LO305 Basic Data for Process ManufacturingLO305
Release 630 29.08.2003
LO305 Basic Data for Process Manufacturing...............................................................................................................0-1
Copyright....................................................................................................................................................................0-2
Process Industry (PP - PI)......................................................................................................................................0-3
Prerequisites...........................................................................................................................................................0-4
Target Group..........................................................................................................................................................0-5
Introduction................................................................................................................................................................1-1
Course Goals (I).....................................................................................................................................................1-2
Course Goals (II)....................................................................................................................................................1-3
Course Objectives...................................................................................................................................................1-4
Course Content 1....................................................................................................................................................1-5
Course Content 2....................................................................................................................................................1-6
Overview Diagram 1..............................................................................................................................................1-7
Main Business Scenario.........................................................................................................................................1-8
PP-PI Overview..........................................................................................................................................................2-1
PP-PI Overview: Unit Objectives...........................................................................................................................2-2
Overview Diagram 2..............................................................................................................................................2-3
PP-PI - Integration with the R/3 System................................................................................................................2-4
Application Areas of PP-PI....................................................................................................................................2-5
Positioning of PP-PI in the Enterprise Model........................................................................................................2-6
Functions of PP-PI..................................................................................................................................................2-7
Data Flow in PP-PI.................................................................................................................................................2-8
PP-PI Overview: Summary....................................................................................................................................2-9
Exercise Data........................................................................................................................................................2-10
Exercises...............................................................................................................................................................2-13
Solutions...............................................................................................................................................................2-15
Master Data: Overview..............................................................................................................................................3-1
Master Data: Unit Objectives.................................................................................................................................3-2
Overview Diagram 3..............................................................................................................................................3-3
Master Data: Business Scenario.............................................................................................................................3-4
Master Data Overview............................................................................................................................................3-5
Material..................................................................................................................................................................3-6
Batch.......................................................................................................................................................................3-7
Resource.................................................................................................................................................................3-8
Production Version.................................................................................................................................................3-9
Master Recipe.......................................................................................................................................................3-10
Bill of Material - Definition.................................................................................................................................3-11
BOM Categories...................................................................................................................................................3-12
Master Data: Unit Summary.................................................................................................................................3-13
Materials.....................................................................................................................................................................4-1
Materials: Unit Objectives......................................................................................................................................4-2
Overview Diagram 4..............................................................................................................................................4-3
Materials: Business Scenario..................................................................................................................................4-4
Material Master Records: Definition......................................................................................................................4-5
Material Master Records: Views............................................................................................................................4-6
Material Type.........................................................................................................................................................4-7
Control Using Material Type..................................................................................................................................4-8
Industry Sectors and Material Types......................................................................................................................4-9
Field Selection: Influencing Factors.....................................................................................................................4-10
Field Selection: Influencing Factors - Field Reference........................................................................................4-11
Field Selection: Field Selection Group (Example)...............................................................................................4-12
Field Selection: Field Selection Groups and Field References............................................................................4-13
Field Selection: Link Rules..................................................................................................................................4-14
Customized Material Master................................................................................................................................4-15
Creating a Customized Material Master...............................................................................................................4-16
Influencing Factors for Screen Sequences...........................................................................................................4-17
Screens for Material Master Maintenance............................................................................................................4-18
Materials: Summary.............................................................................................................................................4-19
Exercises...............................................................................................................................................................4-20
Solutions...............................................................................................................................................................4-26
R/3 Classification System...........................................................................................................................................5-1
R/3 Classification System: Unit Objectives...........................................................................................................5-2
Overview Diagram 5..............................................................................................................................................5-3
R/3 Classification System: Business Scenario.......................................................................................................5-4
Classification..........................................................................................................................................................5-5
Classification in the R/3 System.............................................................................................................................5-6
R/3 Classification System.......................................................................................................................................5-7
R/3 Classification System: Example......................................................................................................................5-8
Class Types.............................................................................................................................................................5-9
Creating Classes...................................................................................................................................................5-10
Classifying Objects...............................................................................................................................................5-11
Classifying Objects for Process Manufacturing...................................................................................................5-12
Example : Classification of Resources.................................................................................................................5-13
R/3 Classification System: Summary...................................................................................................................5-14
Exercises...............................................................................................................................................................5-15
Solutions...............................................................................................................................................................5-19
Batches.......................................................................................................................................................................6-1
Batches : Unit Objectives.......................................................................................................................................6-2
Overview Diagram 6..............................................................................................................................................6-3
Batches : Business Scenario...................................................................................................................................6-4
Material and Batch.................................................................................................................................................6-5
Batch Management in the Logistics Process..........................................................................................................6-6
Levels of Uniqueness of a Batch............................................................................................................................6-7
Changing Batch Levels...........................................................................................................................................6-8
Converting Batch Numbers....................................................................................................................................6-9
Classification of a Material and a Batch - Characteristic Inheritance..................................................................6-10
Creating Classes for Batches I..............................................................................................................................6-11
Creating Classes for Batches II............................................................................................................................6-12
The Batch Where-Used List at Several Production Levels..................................................................................6-13
Batch-Specific Material Unit of Measure.............................................................................................................6-14
Batch-Specific Units of Measure as an Attribute of a Batch................................................................................6-15
Integration of Batch-Specific Units of Measure...................................................................................................6-16
Physical Quantity and Active Ingredient Quantity...............................................................................................6-17
The Central Unit of Measure for Active Ingredients............................................................................................6-18
Relation of Units of Measure...............................................................................................................................6-19
Percentage and User-defined Calculation............................................................................................................6-20
Active Ingredient Characteristics.........................................................................................................................6-21
Linking Master Data I..........................................................................................................................................6-22
Linking Master Data II.........................................................................................................................................6-23
Maintaining Units of Measurement in the Material Master.................................................................................6-24
Batches : Unit Summary.......................................................................................................................................6-25
Exercises...............................................................................................................................................................6-26
Solutions...............................................................................................................................................................6-31
Resources: Customizing.............................................................................................................................................7-1
Resources: Customizing: Unit Objectives..............................................................................................................7-2
Overview Diagram 7..............................................................................................................................................7-3
Resources: Customizing: Business Scenario..........................................................................................................7-4
Resources in the Company.....................................................................................................................................7-5
Resource Master Record........................................................................................................................................7-6
Functions of the Resource Category.......................................................................................................................7-7
Field Selection........................................................................................................................................................7-8
Capacity and Available Capacity...........................................................................................................................7-9
Capacity Categories for a Resource.....................................................................................................................7-10
Formulas in the Resource.....................................................................................................................................7-11
Example of a Formula..........................................................................................................................................7-12
Customizing a Default Resource..........................................................................................................................7-13
Resources: Customizing: Unit Summary.............................................................................................................7-14
Exercises...............................................................................................................................................................7-15
Solutions...............................................................................................................................................................7-22
Resources: Functions..................................................................................................................................................8-1
Resources: Functions: Unit Objectives..................................................................................................................8-2
Overview Diagram 8..............................................................................................................................................8-3
Resources: Functions: Business Scenario..............................................................................................................8-4
Resource Data I......................................................................................................................................................8-5
Resource Data II.....................................................................................................................................................8-6
Resource Management Views................................................................................................................................8-7
Cost Center / Activity Type / Resource..................................................................................................................8-8
Creating a Resource................................................................................................................................................8-9
Resource Network................................................................................................................................................8-10
Classification of Resources..................................................................................................................................8-11
Available Capacity of a Resource........................................................................................................................8-12
Maintaining Avail. Capacity Using Shift Sequences...........................................................................................8-13
Assignments to the Personnel System (HR).........................................................................................................8-14
Reporting Functions for Resources......................................................................................................................8-15
Resources: Functions: Unit Summary..................................................................................................................8-16
Exercises...............................................................................................................................................................8-17
Solutions...............................................................................................................................................................8-29
Production Version.....................................................................................................................................................9-1
Production Version: Unit Objectives......................................................................................................................9-2
Overview Diagram 9..............................................................................................................................................9-3
Production Version: Business Scenario.................................................................................................................9-4
Production Version: Definition..............................................................................................................................9-5
Production Version: Mass Processing (I)...............................................................................................................9-6
Production Version: Mass Processing (II)..............................................................................................................9-7
Recipe Editing........................................................................................................................................................9-8
Consistency Check.................................................................................................................................................9-9
Approval...............................................................................................................................................................9-10
Production Version: Unit Summary.....................................................................................................................9-11
Exercises...............................................................................................................................................................9-12
Solutions...............................................................................................................................................................9-16
Master Recipes: Operations and Phases...................................................................................................................10-1
Master Recipes, Operations, and Phases:Unit Objectives....................................................................................10-2
Overview Diagram 10..........................................................................................................................................10-3
Master Recipes, Operations, and Phases: Business Scenario...............................................................................10-4
Elements of a Master Recipe................................................................................................................................10-5
Structure of a Master Recipe (I)...........................................................................................................................10-6
Structure of a Master Recipe (II)..........................................................................................................................10-7
Functions of a Master Recipe...............................................................................................................................10-8
Non-Manufacturing Recipes................................................................................................................................10-9
Profile for the Recipe..........................................................................................................................................10-10
Recipe-Plant Assignment...................................................................................................................................10-11
Copying Recipes from Other Plants...................................................................................................................10-12
Reporting............................................................................................................................................................10-13
Recipe Header Data............................................................................................................................................10-14
Operations and Phases........................................................................................................................................10-15
Assignment of Primary and Secondary Resources.............................................................................................10-16
Standard and Default Values from the Resource...............................................................................................10-17
Relationships......................................................................................................................................................10-18
Relationships Between Master Recipes..............................................................................................................10-19
Scheduling in the Master Recipe........................................................................................................................10-20
Phase Duration...................................................................................................................................................10-21
Classification of Operations and Resources.......................................................................................................10-22
Checking the Recipe / Consistency Log.............................................................................................................10-23
Master Recipes, Operations, and Phases:Unit Summary...................................................................................10-24
Exercises.............................................................................................................................................................10-25
Solutions.............................................................................................................................................................10-34
Master Recipes: Materials........................................................................................................................................11-1
Master Recipes, Materials: Unit Objectives.........................................................................................................11-2
Overview Diagram 11..........................................................................................................................................11-3
Master Recipes, Materials: Business Scenario.....................................................................................................11-4
Typical Material Flow in the Process Industry.....................................................................................................11-5
Material-Recipe Assignment (I)...........................................................................................................................11-6
Bill of Material - Definition.................................................................................................................................11-7
Material-Recipe Assignment (II)..........................................................................................................................11-8
Bill of Material - Example....................................................................................................................................11-9
BOM Item Categories........................................................................................................................................11-10
Material List.......................................................................................................................................................11-11
Classification of BOM Components..................................................................................................................11-12
Material Quantity Calculation I..........................................................................................................................11-13
Material Quantity Calculation II........................................................................................................................11-14
Material Quantity Calculation - Example...........................................................................................................11-15
Material Quantity Calculation - Process (I)........................................................................................................11-16
Material Quantity Calculation - Process (II)......................................................................................................11-17
Material Quantity Calculation Screen................................................................................................................11-18
Product Quantity Calculation.............................................................................................................................11-19
Component Quantity Calculation (I)..................................................................................................................11-20
Calculation Using Active Ingredient Quantities of Batches...............................................................................11-21
Calculation Using Physical Batch Quantities.....................................................................................................11-22
Component Quantity Calculation (II).................................................................................................................11-23
Master Recipes, Materials: Unit Summary........................................................................................................11-24
Master Recipes, Materials: Exercises................................................................................................................11-25
Solutions.............................................................................................................................................................11-38
Master Recipes: Control View.................................................................................................................................12-1
Master Recipes, Control View: Unit Objectives..................................................................................................12-2
Overview Diagram 12..........................................................................................................................................12-3
Master Recipes, Control View: Business Scenario..............................................................................................12-4
Process Management............................................................................................................................................12-5
Creating and Downloading Control Recipes........................................................................................................12-6
Process Instructions and Control Recipes............................................................................................................12-7
Planning View and Control View........................................................................................................................12-8
PI Sheet.................................................................................................................................................................12-9
PI Sheet: Structure..............................................................................................................................................12-10
Process Instruction Maintenance........................................................................................................................12-11
Displaying Generated Process Instructions........................................................................................................12-12
PI Sheet Simulation in the Master Recipe..........................................................................................................12-13
Master Recipes, Control View: Unit Summary..................................................................................................12-14
Exercises.............................................................................................................................................................12-15
Solutions.............................................................................................................................................................12-21
Aspects of Co-Product Manufacturing.....................................................................................................................13-1
Aspects of Co-Product Manufacturing: Unit Objectives......................................................................................13-2
Overview Diagram 13..........................................................................................................................................13-3
Aspects of Co-Product Manufacturing:Business Scenario...................................................................................13-4
Typical Material Flow for the Manufacture of Co-Products................................................................................13-5
Material Master....................................................................................................................................................13-6
BOMS for the Manufacture of Co-Products........................................................................................................13-7
Material Costing: Objectives................................................................................................................................13-8
Executing a Material Cost Estimate.....................................................................................................................13-9
Aspects of Co-Product Manufacturing: Unit Summary.....................................................................................13-10
Exercises.............................................................................................................................................................13-11
Solutions.............................................................................................................................................................13-18
Aspects of Quality Inspection During Production....................................................................................................14-1
Aspects of Quality Inspection During Production: Unit Objectives....................................................................14-2
Overview Diagram 14..........................................................................................................................................14-3
Aspects of Quality Inspection During Production: Business Scenario................................................................14-4
Integration with Quality Management..................................................................................................................14-5
Inspection Lot.......................................................................................................................................................14-6
In-Process Inspection - Inspection Lot.................................................................................................................14-7
Assignment of Production Resource / Tool to Inspection Characteristics...........................................................14-8
Inspection Points, Partial Lots, and Batches........................................................................................................14-9
Specification of Batches Produced.....................................................................................................................14-10
Creating a Material Specification.......................................................................................................................14-11
In-Process Inspection - Example........................................................................................................................14-12
Aspects of Quality Inspection During Production: Unit Summary....................................................................14-13
In-Process Quality Inspection: Exercises..........................................................................................................14-14
Solutions.............................................................................................................................................................14-20
Engineering Change Management, Recipe Approval..............................................................................................15-1
Engineering Change Management, Recipe Approval: Unit Objectives...............................................................15-2
Overview Diagram 15..........................................................................................................................................15-3
Engineering Change Management, Recipe Approval: Business Scenario...........................................................15-4
Objects Linked to Engineering Change Management..........................................................................................15-5
Why Use Engineering Change Management for Changes?.................................................................................15-6
Engineering Change Management: With and Without History...........................................................................15-7
Change Master Record (Change Number)...........................................................................................................15-8
Structure of a Change Master Record..................................................................................................................15-9
Change Documentation......................................................................................................................................15-10
Engineering Change Mgmt - Validity Period of Recipe Objects.......................................................................15-11
Engineering Change Request / Order.................................................................................................................15-12
Structure of an Engineering Change Request.....................................................................................................15-13
Comparison of Change Master Records and Engineering Change Requests / Orders.......................................15-14
Changing Master Recipes...................................................................................................................................15-15
System Status Network Object...........................................................................................................................15-16
System Status Network for Engineering Change Requests / Orders..................................................................15-17
Recipe Approval (General Procedure)...............................................................................................................15-18
Recipe Approval (Statuses I)..............................................................................................................................15-19
Recipe Approval (Statuses II)............................................................................................................................15-20
Digital Signature (I)............................................................................................................................................15-21
Digital Signature (II)..........................................................................................................................................15-22
Activating the Digital Signature.........................................................................................................................15-23
Engineering Change Management, Recipe Approval: Unit Summary..............................................................15-24
Exercises.............................................................................................................................................................15-25
Solutions.............................................................................................................................................................15-35
Summary and Conclusion........................................................................................................................................16-1
Summary and Conclusion: Unit Objectives.........................................................................................................16-2
Overview Diagram 16..........................................................................................................................................16-3
Summary and Conclusion: Business Scenario.....................................................................................................16-4
Functions of PP-PI................................................................................................................................................16-5
Data Flow in PP-PI...............................................................................................................................................16-6
Life Cycle of a Process Order..............................................................................................................................16-7
Order Processing - Further Information...............................................................................................................16-8
Process Management - Further Information.........................................................................................................16-9
QM and Batches - Further Information..............................................................................................................16-10
Summary: Exercises...........................................................................................................................................16-11
Solutions.............................................................................................................................................................16-15
0
SAP AG 2001
LO305 Basic Data for Process Manufacturing
LO305LO305Basic Data for Process Manufacturing
Basic Data for Process Manufacturing
R/3 System Release 4.6C March 2001 5004 2382
0.2
SAP AG 2002
Copyright 2002 SAP AG. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.
Copyright
Notes on Trademarks: Some software products marketed by SAP AG and its distributors contain proprietary software
components of other software vendors. Microsoft®, WINDOWS®, NT®, EXCEL®, Word®, PowerPoint®, and SQL Server® are registered
trademarks of Microsoft Corporation. IBM®, DB2®, OS/2®, DB2/6000®, Parallel Sysplex®, MVS/ESA®, RS/6000®, AIX®, S/390®, AS/400®,
OS/390®, and OS/400® are registered trademarks of IBM Corporation. ORACLE® is a registered trademark of ORACLE Corporation. INFORMIX®-OnLine for SAP and INFORMIX® Dynamic ServerTM are registered trademarks
of Informix Software Incorporated. UNIX®, X/Open®, OSF/1®, and Motif® are registered trademarks of the Open Group. HTML, DHTML, XML, and XHTML are trademarks or registered trademarks of W3C®, World Wide
Web Consortium, Massachusetts Institute of Technology. JAVA® is a registered trademark of Sun Microsystems, Inc. JAVASCRIPT® is a registered trademark of Sun Microsystems, Inc., used under license for technology
developed and implemented by Netscape. SAP, SAP Logo, R/2, RIVA, R/3, ABAP, SAP ArchiveLink, SAP Business Workflow, WebFlow, SAP
EarlyWatch, BAPI, SAPPHIRE, Management Cockpit, mySAP.com Logo, and mySAP.com are trademarks or registered trademarks of SAP AG in Germany and several other countries all over the
world. All other products mentioned are trademarks or registered trademarks of their respective companies.
0.3
SAP AG 1999
Process Industry (PP - PI)
Level 2
ProcessManufacturing
LO060 5 daysMaster Data for Process Manufacturing
LO305 5 days
KANBAN
LO235 2 days
Variant Configuration Part 1
LO990 5 days
Classification
LO985 3 days
Capacity Planning
LO230 5 days
Special Features of LISin Production
LO275 2 days ProcessManagement
LO315 3 days
Level 3
Production Planning
LO210 5 days
Process FlowScheduler
LO320 3 days
Logistics Info Planning
LO935 2 days
Logistics Info System (LIS)
LO930 2 days
Detail Functions ofProcess Orders
LO310 5 days
Variant Configuration Part 2
LO991 3 days Batch Management
LO955 3 days
0.4
SAP AG 1999
Prerequisites
LO060 - Planning & Control for Process Manufacturing
0.5
SAP AG 1999
Audience
Members of project teams who are responsible for the introduction of material masters (including batch master records), resources, and master recipes (including BOMs) into the R/3 System.
Duration: 5 days
Target Group
Note: This training material is not intended to be used as self-study material but rather to complement the
trainer‘s explanations. It therefore includes space for noting down additional information.
1
SAP AG 1999
Course goals
Course objectives
Course content
Course overview diagram
Main business scenario
Introduction to course
Contents
Introduction
(C) SAP AG LO305 1
1.2
SAP AG 1999
This course will prepare you to maintain the basic data required for process manufacturing.This includes:
Material master and batches
Resources
Production versions
Master recipes
Material BOMs
Course Goals (I)
(C) SAP AG LO305 2
1.3
SAP AG 1999
Furthermore, you will be introduced to the following special aspects of process manufacturing:
Using engineering change management to edit a master recipe that requires approval
Visually reproducing the manufacture of co-products and costing of the materials involved
Planning a quality inspection during production
Preparing master data for active ingredient management
Course Goals (II)
(C) SAP AG LO305 3
1.4
SAP AG 1999
Make the most important system settings regarding the material master, resources, and master recipes with material lists
Describe the effects of these system settings on process manufacturing
Use engineering change management for recipe approval
Visually reproduce the manufacture of co-products
Perform a quality inspection in the system during production
At the conclusion of this course, you will be able to:
Course Objectives
(C) SAP AG LO305 4
1.5
SAP AG 1999
Unit 9 Production Versions
Unit 10 Master Recipes, Operations and Phases
Unit 11 Master Recipes,Materials
Unit 12 Master Recipes,Control View
Unit 13 Aspects of Co-ProductManufacturing
Unit 1 Introduction
Unit 2 PP-PI Overview
Unit 3 Master Data: Overview
Unit 4 Materials
Unit 5 R/3 Classification System
Unit 6 Batches
Unit 7 Resources: Customizing
Unit 8 Resources: Functions
Preface
Course Content 1
(C) SAP AG LO305 5
1.6
SAP AG 1999
Unit 16 Summary and Conclusion
Unit 14 Aspects of Quality Inspection During Production
Unit 15 Engineering ChangeManagement, Recipe Approval, and Further Functions
Course Content 2
(C) SAP AG LO305 6
1.7
SAP AG 1999
PP-PI Overview
Master Data: Overview
Materials
R/3 Classification System
Batches
Resources: Customizing
Resources: Functions
Production Version
Master Recipes: Operations and Phases
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
1111
11
22
33
44
55
66
77
88
99
1010
1212
1313
1414
1515
IntroductionIntroduction
Summary and Conclusion1616
Master Recipes: Materials
Overview Diagram 1
(C) SAP AG LO305 7
1.8
SAP AG 1999
As a member of a project team in a company, you are responsible for creating the basic data in the R/3 System.
The company is a process manufacturing enterprise with chemical and pharmaceutical divisions. It produces detergent, fertilizer, and headache tablets.
The basic data that you will define covers materials, batches, classes, resources, and production versions with master recipes and material BOMs.
Main Business Scenario
(C) SAP AG LO305 8
2
SAP AG 1999
Integration of PP-PI with the R/3 System
Application areas
Functions for representing process manufacturing in the R/3 System
Contents:
PP-PI Overview
(C) SAP AG LO305 1
2.2
SAP AG 1999
PP-PI Overview: Unit Objectives
Describe how PP-PI is integrated in the R/3 System
Tell which application areas exist for PP-PI
Name the functions PP-PI contains
At the conclusion of this unit, you will be able to:
(C) SAP AG LO305 2
2.3
SAP AG 1999
Introduction
Master Data: Overview
Materials
R/3 Classification System
Batches
Resources: Customizing
Resources: Functions
Production Version
Master Recipes: Operations andPhases
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
1111
11
33
44
55
66
77
88
99
1010
1212
1313
1414
1515
Summary and Conclusion1616
Master Recipes: Materials
22 PP-PI Overview
Overview Diagram 2
(C) SAP AG LO305 3
2.4
SAP AG 1999
PP - SOPSales & Operation Planning
PP - MPSMaster Prod. Scheduling
PP - MRPMaterial Rqmts Planning
PP - CRPCapacity Rqmts Planning
PP - SFCShop Floor Control
PP - PCProduct Costing
.
.
.
PP - PIProcess Industries
IntroductionIntroduction
R/3R/3Client / ServerClient / Server
ABAP/4ABAP/4
FIFI
COCO
AMAM
PSPS
WFWF
ISIS
MMMM
HRHR
SDSD
PMPM
QMQM
PPPP
PP-PI - Integration with the R/3 System
The R/3 System contains integrated application software that is based on an open three-level client/server architecture. It covers the entire range of business functionality a company requires. The system’s efficiency is achieved through an integration of different application components that represent a network of business functions. This guarantees a consistent execution of all business processes in every area of a company. All components work on the basis of real-time processing.
With its PP-PI component, SAP offers a set of functions that meet the requirements of production planning and control in process industries.
The PP-PI component is a fully integrated production planning and control system designed for process industries. Since it is an integral part of the R/3 production planning component PP, it is linked to other PP subcomponents such as Sales & Operations Planning (PP-SOP), Material Requirements Planning (PP-MRP), Capacity Requirements Planning (PP-CRP), and Shop Floor Control (PP-SFC).
In addition, PP and PP-PI are fully embedded in the logistics chain, consisting of the R/3 components Sales and Distribution (SD), Materials Management (MM), Production Planning (PP), and Quality Management (QM).
Furthermore, PP-PI is linked to applications of other business areas such as the Human Resources System (HR) and Controlling (CO).
(C) SAP AG LO305 4
2.5
SAP AG 1999
Process manufacturingProcess manufacturing
Target markets:
Batch manufacturingBatch manufacturing
CoCo--productsproducts / by/ by--productsproducts
Fully and partially automated linesFully and partially automated lines Lines with variable usagesLines with variable usages Variable production parametersVariable production parameters Quality assuranceQuality assurance Batch and production recordsBatch and production records
Chemical industry
Pharmaceutical industry
Food industry
Process-oriented electronics industry
Application Areas of PP-PI
PP-PI is designed for the batch-oriented process manufacturing company that uses integrated planning for its production processes. Ideally, PP-PI is used in companies of the chemical and pharmaceutical industry, the food, beverages, and tobacco industry as well as the process-oriented electronics industry.
PP-PI meets the following typical requirements of such companies:The production process is carried out in batches, that is, non-reproducible units that are characterized by certain specifications. In addition, many materials entering the manufacturing process are managed in batches with varying specifications.During the different manufacturing steps, products, co-products, by-products, and remaining materials are produced. If several planned materials are manufactured during one production run, they are called co-products.Information is exchanged between the process planning and the process control levels. Production is carried out in automated or partially automated lines. Part of the manufacturing instructions must therefore be displayed in natural language to be read by a process operator, whereas part of them must be prepared for an automatic process control system.The usage of the production lines is variable and process control is carried out using variable parameters that differ from batch to batch.To ensure the quality of the product, a constant coordination with quality assurance is indispensable.
(C) SAP AG LO305 5
It must be possible to archive and evaluate the planning data and actual data of the manufacturing process for each batch.
(C) SAP AG LO305 6
2.6
SAP AG 1999
Company management level
Production management level
Process control level
Business applications
Production planning - process industries
Process control systems
PP-PI
PP
AMCOFI
PCS
SD
MM
QM
Positioning of PP-PI in the Enterprise Model
The graphic shows the hierarchical structuring of information of an individual company. The following levels exist:
Company management levelProduction management levelProcess management level
PP-PI is situated at the production management level between the upper-level business applications and the lower-level process control systems.
