.00 $450,000.00

Wednesday, January 13, 2016 Page 27 of 42General Aviation Capital Outlay

Page 59: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

133 DE QUINCY INDUSTRIAL AIRPARK Overlay Taxiway and South Apron $562,500.00 $62,500.00 $0.00 $625,000.00

134 ESLER REGIONAL AIRPORT GA Apron Strengthening and Expansion $150,000.00 $200,000.00 $0.00 $350,000.00

135 JENNINGS AIRPORT North Apron Development - Phase I (Design) $0.00 $70,000.00 $0.00 $70,000.00

136 JENNINGS AIRPORT Approach Lights for Runway 8/26 (ODALS) $242,105.00 $26,901.00 $0.00 $269,006.00

137 VICKSBURG-TALLULAH REGIONAL AIRPORT

Taxiway Lighting - Phase I $0.00 $35,000.00 $0.00 $35,000.00

138 NEW ORLEANS LAKEFRONT AIRPORT Construct Parallel Taxiway $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

139 NATCHITOCHES REGIONAL AIRPORT Construct Partial Parallel Taxiway $405,000.00 $45,000.00 $0.00 $450,000.00

140 ST JOHN THE BAPTIST PARISH AIRPORT Construct Aircraft Parking Apron $1,475,000.00 $913,889.00 $66,168.00 $2,455,057.00

141 RUSTON REGIONAL AIRPORT Construct SSALR $0.00 $800,000.00 $0.00 $800,000.00

142 RUSTON REGIONAL AIRPORT Rehabilitate Runway - Phase I $153,000.00 $17,000.00 $0.00 $170,000.00

143 LEESVILLE AIRPORT Construct Parallel Taxiway - Phase I $189,000.00 $21,000.00 $0.00 $210,000.00

144 ST TAMMANY REGIONAL AIRPORT Parallel Taxiway $3,316,590.00 $368,510.00 $0.00 $3,685,100.00

Wednesday, January 13, 2016 Page 28 of 42General Aviation Capital Outlay

Page 60: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

145 NATCHITOCHES REGIONAL AIRPORT Complete Parallel Taxiway B $1,170,000.00 $130,000.00 $0.00 $1,300,000.00

146 CONCORDIA PARISH AIRPORT Rehabilitate Southwest Apron - Phase I $71,250.00 $7,917.00 $0.00 $79,167.00

147 NATCHITOCHES REGIONAL AIRPORT Relocate Road Around Localizer $0.00 $750,000.00 $0.00 $750,000.00

148 LE GROS MEMORIAL AIRPORT Parallel Taxiway for Runway 4-22 $2,047,500.00 $227,500.00 $0.00 $2,275,000.00

149 GEORGE R. CARR MEMORIAL AIRPORT Runway 18-36 and Parking Apron Pavement Improvement $1,980,000.00 $220,000.00 $0.00 $2,200,000.00

