LOA STATUS AS ON 15.03.2012
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Power 1Tata Power Co. Ltd., Unit-V,
Jojobera, Jamshedpur.02.08.2007
23011/52/20
07-CPD
dt.29.08.200
7
7d 20 19
1st
CLOA/11.3.08
vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
1 X 120
MW 27.3.08 550,000
Not
submited - -
Power 2Rayalseema TPS Stage-III Unit-V,
Kadapa02.08.2007
23011/52/20
07-CPD
dt.29.08.200
7
3 11 6
1st
CLOA/11.3.08
vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
1 X 210
MW 27.3.08 1,010,000 1010000 22.11.08 14.3.09 44500000 18.3.09 4.12.09
Power 3Rayalseema TPS Stage-III Unit-VI,
Kadapa02.08.2007
23011/52/20
07-CPD
dt.29.08.200
7
5 21 9
1st
CLOA/11.3.08
vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
1 X 600
MW 27.3.08 2,310,000 2310000 19.11.08 6.3.09 101700000 18.3.09
Power 4Simhadri Expansion Stage-II Phase-
I Visakhapatnam.02.08.2007
23011/52/20
07-CPD
dt.29.08.200
7
c - 28
1st
CLOA/11.3.08
vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
1 X 500
MW 27.3.08 2,310,000 2310000 2.2.09 26.12.08 101640000 17.2.09 7.5.09
Power 5Bellary TPS Unit-II, KPCL, Bellary,
Karnataka.02.08.2007
23011/52/20
07-CPD
dt.29.08.200
7
3 1 5
1st
CLOA/11.3.08
vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
1 X 500
MW 27.3.08 2,310,000 2310000 6.06.08 2.09.08 101640000 25.9.08 11.3.09 7.4.09 22.12.10 2310000
Power 6
Haldia Energy Ltd.( Formerly CESC
Ltd.) Phase-I, Sutahata Railway
Station, Haldia2
02.08.2007
23011/52/20
07-CPD
dt.29.08.200
7
7d 11 18
1st
CLOA/11.3.08
vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
1 X 600
MW(chan
ged to
2X300
MW)
27.3.08 2,572,200 2,572,200 10.07.08 6.08.08 158480000 13.8.08 23.4.09
Power 7
GMR Kamalanga Energy
Ltd.(Formely GMR Energy Ltd.),
Phase-I, Kamalnga, Dhenkanal.
02.08.2007
23011/52/20
07-CPD
dt.29.08.200
7
7b 4 13
1st
CLOA/11.3.08
vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
1 X 500
MW 27.3.08 2,140,000 2140000 17.06.08 25.07.08 119840000 25.7.08 10.2.09
Power 8
Rajiv Gandhi Thermal Power Plant,
Khedar, Hissar (earlier Hissar TPS)
(HPGCL), Phase-I, Haryana
02.08.2007
23011/52/20
07-CPD
dt.29.08.200
7
a - 27
1st
CLOA/11.3.08
vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
Ph-I 100
MW, Ph-
II 600
MW
27.3.08 3,240,000 3240000 24.06.08 24.10.08 142560000 24.10.08 6.4.09 29.7.09 10.11.10 2030000
Power 9
LANCO Babandh Power Ltd
(FormelyLANCO Group Ltd.),
Phase-I, Babandh Village,
Dhenkanal.
02.08.2007
23011/52/20
07-CPD
dt.29.08.200
7
7d 17a 19
1st
CLOA/11.3.08
vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
660 MW 27.3.08 2,830,000 2830000 19.06.08 29.12.08 158480000 29.12.08 3.6.09
Power 10Sterilite Energy Ltd (SEL) (Phase-
1), Jharsuguda, Orissa02.08.2007
23011/52/20
07-CPD
dt.29.08.200
7
7b 3 12
1st
CLOA/11.3.08
vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
600 MW 27.3.08 2,570,000 2570000 21.04.08 25.06.08 143920000 25.6.08 24.12.08 20.12.09 10.9.2011 10.9.2011 2570000
Power 11
Talwandi Sabo Power Ltd., PSEB,
Pansa, Talwani, Sabo, Bhatinda,
Punjab.
02.08.2007
23011/52/20
07-CPD
dt.29.08.200
7
3 9 6
1st
CLOA/11.3.08
vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
3 X 600
MW(revis
ed to
3X660)
27.3.08 7,720,000 7720000 11.6.09 18.7.09 339680000 14.8.08 6.2.09
Power 12
KVK Nilachal Power Pvt. Ltd,
Kandarei, Cuttack Dist., Orissa
(earlier location was Kamalangana,
Dhenkanal Dist, Orissa)
02.08.2007
23011/52/20
07-CPD
dt.29.08.200
7
7a 2 11
1st
CLOA/11.3.08
vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
50 MW 27.3.08 240,000 240000 21.06.08 9.08.08 10560000 9.8.08 12.12.08
Power 13
Ind-Barath Energy(Utkal) Ltd.
(formerly Ind Barath Energy Ltd.), Ib
Valley
02.08.2007
23011/52/20
07-CPD
dt.29.08.200
7
7b 2 12
1st
CLOA/11.3.08
vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
1 x 250
MW27.3.08 1,120,000 1120000 27.06.08 29.12.08 62720000 29.12.08 31.12.08
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
Page 1 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
Power 14
Ideal Energy Project Ltd., Plot
No.121, 2nd Floor, Telecom Nagar,
Nagpur.
12.11.08 270 MW17/18.4.
09390,000 390000 20.5.09 18.6.09 17160000 18.6.09 8.4.09
Power 15
Nava Bharat Power Pvt. Ltd.,
Mahalxmi House, 8-2-583/3, Road
No.9, Banjara Hills, Hyderabad.
12.11.08
1050
MW
(Revised)
17/18.4.
094,219,000 4219000 16.5.09 23.5.09 206844000 11.6.09
Power 16
DB Power Ltd., 6, Dwarka Sadan,
Press Complex, MP Nagar, Zone-1,
Bhopal.
12.11.082X600
MW
17/18.4.
092,497,000 2497000 16.5.09 7.7.09 109868000 8.7.09
Power 17
Jhabua Power Ltd. (formerly Kedia
Power Ltd.), Thapar House, 124,
Janpath, New Delhi.
12.11.08
300 MW
revised
to 1
x 600 MW
17/18.4.
09650,000 650000 5.5.09 5.6.09 28600000 11.6.09 9.11.09
Power 18
Adani Power Ltd., Adani House,
Power Division, Plot No.83,
Industrial Area, Sector-32, Gurgaon.
12.11.08 1980 MW17/18.4.
096,409,000 6409000 12.5.09 25.6.09 281996000 25.6.09 21.10.09
Power 19
Meenakshi Energy Pvt. Ltd.,
Meenakshi House, 8-2-418, Road
No.7, Banjara Hills, Hyderabad.
12.11.08 600 MW17/18.4.
092,023,000 2023000 16.5.09 23.5.09 89012000 11.6.09 3.7.09
Power 20
Thermal Power Tech Corpn. (I) Ltd.,
C/o M/s gayatri Projects Ltd., 6-3-
1090, TSR Towers, Raj Bhavan
Road, Somajiguda, Hyderabad.
12.11.08 1320 MW17/18.4.
094,273,000 4273000 18.5.09 29.6.09 188012000 4.7.09
Power 21
NSL Nagapatnam Power &
Infratech Pvt. Ltd. (formerly Sirkazhi
Power Projects), INS Icon, Door
No.8-2-634, 4th Floor, Road No.12,
Banjara Hills, Hyderabad.
12.11.08 1320 MW17/18.4.
094,273,000 4273000 19.5.10 22.6.10 205104000 26.6.10 -
Power 22
NCC Power Projects Ltd. (Formely
NCC Vansadhara Mega Power
Projects), Nagarjuna Constuction
Co, 4th Floor, MJ Towers, Road No.
12 Banjara Hills, Hydreabad
12.11.08 1320 MW17/18.4.
092,136,000 2136000 13.5.09 11.6.09 93984000 11.6.09
Power 23
Ind-Barath Energy (Utkal) Ltd., Plot
No.38, Road No.1, Film Nagar,
Jubilee Hills, Hyderabad.
12.11.08 450 MW17/18.4.
091,950,000 1950000 6.5.09 8.7.09 86800000 8.7.09 30.6.09
Power 24
East Coast Energy Pvt. Ltd., 7-1-24,
B Block, 5th Floor, Roxana Towers,
Green Land, Begumpet, Hyderabad.
12.11.08 1320 MW17/18.4.
094,273,000 4273000 14.5.09 23.5.09 188012000 11.6.09 26.6.09
Power 25
KVK Nilachal Power Pvt. Ltd., 6-3-
1109/19/1, 3rd Floor, Nava Bharat
Chambers, Raj Bhavan Road,
Somajiguda, Hyderabad.
12.11.08 700 MW17/18.4.
093,034,000 3034000 15.5.09 23.5.09 133496000 11.6.09 9.12.09
Power 26
GMR Kamalanga Energy
Ltd.(Formely GMR Energy Ltd.),
Phase-I, Kamalnga, Dhenkanal.
12.11.08 550 MW17/18.4.
092,384,000 2384000 12.5.09 4.7.09 104896000 8.7.09 12.10.09
Power 27
India Bulls Realtech Ltd., India Bulls
House, 448-451, Udyog Vihar,
Phase-V, Gurgaon. (Nasik TPS)
12.11.08
1320
MW
revised
to 5x270
MW
17/18.4.
091,831,000 1831000 15.5.09 23.5.09 80564000 11.6.09 18.12.09
Power 28
Jindal India Thermal Power Ltd.,
Plot No.12, Local Shopping
Complex, Sec.-B-1, Vasant Kunj,
New delhi.
12.11.08 #REF! 350 MW17/18.4.