PP-PI is designed to close the information gap between business applications and process control.
(C) SAP AG LO305 7
2.7
SAP AG 1999
PCS
Process controlsystem (autom.)
PI sheetLaboratory
information syst.
LIMS PI sheet(manual)
Master recipe
Resource
MaterialMaterial
Master dataMaster data
Production planningProduction planning
Qualitymanagement
Processplanning/
orders
Processmanagement
Process datadocumentation/
evaluation
Functions of PP-PI
PP-PI comprises the following functional areas :Resource management: The PI-specific master data of resources describes all means of production and persons involved in the production process.Master recipe management: The PI-specific master data of master recipes describes the manufacture of one or more materials in one production run without relating to a particular order. Master recipes are the basis for process orders.Process planning comprises the planning of process orders. Process orders are created on the basis of master recipes. They describe and monitor the actual production process.Process management coordinates the transfer of data between PP-PI and the process control level. It can be used in fully automated, partially automated, and manually operated plants.Process data documentation and evaluation enables a detailed documentation and evaluation of all planned and actual values of a process.
PP-PI is integrated with, for example:R/3 Quality Management. Via a special interface, external laboratory information systems (LIMS) can be linked to R/3 QM.The higher-level planning components of R/3. Production requirements for PP-PI are created in R/3 Material Requirements Planning. Via a special interface, you can also transfer requirements from an R/2 System or an external planning system to PP-PI.
(C) SAP AG LO305 8
The master data and functions of R/3 Materials Management (such as material, inventory management).
(C) SAP AG LO305 9
2.8
SAP AG 1999
•Material master•Bill of material
•Proc. units•Personnel
•Automatic control•Manual control (PI sheet)
Manually
QMQM
MMMM
PPPP
PP-PIPP-PI
Planned orderPlanned orderProduction reqmts
MaterialsMaterialsMaster recipeMaster recipe Process orderProcess order
ResourcesResources
Process data documen-tation & evaluation Process managementProcess management
ProcessProcessmessagesmessages
Control recipe:Control recipe:proc. instructionsproc. instructions
Process controlProcess controlsystemsystem
Processcontrol level
Data Flow in PP-PI
A production process is triggered by production requirements. Production requirements are created in material requirements planning in the form of planned orders. Planned orders define the basic dates and planned production quantities.
During process planning, planned orders are converted into process orders. The basic dates and production quantities are copied from the planned order. The actual production dates are calculated using the basic dates. You can also create a process order manually.
A process order provides a detailed description of the actual production of one or more materials in one production run. It is the main control instrument in production, describing and monitoring all planned and actual data relating to production.
A master recipe is used as the basis for a process order. It defines, for example, the planned resources and material components.
After a process order has been released for production, the process instructions maintained in the order are bundled into control recipes by process management. The control recipes are either transferred to a process control system via a specific interface or are displayed online in the form of a process instruction sheet (PI sheet) that can be read and maintained by process operators.
Process management in turn receives process messages from the process control level and transfers them to various destinations. For instance, it is possible to record confirmations for the process order, transfer actual values of the process to functions for process data documentation and evaluation, post
(C) SAP AG LO305 10
material consumptions or production yields as goods movements and transfer quality data to Quality Management results recording.
(C) SAP AG LO305 11
2.9
SAP AG 1999
PP-PI Overview: Summary
The PP-PI component covers the requirements of production planning and production control in process industries.
The application area of PP-PI is the batch-oriented, process manufacturing enterprise.
The process order describes in detail the concrete production of a material in one production run. The source for the order is the master recipe.
Process management coordinates the data exchange between PP-PI and the process control level.
(C) SAP AG LO305 12
2.10Exercise Data
Key to the symbols in the exercises and solutions:
Exercises
Solutions
Unit Objectives
Business Scenario
Tips & Tricks
Warning
Data Used in Exercises
Data Data in Training System
Data in IDES System
Plant 1100 1100
Master recipes T-DET100 T-DET100
T-RC1## T-RC100
T-TAB## N-2100
T-ICE## T-ICE00
COLORS COLORS
T-JUI100 T-JUI100
Resources T-DTM1## T-DTM100
(C) SAP AG LO305 13
T-DTR1## T-DTR100
T-DTR2## T-DTR200
T-DTR3## T-DTR300
T-DTA1## T-DTA100
T-DTG1## T-DTG100
T-IC1## T-IC100
T-JM100 T-JM100
Secondary resource T-DTT1## T-DTT100
Material, ROH T-RD1## T-RD100
T-RD2## T-RD200
T-RD4## T-RD400
T-RD5## T-RD500
T-RF1## T-RF100
T-RF2## T-RF200
T-RF3## T-RF300
T-RJ1## T-RJ100
T-RJ2## T-RJ200
T-RJ3## T-RJ300
T-RI5## T-IC-R2006
Material, PIPE T-RD3## T-RD300
Material, HALB T-FF3## T-FF300
T-Hat2## N-2100
Material, FERT T-FD1## T-FD100
T-FF1## T-FF100
T-FJ1## T-FJ100
(C) SAP AG LO305 14
Characteristics M100 M100
M200 M200
M700 M700
M800 M800
M900 M900
Classes 023_14 023_14
023_15 023_15
023_20 023_20
023_21 023_21
## = 01 - 20
(C) SAP AG LO305 15
2.11Exercises
Unit: PP-PI Overview: Overview PP-PI
Topic: Logging on to the System/ Menu Paths
At the conclusion of these exercises, you will be able to:
Log on to the system
Find the menu paths for process industries
Create a user menu
You are a member of your company's project team and are responsible for creating the basic data in the R/3 System.
Your company is a process manufacturing enterprise with chemical and pharmaceutical divisions. It produces detergent, fertilizer, and headache tablets.
The basic data that you will define includes materials, batches, classes, resources, and master recipes.
1-1 Logging on to the system
1-1-1 Log on to the PC
USER:PASSWORD:
1-1-2 Log on to the R/3 System
CLIENT:USER:PASSWORD: INITLANGUAGE: EN
1-2 Overview of the menu paths for process industries in the SAP menu
Familiarize yourself with the menu paths in the SAP menu.Familiarize yourself in particular with the master data that can be selected and maintained in Production – Process
(C) SAP AG LO305 16
1-3 Creating a role (user role)
Create your own role by selectively copying the role LO305_EN and giving it the name LO305_## with the description Role for LO305 group ## . Do not copy the user that is already assigned.
Add the SAP homepage to your role. The web address is www.sap.com.
Move your web address so that it is below Customizing in your role menu.
Assign your user ID to the role.
Save your role.
Open a second session and select the menu for your activity group. In this session, the changes are effective.
Compare the structure of your user menu with that of the SAP standard menu.
Close the first session.
Your user menu was specifically created for this course and contains all transactions you need to do the exercises. The structure of the user menu can be adjusted at any time to meet your individual needs. For this reason, the menu paths in the solutions refer to the SAP menu, not to the individual user menu.
(C) SAP AG LO305 17
2.12Solutions
Unit: PP-PI Overview
Topic: Logging on to the System/Menu Paths
1-1 Logging on to the System
1-2 Overview of the Menu Paths for Process Industries
Master Data: Material master
Production Versions
Resources
Master Recipes
Engineering Change Management
Production Resources / Tools
1-3 Choose Create role.
Enter role LO305 DE.
Choose Copy role
from role: LO305_DE to role: LO305_##
Choose Copy selectively.
X Personalization
Choose Continue.
Choose Change.
Description: Role for LO305 group ##
Choose the Menu tab page.
Choose Other.
X Web address or file
Choose Continue.
Text: For example, SAP Homepage
Web address or file: www.sap.com
(C) SAP AG LO305 18
Choose Continue.
Select the Web address and use the Move down button to move it to another position.
(C) SAP AG LO305 19
User tab page
User ID: PI-##
Save
Choose Create a new session.
Choose User menu.
In the first session, choose System -> Delete mode.
(C) SAP AG LO305 20
3
SAP AG 1999
Master Data: Overview
Material
Batch
Resource
Production version
Master recipe with material BOM
Contents:
(C) SAP AG LO305 1
3.2
SAP AG 1999
Master Data: Unit Objectives
Distinguish between the definitions of material and batch
Define resources
Explain what a production version is
Define the components of a master recipe along with its material BOM
At the conclusion of this unit, you will be able to:
(C) SAP AG LO305 2
3.3
SAP AG 1999
Overview Diagram 3
PP-PI Overview
Materials
Introduction
R/3 Classification System
Batches
Resources: Customizing
Resources: Functions
Production Version
Master Recipes: Operations and Phases
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
1111
22
44
11
55
66
77
88
99
1010
1212
1313
1414
1515
Summary and Conclusion1616
Master Recipes: Materials33 Master Data: Overview
(C) SAP AG LO305 3
3.4
SAP AG 1999
Master Data: Business Scenario
Before you start maintaining master data in the R/3 System, get an overview of the R/3 terminology and the following PP-PI basic data objects:
Material and batch
Resource
Production version
Master recipe with material BOM
(C) SAP AG LO305 4
3.5
SAP AG 1999
ResourceResource
Master recipeMaster recipe
...
Master Data Overview
BatchBatchBatch
BatchBatchBatch
BatchBatchBatch
Production versionProduction version
Material BOMMaterial BOM
MaterialMaterial
Master data is data in the R/3 System that remains unchanged over an extended period of time. It contains information that is used in the same manner for similar objects.
The material is the central master record in Logistics. In general, SAP defines a material as a substance or commodity that is bought or sold on a commercial basis, or is used, consumed or created in production.
A batch is a subset of a material with unique specifications. The batches of one material are managed separately in stock. With regard to the production process, a batch is a quantity of a material produced in a given production run. This quantity, therefore, represents a non-reproducible unit with unique specifications.
The PI-specific master data of the resource describes all means of production and persons involved in the production process.
A production version determines which alternative BOM is used together with which master recipe. The PI-specific master data of master recipes describes the manufacture of one or more materials in one
production run without relating to a particular order. Material BOMs are used to represent the structure of products that a company manufactures.
(C) SAP AG LO305 5
3.6
SAP AG 1999
Material
Substance or commodity that is bought or sold on a commercial basis, or is used, consumed, or created in production. A material can also be a service.
MaterialMaterial
MaterialMaterial
A material master record contains data of a descriptive nature (such as size, dimension, weight) and data with a control function (such as material type).
In addition to this data, which can be maintained by the user, the material master record also contains data that is automatically updated by the system (such as stock levels).
An alphanumeric material number identifies a material master record in the system. This material number is unique at the client level.
Depending on its function or usage, master record data is assigned to different organizational levels (such as plant, storage location, sales organization).
A material master record comprises different views. A view groups all data on a material created by a particular department (such as Purchasing, MRP, Work scheduling) in the master record.
Depending on their usage and requirements, material master records are grouped into material types.
(C) SAP AG LO305 6
3.7
SAP AG 1999
Batch
Subset of the total quantity of a material held in stock. This subset is managed separately from other subsets of the same material.
Quantity of a material produced during a given production run. A batch represents a non-reproducible, homogeneous unit with unique specifications.
...
BatchBatchBatch
BatchBatchBatch
BatchBatchBatch
BatchBatchBatch
MaterialMaterial
In a process manufacturing company, production is usually executed in batches. In addition, many materials entering the process are managed separately in batch stocks with different specifications.
In the R/3 System, batch master records depend on the corresponding material master record. Batches are created for a material.
In general, the data of a material master record is valid for all batches assigned to it. In contrast, a batch master record contains data that uniquely identifies a batch and characterizes it as a non-reproducible unit.
A batch master record is identified by an alphanumeric batch number. In accordance with the structure of your plant or company and your operational requirements, you can choose whether you want the batch number to be unique in combination with a material and a plant, in combination with a material number, or at client level.
(C) SAP AG LO305 7
3.8
SAP AG 1999
Processingunit
Labor
Resource
Means of production and persons in the production process that have capacities assigned to them. Resources are subdivided into resource categories.
Resources
Waste disposal facility
Energy
Transport
Resources are the main planning instruments of production planning and control. The data you maintain for a resource is, for example, used for:
Scheduling process ordersCapacity requirements planningProduct and order costing
Resources are grouped in resource categories on the basis of their usage and function. You can define your own resource categories in Customizing.
(C) SAP AG LO305 8
3.9
SAP AG 1999
Production Version
Production versionProduction version
A production version determines which alternative BOM is used together with which master recipe to produce a material or create a master plan for a material.
More than one production version for different validity periods and lot-size ranges can be assigned to a material.
Production versions are used both in discrete manufacturing and process manufacturing.
Production versions are used in Sales & Operations Planning (SOP), material requirements planning (MRP), process order creation, and product costing to select the most suitable task list or recipe and the corresponding material list.
(C) SAP AG LO305 9
3.10
SAP AG 1999
Master Recipe
EBF/ISA(S88)/NAMUREBF/ISA(S88)/NAMUR
Proc. planning Proc. control
Control information
Quality inspec. data
Steps in the prod. process
Resources
Materials
Master recipe
Process order Process order Control recipeControl recipe
A master recipe defines the following data that is required for the manufacturing of materials without relating to a particular order: processing steps, resources, material components, data for quality inspection during production, and control information for the process control level.
Master recipes have a planning and a control view. The planning view comprises the planning of operations, materials, resources, and inspection characteristics, realizing links to the R/3 application components PP, MM, SD, WM, and QM. The control view contains information required for communicating with the process control level.
The master recipe is the basis for creating process orders. A process order describes an actual production process. It contains all the information specified during process planning, such as the production date and quantities to be produced.
A control recipe contains all the information necessary for the execution of a process order by a certain process control system or a line operator. Control recipes are generated from the process instructions in a process order and sent to the corresponding destination in process control. Process instructions are defined in the master recipe the process order is based on.
Three organizations have defined the data that must be included in the standard recipe maintenance of the PP-PI module:
The European Batch Forum (EBF)The Instrument Society of America (ISA; with standards S88)
(C) SAP AG LO305 10
NAMUR (Norms working committee for measuring and control techniques in the chemical industry).
(C) SAP AG LO305 11
3.11
SAP AG 1999
Bill of Material - Definition
Bill of material
A complete, fully structured list of the components that
make up a product or assembly. The list contains the object
number of each component together with the quantity and
unit of measure.
Bill of materialBill of material
MaterialMaterial(to be produced)(to be produced)
Materialcomponent 10
Materialcomponent 20
Materialcomponent 30
Materialcomponent 40
Bills of material (BOMs) contain important basic data used in many different organizational areas. BOM data is, for instance, important for:
Material requirements planningMaterial staging during productionProduct costing
(C) SAP AG LO305 12
3.12
SAP AG 1999
BOM Categories
Document
Material BOM
Material
Sales order BOM WBS BOM
Doc. structure Equipment BOM Funct. loc. BOM
BOM categories are used to represent different objects.
Material BOMs are used to represent the structure of products that a company manufactures.
Sales order BOMs are used to represent the specific bill of material used to manufacture a product for a specific sales order.
Work breakdown structure BOMs (WBS BOMs) are used to enter components in the project system.
A document may consist of several different documents such as a program, drawings, manuals, and photos. Document structures are used to represent this. They are created for a single document information record and are maintained in the R/3 document management system.
Equipment BOMs are used in Plant Maintenance to describe the structure of a piece of equipment and to assign spares to the piece of equipment for maintenance purposes.
Functional location BOMs are used in Plant Maintenance to tie equipment to a particular location within a facility.
(C) SAP AG LO305 13
3.13
SAP AG 1999
Master Data: Unit Summary
The most important master data in PP-PI are material, resource, and master recipe.
A batch is a subset of a total quantity of a material with unique specifications.
Resources are means of production and persons involved in the production process that have capacities assigned to them.
Production versions serve to assign a master recipe to a material BOM.
A master recipe defines processing steps, resources, material components, QM data, and control information required for the manufacturing of materials without relating to a particular order.
(C) SAP AG LO305 14
4
SAP AG 1999
Material Master Record: Definition
Material Type
Field Selection
User-Defined Material Master Record
Creating Material Master Records
Contents:
Materials
(C) SAP AG LO305 1
4.2
SAP AG 1999
At the conclusion of this unit, you will be able to:
Materials: Unit Objectives
Define the term "material master"
Create a material type
Make field selection settings
Make user-specific configurations
Create material master records
(C) SAP AG LO305 2
4.3
SAP AG 1999
PP-PI Overview
Master Data: Overview
Introduction
R/3 Classification System
Batches
Resources: Customizing
Resources: Functions
Production Version
Master Recipes: Operations and Phases
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
1111
22
33
11
55
66
77
88
99
1010
1212
1313
1414
1515
Summary and Conclusion1616
Master Recipes: Materials
44 Materials
Overview Diagram 4
(C) SAP AG LO305 3
4.4
SAP AG 1999
Materials: Business Scenario
Your company is going to put a new detergent on the market.
You are responsible for the definition of the material masters that are required for the new product:
Raw materials
Finished product
(C) SAP AG LO305 4
4.5
SAP AG 2001
Material Master Records: Definition
MaterialMaterial
Material master recordMaterial master record
Substance or commodity that is bought or sold on a commercial basis, or is used, consumed, or created in production. A material can also be a service.
Data record containing all data required for managing a material; the data is arranged according to various criteria.
Materials are created as material master records and identified using a material number. A material master record contains data of a descriptive nature (such as size, dimension, weight) and data
with a control function (such as material type). In addition to this data, which can be maintained by the user, the material master record also contains
data that is automatically updated by the system (such as stock levels). An alphanumeric material number identifies a material master record in the system. This material
number is unique at the client level. Depending on its function or usage, master record data is assigned to different organizational levels
(such as plant, storage location, sales organization). A material master record comprises different views. A view groups all data on a material created by a
particular department (such as Purchasing, MRP, Work scheduling) in the master record.
(C) SAP AG LO305 5
4.6
SAP AG 1999
A BXX XX
Materialmaster record
St
Purchasing Sales
Basic data
MRP
Plant / Storage location stock
Accounting
Storage
Qualitymanagement
Work scheduling
Forecasting
Classification
Warehousemanagement
Material Master Records: Views
Each department of a company needs to maintain different information on a material. Therefore, the material master record comprises different views.
A view groups all data on a material created by a particular department (such as Purchasing, MRP, Work scheduling) in the master record.
In accordance with their different usages, the materials of a company are grouped together in material types. The material type controls, for example, which views of a material master record can be accessed.
Master record data is assigned to different organizational levels of the R/3 System. When maintaining specific views, you must therefore enter the organizational units (such as plant, storage location, and purchasing organization) for which you want to maintain the data.
For each user, you can specify which views of the material master record may be maintained or displayed.
(C) SAP AG LO305 6
4.7
SAP AG 1999
Material typeMaterial type
Material Type
Term for the subdivision of materials into different groups such as raw materials, semi-finished products, finished products, configurable materials, process materials, intra materials.
The material type controls, for instance, the material's procurement type, screen sequence and field selection, inventory management type, and account determination in financial accounting.
Within a company, different materials are used for different purposes. Material master records must therefore meet different requirements with regard to views to be maintained and control of certain business transactions. To achieve this, materials are assigned to different material types in the R/3 System.
(C) SAP AG LO305 7
4.8
SAP AG 1999
Field selection and screen sequence
General indicator (pricing for pipeline,process, configurable)
Costing control
Item category group in SD
Views for material maintenance
Procurement type
Type of inventory management (quantity/value)
Number assignment (check external numbers Y/N)
Assignment of account categories and references
Authorization group
MaterialMaterial
Mat. typeMat. type
Control Using Material Type
You specify a material type for each material. It is part of the general data of a material. The material type defines the following:
Which procurement type is set, that is, whether external or internal orders are possible Which views can be maintained by which user departments Whether material numbers can be checked against a number range Whether stock quantities and stock values can be updated Which material accounts are assigned The field selection and screen sequence in material master maintenance Costing control for a material The determination of item category groups for sales documents Control of data access via authorization groups
(C) SAP AG LO305 8
4.9
SAP AG 1999
SAP R/3 Material Types
ROH - Raw materials
HALB - Semi-finished products
FERT - Finished products
KMAT - Configurable materials
HAWA - Trading goods
INTR - Intra materials
PROC - Process materials
VERP - Packaging materials
Semi-finished products
Raw materials
Raw materials
Semi-finished products
Finished products Finished products
Miscellaneous Miscellaneous
Industry sectorPharmaceutics
Industry sectorChemical
.
.
.
Industry Sectors and Material Types
The material types ROH (for raw materials), HALB (for semi-finished products), FERT (for finished products) and KMAT (for configurable materials) are generally used in production.
The material types PROC and INTR are specifically used in process industries:The material type PROC (process material) can be used to represent the manufacture of co-products that is not initiated by material requirements planning.The material type INTR (intra material) describes materials that exist only temporarily in a process.
The industry sector determines to which branch of industry the material is assigned. The industry sector determines which fields are required fields in material master data maintenance.
(C) SAP AG LO305 9
4.10
SAP AG 1999
..................
..................
..................
?
Transaction
Procurementindicator
Material type
Plant
Industry sector
SAP / user
Field selection
Field Selection: Influencing Factors
(C) SAP AG LO305 10
4.11
SAP AG 2001
Field Selection: Influencing Factors - Field Reference
User
Procurement indicators E / F
Transaction MM02
Industry sector C
Plant 1100
Material type HALB HALB
1100
C
KB
MM02
E / F
Influencing factor Field reference
Examples
Material type PI01 Z01
SAP SAP1SAPR
Material type HALB
Each influencing factor is assigned its own field reference for field selection. You can define field references for the material type, plant, and industry sector. The field references for the other influencing factors are predefined.
(C) SAP AG LO305 11
4.12
SAP AG 1999
Field nameMARA-FERTH
Field nameMARA-FORMT
Field nameMARA-KZUMW
1:nField selectiongroup
015
Field Selection: Field Selection Group (Example)
The material master fields are grouped in field selection groups.
(C) SAP AG LO305 12
4.13
SAP AG 2001
Field Selection: Field Selection Groups and Field References
T006A-MSHT
Field selectiongroup 1
MARA-MATKLMARA-MEINS
…
Field selectiongroup 2
Field selection (field sel. grp 1) Field selection (field sel. grp 2)
Field ref. Hide Disp. Reqd.Opt.
P
PROC
ROH
SAP1
(and so on)
Field ref. Hide Displ. Reqd. Opt.
P
PROC
ROH
SAP1
All field selection groups are assigned to all field references. The field options (hide, display, required entry, optional entry) are defined for each field selection group
and field reference.
(C) SAP AG LO305 13
4.14
SAP AG 1999
++
+
+
+*
** * *
-
-
-
-
-
- - - -
*
*
.
..
Link rulesfor field selection groups
.
.
+
.
.
.
+
-
*
.
.
.
+
.
*
.
.
.
+ - *
Material type
Plant
Industry sector
Transaction
Procurementindicator
SAP / user
Examples
Field sel. Field sel. Field sel.grp 1 grp 2 grp 3
Field Selection: Link Rules
Field references of several influencing factors (such as the material type or plant) determine the field selection.
The field references define the field options (hide, show, required entry, optional entry) for the indvidual field selection groups.
All field option entries valid for each operation are linked together per field selection group. The link rules shown in this graphic determine the result of the field selection for a field selection
group. In order of priority, the signs mean the following:
- Hide * Show
+ Required entry . Optional entry
(C) SAP AG LO305 14
4.15
SAP AG 1999
Screen Screen modulesmodules
Basic data Basic data
Sales
Purchasing
ScreensScreensScreen Screen
sequencessequences
Customized Material Master
You can structure the material master according to the requirements of your company:
You can remove screens that you do not need from the screen sequence.
You can create your own screens by adding or deleting screen modules.
You can influence individual fields in the screen modules.
Customized material master screens support sufficient data maintenance by creating entry dialogs specific to your company's data requirements.
The material master is a set of logical screens organized in a specific sequence when more that one view is selected. This organization of logical screens is referred to as a screen sequence.
Each logical screen consists of several programmed sets of material master fields. In the R/3 System, these sets are referred to as screen modules or subscreens. The fields assigned to each screen module cannot be changed in Customizing.
In Customizing for the Material Master you can:Maintain screen sequencesMaintain logical screensMaintain the order of logical screens in a screen sequence Determine which screen modules are displayed on which logical screens Assign field selection influencing factors to a screen sequence Assign a user or group of users to a screen sequence Enter default values for the organizational level, the industry sector, and the logical screens for a user or a group of users
(C) SAP AG LO305 15
4.16
SAP AG 1999
a) Use standard screen modules (recommendation)
b) Use field selection to show/hide fields
c) Program and integrate user-specific screen modules
d) Define the sequence of screen modules in the logical screen
Logical screen
Copy standard screen sequence (such as "01”)
Use your own name range for screen sequence => Y*, Z*
Delete, extend, or change logical screens in the new sequence
Define sequence of logical screens in the screen sequence
Link the new screen sequence to influencing factors
Creating a Customized Material Master
Note: When you create your own logical screens, it is a good idea to use the standard screen modules that
already exist. You need your own screen modules if you require non-standard field groupings or new fields. To create your own screen modules, copy the standard program SAPLMGD1 into your own function
group (for instructions, see IMG). Then you can create the subscreens you require in the new function group.
Append structures are defined in the Data Dictionary so that you can integrate your own fields. You can only integrate fields from user-specific tables and user-specific subsreen containers in the
SAPLMGMM program by using modifications. You must use Customizing to create your own material master dialogs.
(C) SAP AG LO305 16
4.17
SAP AG 1999
Influencing Factors for Screen Sequences
Screen sequence 01 Y1
Screen ref. transaction 01 01
Screen ref. user TEMPLATE *
Screen ref. material type * *
Screen ref. industry sector * *
Transaction
User
Material type
Industry sector
Influencing factors:
Combinations of screen
references:
You can create a screen reference for user, material type, and industry sector. The screen references for transactions are predefined. The screen sequence becomes valid for the appropriate user, material types, and industry sectors when
you assign the screen references to this screen sequence. In the example in the graphic, the screen sequence 01 is valid for all users who are assigned to the
"Template" reference, irrespective of industry sector and material type.