150 NATCHITOCHES REGIONAL AIRPORT Construct Hammer Head for Runway 7 $0.00 $350,000.00 $0.00 $350,000.00

151 FALSE RIVER REGIONAL AIRPORT Perimeter Fencing of Runway 18 RPZ (5.0 acres) and Install Culvert for Runway 36 RPZ

$72,000.00 $8,000.00 $0.00 $80,000.00

152 HART AIRPORT Construct Runway Extension - Phase II $0.00 $800,000.00 $0.00 $800,000.00

153 MINDEN AIRPORT Design Apron Expansion, Connector Taxiway, and Access Road Extension

$108,000.00 $12,000.00 $0.00 $120,000.00

154 LE GROS MEMORIAL AIRPORT LPV Survey $61,750.00 $6,861.00 $0.00 $68,611.00

155 FALSE RIVER REGIONAL AIRPORT Taxiway Lighting to Terminal Area and T-Hangar Area $0.00 $50,000.00 $0.00 $50,000.00

156 ST TAMMANY REGIONAL AIRPORT Apron Extension - Phase I (Design) $0.00 $146,000.00 $0.00 $146,000.00

Wednesday, January 13, 2016 Page 29 of 42General Aviation Capital Outlay

Page 61: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

157 TENSAS PARISH AIRPORT Environmental Assessment for Runway Extension $0.00 $175,000.00 $0.00 $175,000.00

158 HARRY P. WILLIAMS MEMORIAL AIRPORT Rehabilitate Segmented Circle $0.00 $7,500.00 $0.00 $7,500.00

159 TENSAS PARISH AIRPORT Design Runway Extension $0.00 $150,000.00 $0.00 $150,000.00

160 MINDEN AIRPORT Construct Apron Expansion, Connector Taxiway, and Access Road Extension

$1,530,000.00 $170,000.00 $0.00 $1,700,000.00

161 ALLEN PARISH AIRPORT Install Perimeter Fence - Phase I $0.00 $22,500.00 $0.00 $22,500.00

162 HART AIRPORT Construct Parallel Taxiway $0.00 $2,000,000.00 $0.00 $2,000,000.00

163 LE GROS MEMORIAL AIRPORT Security Fencing and Gates $176,580.00 $19,620.00 $0.00 $196,200.00

164 LEESVILLE AIRPORT Install Perimeter Fence $360,000.00 $40,000.00 $0.00 $400,000.00

165 ACADIANA REGIONAL AIRPORT Perimeter/Emergency Access Road - Phase I (Design) $288,000.00 $32,000.00 $0.00 $320,000.00

166 FRANKLINTON AIRPORT Hangar Taxilane - Phase II (Construction) $0.00 $300,000.00 $0.00 $300,000.00

167 HART AIRPORT Design Parallel Taxiway $0.00 $200,000.00 $0.00 $200,000.00

168 RUSTON REGIONAL AIRPORT Design Runway & Taxiways Rehabilitation $0.00 $50,000.00 $0.00 $50,000.00

Wednesday, January 13, 2016 Page 30 of 42General Aviation Capital Outlay

Page 62: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

169 NEW ORLEANS LAKEFRONT AIRPORT Expand ARFF Building $1,350,000.00 $150,000.00 $0.00 $1,500,000.00

170 VIVIAN AIRPORT 6 Unit T-Hangar $0.00 $400,000.00 $38,000.00 $438,000.00

171 DE QUINCY INDUSTRIAL AIRPARK Apron Expansion $1,719,068.00 $191,008.00 $0.00 $1,910,076.00

172 JENA AIRPORT Apron Rehabilitation - Phase III $0.00 $232,000.00 $0.00 $232,000.00

173 VICKSBURG-TALLULAH REGIONAL AIRPORT

Rehabilitate Apron $120,000.00 $13,333.00 $0.00 $133,333.00

174 ST JOHN THE BAPTIST PARISH AIRPORT GA Hangar $0.00 $700,000.00 $0.00 $700,000.00

175 ST JOHN THE BAPTIST PARISH AIRPORT New Terminal Building and Apron $0.00 $2,800,000.00 $0.00 $2,800,000.00

176 RUSTON REGIONAL AIRPORT Construct Taxilanes and T Hangars - Phase I (Design) $0.00 $75,000.00 $0.00 $75,000.00

177 HOMER MUNICIPAL AIRPORT Apron Rehabilitation Phase II $0.00 $175,000.00 $0.00 $175,000.00

178 ST LANDRY PARISH-AHART FIELD T-Hangars $246,600.00 $27,400.00 $0.00 $274,000.00

179 COLUMBIA AIRPORT Construct New Runway - Phase I $0.00 $350,000.00 $0.00 $350,000.00

180 BUNKIE MUNICIPAL AIRPORT Perimeter Fencing - Phase II $0.00 $325,000.00 $0.00 $325,000.00

Wednesday, January 13, 2016 Page 31 of 42General Aviation Capital Outlay

Page 63: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

181 EUNICE AIRPORT New Aircraft Hangars $900,000.00 $100,000.00 $0.00 $1,000,000.00

182 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Master Plan Update $225,000.00 $25,000.00 $0.00 $250,000.00

183 JENNINGS AIRPORT Land Acquisition OFZ North of Runway 8-26 $0.00 $294,000.00 $0.00 $294,000.00

184 NATCHITOCHES REGIONAL AIRPORT Construct Taxilanes for T-Hangars $450,000.00 $50,000.00 $0.00 $500,000.00

185 UNION PARISH AIRPORT Parallel Taxiway Extension - Phase II $1,125,000.00 $125,000.00 $0.00 $1,250,000.00

186 THIBODAUX MUNICIPAL AIRPORT Airport Terminal $0.00 $25,000.00 $8,000.00 $33,000.00

187 CHENNAULT INTERNATIONAL AIRPORT Land Aquisition - Phase I $0.00 $900,000.00 $0.00 $900,000.00

188 CHENNAULT INTERNATIONAL AIRPORT Land Acquistion Adjacent to Taxiway G $9,025,000.00 $1,002,778.00 $0.00 $10,027,778.00