091,457,000 1457000 23.5.09 64108000 11.6.09 7.8.09
Power 29North Chennai Thermal Power
Project(Stage-II)TNEB29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
600 25.5.10 2,315,000 2315000 19.6.10 14.7.10 143530000 17.7.10 24.8.10
Page 2 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
Power 30NTPC Tamilnadu Energy Company
Limited (a JV of NTPC and TNEB )29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
500 13.5.10 1,929,200 1929200 2.6.10 16.6.10 119610400 26.6.10 23.9.10
Power 31
M/s Chhattisgarh Power Venture
Pvt. Ltd., Special Purpose Vehicle
(Formely Videocon Industries Ltd)
29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
660 29.4.10 1,273,200 1273200 21.5.10 16.061 78938400 26.6.10 24.9.10Change in name
w.e.f. 15.09.2011
Power 32 Sterlite Energy Ltd. 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
1800 29.4.10 6,944,900 6944900 27.5.10 430583800 14.7.10 12.11.10 10.9.2011 10.9.2011 2314967
Power 33
Mahanadi Thermal Power Project of
M/s Lanco Mahandi Power Pvt
Limited
29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
660 29.4.10 2,546,500 Not
submitted
Power 34 Jindal Power Ltd. 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
1200 29.4.10 2,315,000 2315000 25.5.10 143530000 10.8.10
Power 35PEL Power Limited(an SPV of Patel
Engineering Limited) 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
500 29.4.10 1,929,200 1929200 20.5.10 119610400 27.8.10 23.9.10
Power 36Ind-Barath Power(Madras) Limited
of M/s Ind-Barath-infra (P) Ltd.29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
660 29.4.10 1,980,600 1980600 26.5.10 117800000 23.11.10
Power 37Raj West Power Ltd of JSW Energy
Ltd.29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
540 29.4.10 1,106,900 1106900 24.5.10 16.6.10 68627800 17.6.10 30.6.10
Power 38India Bulls Power Ltd. (Amravati
Thermal Power Project)08.04.10
23011/66/20
08-CPD
(Vol.iii)
dt.03.5.10
13th
CLOA/14.5.10
vide
CIL/S&M/LOA/4
7252(New
Pol)/483
dt.2.8.10
2x660
MW
revised
to 5 x
270 MW
24.8.10 2,546,500 2,546,500 24.8.10 157883000 3.11.10
Power 39NTPC,Solapur Thermal Power
Project,Dist-Solapur,Maharastra
Moc letter
No.23011/2
5/2009-
CPD
dtd.9.3.10
Moc letter
No.23011/25/
2009-CPD
dtd.9.3.10
13th
CLOA/14.5.10
vide
CIL/S&M/LOA/4
7252(New
Pol)/483
dt.2.8.10
2x660 11.8.10 5,093,000 5,093,000 8.9.10 315766000 11.11.10
Power 40NTPC,Mouda Extension,Dist-
Nagpur,Maharastra
Moc letter
No.23011/2
5/2009-
CPD
dtd.9.3.10
Moc letter
No.23011/25/
2009-CPD
dtd.9.3.10
13th
CLOA/14.5.10
vide
CIL/S&M/LOA/4
7252(New
Pol)/483
dt.2.8.10
2x660 11.8.10 5,093,000 5,093,000 8.9.10 315766000 11.11.10
TOTAL 107,794,200 104,697,700 9,224,967
OLD LOA CASES PRIOR TO NCDP
Page 3 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
Power 1
Karnataka Power Corpn. Ltd.,
Shakthi Bhavan, #82, Race Course
Road, Bangaluru.( Raichur- Unit-8
250MW 24.4.09 1,011,000 1,011,000 18.5.09 23.5.09 44484000 19.8.06 4.6.09 4.6.09 5.5.10 5.5.10 1011000
Power 2
Andhra Pradesh Power Generation
Corpn. Ltd. Vidyut soudha,
Khairatabad, Hyderabad. (
KrishnapatanamTPS)
2X800 MW 24.4.09 5,000,000 Not
Submitted23.3.07
Power 3
Andhra Pradesh Power Generation
Corpn. Ltd. Vidyut soudha,
Khairatabad, Hyderabad.
Kothagudam-VI
500MW 24.4.09 2,312,000 Not
Submitted19.8.06 4.4.09 4.4.09
Power 4
Tamilnadu Electricity Board,
Electricity Avenue, 10th Floor, 144,
Anna Salai, Chennai ( Mettur TPS)
600Mw 11.8.10 2,315,000 2,315,000 2.9.10 28.10.10 143530000 29.10.10
Power 5
Tamilnadu Electricity Board,
Electricity Avenue, 10th Floor, 144,
Anna Salai, Chennai ( North
Chennai TPS)
600MW 11.8.10 2,315,000 2,315,000 2.9.10 28.10.10 143530000 29.10.10
Power 6
Jindal India Thermal Power Ltd.
(formerly Jindal Photo Ltd.), Plot
No.12, Local Shopping Complex,
Sector-B1, Vasant Kunj, New Delhi.
250MW 24.4.09 1,204,000 1,204,000 4.6.09 52976000 19.8.06 16.3.09
Power 7
Neyveli Lignite Corpn., Corporate
Office, Block-1, Po: Neyveli,
Tamilnadu.(Ib TPS)
2X500MW 24.4.09 2,310,000 Not
Submitted19.8.06
Not
Submitted
Power 8
KVK Nilachal Power Pvt., 6-3-
1109/19/1, 3rd Floor, Nava Bharat
Chambers, Raj Bhavan Road,
Somajiguda, Hyderabad.
250MW 24.4.09 1,204,000 1,204,000 15.5.09 23.5.09 52976000 19.8.06 14.3.09 14.3.09
Power 9
Nava Bharat Power Pvt. Ltd.,
Mahalxmi House, 8-2-583/3, Road
No.9, Banjara Hills, Hyderabad.
Power 10
NLC Tamilnadu Power Ltd., Room
No.27, Coreporate Office, NLC
Block, Neyveli.(TutticorinTPS)
2X500MW 11.8.10 3000000 3,000,000 19.8.10 20.9.10 186000000 24.9.10 9.10.10
Power 11
Rajiv Gandhi TPP, Haryana Power
Generation Corpn. Ltd., 16/VII,
Vidyut Nagar, Hissar.(Hissar TPS)
500mw 24.4.09 2310000 2,310,000 1.8.09 11.8.09 101640000 30.3.07 25.4.09 25.4.09 30.11.09 2030000
Power 12
Damodar Valley Corporation, DVC
Tower, VIP Road, Kolkata.(
KodermaTPS)
2X500MW 24.4.09 4620000 Not
Submitted23.3.07 20.4.09
Power 13
Executive Director(FM),
Engineering Office Complex, Plot
No.A-8A, Sector-24, Post Box
No.13, NOIDA. (Simhadri TPS
Expn.)
500MW 24.4.09 2310000 2,310,000 8.6.09 101640000 23.3.07 7.5.09 07.09.11 1690000
Power 14
Executive Director(FM),
Engineering Office Complex, Plot
No.A-8A, Sector-24, Post Box
No.13, NOIDA. (Jhajjar TPS)
3X500MW 24.4.09 6950000 6,950,000 6.6.09 305800000 23.3.07 18.7.09 18.7.09 04.09.10 1690000
Power 15
Executive Director(FM),
Engineering Office Complex, Plot
No.A-8A, Sector-24, Post Box
No.13, NOIDA. (Ennore TPS)
Project name changed to Vellur
TPS.
2X500MW 24.4.09 4620000 4,620,000 6.6.09 203280000 23.3.07 17.8.09 17.8.09
Power 16
Maharashtra State Power
Generation corpn. Ltd.,
Bandra(East) Mumbai
(Khaperkheda TPS)
500MW 21.5.10 2312000 2,312,000 8.6.10 30.6.10 110976000 6.7.10 11.8.10 4.7.11 920000
Power 17
Maharashtra State Power
Generation corpn. Ltd.,
Bandra(East) Mumbai (Bhusawal
TPS)
1000MW 21.5.10 4624000 4,624,000 8.6.10 30.6.10 221952000 6.7.10 11.8.10
Power 18
Maharashtra State Power
Generation corpn. Ltd.,
Bandra(East) Mumbai (Parli Unit-II
TPS)
250MW 21.5.10 1204000 1,204,000 8.6.10 30.6.10 57792000 6.7.10 11.8.10 30.9.10 880000
Power 19
Maharashtra State Power
Generation corpn. Ltd.,
Bandra(East) Mumbai (Paras Expn.-
II TPS)
250MW 21.5.10 1204000 1,204,000 8.6.10 30.6.10 57792000 6.7.10 11.8.10 30.09.10 880000
Page 4 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
Power 20
Executive Director(FM),
Engineering Office Complex, Plot
No.A-8A, Sector-24, Post Box
No.13, NOIDA. (Mouda TPS)
500MW 24.4.09 2312000 2,312,000 8.6.09 29.6.09 110000000 14.7.09
Power 21
Andhra Pradesh Power Generation
Corpn. Ltd. Vidyut soudha,
Khairatabad, Hyderabad.
(Vijayawada-IV)
500MW 30.4.09 2312000 2,312,000 15.6.09 101728000 5.8.09 4.4.09 9.12.09 26.2.10 1690000
Power 22 Vishakapatnam TPS of HNPCL 22/23.10.08
23011/66/20
08-CPD
dt.27.11.200
8
1 - 4
6th
CLOA/06.01.09
vide
CIL/S&M/LOA/5
0 dt.05.02.2009
2x500
MW(chan
ged to
2X520)
5.2.09 4624000 4624000 19.3.09 203456000 6.5.09 4.8.11 4624000
TOTAL 60,073,000 45,831,000 15,415,000
Cement 1ACC LTD, Bargarh Cement Works,
Cement Nagar, Bardol, Bargarh 06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.1 1
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
25 27.3.08 240,000 240000 3.7.08 2.9.08 13440000 8.9.08 6.10.08 29.7.09 2.8.09 2.8.09 2.08.09 196700
Cement 2
Adhunik Metaliks Ltd, Chadri,
Hariharpur, Dist- Sundergarh
(Orissa)
06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.A.5 7
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
10 27.3.08 128,000
Cement 3
Calcon Cement Works,
(Clinkerisation Unit), At-Umrangshu,
NC Hills Dist., Assam. &
Grinding Unit, At-Lanka, Naogaon,
Assam.
06.11.07
23011/52/20
07-CPD
dt.29.08.07
20 9
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
14 179,000
Cement 4
OCL India Ltd. (New Clinkerisation),
Line No,.2, Rajgangpur,
Sundargarh, Orissa.
06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.4 8
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
17 27.3.08 217,000 217000 28.5.08 16.06.08 12152000 25.7.08 2.8.08 15.12.08 13.12.08 15.12.08 7.09 217000
Cement 5
OCL India Ltd. (Kapilas Cement
Works) (Standlone Cement
Gridning Unit), At-Biswali, Jagatpur,
Cuttack, Orissa.
