LOA STATUS AS ON 15.03.2012 Date of SLC( LT) meeting MOC's letter reference on SLC (LT) Minutes Item no in the Minut es Sl no in the Minut es Page No in the Minute s Date of issue of Notice Quantity for which CG to be submitted Quantity in tonne CG submissi on date Date of confirma tion of BG Amount of CG in Rs Date of letter Suppl y Month Power 1 Tata Power Co. Ltd., Unit-V, Jojobera, Jamshedpur. 02.08.2007 23011/52/20 07-CPD dt.29.08.200 7 7d 20 19 1st CLOA/11.3.08 vide CIL/CMO/Apex/ 2805-2833 dt.19.03.08 1 X 120 MW 27.3.08 550,000 Not submited - - Power 2 Rayalseema TPS Stage-III Unit-V, Kadapa 02.08.2007 23011/52/20 07-CPD dt.29.08.200 7 3 11 6 1st CLOA/11.3.08 vide CIL/CMO/Apex/ 2805-2833 dt.19.03.08 1 X 210 MW 27.3.08 1,010,000 1010000 22.11.08 14.3.09 44500000 18.3.09 4.12.09 Power 3 Rayalseema TPS Stage-III Unit-VI, Kadapa 02.08.2007 23011/52/20 07-CPD dt.29.08.200 7 5 21 9 1st CLOA/11.3.08 vide CIL/CMO/Apex/ 2805-2833 dt.19.03.08 1 X 600 MW 27.3.08 2,310,000 2310000 19.11.08 6.3.09 101700000 18.3.09 Power 4 Simhadri Expansion Stage-II Phase- I Visakhapatnam. 02.08.2007 23011/52/20 07-CPD dt.29.08.200 7 c - 28 1st CLOA/11.3.08 vide CIL/CMO/Apex/ 2805-2833 dt.19.03.08 1 X 500 MW 27.3.08 2,310,000 2310000 2.2.09 26.12.08 101640000 17.2.09 7.5.09 Power 5 Bellary TPS Unit-II, KPCL, Bellary, Karnataka. 02.08.2007 23011/52/20 07-CPD dt.29.08.200 7 3 1 5 1st CLOA/11.3.08 vide CIL/CMO/Apex/ 2805-2833 dt.19.03.08 1 X 500 MW 27.3.08 2,310,000 2310000 6.06.08 2.09.08 101640000 25.9.08 11.3.09 7.4.09 22.12.10 2310000 Power 6 Haldia Energy Ltd.( Formerly CESC Ltd.) Phase-I, Sutahata Railway Station, Haldia2 02.08.2007 23011/52/20 07-CPD dt.29.08.200 7 7d 11 18 1st CLOA/11.3.08 vide CIL/CMO/Apex/ 2805-2833 dt.19.03.08 1 X 600 MW(chan ged to 2X300 MW) 27.3.08 2,572,200 2,572,200 10.07.08 6.08.08 158480000 13.8.08 23.4.09 Power 7 GMR Kamalanga Energy Ltd.(Formely GMR Energy Ltd.), Phase-I, Kamalnga, Dhenkanal. 02.08.2007 23011/52/20 07-CPD dt.29.08.200 7 7b 4 13 1st CLOA/11.3.08 vide CIL/CMO/Apex/ 2805-2833 dt.19.03.08 1 X 500 MW 27.3.08 2,140,000 2140000 17.06.08 25.07.08 119840000 25.7.08 10.2.09 Power 8 Rajiv Gandhi Thermal Power Plant, Khedar, Hissar (earlier Hissar TPS) (HPGCL), Phase-I, Haryana 02.08.2007 23011/52/20 07-CPD dt.29.08.200 7 a - 27 1st CLOA/11.3.08 vide CIL/CMO/Apex/ 2805-2833 dt.19.03.08 Ph-I 100 MW, Ph- II 600 MW 27.3.08 3,240,000 3240000 24.06.08 24.10.08 142560000 24.10.08 6.4.09 29.7.09 10.11.10 2030000 Power 9 LANCO Babandh Power Ltd (FormelyLANCO Group Ltd.), Phase-I, Babandh Village, Dhenkanal. 02.08.2007 23011/52/20 07-CPD dt.29.08.200 7 7d 17a 19 1st CLOA/11.3.08 vide CIL/CMO/Apex/ 2805-2833 dt.19.03.08 660 MW 27.3.08 2,830,000 2830000 19.06.08 29.12.08 158480000 29.12.08 3.6.09 Power 10 Sterilite Energy Ltd (SEL) (Phase- 1), Jharsuguda, Orissa 02.08.2007 23011/52/20 07-CPD dt.29.08.200 7 7b 3 12 1st CLOA/11.3.08 vide CIL/CMO/Apex/ 2805-2833 dt.19.03.08 600 MW 27.3.08 2,570,000 2570000 21.04.08 25.06.08 143920000 25.6.08 24.12.08 20.12.09 10.9.2011 10.9.2011 2570000 Power 11 Talwandi Sabo Power Ltd., PSEB, Pansa, Talwani, Sabo, Bhatinda, Punjab. 02.08.2007 23011/52/20 07-CPD dt.29.08.200 7 3 9 6 1st CLOA/11.3.08 vide CIL/CMO/Apex/ 2805-2833 dt.19.03.08 3 X 600 MW(revis ed to 3X660) 27.3.08 7,720,000 7720000 11.6.09 18.7.09 339680000 14.8.08 6.2.09 Power 12 KVK Nilachal Power Pvt. Ltd, Kandarei, Cuttack Dist., Orissa (earlier location was Kamalangana, Dhenkanal Dist, Orissa) 02.08.2007 23011/52/20 07-CPD dt.29.08.200 7 7a 2 11 1st CLOA/11.3.08 vide CIL/CMO/Apex/ 2805-2833 dt.19.03.08 50 MW 27.3.08 240,000 240000 21.06.08 9.08.08 10560000 9.8.08 12.12.08 Power 13 Ind-Barath Energy(Utkal) Ltd. (formerly Ind Barath Energy Ltd.), Ib Valley 02.08.2007 23011/52/20 07-CPD dt.29.08.200 7 7b 2 12 1st CLOA/11.3.08 vide CIL/CMO/Apex/ 2805-2833 dt.19.03.08 1 x 250 MW 27.3.08 1,120,000 1120000 27.06.08 29.12.08 62720000 29.12.08 31.12.08 Qty. for which FSA/MOU signed Date of executio n of FSA Date of executio n of MOU Date of confirm ation of milesto ne complet e in all Date of receipt of consent for importe d coal LOA Notice issued Initial date of submissi on of mile stone Sl No Name Of the Unit Remarks Capacity Approve d Quantity for which CG submitted Date of issue of LOA Sector CLOA Reference details SLC LT Reference detailds/Ref. No. of the Page 1 of 34

LOA Status mar.pdf - mcl.gov.in · LOA STATUS AS ON 15.03.2012 Date of SLC( LT) meeting MOC's letter reference on SLC (LT) Minutes Item no in the Minut es Sl no in the Minut es Page

Embed Size (px)

Citation preview

LOA STATUS AS ON 15.03.2012

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Power 1Tata Power Co. Ltd., Unit-V,

Jojobera, Jamshedpur.02.08.2007

23011/52/20

07-CPD

dt.29.08.200

7

7d 20 19

1st

CLOA/11.3.08

vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

1 X 120

MW 27.3.08 550,000

Not

submited - -

Power 2Rayalseema TPS Stage-III Unit-V,

Kadapa02.08.2007

23011/52/20

07-CPD

dt.29.08.200

7

3 11 6

1st

CLOA/11.3.08

vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

1 X 210

MW 27.3.08 1,010,000 1010000 22.11.08 14.3.09 44500000 18.3.09 4.12.09

Power 3Rayalseema TPS Stage-III Unit-VI,

Kadapa02.08.2007

23011/52/20

07-CPD

dt.29.08.200

7

5 21 9

1st

CLOA/11.3.08

vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

1 X 600

MW 27.3.08 2,310,000 2310000 19.11.08 6.3.09 101700000 18.3.09

Power 4Simhadri Expansion Stage-II Phase-

I Visakhapatnam.02.08.2007

23011/52/20

07-CPD

dt.29.08.200

7

c - 28

1st

CLOA/11.3.08

vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

1 X 500

MW 27.3.08 2,310,000 2310000 2.2.09 26.12.08 101640000 17.2.09 7.5.09

Power 5Bellary TPS Unit-II, KPCL, Bellary,

Karnataka.02.08.2007

23011/52/20

07-CPD

dt.29.08.200

7

3 1 5

1st

CLOA/11.3.08

vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

1 X 500

MW 27.3.08 2,310,000 2310000 6.06.08 2.09.08 101640000 25.9.08 11.3.09 7.4.09 22.12.10 2310000

Power 6

Haldia Energy Ltd.( Formerly CESC

Ltd.) Phase-I, Sutahata Railway

Station, Haldia2

02.08.2007

23011/52/20

07-CPD

dt.29.08.200

7

7d 11 18

1st

CLOA/11.3.08

vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

1 X 600

MW(chan

ged to

2X300

MW)

27.3.08 2,572,200 2,572,200 10.07.08 6.08.08 158480000 13.8.08 23.4.09

Power 7

GMR Kamalanga Energy

Ltd.(Formely GMR Energy Ltd.),

Phase-I, Kamalnga, Dhenkanal.

02.08.2007

23011/52/20

07-CPD

dt.29.08.200

7

7b 4 13

1st

CLOA/11.3.08

vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

1 X 500

MW 27.3.08 2,140,000 2140000 17.06.08 25.07.08 119840000 25.7.08 10.2.09

Power 8

Rajiv Gandhi Thermal Power Plant,

Khedar, Hissar (earlier Hissar TPS)

(HPGCL), Phase-I, Haryana

02.08.2007

23011/52/20

07-CPD

dt.29.08.200

7

a - 27

1st

CLOA/11.3.08

vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

Ph-I 100

MW, Ph-

II 600

MW

27.3.08 3,240,000 3240000 24.06.08 24.10.08 142560000 24.10.08 6.4.09 29.7.09 10.11.10 2030000

Power 9

LANCO Babandh Power Ltd

(FormelyLANCO Group Ltd.),

Phase-I, Babandh Village,

Dhenkanal.

02.08.2007

23011/52/20

07-CPD

dt.29.08.200

7

7d 17a 19

1st

CLOA/11.3.08

vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

660 MW 27.3.08 2,830,000 2830000 19.06.08 29.12.08 158480000 29.12.08 3.6.09

Power 10Sterilite Energy Ltd (SEL) (Phase-

1), Jharsuguda, Orissa02.08.2007

23011/52/20

07-CPD

dt.29.08.200

7

7b 3 12

1st

CLOA/11.3.08

vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

600 MW 27.3.08 2,570,000 2570000 21.04.08 25.06.08 143920000 25.6.08 24.12.08 20.12.09 10.9.2011 10.9.2011 2570000

Power 11

Talwandi Sabo Power Ltd., PSEB,

Pansa, Talwani, Sabo, Bhatinda,

Punjab.