189 BEAUREGARD REGIONAL AIRPORT Construct T-Hangar Taxilanes $1,352,502.00 $150,278.00 $0.00 $1,502,780.00

190 COLUMBIA AIRPORT Construct Apron and Taxiway Stub - Phase I $0.00 $60,000.00 $0.00 $60,000.00

191 CHENNAULT INTERNATIONAL AIRPORT Perimeter Road Rehabilitation $1,170,000.00 $130,000.00 $0.00 $1,300,000.00

192 VIVIAN AIRPORT Construct Apron - Phase I Design $0.00 $60,000.00 $0.00 $60,000.00

Wednesday, January 13, 2016 Page 32 of 42General Aviation Capital Outlay

Page 64: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

193 PINEVILLE MUNICIPAL AIRPORT East Access Road and Site Improvements $0.00 $200,000.00 $0.00 $200,000.00

194 FALSE RIVER REGIONAL AIRPORT (4) Box Hangars $0.00 $530,000.00 $0.00 $530,000.00

195 RUSTON REGIONAL AIRPORT Construct Hangar Taxiways - Phase II $1,170,000.00 $130,000.00 $0.00 $1,300,000.00

196 SPRINGHILL AIRPORT Design Taxilanes for T-Hangar Development Area $67,500.00 $7,500.00 $0.00 $75,000.00

197 THIBODAUX MUNICIPAL AIRPORT Midfield Connector Taxiway $216,900.00 $24,100.00 $0.00 $241,000.00

198 KELLY-DUMAS Construct Parallel Taxiway - Phase III $2,280,000.00 $120,000.00 $0.00 $2,400,000.00

199 RED RIVER PARISH AIRPORT Construct Parallel Taxiway $1,100,000.00 $122,222.00 $0.00 $1,222,222.00

200 COLUMBIA AIRPORT Perimeter Fencing $0.00 $356,200.00 $0.00 $356,200.00

201 LE MAIRE MEMORIAL AIRPORT Runway Overlay $0.00 $400,000.00 $0.00 $400,000.00

202 COLUMBIA AIRPORT Runway Rehabilitation $0.00 $100,000.00 $0.00 $100,000.00

203 GEORGE R. CARR MEMORIAL AIRPORT Apron Expansion $720,000.00 $80,000.00 $500,000.00 $1,300,000.00

204 ST TAMMANY REGIONAL AIRPORT Box Hangar $0.00 $600,000.00 $0.00 $600,000.00

Wednesday, January 13, 2016 Page 33 of 42General Aviation Capital Outlay

Page 65: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

205 GEORGE R. CARR MEMORIAL AIRPORT Hangar $0.00 $700,000.00 $0.00 $700,000.00

206 COLUMBIA AIRPORT Install AWOS $0.00 $230,100.00 $0.00 $230,100.00

207 VIVIAN AIRPORT AGIS Survey for New Runway/Extension $0.00 $80,000.00 $0.00 $80,000.00

208 VIVIAN AIRPORT Site Preparation for New Runway 9/27 $2,227,500.00 $522,500.00 $0.00 $2,750,000.00

209 TENSAS PARISH AIRPORT Perimeter Fencing Phase I $0.00 $250,000.00 $0.00 $250,000.00

210 FALSE RIVER REGIONAL AIRPORT Construction of Corporate Hangar $114,000.00 $12,667.00 $30,000.00 $156,667.00

211 ESLER REGIONAL AIRPORT Rehabilitate Security Fencing & Gates $0.00 $108,977.00 $0.00 $108,977.00

212 ESLER REGIONAL AIRPORT Access Road and Security Checkpoints $1,080,000.00 $120,000.00 $0.00 $1,200,000.00

213 VIVIAN AIRPORT Construct New Runway 9/27 $1,822,500.00 $427,500.00 $0.00 $2,250,000.00

214 WELSH AIRPORT Airfield Perimeter Fencing - Phase II $0.00 $250,000.00 $0.00 $250,000.00

215 MARKSVILLE MUNICIPAL AIRPORT Runway 4/22 Extension - Phase I (Design) $0.00 $122,000.00 $0.00 $122,000.00

216 UNION PARISH AIRPORT Design Runway Extension $180,000.00 $20,000.00 $0.00 $200,000.00

Wednesday, January 13, 2016 Page 34 of 42General Aviation Capital Outlay

Page 66: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

217 TENSAS PARISH AIRPORT Acquire and Install AWOS $0.00 $200,000.00 $0.00 $200,000.00

218 JOHN H.HOOKS JR. MEMORIAL New East Apron - Phase I $95,000.00 $10,556.00 $0.00 $105,556.00

219 HOUMA-TERREBONNE AIRPORT Rehabilitate Airfield Drainage - Phase I $0.00 $750,000.00 $0.00 $750,000.00

220 JOHN H.HOOKS JR. MEMORIAL New East Apron - Phase II $475,000.00 $52,778.00 $0.00 $527,778.00

221 MOREHOUSE MEMORIAL AIRPORT 1000 Foot Runway Extension $1,000,000.00 $111,111.00 $0.00 $1,111,111.00

222 FRANKLINTON AIRPORT Hangar Taxilane - Phase I (Design) $0.00 $50,000.00 $0.00 $50,000.00

223 RED RIVER PARISH AIRPORT Design & Construct Hangars for New Apron $0.00 $350,000.00 $0.00 $350,000.00

224 HARRY P. WILLIAMS MEMORIAL AIRPORT Update ALP/Convert to eALP $90,000.00 $10,000.00 $0.00 $100,000.00

225 ALLEN PARISH AIRPORT Construct T-Hangars $0.00 $300,000.00 $0.00 $300,000.00

226 THIBODAUX MUNICIPAL AIRPORT Renovate Terminal/FBO Hangar $0.00 $137,515.00 $0.00 $137,515.00

227 LEESVILLE AIRPORT Access Road Rehabilitation $27,000.00 $3,000.00 $0.00 $30,000.00

228 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Security Cameras $0.00 $60,000.00 $0.00 $60,000.00

Wednesday, January 13, 2016 Page 35 of 42General Aviation Capital Outlay

Page 67: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

229 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Access Road - Phase I $0.00 $50,000.00 $0.00 $50,000.00

230 LE MAIRE MEMORIAL AIRPORT Apron Rehabilitation $0.00 $350,000.00 $0.00 $350,000.00

231 FALSE RIVER REGIONAL AIRPORT Bury Powerlines - Runway 36 Approach $0.00 $250,000.00 $0.00 $250,000.00

232 FALSE RIVER REGIONAL AIRPORT Overlay Runway and Taxiway - Phase II (Construction) $1,485,000.00 $165,000.00 $0.00 $1,650,000.00