06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.5 8
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
9 27.3.08 115,000 26000 28.5.08 16.06.08 1456000 25.7.08 2.8.08 15.12.08 13.12.08 15.12.08 22.1.09 26000
Cement 6Shiva Cement Works, Telighana,
Sundargarh, Orissa. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
1 10
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
26 27.3.08 332,000 127500 3.7.08 11.08.08 7140000 13.8.08 5.9.08 31.12.08 12.12.08 31.12.08 19.1.09 34770
TOTAL 1,211,000 610,500 474470
CPP 1ACC LTD, Bargarh Cement Works,
Cement Nagar, Bardol, Bargarh20.3.08
23011/81/20
07-CPD
dt.10.04.08
I.6 6
3rd CLOA
/7.6.08
CIL/CMO/SO/47
252(New
Pol)/dt30.6.08
30MW 9.8.08 163,000 163000 17.12.08 13.2.09 13440000 17.02.09 13.3.09 29.7.09 2.8.29 2.8.09 2.8.09 163000
CPP 2
Adhunik Metaliks Ltd, Chadri,
Hariharpur, Dist- Sundergarh
(Orissa) Formerly Neepaz Metaliks
(P) Ltd.
06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.A.5 1
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30MW 27.3.08 163,000 163000 10.6.08 22.9.08 9128000 25.9.08 18.10.08 23.9.09 23.9.09 23.9.09 23.9.09 163000
CPP 3
Aryan Ispat & Power (P) Ltd. At-
Bomlai, Tahsil- Rengali Sambalpur
Orissa
06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.B.17 5
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
45(Revis
ed to
6+18=24
MW
27.3.08 235,000 235000 31.5.10 14.7.10 14570000 14.7.10 12.8.10 28.3.11 130752
CPP 4Balasore Alloys Ltd., Balgopalpur,
Balasore, Orissa. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.94 25
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
135
(2x67.5)27.3.08 687,000 687000 16.7.08 18.7.08 38472000 25.7.08 1.12.08
CPP 5Bhagyanagar Solvent Extraction P.
Ltd., Secunderabad 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.44 19
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
11 27.3.08 60,000
CPP 6
Bhaskar Steel & Ferro Alloys Ltd.,
Badatumkela, Lahunipada,
Sundargarh, Orissa.
06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.105 26
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
12 27.3.08 65,000 65000 3.7.08 6.8.08 3640000 13.8.08 18.9.08 4.8.09 7.8.09 7.8.09 7.8.09 21660
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
Transfered to ECL
CEMENT
CAPTIVE POWER PLANT
Page 5 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
CPP 7
Bhubaneswar Power P. Ltd.,
Anantapur, Athagarh, Cuttack,
Orissa.
06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.93 25
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
135
(2x67.5)27.3.08 687,000 687000 27.6.08 29.7.08 38472000 19.9.08 18.11.08 11.12.10 687000
CPP 8
Bhushan Steel Ltd., (FORMERLY
BHUSAN STEEL & STRIPS LTD)
At-Meramandali, Dist- Dhenkanal
7101.A.13
23011/52/20
07-CPD
dt.29.08.07
1.A.13 2
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
110(77+3
3)27.3.08 501,000 501000 2.7.08 2.7.08 28056000 10.7.08 14.7.08 09.08.10 09.08.10 09.08.10 501000
CPP 9
Bhushan Energy Ltd., (LOA
transferred from BHUSAN STEEL
LTD) At-Meramandali, Dist-
Dhenkanal
06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.A.13 2
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
3X110
MW
revised
to
2x150+20
+12
27.3.08 1,358,132 1358132 2.7.08 2.7.08 84168000 10.7.08 08.04.10 22.10.11 22.10.11 1018599
CPP 10BRG Iron & steel Co. (P) Ltd., Vill-
Kuranti, Dist- Dhenkanal, Orissa 06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.A.11 2
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
60MW 27.3.08 313,000 313000 14.7.08 18.7.08 17528000 25.9.08Not
submited
CPP 11BRG Iron & steel Co. (P) Ltd., Vill-
Kuranti, Dist- Dhenkanal, Orissa 06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.A.11 2
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
90MW 27.3.08 458,000 458000 14.7.08 21.8.08 25648000 25.9.08Not
submited
CPP 12BRG Iron & steel Co. (P) Ltd., Vill-
Kuranti, Dist- Dhenkanal, Orissa 06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.A.11 2
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30
(2x15)27.3.08 163,000 163000 26.6.08 18.7.08 9128000 25.9.08
Not
submited
CPP 13
Dinbandhu Steel & Power Ltd., At-
Kalinga Nagar Growth Cenre,
Dasmania, Dist- Jajpur, Orissa
06.11.07
23011/52/20
07-CPD
dt.29.08.07
3.13 11
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
8 27.3.08 44,000 44000 10.6.08 19.7.08 2464000 6.9.08 24.10.08 19.12.09
CPP 14
Emami Paper Mills Ltd.,
Balgopalpur Industrial Area,
Balasore, Orissa.
06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.17 16
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15MW 27.3.08 82,000 82000 28.5.08 30.6.08 4592000 10.7.08 13.8.08 1.12.08 14.11.08 1.12.08 28.01.09 82000
CPP 15Facor Power Ltd., DP Nagar,
Randia, Bhadrak, Orissa. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.26 17
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
45 27.3.08 235,000 235000 5.9.08 7.11.08 13160000 14.11.08 2.6.09 30.7.10 30.7.11 235000
CPP 16Grasim Industries, Kotputi, Jaipur,
Rajasthan. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.34 17
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
46
(2x23)27.3.08 251,000
CPP 17Hindalco Industries Ltd., Hirakuda,
Dist. Sambalpur, Orissa. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.43 19
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
200MW
(2x100)27.3.08 1,018,000 1018000 28.6.08 21.8.08 57008000 28.8.08 12.12.08 29.1.10 28.1.10 17.2.10 17.2.10 1018000
CPP 18Jindal Photo, Mundegaon, Igatpuri,
Nasik, Maharashtra. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.85 24
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
50
(2x25)27.3.08 272,000
CPP 19
JSL Stainless Ltd.(formerly JSL
Limited), Kalinga Nagar, Industrial
Complex, Jajpur, Orissa.
06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.B.19 5
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
500
(4x125)27.3.08 2,278,000 1139000 5.7.08 5.7.08 63784000 1.7.08 21.7.08
1.12.08
/
17.3.09
1.12.08 31.12.08 5.02.09 1139000
CPP 20JSW Aluminium Ltd., Adduru
Sirsapalle, Bangarammapalem 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.36 18
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
80
(2x40)27.3.08 418,000
CPP 21JSW Aluminium Ltd., Adduru
Sirsapalle, Bangarammapalem 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.36 18
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
31
(2x15.5)27.3.08 169,000
CPP 22JSW Aluminium Ltd., Adduru
Sirsapalle, Bangarammapalem 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.36 18
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
40
(2x20)27.3.08 218,000
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
Page 6 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
CPP 23
Kohinoor Paper & Newspring Pvt.
Ltd., Falta Industrial Growth Centre,
Phase-II, No.18 & 19, Kalatalahat,
Diamond Harbour Sub-Division,
South 24 Paraganas Dist., West
Bengal.
06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.104 26
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
12
(2x6)27.3.08 65,000 65000 27.6.08 21.8.08 3640000 19.9.08 14.3.09 20.7.10 20.7.10 20.7.10 32500
CPP 24Maheswary Ispat Ltd., Khuntuni,
Cuttack, Orissa. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.B.25 6
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
24
(Changed
to 14
MW)
27.3.08 131,000 131000 26.6.08 26.12.08 7336000 29.12.08 5.3.09 28.1.11 28.1.11 76272
CPP 25Maheswary Ispat Ltd., Khuntuni,
Cuttack, Orissa. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.B.31 6
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
48
(2x24)27.3.08 262,000
CPP 26Maheswary Ispat Ltd., Rampai,
Cuttack, Orissa. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.B.9 4
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
110
(2x55)27.3.08 620,000
CPP 27MSP Metallics Ltd., At-Marakuta,
Dist- Jharsuguda- 768202, Orissa 06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.B.26 6
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
24
(2x12)27.3.08 131,000 131000 27.6.08 19.7.08 7336000 7.8.08 5.12.08
CPP 28MSP Sponge Iron Ltd., Haldiaguna,
Gobardhan, Keonjhar, Orissa. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.B.27 6
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
12 27.3.08 65,000
CPP 29 NALCO, Angul, Orissa. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.69 22
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
240MW
(2x120)27.3.08 1,093,000 1093000
23.6.08/
18.7.0821.7.08 61208000 29.7.08 3.10.08 8.7.09 10.7.09 10.7.09 10.7.09 1093000
Amendment of
FSA for Unit-X
executed on
30.07.10
CPP 30NALCO, Damanjodi, Koraput,
Orissa. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.74 23
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
18.5MW 27.3.08 101,000 10100023.6.08/
18.7.0821.7.08 5656000 29.7.08 3.10.08 30.7.10 30.7.10 101000
CPP 31
Nava Bharat Ventures Ltd.,
Kharagprasad, Near Meramandali,
Dhenkanal, Orissa.
06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.24 16
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
64
(2x32)27.3.08 334,000 334000 3.6.08 17.7.08 18704000 25.7.08 8.8.08 10.1.09 24.11.08 10.01.08 30.01.09 334000
CPP 32
OPG Power Generaton Ltd.26, KB
Dasan Road,Teynapeth, Chhenai-
600318
2x77 6.10.08 784000 784000 2.12.08 31.12.08 43904000 12.1.09 29.6.09 21.7.10 21.7.10 21.7.10 784000
CPP 33
Orissa Sponge Iron & Steel Ltd.
Palaspanga, Keonjhar, Orissa (
FormerlyOrissa Sponge Iron Ltd)
06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.7 22
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
18
(12+6)27.3.08 98,000 98000 3.7.08 6.8.08 5488000 7.8.08 1.9.08
CPP 34
Rathi Steel & Power Ltd. (formerly
Rathi Udyog Ltd.), At Vill-
Potapali/Sikirdi, PS-Burla, Dist-
Sambalpur, Orissa
06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.61 21
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30 27.3.08 163,000 16300015.5.08/
21.8.0819.9.08 9128000 25.9.08 25.10.08
CPP 35
Ravi Metaliks Pvt. Ltd.,
Sansinghari, Hirakud, Dist.
