Long term evaluation – summarizing “How-to-do-it”

CIVITAS Thematic Groups, Interactive training

7 May 2014, ECOMM 2014, Florence, Italy

Anders Wretstrand, Lund University

Page 2: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

22

« How-to-do » long term evaluation

Each measure

• has one or more objectives

• may be a combination, a bundle, of measures

Objectives may be like

• Modal shift

• Vivid city centre

• Coordinated urban freight

These have to be operationalized into indicators that are

• Linked to objectives

• Quantifiable

• Measurable

• Each objective relate to several measures

• Each measure should be linked to several indicators

Page 3: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

33

Impact and process evaluation

Impact evaluation

• is carried out in several steps

• starting with a baseline study (before)

• after implementation (after - short term, 1st or 2nd year)

• after “a while” (after - long term, 5th or 10th year)

• what matters is what impacts the measure has on the particular area that the measure aims at, revealed by monitoring indicators

Process evaluation

• a means to facilitate dissemination and transferability of the results

• tells the story of

• planning and design

• implementation and operation

• reveals the “road to success” (or failure)

Page 4: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

44

Short and long term

Short term evaluation

• generally covers one year or year or duration of project funding duration

• uses before and after data

Long term evaluation

• can include projecting impacts into future

• Forecasting, scenario-building

• can involve time series data for programs/measures over years

• running, ongoing surveys

• planned, repeated long-term effect surveys

Different results…

• no impact evidence on short term – but positive on long term

• impact on short term – but no “up-scaling” on long term

• in both cases: the process (the story) is important to capture!

Page 5: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

55

About effects – impact assessment

Measure

Before After - Short term

TimeTime

Impact

Impact

Effect of measure

Long termLong term

Beware!

Page 6: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

66

About effects – impact assessment

Measure

Before After - Short term

TimeTime

Impact

Impact

Effect of other factors

Effect of measure

Long termLong term

”Business as usual”

Page 7: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

77

Evaluation design options

Before MeasureMeasure After I

Measure site

Baseline Impact I

After II

Impact II

Before After I

Control site

After II

Changes?Changes?

Changes?Changes?

The ideal situation with control site – nice but quite rare. To strive for!

Page 8: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

88

Evaluation design options

Before MeasureMeasure After I

Measure site

Baseline Impact I

After II

Impact II

After I

Control site

After II

Changes?Changes?

Changes?Changes?

Control site without baseline

Page 9: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

99

Evaluation design options

MeasureMeasure After I

Measure site

Impact I

After II

Impact II

After I

Control site

After II

Changes?Changes?

Changes?Changes?

No baseline data

Page 10: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

1010

Evaluation design options

Before MeasureMeasure After I

Measure site

Baseline Impact I

After II

Impact II

Changes?Changes?

No control site to compare with

Page 11: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

1111

Evaluation design options

MeasureMeasure After I

Measure site

Impact I

After II

Impact II

Changes?Changes?

No control site or baseline data to compare with

Common situation when asked to evaluate!

Page 12: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

1212

Evaluation design options

MeasureMeasure

Measure site

After

Impact

Changes?Changes?

No control site, previous evaluation or baseline data to compare with

Common situation when asked to do long-term evaluation!

Page 13: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

1313

Examples – measures from DYN@MO

Cases

• planning: SUMP

• health and accessibility: healthy walking

• public transport: more efficient trolley buses

• mobilit management in residential areas

Page 14: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

1414

Examples – SUMP

Measure Objective Indicator Method Baseline

SUMP To (plan to) implement more “sustainable” transport measures than previously

“Sustainability” of measures previously implemented and in new SUMP; and those from SUMP that are actually implemented.

Score using checklist methodology (e.g. Ecomobility SHIFT, or a simplified version)

Analysis of recently implemented measures,

One of the objectives and indicators

Very suitable for long term evaluation!

Page 15: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

1515

Examples – Planning for healthy walking

Measure Objective Indicator Method Baseline

Healthy walking

Improve health especially amongst older people in the CIVITAS area

Levels of physical activity that target group in area undertake – self-reported

Questionnaire to 100-200 patients at each Centro de Salud; and a panel of the same 30 people each year.

First survey results before implemen-tation

One of the objectives and indicators

Very suitable for long term evaluation! But still……difficult to assess long term effects, since people age!!!

Page 16: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

1616

Examples – More efficient trolley buses

Measure Objective Indicator Method Baseline

”Supercaps” Economic efficiency

Operating and capital costs

Calculations using records and collecting technical data

Existing records and data sets

One of the objectives and indicators

Easy to do short term evaluation as well! Long term evaluation reveals if system e.g. requires more maintenance. Baseline is less of a problem when dealing with technical data!

Page 17: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

1717

Examples – Electromobile living

Measure Objective Indicator Method Baseline

Offer shared e-vehicles and pedelecs for tenants

Less car-dependent lifestyle

Travel behaviour, modal split

Case/control, annual travel diary

First survey

One of the objectives and indicators

THEORETICALLY easy to do short term evaluation, but might only detect attitudes and awareness! Long term reveals if people substantially have changed their behaviour, e.g. got rid of 2nd cars

Page 18: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

1818

Finally

The « How-to-guide on long term evaluation» from CiViTAS CAPITAL

• will be available for all participants after approval as a final document

• through us or Mobiel21

Now, as a hand-out

• Checklist: recommendations for long term evaluation of MM activities

• If you or anyone else have done a previous evaluation of the measure, or

• If no previous evaluation exists

Page 19: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

1919

Checklist: based on existing short-term evaluation

Steps RemarksImpact evaluation

Identify policy/measure objectives Break down the policies/objectives into discrete parts

Reflect on cause and effect relations Possible long-term behavioural adaptations and changes?

Select short-term evaluation indicators They should match and measure the discrete objectives

Analyse short-term impact evaluation Good methods to be continued, poor methods to be left out

Revise and refine indicator descriptions Make use of ongoing surveys, revise some indicators if needed

Collect new data Align with short term evaluation to continue the time series

Analyse data Use proper methods for analysis, based on guidelines

Interpret data Are some indicators influenced by other measures? Bundles?

Process evaluation

Evaluation of existing documents New policies in place, upscaling of measures, new funding, etc.

Self-assessment of stakeholders Interviews, workshops: reported failure, success, lessons learned

Page 20: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

2020

Checklist: no short-term evaluation available

Steps RemarksImpact evaluation

Identify policy/measure objectives Break down the policies/objectives into discrete parts

Reflect on cause and effect relations Possible long-term behavioural adaptations and changes?

Propose indicators They should match and measure the discrete objectives

Seek for available historical data Which technical and/or survey data sources are available?

Revise and refine indicator descriptions Change of direction may be needed, because of poor data

Collect new and historical data New = current situation; historical = available time series

Analyse data Use proper methods for analysis, based on guidelines

Interpret data Are some indicators influenced by other measures? Bundles?

Process evaluation

Evaluation of existing documents New policies in place, upscaling of measures, new funding, etc.

Self-assessment of stakeholders Interviews, workshops: reported failure, success, lessons learned

Page 21: Long term evaluation – summarizing “How-to-do-it” CIVITAS Thematic Groups, Interactive training 7 May 2014, ECOMM 2014, Florence, Italy Anders Wretstrand,

2121

Thank you!