02.08.2007

23011/52/20

07-CPD

dt.29.08.200

7

3 9 6

1st

CLOA/11.3.08

vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

3 X 600

MW(revis

ed to

3X660)

27.3.08 7,720,000 7720000 11.6.09 18.7.09 339680000 14.8.08 6.2.09

Power 12

KVK Nilachal Power Pvt. Ltd,

Kandarei, Cuttack Dist., Orissa

(earlier location was Kamalangana,

Dhenkanal Dist, Orissa)

02.08.2007

23011/52/20

07-CPD

dt.29.08.200

7

7a 2 11

1st

CLOA/11.3.08

vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

50 MW 27.3.08 240,000 240000 21.06.08 9.08.08 10560000 9.8.08 12.12.08

Power 13

Ind-Barath Energy(Utkal) Ltd.

(formerly Ind Barath Energy Ltd.), Ib

Valley

02.08.2007

23011/52/20

07-CPD

dt.29.08.200

7

7b 2 12

1st

CLOA/11.3.08

vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

1 x 250

MW27.3.08 1,120,000 1120000 27.06.08 29.12.08 62720000 29.12.08 31.12.08

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

Page 1 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

Power 14

Ideal Energy Project Ltd., Plot

No.121, 2nd Floor, Telecom Nagar,

Nagpur.

12.11.08 270 MW17/18.4.

09390,000 390000 20.5.09 18.6.09 17160000 18.6.09 8.4.09

Power 15

Nava Bharat Power Pvt. Ltd.,

Mahalxmi House, 8-2-583/3, Road

No.9, Banjara Hills, Hyderabad.

12.11.08

1050

MW

(Revised)

17/18.4.

094,219,000 4219000 16.5.09 23.5.09 206844000 11.6.09

Power 16

DB Power Ltd., 6, Dwarka Sadan,

Press Complex, MP Nagar, Zone-1,

Bhopal.

12.11.082X600

MW

17/18.4.

092,497,000 2497000 16.5.09 7.7.09 109868000 8.7.09

Power 17

Jhabua Power Ltd. (formerly Kedia

Power Ltd.), Thapar House, 124,

Janpath, New Delhi.

12.11.08

300 MW

revised

to 1

x 600 MW

17/18.4.

09650,000 650000 5.5.09 5.6.09 28600000 11.6.09 9.11.09

Power 18

Adani Power Ltd., Adani House,

Power Division, Plot No.83,

Industrial Area, Sector-32, Gurgaon.

12.11.08 1980 MW17/18.4.

096,409,000 6409000 12.5.09 25.6.09 281996000 25.6.09 21.10.09

Power 19

Meenakshi Energy Pvt. Ltd.,

Meenakshi House, 8-2-418, Road

No.7, Banjara Hills, Hyderabad.

12.11.08 600 MW17/18.4.

092,023,000 2023000 16.5.09 23.5.09 89012000 11.6.09 3.7.09

Power 20

Thermal Power Tech Corpn. (I) Ltd.,

C/o M/s gayatri Projects Ltd., 6-3-

1090, TSR Towers, Raj Bhavan

Road, Somajiguda, Hyderabad.

12.11.08 1320 MW17/18.4.

094,273,000 4273000 18.5.09 29.6.09 188012000 4.7.09

Power 21

NSL Nagapatnam Power &

Infratech Pvt. Ltd. (formerly Sirkazhi

Power Projects), INS Icon, Door

No.8-2-634, 4th Floor, Road No.12,

Banjara Hills, Hyderabad.

12.11.08 1320 MW17/18.4.

094,273,000 4273000 19.5.10 22.6.10 205104000 26.6.10 -

Power 22

NCC Power Projects Ltd. (Formely

NCC Vansadhara Mega Power

Projects), Nagarjuna Constuction

Co, 4th Floor, MJ Towers, Road No.

12 Banjara Hills, Hydreabad

12.11.08 1320 MW17/18.4.

092,136,000 2136000 13.5.09 11.6.09 93984000 11.6.09

Power 23

Ind-Barath Energy (Utkal) Ltd., Plot

No.38, Road No.1, Film Nagar,

Jubilee Hills, Hyderabad.

12.11.08 450 MW17/18.4.

091,950,000 1950000 6.5.09 8.7.09 86800000 8.7.09 30.6.09

Power 24

East Coast Energy Pvt. Ltd., 7-1-24,

B Block, 5th Floor, Roxana Towers,

Green Land, Begumpet, Hyderabad.

12.11.08 1320 MW17/18.4.

094,273,000 4273000 14.5.09 23.5.09 188012000 11.6.09 26.6.09

Power 25

KVK Nilachal Power Pvt. Ltd., 6-3-

1109/19/1, 3rd Floor, Nava Bharat

Chambers, Raj Bhavan Road,

Somajiguda, Hyderabad.

12.11.08 700 MW17/18.4.

093,034,000 3034000 15.5.09 23.5.09 133496000 11.6.09 9.12.09

Power 26

GMR Kamalanga Energy

Ltd.(Formely GMR Energy Ltd.),

Phase-I, Kamalnga, Dhenkanal.

12.11.08 550 MW17/18.4.

092,384,000 2384000 12.5.09 4.7.09 104896000 8.7.09 12.10.09

Power 27

India Bulls Realtech Ltd., India Bulls

House, 448-451, Udyog Vihar,

Phase-V, Gurgaon. (Nasik TPS)

12.11.08

1320

MW

revised

to 5x270

MW

17/18.4.

091,831,000 1831000 15.5.09 23.5.09 80564000 11.6.09 18.12.09

Power 28

Jindal India Thermal Power Ltd.,

Plot No.12, Local Shopping

Complex, Sec.-B-1, Vasant Kunj,

New delhi.

12.11.08 #REF! 350 MW17/18.4.

091,457,000 1457000 23.5.09 64108000 11.6.09 7.8.09

Power 29North Chennai Thermal Power

Project(Stage-II)TNEB29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

600 25.5.10 2,315,000 2315000 19.6.10 14.7.10 143530000 17.7.10 24.8.10

Page 2 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

Power 30NTPC Tamilnadu Energy Company

Limited (a JV of NTPC and TNEB )29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

500 13.5.10 1,929,200 1929200 2.6.10 16.6.10 119610400 26.6.10 23.9.10

Power 31

M/s Chhattisgarh Power Venture

Pvt. Ltd., Special Purpose Vehicle

(Formely Videocon Industries Ltd)

29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

660 29.4.10 1,273,200 1273200 21.5.10 16.061 78938400 26.6.10 24.9.10Change in name

w.e.f. 15.09.2011

Power 32 Sterlite Energy Ltd. 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

1800 29.4.10 6,944,900 6944900 27.5.10 430583800 14.7.10 12.11.10 10.9.2011 10.9.2011 2314967

Power 33

Mahanadi Thermal Power Project of

M/s Lanco Mahandi Power Pvt

Limited

29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

660 29.4.10 2,546,500 Not

submitted

Power 34 Jindal Power Ltd. 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

1200 29.4.10 2,315,000 2315000 25.5.10 143530000 10.8.10

Power 35PEL Power Limited(an SPV of Patel

Engineering Limited) 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

500 29.4.10 1,929,200 1929200 20.5.10 119610400 27.8.10 23.9.10

Power 36Ind-Barath Power(Madras) Limited

of M/s Ind-Barath-infra (P) Ltd.29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

660 29.4.10 1,980,600 1980600 26.5.10 117800000 23.11.10

Power 37Raj West Power Ltd of JSW Energy

Ltd.29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

540 29.4.10 1,106,900 1106900 24.5.10 16.6.10 68627800 17.6.10 30.6.10

Power 38India Bulls Power Ltd. (Amravati

Thermal Power Project)08.04.10

23011/66/20

08-CPD

(Vol.iii)

dt.03.5.10

13th

CLOA/14.5.10

vide

CIL/S&M/LOA/4

7252(New

Pol)/483

dt.2.8.10

2x660

MW

revised

to 5 x

270 MW

24.8.10 2,546,500 2,546,500 24.8.10 157883000 3.11.10

Power 39NTPC,Solapur Thermal Power

Project,Dist-Solapur,Maharastra

Moc letter

No.23011/2

5/2009-

CPD

dtd.9.3.10

Moc letter

No.23011/25/

2009-CPD

dtd.9.3.10

13th

CLOA/14.5.10

vide

CIL/S&M/LOA/4

7252(New

Pol)/483

dt.2.8.10

2x660 11.8.10 5,093,000 5,093,000 8.9.10 315766000 11.11.10

Power 40NTPC,Mouda Extension,Dist-

Nagpur,Maharastra

Moc letter

No.23011/2

5/2009-

CPD

dtd.9.3.10

Moc letter

No.23011/25/

2009-CPD

dtd.9.3.10

13th

CLOA/14.5.10

vide

CIL/S&M/LOA/4

7252(New

Pol)/483

dt.2.8.10

2x660 11.8.10 5,093,000 5,093,000 8.9.10 315766000 11.11.10

TOTAL 107,794,200 104,697,700 9,224,967

OLD LOA CASES PRIOR TO NCDP

Page 3 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

Power 1

Karnataka Power Corpn. Ltd.,

Shakthi Bhavan, #82, Race Course

Road, Bangaluru.( Raichur- Unit-8

250MW 24.4.09 1,011,000 1,011,000 18.5.09 23.5.09 44484000 19.8.06 4.6.09 4.6.09 5.5.10 5.5.10 1011000

Power 2

Andhra Pradesh Power Generation

Corpn. Ltd. Vidyut soudha,

Khairatabad, Hyderabad. (

KrishnapatanamTPS)

2X800 MW 24.4.09 5,000,000 Not

Submitted23.3.07

Power 3

Andhra Pradesh Power Generation

Corpn. Ltd. Vidyut soudha,

Khairatabad, Hyderabad.

Kothagudam-VI

500MW 24.4.09 2,312,000 Not

Submitted19.8.06 4.4.09 4.4.09

Power 4

Tamilnadu Electricity Board,

Electricity Avenue, 10th Floor, 144,

Anna Salai, Chennai ( Mettur TPS)

600Mw 11.8.10 2,315,000 2,315,000 2.9.10 28.10.10 143530000 29.10.10

Power 5

Tamilnadu Electricity Board,

Electricity Avenue, 10th Floor, 144,

Anna Salai, Chennai ( North

Chennai TPS)

600MW 11.8.10 2,315,000 2,315,000 2.9.10 28.10.10 143530000 29.10.10

Power 6

Jindal India Thermal Power Ltd.

(formerly Jindal Photo Ltd.), Plot

No.12, Local Shopping Complex,

Sector-B1, Vasant Kunj, New Delhi.

250MW 24.4.09 1,204,000 1,204,000 4.6.09 52976000 19.8.06 16.3.09

Power 7

Neyveli Lignite Corpn., Corporate

Office, Block-1, Po: Neyveli,

Tamilnadu.(Ib TPS)

2X500MW 24.4.09 2,310,000 Not

Submitted19.8.06

Not

Submitted

Power 8

KVK Nilachal Power Pvt., 6-3-

1109/19/1, 3rd Floor, Nava Bharat

Chambers, Raj Bhavan Road,

Somajiguda, Hyderabad.

250MW 24.4.09 1,204,000 1,204,000 15.5.09 23.5.09 52976000 19.8.06 14.3.09 14.3.09

Power 9

Nava Bharat Power Pvt. Ltd.,

Mahalxmi House, 8-2-583/3, Road

No.9, Banjara Hills, Hyderabad.