Sambalpur, Orissa.
06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.B.29 6
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
22 27.3.08 120,000
CPP 36
Scan Steel Ltd , At- Budhakata,
Biringotoli, Dist- Sundergarh, Orissa
(Formerly Shrishti Ispat Ltd)
06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.57 20
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
12 27.3.08 65,000 65000 3.6.08 2.7.08 3640000 12.7.08 21.7.08 15.12.08t28.11.0
831.12.08 22.01.09 43330 FSA Qty. 43330
CPP 37
Shree Renuka sugarLtd., 7th Floor,
Devegabd Glysem, Shiv Nagar,
Worli, Mumbai
06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.8 23
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15 27.3.08 82,000 82000 10.6.08 24.7.08 4592000 7.8.08 26.8.08 11.2.09 27.12.08 11.2.09 11.2.09 82000
CPP 38
Shri Mahavir Ferro Alloys (P) Ltd.
Jibahal, IDC, Kalunga-770031, Dist-
Sundergarh, Orissa
06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.B.28 6
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
12 27.3.08 65,000 65000 28.5.08 16.6.08 3640000 20.6.08 26.6.08 1.12.08 14.11.08 1.12.08 19.01.09 65000
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
Page 7 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
CPP 39
Shri Mahavir Ferro Alloys (P) Ltd.
Jibahal, IDC, Kalunga-770031, Dist-
Sundergarh, Orissa
06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.5 14
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
125 27.3.08 569,000
CPP 40
Shri Mahavir Ferro Alloys (P) Ltd.
Jibahal, IDC, Kalunga-770031, Dist-
Sundergarh, Orissa
06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.76 23
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
18 27.3.08 98,000 98000 27.6.08 18.7.08 5488000 19.9.08 1.12.08
CPP 41
Shri Mahavir Hi-Tech Chemicals
Pvt. Ltd., Ratanpur, Sundargarh,
Orissa.
06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.B.30 6
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
24
(2x12)27.3.08 131,000
CPP 42
Shyam Metallics & Energy Ltd.
(formerly Shyam DRI Power Ltd.),
At- Rengali, Dist- Sambalpur, Orissa
06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.A.9 2
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
25 27.3.08 136,000 136000 20.6.08 29.7.08 15232000 7.8.08 19.8.08 29.7.09 8.8.09 8.8.09 8.8.09 136000
CPP 43
Shyam Metallics & Energy Ltd.
(formerly Shyam DRI Power Ltd.),
At- Rengali, Dist- Sambalpur, Orissa
06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.A.10 2
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
50
(2x25)27.3.08 272,000 272000 20.6.08 29.7.08 7616000 7.8.08 19.8.08 8.12.09 10.12.09 10.12.09 10.12.09 272000
CPP 44Singhal Enprises (P) Ltd., At/Po-
Hirma, Jharsuguda, Orissa 06.11.07
23011/52/20
07-CPD
dt.29.08.07
3.14 12
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
8 27.3.08 44,000
CPP 45SMC Power Generation Ltd. At-Vill-
Hirma, Jharsuguda, Orissa 06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.B.11 4
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
25 27.3.08 136,000 136000 3.7.08 16.8.08 7616000 6.9.08 24.9.08 31.12.08 24.11.08 31.12.08 29.01.09 136000
CPP 46
Sree Metaliks Ltd., At- Loidapada
(Barbil), Guali, Dist- Keonjhar,
Orissa
06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.35 18
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
24 27.3.08 131,000 131000 28.5.08 16.6.08 7336000 26.6.08 17.7.08 31.12.08 27.11.08 31.12.08 6.02.09 56220 FSA Qty. 56220
CPP 47TCP Ltd., Thandalachirry, New
Gummidipoondi, TN. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.6 14
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
66.5 27.3.08 339,000
CPP 48Vedanta Aluminium Ltd., Vedanta,
Jharsuguda, Orissa.06.11.07
23011/52/20
07-CPD
dt.29.08.07
1.B.18 5
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
675MW
(5x135)27.3.08 3,075,000 3075000 28.4.08 4.6.08 172200000 6.6.08 21.6.08 8.8.08 15.11.08 13.08.09 1.1.09 3075000
CPP 49Vedanta Aluminium Ltd., Vedanta,
Jharsuguda, Orissa. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.81 17
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
540MW
(4x135)
2nd
Phase
27.3.08 2,460,000 2460000 28.4.08 4.6.08 137760000 6.6.08 5.12.08 17.8.09 20.8.0920.8.09 /
2.9.09
20.8.09 /
2.9.091230000
CPP 50Vikram Pvt. Ltd., Tumkela,
Rajamunda, Sundargarh, Orissa. 06.11.07
23011/52/20
07-CPD
dt.29.08.07
7.52 20
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
16(2x8) 27.3.08 87,000
CPP 51
OPG Power Generaton Ltd.26, KB
Dasan Road,Teynapeth, Chhenai-
600318
1X77 14.7.09 392000 392000 15.10.09 21952000 18.1.10
CPP 52 Bhushan Power and Steel Limited 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
260 26.4.10 458,200
CPP 53 Jindal Steel & Power Limited 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
540(100
MW
Tapering)
26.4.10 2,213,700 2213700 20.5.10 137249400 19.7.10 5.8.10 28.12.10 1803780
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
CG NOT SUBMITTED
Page 8 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
CPP 54Tannex Power of Tannex Power
Generation Limited29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
110 26.4.10 402,300
CPP 55 Nagai Power Private Limited 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
300 26.4.10 956,600 956600 22.5.10 24.6.10 59309200 25.6.10
CPP 56 Aarti Steel Ltd 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
50 26.4.10 235,100 235100 20.5.10 22.6.10 14576200 25.6.10 2.8.10
CPP 57Bhushan Power and Steel Limited
(Tapering)29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
100 26.4.10 1,065,900
CPP 58 Visa Steel Limited 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
75 26.4.10 367,700 367700 25.5.10 22.6.10 22797400 25.6.10
CPP 59 Usha Martin Limited 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
39 26.4.10 191,200 191200 19.5.10 11854400 14.7.10 24.9.10 14.02.11 191200
CPP 60 Action Ispat & Power (P) Limited 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
43 26.4.10 202,200 202200 21.5.10 17.5.10 12536400 3.6.10 29.6.10
CPP 61 Kanishk Steel Industries Limited 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
12 26.4.10 58,800
CPP 62 Rungta Mines Ltd, CPP-1 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
20 26.4.10 98,100 98100 24.5.10 16.6.10 6082200 25.6.10 23.7.10
CPP 63 Rungta Mines Ltd, CPP-II 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
20 26.4.10 98,100 98100 24.5.10 16.6.10 6082200 25.6.10 23.7.10
CPP 64
Dhunseri Petrochem & Tea
Ltd.(Formely South Asian
Petrochem Limited)
29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
7.5
(Revised
to 8 MW)
26.4.10 28,600 28600 20.5.10 28.6.10 1773200 25.6.10 30.6.10 21.10.11 14300
CG NOT SUBMITTED
CG NOT SUBMITTED
CG NOT SUBMITTED
Page 9 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
CPP 65 Viraj Steel & Energy Ltd. 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
12 26.4.10 58,800 58800 19.5.10 3645600 29.10.10
CPP 66 Easar Power Limited 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
60 26.4.10 228,800
CPP 67 Patnaik Steels and Alloys Limited 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
6.3(42%o
f 15 MW)26.4.10 34,300 34300 6.5.10 29.6.10 2126600 30.6.10 6.7.10 30.7.10 30.7.10 30.7.10 34300 FSA signed
CPP 68 Action Ispat & Power (P) Limited 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
20 + 43 26.4.10 267,337 267,337 21.5.10 17.5.10 18091600 3.6.10 29.6.10 12.01.11 12.01.11 98064
CPP 69 White Field paper Mills Limited 29.01.10
23011/66/20
08-CPD
(Vol.iii)
dt.26.2.10
12th
CLOA/17.3.10
vide
CIL/S&M/47252(
New Pol)/199
dt.5.4.10
65 26.4.10 297,800
TOTAL 29,150,669 21,874,869 14,816,977
Sponge 1
Action Ispat & Power (P) Ltd. At Vill-
Pandri Pathar & Marakuta, Dist-
Jharsuguda, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 164 34
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
105,000 27.3.08 126000 126000 28.5.08 20.6.08 7056000 26.6.08 7.7.08 13.1.09 15.11.08 13.01.09 13.01.09 126000
Sponge 2
Adhunik Metaliks Ltd, Chadri,
Hariharpur, Dist- Sundergarh
(Orissa) Formerly Neepaz Metaliks
(P) Ltd.
