Long-strip MRPC for CBM. Yongjie Sun Key Laboratory of Technologies of Particle Detection & Electronics, CAS University of Science and Technology of China. Index. R&D on MRPC (STAR TOF, STAR MTD, … ) Long-strip MRPC for CBM August test at GSI Summary and Outlook. Early R&D (2000-2002). - PowerPoint PPT Presentation
Citation preview
Long-strip MRPC for CBM
Yongjie SunKey Laboratory of Technologies of Particle Detection & Electronics, CAS
University of Science and Technology of China
CBM-China meeting 203 Nov. 2009
Index
R&D on MRPC (STAR TOF, STAR MTD, …) Long-strip MRPC for CBM August test at GSI Summary and Outlook
CBM-China meeting 303 Nov. 2009
Early R&D (2000-2002)
beam test at PS-T10, CERN : efficiency >95% ( 5 gas gaps ) >97% ( 6 gas gaps )
~ 99% ( double stack 2 5 gas gaps ) time resolution ~70ps ( 5 gas gaps ) ~60ps ( 6 gas gaps )
~50ps ( double stack 2 5 gas gaps )
M.Shao, L.J.Ruan, H.F.Chen et al.,
NIM A492(2002)344-350
MRPCs of different structures
60
working gas mixture: F134A(90%) + iso- C4H10 (5%) + SF6(5%)
CBM-China meeting 403 Nov. 2009
STAR Upgrade -PID
TPC- tracking
MRPC TOF (TOFr) – stop time measurement
VPD - start time measurement
Particle momentum; dE/dx
~8% resolution
/K separation to ~0.6GeV/c
k/p separation to ~1.0GeV/c
Aim at 100ps time resolution TOF system
/K separation to ~1.6GeV/c & k/p separation to ~3.0GeV/c
CBM-China meeting 503 Nov. 2009
MRPC strip size :3.15cm×6.30cm
Module size : 21.2×9.4×1.79 cm3
Gas gap : 6×0.22mm
In 200 GeV central Au+Au:Time resolution <100ps Efficiency 90%High granularity Rate >200Hz/cm2
MRPC Structure for STAR/TOF
CBM-China meeting 603 Nov. 2009
MRPC Mass Production After STAR Construction Readiness Review in April 2006, M
RPC mass Production in China started. University of Sci. & Tech. of China (USTC) will produce 1210 MRPCs
1/2 3/4 5/6 7/8 11/129/10 1/2 3/4 5/6 7/8 11/129/10 1/2 3/4 5/6 7/8
2006 2007 2008
Prod. Start
40 MRPCs
+192 MRPCs
+326 MRPCs
+326 MRPCs
+326 MRPCs
CBM-China meeting 703 Nov. 2009
100 m2 clean room ( cleanness class 100K ): Temperature : 25o C Humidity : <40% 4 assembly desk ( cleanness class 100 )
USTC site - MRPC Mass production
CBM-China meeting 803 Nov. 2009
QC setup – cosmic ray telescope
QC capability: 8 MRPCs / Day
CBM-China meeting 903 Nov. 2009
Monthly output
2006
Month Output
2007
Month Output Month Output
Jun. 12 Jan. 58 Jul. 120
Jul. 64 Feb. 24 Aug. 120
Sep. 55 Mar. 83 Sep. 119
Oct. 35 Apr. 80 Oct. 121
Nov. 42 May. 126 Nov. 120
Dec. 22 Jun. 82
Total 230 1053
Totally, 1283 MRPCs have been produced.