Power 10

NLC Tamilnadu Power Ltd., Room

No.27, Coreporate Office, NLC

Block, Neyveli.(TutticorinTPS)

2X500MW 11.8.10 3000000 3,000,000 19.8.10 20.9.10 186000000 24.9.10 9.10.10

Power 11

Rajiv Gandhi TPP, Haryana Power

Generation Corpn. Ltd., 16/VII,

Vidyut Nagar, Hissar.(Hissar TPS)

500mw 24.4.09 2310000 2,310,000 1.8.09 11.8.09 101640000 30.3.07 25.4.09 25.4.09 30.11.09 2030000

Power 12

Damodar Valley Corporation, DVC

Tower, VIP Road, Kolkata.(

KodermaTPS)

2X500MW 24.4.09 4620000 Not

Submitted23.3.07 20.4.09

Power 13

Executive Director(FM),

Engineering Office Complex, Plot

No.A-8A, Sector-24, Post Box

No.13, NOIDA. (Simhadri TPS

Expn.)

500MW 24.4.09 2310000 2,310,000 8.6.09 101640000 23.3.07 7.5.09 07.09.11 1690000

Power 14

Executive Director(FM),

Engineering Office Complex, Plot

No.A-8A, Sector-24, Post Box

No.13, NOIDA. (Jhajjar TPS)

3X500MW 24.4.09 6950000 6,950,000 6.6.09 305800000 23.3.07 18.7.09 18.7.09 04.09.10 1690000

Power 15

Executive Director(FM),

Engineering Office Complex, Plot

No.A-8A, Sector-24, Post Box

No.13, NOIDA. (Ennore TPS)

Project name changed to Vellur

TPS.

2X500MW 24.4.09 4620000 4,620,000 6.6.09 203280000 23.3.07 17.8.09 17.8.09

Power 16

Maharashtra State Power

Generation corpn. Ltd.,

Bandra(East) Mumbai

(Khaperkheda TPS)

500MW 21.5.10 2312000 2,312,000 8.6.10 30.6.10 110976000 6.7.10 11.8.10 4.7.11 920000

Power 17

Maharashtra State Power

Generation corpn. Ltd.,

Bandra(East) Mumbai (Bhusawal

TPS)

1000MW 21.5.10 4624000 4,624,000 8.6.10 30.6.10 221952000 6.7.10 11.8.10

Power 18

Maharashtra State Power

Generation corpn. Ltd.,

Bandra(East) Mumbai (Parli Unit-II

TPS)

250MW 21.5.10 1204000 1,204,000 8.6.10 30.6.10 57792000 6.7.10 11.8.10 30.9.10 880000

Power 19

Maharashtra State Power

Generation corpn. Ltd.,

Bandra(East) Mumbai (Paras Expn.-

II TPS)

250MW 21.5.10 1204000 1,204,000 8.6.10 30.6.10 57792000 6.7.10 11.8.10 30.09.10 880000

Page 4 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

Power 20

Executive Director(FM),

Engineering Office Complex, Plot

No.A-8A, Sector-24, Post Box

No.13, NOIDA. (Mouda TPS)

500MW 24.4.09 2312000 2,312,000 8.6.09 29.6.09 110000000 14.7.09

Power 21

Andhra Pradesh Power Generation

Corpn. Ltd. Vidyut soudha,

Khairatabad, Hyderabad.

(Vijayawada-IV)

500MW 30.4.09 2312000 2,312,000 15.6.09 101728000 5.8.09 4.4.09 9.12.09 26.2.10 1690000

Power 22 Vishakapatnam TPS of HNPCL 22/23.10.08

23011/66/20

08-CPD

dt.27.11.200

8

1 - 4

6th

CLOA/06.01.09

vide

CIL/S&M/LOA/5

0 dt.05.02.2009

2x500

MW(chan

ged to

2X520)

5.2.09 4624000 4624000 19.3.09 203456000 6.5.09 4.8.11 4624000

TOTAL 60,073,000 45,831,000 15,415,000

Cement 1ACC LTD, Bargarh Cement Works,

Cement Nagar, Bardol, Bargarh 06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.1 1

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

25 27.3.08 240,000 240000 3.7.08 2.9.08 13440000 8.9.08 6.10.08 29.7.09 2.8.09 2.8.09 2.08.09 196700

Cement 2

Adhunik Metaliks Ltd, Chadri,

Hariharpur, Dist- Sundergarh

(Orissa)

06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.A.5 7

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

10 27.3.08 128,000

Cement 3

Calcon Cement Works,

(Clinkerisation Unit), At-Umrangshu,

NC Hills Dist., Assam. &

Grinding Unit, At-Lanka, Naogaon,

Assam.

06.11.07

23011/52/20

07-CPD

dt.29.08.07

20 9

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

14 179,000

Cement 4

OCL India Ltd. (New Clinkerisation),

Line No,.2, Rajgangpur,

Sundargarh, Orissa.

06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.4 8

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

17 27.3.08 217,000 217000 28.5.08 16.06.08 12152000 25.7.08 2.8.08 15.12.08 13.12.08 15.12.08 7.09 217000

Cement 5

OCL India Ltd. (Kapilas Cement

Works) (Standlone Cement

Gridning Unit), At-Biswali, Jagatpur,

Cuttack, Orissa.

06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.5 8

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

9 27.3.08 115,000 26000 28.5.08 16.06.08 1456000 25.7.08 2.8.08 15.12.08 13.12.08 15.12.08 22.1.09 26000

Cement 6Shiva Cement Works, Telighana,

Sundargarh, Orissa. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

1 10

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

26 27.3.08 332,000 127500 3.7.08 11.08.08 7140000 13.8.08 5.9.08 31.12.08 12.12.08 31.12.08 19.1.09 34770

TOTAL 1,211,000 610,500 474470

CPP 1ACC LTD, Bargarh Cement Works,

Cement Nagar, Bardol, Bargarh20.3.08

23011/81/20

07-CPD

dt.10.04.08

I.6 6

3rd CLOA

/7.6.08

CIL/CMO/SO/47

252(New

Pol)/dt30.6.08

30MW 9.8.08 163,000 163000 17.12.08 13.2.09 13440000 17.02.09 13.3.09 29.7.09 2.8.29 2.8.09 2.8.09 163000

CPP 2

Adhunik Metaliks Ltd, Chadri,

Hariharpur, Dist- Sundergarh

(Orissa) Formerly Neepaz Metaliks

(P) Ltd.

06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.A.5 1

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30MW 27.3.08 163,000 163000 10.6.08 22.9.08 9128000 25.9.08 18.10.08 23.9.09 23.9.09 23.9.09 23.9.09 163000

CPP 3

Aryan Ispat & Power (P) Ltd. At-

Bomlai, Tahsil- Rengali Sambalpur

Orissa

06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.B.17 5

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

45(Revis

ed to

6+18=24

MW

27.3.08 235,000 235000 31.5.10 14.7.10 14570000 14.7.10 12.8.10 28.3.11 130752

CPP 4Balasore Alloys Ltd., Balgopalpur,

Balasore, Orissa. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.94 25

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

135

(2x67.5)27.3.08 687,000 687000 16.7.08 18.7.08 38472000 25.7.08 1.12.08

CPP 5Bhagyanagar Solvent Extraction P.

Ltd., Secunderabad 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.44 19

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

11 27.3.08 60,000

CPP 6

Bhaskar Steel & Ferro Alloys Ltd.,

Badatumkela, Lahunipada,

Sundargarh, Orissa.

06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.105 26

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

12 27.3.08 65,000 65000 3.7.08 6.8.08 3640000 13.8.08 18.9.08 4.8.09 7.8.09 7.8.09 7.8.09 21660

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

Transfered to ECL

CEMENT

CAPTIVE POWER PLANT

Page 5 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

CPP 7

Bhubaneswar Power P. Ltd.,

Anantapur, Athagarh, Cuttack,

Orissa.

06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.93 25

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

135

(2x67.5)27.3.08 687,000 687000 27.6.08 29.7.08 38472000 19.9.08 18.11.08 11.12.10 687000

CPP 8

Bhushan Steel Ltd., (FORMERLY

BHUSAN STEEL & STRIPS LTD)

At-Meramandali, Dist- Dhenkanal

7101.A.13

23011/52/20

07-CPD

dt.29.08.07

1.A.13 2

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

110(77+3

3)27.3.08 501,000 501000 2.7.08 2.7.08 28056000 10.7.08 14.7.08 09.08.10 09.08.10 09.08.10 501000

CPP 9

Bhushan Energy Ltd., (LOA

transferred from BHUSAN STEEL

LTD) At-Meramandali, Dist-

Dhenkanal

06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.A.13 2

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

3X110

MW

revised

to

2x150+20

+12

27.3.08 1,358,132 1358132 2.7.08 2.7.08 84168000 10.7.08 08.04.10 22.10.11 22.10.11 1018599

CPP 10BRG Iron & steel Co. (P) Ltd., Vill-

Kuranti, Dist- Dhenkanal, Orissa 06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.A.11 2

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

60MW 27.3.08 313,000 313000 14.7.08 18.7.08 17528000 25.9.08Not

submited

CPP 11BRG Iron & steel Co. (P) Ltd., Vill-

Kuranti, Dist- Dhenkanal, Orissa 06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.A.11 2

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

90MW 27.3.08 458,000 458000 14.7.08 21.8.08 25648000 25.9.08Not

submited

CPP 12BRG Iron & steel Co. (P) Ltd., Vill-

Kuranti, Dist- Dhenkanal, Orissa 06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.A.11 2

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30

(2x15)27.3.08 163,000 163000 26.6.08 18.7.08 9128000 25.9.08

Not

submited

CPP 13

Dinbandhu Steel & Power Ltd., At-

Kalinga Nagar Growth Cenre,

Dasmania, Dist- Jajpur, Orissa

06.11.07

23011/52/20

07-CPD

dt.29.08.07

3.13 11

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

8 27.3.08 44,000 44000 10.6.08 19.7.08 2464000 6.9.08 24.10.08 19.12.09

CPP 14

Emami Paper Mills Ltd.,

Balgopalpur Industrial Area,

Balasore, Orissa.

06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.17 16

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15MW 27.3.08 82,000 82000 28.5.08 30.6.08 4592000 10.7.08 13.8.08 1.12.08 14.11.08 1.12.08 28.01.09 82000

CPP 15Facor Power Ltd., DP Nagar,

Randia, Bhadrak, Orissa. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.26 17

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

45 27.3.08 235,000 235000 5.9.08 7.11.08 13160000 14.11.08 2.6.09 30.7.10 30.7.11 235000

CPP 16Grasim Industries, Kotputi, Jaipur,

Rajasthan. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.34 17

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

46

(2x23)27.3.08 251,000

CPP 17Hindalco Industries Ltd., Hirakuda,

Dist. Sambalpur, Orissa. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.43 19

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

200MW

(2x100)27.3.08 1,018,000 1018000 28.6.08 21.8.08 57008000 28.8.08 12.12.08 29.1.10 28.1.10 17.2.10 17.2.10 1018000

CPP 18Jindal Photo, Mundegaon, Igatpuri,

Nasik, Maharashtra. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.85 24

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

50

(2x25)27.3.08 272,000

CPP 19

JSL Stainless Ltd.(formerly JSL

Limited), Kalinga Nagar, Industrial

Complex, Jajpur, Orissa.