6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 10 34
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 10.6.08 22.9.08 2016000 25.9.08 17.10.08 7.1.09 15.11.08 7.01.09 19.01.09 36000
Sponge 3
Adhunik Metaliks ltd. Chadri,
Hariharpur, Dt. Sundargarh , Orissa
(Formerly Nepaz Metaliks)
6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 15 4
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 10.6.08 22.9.08 2016000 25.9.08 17.10.08 7.1.09 15.11.08 7.01.10 19.01.10 36000
Sponge 4
Agarsen Sponge Pvt. Ltd., At-
Mandiakudar, Chungimati,
Kansbahal, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 85 22
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 18000 3.6.08 19.7.08 1008000 7.8.08 1.12.08 9.6.09 18.6.09 18.6.09 18.6.09 18000
Late submission
of Coal
requirment date
by the Party
Sponge 5
Agarsen Sponge Pvt. Ltd., At-
Mandiakudar, Chungimati,
Kansbahal, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 85 22
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 18000 3.6.08 19.7.08 1008000 6.9.08 31.12.08 4.9.09 4.11.09 9.11.09
Late submission
of Coal
requirment date
by the Party
Sponge 6
Aryan Ispat & Power (P) Ltd. At-
Bomlai, Tahsil- Rengali Sambalpur
Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 192 38
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
60,000 27.3.08 72000 72,000 7.8.08 6.9.08 7.4.09 8.4.09 8.4.09 21.4.08 72000
Sponge 7
Aryan Ispat & Power (P) Ltd. At-
Bomlai, Tahsil- Rengali Sambalpur
Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 192 38
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
105,000 27.3.08 126000 126,000 7.8.08 6.9.08 4.8.09 23.10.09 23.10.09 10.2.10 126000
Sponge 8
Aryavrata Trading Pvt. Ltd., At-
Lohamellya, PO- Mohanpur, PS-
Jhargram, Dt- Medinapur, WB
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 199 39
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 18000 27.6.08 29.7.08 1008000 13.8.08 31.12.08 1.9.09 15.9.09 15.9.09 15.9.09 14400 FSA qty.14400
7.8.08 11088000Amendme
nt1.8.08
SPONGE
CG NOT SUBMITTED
CG NOT SUBMITTED
Page 10 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
Sponge 9
Bhagwati Steels (P) LTd. At-IDCO,
Plot No.5, Industrial Growth Centre,
Badmal, Jharsuguda, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 117 26
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 18000 28.6.08 27.10.08 1008000 27.10.08 22.12.08 9.4.09 9.4.09 9.4.09 9.4.09 18000
Sponge 10Bhusan Power & Steel Ltd., Tahsil-
Rengali, Dist. Sambalpur (Orissa)6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 3 2
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
300,000 27.3.08 360000 360000 28.5.08 20.6.08 20160000 19.7.08 25.7.08 29.7.09
Late submission
of Coal
requirment date
by the Party
Sponge 11
Bhushan Steel Ltd., (FORMERLY
BHUSAN STEEL & STRIPS LTD)
At-Meramandali, Dist- Dhenkanal
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 242 45
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
600,000 27.3.08 720000 720000 3.7.08 10.7.08 40320000 10.7.08 14.7.08 22.1.09 22.1.09 22.01.09 22.01.09 720000
Sponge 12
Bhushan Steel Ltd., (FORMERLY
BHUSAN STEEL & STRIPS LTD)
At-Meramandali, Dist- Dhenkanal
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 242 45
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
300,000 27.3.08 360000 360000 3.7.08 10.7.08 20160000 10.7.08 22.11.08 22.1.09 22.1.09 22.01.09 22.01.09 360000
Sponge 13BRG Iron & steel Co. (P) Ltd., Vill-
Kuranti, Dist- Dhenkanal, Orissa 6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 37 7
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
225000 (
4X100TP
D+350TP
D
27.3.08 270000
Sponge 14BRG Iron & steel Co. (P) Ltd., Vill-
Kuranti, Dist- Dhenkanal, Orissa 6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 56 7
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
60,000 27.3.08 72000 72000 20.6.08 11.8.08 4032000 13.8.08 12.9.08 3.6.09 8.6.09 8.6.09 8.6.09 72000
Sponge 15BRG Iron & steel Co. (P) Ltd., Vill-
Kuranti, Dist- Dhenkanal, Orissa 6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 36 9
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
120,000 27.3.08 144000
Sponge 16
Crackers India (Alloys) P. Ltd.,
Gobardhanpur, PO- Deojhar, Dist-
Keonjhar, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
4 69 55
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 18.6.08 6.8.08 2016000 7.8.08 12.11.08 10.1.09 10.1.09 10.01.09 21.01.09 36000
Sponge 17
Deepak Steel & Power LTd.,
Topadidhi, PO- Guali, Dist-
Keonjhar, Orissa (Formerly Deepak
MineralP.Ltd)
6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 24 5
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
105,000 27.3.08 126000 126000 20.6.08 6.8.08 7056000 6.9.08 17.2.09 5.9.09 9.9.09 9.9.09 1.12.09 126000
Late submission
of Coal
requirment date
by the Party
Sponge 18
Dhanbad Fuels P. LTD., At-
Mangapur Industrial Area, Raniganj,
WB
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 36 16
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 1800018.6.08/
18.7.0827.1.09 1008000 27.1.09 28.1.09 5.9.09 9.9.09 9.9.09 9.9.09 18000
Sponge 19
Dinbandhu Steel & Power Ltd., At-
Kalinga Nagar Growth Cenre,
Dasmania, Dist- Jajpur, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 151 32
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
60,000 27.3.08 72000 72000 10.6.08 19.7.08 4032000 6.9.08 24.10.08 22.1.09 24.2.09 25.2.09 25.2.09 72000
Late submission
of Coal
requirment date
by the Party
Sponge 20
Eastern Steels & Power Ltd.,
Lahandabud, Dist- Jharsuguda,
Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 113 26
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
100,000 27.3.08 120000 120000 26.5.08 16.6.08 6720000 26.6.08 21.7.08 7.4.09 8.4.09 8.4.09 29.4.09 120000
Sponge 21Electro Steel Casting Ltd., Haldia,
Dt- Purba, WB6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 4 2
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 28.5.08 30.6.08 2016000 10.7.08 22.7.08 13.1.08 13.1.09 29.01.09 29.01.09 36000
Sponge 22
Ganesh Sponge (P) Ltd.,
Krushnachandrapur, Golabandha,
Parang Angul, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 224 42
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 3.6.08 17.7.08 2016000 29.7.08 9.9.08 7.2.09 30.1.09 9.02.09 9.02.09 36000
Late submission
of Coal
requirment date
by the Party
Sponge 23
Haldia Steels Ltd., Angadpur,
Raturia Industrial area, Durgapur,
Bardwan, WB
6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 8 3
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 27.6.08 21.7.08 2016000 25.7.08 13.4.09 20.7.09 1.9.09 1.9.09 1.9.09 36000Addl BG
submitted
Sponge 24Ispat Damodar Ltd., Babagam, PS-
Neturia, Dt. Purulia WB6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 7 3
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
60,000 27.3.08 72000 72000 3.7.08Not
received4032000 19.10.09 23.11.09 27.11.09 28.11.09 28.11.09 28.11.09 72000
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
Page 11 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
Sponge 25Jagannath Sponge Pvt. Ltd., At-
Kuarmunda, Sundergrh, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 94 23
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 18000 27.6.08 10.7.08 1008000 10.7.08 28.7.08 20.4.09 6.5.09 6.5.09 6.5.09 18000
Late submission
of Coal
requirment date
by the Party
Sponge 26
Jai Balaji Jyoti Steels Ltd., , At-
Tainser, Rourkela, Orissa (
Formerly M/s Jyoti Steels Ltd.)
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 135 29
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
60,000 27.3.08 72000 72000 17.7.08 9.9.08 4032000 19.9.08 19.9.08
Late submission
of Coal
requirment date
by the Party
Sponge 27
Jai Balaji Jyoti Steels Ltd., , At-
Tainser, Rourkela, Orissa (
Formerly M/s Jyoti Steels Ltd.)
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 135 29
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
60,000 27.3.08 72000 72000 17.7.08 9.9.08 4032000 19.9.08 19.9.08 18.909 6.10.09 6.10.09 6.10.09 72000
Late submission
of Coal
requirment date
by the Party
Sponge 28
Jai Balaji Jyoti Steels Ltd., , At-
Tainser, Rourkela, Orissa (
Formerly M/s Jyoti Steels Ltd.)
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 33 16
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 17.7.08 9.9.08 2016000 19.9.08 19.9.08 18.9.09 6.10.09 6.10.09 6.10.09 36000
Late submission
of Coal
requirment date
by the Party
Sponge 29
Jai Hanuman Udyog Ltd., At-
Raghunathpali, Kolabira,
Jharsuguda, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 129 28
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 20.6.08 1.11.08 2016000 1.11.08 30.1.09 15.5.09 6.6.09 6.6.09 6.6.09 36000
Sponge 30Jain Sponge Pvt Ltd., Durlaga, Near
Jharsuguda, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 115 26
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
105,000 27.3.08 126000 126000 20.12.08 27.1.09 7056000 27.1.09 21.8.09 27.11.09 31.12.09 31.12.09 31.12.09 126000CG deposite time
extended
Sponge 31
Jay Iron & Steel Ltd., Vill&PO-
Balanda-770031, Dist- Sundergarh,
Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 131 29
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 20.6.08 29.7.08 2016000 19.9.08 10.11.08 3.6.09 26.6.09 26.6.09 26.6.09 36000
Late submission
of Coal
requirment date
by the Party
Sponge 32
Jay Iron & Steel Ltd., Vill&PO-
Balanda-770031, Dist- Sundergarh,
Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 65 19
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 3.7.08 10.4.09 2016000 19.10.09 23.6.09 10.01.11 36000
Sponge 33
K.J. Ispat Ltd., Kalinganagar
Industrial Complex, Duburi, Jajpur,
Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 54 18
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 28.5.08 1.7.08 2016000 10.7.08 18.7.08 13.1.09 25.11.08 15.01.09 19.01.09 36000
Sponge 34
Kalinga Sponge Iron Ltd., Plot No-
82, Sector-A, Industrial Estate,
kalunga, Rourkella, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
4 3 46
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 3.7.08 9.9.08 2016000 19.9.08 22.11.08 7.2.09 25.3.09 25.3.09 25.3.09 36000
Sponge 35
Kaushal Ferro Metal (P) Ltd,
Badbahal, P.O.- Kundukela,
Sundargarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 251 46
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
60,000 27.3.08 72000 7200028.5.08/
15.9.0829.9.08 4032000 16.10.08 30.1.09 9.6.09 10.7.09 10.7.09 10.7.09 72000
Late submission
of Coal
requirment date
by the Party
Sponge 36Kunj Iron Products Ltd., Merha
road, Chikunda, Dt, Dhanbad6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 2 2
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
21,000 27.3.08 25200
Sponge 37
Kusum Powermet(P) Ltd., At-
Kutugaon, PO- Chipinda, Dist-
Keonjhar, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 108 25
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 28.5.08 10.11.08 2016000 27.11.08 29.12.08 3.3.10 12.1.10 12.1.10 12.1.10 36000
Late submission
of Coal
requirment date
by the Party
Sponge 38Maa Mahamaya Industries Pvt. Ltd.,
At- R.G.Peta, Vizianagaram AP6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 33 15
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
110,000 27.3.08 132000 132000 20.6.08 30.7.08 7392000 30.7.08 11.8.08 31.1.09 23.1.09 23.01.09 31.01.09 126000
Sponge 39
Maa Samleswari Industries (P) Ltd.,
At- Lapanga P.S-Katarbaga, Dist-
Sambalpur, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 62 10
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 20.6.08 16.8.08 2016000 30.1.09 30.1.09 19.6.09 26.6.09 26.6.09 26.6.09 36000
LateSubmission
of name changed
letter
Sponge 40
Maa Shakumbari Sponge Pvt. Ltd.,
At- Kuarmunda - 770039,
Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 146 31
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 18.6.08 20.6.08 2016000 26.6.08 24.3.09 7.4.09 7.4.09 7.4.09 22.4.09 36000Addl. BG
submitted
C.G. NOT SUBMITED.