CBM-China meeting 1003 Nov. 2009
Long time stability
More stable at late production stage
CBM-China meeting 1103 Nov. 2009
TOF Time Resolution Summary
2003 to 2009 Operation condition
Time Resolution (ps)VPD
(start time)
TOFr (overall)
TOFr (stop time)
Run III200GeV d+Au ~85 ~120 ~85200GeV p+p ~140 ~160 ~80
Run IV
62GeV (Au+Au) ~55 ~105 ~89
200GeV (Au+Au)
FF/RFF ~27 ~74 ~70
HF ~20 ~74 ~71
Run V200GeV Cu+Cu (TOT) ~ 50 ~92 ~7562GeV Cu+Cu (TOT) ~ 82 ~125 ~94
Run VIII200 GeV d+Au NA NA NA
200 GeV p+p (TOT) ~83 ~112 ~75
Run IX 500 GeV p+p (preliminary) ~85 ~115 ~78
CBM-China meeting 1203 Nov. 2009
STAR/MTD
A large area of Muon Telescope Detector (MTD) at mid-rapidity, allows for the detection ofdi-muon pairs from QGP thermal radiation, quarkonia, light vector mesons, and Drell-Yan production single muons from their semi-leptonic decays of heavy flavor hadrons
advantages over electrons: no conversion, much less Dalitz decay contribution, less affected by radiative losses in the detector materials
CBM-China meeting 1303 Nov. 2009
10 x 0.25 mm gas gaps in 2 stacks
Glass thickness : 0.71 mm
LMRPC -- side view
Design and construction
256mm
(150kΩ/ �)
950mm
Signal readout
anode
cathodeShort
side
Long side LMRPC PCB -- top view
Size: 950 x 256 mm2
Read out strip: 25 mm wide, 4 mm gaps between strips
Active area: 870 x 170 mm2
CBM-China meeting 1403 Nov. 2009
Photos of construction
CBM-China meeting 1503 Nov. 2009
MWPC5MWPC1 MWPC2
MWPC4
TOF1
252” 73”
TOF2
72” 164”449”
LMRPC
GEMsMWPC3
191”56 3381
TOF370”
Upper stream
Down stream
C1, C2
Beam Energy: 32 GeV
FNAL Beam Test (T963)
Beam test setup
CBM-China meeting 1603 Nov. 2009
Efficiency plateau
Results at T963 - I
Time resolution
60
CBM-China meeting 1703 Nov. 2009
Results at T963 - II
Using the tracking, we get the signal propagation velocity:
~ 60ps/cm
The half time difference of 2 ends of a strip:
σΔT/2 ~ 1.1 channel (55ps)
Position resolution: ~ 1 cm
Position resolution
3 prototypes working very well in STAR since 2007
CBM-China meeting 1803 Nov. 2009
Long-Strip MRPC for CBM
Used in relative low track density environment to save electronics channels
Read out at two ends Mean time Eliminate the position along the strip Time difference
Position information Easy to construct for large area coverage
Three Prototypes was test in August at GSI The main focus: Cross-talk performance
CBM-China meeting 1903 Nov. 2009
MRPC structure (endview)
5 x 250μm gaps
5 x 250μm gaps
Readout strips
HV
2.5cm
Readout strips: 2.5 cm x 50 cmHV electrode: Licron spray ~40 MΩ/□
Made of window glass of 0.7 mm thick
CBM-China meeting 2003 Nov. 2009
MRPC #1 (topview)
55 cm
24.1cm
2.5cm
0.6cm
Gaps between strips: 0.6 cm
CBM-China meeting 2103 Nov. 2009
MRPC #2 (topview)
Top/bottom pcb
The readout strips are “hollowed-out” alternately.
Removed: 5 mm x 4
Left: 1 mm x 5
Removed: 2.5 mm x 9
Left: 0.25 mm x 10
CBM-China meeting 2203 Nov. 2009
MRPC #3 (topview)
55 cm
24.1cm
2.5cm0.7cm
Gaps between strips: 0.7 cm (upper part)
0.8 cm (lower part)
0.8cm
CBM-China meeting 2303 Nov. 2009
ADC1 ADC2
ADC3 ADC4
<t 1
-(t 3
+t 4
)/2>
ADC1
<t 2
-(t 3
+t 4
)/2>
ADC2
<t 3
-(t 1
+t 2
)/2>
ADC3ADC4
PMT calibration
<t 4
-(t 1
+t 2
)/2>
((t3+t4)-(t1+t2))/4
Resolution~67 ps
CBM-China meeting 2403 Nov. 2009
T-(t1+t2+t3+t4)/4
T-(t1+t2+t3+t4)/4
T-(
t1+
t2+
t3+
t4)/
4ADC
<T-(
t1+
t2+
t3+
t4)/
4>
ADC
MRPC CalibrationIntrinsic timing resolution = 67 ps (including momentum spread)
CBM-China meeting 2503 Nov. 2009
Efficiency and resolution plateau
65 ps
97%
CBM-China meeting 2603 Nov. 2009
Position scan (±7 kV)
No significant efficiency drop in the gap
Trigger Area: 2 cm wide
From both “charge sharing” and cross talk.
CBM-China meeting 2703 Nov. 2009
Cross Talk
Trigger on the strip center:
“Cross talk” at neighbor strips: 3%
Trigger Area: 2 cm wide
“Cross talk” at next-to-neighbor strips: ~2%
Require valid TDC on two ends
CBM-China meeting 2803 Nov. 2009
TDC vs. QDCValid TDCs and valid QDCs (3 sigma above pedestal)
Valid TDCs
CBM-China meeting 2903 Nov. 2009
MRPC #2
Valid TDCs and QDCs
CBM-China meeting 3003 Nov. 2009
Efficiency vs. Position
Valid TDCs
CBM-China meeting 3103 Nov. 2009
Valid TDCs and valid QDCs (3 sigma above pedestal)
CBM-China meeting 3203 Nov. 2009
MRPC #3
CBM-China meeting 3303 Nov. 2009
Efficiency vs. Position
Valid TDCs
CBM-China meeting 3403 Nov. 2009
Summary USTC has experience on MRPC
technology. Capability of mass production Manpower on online QA, calibration,
related physics analysis CBM RPC-TOF?
Thank
you!
CBM-China meeting 3503 Nov. 2009