06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.B.19 5

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

500

(4x125)27.3.08 2,278,000 1139000 5.7.08 5.7.08 63784000 1.7.08 21.7.08

1.12.08

/

17.3.09

1.12.08 31.12.08 5.02.09 1139000

CPP 20JSW Aluminium Ltd., Adduru

Sirsapalle, Bangarammapalem 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.36 18

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

80

(2x40)27.3.08 418,000

CPP 21JSW Aluminium Ltd., Adduru

Sirsapalle, Bangarammapalem 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.36 18

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

31

(2x15.5)27.3.08 169,000

CPP 22JSW Aluminium Ltd., Adduru

Sirsapalle, Bangarammapalem 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.36 18

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

40

(2x20)27.3.08 218,000

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

Page 6 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

CPP 23

Kohinoor Paper & Newspring Pvt.

Ltd., Falta Industrial Growth Centre,

Phase-II, No.18 & 19, Kalatalahat,

Diamond Harbour Sub-Division,

South 24 Paraganas Dist., West

Bengal.

06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.104 26

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

12

(2x6)27.3.08 65,000 65000 27.6.08 21.8.08 3640000 19.9.08 14.3.09 20.7.10 20.7.10 20.7.10 32500

CPP 24Maheswary Ispat Ltd., Khuntuni,

Cuttack, Orissa. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.B.25 6

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

24

(Changed

to 14

MW)

27.3.08 131,000 131000 26.6.08 26.12.08 7336000 29.12.08 5.3.09 28.1.11 28.1.11 76272

CPP 25Maheswary Ispat Ltd., Khuntuni,

Cuttack, Orissa. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.B.31 6

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

48

(2x24)27.3.08 262,000

CPP 26Maheswary Ispat Ltd., Rampai,

Cuttack, Orissa. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.B.9 4

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

110

(2x55)27.3.08 620,000

CPP 27MSP Metallics Ltd., At-Marakuta,

Dist- Jharsuguda- 768202, Orissa 06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.B.26 6

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

24

(2x12)27.3.08 131,000 131000 27.6.08 19.7.08 7336000 7.8.08 5.12.08

CPP 28MSP Sponge Iron Ltd., Haldiaguna,

Gobardhan, Keonjhar, Orissa. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.B.27 6

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

12 27.3.08 65,000

CPP 29 NALCO, Angul, Orissa. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.69 22

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

240MW

(2x120)27.3.08 1,093,000 1093000

23.6.08/

18.7.0821.7.08 61208000 29.7.08 3.10.08 8.7.09 10.7.09 10.7.09 10.7.09 1093000

Amendment of

FSA for Unit-X

executed on

30.07.10

CPP 30NALCO, Damanjodi, Koraput,

Orissa. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.74 23

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

18.5MW 27.3.08 101,000 10100023.6.08/

18.7.0821.7.08 5656000 29.7.08 3.10.08 30.7.10 30.7.10 101000

CPP 31

Nava Bharat Ventures Ltd.,

Kharagprasad, Near Meramandali,

Dhenkanal, Orissa.

06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.24 16

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

64

(2x32)27.3.08 334,000 334000 3.6.08 17.7.08 18704000 25.7.08 8.8.08 10.1.09 24.11.08 10.01.08 30.01.09 334000

CPP 32

OPG Power Generaton Ltd.26, KB

Dasan Road,Teynapeth, Chhenai-

600318

2x77 6.10.08 784000 784000 2.12.08 31.12.08 43904000 12.1.09 29.6.09 21.7.10 21.7.10 21.7.10 784000

CPP 33

Orissa Sponge Iron & Steel Ltd.

Palaspanga, Keonjhar, Orissa (

FormerlyOrissa Sponge Iron Ltd)

06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.7 22

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

18

(12+6)27.3.08 98,000 98000 3.7.08 6.8.08 5488000 7.8.08 1.9.08

CPP 34

Rathi Steel & Power Ltd. (formerly

Rathi Udyog Ltd.), At Vill-

Potapali/Sikirdi, PS-Burla, Dist-

Sambalpur, Orissa

06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.61 21

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30 27.3.08 163,000 16300015.5.08/

21.8.0819.9.08 9128000 25.9.08 25.10.08

CPP 35

Ravi Metaliks Pvt. Ltd.,

Sansinghari, Hirakud, Dist.

Sambalpur, Orissa.

06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.B.29 6

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

22 27.3.08 120,000

CPP 36

Scan Steel Ltd , At- Budhakata,

Biringotoli, Dist- Sundergarh, Orissa

(Formerly Shrishti Ispat Ltd)

06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.57 20

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

12 27.3.08 65,000 65000 3.6.08 2.7.08 3640000 12.7.08 21.7.08 15.12.08t28.11.0

831.12.08 22.01.09 43330 FSA Qty. 43330

CPP 37

Shree Renuka sugarLtd., 7th Floor,

Devegabd Glysem, Shiv Nagar,

Worli, Mumbai

06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.8 23

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15 27.3.08 82,000 82000 10.6.08 24.7.08 4592000 7.8.08 26.8.08 11.2.09 27.12.08 11.2.09 11.2.09 82000

CPP 38

Shri Mahavir Ferro Alloys (P) Ltd.

Jibahal, IDC, Kalunga-770031, Dist-

Sundergarh, Orissa

06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.B.28 6

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

12 27.3.08 65,000 65000 28.5.08 16.6.08 3640000 20.6.08 26.6.08 1.12.08 14.11.08 1.12.08 19.01.09 65000

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

Page 7 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

CPP 39

Shri Mahavir Ferro Alloys (P) Ltd.

Jibahal, IDC, Kalunga-770031, Dist-

Sundergarh, Orissa

06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.5 14

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

125 27.3.08 569,000

CPP 40

Shri Mahavir Ferro Alloys (P) Ltd.

Jibahal, IDC, Kalunga-770031, Dist-

Sundergarh, Orissa

06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.76 23

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

18 27.3.08 98,000 98000 27.6.08 18.7.08 5488000 19.9.08 1.12.08

CPP 41

Shri Mahavir Hi-Tech Chemicals

Pvt. Ltd., Ratanpur, Sundargarh,

Orissa.

06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.B.30 6

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

24

(2x12)27.3.08 131,000

CPP 42

Shyam Metallics & Energy Ltd.

(formerly Shyam DRI Power Ltd.),

At- Rengali, Dist- Sambalpur, Orissa

06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.A.9 2

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

25 27.3.08 136,000 136000 20.6.08 29.7.08 15232000 7.8.08 19.8.08 29.7.09 8.8.09 8.8.09 8.8.09 136000

CPP 43

Shyam Metallics & Energy Ltd.

(formerly Shyam DRI Power Ltd.),

At- Rengali, Dist- Sambalpur, Orissa

06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.A.10 2

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

50

(2x25)27.3.08 272,000 272000 20.6.08 29.7.08 7616000 7.8.08 19.8.08 8.12.09 10.12.09 10.12.09 10.12.09 272000

CPP 44Singhal Enprises (P) Ltd., At/Po-

Hirma, Jharsuguda, Orissa 06.11.07

23011/52/20

07-CPD

dt.29.08.07

3.14 12

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

8 27.3.08 44,000

CPP 45SMC Power Generation Ltd. At-Vill-

Hirma, Jharsuguda, Orissa 06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.B.11 4

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

25 27.3.08 136,000 136000 3.7.08 16.8.08 7616000 6.9.08 24.9.08 31.12.08 24.11.08 31.12.08 29.01.09 136000

CPP 46

Sree Metaliks Ltd., At- Loidapada

(Barbil), Guali, Dist- Keonjhar,

Orissa

06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.35 18

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

24 27.3.08 131,000 131000 28.5.08 16.6.08 7336000 26.6.08 17.7.08 31.12.08 27.11.08 31.12.08 6.02.09 56220 FSA Qty. 56220

CPP 47TCP Ltd., Thandalachirry, New

Gummidipoondi, TN. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.6 14

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

66.5 27.3.08 339,000

CPP 48Vedanta Aluminium Ltd., Vedanta,

Jharsuguda, Orissa.06.11.07

23011/52/20

07-CPD

dt.29.08.07

1.B.18 5

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

675MW

(5x135)27.3.08 3,075,000 3075000 28.4.08 4.6.08 172200000 6.6.08 21.6.08 8.8.08 15.11.08 13.08.09 1.1.09 3075000

CPP 49Vedanta Aluminium Ltd., Vedanta,

Jharsuguda, Orissa. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.81 17

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

540MW

(4x135)

2nd

Phase

27.3.08 2,460,000 2460000 28.4.08 4.6.08 137760000 6.6.08 5.12.08 17.8.09 20.8.0920.8.09 /

2.9.09

20.8.09 /

2.9.091230000

CPP 50Vikram Pvt. Ltd., Tumkela,

Rajamunda, Sundargarh, Orissa. 06.11.07

23011/52/20

07-CPD

dt.29.08.07

7.52 20

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

16(2x8) 27.3.08 87,000

CPP 51

OPG Power Generaton Ltd.26, KB

Dasan Road,Teynapeth, Chhenai-

600318

1X77 14.7.09 392000 392000 15.10.09 21952000 18.1.10

CPP 52 Bhushan Power and Steel Limited 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

260 26.4.10 458,200

CPP 53 Jindal Steel & Power Limited 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

540(100

MW

Tapering)

26.4.10 2,213,700 2213700 20.5.10 137249400 19.7.10 5.8.10 28.12.10 1803780

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

CG NOT SUBMITTED

Page 8 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

CPP 54Tannex Power of Tannex Power

Generation Limited29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

110 26.4.10 402,300

CPP 55 Nagai Power Private Limited 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

300 26.4.10 956,600 956600 22.5.10 24.6.10 59309200 25.6.10

CPP 56 Aarti Steel Ltd 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

50 26.4.10 235,100 235100 20.5.10 22.6.10 14576200 25.6.10 2.8.10

CPP 57Bhushan Power and Steel Limited

(Tapering)29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

100 26.4.10 1,065,900

CPP 58 Visa Steel Limited 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

75 26.4.10 367,700 367700 25.5.10 22.6.10 22797400 25.6.10

CPP 59 Usha Martin Limited 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

39 26.4.10 191,200 191200 19.5.10 11854400 14.7.10 24.9.10 14.02.11 191200

CPP 60 Action Ispat & Power (P) Limited 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

43 26.4.10 202,200 202200 21.5.10 17.5.10 12536400 3.6.10 29.6.10

CPP 61 Kanishk Steel Industries Limited 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

12 26.4.10 58,800

CPP 62 Rungta Mines Ltd, CPP-1 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

20 26.4.10 98,100 98100 24.5.10 16.6.10 6082200 25.6.10 23.7.10

CPP 63 Rungta Mines Ltd, CPP-II 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

20 26.4.10 98,100 98100 24.5.10 16.6.10 6082200 25.6.10 23.7.10

CPP 64

Dhunseri Petrochem & Tea

Ltd.(Formely South Asian

Petrochem Limited)

29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

7.5

(Revised

to 8 MW)

26.4.10 28,600 28600 20.5.10 28.6.10 1773200 25.6.10 30.6.10 21.10.11 14300

CG NOT SUBMITTED

CG NOT SUBMITTED

CG NOT SUBMITTED

Page 9 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

CPP 65 Viraj Steel & Energy Ltd. 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

12 26.4.10 58,800 58800 19.5.10 3645600 29.10.10

CPP 66 Easar Power Limited 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

60 26.4.10 228,800

CPP 67 Patnaik Steels and Alloys Limited 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

6.3(42%o

f 15 MW)26.4.10 34,300 34300 6.5.10 29.6.10 2126600 30.6.10 6.7.10 30.7.10 30.7.10 30.7.10 34300 FSA signed

CPP 68 Action Ispat & Power (P) Limited 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

20 + 43 26.4.10 267,337 267,337 21.5.10 17.5.10 18091600 3.6.10 29.6.10 12.01.11 12.01.11 98064

CPP 69 White Field paper Mills Limited 29.01.10

23011/66/20

08-CPD

(Vol.iii)

dt.26.2.10

12th

CLOA/17.3.10

vide

CIL/S&M/47252(

New Pol)/199

dt.5.4.10

65 26.4.10 297,800

TOTAL 29,150,669 21,874,869 14,816,977

Sponge 1

Action Ispat & Power (P) Ltd. At Vill-

Pandri Pathar & Marakuta, Dist-

Jharsuguda, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 164 34

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

105,000 27.3.08 126000 126000 28.5.08 20.6.08 7056000 26.6.08 7.7.08 13.1.09 15.11.08 13.01.09 13.01.09 126000

Sponge 2

Adhunik Metaliks Ltd, Chadri,

Hariharpur, Dist- Sundergarh

(Orissa) Formerly Neepaz Metaliks

(P) Ltd.