(C) SAP AG LO305 17
4.18
SAP AG 1999
Initial s
creen
Main d
ata scre
ens
Texts
Additional d
ata screens
Workscheduling
MRP SalesForecasting Accounting
Units ofmeasure
Documentdata
Administrativedata
Consumption
Material
St
t A A
A
KMTKMT
Purchas-ing
Screens for Material Master Maintenance
To maintain a material, you enter the material number on the initial screen. You then select the organizational levels and views of the main data screens.
The data screens on the main level are displayed in a standard sequence. However, you can jump from screen to screen and thus interrupt the standard sequence.
To reach the additional data screens, choose the menu option Extras from within the corresponding view.
(C) SAP AG LO305 18
4.19
SAP AG 1999
Materials: Summary
The material master is the central master record for logistics.
The material is identified using the material number.
Maintenance takes place in individual material views.
The material type groups materials and controls how they are processed.
Material types that are commonly used in PP-PI are: ROH, HALB, FERT.
(C) SAP AG LO305 19
4.20Exercises
Unit: Materials
Topic: Material Master Records
At the conclusion of these exercises, you will be able to:
Make system settings for materials
Create material master records
Your company is going to put a new detergent on the market.
You are responsible for the definition of the material masters that are required for the new product:
Raw materials
Finished product
1-1 Settings for material types
In the IMG (implementation guide/Customizing), display the material types that are defined for finished products, semi-finished products, and raw materials.
1-1-1 Write down the settings for the parameters in the table below.
Parameters Finished Products
Semi-finished Products
RawMaterials
Material type
Are internal orders allowed?
Are external orders allowed?
Which of the following fields are selected in the User departments area?
Sales?
Costing?
Purchasing?
MRP?
(C) SAP AG LO305 20
Parameters Finished Products
Semi-finished Products
RawMaterials
Work scheduling?
Which price control is set?
Does a quantity update take place for the material type?
1-1-2 What does the External no. assignment w/o check indicator specify?
______________________________________________________
______________________________________________________
______________________________________________________
1-1-3 What does the With qty structure indicator specify?
______________________________________________________
______________________________________________________
1-2 Creating a new material type
Copy the material type for the semi-finished product HALB.
Enter a new material type PI## (## = group number).
The description of the material type is "PI Group ##".
Set the following parameters for the new material type:
– External and internal orders are allowed.
– Externally assigned material numbers are checked against a number range.
– Product costing with a quantity structure (BOM, routing)
– For materials of this material type, the following areas may be maintained:
Work scheduling Classification
MRP Storage
Basic data Plant and storage location stock
Costing
– In all plants (valuation areas), quantities and values are to be updated for materials of this material type.
– All materials of this material type (not changeable) are to be valuated according to the moving average price.
(C) SAP AG LO305 21
– Account assignment is to take place according to account category reference 0008, the same as for material type HALB.
– Save the material type.
1-3 Field selection settings for the material type
The material type PI## is used for semi-finished products that are copied from an external system.
Make the following material fields a required entry for material type PI##:
Old material number (MARA-BISMT)Cross-plant material status (MARA-MSTAE)
1-3-1 To which field selection groups are these fields assigned? ____________
1-3-2 Is the content of this field copied (proposed) when you create using a reference material? __________
1-3-3 Which other field belongs to these groups ? ______
1-3-4 Copy field reference Z## and specify that these fields are required fields.Copy the field reference for the semi-finished product HALB.
Save your settings.
1-3-5 Assign the field reference Z## to your material type PI##.
1-3-6 Test your settings by creating material T-PI## with material type PI-## (only the Basic data 1 + 2 views). Notice which views the system displays.
Notice that the fields previously processed are now required entries. You can make any entry in the old material number fields of this material. Use material status 01 with today as the valid from date. Cancel without saving.
1-4 Creating a customized material master
Set up a user-specific screen sequence Y# or Z# (free number) for material master maintenance.Use screen sequence 21 "Std ind.(short) tab" as a template for your screen sequence Y# or Z# "Screen sequence: PI Gr.##".
(C) SAP AG LO305 22
1-4-1 From data screen 08 (basic data 2), copy the screen module environment (2010) to data screen 07 (basic data 1). Then delete data screen 08 and name data screen 07 "basic data".
1-4-2 Control your screen sequence Y# or Z# in a way that the following sequence appears:
Screen 1 Basic dataScreen 2 MRP 1 - 4Screen 3 Work schedulingScreen 4 General plant data/storageScreen 5 Classification
The rest of the sequence after these screens remains the same.
1-4-3 The screen sequence is to be valid for your user PI-##. Define a screen reference for your user and create a new screen sequence control (for all material types and branches).
1-4-4 Open a second session and check your settings by displaying material master record T-RD2##.
Reverse your changes from exercise 1-4-3 for the rest of the exercises.
1-5 Default settings for industries and organizational levelsTo make entering data easier, define default data for the branch (chemicals) and organizational level (1100 as the default plant and source plant) before you create the material master records. Define the default settings in a way that the industry and organizational fields only appear when you need them.
1-6 Creating material master records
1-6-1 Raw materials
Create the following material with the material type raw material by copying:
Material Material type
Copy from
T-RD1## Rawmaterials
T-RD100
In the Select View(s) dialog box, select all of the views except Warehouse management 1 and 2.
On the Basic Data 1 screen, check the following description for your material:
Material Material description
(C) SAP AG LO305 23
T-RD1## Sulfuric acid
Go through all of the data screens and save the material master record when you reach the last data screen.
The material mentioned above is a raw material that will be needed to produce the product.
1-6-2 Finished product
Create material T-FD1## with the material type finished product by copying material T-FD100:
Material Material type Copy from
T-FD1## Finished product T-FD100
In the Select View(s) dialog box, select all of the views.
On the Basic Data 1 screen, check the following description for your finished product:
Material Material description
T-FD1## Detergent, group ##
Go through all of the screens and save the material master record when you reach the last data screen.
In this course, you will create a master recipe for the production of finished product T-FD1##.
(C) SAP AG LO305 24
1-7 Displaying the material master record:
Display the following materials.
What type of materials are they and which material categories are assigned to them?
Material Industry sector
Material type
Material description
T-RD2##
T-RD3##
T-RD4##
T-RD5##
These materials will be used for the production of the finished product T-FD1## along with the raw material in exercise 1-6-1.
(C) SAP AG LO305 25
4.21Solutions
Unit: Materials
Topic: Material Master Records
1-1 Settings for material types
SAP standard menu Tools AcceleratedSAP Customizing Project Management [SAP Reference-IMG] Logistics - General Material Master Basic Settings Material Types Define Attributes of Material Types
Display
1-1-1 Solution table
Double-click the material type.
Parameters Finished Products
Semi-finished Products
RawMaterials
Material type FERT HALB ROH
Are internal orders allowed? Yes Yes No
Are external orders allowed? Allowed with warning
Yes Yes
Which of the following fields are selected in the User departments area?
Sales? Yes Yes No
Costing? Yes Yes Yes
Purchasing? Yes Yes Yes
MRP? Yes Yes Yes
Work scheduling? Yes Yes No
Which price control is set? Standard price Standard price Moving average price/periodic
unit price
Does a quantity update take place for the material type?
By valuation area
In all valuation areas
In all valuation areas
(C) SAP AG LO305 26
1-1-2 What does the External no. assignment w/o check indicator specify?
Choose the F1 help for the field.
If the indicator is set, the material number can be entered manually and it is not compared with the number range for the material type. If the indicator is not set, the number entered is compared with the external number range if external numbers are allowed for this material type.
1-1-3 What does the With qty structure indicator specify?
Choose the F1 help for the field.
This field is used to specify whether product costing is carried out with or without a quantity structure (BOM and routing).
1-2 Creating a new material type
Tools AcceleratedSAP Customizing Project Management SAP Reference IMG Logistics - General Material Master Basic Settings Material Types Define Attributes of Material Types Copy as ... PI## ‚PI Gruppe ##’
Make the settings as described.
1-3 Setting the required fields
You first determine the number of the field selection group.
Tools AcceleratedSAP Customizing Project Management SAP Reference IMG Logistics - General Material Master Field Selection Assign Fields to Field Selection Groups
1-3-1 Field selection groups
Go to Position cursor
MARA-BISMT: 11MARA-MSTAE: 155
1-3-2 Detail screen for field names: Since the Propose field content indicator is set, the contents of the fields are copied when they are created.
(C) SAP AG LO305 27
1-3-3 Tools AcceleratedSAP Customizing Project Management SAP Reference IMG Logistics - General Material Master Field Selection Maintain Field Selection for Data Screens
Enter field selection group 11 in the appropriate field and choose Enter. No other fields belong to field selection group 11. Repeat the procedure for field selection group 155. The fields MARA-MSTAE and MARA-MSTDE belong to group 155.
Choose Details.
1-3-4 Copy field reference Z## and specify that these fields are required fields.Copy the field reference for the semi-finished product HALB.Select the line HALB and copy it to Z## (Edit Copy as). Call up the field groups 11 and 155 in the field reference Z## you just copied. Change the field option to a required entry.
Save your settings.
1-3-5 Assign field reference Z## to your material type PI##.
Tools AcceleratedSAP Customizing Project Management SAP Reference IMG Logistics - General Material Master Basic Settings Material Types Define Attributes of Material Types
Select material type PI## and choose Goto Details.
Field reference Z##” instead of “Halb”.
Save your settings.
1-4 Copy the screen sequence 21 by choosing Edit Copy as....
SAP standard menu Tools AcceleratedSAP Customizing Project Management [SAP Reference-IMG] Logistics - General Material Master Configuring the Material Master-> Define Structure of Data Screens for Each Screen Sequence
Save the screen sequence.
(C) SAP AG LO305 28
1-4-1 Select your screen sequence and double-click the entry Data screen in the dialog structure.Select data screen 08 “Basic Data 2” and double-click the entry Subscreens in the dialog structure. Choose View data screen. Notice the simulation of the logical screen. Choose Cancel. Select the subscreen with Screen number 2010 and choose View subscreen. You now see the Environment screen module .
Go back to the Change view "data screen": Overview screen by double-clicking Data screens in the dialog structure. Select data screen 07 “Basic data 1” and double-click the entry Subscreens in the dialog structure. Add the screen module (subscreen) “Environment” to this data screen by overwriting screen number 0001 (=empty screen module) with the number 2010. Choose View data screen. The Environment screen module is now copied to the “Basic data 1“ data screen. Choose Cancel. Double-click the entry data screens in the dialog structure. Select data screen 08 “basic data“ and choose Edit -> Delete. Change the screen description and the alternative screen description of data screen 07 to “Basic data“. Save your changes.
1-4-2 SAP standard menu Tools AcceleratedSAP Customizing Project Management [SAP Reference-IMG] Logistics - General Material Master Configuring the Material Master-> Maintain Order of Main and Additional Screens. Select the screen sequence and choose Goto->Details. For the data screens MRP 1-4, Work scheduling and General plant data/storage, enter ascending numbers in this sequence that are between the numbers of the data screens Basic data and Classification in the column for sequential numbers. Example :
MRP 1 Current No.: 11MRP 2 Current No.: 12MRP 3 Current No.: 13 etc.
Choose Sort main screens. The screens are put in a new order. Save your changes.
1-4-3 SAP standard menu Tools AcceleratedSAP Customizing Project Management [SAP Reference-IMG] Logistics - General Material Master Configuring the Material Master-> Assign Screen Sequence to User/Material Type/Transaction/Industry Sector
Double-click User screen reference in the dialog structure and then New entries. Enter your user name PI-## in the first column and your screen sequence number Y# or Z# in the second column.Save your entries.
It is not necessary to define the screen sequence control before the user. It is only a selection criteria for controlling the screen sequence. The assignment of one entry to different users allows you to group the users.
(C) SAP AG LO305 29
Double-click Screen sequence control in the dialog structure and then New entries. Enter the following and then save:
SRef:trans. SRef:user SRef: matl type SRef: industry SSq
01 Y# or. Z# * * Y# or Z#
1-4-4 Testing the settings:Open a second session:SAP standard menu Logistics Production – Process Master Data Material Master Material Display Display currentDisplay material master T-RD2##. Notice the sequence of the views in view selection.Choose the Basic data view. The Environment screen module appears.
Reversing changes made in exercise 1-4-3:
In the Change View Screen Sequence Control: Overview view, delete your entry in the Control Screen Sequence table. Choose Edit Delete. Save after deleting and check your settings by displaying material master T-RD2## again.
1-5 Default settings for industry sectors and organizational levels
SAP standard menu Logistics Production - Process Master Data Material Master Material Create general Immediately
Enter a material type, such as "raw material" and a branch such as "chemical industry".
Choose Defaults Industry sector. Choose "Chemical industry". Select the Hide industry sector on initial screen indicator.
Choose Defaults Organizational levels. Enter plant 1100, source plant 1100. Select the Org.levels/profiles only on request indicator.
You can also maintain the user settings in Customizing by choosing: SAP standard menu Tools AcceleratedSAP Customizing Project Management [SAP Reference-IMG] Logistics - General Material Master Configuring the Material Master-> Maintain User Settings
1-6 Creating material master records
1-6-1 Raw materials
Material Master : Material -> Create (general) -> Immediately
(C) SAP AG LO305 30
Select all in the view selection.
1-6-2 Finished product
Material Master / Material -> Create (general) -> Immediately
Select all in the view selection.
1-7 Displaying the material master record:
Material Industry sector
Material type Material description
T-RD2## C ROH Lauryl Alcohol
T-RD3## C PIPE Water
T-RD4## C ROH 1-Butanol
T-RD5## C ROH Sodium hydroxide
Material master menu / Material -> Display -> Display Current
Choose Information on material.
(C) SAP AG LO305 31
5
SAP AG 1999
Creating characteristics and classes in the R/3 classification system
Classifying objects
Classifying objects for process manufacturing
Contents:
R/3 Classification System
(C) SAP AG LO305 1
5.2
SAP AG 1999
At the conclusion of this unit, you will be able to:
R/3 Classification System: Unit Objectives
Describe the advantages of classification
Create classes, characteristics, and objects
Classify objects
Define the functions of the class types
(C) SAP AG LO305 2
5.3
SAP AG 1999
PP-PI Overview
Master Data: Overview
Introduction
Materials
Batches
Resources: Customizing
Resources: Functions
Production Version
Master Recipes: Operations andPhases
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
1111
22
33
11
44
66
77
88
99
1010
1212
1313
1414
1515
Summary and Conclusion1616
Master Recipes: Materials
55 R/3 Classification System
Overview Diagram 5
(C) SAP AG LO305 3
5.4
SAP AG 1999
R/3 Classification System: Business Scenario
Classification is required in your company for the selection of materials and resources for production.
You are responsible for the classification of raw materials and finished products.
You will define a class with the appropriate characteristics to select a suitable reaction vessel for detergent production.
(C) SAP AG LO305 4
5.5
SAP AG 1999
Value AssignmentValue AssignmentValue Assignment
Classification = Object Assignment + Value AssignmentClassification = Object Assignment + Value Assignment
Material Class T-CL100Material Class TMaterial Class T--CL100CL100
Classification
AssignmentAssignment
Va
lues
Va
lues
BatchCH-01
Classification
Acids: Ph 7Solids: 68 %Freezing Point: 3.20°F
Acids: Ph 7Solids: 68 %Freezing Point: 3.20°F
Acids:Solids:Freezing Point:
Acids:Solids:Freezing Point:
In classification, you assign objects to classes and use the characteristics of the class to describe the objects.
You can then use the classification system to search for the objects. You can use the settings in characteristics maintenance to specify, for example, that entries are required
or default values are used in classification.
(C) SAP AG LO305 5
5.6
SAP AG 1999
Describe objects using characteristics
Group similar objects in classes
An object exists
Similar objects exist
No objects exist
You can use the find object function to determine whether:
Classification in the R/3 System
Classification enables you to:
The classification system is a cross-application basic function. The purpose of a classification system is to describe objects using characteristics and to group or classify
similar objects based on a criteria that is defined. You can search for objects using the classes and the characteristics defined for the classes. In this way,
you ensure that objects that are similar or identical regarding their characteristics can be found as soon as possible.
Any basic data elements of the R/3 System can be classified (materials, batches, recipes, operations, resources, documents, ...)
Classes can be structured in single-level or multi-level class hierarchies.
(C) SAP AG LO305 6
5.7
SAP AG 1999
A class is used to groupobjects that have identical or
similar attributes.
An object is a classifiable unit (such as resource, material,
batch, and so on).
A characteristic value is a value assigned to a characteristic
of an object (such as 1000 l, 130 CP).
A characteristic is used to storeinformation on the attributes of anobject (such as volume, viscosity).
CharacteristicCharacteristic Characteristic ValueCharacteristic Value
ClassClass ObjectObject
R/3 Classification System
Characteristics that are defined individually are assigned to classes. A characteristic describes a detail of the classified object. After assigning an object to a class, the object characteristics can be assigned values. Objects can be assigned to several classes.
(C) SAP AG LO305 7
5.8
SAP AG 1999
Class 270 (Oils)
Class Type 001 (Material Classes)
Oil-001
Viscosity120 cP
Object
CharacteristicChar. Value
Class
Class Types
Oil-002 Oil-003
Viscosity130 cP
Viscosity140 cP
R/3 Classification System: Example
You can search for objects using the classification system. Two steps are required to find a certain object:
Find the class in which the object is classifiedSearch for the object in the class
During the search, the characteristics are used as search criteria. They are assigned values, and these values are compared with the values of the objects that are in the class.
(C) SAP AG LO305 8
5.9
SAP AG 1999
Class types
Objects
ResourceMaterial Operation/recipe
001001Mat. classesMat. classes
019019Work ctr cl.Work ctr cl.
023023BatchesBatches
Class Types
Classes are always assigned to a class type. A class type is a top-level unit of control for classes. The class type is used to define, for example:
Which objects can be classified in a classWhether objects of different object types can be classified in the same class
The standard system contains settings for some object types (for example, materials, vendors, documents, and so on) and class types so that you can begin creating a classification system for these objects immediately. You can also include other class types in the classification system.
(C) SAP AG LO305 9
5.10
SAP AG 1999
CreateCreatecharacteristicscharacteristics
Create class Create class for class typefor class type
Assign characteristicsto the class
Creating Classes
You can set up your own classification system in the following way: Define the properties of an object:
You use characteristics to define the properties of an object. You create characteristics centrally in the R/3 System.
Create classesYou need classes to classify objects. These classes must first be created. Characteristics are assigned to the classes.
Up to 999 characteristics can be assigned to a class. The system checks the characteristic values by comparing them to the allowed value range.
(C) SAP AG LO305 10
5.11
SAP AG 1999
CreateCreatecharacteristicscharacteristics
Create class Create class for class typefor class type
Assign characteristicsto the class
Object
Specify char. values
Classifying Objects
The assignment of objects:After the classes required for classification have been created, the objects of these classes can be assigned. The objects are described using the characteristics contained in the classes. In this way, the data required to use the classification system is available. The system can then be used to find objects with specific properties.
(C) SAP AG LO305 11
5.12
SAP AG 1999
Materials / Batches
Resources
Operations: Master Recipe
BOM Items
Class Type "Batch"Class Type "Batch"
Class Type "Work Center Class"'Class Type "Work Center Class"'
Classifying Objects for Process Manufacturing
In PP-PI, different objects can be classified, for example, within a master recipe. In this way, resources (for resource selection which takes place later) as well individual operations of a recipe, for example, can be assigned to a class.
(C) SAP AG LO305 12
5.13
SAP AG 1999
Class type: 019 "Work center class"
Characteristics
Coating GraphiteVolume 350 l
Characteristics
Coating PVCVolum 250 l
Class:Class: Reaction vesselReaction vessel
Object:
Reaction vesselRE-01
Characteristics
Coating EnamelVolume 300 l
Characteristics
U/min 200°CVolume 250 l
HV-02
Characteristics
U/min 300°CVolume 150 l
Class: Heating vessel
Object:
Heating vessel
Characteristics
Max. temp. 300°CVolume 200 l
. . .
Characteristics
U/min 200°CVolume 250 l
MV-02
Characteristics
U/min 200°CVolume 200 l
Class: Mixing vessel
Object:
Mixing vesselRK-01
Characteristics
U/min 150Volume 300 l
. . .
. . .
. . .MV-03
HV-03RE-02
RE-03
Example : Classification of Resources
Classes are always assigned to a class type. A class type is a top-level unit of control for classes. The class type is used to define, for example:
Which objects can be classified in a classWhether objects of different object types (such as materials and batches) can be classified in the same class
There are predefined class types in the standard system such as the class type work center class, for classifying resources, or class type batch, for classifying materials and batches.
(C) SAP AG LO305 13
5.14
SAP AG 1999
R/3 Classification System: Summary
Creating a class:
Create characteristics
Create class for class type
Assign characteristics to the class
Any objects in the R/3 System, such as resources, operations, or MRP components, can be assigned to a class.
The top-level class type for the class controls, for example, which objects can be classified in the class and whether a multi-classification is allowed.
(C) SAP AG LO305 14
5.15Exercises
Unit: R/3 Classification System
Topic: Characteristics and Classes
At the conclusion of these exercises, you will be able to:
Display and create characteristics
Display and create classes
Classification is required in the company for the selection of materials and resources for production.
You are responsible for the classification of raw materials and finished products.
Furthermore, you are to define a class with the appropriate characteristics to select a suitable reaction vessel for detergent production.
1-1 R/3 classification system
1-1-1 Display the characteristics M100 and M200
Logistics -> Central functions -> Classification Master Data -> Characteristics. Choose Display.
Write down the description and formatting details for these characteristics.
Characteristic Description Data type Unit of measurement
M100
M200
Which status do the characteristics have?
________________
What value assignments have been defined for the characteristics?
________________
Is a value assignment for a classified object required?
________________
(C) SAP AG LO305 15
Are interval values allowed for the value assignment?
________________
Are you allowed to enter negative values?
________________
To which class types is the usage of the characteristics restricted?
Restrictions tab
________________
________________
________________
Within which value range are you allowed to assign a value to a characteristic?
Values tab
Characteristic Allowed values
M100
M200
Are you allowed to assign values that have not been defined as allowed values?
________________
Display the indicators for one of the characteristics on the Additional data tab.
Additional data tab
Use the F1 help to find out more about the functions of these indicators.
1-1-2 Display the class 023_14 of the class type 023 Batch.
Which description does this class have?
_______________
Which status does this class have?
________________
Which characteristics are assigned to this class?
(C) SAP AG LO305 16
Characteristics tab
________________
________________
During the course, the class 023_14 will be used for classification of the raw materials used in the production.
1-1-3 Creating characteristics
In this exercise, you will first create the characteristics M3## and M6## in the R/3 classification system. These characteristics will then serve as a basis for class REAC_## that is also to be created for reaction vessels.
1-1-3-1 Create characteristic M3##:
Description Surface coating
Data type Character format
No. of char. 1
Value assignment Single-value
A value assignment for the characteristic is required.
Restrict the possible characteristic values to the following:
Characteristic value Description
G Glass coated
P Polyethylene coated
S Stainless steel
Restrict the usage of the characteristics to the class type 019 Work center class.
Save characteristic M3##.
(C) SAP AG LO305 17
1-1-3-2 Create characteristic M6##:
Description Revolutions per minute, group ##
Data type Numeric format
No. of char. 3
Decimal places 0
Unit No entry
Value assignment Multiple values
A value assignment for the characteristic is not required.
Interval values are allowed.
Enter a possible value range of 0 – 500.
Specify that the allowed values are displayed during value assignment.
Restrict the usage of the characteristics to the class type 019 Work center class.
Save the characteristic M6##.
1-1-4 Creating a class
Create the class REAC_## of the class type 019 Work center class.
Enter "Reaction vessel" as the description and assign the characteristics M3## and M6##.
Save your class.
During the course, the class REAC_## will be used for the classification of resources (reaction vessel). A resource selection based on previously defined characteristic values will follow at a later time.
(C) SAP AG LO305 18
5.16Solutions
Unit: R/3 Classification System
Topic: Characteristics and Classes
1-1 R/3 Classification System
1-1-1 Display the characteristics M100 and M200.
Logistics -> Central Functions -> Classification System Master Data -> Characteristics (Display)
Characteristic
Description Data type Unit of measureme
nt
M100 Concentration Numeric format %
M200 Density Numeric format g/ccm
Which status do the characteristics have?
Released
What value assignments have been defined for the characteristics?
Single-value
Is a value assignment for a classified object required?
no
Are interval values allowed for the value assignment?
yes
Are you allowed to enter negative values?
no
(C) SAP AG LO305 19
To which class types is the usage of the characteristics restricted?
Choose the Restrictions tab.
001 = Material class
022 = Batch (at plant level)
023 = Batch (at client or material level)
Within which value range are you allowed to assign a value to a characteristic?
Values tab
Characteristic Allowed values
M100 2.0 - 98.0 %
M200 0.5000 -2.0000 g/ccm
Are you allowed to assign values that have not been defined as allowed values?
No
Additional data tab
The indicators are listed under "Procedure for value assignment" and "User entries handling".
1-1-2 Display the class 023_14 of class type 023 Batch.
Logistics -> Central Functions -> Classification System Master Data -> Class Management (Display)
Which description does this class have?
Detergent production
(C) SAP AG LO305 20
Which status does this class have?
Released
Which characteristics are assigned to this class?
Characteristics tab
M100 Concentration
M200 Density
1-1-3 Creating characteristics
Logistics -> Central Functions -> Classification System Master Data -> Characteristics Management (Create)
same as part 1-1-1
1-1-4 Creating a class
Logistics -> Central Functions -> Classification System Master Data -> Class Management (Create)
same as part 1-1-2
(C) SAP AG LO305 21
6
SAP AG 1999
Batches
Material and Batch
Batch Management in the Logistics Process
Levels of Uniqueness of a Batch
Classification of a Material and a Batch - Characteristic Inheritance
Batch-Specific Material Unit of Measure
Active Ingredient / Product Quantity Management
Contents:
(C) SAP AG LO305 1
6.2
SAP AG 1999
Batches : Unit Objectives
Define the term "batch"
Describe how you can use batches in logistics
Use the levels of uniqueness for batches
Have batches inherit the characteristics of the top-level materials
Make basic settings for active ingredient management
At the conclusion of this unit, you will be able to:
(C) SAP AG LO305 2
6.3
SAP AG 1999
Overview Diagram 6
PP-PI Overview
Master Data: Overview
Introduction
Materials
R/3 Classification System
Resources: Customizing
Resources: Functions
Production Version
Master Recipes: Operations and Phases
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
1111
22
33
11
44
55
77
88
99
1010
1212
1313
1414
1515
Summary and Conclusion1616
Master Recipes: Materials
66 Batches
(C) SAP AG LO305 3
6.4
SAP AG 1999
Batches : Business Scenario
Since the production is to be handled in batches, you will define, as the person responsible for the basic data, the finished product as subject to be handled in batches.