233 BUNKIE MUNICIPAL AIRPORT Airport Access Drive $0.00 $128,400.00 $0.00 $128,400.00

234 HOMER MUNICIPAL AIRPORT Construct Parallel Taxiway $0.00 $836,063.00 $0.00 $836,063.00

235 RED RIVER PARISH AIRPORT Design Parallel Taxiway $180,000.00 $20,000.00 $0.00 $200,000.00

236 DAVID G. JOYCE AIRPORT Rehabilitate Apron - North Section $0.00 $250,000.00 $0.00 $250,000.00

237 LE MAIRE MEMORIAL AIRPORT T-Hangar Complex $0.00 $400,000.00 $0.00 $400,000.00

238 MINDEN AIRPORT Construct Terminal Building $0.00 $500,000.00 $0.00 $500,000.00

239 RED RIVER PARISH AIRPORT Design New Apron $54,000.00 $6,000.00 $0.00 $60,000.00

240 THIBODAUX MUNICIPAL AIRPORT Resurface Terminal Building Parking Lot $150,000.00 $16,667.00 $0.00 $166,667.00

Wednesday, January 13, 2016 Page 36 of 42General Aviation Capital Outlay

Page 68: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

241 COLUMBIA AIRPORT Mitigate Wastewater Treatment Facility $0.00 $187,200.00 $0.00 $187,200.00

242 COLUMBIA AIRPORT Fuel Farm $0.00 $100,000.00 $0.00 $100,000.00

243 MINDEN AIRPORT Obstruction Mitigation Temporary Terminal $0.00 $50,000.00 $0.00 $50,000.00

244 LE MAIRE MEMORIAL AIRPORT Runway Extension $0.00 $250,000.00 $0.00 $250,000.00

245 ST JOHN THE BAPTIST PARISH AIRPORT Construct 4-Unit Hangar Building $0.00 $307,700.00 $0.00 $307,700.00

246 NATCHITOCHES REGIONAL AIRPORT Wildlife Hazard Study $0.00 $75,000.00 $0.00 $75,000.00

247 TENSAS PARISH AIRPORT Land Acquisition (Phase II) $0.00 $350,000.00 $0.00 $350,000.00

248 CONCORDIA PARISH AIRPORT Security Lighting for Main and T-Hangar Ramps $142,500.00 $15,833.00 $0.00 $158,333.00

249 COLUMBIA AIRPORT Relocate Airport Access Road - Phase I $0.00 $40,000.00 $0.00 $40,000.00

250 COLUMBIA AIRPORT Relocate Airport Access Road and Auto Parking - Phase II $0.00 $200,000.00 $0.00 $200,000.00

251 ST JOHN THE BAPTIST PARISH AIRPORT East Airfield Interior Access Road $0.00 $500,000.00 $0.00 $500,000.00

252 MINDEN AIRPORT Mitigate Obstructions - Phase II Construction $2,150,000.00 $238,889.00 $0.00 $2,388,889.00

Wednesday, January 13, 2016 Page 37 of 42General Aviation Capital Outlay

Page 69: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

253 TENSAS PARISH AIRPORT Construct Access Road $0.00 $700,000.00 $0.00 $700,000.00

254 JOHN H.HOOKS JR. MEMORIAL Terminal Building - Phase I $95,000.00 $10,556.00 $0.00 $105,556.00

255 JOHN H.HOOKS JR. MEMORIAL New Fuel Farm $0.00 $50,000.00 $0.00 $50,000.00

256 JOHN H.HOOKS JR. MEMORIAL Terminal Building - Phase II $475,000.00 $52,778.00 $0.00 $527,778.00

257 CONCORDIA PARISH AIRPORT Construct T-Hangars $0.00 $425,000.00 $0.00 $425,000.00

258 HOUMA-TERREBONNE AIRPORT Airport Perimeter Fencing and Control Gates - Phase III $0.00 $750,000.00 $0.00 $750,000.00

259 GEORGE R. CARR MEMORIAL AIRPORT Construct Perimeter Road $855,000.00 $95,000.00 $0.00 $950,000.00

