12
Located in Exmoor National Park, with nearby bathing beach 3800 population equivalent (summer) 1900 m 3 /d flow to full treatment Sewage feed started 12th February 1998 Porlock Sewage Treatment Plant Site data

Located in Exmoor National Park, with nearby bathing beach

Embed Size (px)

DESCRIPTION

Porlock Sewage Treatment Plant. Site data. Located in Exmoor National Park, with nearby bathing beach 3800 population equivalent (summer) 1900 m 3 /d flow to full treatment Sewage feed started 12th February 1998. Principle of Operation. In. Out. Screened crude sewage. - PowerPoint PPT Presentation

Citation preview

Page 1: Located in Exmoor National Park, with nearby bathing beach

• Located in Exmoor National Park, with nearby bathing beach

• 3800 population equivalent (summer)

• 1900 m3/d flow to full treatment

• Sewage feed started 12th February 1998

Porlock Sewage Treatment Plant

Site data

Page 2: Located in Exmoor National Park, with nearby bathing beach

Principle of Operation

Screened crude sewage

Treated &disinfected

effluent

Air in

Waste Sludge(to further treatment)

In

Out

A Crap Commitment

Page 3: Located in Exmoor National Park, with nearby bathing beach

Membrane Filtration

Air

Bacteria

Virus

Solids

Treated effluent

Membrane

Page 4: Located in Exmoor National Park, with nearby bathing beach

Porlock Treatment Building

Tidal Storage

Blowers

PermeatePumps

Aeration Tanks1 - 4

Anoxic recycleTank

1.

2.

3.

4.

Membrane Units

Final Effluentout

Crude Effluentinlet

Fine Screens3 mm

Washing Tank

Page 5: Located in Exmoor National Park, with nearby bathing beach

Porlock Aeration Tank MLSS

0

5000

10000

15000

20000

25000

30000

0 0.5 1 1.5 2Time in Years

MLSS (mg/l)

Aeration tank average

Feb 98 - Sept 99

Page 6: Located in Exmoor National Park, with nearby bathing beach

Porlock BOD Removal

0

100

200

300

400

500

600

700

0 0.5 1 1.5 2Time in Years

BOD (mgO2/l)

Raw Feed Permeate

Feb 98 - Jan 00

Page 7: Located in Exmoor National Park, with nearby bathing beach

Porlock NH3/4 Removal

0

10

20

30

40

50

200 250 300 350 400Time in Days

AmmN (mgN/l)

Raw Feed Permeate

Aug 98 - Apr 99

No ammonia consentNo dissolved oxygen control

Page 8: Located in Exmoor National Park, with nearby bathing beach

Porlock Faecal Coliforms

0.0000010.000010.00010.0010.010.1

110

1001000

0 0.5 1 1.5 2Time in Years

Faec. Col.

106/100 ml

Raw feed Permeate

Feb 98 - Jan 00

Sampling contamination identified

Intensive sampling periods

Page 9: Located in Exmoor National Park, with nearby bathing beach

0.0000001

0.000001

0.00001

0.0001

0.001

0.01

0.1

1

0 0.5 1 1.5 2Time in Years

Coliphage 105/ml

Feed coliphage Final coliphage (F+coliphage) (F+coliphage)

Porlock Faecal Coliphage Virus

Feb 98 - Jan 00

Change of test procedure

Page 10: Located in Exmoor National Park, with nearby bathing beach

Porlock Final Effluent Turbidity

0

1

2

3

4

5

6

7

55 65 75 85 95 105 115 125Time in Days

NTU

Tank 1 Tank 2 Tank 3 Tank 4

Feb - June 1998

Turbidity meter set up incorrectly - readings higher than actual

Page 11: Located in Exmoor National Park, with nearby bathing beach

Porlock STW- Compliance Results

June 1998 – November 1999

Crude FinalAnalyte

No ofsamples Min Max Average Min Max Average

Total coliforms /100 ml 36 4000000 >3000000000 233000000 <10 480 <44Faecal coliforms /100 ml 37 600000 160000000 16700000 <10 60 <11Faecal streptococcus /100 ml 36 40000 9400000 928000 <10 20 <10Clostridium Perfringens /100 ml 33 500000 1800000 144000 <10 90 <13Salmonella /10 litres 36 0 350 16 0 <10 <1.9Enterovirus /10 litres 32 < 200 360000 2300 <1 10 <1.4F+ coliphage /100 ml 29 40 1118000 154000 <1 60 <6.5Suspended solids mg/litre 30 32 1030 249 <1 8 <5Turbidity NTU 32 - - - 0.07 1.5 0.23BOD5 mgO2/litre 35 26 640 290 <2 <8 <5

Kubota Submerged Membrane Process

Page 12: Located in Exmoor National Park, with nearby bathing beach