A raw material is also to be handled in batches.You will define a batch master record for this raw material.
You will then be able to make a posting of stock for the raw material.
You will also check the settings for active ingredient management.
(C) SAP AG LO305 4
6.5
SAP AG 1999
Material and Batch
Material Y-300Yellow paint
Batch mgmt reqmt
Batch B1Batch B1
Origin:
Process order 60000114
Specifications:
Origin:
Process order 60000146
Specifications:
Origin:
Process order 60000210
Specifications:
Viscosity: 170 -178 cP95.0 - 98 %
580 -620 nm Covering property: Wavelength:
Viscosity: 175 cP97.0 %
589 nm Covering prop.: Wavelength:
Viscosity: 174 cP97.0 %
605 nm Covering prop.: Wavelength:
Viscosity: 170 cP96.0 %
595 nm Covering prop.: Wavelength:
Batch C2Batch C2 Batch C3Batch C3
In the R/3 System, batch master records depend on the corresponding material master records. Batches are created for a material.
In general, the data of a material master record is valid for all batches assigned to it. In contrast, a batch master record contains data that uniquely identifies a batch and characterizes it as a non-reproducible unit.
If a material is to be produced in batches and is subject to inventory management, you must set the Batch management indicator in one of the material master views of Purchasing, Work Scheduling, or Storage.
You either create a batch master record directly during master data maintenance or the system creates it in the background during the first goods movement.
(C) SAP AG LO305 5
6.6
SAP AG 1999
Batch Management in the Logistics Process
Ware-house
Process/productionorder
Ware-house
Salesorder
Warehouse mgmt
A A
A
KMTKMT
Batch Batch assignmentassignment
Batch determination
Batch Batch assignmentassignment
Purchaseorder
ProcurementProcurement ProductionProduction SalesSales
Batch determination
A
B
A
B
Warehouse mgmt
R/3 batch management is used in all areas of logistics. A batch can be followed through the whole logistics chain, from the entry of the raw materials to the production of the finished product, and all the way to sales and delivery to the customer.
You can assign a batch to a material at various points in the logistics process by creating a batch master record. For example, if the subset of a material that is subject to being handled in batches leaves a production process with certain specifications, it is posted to stock with a batch number and can then be clearly identified.
If you need a batch with certain specifications in the logistics process, you can find suitable batches from the system in the stock using the batch determination function. In the production area, batch determination is carried out in a process order to find and withdraw suitable material components for the product to be produced.
(C) SAP AG LO305 6
6.7
SAP AG 1999
Levels of Uniqueness of a Batch
In combination with a plant and material
Unique batch number
Material Y-300 Material P-300
Plant 1 Plant 2 Plant 1 Plant 2
Batch 1 Batch 1 Batch 1 Batch 1
At client level Material Y-300 Material P-300
Batch 1 Batch 2 Batch 1
In combination with a material number
Material Y-300 Material P-300
Plant 1 Plant 2 Plant 1 Plant 2
Batch 1 Batch 1
A material master record is identified by an alphanumeric material number. This material number is unique at the client level.
A batch master record is identified by an alphanumeric batch number. You can choose the level at which you want the batch number to be unique in accordance with the structure of your plant and company and your operational requirements.
(C) SAP AG LO305 7
6.8
SAP AG 1999
Changing Batch Levels
Material levelMaterial level
Plant levelPlant level
Client levelClient level
You can select the validity of the batch in Customizing. Three batch levels are available. The default setting in the standard system is the plant level.
You can change to a higher level at any time. However, if you want to change to a lower level, the system only lets you change from the client level to the material level. You cannot change to the plant level. This is due to the organization of the batch data, which must be converted each time you change the batch level.
(C) SAP AG LO305 8
6.9
SAP AG 1999
Converting Batch Numbers
Batch
C1
C4
B2
B3
Material
4712
Batch
C3
C4
B1
B2
Material
4712
Plant 01 Plant 02C1
B3
C4
B2
C3
B1
Plant level
Material level
Plant level
Material level
Batch
Material
4712
C1 C3 C4 B1 B2 B3
Reorganization program
If the batch number was unique at the plant level up to now, and you want to change the validity so that it is unique only at the material level, you must convert the batch numbers when you make this change.
Up to now, you could issue the same batch number for one material number in each plant. The batches did not need to be identical, since they were completely independent of each other. In this example, we assume that the batch specifications are completely different.
When converting existing batch data, the system checks whether identical batch numbers exist. If all batch numbers are unique at the new level (that is, the material level), the batch number can be converted directly. If they are not unique, the system writes a log containing all batch numbers that cannot be converted. You have to decide which batch numbers remain valid and which have to be posted to new batches together with their stock. If you want the system to delete batches, you must set the deletion flag and start a batch reorganization run.
You can use the conversion tool to display the current state of conversion. The system repeats the checks again and again to find out if the existing batch numbers are unique at the new level. Use the test mode. If the numbers are unique, you can carry out conversion.
At the new batch level, the batch number is unique for each material and is no longer additionally distinguished by the plant.
(C) SAP AG LO305 9
6.10
SAP AG 1999
Viscosity: 170 -178 cP95.0 - 98 %
580 -620 nm Covering property: Wavelength:
Viscosity: 174 cP97.5 %
589 nm Covering property: Wavelength:
Classification of a Material and a Batch -Characteristic Inheritance
CharacteristicsCharacteristics
Class type "Batch"Class type "Batch"
Class 023_08Color
Material Y-300Yellow color Batch B1
Char.
Inheritance
Viscosity:Viscosity: Covering property: Wavelength:
100 100 -- 200 cP200 cP0 0 -- 100 %100 %
400 400 -- 800 nm800 nm
When defining the specifications for batch master records, the higher-level material master records are assigned to classes belonging to class type batch. In these classes, all material and batch attributes are stored as characteristics.
When you create a batch for a material, the batch is automatically assigned to the same class of class type batch used to classify the material. This ensures that the same characteristics are used for the material and the batch. In the R/3 System, this is called characteristic inheritance.
Class type batch specifies a hierarchical relationship between the object types "material" and "batch". The batch inherits the material's characteristics. The specifications for the individual batches are stored as characteristic values.
You can define value ranges or fixed values for a characteristic of a class. These specify a maximum value range that applies to all objects assigned to this class, in this case materials and batches.
In the material master record, you can further restrict the values preset by the characteristics. These restrictions are inherited by the batch of the material. You can then only assign values to the characteristics of the batch that lie within the range specified for the material.
(C) SAP AG LO305 10
6.11
SAP AG 1999
CharacteristicsCharacteristics
Class X
Creating Classes for Batches I
Create a class.Use the class type for batches.
Classification system
Assign characteristics to the class.
Create characteristics.
Class Type "Batch"
ViscosityViscosity ColorColor Epoxy no.Epoxy no. Volatile portionVolatile portion 0.00 0.00 -- 0.500.50
5000 5000 -- 12000120000 0 -- 5523 23 -- 2525
ViscosityViscosity ColorColor Epoxy no.Epoxy no. Volatile portionVolatile portion
Class X
The classification system must be set up such that the specifications of a material and its batches can be stored as classification data.
First, you define the properties that you want to specify the material and the batches.These properties are stored in the classification system as characteristics.
You now create the classes that you want to use for the material and the batches. You can create a selection of various classes for this purpose. Later, you can only assign one class to the material and the batch. You thus do not set up multiple classification.
You have to assign class type 022 or 023, as these have been set up in the standard system specifically for batches. The applicable class type depends on the batch level you have selected.If you have specified plant level as the validity range of the batch in Customizing, you must select class type 022 in the standard system. Otherwise, class type 023 is valid. The system automatically suggests the correct class type.
In the last step, you assign the characteristics to the class. When doing so, you can restrict the value ranges even further.
(C) SAP AG LO305 11
6.12
SAP AG 1999
Materials management
MaterialMaterialEpoxy resin YEpoxy resin Y
Creating Classes for Batches II
Classify your material with the batch class.
BatchBatchEpoxy resin Y1Epoxy resin Y1
Post a batch to the material.
Assign allowed characteristicvalues to your batch.
Class X
Class Type "Batch"
ViscosityViscosity ColorColor Epoxy no.Epoxy no. Volatile portionVolatile portion 0.00 0.00 -- 0.500.50
5000 5000 -- 800080000 0 -- 5523 23 -- 2525
ViscosityViscosity ColorColor Epoxy no.Epoxy no. Volatile portionVolatile portion 0.300.30
725072501 1 -- 3323 23 -- 2525
In Materials Management, you create the material master record and batch master record. You must classify the material to be able to use the entire functionality of batch management.You assign the batch class in the classification view of the material master.You can restrict all value ranges of batch characteristics.
When you create a batch for this material, the system automatically copies the classification data of the material and proposes the value ranges of the characteristics.
The system checks whether the characteristic values you entered lie within the value range if you have defined the characteristics accordingly. For the system to be able to do so, you may not set the Additional values indicator.
(C) SAP AG LO305 12
6.13
SAP AG 1999
The Batch Where-Used List at Several Production Levels
Top down
Bottom up
F=Finished prod. H=Semi-fin. prod. R=Raw material
Customer A Customer B Customer C
F1F1 F2F2
H2H2
Vendor
R1R1 R2R2
H1H1
Customer order Customer order Customer order
Production order Production orderProduction order
Production order Production order
Purchaseorder
The batch where-used list follows the path of a batch using inventory management. Each batch receives its document journal from the first posting to stock to the withdrawal from stock. Additionally, each link between batches is documented at every production level all the way to the customer order and the batch split.
The path of a batch is only registered when an inventory posting has taken place. The numbers of the reference documents, such as the production order and the customer order, are recorded along with the material document.
The display variations "top down" and "bottom up" describe the view direction using the "family tree" of the batch.
The batch where-used list can also be processed graphically.
(C) SAP AG LO305 13
6.14
SAP AG 1999
Batch-Specific Material Unit of Measure
An alternative unit of measure of a material, for which you can define the conversion ratio into the base unit of measure on a batch-specific basis.
Batch-specific material units of measure are:
Proportion unit
Product unit
Proportion and product units for batch-specific materials can be used in all processes in the logistics chain.
BatchBatch--specific material unitspecific material unit
Proportion unit:Unit of measure in which you can enter proportions of the base unit of a material. The total or physical quantity can consist of several proportions.
Product unitUnit of measure which describes the total quantity of a material as an alternative to the base unit of measure.
You use batch-specific units of measure when the ratio for conversion from the unit of measure into the base unit of measure can differ from batch to batch.
While the conversion ratio for the alternative units of measure is fixed in the base unit of measure in the material, for the proportion unit and the product unit you define the following:
-The planned conversion ratio in the material-The actual conversion ratio in the batch
As long as the batch is not known, the system uses the planned conversion ratio from the material when converting to the base quantity. As soon as the batch is known, the system uses the actual conversion ratio from the batch.
(C) SAP AG LO305 14
6.15
SAP AG 1999
AA
BatchBatch
Contains 0.7 liters active
ingredient / liter
Melting point at 45° C
Expires on 12/31/99
Batch-specific unit 1 PC equals 110 KG
Batch-Specific Units of Measure as an Attribute of a Batch
The specification contains the description of the batch. It may also contain measured values and quality characteristics, plus details concerning the usability of the batch and whether it is locked. Important date specifications may also be included, such as the expiration date, the last goods receipt date, and so on.
The active ingredient proportion is one of the criteria that should be used to differentiate between batches of the same material. For this reason it is integrated into the batch specification.
Likewise, the conversion factor between alternative units of measure and base units of measure in a batch forms a characteristic, which can be valuated differently from batch to batch.
(C) SAP AG LO305 15
6.16
SAP AG 1999
Batch-Specific Unit of Measure
Classification
Batch ManagementBatch Management
Integration of Batch-Specific Units of Measure
In the R/3 System, batch-specific units of measure (active ingredient management and product units) are handled in Batch Management.
The active ingredient potency of a batch is stored in the batch's specification along with the batch-specific ratio between the alternative unit of measure and the base unit of measure.
Batch Management uses those features found in the classification system. The characteristic values in the batch classification form the specification.
To use batch-specific units of measure, you must have Batch Management set up, the class system must be in use, and the material concerned must be able to be handled in batches.
(C) SAP AG LO305 16
6.17
SAP AG 2001
Physical Quantity and Active Ingredient Quantity
Withdraw 45
liters of
alcohol!
50% a.i. 90% a.i.
92% a.i.
Full quantity: 500 l Full quantity: 500 l
Full quantity: 500 l
If active ingredients are not suitable for storage on their own, they are stored together with carrier materials. A combination of a carrier material and an active ingredient is called a physical quantity or a weighed quantity. The terms mixed quantity and telquel quantity are also common.
The situation is similar if materials contain impurities of varying degrees. The amount of active ingredient in a material is its active ingredient quantity. The potency (of active ingredient) varies within a material to a certain degree. A material can contain more than one different active ingredient.
(C) SAP AG LO305 17
6.18
SAP AG 1999
The Central Unit of Measure for Active Ingredients
Sales
PurchasingA
BBC
B
Inventory Management
ProportionUnit
BOM
The proportion unit can be seen as a core element which is found throughout the applications and is used to reproduce the active ingredient potency of a material.
The conversion between the proportion unit and the base unit of measure is continuously maintained in the background and can be displayed by each of the respective applications.
The physical quantity is measured in base units of measure, whereas the active ingredient is measured in proportion units.
In Logistics you may enter the active ingredient quantity instead of the physical quantity.
(C) SAP AG LO305 18
6.19
SAP AG 2001
Relation of Units of Measure
Proportion unit
Base unit of measure
=
Ratio
Liter of active ingredient per
liter
LIL
Liter of fruitLF
LiterL
The base unit of measure is the leading unit of measure for a material containing active ingredients. You post the materials in this unit. If an entry is made in proportion units, the system converts this to base units of measure before posting.
The proportion unit is based on the active ingredient. If a material contains more than one active ingredient, separate proportion units must be defined for each active ingredient so that they can be clearly distinguished.
You store a ratio to convert quantities between the proportion unit and the base unit of measure. This constitutes a separate unit of measurement.
In this example, the active ingredient "fruit" is measured in liters. LIL was defined as the proportion unit for the purpose of measuring an active ingredient.
The liters of fruit are based on one liter of the physical quantity. The ratio is recorded in the unit of measurement LIL.
(C) SAP AG LO305 19
6.20
SAP AG 2001
Percentage and User-defined Calculation
Percentage calculation
User-defined calculation
Characteristicunits of measure
measure the active ingredient proportion in relation to the base
unit of measureLF / L
LIL
If the active ingredient proportion for a batch is known, the active ingredient quantity can be calculated from the base quantity. The relation between the potency of the active ingredient and the base quantity is stored in Customizing, and assigned to a characteristic unit of measurement.
If the relation is measured by percentage, the conversion is specified by definition. If the relation is user-defined, any formula can be stored that describes the relationship between the
proportion unit and base unit of measure.
(C) SAP AG LO305 20
6.21
SAP AG 1999
Active Ingredient Characteristics
Which active ingredient ?
What is the ratio?
Data type: numeric
Value assignment: single-value
Fruit
LIL= (%)
LF
L
The characteristic description specifies the active ingredient on which the data is based and a unique assignment is made. For this reason, you should define one characteristic for each active ingredient.
The relationship between active ingredient potency and physical quantity must be entered as a unit of measurement when you create the characteristic.
The characteristic must be numerical and a single value.
(C) SAP AG LO305 21
6.22
SAP AG 1999
Linking Master Data I
Batch classBatch class
Char. potency Char. potency (act.(act. ingredingred.).)
xy
Material
A
Batch 1A
Batch 2 A
Batch 3
Transfers specification
2
The potency of the active ingredient in a material forms part of its specification. If the potency is not constant, the different specified material inventories should be managed separately.
This is carried out by the Batch Management component of the R/3 System. Each batch bears its own characteristic values.
Batch specifications are stored in the classification system as characteristics. The ratio between the active ingredient and the base quantity is linked to a characteristic, and potency of active ingredient is stored as its characteristic value. In this way, the ratio becomes the characteristic unit of measurement.
The active ingredient characteristic contains the information about the active ingredient concerned and the ratio of the proportion of physical quantity to the base unit of measure.
The ratio between the potency of active ingredient and the physical quantity is stored in one batch characteristic and thus becomes part of the specification.
The material transfers the information to its batches.
(C) SAP AG LO305 22
6.23
SAP AG 1999
Linking Master Data II
Batch class
Char. potency (act. ingred.)
Ratio LIL (%)
Unit of measurement
LIL (%)
View S = Subs.
LF <=> L
Material MasterMaterial Master
Active ingredient characteristics are assigned the special view 'S' within the batch class. Characteristics with this view are recognized when you maintain the material master. The information
for conversion between active ingredient and physical quantity is transferred to the material master.
(C) SAP AG LO305 23
6.24
SAP AG 1999
Maintaining Units of Measurement in the Material Master
MaterialMaterial
View:Proportion/product unit
Characteristic Unit of meas. Prop. unitPlnd valueFruit
potency0.75 (75)
LFLIL (%)
X Prop. unit Y Base unit<=>
LF Liter75 100<=>
LF <=> L
After the classification view has been maintained, the system establishes whether any active ingredient characteristics are present.
You must complete the information in the Proportion/Product Unit view. The system requires a planned value for the active ingredient proportion.
The planned value specifies the expected mixing ratio between active ingredient and physical quantity in the characteristic unit of measurement.
If the actual proportion of active ingredient in a batch is not known for a particular business transaction, the system uses the planned value from the material master.The planned value for the conversion between active ingredient and physical quantity is transferred to the units of measure table automatically.
(C) SAP AG LO305 24
6.25
SAP AG 1999
Batches : Unit Summary
A batch is a subset of a material with unique specifications.
The level of the uniqueness of a batch can be changed.
A batch that has been created for a material automatically belongs to the same class or has the same characteristics (characteristic inheritance).
A batch-specific material unit of measure is required for active ingredient management.
(C) SAP AG LO305 25
6.26Exercises
Unit: Batches
At the conclusion of these exercises, you will be able to:
Classify batches
Describe characteristic inheritance
Make settings for active ingredient management
Since the production is to take place in batches, define the finished product as a material to be handled in batches.
A raw material is also to be handled in batches. A batch master record is to be defined for this raw material.
Quantities are to be posted stock.
To be able to carry out active ingredient management at a later time, maintain the required settings.
1-1 Material to be handled in batches
Check whether the Batch management indicator is set for both the finished product T-FD1## and its raw material T-RD1##.
Select view(s): General Plant Data/storage 1
Organizational level:Plant 1100
Check whether the availability check for batches (CH) is set for the raw material T-RD1## in the MRP 3 view.
1-2 Classification of materials in the class type Batch
1-2-1 Classify your finished product T-FD1## in class 023_15 Detergent of class type 023 Batch.
Select view(s):Classification
Class type:023 “Batch”
(C) SAP AG LO305 26
Assign the following characteristic values:
Density: 1.10 -1.20 g/ccm
Save your entry.
1-2-2 Classify your raw material T-RD1## (Sulfuric acid) in the class 023_14 Detergent of the class type 023 Batch.
Assign the following characteristic values:
Concentration 40 – 60 %
Density 1.30 -1.50 g/ccm
Save your entries.
1-3 Characteristic inheritance
1-3-1 Create the batch master record CH_1 for material T-RD1##.
To which class is the batch assigned?
________________
Classification tab
Within which value range can the characteristics be assigned values? Why?
______________________________
______________________________
Assign the following characteristic values:
Concentration 50 %
Density 1.39 g/ccm
(C) SAP AG LO305 27
Save the batch master record.
1-3-2 Post a goods receipt of 500,000 L of batch CH_1 of material T-RD1## in storage location 0002 of plant 1100.
Use movement type 501.
Save the goods receipt and then check the stock for material T-RD1##.
1-3-3 Post another goods receipt (movement type 501) for batch CH_2 of material T-RD1## in storage location 0002 of plant 1100.
The system creates the batch master record in the background. Before posting the goods receipt, the system displays the characteristics of the new batch CH_2 for value assignment.
Assign the following characteristic values:
Concentration 40 %
Density 1.30 g/ccm
Post your goods receipt.
1-4 Settings for active ingredient managementYou have two materials, fruit premix T-RJ1## and lemon juice T-RJ2##, which contain the active ingredients fruit and acid. You want to change the logistic management for the materials. You want to be able to work with the material quantity and with the active ingredient quantity for the materials. Active ingredient management will allow you to do this. You need two batch-specific material units of measure (proportion units).
1-4-1 Check whether the required units of measure are maintained. What are the descriptions for the following units of measurement?
LF = _________________________________
LS = _________________________________
1-4-2 Make sure that the use of batch-specific units of measure is activated!
(C) SAP AG LO305 28
1-4-3 To which base unit of measure are the batch-specific units of measure LF and LS referenced?
______________________________________________________
1-4-4 Notice the definition of the characteristic unit of measurement % for the proportion calculation.
Notice that in the case of proportion calculation in percent, the unit of measurement is defined in connection with the batch-specific units of measure and base units of measure.
Now notice the definition of the characteristic unit of measurement LIL.What are the batch-specific units of measure and the base unit of measure from which it is calculated?
LIL = __________________________________________________
1-4-5 Display the material master records for the materials fruit juice T-FJ1##, fruit premix T-RJ1##, and lemon juice T-RJ2##. Which data is maintained in their classification views?
Char. values: Char. values:
Material: Class: Fruit content Acid content
T-FJ1##
T-RJ1##
T-RJ2##
1-4-6 Check whether the organizational area S is maintained in the basic data and in the characteristics for the classes found under 1-4-5. Display the material master of the raw material T-RJ1##.
1-4-7 What are the characteristic names that belong to the characteristic descriptions fruit content and acid content?
Fruit content = ____________________________
Acid content = ____________________________
(C) SAP AG LO305 29
1-4-8 Check whether the characteristics mentioned in 1-4-7 have the following settings:
The status is released.
The data type is numeric.
The value assignment is a single value and no negative values are allowed.
Which unit of measurement is maintained for these two characteristics?
_______________________________
1-4-9 What is the planned value defined for the fruit content on the Proportion/prod. unit tab in the additional data for material T-RJ1##?
___________________________________
Look at the Units of measure tab.
(C) SAP AG LO305 30
6.27Solutions
Unit: Batches
1-1 Material to be handled in batches
Material -> Display -> Display current
Select view(s): General plant data/storage 1
Organizational levels: Plant 1100
1-2 Classification of materials in the class type Batch
1-2-1 Classify your finished product T-FD1## in class 023_15 Detergent of class type 023 Batch.
Material Change Immediately
Select view(s): Classification
Class type: 023 “Batch”
Assign characteristic values to class.
1-2-2 Classify your raw material T-RD1## (Sulfuric acid) in the class 023_14 Detergent of the class type 023 Batch.
same as in 1-2-1
(C) SAP AG LO305 31
1-3 Characteristic inheritance
1-3-1 Create the batch master record CH_1 for material T-RD1##.
SAP standard menu ->Logistics->production-Process->Master Data/ Material master menu / Batch -> Create
Classification tab
To which class is the batch assigned?
023_14
Within which value range can the characteristics be assigned values? Why?
40 – 60 %
1.3 -1.5 g/ccm
The value range of the characteristics was defined in classification Part 1-2-2.
1-3-2 Goods receipt for batch created
Goods receipt:
SAP standard menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt Other
Post goods receipt (save)
Check stock:
SAP Menu Logistics Production -Process Master Data Material Master Other Stock Overview
1-3-3 Goods receipt for batch not created
Goods receipt:
SAP Menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt Other
Assign characteristic values to class.
Post goods receipt (save)
(C) SAP AG LO305 32
1-4 Settings for active ingredient management:
1-4-1 Tools AcceleratedSAP Customizing Project Management SAP Reference IMG General Settings Check Units of Measurement. Choose Units of measurement (no dimension).
LF = L fruit LS = L acid (= L Säure)
1-4-2 Tools AcceleratedSAP Customizing Project Management SAP Reference IMG Logistics - General Batch Management Batch Specific Material Units of MeasureActivate Batch-Specific Material Units of Measure
1-4-3 Tools AcceleratedSAP Customizing Project Management SAP Reference IMG Logistics - General Batch Management Batch-Specific Material Unit of Measure Edit Batch-Specific Material Unit of Measure
Both batch-specific units of measure reference a liter.
1-4-4 Tools AcceleratedSAP Customizing Project Management SAP Reference IMG Logistics - General Batch Management Batch-Specific Material Unit of Measure Calculate Proportional Factors Define Percentage Calculation
Tools AcceleratedSAP Customizing Project Management SAP Reference IMG Logistics - General Batch Management Batch-Specific Material Units of Measure Calculate Proportional Factors Define Calculation of Proportion Quantity from Base Quantity
LIL = Liter of active ingredient / liter
1-4-5 SAP Standard Menu Logistics Production - Process Master Data Material Master Material Display Display Current
(C) SAP AG LO305 33
Display the Classification view for each of the materials.
Char. values: Char. values:
Material: Class: Fruit content Acid content
T-FJ1## 023_20 35 – 40 % 2 – 2.2 %
T-RJ1## 023_20 80 – 100 % 3 – 5 %
T-RJ2## 023_21 - 40 – 80 %
1-4-6 SAP Standard Menu Logistics Production - Process Master Data Material Master Material Display Display Current
Raw material T-RJ1##
View: Classification
Position cursor on the class entry and choose Environment Display master data
Basic data and Characteristics tabs
Both the class and the characteristics are maintained for application view S.
1-4-7 SAP Standard Menu Logistics Production - Process Master Data Material Master Material Display Display Current
View: Classification
Position cursor on the class entry and choose Environment Display master data. Choose the Characteristics tab.
Fruit content = ______M800______________________
Acid content = ______M900_________________
1-4-8 SAP Standard Menu Logistics Production - Process Master Data Material Master Material Display Display Current
View: Classification
Position cursor on the class entry and choose Environment Display master data
Characteristics tab
Double-click Characteristics.