260 DAVID G. JOYCE AIRPORT Construct Parallel Taxiway - Apron to Midfield $0.00 $471,000.00 $0.00 $471,000.00

261 SPRINGHILL AIRPORT Construct Taxilanes for T-Hangar Development Area $675,000.00 $75,000.00 $0.00 $750,000.00

262 MINDEN AIRPORT New Fuel Facility $0.00 $250,000.00 $0.00 $250,000.00

263 ARCADIA-BIENVILLE AIRPORT Design Parallel Taxiway $0.00 $100,000.00 $0.00 $100,000.00

264 ARCADIA-BIENVILLE AIRPORT Construct Parallel Taxiway $0.00 $1,500,000.00 $0.00 $1,500,000.00

Wednesday, January 13, 2016 Page 38 of 42General Aviation Capital Outlay

Page 70: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

265 DAVID G. JOYCE AIRPORT Design Parallel Taxiway $0.00 $58,000.00 $0.00 $58,000.00

266 ST TAMMANY REGIONAL AIRPORT Runway 18/36 Extension - Phase III (Construction) $2,713,842.00 $301,538.00 $0.00 $3,015,380.00

267 ESLER REGIONAL AIRPORT Drainage Study $0.00 $22,200.00 $0.00 $22,200.00

268 NATCHITOCHES REGIONAL AIRPORT Rehabilitation of Parallel Taxiway Lighting $0.00 $650,000.00 $0.00 $650,000.00

269 GEORGE R. CARR MEMORIAL AIRPORT Pave Auto Parking Lot $135,000.00 $15,000.00 $0.00 $150,000.00

270 UNION PARISH AIRPORT Parallel Taxiway Extension - Phase I $135,000.00 $15,000.00 $0.00 $150,000.00

271 EUNICE AIRPORT Taxiway Extension (South) with Associated Lighting and Signage

$540,000.00 $60,000.00 $0.00 $600,000.00

272 TENSAS PARISH AIRPORT Parking Lot $0.00 $65,000.00 $0.00 $65,000.00

273 ST TAMMANY REGIONAL AIRPORT Runway 18/36 Extension - Phase IV (Widening and Overlay)

$1,140,000.00 $126,667.00 $0.00 $1,266,667.00

274 ARCADIA-BIENVILLE AIRPORT Perimeter Fencing - Phase I $0.00 $70,000.00 $0.00 $70,000.00

275 UNION PARISH AIRPORT Runway Extension $950,000.00 $105,556.00 $0.00 $1,055,556.00

276 EUNICE AIRPORT Relocate Perimeter Fence on East Property Line $54,000.00 $6,000.00 $0.00 $60,000.00

Wednesday, January 13, 2016 Page 39 of 42General Aviation Capital Outlay

Page 71: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

277 HOMER MUNICIPAL AIRPORT Construct Hangars $0.00 $272,816.00 $0.00 $272,816.00

278 RUSTON REGIONAL AIRPORT RehabilitateTaxiway - Phase II $135,000.00 $15,000.00 $0.00 $150,000.00

279 RED RIVER PARISH AIRPORT Construct Terminal Building $400,000.00 $44,444.00 $0.00 $444,444.00

280 BYERLEY AIRPORT Rehabilitate Airfield Lighting $405,000.00 $45,000.00 $0.00 $450,000.00

281 DE QUINCY INDUSTRIAL AIRPARK Construct Six T-Hangars with Taxilane $397,100.00 $44,122.00 $0.00 $441,222.00

282 ST LANDRY PARISH-AHART FIELD Sealcoat Ramp $0.00 $174,619.00 $0.00 $174,619.00

283 BYERLEY AIRPORT Apron Rehabilitation $463,500.00 $51,500.00 $0.00 $515,000.00

284 ST LANDRY PARISH-AHART FIELD Runway 6-24 Pavement Patching, Joint Repair, and Reseal $0.00 $749,642.00 $0.00 $749,642.00

