Scope Power-from-shore HVAC cable system, including 96.5 km of static submarine XLPE cable and 1.5 km of dynamic submarine XLPE cable. Project management. Cable system design, engineering and manufacturing. Installation of cable, cable joints and transition joints. Testing and commissioning. FLYENKK171201web NKT TM is a trademark of NKT Group. ©2017 All rights reserved NKT HV Cables AB PO Box 546 SE-371 23 Karlskrona Sweden T: +46 455 556 00 [email protected] nkt.com NKT is signatory of the Europacable Industry Charter: A commitment towards superior quality. ® Client: ENGIE E&P Location of the project: The North Sea, Norway Quantity of order: Turnkey project of a 115 kV AC cable system with a 40 MW power rating Total cable route length: About 100 km Duration: 2007 - 2010 Location Key Facts World´s first dynamic high voltage cable system brings energy to the floating oil and gas platform in the North Sea. Powering Gjøa from shore Gjøa Mongstad, Norway nkt.com

Location of the project: Duration: Quantity of order ... · Project management. ... Duration: 2007 - 2010 Location Key Facts ... smart way of reducing the cost and the environmen

  • Upload
    vanmien

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

Scope▪ Power-from-shore HVAC cable system, including 96.5 km of static

submarine XLPE cable and 1.5 km of dynamic submarine XLPE cable.

▪ Project management.

▪ Cable system design, engineering and manufacturing.

▪ Installation of cable, cable joints and transition joints.

▪ Testing and commissioning.

FLY

EN

KK

1712

01w

eb

NK

TTM is

a t

rad

emar

k of

NK

T G

roup

. ©20

17 A

ll rig

hts

rese

rved

NKT HV Cables ABPO Box 546SE-371 23 KarlskronaSweden

T: +46 455 556 [email protected]

NKT is signatory of the Europacable Industry Charter: A commitment towards superior quality.

®

Client:ENGIE E&P

Location of the project:The North Sea, Norway

Quantity of order:Turnkey project of a 115 kV AC cable system with a 40 MW power rating

Total cable route length:About 100 km

Duration:2007 - 2010

Location

Key Facts

World´s first dynamic high voltage cable system brings energy to the floating oil and gas platform in the North Sea.

Powering Gjøa from shore

Gjøa

Mongstad, Norway

nkt.com

“By installing the first dynamic high voltage submarine cable system and longest AC submarine cable in the world, we opened up a new powerful era for the offshore oil and gas industry.”

Environmentally friendly technology.The power-from-shore solution reduces CO2 emissions by 210,000 tons per year and is a less costly and more efficient solution than gas turbines.

The project Gjøa was the world’s first floating oil and gas platform to be powered from the onshore grid.

Gjøa is a large development project in the North Sea. The production at the field began in 2010 via a semi-submersible platform located off the Norwegian coast. The floating production facility is owned and operated by ENGIE E&P.

Oil and gas platforms typically use gas turbines to generate the electric power needed for their operations. Gas turbines consume large volumes of gas that could otherwise be sold and produce large quantities of CO2 (carbon dioxide) emissions. They have significant and costly space and weight requirements and require regular maintenance.

ENGIE E&P has therefore decided to prioritize the use of emission-free hydropower from the Norwegian grid to power offshore production facilities. It is a smart way of reducing the cost and the environmen-tal footprint of its operations.

At the time of this project, the powering of a floating platform with electricity from the onshore grid had never been attempted as there was not yet any AC cable sufficiently robust to withstand the mechanical stress of floating applications.

ENGIE E&P turned to us for an innovative power cable system solution for Gjøa, based on prior successful partnership projects within power-from-shore solutions in the North Sea..

The solutionThe pioneering 115 kV HVAC cable system is designed, manufactured and installed to withstand the extreme conditions and trans-mit 40 MW of power for decades to come.

The Gjøa floating production facility is located 360 meters above the seabed. The cabling consists of a static HVAC cable system along the seafloor for a distance of 96.5 km and the world´s first 1.5 km dynamic cable, which links the static cable to the floating platform.

Although the platform is moored to the seafloor, it can be moved as much as 75 meters to one side by the wind and the waves. Working closely with ENGIE E&P, the solution is developed to handle the substantial mechanical stress and risk of fatigue, with an operating life of at least 35 years. An important feature of the dynamic design is the replacement of the conventional lead sheath, which is not sufficiently robust for this application, with a new innovative sheath.

The turnkey solution at this time comprised the longest HVAC submarine cable in the world installed in one complete length and at this voltage. It opened up a new era for the offshore oil and gas industry by enabling a floating production facility to be powered entirely from onshore.