Page 12 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
Sponge 41
Mahakali Ispat Pvt. Ltd., At-
Gurundupali, PO-Bonaigarh-
770038, Dist- Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 187 37
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 18000 10.6.08 19.9.08 108000 19.9.08 18.3.09 31.8.09 2.9.09 2.9.09 2.9.09 18000
Sponge 42Maheswari Ispat (P) Ltd., Beldanga,
Dt- Bardwan WB6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 20 4
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000
Sponge 43
Maithon Ispat Ltd At-
Kalinga Nagar, Industrial Complex,
Dasamania, Dist- Jajpur, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 209 40
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
105,000 27.3.08 126000 126000 20.6.08 24.10.08 7056000 24.10.08 25.11.08 13.1.09 5.1.09 19.01.09 19.01.09 126000
Sponge 44
Maithon Ispat Ltd At-
Kalinga Nagar, Industrial Complex,
Dasamania, Dist- Jajpur, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 209 40
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
105,000 27.3.08 126000 126000 20.6.08 24.10.08 7056000 24.10.08 25.11.08 13.1.09 5.1.09 19.01.09 19.01.09 126000
Sponge 45
Metasponge, Plot No.201, Industrial
Estate, Kalunga-770 031,
Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 121 27
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
12,000 27.3.08 14400 14400 28.5.08 16.6.08 806400 10.7.08 17.7.08 7.4.09 8.4.09 8.4.09 8.4.09 14400
Late submission
of Coal
requirment date
by the Party
Sponge 46
Monika Holdings Pvt.Ltd.,
Badtumkela, PO- Tumkela, PS-
Lohnipara, Dist- Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 217 41
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000
Sponge 47MSP Metallics Ltd., At-Marakuta,
Dist- Jharsuguda- 768202, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 70 20
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 27.6.08 29.7.08 2016000 7.8.08 4.12.08 19.6.09 19.6.09 19.6.09 19.6.09 36000
Sponge 48N.K. Bhojani (P) Ltd., At- Rugudihi,
Keonjhar, Orissa 6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 72 20
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
12,000 27.3.08 14400 14400 28.5.08 16.6.08 806400 10.7.08 10.9.08 3.6.09 8.6.09 8.6.09 8.6.09 14400
Sponge 49N.K. Bhojani (P) Ltd., At- Rugudihi,
Keonjhar, Orissa 6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 25 5
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 18000 28.5.08 16.6.08 1008000 10.7.08 10.9.08 3.6.09 8.6.09 8.6.09 8.6.09 18000
Sponge 50
Ores Ispat (P) Ltd., At- Villl-
Gurundupalli, Bonai, Sundergarh,
Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 160 33
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000
Sponge 51
Patnaik Minerals P. Ltd.(Formerly
Orion Ispat Ltd)., Ramchandrapur,
PO Basantpur, Dt. Keonjar, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 61 10
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 29.4.08 13.8.08 2016000 28.8.08 15.9.08 9.6.09 9.6.09 9.6.09 9.6.09 36000
Sponge 52
Orissa Sponge Iron & Steel Ltd.
Palaspanga, Keonjhar, Orissa (
FormerlyOrissa Sponge Iron Ltd)
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 88 22
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
150,000 27.3.08 180000 180000 27.6.08 19.7.08 10080000 7.8.08 1.9.08 13.1.09 17.1.09 17.01.09 29.01.09 180000
Late submission
of Coal
requirment date
by the Party
Sponge 53
Patnaik Steels & Alloys Pvt. Ltd., At-
Purunapani, GP- Nayagarh, Dist-
Keonjhar, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 156 33
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
105,000 27.3.08 126000 126000 29.4.08 16.6.08 7056000 7.7.08 8.8.08 15.12.08 15.12.08 15.12.08 19.01.09 126000
Sponge 54
Pawan Jay Sponge Iron Ltd., AT-
Bijabahal, PO- Kumjharia, Dist-
Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 147 31
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 18000 27.6.08 27.10.08 1008000 27.10.08 15.1.09 17.3.08 9.4.09 9.4.09 9.5.09 18000
Sponge 55
Pawansut Sponge Pvt. Ltd., AT-
Badmal, Jhanda Chowk,
Jharsuguda, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 120 27
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 3.7.08 6.8.08 2016000 19.9.08 9.3.09 17.9.09 1.12.09 1.12.09 1.12.09 36000
Late submission
of Coal
requirment date
by the Party
Sponge 56
Prabhu Sponge (P) Ltd., Vill-
Jhagarpur, PS- Rajgangpur,
Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 30 6
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 18000 10.6.08 25.6.08 1008000 25.6.08 23.8.08 9.6.09 6.7.09 6.7.09 6.7.09 18000
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
Page 13 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
Sponge 57
Prabhu Sponge (P) Ltd., Vill-
Jhagarpur, PS- Rajgangpur,
Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
4 73 56
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 18000 10.6.08 12.7.08 1008000 12.7.08 23.8.08 9.6.09 6.7.09 6.7.09 6.7.09 18000
Sponge 58Ramsarup Lohh Udyog Ltd., At-
Kharagpur, Kolkata, WB6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 25 14
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
150,000 27.3.08 180000 18000027.6.08/
21.8.0811.10.08 10080000 16.10.08 30.12.09 2.4.09 8.6.09 8.6.09 8.6.09 180000
Sponge 59Rana Sponge Ltd., At-Kulei,
Parjang, Dist- Dhenkanal, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 23 14
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
105,000 27.3.08 126000 126000 10.6.08 19.7.08 7056000 19.7.08 1.12.08 17.3.08 18.3.09 18.3.09 18.3.09 126000
Sponge 60
Rathi Udyog Ltd., At Vill-
Potapali/Sikirdi, PS-Burla, Dist-
Sambalpur, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 220 42
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
150,000 27.3.08 180000 18000015.5.08/
21.8.0817.10.08 10080000 24.10.08 27.10.08 23.1.08 8.12.08 23.01.09 23.01.09 180000
Sponge 61
Reliable Sponge (P) Ltd.,
Jhaliaberna, Bonai, Dist-
Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 26 5
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 3.7.08 5.8.08 2016000 7.8.08 25.9.08 6.5.09 7.5.09 7.5.09 7.5.09 36000
Sponge 62Rungta Mines Ltd., Vill- Karakolha,
Dist-Keonjhar, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 33 6
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 3.7.08 12.7.08 2016000 12.7.08 1.11.09 9.7.09 7.10.09 7.10.09 7.10.09 36000
Sponge 63
Scan Steel Ltd , At- Budhakata,
Biringotoli, Dist- Sundergarh, Orissa
(Formerly Shrishti Ispat Ltd)
6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 43 8
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 3.6.08 2.7.08 2016000 12.7.08 21.7.08 22.1.09 23.11.08 22.01.09 22.01.09 36000
Sponge 64
Scan Steel Ltd , At- Budhakata,
Biringotoli, Dist- Sundergarh, Orissa
(Formerly Shrishti Ispat Ltd)
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 186 37
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
60,000 27.3.08 72000 72000 3.6.08 2.7.08 4032000 12.7.08 21.7.08 22.1.09 23.11.08 22.01.09 22.01.09 72000
Sponge 65
Seeta Sponge Iron Ltd., At- Plot
No.202, Kalunga, Industrial Estate,
PO- Kalunga, Dist- Sundergarh,
Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 74 21
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 28.5.08 26.6.08 2016000 12.7.08 28.7.08 31.12.08 19.11.08 31.12.08 20.01.09 36000
Sponge 66Seven Star Steel Ltd., At-
Kalendamal, Jharsuguda, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 171 35
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 20.6.08 29.7.08 2016000 13.8.08 16.9.08 15.5.09 3.6.09 3.6.09 3.6.09 36000
Late submission
of Coal
requirment date
by the Party
Sponge 67Seven Star Steel Ltd., At-
Kalendamal, Jharsuguda, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 171 35
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 20.6.08 29.7.08 2016000 7.8.08 16.9.08 15.5.09 3.6.09 3.6.09 3.6.09 36000
Sponge 68
Shiv Metaliks (P) Ltd., At-
Gurundipali, Bonai, Dist-
Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 162 33
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 3.7.08 5.8.08 2016000 13.8.08 27.10.08 2.4.09 3.4.09 3.4.09 3.4.09 36000
Sponge 69
Shree Hari Sponge Pvt.Ltd., At-
Kendrikela, PO- Bonai, Dist-
Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 122 27
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 3.7.08 27.10.08 2016000 27.10.08 29.12.08 6.5.09 15.5.09 15.5.09 15.5.09 36000
Sponge 70
Shree Jagannath Metaliks
Industries Ltd, At Vill-Khaparkhai,
PO-Palasponga, Dist- Keonjhar,
Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 188 37
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 3600010.6.08/
5.12.0829.1.09 2016000 30.1.09 26.2.09 5.8.09 5.9.09 5.9.09 5.9.09 36000
Sponge 71
Shree Madhav Ispat (P) Ltd., At-
Siriapalli, Po- Parmanandpur, Dist-
Jharsuguda, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 23 5
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 28.5.08 20.6.08 2016000 12.7.08 23.7.08 23.1.09 28.11.08 23.01.09 23.01.09 36000
Late submission
of Coal
requirment date
by the Party
Sponge 72
Shree Madhav Ispat (P) Ltd., At-
Siriapalli, Po- Parmanandpur, Dist-
Jharsuguda, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 78 21
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 28.5.08 20.6.08 2016000 12.7.08 23.7.08 23.1.09 28.11.08 23.01.09 23.01.09 36000
Late submission
of Coal
requirment date
by the Party
Page 14 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
Sponge 73
Shree Sai Shradha Steels Pvt. Ltd.,
At Vill-Bijabahal, PO-Kumjharia,
Dist- Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 238 44
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
7,500 27.3.08 9000 9000 28.5.08 20.6.08 504000 20.6.08 8.7.08 7.7.09 8.7.09 8.7.09 8.7.09 9000
Sponge 74
Shri Mahavir Ferro Alloys (P) Ltd.
Jibahal, IDC, Kalunga-770031, Dist-
Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 84 22
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 28.5.08 16.6.08 2016000 26.6.08 26.6.08 1.12.08 14.11.08 1.12.08 19.01.09 36000
Late submission
of Coal
requirment date
by the Party
Sponge 75
Shri Mahavir Ferro Alloys (P) Ltd.