285 MARKSVILLE MUNICIPAL AIRPORT LPV Obstruction Survey $0.00 $60,000.00 $0.00 $60,000.00

286 HAMMOND NORTHSHORE REGIONAL AIRPORT

Runway 13/31 LPV Survey $0.00 $48,000.00 $0.00 $48,000.00

287 NATCHITOCHES REGIONAL AIRPORT Runway 17/25 Extension- Phase I $0.00 $175,000.00 $0.00 $175,000.00

288 HOUMA-TERREBONNE AIRPORT Land Acquisition $0.00 $750,000.00 $0.00 $750,000.00

Wednesday, January 13, 2016 Page 40 of 42General Aviation Capital Outlay

Page 72: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

289 SPRINGHILL AIRPORT Design/Construct 6 Unit T-Hangar $0.00 $350,000.00 $0.00 $350,000.00

290 LE MAIRE MEMORIAL AIRPORT Land Acquisition $0.00 $150,000.00 $0.00 $150,000.00

291 EUNICE AIRPORT Construct Ag Loading Area with Access Road $284,202.00 $31,578.00 $0.00 $315,780.00

292 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Taxiway B $270,000.00 $30,000.00 $0.00 $300,000.00

293 WINNSBORO MUNICIPAL AIRPORT Rehabilitate Airside Access Road $112,500.00 $12,500.00 $0.00 $125,000.00

294 FRANKLINTON AIRPORT Airport Terminal $0.00 $32,000.00 $8,000.00 $40,000.00

295 EUNICE AIRPORT Construct Maintenance Hangar $270,000.00 $30,000.00 $0.00 $300,000.00

296 WINNSBORO MUNICIPAL AIRPORT AGIS Survey $21,900.00 $43,100.00 $0.00 $65,000.00

297 COLUMBIA AIRPORT Terminal Building $0.00 $50,000.00 $0.00 $50,000.00

298 UNION PARISH AIRPORT Construct Hangars $0.00 $650,000.00 $0.00 $650,000.00

299 EUNICE AIRPORT Land Acquisition - East $630,000.00 $70,000.00 $0.00 $700,000.00

300 VIVIAN AIRPORT Site Selection from Previous ALP Update $112,500.00 $12,500.00 $0.00 $125,000.00

Wednesday, January 13, 2016 Page 41 of 42General Aviation Capital Outlay

Page 73: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2018-2021General Aviation Capital Outlay

301 ST LANDRY PARISH-AHART FIELD Install Localizer Runway 18 $225,000.00 $25,000.00 $0.00 $250,000.00

302 WELSH AIRPORT T-Hangar $0.00 $400,000.00 $0.00 $400,000.00

303 C.E. (RUSTY) WILLIAMS AIRPORT Taxiway Lighting System $0.00 $400,000.00 $0.00 $400,000.00

304 WINNSBORO MUNICIPAL AIRPORT Construct Entrance Drive, Gating & Erosion Control Measures for New Airport Site

$360,000.00 $40,000.00 $0.00 $400,000.00

305 VIVIAN AIRPORT Construct Apron - Phase II Construction $575,000.00 $63,889.00 $0.00 $638,889.00

306 DELHI MUNICIPAL AIRPORT Fuel Farm $0.00 $100,000.00 $0.00 $100,000.00

307 WELSH AIRPORT Airport Layout Plan (ALP) $0.00 $80,000.00 $0.00 $80,000.00

308 BYERLEY AIRPORT Fuel Farm $0.00 $50,000.00 $0.00 $50,000.00

309 NATCHITOCHES REGIONAL AIRPORT Relocate Fairgrounds Road Project - Phase I $0.00 $125,000.00 $0.00 $125,000.00

310 PINEVILLE MUNICIPAL AIRPORT Airport Terminal $0.00 $25,000.00 $8,000.00 $33,000.00

311 DAVID G. JOYCE AIRPORT Construct Parallel Taxiway - Midfield to Runway 09 $0.00 $508,000.00 $0.00 $508,000.00

312 COLUMBIA AIRPORT Access Gate and Terminal Area Fencing $0.00 $50,000.00 $0.00 $50,000.00

$88,614,981.00 $1,451,668.00 $296,105,790.00General Aviation Capital Outlay Totals $206,039,141.00