(C) SAP AG LO305 34
The characteristics M800 and M900 are both released, numeric, and single-value. Negative values are not allowed, and they are assigned to a class type batch. For both characteristics, the unit of measure % (percent) is maintained.
1-4-9 SAP standard menu Logistics Production - Process Master Data Material Master Material Display Display Current
Select Basic data view 1, choose Additional data, and then choose the Proportion/prod. unit tab.
The planned value for the fruit content is 85 %. The conversion ratio is entered on the Units of measure tab.
As long as the batch is not known, the system uses the planned conversion ratio from the material when converting to the base quantity. As soon as the batch is known, the system uses the actual conversion ratio from the batch.
(C) SAP AG LO305 35
7
SAP AG 1999
General data for resources
Planning data
Data for capacity requirements planning
Costing data
Default capacity
Contents:
Resources: Customizing
(C) SAP AG LO305 1
7.2
SAP AG 1999
Make user-specific settings for the resource master record
Maintain general data for resources
Define formulas for resources
Create a default capacity
Prepare for the creation of a default resource
At the conclusion of this unit, you will be able to:
Resources: Customizing: Unit Objectives
(C) SAP AG LO305 2
7.3
SAP AG 1999
PP-PI Overview
Materials
Introduction
R/3 Classification System
Batches
Master Data: Overview
Resources: Functions
Production Version
Master Recipes:Operations and Phases
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
1111
22
44
11
55
66
33
88
99
1010
1212
1313
1414
1515
1616
Master Recipes: Materials
77 Resources: Customizing
Overview Diagram 7
Summary and Conclusion
(C) SAP AG LO305 3
7.4
SAP AG 1999
Resources: Customizing: Business Scenario
Your company wants to reorganize the resources used for detergent production.
You are responsible for setting up and maintaining the resources. You will make preparations for the creation of a default resource in Customizing.
You will also define an available capacity for the corresponding capacity category.
(C) SAP AG LO305 4
7.5
SAP AG 1999
Processing unit
Labor
Means of production and persons in the production process that have capacities assigned to them. Resources are subdivided into resource categories.
Resources
Waste disposal facility
Energy
Transport
Resources in the Company
Resources are the main planning instruments of production planning and control. The data you maintain for a resource is, for example, used for:
Scheduling process ordersCapacity requirements planningProduct and order costing
Resources are grouped in resource categories on the basis of their usage and function. You can define your own resource categories in Customizing.
(C) SAP AG LO305 5
7.6
SAP AG 1999
Descrpts. Admin. data Classification Subsystems
Basic data Default values Capacities Scheduling Costing
General data
Standard value maintenance
Resource category
Person responsible
Plant
Resource Resource description
Resource Master Record
The data in the resource is used, for example, for:
Basic data
When creating a resource, you enter general basic data before you maintain specific data such as standard values, capacity data, or scheduling data.
Simplification of operation maintenance
Various default values can be maintained in the resource for operations.
Scheduling
Formulas for calculating operation duration can be maintained here.
Costing
Formulas for calculating the operation costs are maintained in the resource. In addition, a resource is assigned to a cost center.
Capacity requirements planning
(C) SAP AG LO305 6
Formulas for calculating capacity requirements of an operation can be maintained here.
(C) SAP AG LO305 7
7.7
SAP AG 1999
UsageUsage
ResourceResourcecategorycategory
Control of field and screen selectionControl of field and screen selection
Default resourceDefault resource
...
Basic data
Scheduling
Recipes
Routings for plant maintenance
...
Functions of the Resource Category
Resources are grouped in resource categories on the basis of their usage and function. You can define your own resource categories in Customizing. Resource categories have the following functions:
Each resource category is assigned one or more task list types in Customizing. A task list application groups one or more task list types. This assignment specifies the task list types for which a resource of a certain category can be used. Task list types are, for instance, master recipes, maintenance task lists, inspection plans. In PP-PI, the task list type "master recipes" is used.In Customizing, you can maintain a default resource for each resource category and plant. When you create a resource, the data maintained for the default resource is transferred to this resource as default values.In Customizing, you can define the screen sequence and field selection for resource maintenance for each resource category.
(C) SAP AG LO305 8
7.8
SAP AG 1999
Modifiable field Input Req. Disp. Hide HiLi
Field 1
Field 2
Field 3
Field 5
Field 6
Field 7
Input in modifiable field (for all resource types)
Input in influencingfield (enter resource
type)
Field Selection
In Customizing for Resources, you can use field modification to influence the attributes of individual fields shown on the resource maintenance screens. You can specify how specific data fields are displayed. You have the following options for data fields:
Input field
Required input field
Display field
The field is hidden.
The field is highlighted.
You can decide whether the fields are to be modifiable or influencing for each screen group.
(C) SAP AG LO305 9
7.9
SAP AG 1999
CapacityCapacity
VAR = DV *PHQU
BAQU
ClassA
$
Capacities
Capacity and Available Capacity
A capacity refers to the ability to perform a specific task.
A capacity refers to the ability to perform a specific task. Together with the available capacity and capacity loads collected for them, capacities are the central planning unit for capacity requirements planning.
You can assign any number of capacities of different capacity categories to one resource. You can maintain variable availability in time for each capacity. The available capacity is the ability of a capacity to perform a specific task in a certain period of time.
The available capacity is determined using work start and finish times, break times, rate of capacity utilization, and the number of individual capacities.
(C) SAP AG LO305 10
7.10
SAP AG 1999
EnergyEnergyResourceResource
Processing unit 1Processing unit 1
Available capacityAvailable capacity
PooledPooledcapacitycapacity
Steam
MachineMachine
PersonnelPersonnel
ResourceResource
Processing unit 2Processing unit 2
Capacity Categories for a Resource
The ability of a resource to perform a specific task is limited in time. In the R/3 System, this limited availability is expressed by capacities.
Available capacities form the basis of scheduling for process orders and are required for capacity planning and shop floor control. Formulas are assigned to resources in order to calculate execution times and capacity requirements of operations.
You can assign any number of capacities of different capacity categories to one resource. However, per capacity category, you can only assign exactly one capacity.
A capacity category is a description that classifies capacities and can be defined by the user in Customizing. Capacity categories are, for example, machine capacities, labor capacities, and energy.
You create the available capacity that is to apply to only one specific resource as a resource capacity in the resource itself. Capacities that are used by several capacities, such as a common steam reservoir or the clean-out team, are created as pooled capacities and assigned to the resources.
(C) SAP AG LO305 11
7.11
SAP AG 1999
Resource
Execution times
Capacity requirementsFormulas
Production costs
Formulas in the Resource
To calculate costs, execution times, and capacity requirements of phases carried out at a resource, enter a formula key that refers to a suitable formula on the corresponding screens of the resource.
(C) SAP AG LO305 12
7.12
SAP AG 2001
General operationGeneral operationvaluesvalues
Formula constantFormula constant
Standard valuesStandard values
FormulaFormulaOperation qty
Base quantityTotal time = X
Base output
Res. outputX Duration
Operation quantity
Base quantity
Resource output
Duration
Base output
Example of a Formula
Formulas and formula parameters are defined in Customizing. Formula parameters that you can use include standard values, constants defined in the resource (for
example, resource output) as well as general operation values in master recipes or process orders (for example, operation quantity).
(C) SAP AG LO305 13
7.13
SAP AG 1999
Define defaultDefine defaultresourceresource
Define Define formula formula
parameterparameter
Define Define standard standard value keyvalue key
Defineformula key
Define default capacity
Define area of Define area of responsibility responsibility
for cap. req. planningfor cap. req. planning
Create capacity categoryCreate capacity category
Define control keyDefine control key
Define task list usageDefine task list usage
Define person Define person responsible for resourcesresponsible for resources
Define resource categoryDefine resource category
1.21.2
1.31.3
44
33
2.12.1
2.22.2
2.32.3
2.42.4
1.11.1
Customizing a Default Resource
When you define a default resource in Customizing, you can maintain the following data:Capacity category, area of responsiblility for capacity requirements planning, default capacitiesResource category, person responsible for resourcesTask list usage, control keyFormula parameter, standard value key, formula key
The default resources defined in Customizing can be used as a basis for creating new resources in PP-PI. The previously defined default resources are copied when you go through the individual resource screens.
For each resource category, you can define exactly one default resource in Customizing.
(C) SAP AG LO305 14
7.14
SAP AG 1999
Make settings for the field selection in the resource master record
Explain the structure and use of the formulas for the resource
Make the Customizing settings required to create a default resource
You are now able to:
Resources: Customizing: Unit Summary
(C) SAP AG LO305 15
7.15Exercises
Unit: Resources - Customizing
At the conclusion of these exercises, you will be able to:
Make general Customizing settings for resources
Define default capacities
Maintain formula parameters and formulas
Your company wants to reorganize the resources used for detergent production.
You are responsible for setting up and maintaining the resources. You are also responsible for creating a default resource in Customizing.
The available capacity for the resource must also be defined.
1-1 Resource data overview
To get a general overview of the screens and fields of a resource, look through those for resource T-IC1## for plant 1100. Write down the corresponding entries in the tables below.
Use F1 to find out more about the meaning and functions of individual data fields. Use F4 to have the possible entry values displayed for each data field.
1-1-1 Basic data tab
Description
Resource category
Person responsible
Task list usage
Standard value key
Parameters assigned
(C) SAP AG LO305 16
1-1-2 Default values tab
Control key
Unit of measure of standard values
1-1-3 Capacities tab
Capacity category
Formula key
(Formula assigned for capacity requirements determination)
1-1-4 Scheduling tab
Capacity category
Duration of internal processing
(Formula assigned for calculating the phase duration)
1-1-5 Costing tab
Validity
Controlling area
Cost center
Activity type
Formula key
(Formula assigned for activity cost calculation)
From the resource menu, go to the SAP Library. Familiarize yourself with the information available on resources in the R/3 documentation.
Choose Default resource in the index to display information about the function of a default resource.
(C) SAP AG LO305 17
1-2 General data and task list data for resources
In this exercise, you will become familiar with the most important Customizing settings for resources. IMG texts are available for the individual Customizing activities, which you can display if you need help making Customizing settings. Furthermore, you can use the F1 and F4 help.
Tools -> Accelerated SAP -> Customizing ->Project management -> SAP Reference IMG -> Production Planning for Process Industries -> Master Data -> Resource -> (..)
1-2-1 Defining a resource category
Define the resource category RE## "Processing unit gr##".
(...) -> Resource -> General Data -> Define Resource Category (Work Center Category)
Copy the field selection and the screen sequence of the existing resource category 0008.
Specify that change documents are to be written for the resources of the category RE##.
Assign the task list usage for recipes to resource category RE##.
1-2-2 Defining a person responsible for a resource
Define the person responsible R## "Person responsible for resource group##" for plant 1100.
(...) -> General Data -> Determine Person Responsible
1-2-3 Defining a task list usage
Define the task list usages O## "Recipe & Order group##" and C## "Recipe until release group##".
(...) -> General Data -> Define Task List Usage
Assign both task list usages to the task list type “Master recipe”.
(C) SAP AG LO305 18
Indicate that a resource with a task list usage of C## can only be used until phase release, operation release, or order release.
1-2-4 Defining a control key
Define control key K1## "Cost., Sched., Cap. Grp.##" and K2## "Cost., Sched., Cap., QM Grp.##'".
(...) -> Resource -> Master Recipe -> Data for Operations and Phases -> Define Control Key
Set the Scheduling indicator, Det. Cap. Reqmnts indicator, and Cost indicator for both control keys.
For control key K2##, also set the Insp. char. required indicator.
Confirmations for the phases with this control key are possible, but not required.
1-2-5 Defining the field selection
Which field groups of the basic data screen group are defined as required entries for resource category 0008?
(...) -> Resource -> General Data -> Define Field Selection
_______________________ and _______________________
1-3 Data on capacity requirements planning
Tools -> Accelerated SAP -> Customizing ->Project management -> SAP Reference IMG -> Production Planning for Process Industries -> Master Data -> Resource -> (..)
1-3-1 Creating capacity categories
Create the capacity category M## "Processing unit##" and P## "Personnel Group##".
(...) -> Capacity Requirements Planning -> Define Capacity Categories
Define capacity category P## as personnel capacity. Which function is made possible by setting the CapCatPers indicator?
(C) SAP AG LO305 19
______________________________________________
______________________________________________
Save your entries.
1-3-2 Defining an area of responsibility for capacity requirements planning.
Define the responsible capacity requirements planner group C## "Cap. planner grp.##".
(...) -> Capacity Requirements Planning -> Determine Capacity Planner
1-3-3 Defining default capacities
Define default capacities for the capacity categories M## and P## in plant 1100.
(...) -> Capacity Requirements Planning -> Define Default Capacity
Define the following default values for both capacity categories:
Capacity planner group C##
Factory calendar ID 01
Base unit of measure H
Standard avail. capacity Start: 00:00:00
Finish: 24:00:00
Capacity utilization 100
No. of indiv. cap. 1
The capacity categories are to be relevant for finite scheduling. This means that the available capacity is taken into account during capacity requirements planning.
(C) SAP AG LO305 20
1-4 Creating formulas for resources
Tools -> Accelerated SAP -> Customizing ->Project management -> SAP Reference IMG -> Production Planning for Process Industries -> Master Data -> Resource -> (..)
1-4-1 Defining formula parameters
Define the following formula parameters:
(...) -> General Data -> Standard Value -> Define Parameters
Param Origin Short keyword and
keyword
Dim. Std value Std value unit.
Field name
DF## 2 Fixed time TIME H
DV## 2 Var. dur. TIME H
BAQU## Base quantity 1 BMSCH
PHQU## Phase qty 1 MGVRG
The parameters DF## and DV## are the standard values for the operation.
The parameters BAQU## and PHQU## are general operation values for the recipe or process order. The operation values are transferred to the formula parameters by way of their field names.
1-4-2 Defining a standard value key
Define the standard value key SK## "Fixed and variable time gr##" and assign the standard values DF## and DV## to it.
(...) -> General Data -> Standard Value -> Define Standard Value Keys
Also set the Generate indicator. You use this indicator to control whether a coding (ABAP command) is generated for a standard value key.
1-4-3 Defining formula keys
Define the following formulas:
(C) SAP AG LO305 21
(...) -> Capacity Requirements Planning -> Resource (Work Center) Formulas -> Define Formulas for Resources (Work Centers)
or
(...) -> Costing -> Resource (Work Center) Formulas -> Define Formulas for Resource (Work Center)
Formula Description Formula definition
FIX## Fixed duration DF##
VAR## Duration, qty-dep. DV## * PHQU## / BAQU##
DUR## Total duration DF## +DV## * PHQU## / BAQU##
Be sure to put a space between each parameter and the adjacent operator. Set the Generate indicator for each one.
Also allow the use of the formula for costing, capacity requirements determination, and scheduling.
(C) SAP AG LO305 22
7.16Solutions
Unit: Resources - Customizing
1-1 Resource data overview
Resources menu: Resource -> Display
1-1-1 Basic data tab
Description Mixing tank
Resource category 0008
Person responsible I##
Task list usage PI2
Standard value key SAP8
Parameters assigned Fixed time
1-1-2 Default values tab
Control key PI01
Unit of measure of standard values
min.
1-1-3 Capacities tab
Capacity category assigned 008
Formula key SAPL61
1-1-4 Scheduling tab
(C) SAP AG LO305 23
Capacity category assigned 008
Formula key SAPL61
1-1-5 Costing tab
Validity 01.01.1998 – 12.31.9999
Controlling area 1000
Cost center 4271
Activity type 1420
Formula key SAPL61
1-2 General data and task list data for resources
1-2-1 to 1-2-4
Enter the Customizing settings as described in the exercise.
1-2-5 Defining the field selection
Position the cursor on the screen group Basic data. Choose Influencing and enter 0008 (resource category processing unit) as the influencing value. Choose Enter.
The following are required fields:
Usage and Person responsible
1-3 Data on capacity requirements planning
1-3-1 Creating capacity categories
(...) Resource -> Capacity requirements planning -> Define Capacity Categories
Define capacity category P## as a personnel capacity. Which function is made possible by setting the CapCatPers indicator?
You set this indicator to specify that persons can be assigned to this capacity category as single capacities.
1-3-2 to 1-3-3
Enter the Customizing settings as described in the exercise.
(C) SAP AG LO305 24
(C) SAP AG LO305 25
1-4 Creating formulas for resources
1-4-1 to 1-4-3
Enter the Customizing settings as described in the exercise.
(C) SAP AG LO305 26
8
SAP AG 1999
Resource management
Cost center assignment
Available capacity
Resource network
Classification
Evaluation options
Contents:
Resources: Functions
(C) SAP AG LO305 1
8.2
SAP AG 1999
Create a default resource and resource master record
Maintain available capacities
Create resource networks
Define selection criteria for a system-aided resource selection
Execute evaluations
At the conclusion of this unit, you will be able to:
Resources: Functions: Unit Objectives
(C) SAP AG LO305 2
8.3
SAP AG 1999
Overview Diagram 8
PP-PI Overview
Materials
Introduction
R/3 Classification System
Batches
Master Data: Overview
Resources: Customizing
Production Version
Master Recipes:Operations and Phases
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
1111
22
44
11
55
66
33
77
99
1010
1212
1313
1414
1515
1616
Master Recipes: Materials
88 Resources: Functions Summary and Conclusion
(C) SAP AG LO305 3
8.4
SAP AG 1999
You will create the master records for resources that are used for detergent production in your company.
You will also allow the resources to be selected just before production begins.
Resources: Functions: Business Scenario
(C) SAP AG LO305 4
8.5
SAP AG 1999
Resource Data I
Default values
Basic data
Cost centerassignment
Name and description
Person responsible
Task list usage
Standard value key
Control key
Standard text key
Wage data
Cost center
Activity types
Formula key
Costing dataCosting data
Default valuesDefault valuesfor operations in for operations in master recipemaster recipe
General dataGeneral data
You can find resource-related data on several screens. This graphic shows some of the most important resource data.
On the Basic Data screen, you define a person or group of persons responsible for the maintenance of the master data of this resource. By defining the task list usage, you also specify the task list types (such as master recipe, equipment task list, or inspection plans) in which the resource can be used and whether the resource can be used in orders.
By entering a standard value key, a resource is assigned standard values for operations in master recipes or process orders to be executed at this resource. A standard value is a planned value used to carry out an operation, such as the execution time. Standard values are used in costing, scheduling, and capacity requirements planning to calculate costs, execution times, and capacity requirements.
You can enter default values for the operation to be executed at a resource. When you maintain the operations in the master recipe or process order, the system copies or references this information. You can, for instance, propose a control key. A control key specifies how an operation is to be processed from a business point of view.
By assigning a cost center to a resource, you link the resource to cost accounting and can now carry out product and order costing. You can define the specific output of a resource by assigning activity types which are defined for the cost center.
(C) SAP AG LO305 5
8.6
SAP AG 1999
Capacity Available capacity
Formula key
Capacity dataCapacity data
Resource Data II
Assignments Persons
Positions
Qualifications
HR data /HR data /QualificationsQualifications
Scheduling Scheduling basis
Formula key
Scheduling Scheduling datadata
Available capacities of resources are the basis for scheduling process orders. They are also required for capacity requirements planning and shop floor control.
In order to calculate the execution time of an operation during process order scheduling, the available capacity of exactly one of several possible resource capacities is defined as the basis for scheduling.
To calculate costs, execution times, and capacity requirements of phases carried out at a resource, enter a formula key that refers to a suitable formula in the corresponding screens.
(C) SAP AG LO305 6
8.7
SAP AG 1999
S
VAR = DV *PHQU
BAQU
Classification
Formulas
Cost centerassignment
Capacities
Personnel
Resourcenetwork
Resource Management Views
ClassA
Resources are used in the operations of the recipes and the process orders. With the resource, you can
Determine which processing units, persons, or other resources are to be used in the operations and phases of the recipe.Specify costs, capacity requirements, and dates for the operations and phases.
Persons are assigned to the resource to determine which employees are to work at this resource. Costs, execution times, and the capacity requirements of the resource can be calculated from standard
values using formulas. Activity types that are linked to a cost center are assigned to a resource via the cost center. You can
calculate in-house costs of an operation by assigning the resource to a cost center.
(C) SAP AG LO305 7
8.8
SAP AG 2001
Cost Center / Activity Type / Resource
Resource Cost CenterFormula Activity types Charge rates
F1 A USD 10/hF2 B USD 20/h
.
. .
. .
Example :
Formula F1 Rate foractivity type A
x x Duration = Total time
(max. 6)
USD 10/h
Total timeTotal time
Operation qty
Standard values
Operation values
Resource constant
Base output
Base quantity Res. output
xx Charge rateCharge rate == COSTSCOSTS
The costs incurred due to the use of a resource in a phase must be calculated in production and order costing. For this, you must maintain costing data in the resource.
The link to cost accounting is created by assigning a cost center to a resource. For a specified validity period, you can assign a resource to one cost center only. The specific output of a resource is defined by assigning activity types specified in the cost centers to
the resource. Each activity type is valued with specific charge rates. The output (= total time) of a resource is calculated with the help of formulas. A formula is assigned to
each activity type. Finally, the costs are calculated using the output (= total time) of a resource and the corresponding
charge rates.
(C) SAP AG LO305 8
8.9
SAP AG 1999
Creating a Resource
Customizing PP-PI
Manually
Copy
DefaultDefaultresourceresource
Resource 1 Resource 1a
Resource 1b
Resource 1c
You can create a resource for a resource category in PP-PI in the following ways:ManuallyBy using a predefined default value in CustomizingBy copying a resource that already exists
(C) SAP AG LO305 9
8.10
SAP AG 1999
Resource Network
Charge Reaction Discharge
B1
B2
R1
R2
R3
E1
You can often use processing units in a specified sequence only. To represent this sequence in the system, you can create predecessor/successor relationships between resources in the form of resource networks.
During process planning, these networks are used to determine possible sequences in which a resource can be used to manufacture a batch.
If several similar resources are available in a network, it makes sense to decide on the resource to be used at the time of production and not before. To do this, you can define a resource that is to be used for planning purposes only. This resource represents several equivalent resources.
You can restrict the usage of resources defined for planning reasons only with the task list usage of the resource. In Customizing, you can set the Until release indicator for a task list usage. If a resource has been assigned to a process order whose usage is restricted in this way, the order cannot be released. Before releasing the order, you must replace the planning resource with a suitable individual resource. You can use the function of resource selection to do so.
(C) SAP AG LO305 10
8.11
SAP AG 1999
Classification of Resources
Class: Mixing vessel
Class type: 019 "Work center class"
Object:
Reaction vesselReactor - 01
Characteristics
U/min 150 - 300Temp. 80 - 120°C
Object:
Oper. 10 "Stirring"(Mst. rec. "Colors")
Characteristics
U/min 170Temp. 85°C
. . .
Fits ?Fits ?
Resource selectionin the process order
You can add specific resource attributes to the resource data by classifying the resource with classes of class type 019 work center class. The resource attributes are stored as characteristics of a class and are assigned specific values in the resources.
Apart from resources, you can also classify operations of master recipes in classes of class type 019. This allows you to store specifications for a resource in an operation.
The characteristic values of classified operations represent the selection criteria for system-aided resource selection in the process order. This allows you to select a suitable resource just before production begins. The resource network must be taken into account for resource selection.
(C) SAP AG LO305 11
8.12
SAP AG 1999
Avail. cap. maint.Avail. cap. maint.outside outside of the of the resourceresource
Avail. cap. maint.Avail. cap. maint.outsideoutside of the of the resourceresource
Available Capacity of a Resource
Resource
CapCat 010"Transport unit"
"Clean-out labor"CapCat 009Labor
CapCat 008CapCat 008Process. unitProcess. unit
"Clean"Clean--out labor" out labor" CapCat 009CapCat 009
"Labor""Labor"
Default values per Default values per capacity category and plantcapacity category and plant
orcopy
Pooled capacity
Customizing: Default capacity
ReferenceReference
ReferenceReference CapTRANSCapTRANSCapCat 010CapCat 010"Transport unit""Transport unit"
Avail. cap. maint.Avail. cap. maint.in thein the resourceresource
You can maintain and assign the capacity of a resource while processing the resource, provided the capacity data can be maintained for the resource category.
The capacity overview is the starting point for capacity maintenance from the resource. Different available capacities of a capacity category are identified using the version number. The version
of the available capacity that appears in the screen header as the active version is used during capacity requirements planning and scheduling.
When creating an available capacity, you can copy or reference capacities of different origins.
(C) SAP AG LO305 12
8.13
SAP AG 1999
Maintaining Avail. Capacity Using Shift Sequences
Day 7Day 1 Day 2Shift definitionShift definition
. . .
. . .
Resources /Work centers
Shift sequence
Shift 1Shift 1Shift 1
Work startWork start
Work finishWork finish
BreaksBreaks
Shift 2Shift 2Shift 2
Shift 3Shift 3
You can use shift sequences to reduce the time and effort needed to maintain an available capacity. In a shift definition, you define the work start and finish times as well as duration of breaks, which are
valid for several resources. In a shift sequence, you maintain the sequence of certain shift definitions for several resources. You define shift sequences in Customizing.
(C) SAP AG LO305 13
8.14
SAP AG 1999
Assignments to the Personnel System (HR)
Resource
ResourceMaster data
Line operator
Process order
Operation:Reaction
Resources:VesselVolume 10 m3Line operator2 years experience
Shift schedule
Capacities
Human resources
Resource network
2 yr 1 yr
You can only maintain assignments of personnel, qualifications, and position when the HR system is being used.
(C) SAP AG LO305 14
8.15
SAP AG 1999
Reporting Functions for Resources
ResourcesResources
Which cost centersare assigned to them?
Which resources exist in a plant? Which capacities
are assigned?
Which hierarchy doesthe resource
belong to?
Which recipes use the resource?
Different reporting functions are available for the resources of your company. They provide information on, for example:
Which resources are available?Which cost centers are they assigned to?Which capacities have been defined for the resources, or which resources use a capacity?To which resource hierarchies have the resources been assigned?Which recipes use the resources?
In addition, you can use the Logistics Information System to carry out resource evaluations.