6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 10 34

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 10.6.08 22.9.08 2016000 25.9.08 17.10.08 7.1.09 15.11.08 7.01.09 19.01.09 36000

Sponge 3

Adhunik Metaliks ltd. Chadri,

Hariharpur, Dt. Sundargarh , Orissa

(Formerly Nepaz Metaliks)

6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 15 4

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 10.6.08 22.9.08 2016000 25.9.08 17.10.08 7.1.09 15.11.08 7.01.10 19.01.10 36000

Sponge 4

Agarsen Sponge Pvt. Ltd., At-

Mandiakudar, Chungimati,

Kansbahal, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 85 22

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 18000 3.6.08 19.7.08 1008000 7.8.08 1.12.08 9.6.09 18.6.09 18.6.09 18.6.09 18000

Late submission

of Coal

requirment date

by the Party

Sponge 5

Agarsen Sponge Pvt. Ltd., At-

Mandiakudar, Chungimati,

Kansbahal, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 85 22

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 18000 3.6.08 19.7.08 1008000 6.9.08 31.12.08 4.9.09 4.11.09 9.11.09

Late submission

of Coal

requirment date

by the Party

Sponge 6

Aryan Ispat & Power (P) Ltd. At-

Bomlai, Tahsil- Rengali Sambalpur

Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 192 38

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

60,000 27.3.08 72000 72,000 7.8.08 6.9.08 7.4.09 8.4.09 8.4.09 21.4.08 72000

Sponge 7

Aryan Ispat & Power (P) Ltd. At-

Bomlai, Tahsil- Rengali Sambalpur

Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 192 38

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

105,000 27.3.08 126000 126,000 7.8.08 6.9.08 4.8.09 23.10.09 23.10.09 10.2.10 126000

Sponge 8

Aryavrata Trading Pvt. Ltd., At-

Lohamellya, PO- Mohanpur, PS-

Jhargram, Dt- Medinapur, WB

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 199 39

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 18000 27.6.08 29.7.08 1008000 13.8.08 31.12.08 1.9.09 15.9.09 15.9.09 15.9.09 14400 FSA qty.14400

7.8.08 11088000Amendme

nt1.8.08

SPONGE

CG NOT SUBMITTED

CG NOT SUBMITTED

Page 10 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

Sponge 9

Bhagwati Steels (P) LTd. At-IDCO,

Plot No.5, Industrial Growth Centre,

Badmal, Jharsuguda, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 117 26

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 18000 28.6.08 27.10.08 1008000 27.10.08 22.12.08 9.4.09 9.4.09 9.4.09 9.4.09 18000

Sponge 10Bhusan Power & Steel Ltd., Tahsil-

Rengali, Dist. Sambalpur (Orissa)6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 3 2

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

300,000 27.3.08 360000 360000 28.5.08 20.6.08 20160000 19.7.08 25.7.08 29.7.09

Late submission

of Coal

requirment date

by the Party

Sponge 11

Bhushan Steel Ltd., (FORMERLY

BHUSAN STEEL & STRIPS LTD)

At-Meramandali, Dist- Dhenkanal

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 242 45

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

600,000 27.3.08 720000 720000 3.7.08 10.7.08 40320000 10.7.08 14.7.08 22.1.09 22.1.09 22.01.09 22.01.09 720000

Sponge 12

Bhushan Steel Ltd., (FORMERLY

BHUSAN STEEL & STRIPS LTD)

At-Meramandali, Dist- Dhenkanal

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 242 45

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

300,000 27.3.08 360000 360000 3.7.08 10.7.08 20160000 10.7.08 22.11.08 22.1.09 22.1.09 22.01.09 22.01.09 360000

Sponge 13BRG Iron & steel Co. (P) Ltd., Vill-

Kuranti, Dist- Dhenkanal, Orissa 6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 37 7

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

225000 (

4X100TP

D+350TP

D

27.3.08 270000

Sponge 14BRG Iron & steel Co. (P) Ltd., Vill-

Kuranti, Dist- Dhenkanal, Orissa 6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 56 7

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

60,000 27.3.08 72000 72000 20.6.08 11.8.08 4032000 13.8.08 12.9.08 3.6.09 8.6.09 8.6.09 8.6.09 72000

Sponge 15BRG Iron & steel Co. (P) Ltd., Vill-

Kuranti, Dist- Dhenkanal, Orissa 6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 36 9

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

120,000 27.3.08 144000

Sponge 16

Crackers India (Alloys) P. Ltd.,

Gobardhanpur, PO- Deojhar, Dist-

Keonjhar, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

4 69 55

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 18.6.08 6.8.08 2016000 7.8.08 12.11.08 10.1.09 10.1.09 10.01.09 21.01.09 36000

Sponge 17

Deepak Steel & Power LTd.,

Topadidhi, PO- Guali, Dist-

Keonjhar, Orissa (Formerly Deepak

MineralP.Ltd)

6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 24 5

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

105,000 27.3.08 126000 126000 20.6.08 6.8.08 7056000 6.9.08 17.2.09 5.9.09 9.9.09 9.9.09 1.12.09 126000

Late submission

of Coal

requirment date

by the Party

Sponge 18

Dhanbad Fuels P. LTD., At-

Mangapur Industrial Area, Raniganj,

WB

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 36 16

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 1800018.6.08/

18.7.0827.1.09 1008000 27.1.09 28.1.09 5.9.09 9.9.09 9.9.09 9.9.09 18000

Sponge 19

Dinbandhu Steel & Power Ltd., At-

Kalinga Nagar Growth Cenre,

Dasmania, Dist- Jajpur, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 151 32

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

60,000 27.3.08 72000 72000 10.6.08 19.7.08 4032000 6.9.08 24.10.08 22.1.09 24.2.09 25.2.09 25.2.09 72000

Late submission

of Coal

requirment date

by the Party

Sponge 20

Eastern Steels & Power Ltd.,

Lahandabud, Dist- Jharsuguda,

Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 113 26

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

100,000 27.3.08 120000 120000 26.5.08 16.6.08 6720000 26.6.08 21.7.08 7.4.09 8.4.09 8.4.09 29.4.09 120000

Sponge 21Electro Steel Casting Ltd., Haldia,

Dt- Purba, WB6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 4 2

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 28.5.08 30.6.08 2016000 10.7.08 22.7.08 13.1.08 13.1.09 29.01.09 29.01.09 36000

Sponge 22

Ganesh Sponge (P) Ltd.,

Krushnachandrapur, Golabandha,

Parang Angul, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 224 42

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 3.6.08 17.7.08 2016000 29.7.08 9.9.08 7.2.09 30.1.09 9.02.09 9.02.09 36000

Late submission

of Coal

requirment date

by the Party

Sponge 23

Haldia Steels Ltd., Angadpur,

Raturia Industrial area, Durgapur,

Bardwan, WB

6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 8 3

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 27.6.08 21.7.08 2016000 25.7.08 13.4.09 20.7.09 1.9.09 1.9.09 1.9.09 36000Addl BG

submitted

Sponge 24Ispat Damodar Ltd., Babagam, PS-

Neturia, Dt. Purulia WB6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 7 3

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

60,000 27.3.08 72000 72000 3.7.08Not

received4032000 19.10.09 23.11.09 27.11.09 28.11.09 28.11.09 28.11.09 72000

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

Page 11 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

Sponge 25Jagannath Sponge Pvt. Ltd., At-

Kuarmunda, Sundergrh, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 94 23

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 18000 27.6.08 10.7.08 1008000 10.7.08 28.7.08 20.4.09 6.5.09 6.5.09 6.5.09 18000

Late submission

of Coal

requirment date

by the Party

Sponge 26

Jai Balaji Jyoti Steels Ltd., , At-

Tainser, Rourkela, Orissa (

Formerly M/s Jyoti Steels Ltd.)

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 135 29

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

60,000 27.3.08 72000 72000 17.7.08 9.9.08 4032000 19.9.08 19.9.08

Late submission

of Coal

requirment date

by the Party

Sponge 27

Jai Balaji Jyoti Steels Ltd., , At-

Tainser, Rourkela, Orissa (

Formerly M/s Jyoti Steels Ltd.)

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 135 29

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

60,000 27.3.08 72000 72000 17.7.08 9.9.08 4032000 19.9.08 19.9.08 18.909 6.10.09 6.10.09 6.10.09 72000

Late submission

of Coal

requirment date

by the Party

Sponge 28

Jai Balaji Jyoti Steels Ltd., , At-

Tainser, Rourkela, Orissa (

Formerly M/s Jyoti Steels Ltd.)

