Check following conditions to enable to start Unit:- Generator Circuit Breaker is opened- Generator Brake is opened- Governor is ready to start- Excitation is ready to start- There's no hydraulic protection (Do not have level 1, 2, 3 protection)
- There's no electrical protection (come from system 1, system 2 system)
Perform the start command:- By turning selector switch at Local Control Panel, or- Press button on DCS touch screen at local, or- Press button on DCS screen at Central Control Room
START MODE
Send a command to start sychronizer
(When synchronizer started, it will perform:- Adjusting turbine speed ( Generator frequency)- Adjusting voltage (Generator voltage))
Governor will work according to startingprogram which had been installed insideitself
Send a command to startthe Excitation system
when speed reachs 98% (n=98%)
Open the valve of engineeringcooling-water system
If synchronizing is OK
It will send a signal to close Generator Circuit Breaker(and then Generator will be connected to Power Grid)
Complete start sequence logic(Generator will be adjusted the Power, Voltageaccording to requirements)
Start sequence logic of Unit 2 & Unit 3 are the same as Unit 1
when speed reachs 95% (n=95%)
START SEQUENCE LOGIC OF UNIT 1