(C) SAP AG LO305 15
8.16
SAP AG 1999
Copy and reference available capacities
Prepare for a system-aided resource selection by creating a resource network and using resource classification
Create a resource based on a default resource and by copying another resource
You are now able to:
Resources: Functions: Unit Summary
(C) SAP AG LO305 16
8.17Exercises
Unit: Resources - Functions
At the conclusion of these exercises, you will be able to:
Create a default resource
Create, copy, and classify resources
Create resource networks, maintain available capacities, and assign cost centers
The resources required to produce detergent in your plant must be maintained in the system. Resource selection is to take place just before production starts. You will therefore classify the resources and include them in a resource network.
After entering the data in the system, you will use various reports for the resources.
1-1 Creating a Resource
Create some resources using the Customizing settings you made in the previous unit.
1-1-1 Defining a default resource
Define a default resource for resource category RE## in plant 1100.
Tools -> Accelerated SAP -> Customizing ->Project Management -> SAP Reference IMG -> Production Planning for Process Industries -> Master Data -> Resource ->General Data Define Default Resource (Default Work Center)
Basic data tab
Description Resource
Person responsible R##
Usage O##
Standard value key SK##
(C) SAP AG LO305 17
Specify that the system is not to check the standard values.
Default values tab
Control key K1##
Capacities tab
Capacity category M##
Other formula DUR##
Scheduling tab
Capacity category M##
Other formula DUR##
Costing tab
Cost center 4250
Activity type
Fixed time
1420
Activity type
Variable time
1420
Formula key
Fixed duration
FIX##
Formula key
Duration,qty-dep.
VAR##
Save your default resource.
(C) SAP AG LO305 18
1-1-2 Creating a resource based on the default resource
Create resource T-DTM1## of the resource category RE## in plant 1100.
Resources menu / Resource -> Create
When you maintain the resource data, the system suggests values that were created in Customizing as default values.
Enter Charging vessel grp.## as the resource description on the Basic Data screen.
Copy the other default values suggested on the Basic Data screen without changing them.
Look at the other detail screens on:
– Default values
– Capacities
– Scheduling
– Costing
Click through the corresponding tabs.
While doing this, pay attention to the messages on the status bar.
The default values will not be copied automatically from the default resource until you run through the detail screens.
Save your resource.
(C) SAP AG LO305 19
1-1-3 Creating resources with reference to existing resources
In plant 1100, create the resources in the following table that are of the category RE## by copying the source T-DTM1##.
Select all the views that are offered for selection on the Copy from screen and choose Copy.
You only have to maintain the resource description and perhaps the task list usage on the Basic Data screen. You can then save the resource without going through further detail screens. All of the data from the screens you selected are copied from the source.
Create the following resources:
Resource Description Task list usage
T-DTR1## Reaction vessel 1 grp.## O##
T-DTR2## Reaction vessel 2 grp.## O##
T-DTR3## Reaction vessel 3 grp ## O##
T-DTA1## Cooling tank grp ## O##
T-DTG1## Group reaction vessel grp ## C##
In which way is resource T-DTG1## restricted by task list usage C## ?
_____________________________________________
_____________________________________________
1-2 Capacities
1-2-1 Displaying the capacity data of a resource
Display the capacity data of your cooling tank T-DTA1##.
Which capacity category is assigned to it? Why?
_____________________________
_____________________________
Display the capacity header data of the capacity category assigned.
Choose Capacity Header Data.
(C) SAP AG LO305 20
Where was the header data of this resource capacity originally created?
_____________________________
_____________________________
1-2-2 Creating a pooled capacity with available capacity intervals
Create a pooled capacity POOL-## (personnel pool group##) of the capacity category P## in plant 1100.
Resources menu / Capacity -> Create
The data that is maintained as the default capacity for each plant and capacity category in Customizing is automatically copied.
Set the Pooled capacity indicator.
Set the Can be used by several operations indicator.
The standard available capacity has an operation time of 24 hours. An average of 10 single capacities is available in the standard available capacity, and the rate of capacity utilization is 100%. Maintain the standard available capacity accordingly.
Enter the detailed information for the available capacity of your pooled capacity. Define an available capacity interval for the active version 1 “Normal available capacity” according to the following information.
Choose Interval avail. cap.
Choose Insert.
(C) SAP AG LO305 21
Make the following entries on the Add Interval of Available Capacity screen:
Valid from: “Today”
Valid to: “End of this year”
Length of cycle: 1
Number of shifts: 3
Workdays: 1 (overrides factory calendar)
Specify the following shifts on the Create Capacity: Shifts screen:
Shf Start Finish Breaks No.
1 00:00:00 08:00:00 01:00:00 8
2 08:00:00 16:00:00 01:00:00 12
3 16:00:00 24:00:00 01:00:00 10
After defining your shifts, choose F3 Back.
Check the available capacity intervals that are now valid on the Create Capacity: Interval of Available Capacity screen.
Save your pooled capacity.
1-2-3 Assigning a pooled capacity
Assign your pooled capacity POOL-## of the capacity category P## to your cooling tank T-DTA1##.
Resource -> Change
Capacities tab
Choose Create capacity.
Check whether the capacity data has been copied correctly to the resource.
Position your cursor on capacity category P20 and choose Capacity Header Data.
Save the resource.
1-2-4 Referencing a capacity
(C) SAP AG LO305 22
Assign the capacity category 010 (Transport) to your cooling tank, T-DTA1##.
Resource -> Change
Capacities tab page
Choose Create capacity.
On the Header Data screen for this capacity category, reference the available capacity of the capacity TRANS-00 of the capacity category 010.
Choose Capacity Header Data.
Choose Reference avail. cap.
After entering the capacity on the Reference Available Capacity screen, you reference the available capacity by choosing Continue. You cannot process the referenced data within the resource. You do have the option of changing the available capacity data by choosing Copy.
Save your resource.
Display the capacity
TRANS-00 and check the data again.
1-3 Formulas
1-3-1 Formulas in the resource
On which screens in a resource is a formula key used to reference the formulas that were defined in Customizing? Display, for example, the resource T-DTA1## again.
______________________
______________________
______________________
What is calculated with each of the formulas?
______________________
______________________
______________________
1-3-2 Displaying and testing the formula in a resource
(C) SAP AG LO305 23
You can display the formulas that are assigned to the formula keys on the resource screens. You can also test the formulas.
Display the formulas defined on the Capacities, Scheduling and Costing screens for one of your resources and write down the formulas.
__________________________________
__________________________________
__________________________________
Extras -> Formula -> Display
For example, test the formula on the Scheduling screen
Extras -> Formula -> Tests
General operation values: (for example)
Operation qty: 1000 kg
Base quantity: 100 kg
Standard values: (for example)
Duration, fixed: 10 H
Duration, variable: 1 H
Choose Calculate.
Result: Total duration = 20 H
(C) SAP AG LO305 24
1-3-3 Formula constants of a resource
Assign the formula constant RESPOW (Resource activity) to one of your resources.
Note: Resource constants can be used as parameters in the formula for costing, capacity requirements determination, and scheduling. This can be useful for resources, for example, that have activity-dependent output.
Resource -> Change /
(for example) Choose Scheduling /
Extras -> Formula ->Formula constants
Param. Values UN
RESPOW (for example) 10,000
W
Which origin must be specified for a formula parameter in Customizing so that it can be used as a resource constant?
____________________________
1-4 Resource selection requirements
1-4-1 Creating a resource network
Create a resource network NETZ-## in plant 1100 according to the following graphic.
(C) SAP AG LO305 25
0.2.2T-DTR1##
0.2.5T-DTR2##
0.2.6T-DTR3##
0.2.4T-DTM1##
0.2.3T-DTA1##
Make the following entries on the Header Data screen:
Description Resource network group ##
Person responsible R##
Assign the resources of the network shown in the graphic above.
Choose Resource allocation.
Choose the following selection conditions:
Plant: 1100
Resource: T-DT*
Resource Category: RE##
On the Resource allocations screen, select the resources and go to graphical maintenance.
Choose Graphic.
Create the resource network shown above in the graphic. Use drag and drop to position the resources as shown. Choose Connect and draw the links between the resources. Click in the blank area and go back one screen.
Save your resource network.
1-4-2 Displaying the network relationship of a resource
Display the data of the network resource for the reaction vessel T-DTR2##.
Resource -> Display
Goto -> Network -> Relationships
Goto -> Relationship detail
Header
Graphic
(C) SAP AG LO305 26
1-4-3 Classification of resources
Classify your reaction vessel in class REAC_## (Reaction vessel) of the class type 019 (Work center class).
Assign values to the characteristics assigned for the individual reaction vessels in the following way:
T-DTR1## T-DTR2## T-DTR3##
Surface G
(glass)
P
(polyethylene)
S
(stainless steel)
Rev. per min 20 - 80 20 - 40 20 - 60
Save your data.
Classification is carried out for the purpose of system-aided resource selection in the process order.
1-5 Reporting
Resources / Reporting -> < ... >
1-5-1 Resource list
Display all resources that R## is responsible for in plant 1100. Be sure to remove any resources that have defaulted onto the selection screen.
Reporting ->Resources list
Note: Double-click one of the resources listed to display the corresponding resource data.
(C) SAP AG LO305 27
1-5-2 Cost center assignment
Display the cost center that is assigned to your resources.
Plant: 1100
Work center: T-DT*##
Reporting -> Cost center assignment
Note: Double-click the objects listed to display data for the resources, cost centers, and activity categories.
1-5-3 Resource capacities
Display the capacities that are assigned to your resources.
Reporting -> Resource capacity
Plant: 1100
Work center: T-DT*##
Note: Double-click the capacities listed to display the corresponding capacity data.
1-5-4 Where-used list
In which master recipe is, for example, the resource T-IC101 from plant 1100 used? Use overview variant: L00000000100.
Reporting -> Where-used list ->Resource
For which resources is the capacity POOL-## from plant 1100 used?
Reporting -> Where-used list ->Capacity
(C) SAP AG LO305 28
8.18Solutions
Unit: Resources - Functions
1-1 Creating a Resource
1-1-1 Defining default resources
Maintain the data as described for the exercise.
1-1-2 Creating a resource based on the default resource
Maintain the data as described for the exercise.
1-1-3 Creating resources with reference to an existing resource
Maintain the data as described for the exercise.
In which way is resource T-DTG1## restricted by task list usage C##?
The "Until rel." indicator (usage only until release in order) is set. An operation with this resource in its process order cannot be released. By this time at the latest, the resource must be replaced by a resource that physically exists.
1-2 Capacities
1-2-1 Displaying the capacity data of a resource
Which capacity category is assigned to it? Why?
M##. This capacity category was defined in the default resource and was copied when the resource was created.
Display the capacity header data of the capacity category assigned.
(C) SAP AG LO305 29
Choose Capacity Header Data.
When was the header data of this resource capacity originally created?
When the default capacity was defined for M## ( in Unit “Resources: Customizing”).
1-2-2 Creating a pooled capacity with available capacity intervals
Resources menu: Capacity -> Create
Choose Interval avail. cap.
Choose Insert.
1-2-3 Assigning a pooled capacity
Resource -> Change
Capacities tab
Choose Create capacity.
Check whether the capacity data has been copied correctly to the resource.
Choose Capacity Header Data.
1-2-4 Referencing a capacity
Display and check the capacity TRANS-00
again.
Resources menu/ Capacity ->Display
1-3 Formulas
(C) SAP AG LO305 30
1-3-1 Formulas in the Resource
On which screens in a resource is a formula key used to reference formulas that were defined in Customizing?
Capacities
Scheduling
Costing
What is calculated with each of the formulas?
Capacity requirements are determined
Operation time is calculated
Costs based on fixed and variable duration
1-3-2 Displaying and testing the formula in a resource
Display the formulas defined on the Capacities, Scheduling and Cost centers screens for one of your resources and write down the formulas.
Extras -> Formula -> Display
DUR##: Duration, Fixed + Duration, Var. * Phase Quantity / Base Quantity
FIX##: Duration, Fixed
VAR##: Duration, Var. * Phase Quantity / Base Quantity
For example, test the formula on the Scheduling screen
Extras -> Formula -> Tests
Choose Calculate.
1-3-3 Formula constants of a resource
(C) SAP AG LO305 31
Resource -> Change /
Choose (for example) Scheduling /
Extras -> Formula ->Formula constants
Which origin must be specified for a formula parameter in Customizing so that it can be used as a resource constant?
Use the F1 help in the "Param." field on the "Formula constants" screen to answer this question.
Origin 1 “Work center constant”
1-4 Resource selection requirements
1-4-1 Creating a resource network
Resources menu / Resource network -> Create
Choose Resource allocation.
Choose Graphic.
1-4-2 Displaying the network relationship of a resource
Resource -> Display
Goto Network -> Relationships
Relationship detail
Header
Graphic
1-4-3 Classification of resources
Resource Change.
On the Basic data tab, choose Classification.
(C) SAP AG LO305 32
1-5 Reporting
Resources / Reporting -> < ... >
1-5-1 Resource list
Reporting -> Resource list
1-5-2 Cost center assignment
Reporting -> Cost center assignment
1-5-3 Resource capacities
Reporting -> Resource capacity
1-5-4 Where-used list
Reporting -> Where-used list ->Resource
Reporting -> Where-used list ->Capacity
(C) SAP AG LO305 33
9
SAP AG 1999
Mass processing: overview and access to recipe and BOM maintenance
Recipe editing
Approval
Consistency check
Contents:
Production Version
(C) SAP AG LO305 1
9.2
SAP AG 1999
Create, change, check, display, and delete production versions
Access master recipes and BOMs through production versions to edit them
Perform consistency checks for production versions
At the conclusion of this unit, you will be able to:
Production Version: Unit Objectives
(C) SAP AG LO305 2
9.3
SAP AG 1999
PP-PI Overview
Master Data: Overview
Materials
R/3 Classification System
Batches
Resources: Customizing
Resources: Functions
Introduction
Master Recipes: Operations andPhases
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
11
2
3
4
5
6
7
8
1
10
12
13
14
15
Summary and Conclusion16
Master Recipes: Materials
9 Production Version
Overview Diagram 9
(C) SAP AG LO305 3
9.4
SAP AG 1999
The products in your company are manufactured in different ways and are therefore managed in several different production versions.
You are responsible for maintaining production versions in individual or mass processing.
Production Version: Business Scenario
(C) SAP AG LO305 4
9.5
SAP AG 1999
Production versionProduction version
Production Version: Definition
A production version determines which alternative BOM is used together with which master recipe to produce a material or create a master plan for a material.
More than one production version for different validity period and lot-size ranges can be assigned to a material.
Production versions are used in discrete manufacturing, repetitive manufacturing, and process manufacturing.
Production versions are used in sales & operations planning (SOP), material requirements planning (MRP), process order creation, and product costing to select the most suitable task list or recipe and the corresponding material list.
A production version comprises the following data: Material number, version ID, lot-size range, and validity period of the production version, details about whether the production version is locked, the date of the last consistency check, the assignment of master recipes to the production version, the assignment of the alternative BOM to the production version, a check status that displays the result of the last consistency check, the production line if the product is manufactured in discrete manufacturing, the change number that was used when the production version was last changed, as well as further administrative data.
When you create process orders that require approval, the system uses the change number to check whether the production version has been approved.
You can also select a production version without a recipe or BOM. Note, however, that if you do so, material quantity calculation data is not copied.
(C) SAP AG LO305 5
9.6
SAP AG 1999
Selection criteria for worklist creation:
Selection criteria:
Plant
Material
MRP controller
Key date
Task list type / group
Production line
Selection criteria:
Plant
Material
MRP controller
Key date
Task list type / group
Production line
Extended selection:
Header data
Lot size
Validity
Tas Lists
BOMs
Repetitive manufacturing
Extended selection:
Header data
Lot size
Validity
Tas Lists
BOMs
Repetitive manufacturing
Production Version: Mass Processing (I)
(C) SAP AG LO305 6
9.7
SAP AG 1999
Copy
Assign change number
Delete
Create
Change
Check consistency
Lock
Create
Change
Check consistency
Lock
Production Version: Mass Processing
Maintain Prod.Version: Detail Screen
Production Version: Mass Processing (II)
(C) SAP AG LO305 7
9.8
SAP AG 1999
Worklist:Production version Task list group Grp cntr Alt. BOM
Recipe Key date (for change status)
Master recipe Bill of material
0001
0003
T-DET100
T-DET100
1
1
1
2
0002 T-DET100 2 2
Detailed plng grp: T-DET100
Group counter: 2Alternative BOM 2
... ... ... ...
Recipe Editing
From mass processing of production versions, you can navigate to the corresponding master recipe and create, edit, or display the recipe or alternative BOM there. From the production version, you can thus access all production related master data.
If you have assigned a change number to a production version, this number is also valid for recipe and BOM editing from the production version. This enables you to use an approval procedure in the same way for all related objects.
(C) SAP AG LO305 8
9.9
SAP AG 1999
PlantMaterialProd.version
Production version
Task lists
Bill of material
Check statusCheck status
Check statusCheck status
Lock
From lot sizeValid from
1100T-FD1000001
1 000 01/20/2000
1Group counterTask list group
T-DET100
Alternative BOM 1 BOM usage 1
Change no.assign.
Valid toTo lot size
12/31/200220 000
Recipe group for... 03/05/199903/05/1999Date of
last check
Check
Repetitive manufacturing
Consistency Check
You can check whether the data of a production version is consistent with the data of the master recipe and the data of the alternative BOM assigned to it. You can then be sure that a valid recipe or valid BOM actually exists within the whole validity period of the production version.
In order for a production version to be consistent, it must fulfill the following requirements:The lot-size range of the production version must be in the lot-size range of the assigned recipe as well as of the assigned alternative BOM. This applies to all change statuses of the recipe and alternative BOM that are in the validity period of the production version. The assigned recipe and alternative BOM must exist during the whole validity period of the production version. The deletion flag must not be set for them.
If one of these requirements is not met, an error or warning message is given in the inspection result.
After the check, you can update the date of the last check and check status of the production version. The recipe, task list, or BOM are then assigned one of the following statuses in the production version:
Last check ok
Last check with warning
Last check with error
(C) SAP AG LO305 9
9.10
SAP AG 1999
Recipe group TRecipe group T--DET100DET100 Material TMaterial T--FD100FD100
Prod.vers. 0001Prod.vers. 0001
MaterialMaterial--recipe assignmentrecipe assignment
Material Recipe
T-FD100 T-FD100 1 1
MRPMRP viewview
Prod.vers. 0001Prod.vers. 0001
Recipe: 1
Change rule:• With an engineering change order
Mai
nta
inM
ain
tain
Mai
nta
inM
ain
tain
Production versionProduction versionMass processingMass processing
Mai
nta
inM
ain
tain
Change number
Validity period
Approval
Unlike recipe editing with a change master record or engineering change order, you do not create a new change status for the production version. You only assign the change number to it in the worklist for production version processing by carrying out the corresponding function. The change number is used to document or approve changes. If required, you must adjust the validity period of the production version manually.
You cannot use a change number when you edit production versions in the material master record. In the standard system therefore you cannot edit production versions whose change rule requires an engineering change order in the material master record.
A production version is considered approved when the following requirements are met:
The master recipe assigned to the production version has a change rule that requires an engineering change order with or without a change type.
The production version has been assigned a change number that complies with this change rule.
The relevant engineering change order has been released. This means you can no longer use it for changes.
(C) SAP AG LO305 10
9.11
SAP AG 1999
You can create, change, check, and lock production versions in detail maintenance.
In addition, you can copy and delete production versions in mass processing and assign change numbers.
From the production version, you can access all production-related data (master recipe and material BOM).
The consistency check ensures that a master recipe and BOM exist during the whole validity period of a production version.
Production Version: Unit Summary
(C) SAP AG LO305 11
9.12Exercises
Unit: Production Version
At the conclusion of these exercises, you will be able to:
Create and process production versions
Perform consistency checks for production versions
You are responsible for mass maintenance of production versions in your plant. You will create several production versions for the new detergent T-FD1##, since you are planning to produce it on different lines with different ingredients. You will therefore create production versions for different lot-size ranges, master recipes, validity periods, and BOM versions.
1-1 Creating a production version Create production version 0001 for material T-FD1## in plant 1100 using the following specifications:
Description of production version
Detergent 1
Valid from Today
Valid to Maximum validity date
From lot size 1000
To lot size 20000
Alternative BOM 1
BOM usage Production
Detailed plng grp: T-DET1##
Group counter: 1
Task list type: Master recipe
1-1-1 Which warnings appear after detail maintenance for the production version?
______________________________________________________
(C) SAP AG LO305 12
______________________________________________________
1-1-2 Use the application help to find out more about the symbol that appears in the processing status column. What does this symbol stand for?
______________________________________________________
1-2 Copying from production versionsCopy the production versions created and change the copies according to the following instructions:
1-2-1 Copy production version 0001 to production version 0002 and change the number of the alternative BOM from 1 to 2.
1-2-2 Copy production version 0002 to production version 0003 and change the valid from date from today to today + 2 months in detail maintenance. Also change the number of the alternative BOM from 2 to 3.
1-2-3 Copy production version 0001 to production version 0004 and change the lot-size range from 1000 - 20000 to 20000 - 30000. Also change the group counter from 1 to 2.
1-2-4 Copy production version 0004 to production version 0005 and change the number of the alternative BOM from 1 to 2.
Save the production versions.
1-3 Consistency check for production versions /processing statusPerform a consistency check for production version 0003 of material T-FD1##.
1-3-1 Which messages appear in the consistency log?
______________________________________________________
______________________________________________________
1-3-2 How do you recognize that a consistency check has been performed on this production version?_____________________________________________________
_____________________________________________________
_____________________________________________________
1-3-3 What is the processing status?
________________________________________________________________
____________________________________________
Save the production versions.
(C) SAP AG LO305 13
1-3-4 What changes with regard to the processing status after you save?
______________________________________________________
(C) SAP AG LO305 14
1-4 Production version in the material master
The production version that was created in the previous exercise is defined in the master data record of the material T-FD1##.
Display the production version for material T-FD1## in the material master.
(C) SAP AG LO305 15
9.13Solutions
Unit: Production Version
1-1 Creating a production version
SAP Standard Menu Logistics Production -Process Master Data Production Versions
Enter plant 1100 and material T-FD1## as your selection criteria.
Choose Refresh or press enter.
Choose Create production version
The Detail Maintenance: Production Version screen appears.
Maintain the data as described for the exercise.
1-1-1 The following warnings appear:
No task list exists
No BOM exists
1-1-2 Help Application help
The symbol means the following:
Newly created or copied production versions
Save your production version.
1-2 Copying from production versions
1-2-1 Copy production version 0001 to production version 0002.
Select production version 0001.
Choose Copy production version
Enter number 0002 in the Copy/ProdVersion field.
(C) SAP AG LO305 16
Choose Enter.
On the Production Version: Mass Maintenance screen, enter alternative BOM 2 for production version 0002.
Confirm the No BOM exists warning by choosing Enter.
(C) SAP AG LO305 17
1-2-2 Copy production version 0002 to production version 0003.
Select production version 0002.
Choose Copy production version
Enter number 0003 in the Copy/ProdVersion field and choose Enter.
Double-click the entry production version 0003. The Detail Maintenance: Production Version screen appears. Change the Valid from date and the alternative BOM as described in the exercise.
Choose Close detail screen.
Confirm the No task list exists, No BOM exists warnings by choosing Enter.
1-2-3 Copy production version 0001 to production version 0004.
Copy production version 0001 as described in 1-2-1.
Change the lot-size range and the group counter as described in the exercise.
Confirm the warnings by choosing Enter.
1-2-4 Copy production version 0004 to production version 0005.
Copy production version 0004 as described in 1-2-1.
Change the alternative BOM number as described in the exercise.
Confirm the warnings by choosing Enter.
Save the production versions.
1-3 Consistency check for production versions /processing status
Select production version 0003.
Choose Consistency check
The consistency log for production version 0003 appears.
1-3-1 The consistency log contains the following error messages:
Task list does not exist
BOM does not exist
Choose Back.
1-3-2 The current date was entered in the check date column. Additionally, the check status "Last check with error" (red light) is set.
(C) SAP AG LO305 18
1-3-3 The processing status shows that the production version data was changed.
Note: The production version is therefore locked for other users until you save.
Save the production versions.
1-3-4 The following results when you save:
The symbol in the Processing status column disappears.
Note: This unlocks the production version.
1-4 Production version in the material master
SAP standard menu Logistics Production -Process Master Data Material Master Material. Display Display current
Display the MRP 4 view in the material master for material T-FD1##.
Choose ProdVersion.
On the Production Version Overview screen, the production versions just created are listed.
Select a version and press Detail to call the Production Versions Details screen.
If you enter the material master in the change mode, you can also create, check, and delete production versions if the production versions are not for recipes to be approved.
(C) SAP AG LO305 19
10
SAP AG 1999
Contents:
Master Recipes: Operations and Phases
Elements and structure of a master recipe
Functions of a master recipe
Recipe-plant assignment
Recipe header data
Operations and phases
Resource assignment
Relationships
Scheduling
Classification of operations and resources
(C) SAP AG LO305 1
10.2
SAP AG 1999
Define the elements and structure of a master recipe
Describe the functions of a master recipe
Make assignments between recipes and plants
Create operations and phases
Assign primary and secondary resources
Create relationships
Classify operations
Carry out scheduling for a master recipe
At the conclusion of this unit, you will be able to:
Master Recipes, Operations, and Phases:Unit Objectives
(C) SAP AG LO305 2
10.3
SAP AG 1999
PP-PI Overview
Master Data: Overview
Materials
R/3 Classification System
Batches
Resources: Customizing
Resources: Functions
Introduction Production Version
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
11
2
3
4
5
6
7
8
1 9
12
13
14
15
16
Master Recipes: Materials
10Master Recipes: Operationsand Phases
Overview Diagram 10
Summary and Conclusion
(C) SAP AG LO305 3
10.4
SAP AG 1999
Master Recipes, Operations, and Phases:Business Scenario
The elements and structure of a master recipe that already exists will be presented.
Your company is going to put a new product on the market.
The production process is to be described in a master recipe.
You are responsible for creating a master recipe with operations and phases based on the resources used.
(C) SAP AG LO305 4
10.5
SAP AG 1999
A recipe that describes the production of one or several materials in a production process.
Master recipe
EBF/ISA(S88)/NAMUREBF/ISA(S88)/NAMUR
Proc. planning Proc. control
Control information
Quality inspec. data
Steps in the prod. process
Resources
Materials
Master recipe
Elements of a Master Recipe
Process order Process order Control recipeControl recipe
A master recipe defines the following data required for the manufacturing of materials without relating to a particular order
ResourcesMaterial componentsData for in-process quality inspectionControl information for the process control level
Master recipes have a planning and a control view. The planning view comprises the planning of operations, materials, resources, and inspection characteristics. Therefore, links to the R/3 application components PP, MM, SD, WM, and QM have been realized. The control view contains information required for communicating with the process control level.