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 33 16

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 17.7.08 9.9.08 2016000 19.9.08 19.9.08 18.9.09 6.10.09 6.10.09 6.10.09 36000

Late submission

of Coal

requirment date

by the Party

Sponge 29

Jai Hanuman Udyog Ltd., At-

Raghunathpali, Kolabira,

Jharsuguda, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 129 28

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 20.6.08 1.11.08 2016000 1.11.08 30.1.09 15.5.09 6.6.09 6.6.09 6.6.09 36000

Sponge 30Jain Sponge Pvt Ltd., Durlaga, Near

Jharsuguda, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 115 26

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

105,000 27.3.08 126000 126000 20.12.08 27.1.09 7056000 27.1.09 21.8.09 27.11.09 31.12.09 31.12.09 31.12.09 126000CG deposite time

extended

Sponge 31

Jay Iron & Steel Ltd., Vill&PO-

Balanda-770031, Dist- Sundergarh,

Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 131 29

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 20.6.08 29.7.08 2016000 19.9.08 10.11.08 3.6.09 26.6.09 26.6.09 26.6.09 36000

Late submission

of Coal

requirment date

by the Party

Sponge 32

Jay Iron & Steel Ltd., Vill&PO-

Balanda-770031, Dist- Sundergarh,

Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 65 19

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 3.7.08 10.4.09 2016000 19.10.09 23.6.09 10.01.11 36000

Sponge 33

K.J. Ispat Ltd., Kalinganagar

Industrial Complex, Duburi, Jajpur,

Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 54 18

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 28.5.08 1.7.08 2016000 10.7.08 18.7.08 13.1.09 25.11.08 15.01.09 19.01.09 36000

Sponge 34

Kalinga Sponge Iron Ltd., Plot No-

82, Sector-A, Industrial Estate,

kalunga, Rourkella, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

4 3 46

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 3.7.08 9.9.08 2016000 19.9.08 22.11.08 7.2.09 25.3.09 25.3.09 25.3.09 36000

Sponge 35

Kaushal Ferro Metal (P) Ltd,

Badbahal, P.O.- Kundukela,

Sundargarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 251 46

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

60,000 27.3.08 72000 7200028.5.08/

15.9.0829.9.08 4032000 16.10.08 30.1.09 9.6.09 10.7.09 10.7.09 10.7.09 72000

Late submission

of Coal

requirment date

by the Party

Sponge 36Kunj Iron Products Ltd., Merha

road, Chikunda, Dt, Dhanbad6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 2 2

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

21,000 27.3.08 25200

Sponge 37

Kusum Powermet(P) Ltd., At-

Kutugaon, PO- Chipinda, Dist-

Keonjhar, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 108 25

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 28.5.08 10.11.08 2016000 27.11.08 29.12.08 3.3.10 12.1.10 12.1.10 12.1.10 36000

Late submission

of Coal

requirment date

by the Party

Sponge 38Maa Mahamaya Industries Pvt. Ltd.,

At- R.G.Peta, Vizianagaram AP6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 33 15

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

110,000 27.3.08 132000 132000 20.6.08 30.7.08 7392000 30.7.08 11.8.08 31.1.09 23.1.09 23.01.09 31.01.09 126000

Sponge 39

Maa Samleswari Industries (P) Ltd.,

At- Lapanga P.S-Katarbaga, Dist-

Sambalpur, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 62 10

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 20.6.08 16.8.08 2016000 30.1.09 30.1.09 19.6.09 26.6.09 26.6.09 26.6.09 36000

LateSubmission

of name changed

letter

Sponge 40

Maa Shakumbari Sponge Pvt. Ltd.,

At- Kuarmunda - 770039,

Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 146 31

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 18.6.08 20.6.08 2016000 26.6.08 24.3.09 7.4.09 7.4.09 7.4.09 22.4.09 36000Addl. BG

submitted

C.G. NOT SUBMITED.

Page 12 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

Sponge 41

Mahakali Ispat Pvt. Ltd., At-

Gurundupali, PO-Bonaigarh-

770038, Dist- Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 187 37

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 18000 10.6.08 19.9.08 108000 19.9.08 18.3.09 31.8.09 2.9.09 2.9.09 2.9.09 18000

Sponge 42Maheswari Ispat (P) Ltd., Beldanga,

Dt- Bardwan WB6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 20 4

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000

Sponge 43

Maithon Ispat Ltd At-

Kalinga Nagar, Industrial Complex,

Dasamania, Dist- Jajpur, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 209 40

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

105,000 27.3.08 126000 126000 20.6.08 24.10.08 7056000 24.10.08 25.11.08 13.1.09 5.1.09 19.01.09 19.01.09 126000

Sponge 44

Maithon Ispat Ltd At-

Kalinga Nagar, Industrial Complex,

Dasamania, Dist- Jajpur, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 209 40

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

105,000 27.3.08 126000 126000 20.6.08 24.10.08 7056000 24.10.08 25.11.08 13.1.09 5.1.09 19.01.09 19.01.09 126000

Sponge 45

Metasponge, Plot No.201, Industrial

Estate, Kalunga-770 031,

Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 121 27

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

12,000 27.3.08 14400 14400 28.5.08 16.6.08 806400 10.7.08 17.7.08 7.4.09 8.4.09 8.4.09 8.4.09 14400

Late submission

of Coal

requirment date

by the Party

Sponge 46

Monika Holdings Pvt.Ltd.,

Badtumkela, PO- Tumkela, PS-

Lohnipara, Dist- Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 217 41

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000

Sponge 47MSP Metallics Ltd., At-Marakuta,

Dist- Jharsuguda- 768202, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 70 20

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 27.6.08 29.7.08 2016000 7.8.08 4.12.08 19.6.09 19.6.09 19.6.09 19.6.09 36000

Sponge 48N.K. Bhojani (P) Ltd., At- Rugudihi,

Keonjhar, Orissa 6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 72 20

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

12,000 27.3.08 14400 14400 28.5.08 16.6.08 806400 10.7.08 10.9.08 3.6.09 8.6.09 8.6.09 8.6.09 14400

Sponge 49N.K. Bhojani (P) Ltd., At- Rugudihi,

Keonjhar, Orissa 6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 25 5

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 18000 28.5.08 16.6.08 1008000 10.7.08 10.9.08 3.6.09 8.6.09 8.6.09 8.6.09 18000

Sponge 50

Ores Ispat (P) Ltd., At- Villl-

Gurundupalli, Bonai, Sundergarh,

Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 160 33

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000

Sponge 51

Patnaik Minerals P. Ltd.(Formerly

Orion Ispat Ltd)., Ramchandrapur,

PO Basantpur, Dt. Keonjar, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 61 10

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 29.4.08 13.8.08 2016000 28.8.08 15.9.08 9.6.09 9.6.09 9.6.09 9.6.09 36000

Sponge 52

Orissa Sponge Iron & Steel Ltd.

Palaspanga, Keonjhar, Orissa (

FormerlyOrissa Sponge Iron Ltd)

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 88 22

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

150,000 27.3.08 180000 180000 27.6.08 19.7.08 10080000 7.8.08 1.9.08 13.1.09 17.1.09 17.01.09 29.01.09 180000

Late submission

of Coal

requirment date

by the Party

Sponge 53

Patnaik Steels & Alloys Pvt. Ltd., At-

Purunapani, GP- Nayagarh, Dist-

Keonjhar, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 156 33

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

105,000 27.3.08 126000 126000 29.4.08 16.6.08 7056000 7.7.08 8.8.08 15.12.08 15.12.08 15.12.08 19.01.09 126000

Sponge 54

Pawan Jay Sponge Iron Ltd., AT-

Bijabahal, PO- Kumjharia, Dist-

Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 147 31

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 18000 27.6.08 27.10.08 1008000 27.10.08 15.1.09 17.3.08 9.4.09 9.4.09 9.5.09 18000

Sponge 55

Pawansut Sponge Pvt. Ltd., AT-

Badmal, Jhanda Chowk,

Jharsuguda, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 120 27

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 3.7.08 6.8.08 2016000 19.9.08 9.3.09 17.9.09 1.12.09 1.12.09 1.12.09 36000

Late submission

of Coal

requirment date

by the Party

Sponge 56

Prabhu Sponge (P) Ltd., Vill-

Jhagarpur, PS- Rajgangpur,

Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 30 6

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 18000 10.6.08 25.6.08 1008000 25.6.08 23.8.08 9.6.09 6.7.09 6.7.09 6.7.09 18000

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

Page 13 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

Sponge 57

Prabhu Sponge (P) Ltd., Vill-

Jhagarpur, PS- Rajgangpur,

Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

4 73 56

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 18000 10.6.08 12.7.08 1008000 12.7.08 23.8.08 9.6.09 6.7.09 6.7.09 6.7.09 18000

Sponge 58Ramsarup Lohh Udyog Ltd., At-

Kharagpur, Kolkata, WB6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 25 14

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

150,000 27.3.08 180000 18000027.6.08/

21.8.0811.10.08 10080000 16.10.08 30.12.09 2.4.09 8.6.09 8.6.09 8.6.09 180000

Sponge 59Rana Sponge Ltd., At-Kulei,

Parjang, Dist- Dhenkanal, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 23 14

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

105,000 27.3.08 126000 126000 10.6.08 19.7.08 7056000 19.7.08 1.12.08 17.3.08 18.3.09 18.3.09 18.3.09 126000

Sponge 60

Rathi Udyog Ltd., At Vill-

Potapali/Sikirdi, PS-Burla, Dist-

Sambalpur, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 220 42

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

150,000 27.3.08 180000 18000015.5.08/

21.8.0817.10.08 10080000 24.10.08 27.10.08 23.1.08 8.12.08 23.01.09 23.01.09 180000

Sponge 61

Reliable Sponge (P) Ltd.,

Jhaliaberna, Bonai, Dist-

Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 26 5

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 3.7.08 5.8.08 2016000 7.8.08 25.9.08 6.5.09 7.5.09 7.5.09 7.5.09 36000

Sponge 62Rungta Mines Ltd., Vill- Karakolha,

Dist-Keonjhar, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 33 6

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 3.7.08 12.7.08 2016000 12.7.08 1.11.09 9.7.09 7.10.09 7.10.09 7.10.09 36000

Sponge 63

Scan Steel Ltd , At- Budhakata,

Biringotoli, Dist- Sundergarh, Orissa

(Formerly Shrishti Ispat Ltd)

6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 43 8

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 3.6.08 2.7.08 2016000 12.7.08 21.7.08 22.1.09 23.11.08 22.01.09 22.01.09 36000

Sponge 64

Scan Steel Ltd , At- Budhakata,

Biringotoli, Dist- Sundergarh, Orissa

(Formerly Shrishti Ispat Ltd)

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 186 37

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

60,000 27.3.08 72000 72000 3.6.08 2.7.08 4032000 12.7.08 21.7.08 22.1.09 23.11.08 22.01.09 22.01.09 72000

Sponge 65

Seeta Sponge Iron Ltd., At- Plot

No.202, Kalunga, Industrial Estate,

PO- Kalunga, Dist- Sundergarh,

Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 74 21

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 28.5.08 26.6.08 2016000 12.7.08 28.7.08 31.12.08 19.11.08 31.12.08 20.01.09 36000

Sponge 66Seven Star Steel Ltd., At-

Kalendamal, Jharsuguda, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 171 35

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 20.6.08 29.7.08 2016000 13.8.08 16.9.08 15.5.09 3.6.09 3.6.09 3.6.09 36000

Late submission

of Coal

requirment date

by the Party

Sponge 67Seven Star Steel Ltd., At-

Kalendamal, Jharsuguda, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 171 35

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 20.6.08 29.7.08 2016000 7.8.08 16.9.08 15.5.09 3.6.09 3.6.09 3.6.09 36000

Sponge 68

Shiv Metaliks (P) Ltd., At-

Gurundipali, Bonai, Dist-

Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 162 33

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 3.7.08 5.8.08 2016000 13.8.08 27.10.08 2.4.09 3.4.09 3.4.09 3.4.09 36000

Sponge 69

Shree Hari Sponge Pvt.Ltd., At-

Kendrikela, PO- Bonai, Dist-

Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 122 27

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 3.7.08 27.10.08 2016000 27.10.08 29.12.08 6.5.09 15.5.09 15.5.09 15.5.09 36000

Sponge 70

Shree Jagannath Metaliks

Industries Ltd, At Vill-Khaparkhai,

PO-Palasponga, Dist- Keonjhar,

Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 188 37

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 3600010.6.08/

5.12.0829.1.09 2016000 30.1.09 26.2.09 5.8.09 5.9.09 5.9.09 5.9.09 36000

Sponge 71

Shree Madhav Ispat (P) Ltd., At-

Siriapalli, Po- Parmanandpur, Dist-

Jharsuguda, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 23 5

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 28.5.08 20.6.08 2016000 12.7.08 23.7.08 23.1.09 28.11.08 23.01.09 23.01.09 36000

Late submission

of Coal

requirment date

by the Party

Sponge 72

Shree Madhav Ispat (P) Ltd., At-

Siriapalli, Po- Parmanandpur, Dist-

Jharsuguda, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 78 21

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 28.5.08 20.6.08 2016000 12.7.08 23.7.08 23.1.09 28.11.08 23.01.09 23.01.09 36000

Late submission

of Coal

requirment date

by the Party

Page 14 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

Sponge 73

Shree Sai Shradha Steels Pvt. Ltd.,

At Vill-Bijabahal, PO-Kumjharia,

Dist- Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 238 44

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

7,500 27.3.08 9000 9000 28.5.08 20.6.08 504000 20.6.08 8.7.08 7.7.09 8.7.09 8.7.09 8.7.09 9000

Sponge 74

Shri Mahavir Ferro Alloys (P) Ltd.