Wednesday, January 13, 2016 Page 42 of 42General Aviation Capital Outlay

Page 74: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Cancelled Projects and

Addendum

Page 75: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

PROJECTS TO BE CANCELLED

Listed below are projects in the Aviation Priority Program for the Fiscal Years indicated. These projects are either idle or outdated, and their scopes of work are no longer valid. Therefore, we recommend approval of the sponsor’s request to withdraw the following projects from the Aviation Priority Program:

Fiscal Year 2013-2014 Funded List

General Aviation 03GA Shreveport Downtown - Mitigate Obstructions; $50,000 28GA Delhi - Obstruction Removal; $55,000 42GA Springhill - Rehabilitate Airfield Pavement - Phase I (Design); $3,000

Fiscal Year 2014-2015 Funded List

General Aviation 13GA St. Landry Parish-Ahart Field – Obstruction Removal Runway 18 Approach; $15,525 17GA Slidell Airport – Runway Pavement Rehabilitation; $49,500 41GA St. Landry Parish-Ahart Field – Security Fence-North; $6,345

Air Carrier 03AC Shreveport Regional – WHA Mitigation Drainage Project; $55,556 07AC Shreveport Regional – Airfield Lighting Rehab – Phase II; $1,200,000

Fiscal Year 2015-2016 Funded List

General Aviation 49GA David G Joyce - Apron Rehabilitation - Phase I (Design); $3,000 53GA Red River Parish - Construct Perimeter Fence - Design Only; $4,500

General Aviation Cancelled Projects: $186,870

Air Carrier Cancelled Projects: $1,255,556

Total Cancelled Projects: $1,442,426

Page 76: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Additional Comments to the Airport Construction and Development Priority Program Funded 2016-2017,

Unfunded Program 2017-2018, and Unfunded Program 2018-2021. The actual project cost, on a project by project basis, may be below or above the estimate. However, the total amount approved for the Airport Construction and Development Priority Program, for fiscal year 2016-2017, will not be exceeded. In accordance with Act 451, 1989 regular Session, paragraph 803 (B), which states “…if governing authority of an airport authority, district, parish or of any local unit of government obtains ninety percent or more funding for an airport, or for an airport project, from federal sources or from sources other than state funds, the legislature shall give priority to funding the remaining amount necessary for the airport or for the airport project, even if the project is not on the priority list of projects.” The legislature does further authorize LA DOTD to provide matching funds for any project during the Fiscal Year 2016-2017, which does not specifically appear on the list of projects developed in compliance with the Louisiana Airport Construction and Development Priority Program, but which has received a commitment of ninety percent or more funding. The available funds will be distributed in the following order: 1) Projects in the FY 2016-2017 Airport Construction and Development Priority Program are funded directly from the Transportation Trust Fund that is allocated in FY 2016-2017 to the Airport Construction and Development Priority Program. 2) Any other project or eligible enhancements to previously approved projects which receives 90% funding from any source, other than another State source, but which has not been processed and prioritized and is not in either the FY 2016-2017 funded or the FY 2017-2018 and 2018-2021 unfunded portion of the Airport Construction and Development Priority Program. 3) The General Aviation and Reliever Airports Maintenance Grant Program shall be funded in accordance with the conditions specified in Chapter 8 of Title 2 of the Louisiana Revised Statues. 4) In the event that additional funds become available, through special appropriations, underruns, project cancellations, or otherwise, certain unfunded, state only projects required for safety or infrastructure preservation at airports not eligible for Federal Aviation Administration (FAA) Airport Improvement Program (AIP) funding may be moved from the Unfunded FY 2017-2018 or Unfunded FY 2018-2021 Airport Construction and Development Priority Program to the FY 2016-2017 Airport Construction and Development Priority Program (funded list). 5) Aviation Trust Funds will not be used as a match for projects funded with Passenger Facility Charges (PFC) as PFCs can be approved by the FAA at 100% of the project cost.