The master recipe is the basis for the creation of process orders. A process order describes an actual production process. It contains all information specified during process planning, such as production date and quantities to be produced.
A control recipe contains all the information necessary for the execution of a process order by a certain process control system or a process operator. Control recipes are generated from the process instructions in a process order and transferred to the corresponding destination in process control. Process instructions are defined in the master recipe on which the process order is based.
Three organizations have defined the data that must be included in the standard recipe maintenance of the PP-PI application component:
(C) SAP AG LO305 5
The European Batch Forum (EBF)The Instrument Society of America (ISA; with standards S88)NAMUR (Norms working committee for measuring and control techniques in the chemical industry).
(C) SAP AG LO305 6
10.6
SAP AG 1999
Recipe headerRecipe header
OperationsOperations
PhasesPhases
Process instructionsProcess instructions
Proc. instr. characteristicsProc. instr. characteristics
Resource network
Material (product)Primary resource
Structure of a Master Recipe (I)
The recipe header contains data that is valid for the whole recipe. At the header level, a resource network and the material to be produced is assigned to the recipe.
Operations describe the different steps required during the production process. For a more detailed description of these steps, operations are subdivided into phases.
Exactly one primary resource at which an operation is to be carried out is assigned to the operation. This assignment of the primary resource is also valid for all phases that belong to the operation.
Process instructions are structures with which data is transferred from R/3 process planning to process control. Process instructions are assigned to the phases of a master recipe.
Process instruction characteristics are assigned to process instructions and define the content of the process instructions together with the corresponding characteristic values..
(C) SAP AG LO305 7
10.7
SAP AG 1999
Recipe headerRecipe header
OperationsOperations
PhasesPhases
Process instructionsProcess instructions
Proc. instr. characteristicsProc. instr. characteristics
Secondary resources
Materialcomponents
Inspection characteristics
Relationships
Resource network
Material (product)Primary resource
Structure of a Master Recipe (II)
If required, you can assign additional secondary resources to operations and phases. If materials are added, temporarily created, or withdrawn at certain places in the production process, you
assign them to the corresponding operations and phases as components of a material list. Inspection characteristics specify which in-process quality inspections are to be carried out. They can
be assigned to operations and phases.
Relationships define the sequence of phases as well as link the start and finish points of phases.
(C) SAP AG LO305 8
10.8
SAP AG 1999
Process orderProcess order
MRPMRP
Cost accountingCost accounting
Master recipe
Recipe headerRecipe header
OperationsOperations
PhasesPhases
Process instructionsProcess instructions
Proc. instr. characteristicsProc. instr. characteristics
Primary resource
Functions of a Master Recipe
(C) SAP AG LO305 9
10.9
SAP AG 1999
EquipmentEquipment--testingtestingrecipesrecipes
Setup recipeSetup recipe
CleanClean--out recipesout recipes
Changeover recipesChangeover recipes
Non-Manufacturing Recipes
Master recipes can also be created for purposes other than the manufacture of materials. Non-manufacturing master recipes are, for example:
Equipment-testing recipesClean-out recipesSetup or changeover recipes
Equipment-testing recipes contain process instructions that are used to carry out and document periodic functional testing of a plant line.
Clean-out recipes describe the activities as well as the time, resource, and material requirements that are necessary to clean out a vessel after a production run.
Changeover recipes describes the activities necessary to transfer a processing unit from an initial state to a subsequent state.
(C) SAP AG LO305 10
10.10
SAP AG 1999
ProfileProfile
Default values for recipe maintenance for:
Default values for quality inspection
The operation
The relationship
The process instruction
The relationship graphic
Changeability
Profile for the Recipe
When creating a master recipe, you must enter a profile defined in Customizing. To display or change the default values set in this profile, choose Extras in the master recipe menu.
You can change the values in the profile dialog box. However, these changes are only valid until you exit the recipe.
In the profile, you can enter default values for the operation, the relationship, the increment of process instructions and process instruction characteristics as well as for the relationship graphic and how it is displayed.
Moreover, you can branch to a dialog box displaying QM data and enter default values for quality inspection.
(C) SAP AG LO305 11
10.11
SAP AG 1999
Recipe group Detergent production
Recipe
12
34
1100
Description
Detergent productionClean-out
Detergent productionClean-out
Plant
11001100
31003100
Productionplants
3100
Recipe-Plant Assignment
Master recipes that belong to the same recipe group can be assigned to different plants. When creating a master recipe, you can enter the plant number in the recipe header.
(C) SAP AG LO305 12
10.12
SAP AG 1999
Plant 3100
Plant 1100
Material components
Material listMat. qty calc.
Operations / phases
Copy
MaterialMaterial
Production versionProduction version
BOMBOM
RecipeRecipe
RecipeRecipeOperations / phases
Copying Recipes from Other Plants
You can create a master recipe by copying another master recipe, even if they are from different plants. The material in the recipe header of the recipe being copied as well as the factory calendar are copied to the new recipe.
The other recipe objects, such as primary resources, control recipe destinations, process instructions, etc. are copied to the new recipe if they already exist in the target plant (otherwise error messages appear).
The data on the recipe detail screen of the new recipe is checked. The data must be changed if the entry does not exist in the target plant or is not the same as the resource data in the target plant.
Caution! The master inspection characteristics are not checked in the target plant. The system also does not check whether the process instruction characteristics that were copied have been released in the target plant.
To use the material assignments that have been copied to the new recipe, you must first create a production version to use the alternative bills of material in the new recipe.
(C) SAP AG LO305 13
10.13
SAP AG 2001
Master recipe
Mass changes Recipe: Replacing resource
Replacing process instruction Material list: Replacing material
Recipe changes:Which objects were created, changed, ordeleted for a recipe?
Material lists Structure Changes Quantity
Recipe list:Whichtexts forrelationshipssecondary resourcesmaterial componentsproc. instructionsPI characteristicsinsp. characteristicsare used in a recipe?
Where-used list:Which recipe uses a Resource Process instruction Material Document Class?
Reporting
You can evaluate the data of your recipe in the following ways:Evaluations on recipe changes: Documentation of changes made to all objects belonging to a recipe over a certain period of time.Where-used list for resources, process instruction categories, materials, documents, and classes.Evaluations of material lists: Evaluations of the structure and changes carried out for a material listMass changes: Replacing of process instruction categories and resources in master recipes. Replacing of materials in material lists.
(C) SAP AG LO305 14
10.14
SAP AG 1999
Material-recipe assignment
UsagePlanner groupStatus
Resource network
Recipe group, recipe counter, plant
Recipe header dataRecipe header data
Charge quantity rangeChange rule
Long text
QM data
Administrative data
Recipe Header Data
Data that is valid for the whole recipe is maintained on the recipe header level. A recipe is identified by the recipe group and the recipe counter. Recipes are defined on the plant
level. They can be grouped into recipe groups based on criteria defined by the user. By assigning a resource network, the physical network of the resources is described for the line at
which the process is to take place. The usage describes the purpose for which the recipe can be used (for example, production,
construction, plant maintenance). The planner group specifies a group of people who are responsible for the maintenance of the recipe. The status gives information about the processing status of a recipe (for example, creation phase, released for order, released for costing) and controls which business operations are allowed or not allowed.
With the charge quantity range, you specify a value range that is allowed for the production quantity and for which the master recipe may be used as the reference for a process order in production.
The material to be produced using the recipe is assigned to the recipe at the header level. To give more information, you can create a long text for the recipe header. On the recipe header detail screen for QM data, you determine whether an in-process inspection is to
take place with or without inspection points. Administrative data gives information about the validity dates of the recipe, who has created or
changed the recipe, and whether a change was made using a change number.
(C) SAP AG LO305 15
(C) SAP AG LO305 16
10.15
SAP AG 1999
.
.
.
CtrKCtrK
CtrKCtrK
CtrKCtrK
Operation 20Operation 20 ReactionReaction
Phase 21 Charge
Phase 22 Heat
Phase 23 Discharge
Operation 10Operation 10 ChargingCharging
Phase 11 Charge
Phase 12 Mix
Phase 13 Discharge
CtrKCtrK
Operation 30Operation 30 CoolingCooling
Phase 31 Charge
Phase 32 Cool
Phase 33 DischargeControl key
Operations and Phases
Operations describe the different steps required during the production process. For a more detailed description of these steps, operations are subdivided into phases.
You must enter a control key for each operation and phase. The control key determines how an operation or phase is to be processed in functions such as process orders, costing, and capacity requirements planning.
Control keys are defined in Customizing. You can set a number of indicators specifying, for instance: Whether scheduling is to be carried out for the phase Whether capacity load records are to be written for the phase Whether the phase is costed Whether a goods receipt is to be posted automatically for the process order when a confirmation is
received Whether time tickets are to be printed for the operation or phase Whether inspection characteristics have to be maintained for the operation or phase
Note: Scheduling, determination of capacity requirements, and costing take place at phase level. The dates and capacity requirements for operations are derived from the corresponding phases.
(C) SAP AG LO305 17
10.16
SAP AG 1999
Operation 30 CoolingOperation 30 Cooling
Primary resourceCooling tank
Var. start
Var. finish
Time
Secondary resource Line operator
Phase 31Charge
Phase 32Cool and check quality
Phase 33Discharge
Secondary resource Transport truck
CtrKCtrK CtrKCtrK
Assignment of Primary and Secondary Resources
Exactly one primary resource is assigned to an operation. The primary resource is that part of a line or processing unit at which the operation is carried out. It is committed for the entire duration of the operation.
The primary resource is also assigned to all phases subordinate to the operation in the hierarchy. If required, you can assign additional secondary resources to operations and phases. This assignment
can be carried out with a flexible start and finish time, relative to the start or finish of the operation or phase.
You must assign a control key to each secondary resource. The same business transactions can be carried out for secondary resources as for operations and phases. Secondary resources can, for example, be included in scheduling, capacity requirements planning, and costing.
(C) SAP AG LO305 18
10.17
SAP AG 1999
Recipe operation/phase
ResourceResource
Standard valuesf.ex. duration
Default values
Units for standard values
Control key
Standard text key
Wage data
Activity types
Rule for maint.Mandatory3
Ref.ind.
Ref.ind.
Ref.ind.
Ref.ind.
Standard and Default Values from the Resource
When you assign a resource to an operation or phase, you also assign the standard and default values maintained in the resource.
A standard value is a planned value for the execution of an operation or phase such as the execution time or operation quantity. Standard values are used in costing, scheduling, and capacity requirements planning to calculate costs, execution times, and capacity requirements.
Possible standard values for an operation or phase are defined in the corresponding resource. You can use a rule for maintenance to specify whether a standard value for an operation or phase may be, should be, or has to be entered. In the resource, you can also maintain default values for the units of measure of the standard values.
In the resource, you can maintain default values for the operation or phase data "control key" and "standard text key", for wage data as well as for the activity types to be assigned. These default values are then either copied into the operation or phase, giving you the possibility to later change them, or they are referenced into the operation or phase, thus making further changes impossible. In the latter case, a reference indicator is set for the relevant default value in the resource.
The control key specifies how an operation or phase is processed from a business point of view. Using the standard text key, you can choose a standard text created previously for the description of an
operation or phase.
(C) SAP AG LO305 19
The specific output of a resource is defined by assigning activity types to the resource. Each activity type is valued with a specific charge rate (for example, USD 100/h). This forms the basis for calculating the costs resulting from activities performed.
(C) SAP AG LO305 20
10.18
SAP AG 1999
Phase 31Charge
Phase 32Cool
Phase 33Discharge
Time
Operation 10Operation 10 ChargingChargingChargeCharge vevesselssel
Operation 30Operation 30 CoolingCoolingCooling tankCooling tank
Operation 20Operation 20 ReactionReactionReaction vesselReaction vessel
Phase 13Discharge
Phase 12Mix
Phase 11Charge
Phase 21Charge
Phase 22Mix
Phase 23Discharge
Relationships
Relationships determine the time-based sequence of phases. Relationships link the start and finish points of phases. This enables you, for instance, to synchronize phases belonging to different operations.
(C) SAP AG LO305 21
10.19
SAP AG 1999
Recipe group "Production"Recipe 1
Recipe group "Clean-out"Recipe 1
Relationships Between Master Recipes
Phases from different recipes can be linked using relationships.
(C) SAP AG LO305 22
10.20
SAP AG 1999
Float beforeproduction
Duration
Float afterproduction
Relationships !
Time
PhS PhF
SSBS BFSF
Ph11Ph11 Ph12Ph12 Ph13Ph13 Ph31Ph31 Ph32Ph32 Ph33Ph33
Ph21Ph21 Ph22Ph22 Ph23Ph23
Dates: BS:BF:SS:SF:PhS:PhE:
Basic startBasic finishScheduled startScheduled finishPhase startPhase finish
Scheduling in the Master Recipe
Scheduling a master recipe enables a time-based simulation of the manufacturing process in the planning phase. During scheduling, the start and finish times of phases are determined. Scheduling takes place at phase level only. The operation dates are derived from the phase dates.
Starting from the basic start or basic finish dates, scheduling is done either as forward or backward scheduling. You can enter a planned lot size if the phase duration depends on the quantity to be processed.
To be able to schedule, you must maintain default values for phases as well as relationships between phases.
Depending on the scheduling type, the float before production is either added to the basic start date, or the float after production is subtracted from the basic finish date. In this way you can determine the start and finish dates of production (scheduled start date, scheduled finish date).
The float before production and float after production are time buffers enabling you to react to disturbances in the manufacturing process. You can assign them to the material in the MRP view of the material master record using the scheduling margin key.
(C) SAP AG LO305 23
10.21
SAP AG 2001
ResourceResource
Formula key for scheduling
Capacity category as a basis for scheduling
Formula constants
General operation values
Standard values Control key
"Scheduling"
Phase 11Phase 11 Phase 12Phase 12 Phase 13Phase 13
Operation 10Operation 10
PhSPhS PhFPhF
PhS PhF PhS PhF
OSOS OFOF
Duration
FormulaFormula
PhasePhase
Phase Duration
To calculate the phase duration, you must specify a capacity category as a basis for scheduling and define a formula in the resource.
The phase duration is determined on the basis of the standard values and additional formula parameters. When calculating the phase dates, the available capacity is taken into account as the basis for scheduling. Scheduling takes place via the phases. The operation duration is derived from the phase dates. The scheduling result can either be displayed in a table or graphically in a Gantt chart. Due to the relationships, phase dates can have a certain time buffer. Therefore, the earliest and latest start
and finish dates are determined in scheduling.
(C) SAP AG LO305 24
10.22
SAP AG 1999
Class type 019 "Work center class"Class type 019 "Work center class"Class "Reaction vessel"
Characteristics:
Resource selection in the process order
Requirements Requirements --OperationOperation
1200 RPM
85° C
Fits ?Fits ?
Stirring speedTemperature
Classification of Operations and Resources
Attributes Attributes --ResourceResource
80-120° C
1000-2000 RPM
Using classes of class type 019 work center type, you can classify resources as well as operations contained in master recipes.
You can thus use the characteristics of a class of class type 019 in two ways: first, you can store specific resource attributes and second, you can define requirements a resource must meet if it is to be used in an operation of a master recipe.
The characteristic values of classified operations represent the selection criteria for system-aided resource selection in the process order´.
(C) SAP AG LO305 25
10.23
SAP AG 1999
WEI
Consistency logHeaderHeader
Oper.Oper.
PhasePhase
Proc. inst.Proc. inst.
PI char.PI char.
Res. netwk
Material
Comp.
Sec. res.
Insp. char.
Relationsh.
Primary res. !QM data ismissing
CheckCheck
Checking the Recipe / Consistency Log
If you want to check whether the data for your recipe is complete and consistent, call the Recipe check function.
After the recipe is checked, warnings, information, and errors are collected for the recipe check in a consistency log.
(C) SAP AG LO305 26
10.24
SAP AG 1999
Describe the elements and structure of master recipes.
Assign recipes of the same group to different plants.
Copy master recipe between plants.
Assign primary resources.
Define relationships.
Carry out scheduling.
Prepare system-aided resource selection by classifying operartions.
Master Recipes, Operations, and Phases:Unit Summary
(C) SAP AG LO305 27
10.25Exercises
Unit: Master Recipes
Topic: Operations and Phases
At the conclusion of these exercises, you will be able to:
Describe the elements and structure of a master recipe
Create a master recipe
Classify operations
Perform scheduling
The elements and structure of a master recipe that already exists will first be presented.
Your company is going to put a new detergent on the market.
The production process will be described in a master recipe.
You are responsible for creating a master recipe with operations and phases based on the resources used.
1-1 Elements and structure of a master recipe
Go to mass maintenance for production versions in plant 1100 for group T-ICE##. Familiarize yourself with the data in the master recipe for production version 0001 of material T-FI1##.
1-1-1 Operation overview
Familiarize yourself with the operations, phases, and resources assigned.
1-1-2 Relationships
Display the relationships defined between the phases in the graphic.
(C) SAP AG LO305 28
1-1-3 Recipe header data
Display the recipe header data.
Which materials are assigned to the recipe as products?
________________________
________________________
________________________
1-1-4 Material list
Familiarize yourself with the material components that are assigned to the recipe.
Which materials are assigned?
In which quantities are the material components required?
To which operations or phases are the material components assigned?
Material Quantity Operation
(5 examples are sufficient)
1-1-5 Process instructions
Display the process instructions maintained for phase 1010.
Which process instruction is assigned?
________________________
(C) SAP AG LO305 29
1-2 Reporting and changing master recipes
1-2-1 Recipe list
Create a print list for the master recipe T-ICE##.
Master recipe menu / Reporting Recipe -> Recipe list
Task list type: 2
Plant:
Recipe group: T-ICE##
Recipe: 1
Material components are to be displayed for all BOMs.
Program -> Execute
1-2-2 Familiarize yourself with the further reporting functions that are available for the master recipe.
Master recipe menu / Reporting -> < ... >
1-2-3 Familiarize yourself with the mass changes that are possible for master data.
Master recipe menu / Mass changes -> < ...
1-2-4 Familiarize yourself with the settings you can make in the master recipe environment.
Master recipe menu / Environment -> < ...
1-3 Creating a master recipe: header data and operations / phases
Go to mass maintenance for the production version for material T-FD1## in plant 1100.
Create a master recipe for production version 0001 based on the following information:
Key date: today
Profile: 0001
1-3-1 Data for recipe header
(C) SAP AG LO305 30
1-3-1-1 The Create Master Recipe: Recipe appears. Enter the following data on the Recipe header tab:
Description of the recipe: Recipe for detergent production, grp ##
Plant: 1100
Status: 4 “Released general”
Use: 1 “Production“
Planner group: 001 “Planner group PI”
Resource network: NETZ-##
Charge quantity range: 1000 - 20000 l
1-3-1-2 Header text
Create a long text that describes the recipe.
Choose Header text.
Header text: Recipe for detergent production, grp ##,
exothermic reaction
1-3-1-3 Administrative data
Display the administrative data.
Administrative data tab
1-3-2 Operations and phases
1-3-2-1 Creating operations and phases and assigning primary resources
Create operations and phases for your recipe 1 of the recipe group T-DET1## based on the data in the following table. Assign the primary resource.
(C) SAP AG LO305 31
Operations tab
Op Ph SOp CRD Resource Description
100 T-DTM1## CHARGING
110 x 100 DE Charge
120 x 100 DE Mix
130 x 100 DE Add water
140 x 100 DE Discharge
200 T-DTG1## REACTION
210 x 200 DE Charge
220 x 200 DE Add Butanol and NaOH
230 x 200 DE Discharge
300 T-DTA1## COOLING
310 x 300 DE Charge
320 x 300 DE Cool
330 x 300 DE Discharge
Save your master recipe.
1-3-2-2 Control key
Use the input help (F4) to display detailed information about the control key K1##.
Which indicators are set?
____________________
____________________
____________________
Based on the indicators that have been set, what happens to a phase marked with this control key in the process order?
______________________________________
______________________________________
______________________________________
Use field help (F1) to display information about the functions of the different indicators.
(C) SAP AG LO305 32
1-3-2-3 Text
Create the following text for operation 200.
Choose Text.
Text: Reaction
Resource selection condition have been defined for the operation so that a suitable reaction vessel can be selected.
1-3-2-4 Administrative data
Display the administrative data for an operation or a phase.
1-3-2-5 Maintaining standard values
Maintain the standard values for the phases of your recipe using the information in the following table.
The quantity-dependent durations should each refer to a base quantity of 1000 L.
Phase Duration, fixed
Act. type
Duration, variable
Act. type
(1st oper. value)
(2nd oper. value)
110 10 min 1420
120 30 min 1420
130 10 min 1420
140 10 min 1420
210 10 min 1420
220 30 min 1420
230 10 min 1420
310 10 min 1420
320 5 h 1420
330 20 min 1420
1-3-3 Assigning a secondary resource
Add the secondary resource T-DTT1## (Transport vehicle) for phase 330.
(C) SAP AG LO305 33
SRes Resource Plant Description
0001 T-DTT1## 1100 Discharge into transport unit
1-3-3-1 Text
Enter the following text for your secondary resource.
Text: Discharge into transport unit:
The transport vehicle must be connected
15 minutes before charging begins.
It cannot be detached until 10 minutes
after charging has ended.
1-3-3-2 Resource dates
Define the earliest and latest dates of your secondary resource based on the following information.
Offset to start: 15- min. (Be sure to put a negative sign after 15 to indicate 15 minutes before)
Offset to finish: 10 min.
1-3-3-3 Administrative data
Display the administrative data for your secondary resource.
Save your recipe.
1-3-4 Relationships
1-3-4-1 Graphic maintenance
Create the relationships between the phases of your recipe as shown in the following graphic.
(C) SAP AG LO305 34
Suggestion: Put the phases in the appropriate positions before connecting them.
1-3-4-2 Phase maintenance on the Detail screen
Maintain the last relationship in the corresponding detail screen for phase 320.
320------330
Rel. type Phase Scs (successor)
Rcp. grp Rcp. grp.
NF
Normal sequence
330 X T-DET1## 1
Display the detail information for this relationship.
Choose Details for the relationships created.
Display the administrative data for this relationship.
Administrative data tab
1-3-4-3 Displaying information in graphic maintenance
Go back to the graphic display of the relationships.
Double-click a phase. Which detail screen appears?
____________________
Double-click a line connecting two phases. Which detail screen for the relationships appears?
____________________
Save your recipe.
1-4 Classifying operations
Classify the operation 200 with the class REAC_## (Reaction vessel).
(C) SAP AG LO305 35
Assign the following values to the characteristics:
Surface coating P
Revolutions per min. 30
Save your master recipe.
The classification of the operation defines the selection conditions for a system-aided resource selection in the process order.
1-5 Scheduling
Suggestion: Do the following exercise for different charge quantities.
1-5-1 Scheduling overview
Simulate order scheduling in your master recipe.
Choose Schedule recipe.
Display the result in the scheduling overview.
1-5-2 Gantt chart
Display the scheduling results in the Gantt chart.
Choose Gantt chart.
Select a suitable time unit.
(C) SAP AG LO305 36
10.26Solutions
Unit: Master Recipes
Topic: Operations and Phases
1-1 Elements and structure of a master recipe
Production – Process Master Data Production Versions
Plant: 1100
Planning type: 2
Group: T-ICE##
Select production version 0001 of material T-FI1##.
Choose Recipe.
On the Parameter for recipe maintenance screen, choose Display recipe.
1-1-1 Operation overview
1-1-2 Relationships
On the Operations tab, choose Operation graphic
1-1-3 Recipe header data
Recipe header tab
Which materials are assigned to the recipe as products?
Choose Material assignments.
T-FI100
T-FI200
T-FI300
(C) SAP AG LO305 37
(C) SAP AG LO305 38
1-1-4 Material list
Materials tab
Material Quantity Op
T-RI000 0.1 KG 1010
T-RI100 0.12 KG 1010
T-RI200 0.16 KG 1010
T-RI300 0.02 KG 1010
T-RI400 0.02 KG 1010
1-1-5 Process instructions
Operations tab
Select phase 1010.
Choose Proc. inst.
Which process instruction is assigned?
INSTR
1-2 Reporting and changing master recipes
1-2-1 to 1-2-4
Production – Process Master Data Master Recipes
<....> Reporting Recipe Recipe list
Production versions
Recipe Recipe changes
Change documents
Material list <....>
Where-used list
Mass changes
Environment
(C) SAP AG LO305 39
1-3 Creating a master recipe: header data and operations / phases
Production – Process Master Data Production Versions
Select production version 0001 of material T-FD1##.
Choose Recipe.
Parameter for recipe maintenance: edit recipe
1-3-1 Data for recipe header
1-3-1 to 1-3-1-3
Maintain the data as described for the exercise.
1-3-2 Operations and phases
1-3-2-1 Creating operations and phases and assigning primary resources
Operations tab
1-3-2-2 Control key
Use the input help (F4) to display detailed information about the control key K1##.
In the operation overview, position the cursor on the control key.
F4 help.
In the control key overview, position the cursor on the control key and choose Detail info.
Which indicators are set?
Scheduling
Det. Cap. Reqmnts
Cost
Based on the indicators that have been set, what happens to a phase marked with this control key in the process order?
The phase is scheduled
(C) SAP AG LO305 40
Capacity requirement records are generated
The phase is costed
1-3-2-3 Text
Choose Text.
1-3-2-4 Administrative data
Double-click the operation/phase number.
Administrative data tab
1-3-2-5 Maintaining standard values
On the Operations tab, double-click each phase number.
Standard values tab.
1-3-3 Assigning a secondary resource
On the Operations tab:Select phase 330.Choose Secondary resource.
1-3-3-1 Text
On the Secondary resource tab:Select the secondary resource.Choose Text
1-3-3-2 Schedule
Double-click the item number of the secondary resource.Standard values tab
1-3-3-3 Administrative data
Administrative data tab
1-3-4 Relationships
(C) SAP AG LO305 41
1-3-4-1 Graphic maintenance
In the operation overview (Operations tab), choose Operation graphic.
(C) SAP AG LO305 42
1-3-4-2 Phase maintenance on the Detail screen
In the operation overview:Double-click phase number 320.