Jibahal, IDC, Kalunga-770031, Dist-

Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 84 22

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 28.5.08 16.6.08 2016000 26.6.08 26.6.08 1.12.08 14.11.08 1.12.08 19.01.09 36000

Late submission

of Coal

requirment date

by the Party

Sponge 75

Shri Mahavir Ferro Alloys (P) Ltd.

Jibahal, IDC, Kalunga-770031, Dist-

Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 84 22

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

3,000 27.3.08 36000 36000 28.5.08 16.6.08 2016000 26.6.08 26.6.08 1.12.08 14.11.08 1.12.09 19.01.10 36000

Late submission

of Coal

requirment date

by the Party

Sponge 76Shyam DRI Power Ltd., At- Rengali,

Dist- Sambalpur, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 34 6

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

210,000 27.3.08 252000 252000 20.6.08 7.8.08 14112000 7.8.08 19.8.08 15.12.08 29.12.08 15.01.09 29.01.09 252000

Sponge 77Singhal Enprises (P) Ltd., At/Po-

Hirma, Jharsuguda, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 39 7

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 27.6.08 29.7.08 2016000 7.8.08 19.9.08 7.1.09 18.11.08 7.01.09 19.01.09 36000

Sponge 78SMC Power Generation Ltd. At-Vill-

Hirma, Jharsuguda, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 206 40

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

150000

Reduced

to

105000

vide

MOC'slett

er No.

23021/24/

2004-

CPD dt

27.3.08 126000 126000 3.7.08 5.8.08 10080000 6.9.08 24.9.08 3.2.09 3.2.09 3.2.09 3.2.09 108000

Latesubmission

of coal

requirmrnt date

by Party. FSA

Qty. 108000 te.

Sponge 79

Sponge Udyog (P) Ltd., Vill-

Jaibhal, PO- Kalunga, Dist-

Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

4 39 51

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 27.6.08 30.10.08 2016000 1.11.08 29.12.08 29.7.09 19.8.09 12.3.10 12.3.10 36000

Sponge 80

SPS Sponge Iron Ltd.(Addl.

Linkage), Badmal,Jharsuguda,

Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 29 6

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

60,000 27.3.08 72000 72000 8.7.08 1.9.08 4032000 14.4.09 14.4.09 9.10.09 5.11.09 5.11.09 5.11.09 72000

Sponge 81Sree Metaliks Ltd., At- Dist- Angul,

Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 127 28

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 3.6.08 19.7.08 2016000 19.7.08 30.7.08 15.12.08 14.11.08 23.01.09 31.01.09 36000

Sponge 82Sree Metaliks Ltd., At- Dist- Angul,

Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 127 28

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 3.6.08 20.6.08 2016000 20.6.08 17.7.08 15.12.08 14.11.08 23.01.09 31.01.09 36000

Sponge 83

Sree Metaliks Ltd., At- Loidapada

(Barbil), Guali, Dist- Keonjhar,

Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 130 29

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

90,000 27.3.08 108000 108000 28.5.08 16.6.08 6048000 26.6.08 17.7.08 31.12.08 27.11.08 31.12.08 6.02.09 108000

Sponge 84

Sri Balaji Metallics (P) Ltd. , At-

Kherbhandh, Po-Ranto Birkera,

Sundargarh Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 179 36

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 18000 3.7.08 5.8.08 1008000 19.9.08 9.3.09 10.9.09 23.9.09 23.9.09 23.9.09 18000

Late submission

of Coal

requirment date

by the Party

Sponge 85

Sri Ganesh Sponge Iron (P) Ltd., At-

Kutugaon, PO-Chipinda, Dist-

Keonjhar, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 224 14

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 20.6.08 5.8.08 2016000 13.8.08 18.8.08 9.4.09 9.4.09 9.4.09 9.4.09 36000

Sponge 86Sri Hardev Steels Pvt. Ltd At-Vill-

Suniamuhan, Dist- Cuttack6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 157 33

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 18000 1.7.08/ 16.7.086.8.08 1008000 19.9.08 16.10.08 1.9.09 3.9.09 3.9.09 3.9.09 18000

Late submission

of Coal

requirment date

by the Party

Page 15 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

Sponge 87

Sumrit Metaliks Pvt. Ltd., At Vill-

Soyabali, PO- Barbil-758035, Dist-

Keonjhar, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 196 38

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

15,000 27.3.08 18000 18000 17.7.08 17.7.08 1008000 25.7.08 6.9.08 24.7.09 24.7.09 24.7.09 24.7.09 18000

Sponge 88

Surendra Mining Industries Pvt. Ltd.

At/Vill- Barhamusa, Bonai,

Sundargarh

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 92 23

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 20.6.08 18.7.08 2013000 29.7.08 6.9.08 28.2.09 3.3.09 3.3.09 3.3.09 36000

Sponge 89

Surya Sponge Iron Ltd., At-

Budhakendua, PO- KalkaLa-

754082, Dist- Jajpur, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 202 39

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 3.7.08 21.8.08 2016000 28.8.08 22.12.08 2.6.09 9.6.09 9.6.09 9.6.09 36000

Sponge 90

Swastik Ispat (P) Ltd., At-

Kuarmunda, Birmitrapur,

Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 24 14

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 3.7.08 12.7.08 2016000 12.7.08 23.7.08 9.3.09 18.3.09 18.3.09 18.3.09 32400FSA Qty. 32400

te.

Sponge 91

Swastik Ispat (P) Ltd., At-

Kuarmunda, Birmitrapur,

Sundergarh, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

4 72 55

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000

Sponge 92

Thakur Prasad Sao & Sons P.Ltd.

Unit-iii ( FormerlyMangalam Ispat

(P) Ltd.) , Po-Ushra Naikinbahal,

Kuarmunda, Sundargarh

6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 60 10

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 28.5.08 16.6.08 2016000 12.7.08 16.9.08 10.7.08 10.9.09 10.9.09 10.9.09 36000

Late submission

of Coal

requirment date

by the Party

Sponge 93

Thakur Prasad Sao & Sons P.Ltd.

Unit-I (Formerly Bajrang Ispat (P)

Ltd. ), At- Naikanbahal,

Kuarmunda, Rourkela, Orissa

6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 58 10

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 28.5.08 16.6.08 2016000 12.7.08 16.9.08 10.7.08 10.9.09 10.9.09 10.9.09 36000

Late submission

of Coal

requirment date

by the Party

Sponge 94TR Chemicals Ltd., At- Belpada,

Bamra, Dist- Sambalpur, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 16 4

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

60,000 27.3.08 72000 72000 18.6.08 20.6.08 4032000 20.6.08 1.7.08 17.3.09 18.3.09 18.3.09 18.3.09 72000

Sponge 95TR Chemicals Ltd., At- Belpada,

Bamra, Dist- Sambalpur, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

2 16 4

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 27.6.08 10.7.08 2016000 19.9.08 17.11.08

9.4.09

for kiln

III

/18.9.09

for kiln

IV

9.4.09 9.4.09 9.4.09 36000

Late submission

of Coal

requirment date

by the Party

Sponge 96

Vasundhara Metaliks (P) Ltd., At

Vill-Podajalanga, PO- Bilaimunda,

Dist- Sundergarh, 7700245

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 173 35

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

12,000 27.3.08 14400 14400 18.5.08 16.6.08 806400 6.9.08 25.5.09 3.9.09 3.9.09 3.9.09 3.9.09 14400Addl. BG

submitted

Sponge 97Vikram Pvt. Ltd., At- Tumkela,

Bonai, Sundergarh, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 181 36

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

60,000 27.3.08 72000 72000 28.5.08 20.6.08 4032000 10.7.08 12.11. 08 2.6.09 8.6.09 8.6.09 8.6.09 72000

Sponge 98

Viraja Steel & Power Ltd., At-

Suniamuhan, PO- Mancheswar -

754 027, Via- Chasapar, Dist-

Cuttack ( Formerly Shiva Metaliks

P.Ltd.)

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 68 20

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

12,500 27.3.08 15000 15000 20.6.08 25.6.08 840000 25.6.08 7.7.08 2.6.09 9.6.09 9.6.09 9.6.09 15000

Sponge 99Viraz Steel & Energy Ltd., At-

Gurupali, Dist- Sambalpur, Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 212 40

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

105,000 27.3.08 126000 126000 3.7.08 12.7.08 7056000 12.7.08 28.7.08 23.1.09 27.12.08 23.01.09 29.01.09 126000

Sponge 100Visa Steel Ltd., In front of POSCO

Ltd., Kanga Nagar, Dt. Jajpur Orissa6.11.07

23011/52/20

07-CPD

dt.29.08.07

4 70 55

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

300,000 27.3.08 360000 360000 10.6.08 25.7.08 20160000 25.7.08 13.8.08 2.4.09 2.4.09 2.4.09 2.4.09 360000

Sponge 101

Vishal Metaliks Pvt.Ltd., At-

Barhamusa, Tahsil- Bonai, Dist-

Sundergarh, Orissa- 770038

6.11.07

23011/52/20

07-CPD

dt.29.08.07

3 174 35

1st CLOA

/11.3.08 vide

CIL/CMO/Apex/

2805-2833

dt.19.03.08

30,000 27.3.08 36000 36000 20.6.08 18.7.08 2013000 29.7.08 8.9.08 28.2.09 3.3.09 3.3.09 3.3.09 36000

Sponge 102Bindal Sponge Ltd., Sunakhani,

Talcher

24.10.0

823400 23400 14.1.09 16.2.09 1310400 16.2.09 2.4.09 2.4.09 3.4.09 3.4.09 3.4.09 16200

FSA Qty. 16200

te. DD submitted

as CG

C.G. NOT SUBMITED.