Jibahal, IDC, Kalunga-770031, Dist-
Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 84 22
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
3,000 27.3.08 36000 36000 28.5.08 16.6.08 2016000 26.6.08 26.6.08 1.12.08 14.11.08 1.12.09 19.01.10 36000
Late submission
of Coal
requirment date
by the Party
Sponge 76Shyam DRI Power Ltd., At- Rengali,
Dist- Sambalpur, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 34 6
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
210,000 27.3.08 252000 252000 20.6.08 7.8.08 14112000 7.8.08 19.8.08 15.12.08 29.12.08 15.01.09 29.01.09 252000
Sponge 77Singhal Enprises (P) Ltd., At/Po-
Hirma, Jharsuguda, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 39 7
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 27.6.08 29.7.08 2016000 7.8.08 19.9.08 7.1.09 18.11.08 7.01.09 19.01.09 36000
Sponge 78SMC Power Generation Ltd. At-Vill-
Hirma, Jharsuguda, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 206 40
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
150000
Reduced
to
105000
vide
MOC'slett
er No.
23021/24/
2004-
CPD dt
27.3.08 126000 126000 3.7.08 5.8.08 10080000 6.9.08 24.9.08 3.2.09 3.2.09 3.2.09 3.2.09 108000
Latesubmission
of coal
requirmrnt date
by Party. FSA
Qty. 108000 te.
Sponge 79
Sponge Udyog (P) Ltd., Vill-
Jaibhal, PO- Kalunga, Dist-
Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
4 39 51
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 27.6.08 30.10.08 2016000 1.11.08 29.12.08 29.7.09 19.8.09 12.3.10 12.3.10 36000
Sponge 80
SPS Sponge Iron Ltd.(Addl.
Linkage), Badmal,Jharsuguda,
Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 29 6
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
60,000 27.3.08 72000 72000 8.7.08 1.9.08 4032000 14.4.09 14.4.09 9.10.09 5.11.09 5.11.09 5.11.09 72000
Sponge 81Sree Metaliks Ltd., At- Dist- Angul,
Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 127 28
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 3.6.08 19.7.08 2016000 19.7.08 30.7.08 15.12.08 14.11.08 23.01.09 31.01.09 36000
Sponge 82Sree Metaliks Ltd., At- Dist- Angul,
Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 127 28
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 3.6.08 20.6.08 2016000 20.6.08 17.7.08 15.12.08 14.11.08 23.01.09 31.01.09 36000
Sponge 83
Sree Metaliks Ltd., At- Loidapada
(Barbil), Guali, Dist- Keonjhar,
Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 130 29
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
90,000 27.3.08 108000 108000 28.5.08 16.6.08 6048000 26.6.08 17.7.08 31.12.08 27.11.08 31.12.08 6.02.09 108000
Sponge 84
Sri Balaji Metallics (P) Ltd. , At-
Kherbhandh, Po-Ranto Birkera,
Sundargarh Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 179 36
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 18000 3.7.08 5.8.08 1008000 19.9.08 9.3.09 10.9.09 23.9.09 23.9.09 23.9.09 18000
Late submission
of Coal
requirment date
by the Party
Sponge 85
Sri Ganesh Sponge Iron (P) Ltd., At-
Kutugaon, PO-Chipinda, Dist-
Keonjhar, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 224 14
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 20.6.08 5.8.08 2016000 13.8.08 18.8.08 9.4.09 9.4.09 9.4.09 9.4.09 36000
Sponge 86Sri Hardev Steels Pvt. Ltd At-Vill-
Suniamuhan, Dist- Cuttack6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 157 33
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 18000 1.7.08/ 16.7.086.8.08 1008000 19.9.08 16.10.08 1.9.09 3.9.09 3.9.09 3.9.09 18000
Late submission
of Coal
requirment date
by the Party
Page 15 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
Sponge 87
Sumrit Metaliks Pvt. Ltd., At Vill-
Soyabali, PO- Barbil-758035, Dist-
Keonjhar, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 196 38
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
15,000 27.3.08 18000 18000 17.7.08 17.7.08 1008000 25.7.08 6.9.08 24.7.09 24.7.09 24.7.09 24.7.09 18000
Sponge 88
Surendra Mining Industries Pvt. Ltd.
At/Vill- Barhamusa, Bonai,
Sundargarh
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 92 23
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 20.6.08 18.7.08 2013000 29.7.08 6.9.08 28.2.09 3.3.09 3.3.09 3.3.09 36000
Sponge 89
Surya Sponge Iron Ltd., At-
Budhakendua, PO- KalkaLa-
754082, Dist- Jajpur, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 202 39
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 3.7.08 21.8.08 2016000 28.8.08 22.12.08 2.6.09 9.6.09 9.6.09 9.6.09 36000
Sponge 90
Swastik Ispat (P) Ltd., At-
Kuarmunda, Birmitrapur,
Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 24 14
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 3.7.08 12.7.08 2016000 12.7.08 23.7.08 9.3.09 18.3.09 18.3.09 18.3.09 32400FSA Qty. 32400
te.
Sponge 91
Swastik Ispat (P) Ltd., At-
Kuarmunda, Birmitrapur,
Sundergarh, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
4 72 55
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000
Sponge 92
Thakur Prasad Sao & Sons P.Ltd.
Unit-iii ( FormerlyMangalam Ispat
(P) Ltd.) , Po-Ushra Naikinbahal,
Kuarmunda, Sundargarh
6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 60 10
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 28.5.08 16.6.08 2016000 12.7.08 16.9.08 10.7.08 10.9.09 10.9.09 10.9.09 36000
Late submission
of Coal
requirment date
by the Party
Sponge 93
Thakur Prasad Sao & Sons P.Ltd.
Unit-I (Formerly Bajrang Ispat (P)
Ltd. ), At- Naikanbahal,
Kuarmunda, Rourkela, Orissa
6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 58 10
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 28.5.08 16.6.08 2016000 12.7.08 16.9.08 10.7.08 10.9.09 10.9.09 10.9.09 36000
Late submission
of Coal
requirment date
by the Party
Sponge 94TR Chemicals Ltd., At- Belpada,
Bamra, Dist- Sambalpur, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 16 4
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
60,000 27.3.08 72000 72000 18.6.08 20.6.08 4032000 20.6.08 1.7.08 17.3.09 18.3.09 18.3.09 18.3.09 72000
Sponge 95TR Chemicals Ltd., At- Belpada,
Bamra, Dist- Sambalpur, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
2 16 4
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 27.6.08 10.7.08 2016000 19.9.08 17.11.08
9.4.09
for kiln
III
/18.9.09
for kiln
IV
9.4.09 9.4.09 9.4.09 36000
Late submission
of Coal
requirment date
by the Party
Sponge 96
Vasundhara Metaliks (P) Ltd., At
Vill-Podajalanga, PO- Bilaimunda,
Dist- Sundergarh, 7700245
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 173 35
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
12,000 27.3.08 14400 14400 18.5.08 16.6.08 806400 6.9.08 25.5.09 3.9.09 3.9.09 3.9.09 3.9.09 14400Addl. BG
submitted
Sponge 97Vikram Pvt. Ltd., At- Tumkela,
Bonai, Sundergarh, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 181 36
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
60,000 27.3.08 72000 72000 28.5.08 20.6.08 4032000 10.7.08 12.11. 08 2.6.09 8.6.09 8.6.09 8.6.09 72000
Sponge 98
Viraja Steel & Power Ltd., At-
Suniamuhan, PO- Mancheswar -
754 027, Via- Chasapar, Dist-
Cuttack ( Formerly Shiva Metaliks
P.Ltd.)
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 68 20
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
12,500 27.3.08 15000 15000 20.6.08 25.6.08 840000 25.6.08 7.7.08 2.6.09 9.6.09 9.6.09 9.6.09 15000
Sponge 99Viraz Steel & Energy Ltd., At-
Gurupali, Dist- Sambalpur, Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 212 40
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
105,000 27.3.08 126000 126000 3.7.08 12.7.08 7056000 12.7.08 28.7.08 23.1.09 27.12.08 23.01.09 29.01.09 126000
Sponge 100Visa Steel Ltd., In front of POSCO
Ltd., Kanga Nagar, Dt. Jajpur Orissa6.11.07
23011/52/20
07-CPD
dt.29.08.07
4 70 55
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
300,000 27.3.08 360000 360000 10.6.08 25.7.08 20160000 25.7.08 13.8.08 2.4.09 2.4.09 2.4.09 2.4.09 360000
Sponge 101
Vishal Metaliks Pvt.Ltd., At-
Barhamusa, Tahsil- Bonai, Dist-
Sundergarh, Orissa- 770038
6.11.07
23011/52/20
07-CPD
dt.29.08.07
3 174 35
1st CLOA
/11.3.08 vide
CIL/CMO/Apex/
2805-2833
dt.19.03.08
30,000 27.3.08 36000 36000 20.6.08 18.7.08 2013000 29.7.08 8.9.08 28.2.09 3.3.09 3.3.09 3.3.09 36000
Sponge 102Bindal Sponge Ltd., Sunakhani,
Talcher
24.10.0
823400 23400 14.1.09 16.2.09 1310400 16.2.09 2.4.09 2.4.09 3.4.09 3.4.09 3.4.09 16200
FSA Qty. 16200
te. DD submitted
as CG
C.G. NOT SUBMITED.
Page 16 of 34
Date of
SLC( LT)
meeting
MOC's letter
reference
on SLC (LT)
Minutes
Item
no in
the
Minut
es
Sl no
in the
Minut
es
Page
No in
the
Minute
s
Date of
issue
of
Notice
Quantity for
which CG to
be submitted
Quantity in
tonne
CG
submissi
on date
Date of
confirma
tion of
BG
Amount of
CG in Rs
Date of
letter
Suppl
y
Month
Qty. for
which
FSA/MOU
signed
Date of
executio
n of FSA
Date of
executio
n of MOU
Date of
confirm
ation of
milesto
ne
complet
e in all
Date of
receipt
of
consent
for
importe
d coal
LOA Notice issued Initial
date of
submissi
on of
mile
stone
Sl No Name Of the Unit Remarks
Capacity
Approve
d
Quantity for which CG submitted
Date of
issue of
LOA
Sector
CLOA
Reference
details
SLC LT Reference detailds/Ref. No. of the
103
Jay Iron & Steel Ltd., Vill&PO-
Balanda-770031, Dist- Sundergarh,
Orissa
24.10.0
87200 7200 23.1.09 10.4.09 403200 14.4.09 30.7.09 17.8.09 19.9.09 19.9.09 19.9.09 7200
7449000 6,901,800 6,413,400
CPP
CPP 1Hindalco Industries Ltd., Hirakuda,
Dist. Sambalpur, Orissa.67.5 17.2.09 350000
CPP 2 Utkal Alumina International Ltd. 80 17.2.09 800000
CPP 3 Aditya aluminium Project Raygada 3X25 17.2.09 380000
1,530,000
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
C.G. NOT SUBMITED.