Page 77: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Glossary

Page 78: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

GLOSSARY

AC (Air Carrier): Airports or aircraft providing service to fare paying passengers Apron: Parking area for aircraft ALP: Airport Layout Plan ARFF (Aircraft Rescue & Firefighting): Trucks and equipment for fighting aircraft fires ATC (Air Traffic Control): A service operated by appropriate authority to promote the safe, orderly, and expeditious flow of air traffic. ATCT (Air Traffic Control Tower): Air traffic control facility located on airport responsible for controlling local airport traffic. ASOS (Automated Surface Observation System): Automated system that transmits weather data to aircraft AWOS (Automated Weather Observation System): Automated system that transmits weather data to aircraft Blast Pad: Concrete extension at the end of a runway to prevent erosion caused by jet blast CAT (Category): Category of instrument landing system based on visibility requirements. Construct: Build a new system DME (Distance Measuring Equipment): A transponder-based radio navigation technology that measures distance by timing the propagation delay of radio signals DNL (Average Day/Night Noise Level): Noise levels measured in the vicinity of an airport EA: Environmental Assessment EDS (Explosive Detection System): Electronic equipment for screening luggage EMAS (Engineered Mechanical Arresting System): An area at the end of a runway paved with special, soft concrete to stop aircraft in an emergency FBO (Fixed Base Operator): A commercial operator of aviation services on an airport that provides fuel, maintenance, aircraft rental, etc. GA (General Aviation): All aviation except air carriers and military GIS: Geographic Information Systems GLS (GNSS Landing System) GNSS (Global Navigation Satellite System) Grooving: Longitudinal grooves cut into runways to promote drainage and prevent hydroplaning

Page 79: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

Holding Bay: Paved pull-off area for temporary aircraft parking near the runway end ILS (Instrument Landing System): Ground based instrument approach system that provides precision guidance to an aircraft approaching and landing on a runway. Incursion Device: Detects aircraft or vehicles that go onto a runway without approval Joints: Space between concrete slabs LLWAS: Low Level Wind shear Alert System LNAV: Lateral navigation instrument approach procedure LNAV/VNAV: Lateral Navigation/Vertical Navigation instrument approach procedure Localizer: The component of an instrument landing system that provides course guidance to the runway centerline. LOI: (Letter of Intent) The FAA’s intent to obligate AIP discretionary and entitlement funds from future budgetary authority in an amount not greater than the Federal Government’s share of allowable costs for that project. LPV: Localizer performance with vertical guidance instrument approach procedure MALSR (Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights): Lighting system used to align landing aircraft with the runway Marking: Numbers, letters, and symbols painted on runways and taxiways Master Plan: A plan for airport growth during a 20-25 year period MIRL (Medium Intensity Runway Lights): Lights that mark the edge of a runway MITL (Medium Intensity Taxiway Lights): Lights that mark the edge of a taxiway Noise Compatibility: FAA program to assist homeowners near airports Obstruction Removal: A planned program to remove obstructions (trees, buildings, ditches, etc) from an RPZ or safety areas Overlay: A layer of asphalt placed on top of an existing asphalt surface Overrun: Area beyond the end of a runway used for aircraft unable to stop on the runway PAPI (Precision Approach Path Indicator): A visual landing aid that provides landing information by the use of colored lights Parallel Taxiway: A taxiway paralleling a runway Passenger Loading Bridge: Enclosed movable hallway connecting a passenger aircraft to the terminal PCI: Pavement Condition Index

Page 80: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

PCC: Portland Concrete Cement RAIL (Runway Alignment Indicator Lights): Sequence flashing lights used as part of an approach lighting system Ramp: Parking area for aircraft Reconstruct: Rebuild an existing system Rehabilitate: Major repairs to an existing system REIL (Runway End Identifier Lights): Flashing lights that identify the runway end Rejuvenator: An additive that replaces lost oils in asphalt RPZ (Runway Protection Zone): Area which must be free of vertical obstacles Runway: A strip of concrete, asphalt, or turf used for the landing and takeoff of aircraft Safety Area: Land immediately adjacent to runways and taxiways Sealcoat: Protective surface applied to asphalt pavements (sometimes called a slurry seal) Seaway: Landing area for seaplanes or amphibious airplanes Segmented Circle: A system of visual indicators designed to provide traffic pattern information to aircraft Sound Mitigation: FAA program to assist homeowners near airports SSALR (Simplified Short Approach Light System with RAIL): Lighting system used to align landing aircraft with the runway Striping: White or yellow lines painted on runways and taxiways Stub Taxiway: Small taxiway connecting a runway to a parallel taxiway, apron or ramp Taxilane: Small taxiway leading to hangars Taxiway: Strip of concrete, asphalt, or turf used to move aircraft to and from the runway Terminal: Building used by pilots and passengers for creature comfort and flight planning. Also adjacent aircraft parking T-hangar: Hangars shaped like a “T” designed for storing airplanes tail to tail Tie Down: A ring set in an apron for anchoring small aircraft UAS: Unmanned Aerial Systems UHF (Ultra High Frequency): Radio signals primarily used by military aircraft Vault: Building that houses electrical equipment for an airport

Page 81: LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT … · louisiana airport construction and development priority program fiscal year 2016-2017

WHA: Wildlife Hazard Assessment Wind Cone: Device for detecting and displaying wind direction (also called wind sock) Wind Tee: Device for detecting and displaying wind direction