Page 16 of 34

Date of

SLC( LT)

meeting

MOC's letter

reference

on SLC (LT)

Minutes

Item

no in

the

Minut

es

Sl no

in the

Minut

es

Page

No in

the

Minute

s

Date of

issue

of

Notice

Quantity for

which CG to

be submitted

Quantity in

tonne

CG

submissi

on date

Date of

confirma

tion of

BG

Amount of

CG in Rs

Date of

letter

Suppl

y

Month

Qty. for

which

FSA/MOU

signed

Date of

executio

n of FSA

Date of

executio

n of MOU

Date of

confirm

ation of

milesto

ne

complet

e in all

Date of

receipt

of

consent

for

importe

d coal

LOA Notice issued Initial

date of

submissi

on of

mile

stone

Sl No Name Of the Unit Remarks

Capacity

Approve

d

Quantity for which CG submitted

Date of

issue of

LOA

Sector

CLOA

Reference

details

SLC LT Reference detailds/Ref. No. of the

103

Jay Iron & Steel Ltd., Vill&PO-

Balanda-770031, Dist- Sundergarh,

Orissa

24.10.0

87200 7200 23.1.09 10.4.09 403200 14.4.09 30.7.09 17.8.09 19.9.09 19.9.09 19.9.09 7200

7449000 6,901,800 6,413,400

CPP

CPP 1Hindalco Industries Ltd., Hirakuda,

Dist. Sambalpur, Orissa.67.5 17.2.09 350000

CPP 2 Utkal Alumina International Ltd. 80 17.2.09 800000

CPP 3 Aditya aluminium Project Raygada 3X25 17.2.09 380000

1,530,000

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

C.G. NOT SUBMITED.

Old LOA cases prior to NCDP

Page 17 of 34

CG not submitted in time.

MoU singed as on 17.12.2011

Letter from Forest Department submitted after

due date.

Ready for FSA/MOU.

FSA signed on 22.12.10. Clarification

regarding coal block required.

Advised to sign FSA

Ipso- Facto case.2nd stage Forest clearance &

final water approval submitted after validity of

LoA but within validity of 2nd LOA.

Drawing coal under MoU

Notice issued for cancellation but MoC letter dt.

18.08.2011 advised not to take any coercive

action

Earlier drawing coal under MOU since

Aug'2010.Now,drawing coal under FSA dated

10.9.2011

Advised to sign FSA

i)ipso facto case.Capacity enhanced to 300MW

(250 MW is pre-NCDP).ii)Documents submitted

for 350 MW.iii)Forest clearance not

submitted.iv)Notice issued for

cancellation.Matter sub-judice

Ipso- Facto case. Final water approval submitted

after validity of 1st LoA but within validity of 2nd

LOA. All other milestoones achieved except

Synchronization and COD.

Status after verification

Page 18 of 34

Status after verification

All other milestones achieved except COD and

Synchronization

Notice issued for cancellation.Matter sub-judice.

Clearification regarding Forest Clearance from

Revenue Department submitted on 27.08.2011.

COD and Synchronization not submitted

All other milestones achieved except COD and

Synchronization(Part capacity LOA with SECL).

Location changed to Barela- Ghorkhpur, Seoni, MP.

All other milestones achieved except COD and

Synchronization. 50000 tes of coal released for

trial run, carpeting etc. under MOU dtd.15.11.2011

All other milestones achieved except COD and

Synchronization

All other milestones achieved expcet COD and

Synchronization.

Land acquired is less and deficiencies found in

investment decision, forest clearance,

commitment of equity and finacial closure

i)Env. Clerance remains in the name of Nelcast

Energy.ii)Final water allocation to be issued later

as per Govt. of AP letter. iii) BTG order not placed

within 3 months as directed by MoC letter dt.

19.11.10 iv)MoC letter dt. 15.06.2011 advised not

to forfiet CG / cancel LoA. Location changed to

Muthukur Mandal, Nellore, APi)ipso facto case. Capacity changed to 2x350

MW.ii)All other milestones achieved except COD

and Synchronization

All other milestones achieved except COD and

Synchronization.MOC vide ltr.dtd.2.6.11 clarified

the location of plant at Kakarapalli Village.

All other milestones achieved except COD and

Synchronization

i)ipso facto case. Capacity changed to 3x350

MW.ii)All other milestones achieved except COD

and Synchronization

All other milestones achieved expcet COD and

Synchronization

Ipso-Facto. Clarification required regarding

capacity of EUP of Coal block. All other milestones

achieved epxect COD and Synchronization.

Environmental clearance submitted for 2x525 MW

Page 19 of 34

Status after verification

Land doc submitted for less than 90%.

I)Investment decision and DPR submitted for

different capcity2X600MW (LoA for 660).

II)Environment clearance TOR only submitted.

III)Financial closure in-principle (IV) Only

recommendation to acquire land submitted.Sale

deed/lease deed not submitted. V)Document for

start of construction.& equity not submitted..

All milestones achieved but Synchronization and

COD achieved for 2 units only. FSA signed for 2

units.

CG not submitted

Fin.Closure submitted after due date but addl BG

submitted. Other milestones are under

verification. LOA still valid

Investment decision and DPR submitted for

different capcity3X350MW but LOA issued for 500

MW.Application for change of configuration has

been forwarded to MOP for

comments.Environment clearance for imported

coal,Financial closure in-principle,no document for

start of constrn.

Location mentioned in land doc. And MOEF doc

are different from location mentioned in LOA,

other milestones are under verfication. LOA still

valid.

MoEF clearance submitted for lignite coal with

<20% ash , not for raw coal.

All milestones submitted expect COD and

Synchronization.

Documents for investment decision, commitment

of equity not submitted. For Financial closure only

statement submitted.Other milestones are under

verification.

Documents for investment decision, commitment

of equity not submitted. For Financial closure only

statement submitted.For land only notification

submitted. Other milestones are under verification.

Page 20 of 34

Status after verification

FSA signed. Drawing coal since June,2010.

Board resolution not submitted. Further, project

being implemented by APPDCL,whereas LOA was

in name of APGENCO.

Deficiency in milestone relating to networth.

Milestone under verification.

Environmental clearance submitted for 2x525 MW

where as LOA issued for 600 MW.Other

documents under verification.

Ipso- Facto case,Size changed from 250 to

600MW.Clarification reg Capacity of EUP required.

COD nad Synchronization not yet submitted.

CG not Submitted.

Ipso facto case. Capacity changed to 300MW but

documents submitted for 350 MW.

Details as per revised LOA in Sl.No.15 in post-

NCDP cases.

i) Gap of Rs. 937 crs. in funding ii) forest clearance-

only self declaration that there is no forest

land.NOC from forest authority is required. COD

and Synchronization not yet submitted. LOA still

valid

Drawing coal under MoU

MoU signed on 02.03.2012 valid upto Mar'12

MOU signed on 07.09.11

Drawing coal under revised MOU dt.20.6.11

@ 140833 Tes/Month..

MOU signed for 100000 Tes.for carpeting,trial run.

Drawing coal under MoU

All other milestones achieved except COD and

Synchronization within validity.

Drawing coal under revised MOU

dt.14.7.11@ 73333 Tes/Month.

Drawing coal under revised MOU dt.4.7.11 @

73333 Tes/Month.

Page 21 of 34

Status after verification

Ready for FSA

Drawing coal under MOU since March,2010

which was valid till June,2011. MOU for

revised quantity yet to be signed.

FSA signed on 4.8.11. Supply not yet

commenced

less capacity installed

Part capacity comissioned.

FSA signed on 28.3.11. Coal released for 6

MW out of 24 MW (6+18) from July'11.

Due to non-acievement of milestones,LOA

cancelled.Matter subjudice

CG not submitted

Out of 12 MW WHRB 8 MW & AFBC 4 MW

Coal alloted for AFBC boiler.CG forfeited for

part capacity.

Page 22 of 34

Status after verification

FSA signed but supply not commenced

Due to non-acievement of milestones,LOA

cancelled.Matter subjudice

Due to non-acievement of milestones,LOA

cancelled.Matter subjudice

Due to non-acievement of milestones,LOA

cancelled.Matter subjudice

Clearification regarding AFBC and WHRB

capcity of CPP required from MOC/ CIL

CG not submitted

FSA signed

CG not submitted

Supplies commenced

CG not submitted

CG not submitted

Page 23 of 34

Status after verification

FSA signed for 6 MW supplies commenced &

forfeiture for balance capacity.Matter

subjudice

FSA signed for 14 MW and ACQ 76272

tes.CG of balance capacity forfeited

CG not submitted

CG not submitted

Due to non-acievement of milestones,LOA

cancelled.Matter subjudice

CG not submitted

FSA signed but supply is kept in abeyance

due to captive block

FSA signed.

FSA signed for 2x77 MW.Coal is being

released for 1 unit.2nd unit not commissioned

Due to non-acievement of milestones,LOA

cancelled.

Due to non-acievement of milestones,LOA

cancelled.Matter subjudice

CG not submitted

Out of 12 MW WHRB 4 MW & AFBC 8 MW

Coal alloted for AFBC boiler.CG for balance

capacity forfeited.

FSA signed and coal supplies commenced

Page 24 of 34

Status after verification

CG not submitted

Due to non-acievement of milestones,LOA

cancelled.Matter subjudice

CG not submitted

FSA was signed for 1 unit on 10.12.09. The

amendment to the FSA for 2nd unit signed on

06.08.10.

CG not submitted

Out of 20 MW WHRB 9.7 MW & AFBC 10.3

MW Coal alloted for AFBC boiler.Matter sub

judice

CG not submitted

FSA signed for first 2 units.CG forfeited for

balance 2 units

CG not submitted

Milestones under evaluation

CG not submitted

FSA signed on 28.12.10. Coal is being

released for one unit as other units not

commissioned.

Page 25 of 34

Status after verification

CG not submitted

Milestone submitted . Under verification.

Deficiency informed.

Milestone submitted . Under verification.

Deficiency informed.

CG not submitted

Milestone under verification.

Milestone submitted under verification.

CG not submitted

Milestone submitted. Under verification.

Deficiency informed.

Milestone submitted. Under verification.

Deficiency informed.

The purchaser has excersied the option to

surrender imported coal. Hence, FSA signed

for 14300 Tes

Page 26 of 34

Status after verification

Milestone submitted. Under verification.

Deficiency informed.

CG not submitted.

Approval for change in size from 25 + 36 to 20

+ 43 received from MOC/CIL. FSA signed on

12.01.11 for 20 MW and coal supplies

commenced.Documents for balance capacity

under verification

CG not submitted.

SD forfeited due to non commission of unit

within condition precedent period.

Pollution Clearance for 40 TPD in stead of

50TPD.

Page 27 of 34

Status after verification

Clarification on tapering linkage not received.

Hence FSA not signed.

Page 28 of 34

Status after verification

CG forfeited due to non submission of

milestonesin due time.

FSA signed on 10.01.11.

Page 29 of 34

Status after verification

Letter from MOC required for change of

destination of the unit.

Letter from MOC required for change of

destination of the unit.

Page 30 of 34

Status after verification

Page 31 of 34

Status after verification

Pollution Clearance for 300TPD in stead of

350TPD.

Page 32 of 34

Status after verification

Pollution Clearance for 90 (40+50) TPD in

stead of 100TPD.

FSA signed for kiln III on 9.4.09 & for IV on

, Coal for kiln III is released.

Pollution Clearance for 300 TPD in stead of

325TPD.

Page 33 of 34

Status after verification