Old LOA cases prior to NCDP
Page 17 of 34
CG not submitted in time.
MoU singed as on 17.12.2011
Letter from Forest Department submitted after
due date.
Ready for FSA/MOU.
FSA signed on 22.12.10. Clarification
regarding coal block required.
Advised to sign FSA
Ipso- Facto case.2nd stage Forest clearance &
final water approval submitted after validity of
LoA but within validity of 2nd LOA.
Drawing coal under MoU
Notice issued for cancellation but MoC letter dt.
18.08.2011 advised not to take any coercive
action
Earlier drawing coal under MOU since
Aug'2010.Now,drawing coal under FSA dated
10.9.2011
Advised to sign FSA
i)ipso facto case.Capacity enhanced to 300MW
(250 MW is pre-NCDP).ii)Documents submitted
for 350 MW.iii)Forest clearance not
submitted.iv)Notice issued for
cancellation.Matter sub-judice
Ipso- Facto case. Final water approval submitted
after validity of 1st LoA but within validity of 2nd
LOA. All other milestoones achieved except
Synchronization and COD.
Status after verification
Page 18 of 34
Status after verification
All other milestones achieved except COD and
Synchronization
Notice issued for cancellation.Matter sub-judice.
Clearification regarding Forest Clearance from
Revenue Department submitted on 27.08.2011.
COD and Synchronization not submitted
All other milestones achieved except COD and
Synchronization(Part capacity LOA with SECL).
Location changed to Barela- Ghorkhpur, Seoni, MP.
All other milestones achieved except COD and
Synchronization. 50000 tes of coal released for
trial run, carpeting etc. under MOU dtd.15.11.2011
All other milestones achieved except COD and
Synchronization
All other milestones achieved expcet COD and
Synchronization.
Land acquired is less and deficiencies found in
investment decision, forest clearance,
commitment of equity and finacial closure
i)Env. Clerance remains in the name of Nelcast
Energy.ii)Final water allocation to be issued later
as per Govt. of AP letter. iii) BTG order not placed
within 3 months as directed by MoC letter dt.
19.11.10 iv)MoC letter dt. 15.06.2011 advised not
to forfiet CG / cancel LoA. Location changed to
Muthukur Mandal, Nellore, APi)ipso facto case. Capacity changed to 2x350
MW.ii)All other milestones achieved except COD
and Synchronization
All other milestones achieved except COD and
Synchronization.MOC vide ltr.dtd.2.6.11 clarified
the location of plant at Kakarapalli Village.
All other milestones achieved except COD and
Synchronization
i)ipso facto case. Capacity changed to 3x350
MW.ii)All other milestones achieved except COD
and Synchronization
All other milestones achieved expcet COD and
Synchronization
Ipso-Facto. Clarification required regarding
capacity of EUP of Coal block. All other milestones
achieved epxect COD and Synchronization.
Environmental clearance submitted for 2x525 MW
Page 19 of 34
Status after verification
Land doc submitted for less than 90%.
I)Investment decision and DPR submitted for
different capcity2X600MW (LoA for 660).
II)Environment clearance TOR only submitted.
III)Financial closure in-principle (IV) Only
recommendation to acquire land submitted.Sale
deed/lease deed not submitted. V)Document for
start of construction.& equity not submitted..
All milestones achieved but Synchronization and
COD achieved for 2 units only. FSA signed for 2
units.
CG not submitted
Fin.Closure submitted after due date but addl BG
submitted. Other milestones are under
verification. LOA still valid
Investment decision and DPR submitted for
different capcity3X350MW but LOA issued for 500
MW.Application for change of configuration has
been forwarded to MOP for
comments.Environment clearance for imported
coal,Financial closure in-principle,no document for
start of constrn.
Location mentioned in land doc. And MOEF doc
are different from location mentioned in LOA,
other milestones are under verfication. LOA still
valid.
MoEF clearance submitted for lignite coal with
<20% ash , not for raw coal.
All milestones submitted expect COD and
Synchronization.
Documents for investment decision, commitment
of equity not submitted. For Financial closure only
statement submitted.Other milestones are under
verification.
Documents for investment decision, commitment
of equity not submitted. For Financial closure only
statement submitted.For land only notification
submitted. Other milestones are under verification.
Page 20 of 34
Status after verification
FSA signed. Drawing coal since June,2010.
Board resolution not submitted. Further, project
being implemented by APPDCL,whereas LOA was
in name of APGENCO.
Deficiency in milestone relating to networth.
Milestone under verification.
Environmental clearance submitted for 2x525 MW
where as LOA issued for 600 MW.Other
documents under verification.
Ipso- Facto case,Size changed from 250 to
600MW.Clarification reg Capacity of EUP required.
COD nad Synchronization not yet submitted.
CG not Submitted.
Ipso facto case. Capacity changed to 300MW but
documents submitted for 350 MW.
Details as per revised LOA in Sl.No.15 in post-
NCDP cases.
i) Gap of Rs. 937 crs. in funding ii) forest clearance-
only self declaration that there is no forest
land.NOC from forest authority is required. COD
and Synchronization not yet submitted. LOA still
valid
Drawing coal under MoU
MoU signed on 02.03.2012 valid upto Mar'12
MOU signed on 07.09.11
Drawing coal under revised MOU dt.20.6.11
@ 140833 Tes/Month..
MOU signed for 100000 Tes.for carpeting,trial run.
Drawing coal under MoU
All other milestones achieved except COD and
Synchronization within validity.
Drawing coal under revised MOU
dt.14.7.11@ 73333 Tes/Month.
Drawing coal under revised MOU dt.4.7.11 @
73333 Tes/Month.
Page 21 of 34
Status after verification
Ready for FSA
Drawing coal under MOU since March,2010
which was valid till June,2011. MOU for
revised quantity yet to be signed.
FSA signed on 4.8.11. Supply not yet
commenced
less capacity installed
Part capacity comissioned.
FSA signed on 28.3.11. Coal released for 6
MW out of 24 MW (6+18) from July'11.
Due to non-acievement of milestones,LOA
cancelled.Matter subjudice
CG not submitted
Out of 12 MW WHRB 8 MW & AFBC 4 MW
Coal alloted for AFBC boiler.CG forfeited for
part capacity.
Page 22 of 34
Status after verification
FSA signed but supply not commenced
Due to non-acievement of milestones,LOA
cancelled.Matter subjudice
Due to non-acievement of milestones,LOA
cancelled.Matter subjudice
Due to non-acievement of milestones,LOA
cancelled.Matter subjudice
Clearification regarding AFBC and WHRB
capcity of CPP required from MOC/ CIL
CG not submitted
FSA signed
CG not submitted
Supplies commenced
CG not submitted
CG not submitted
Page 23 of 34
Status after verification
FSA signed for 6 MW supplies commenced &
forfeiture for balance capacity.Matter
subjudice
FSA signed for 14 MW and ACQ 76272
tes.CG of balance capacity forfeited
CG not submitted
CG not submitted
Due to non-acievement of milestones,LOA
cancelled.Matter subjudice
CG not submitted
FSA signed but supply is kept in abeyance
due to captive block
FSA signed.
FSA signed for 2x77 MW.Coal is being
released for 1 unit.2nd unit not commissioned
Due to non-acievement of milestones,LOA
cancelled.
Due to non-acievement of milestones,LOA
cancelled.Matter subjudice
CG not submitted
Out of 12 MW WHRB 4 MW & AFBC 8 MW
Coal alloted for AFBC boiler.CG for balance
capacity forfeited.
FSA signed and coal supplies commenced
Page 24 of 34
Status after verification
CG not submitted
Due to non-acievement of milestones,LOA
cancelled.Matter subjudice
CG not submitted
FSA was signed for 1 unit on 10.12.09. The
amendment to the FSA for 2nd unit signed on
06.08.10.
CG not submitted
Out of 20 MW WHRB 9.7 MW & AFBC 10.3
MW Coal alloted for AFBC boiler.Matter sub
judice
CG not submitted
FSA signed for first 2 units.CG forfeited for
balance 2 units
CG not submitted
Milestones under evaluation
CG not submitted
FSA signed on 28.12.10. Coal is being
released for one unit as other units not
commissioned.
Page 25 of 34
Status after verification
CG not submitted
Milestone submitted . Under verification.
Deficiency informed.
Milestone submitted . Under verification.
Deficiency informed.
CG not submitted
Milestone under verification.
Milestone submitted under verification.
CG not submitted
Milestone submitted. Under verification.
Deficiency informed.
Milestone submitted. Under verification.
Deficiency informed.
The purchaser has excersied the option to
surrender imported coal. Hence, FSA signed
for 14300 Tes
Page 26 of 34
Status after verification
Milestone submitted. Under verification.
Deficiency informed.
CG not submitted.
Approval for change in size from 25 + 36 to 20
+ 43 received from MOC/CIL. FSA signed on
12.01.11 for 20 MW and coal supplies
commenced.Documents for balance capacity
under verification
CG not submitted.
SD forfeited due to non commission of unit
within condition precedent period.
Pollution Clearance for 40 TPD in stead of
50TPD.
Page 27 of 34
Status after verification
Clarification on tapering linkage not received.
Hence FSA not signed.
Page 28 of 34
Status after verification
CG forfeited due to non submission of
milestonesin due time.
FSA signed on 10.01.11.
Page 29 of 34
Status after verification
Letter from MOC required for change of
destination of the unit.
Letter from MOC required for change of
destination of the unit.
Page 30 of 34
Status after verification
Pollution Clearance for 90 (40+50) TPD in
stead of 100TPD.
FSA signed for kiln III on 9.4.09 & for IV on
, Coal for kiln III is released.
Pollution Clearance for 300 TPD in stead of
325TPD.
Page 33 of 34