Relationships tab.
1-3-4-3 Displaying information in graphic maintenance
Operations tab
Choose Operation graphic.
Double-click a phase. Which detail screen appears?
Standard values of the phase
Double-click a line connecting two phases. Which detail screen appears for the relationships?
Relationships General Data screen
1-4 Classifying operations
On the Operations tab:Select operation 200Choose Resource selection criteria Goto -> Res. sel. criteria.
1-5 Scheduling
1-5-1 Scheduling overview
In the operation overview, choose Schedule recipe.
1-5-2 Gantt chart
Choose Gantt chart.
(C) SAP AG LO305 43
11
SAP AG 1999
Contents:
Material-recipe assignment
Bill of material
Material list
Classification of bill of material items
Material quantity calculation
Master Recipes: Materials
(C) SAP AG LO305 1
11.2
SAP AG 1999
At the conclusion of this unit, you will be able to:
Describe what the material list and the bill of material are used for
Create a material list for a master recipe
Classify bill of material components
Define and carry out a material quantity calculation in the recipe
Master Recipes, Materials: Unit Objectives
(C) SAP AG LO305 2
11.3
SAP AG 1999
PP-PI Overview
Master Data: Overview
Introduction
Materials
R/3 Classification System
Resources: Customizing
Resources: Functions
Production Version
Master Recipes: Operations and Phases
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
66
22
33
11
44
55
77
88
99
1010
1212
1313
1414
1515
Summary and Conclusion1616
Batches
1111 Master Recipes: Materials
Overview Diagram 11
(C) SAP AG LO305 3
11.4
SAP AG 1999
Your company is going to put a new product on the market.
As the person responsible, you will add a material list and a material quantity calculation to the the master recipe that has been defined for the production of the new detergent.
Master Recipes, Materials: Business Scenario
(C) SAP AG LO305 4
11.5
SAP AG 1999
Catalyst
Product A
Product B
Ingredients
Operation 10 "Charging"
Catalyst
Intra material
Waste
Chargevessel
Operation 20 "Reaction"
Reaction vessel
Typical Material Flow in the Process Industry
The graphic shows two examples of operations carried out at the primary resources charge vessel and reaction vessel and the typical material flow in process manufacturing.
The graphic shows:Ingredients entering the production processThe temporary appearance of an intermediate product between two processing units which continues to be processed without leaving the process. Such materials are assigned material type INTR Intra material.Waste produced during the manufacturing process.The use of a catalyst that enters the process at a certain point of time and leaves it again later.The manufacture of one or more products. If several planned materials are manufactured during one production run, they are called co-products.
(C) SAP AG LO305 5
11.6
SAP AG 1999
Bill of material
MaterialMaterial(to be produced)(to be produced)
Materialcomponent 10
Materialcomponent 20
Materialcomponent 30
Materialcomponent 40
Recipe headerRecipe header
Operation 10
Material list
Master recipeMaster recipe
Operation 20
Operation 30
Phase 31
11
Material-recipe assignment
11
Material-Recipe Assignment (I)
The material to be produced is assigned to the master recipe at header level.
The structure of the product, which is the material to be produced along with the corresponding material components without operation and phase assignments, is defined in PP BOM Management as the bill of material (BOM). A fixed and unique link between the master recipe and BOM is defined in a production version. The production version is an attribute of the material to be produced.
The BOM data is used, for example, in material requirements planning and product costing.
(C) SAP AG LO305 6
11.7
SAP AG 1999
Bill of material
A complete, fully structured list of the components that
make up a product or assembly. The list contains the object
number of each component together with the quantity and
unit of measure.
Bill of materialBill of material
MaterialMaterial(to be produced)(to be produced)
Materialcomponent 10
Materialcomponent 20
Materialcomponent 30
Materialcomponent 40
Bill of Material - Definition
Bills of material (BOMs) contain important basic data used in many different organizational areas. BOM data is, for instance, important for:
Material requirements planningMaterial staging during productionProduct costing
(C) SAP AG LO305 7
11.8
SAP AG 1999
Bill of material
MaterialMaterial(to be produced)(to be produced)
Materialcomponent 10
Materialcomponent 20
Materialcomponent 30
Materialcomponent 40
Material quantity calculation
Recipe headerRecipe header
Operation 10
Material list
Master recipeMaster recipe
Operation 20
Operation 30
Phase 31
11
22
22
22
22Material-recipeassignment
11
Material component-operation/phaseassignment
22
Material-Recipe Assignment (II)
The material list contains all materials that enter, are temporarily created, and leave the process along with their planned quantities as components. It also defines the assignment of these material components to operations or phases of the recipe according to where they appear in the process.
A specific material list component is assigned to exactly one operation or phase. You can assign several different material components to an operation or phase.
In material quantity calculation, you define formulas to calculate the material quantities to be used or obtained in a production process, taking into account the mixing ratios of the ingredients, yield ratios of the products and remaining materials as well as specific material attributes (for example, concentration).
(C) SAP AG LO305 8
11.9
SAP AG 1999...
YY--300 "Yellow paint"300 "Yellow paint" Base quantity : 5000 lProduct(Co-product)
BOM header
BOM items
...
Item 10 300 -110 Water 837 l
C
Item 20 300 -120 Diaminobenzol 1163 kg
Item 30 INTRA_01 Intra material 2000- kg
Item 40 INTRA_01 Intra material 2000 kg
Item 50 CAT_01 Catalyst 50 kg
Item 60 CAT_01 Catalyst 40- kg
Item 170 PA-300 Paste 500- kg
Ingredients
Intra material
Catalyst
Co-product
Bill of Material - Example
The graphic shows the structure of a bill of material (BOM) for a material. The product is assigned to the BOM header. A base quantity is defined in the BOM header and the
quantities of the material components entered in the BOM items refer to this base quantity. BOM items are, for example:
Ingredients, intra materials, catalyts, co-products, waste Quantities of materials entering the production process are maintained with a positive number, quantities
of materials leaving the process with a number followed by a negative sign. Materials that both enter and leave the process are assigned two different BOM items with the corresponding signs.
If a BOM item is a co-product, the corresponding indicator must be set for this item. In addition to this, the co-product assigned to the BOM header as well as the co-products listed as BOM items must be marked as co-products in their material master records.
(C) SAP AG LO305 9
11.10
SAP AG 1999
BOM Item Categories
When creating a new BOM item, you must assign each component toan item category.
The item category controls how the individual BOM items are processed.
Stock itemStock item
NonNon--stock itemstock item
VariableVariable--size itemsize item
Text itemText item
Document itemDocument item
Intra materialIntra material
Item Categories:
When creating a new BOM item, you must assign each item to an item category. The item category defines the attributes and functions of an item and controls how the individual BOM items are processed.
A BOM item category specifically designed for the process industry is category M for intra materials. The item category determines, for example:
Whether you must enter a material numberWhether quantity-based inventory management is to be carried out for this itemWhich sign is to be entered for the item quantityWhether sub-items can be usedWhat the screen selection and the screen layout of the item detail screens look like
Note that you cannot change the item category once you have created an item. You can only correct a wrong item category assignment by deleting the item and creating it again.
(C) SAP AG LO305 10
11.11
SAP AG 1999
Ph 11Ph 11
Ph 12
Ph 31
Ph 32
Ph 33Ph 33
Ph 21Ph 21
Ph 22Ph 22
Ph 13Ph 13
Ph 23Ph 23
300 -110 Water 837 l
300 -120 Diaminobenzol 1163 kg
INTRA_01 Intra material 2000- kg
INTRA_01 Intra material 2000 kg
CAT_01 Catalyst 50 kg
CAT_01 Catalyst 40- kg
PA-300 Paste 500- kg
...
...
C
Material List
In the material list, the material components of the BOM are assigned to phases and operations. The material list is made up of components representing the materials entering and leaving the
production process, as well as temporarily existing materials and their planned quantities. It also defines the assignment of these material components to operations or phases of the recipe according to their appearance in the process.
A specific material list component is assigned to exactly one operation or phase. You can assign several different material components to an operation or phase.
(C) SAP AG LO305 11
11.12
SAP AG 1999
YY--300 "Yellow paint"300 "Yellow paint"
BOM item as classifiable object
Class"Pyridene"
CharacteristicsSolubilityColor purity
Material quantity calculation
Batch determination in the process order
Class typeClass type "Batch""Batch"
023_02
300 -110 Water
300 -120 Diaminobenzol
300 - 130 Pyridene
Characteristic values
light yellow40 - 60 kg/m3Solubility:
Color purity:
...
Classification of BOM Components
BOM components can be classified with class type batch in the master recipe. You thus store specific attributes that the planned material components must possess in the form of characteristic values for individual BOM items.
BOM components are classified for the purpose of material quantity calculation and batch determination. The characteristic values can be used in the formulas of material quantity calculation. The characteristic values defined in the process order are used as selection criteria during batch
determination.
(C) SAP AG LO305 12
11.13
SAP AG 1999
Material Quantity Calculation I
Material quantity calculationMaterial quantity calculation
Calculation of the material quantities to be used or obtained in a production process, taking into account the mixing ratios of the ingredients, yield ratios of the products and remaining materials as well as specific material attributes.
(C) SAP AG LO305 13
11.14
SAP AG 1999
Characteristics
Concentration:80%
IngredientsIngredients
YieldYield
RawRawmaterialmaterial
CatalystCatalyst SolventSolvent
Remainingmaterial
Catalyst Product
Characteristics
Viscosity:15.5 cP
Material Quantity Calculation II
In material quantity calculation, you define formulas to calculate the material quantities to be used or obtained in a production process, taking into account the mixing ratios of the ingredients, yield ratios of the products and remaining materials as well as specific material attributes (for example, concentration).
Formulas for material quantity calculation can consist of:All quantities of materials in the material listThe characteristics and their valuesQuantities assigned to operations or phases
(C) SAP AG LO305 14
11.15
SAP AG 1999
Material Quantity Calculation - Example
Bill of material
Fruit juiceFruit juice
Treated waterTreated water
Material quantity calculation
Recipe headerRecipe header
Material list
Master recipe: fruit juice production
Product: fruit juice Production version: 0001
MIXING OPERATIONMIXING OPERATION
- Charge
- Discharge- Discharge
- Mix
Fruit premix
Lemon juice
Sugar
The food division of your company produces fruit juice. At the beginning of the mixing operation, the individual components fruit premix, lemon juice, treated water, and sugar are charged into the mixer.
The fruit premix and lemon juice are listed in the material BOM and material list in their proportion units Liter fruit and Liter acid.
(C) SAP AG LO305 15
11.16
SAP AG 1999
Batch 1:Batch 1: 100 LF (B11)
Batch 2:Batch 2: 150 LF (B12)
and so onand so on
Quantity: 6.875 liter acid (LS) (C1)
40 -80 % acid content (C3)
Quantity: 350 liter fruit (LF) (B1)
80 - 100 % fruit content (B2)
3 - 5 % acid content (B3)
Lemon juice (C)Lemon juice (C)
Material Quantity Calculation - Process (I)
Batch determination:fruit premix
Recalculate product quantity
Adjust product quantity?
Fruit juice (A)Fruit juice (A)
Quantity: 1000 liter (A1)
35 % fruit content (A2)
2 % acid content (A3)
Fruit premix (B)Fruit premix (B)
B1 = A1 * A2
A1 = (B1n) * A2
C1 = A1 * A3 - ((B1n / B2n) * B3n )
You want to use a fruit premix with varying fruit and acid content to produce a fruit juice whose fruit content is always 35 % and whose acid content is always 2%. The fruit quantity in the fruit premix is thus calculated as follows:
Fruit quantity of fruit premix = Quantity of fruit juice * 35 %
The fruit premix has limited shelf life, therefore you want to use complete batches, i.e. no batch splits. The actual fruit quantity in the fruit premix may not equal the planned fruit content, so the product quantity and all component quantities must be adjusted. You adjust the fruit content of the fruit juice by mixing water with it. The acid content, on the other hand, is adjusted by adding lemon juice. Different lemon juice batches also have different acid contents.
The product quantity in the order is determined by the available fruit quantity in the fruit premix. The system must calculate the fruit juice quantity as follows:
Fruit juice quantity = Fruit quantity of fruit premix / Fruit content of fruit juice
To obtain the intended acid content of the fruit juice, you must balance variations in the percent of acid content of the fruit premix by adjusting the lemon juice quantity. This adjustment is not in proportion to the product quantity:
Acid quantity of lemon juice = Acid quantity of fruit juice - Acid quantity of fruit premix
(C) SAP AG LO305 16
11.17
SAP AG 1999
Quantity: 545 L (D1)
Quantity: 10 kilograms (E1)
Treated water (D)Treated water (D)
Sugar (E)Sugar (E)
Batch 1: Batch 1: 5 LS (C11)
Batch 2:Batch 2: 1.9 LS (C12)
Material Quantity Calculation - Process (II)
Add to obtain product quantity:
D1 = A1 - (B1n / B2n) - (C1n / C3n)
Batch determination:lemon juice
E1 = A1 / 100
(to exactly 100 g)
After batch determination has been carried out for the lemon juice, the actual acid quantity in the lemon juice and the actual fruit quantity in the fruit premix are known. The batch-specific quantity proportions of fruit and acid can be used to calculate the physical quantities of the fruit premix and lemon juice.
Treated water is added to obtain the product quantity. The amount of water required depends on the product quantity and the physical quantities of the fruit premix and lemon juice:Quantity of water = Quantity of fruit juice - Quantity of fruit premix - Quantity of lemon juice. When adding water, the quantity added is always rounded up to full liters.
Sugar is added to improve the taste of the fruit juice. The sugar dissolves completely. The amount of sugar added is to be approximately 1% of the product quantity. It is to be added in 100 gram portions.
(C) SAP AG LO305 17
11.18
SAP AG 1999
Material Quantity Calculation Screen
001 002
Components/operations
003
[ 003 , 001 ]Column number
Line number
Key
Select formula Insert formula Calculate prod. qty
MT = Material textOP = Operation
001 MT T-FJ100
002 OP Charge
003 MT T-RJ100
004 MT T-RJ200
-
Quantity Fruit content Acid cont..
1000 L 35 %
80 %
2 %
1000 L
3 %350 LF
Formula definition
[001,001] * ([001,002] / 100)
003,001 003T-RJ100:gquantity
The numbers in brackets define a "cell" consisting of line and column numbers (see key) The detail functions of material quantity calculation are:
Select formulaThis function selects the cell on which you have positioned the cursor and enters it in the formula section of the screen. Insert in formulaThis function copies the coordinates of the line and column in the formula section, for example, [003,001]. Save formulaThis function saves formulas but does not transfer the values into the material list. Save formula and copy result This function saves all formulas and copies the values to the material list and bill of material. Formula overview This function contains the quantities and value fields plus the corresponding formulas. References used in the formulas are replaced by the value and the description of the field to which they refer. Calculate product qty The system calculates the product quantity and subsequently updates all component, operation, phase, and scrap quantities for which formulas have been defined.
(C) SAP AG LO305 18
11.19
SAP AG 1999
Product Quantity Calculation
Materialquantities
Materialcharacteristics
ID Material UnTotal quantity Fruit content Acid content
1
4
5
6
7
...
Fruit juice
Fruit premix
Lemon juice
Water
Sugar
L
LF
LS
L
KG
35 %
80 %
2 %
3 %
40 %
1000 1000
350
6.875
545
10 Qty (1) = Qty (4) / Fruit contentQty (1) = Qty (4) / Fruit content (1) (1)
10001000 == CSUM (4)CSUM (4) //(fruit content(fruit content (1)(1) / 100)/ 100)
The material, phase, and operation quantities for a recipe can be linked to each other in formulas. Material characteristics can also be entered in the formulas.
The formulas are used to calculate the relevant quantities when creating a process order. If a material or characteristic quantity is changed, dependent quantities can be recalculated. The product quantity in the order is determined by the available fruit quantity in the fruit premix. The
system calculates the fruit juice quantity as follows: Quantity of fruit juice = Quantity of fruit premix / Fruit proportion of fruit juice.
To calculate the actual fruit quantity of the fruit premix, the system must add the fruit quantities of the batches selected in the order.
Adding batch quantities or characteristic values - CSUM This function adds the batch quantities or the values in the characteristic column you specified for all batches of a material item. As long as no batches have been assigned to the material item, the function returns the quantity of the material item or the characteristic value of the material item.
The formula for material quantity calculation looks as follows:CSUM(004) / ( [001,002] / 100 )
(C) SAP AG LO305 19
11.20
SAP AG 1999
Component Quantity Calculation (I)
Materialquantities
Materialcharacteristics
ID Material UnTotal quantity Fruit content Acid content
1
4
5
6
7
...
Fruit juice
Fruit premix
Lemon juice
Water
Sugar
L
LF
LS
L
KG
35 %
80 %
2 %
3 %
40 %
1000
350350
6.875
545
10
Qty (4) = Qty (1) * Fruit contentQty (4) = Qty (1) * Fruit content (1) (1) 350350 == Qty (1)Qty (1) **(fruit content(fruit content (1)(1) / 100)/ 100)
The fruit quantity of the fruit premix can be calculated using a percentage calculation. The formula for material quantity calculation looks as follows:
[001,001] * ( [001,002] / 100 )
(C) SAP AG LO305 20
11.21
SAP AG 1999
Calculation Using Active Ingredient Quantities of Batches
Materialquantities
Materialcharacteristics
ID Material UnTotal quantity Fruit content Acid content
1
4
5
6
7
...
Fruit juice
Fruit premix
Lemon juice
Water
Sugar
L
LF
LS
L
KG
USERUSER--EXITEXIT
35 %
80 %
2 %
3 %
40 %
1000
350
6.8756.875
545
10
Qty (5) = Qty (1) * Acid contentQty (5) = Qty (1) * Acid content (1) (1) -- Phys. qty (4) * Acid contentPhys. qty (4) * Acid content (4) (4) 6.8756.875 ==Qty (1) * (Acid con.Qty (1) * (Acid con. (1) / 100)(1) / 100) ---- ( (Qty (4) / Fruit content( (Qty (4) / Fruit content (4)) * Acid content(4)) * Acid content (4))(4))
To obtain the intended acid content of the fruit juice, you must balance variations in the percent of acid content of the fruit premix by adjusting the lemon juice quantity. This adjustment is not in proportion to the product quantity:Acid quantity of lemon juice = Acid quantity of fruit juice - Acid quantity of fruit premix
The acid quantity of the fruit juice is calculated by multiplying the product quantity with the acid content of the fruit juice.
The acid quantity in the fruit premix is calculated by multiplying its physical quantity with its acid content. The physical quantity is calculated by dividing the fruit quantity by the fruit content. The following calculation must therefore be carried out for each batch of the fruit premix:Fruit quantity of fruit premix / Fruit content of fruit premix * Acid content of fruit premix. Afterwards, the results for the acid quantities of the fruit premix are added.A user exit is required for this complex calculation.
An SAP enhancement (user exit) for material quantity calculation can be used to enhance standard functionality. The following are just some of the features offered by this SAP enhancement:
Enhancement of input data through the inclusion of additional fields and columnsCalculation of values that cannot be calculated in the standard system
The formula for material quantity calculation is: [001,001] * ([001,003] / 100) - CPSM (004;005)
(C) SAP AG LO305 21
11.22
SAP AG 1999
Calculation Using Physical Batch Quantities
Materialquantities
Materialcharacteristics
ID Material UnTotal quantity Fruit content Acid content
1
4
5
6
7
...
Fruit juice
Fruit premix
Lemon juice
Water
Sugar
L
LF
LS
L
KG
1000
350
6.875
545545
10
35 %
80 %
2 %
3 %
40 %
Qty (6) = Qty (1) Qty (6) = Qty (1) -- Phys. Qty (4) Phys. Qty (4) -- Phys. Qty (5)Phys. Qty (5)
545 = Qty (1) 545 = Qty (1) -- CQSM (Qty (4) / Fruit contentCQSM (Qty (4) / Fruit content (4)) (4)) -- CQSM (Qty (5) / Acid contentCQSM (Qty (5) / Acid content (5)) (5))
Treated water is added to obtain the product quantity. The amount of water required depends on the product quantity and the physical quantities of the fruit premix and lemon juice:Quantity of water = Quantity of fruit juice - Quantity of fruit premix - Quantity of lemon juice. The quantity of water added is always rounded up to full liters:
Adding weighted batch quantities of characteristic values: Quotient sum - CQSM. For each batch of a material item, this function divides the batch quantities by the value in the characteristic column you specified or the value of the first characteristic column by that of the second column. It then adds the results. The system interprets the characteristic value as a percentage if its unit of measure contains a percent sign (%).
As long as no batches have been assigned to the material item, the function divides the quantity of the material item by the corresponding characteristic value or the first characteristic value of the material item by that of the second value.
You may need this function, for example, to calculate the total of the physical batch quantities from the active ingredient quantities of batches based on the active ingredient concentration.
The formula for material quantity calculation looks as follows:[001,001] - CQSM(004;002) - CQSM(005;003)
(C) SAP AG LO305 22
11.23
SAP AG 1999
Component Quantity Calculation (II)
Materialquantities
Materialcharacteristics
ID Material UnTotal quantity Fruit content Acid content
1
4
5
6
7
...
Fruit juice
Fruit premix
Lemon juice
Water
Sugar
L
LF
LS
L
KG
1000
350
6.875
545
10 10
35 %
80 %
2 %
3 %
40 %
Qty (7) = Qty (1) / 100 (to exactly 100 grams)Qty (7) = Qty (1) / 100 (to exactly 100 grams)1010 == Qty (1)Qty (1) DIV 10DIV 10 / 10/ 10
Sugar is added to improve the taste of the fruit juice. The sugar dissolves completely. The amount of sugar added is to be approximately 1% of the product quantity. It is to be added in 100 kilogram portions.
The quantity of sugar can be determined using a percentage calculation. The result is always to be rounded to 100 kilograms. The following basic function is used:
DIV - Division using integers; not intended for negative numbers. Example: 1015 DIV 10 = 101 The formula for material quantity calculation is as follows:
[001,001] DIV 10 / 10It returns results with no more than one decimal place.
(C) SAP AG LO305 23
11.24
SAP AG 1999
Master Recipes, Materials: Unit Summary
The material to be produced is assigned to the recipe at the recipe header level.
The material list shows the assignment of the BOM components to phases.
BOM components are classified so that a system-aided batch determination can later be carried out.
Using material quantity calculation, you can calculate the material quantities required or obtained in a production process by considering the mixing ratios of the ingredients and yield ratios of the products.
(C) SAP AG LO305 24
11.25Master Recipes, Materials: Exercises
Unit: Master Recipes
Topic: Materials
At the conclusion of these exercises, you will be able to:
Carry out material-recipe assignment
Create a material list
Check a production version
Classify bill of material components
Set up material quantity calculation
Your company is going to put a new product on the market.
As the person responsible, you will add to a material list and prepare a BOM component for system-aided batch determination in the master recipe for the new detergent.
1-1 Material-recipe assignment
Your master recipe T-DET1## describes the production of the material T-FD1##.
Check the material assignment in the recipe header.
How was this material assignment determined?
____________________________________________________________
1-2 Creating a BOM and material list for the product assigned
Create the BOM and material list for the assigned material.
Go to the material overview (Materials tab) of your recipe.
(C) SAP AG LO305 25
1-2-1 Bill of material for material T-FD1##
The initial screen for BOM maintenance appears. After entering the data, you can assign the required material components in the BOM. Enter the following data:
Item Item cat. Component Quantity
0010 L T-RD1## 975 liters
0020 L T-RD2## 400 liters
0030 N T-RD3## 1225 liters
0040 L T-RD4## 1000 liters
0050 L T-RD5## 1400 liters
Enter 5000 L as a base quantity in the BOM header.
Choose Header.
1-2-2 Material list for material T-FD1##
Choose Back. The overview screen for the material list appears. Assign the material components to the phases of your recipe based on the following table.
Component Phase
T-RD1## 110
T-RD2## 110
T-RD3## 130
T-RD4## 220
T-RD5## 220
Save your recipe.
(C) SAP AG LO305 26
1-3 Checking the production version
Perform a consistency check for production version 0001 of material T-FD1##.
Which messages appear in the consistency log?
____________________________________________________________
____________________________________________________________
What is the new check status for the production version?
____________________________________________________________
1-4 Classifying BOM components
1-4-1 In your master recipe T-DET1## for material T-FD1##, classify the BOM component T-RD1##.
You must classify the BOM components so you can carry out system-aided batch determination in the process order.
To which class of class type 023 Batch is the BOM item assigned? Why?
__________________________________
__________________________________
Define the following values for the class characteristics as batch selection conditions:
Concentration 40 – 50 %
Density 1.3000 - 1.4000 g/ccm
Save your master recipe.
(C) SAP AG LO305 27
1-5 Material quantity calculation
To carry out material quantity calculation, you will create a production version and a master recipe for fruit juice production in your company.
The corresponding material master records are already available in the system. The master record for the fruit juice mixing line still needs to be created.
1-5-1 Creating a resource
Create resource master record T-JM1## of the resource category RE##. The description is "fruit mixing line".
Check the default values offered for the resource.
Fruit juice production only takes place in a two-shift plant.
Assign grouping 01 (for shift definitions and shift sequences) to your resource in the header data of the assigned capacity category. Choose Intervals and shifts and insert a new interval with shift sequence.
Choose the interval from today to today + 1 year and the shirt sequence M2.
Assign the fruit mixing line to the cost center for the production of food. Use the F4 help to find the cost center key.
Save the resource.
1-5-2 Checking the material master records
In addition to the materials considered in Unit 6 Batches: Settings for Active Ingredient Management, which are fruit juice T-FJ1##, fruit premix T-RJ1## and lemon juice T-RJ2##, treated water and sugar are also to be added to the master recipe for fruit juice production.
The material numbers to be used are:
Treated water = T-RI5##
Sugar = T-RJ3##
(C) SAP AG LO305 28
1-5-3 Creating production versions
Create a production version 0001 in plant 1100 for fruit juice T-FJ1##.
The lot size covers the range of 1000 to 20000 L. The production version is valid from today.
The master recipe for production version 0001 is maintained with group counter 1 for recipe group T-JUI1##. The corresponding alternative BOM number 1 is used in production.
1-5-4 Creating master recipes
Create master recipe 1 in recipe group T-JUI1## with the following data (profile: PI01) for the production version:
Description of the recipe: Fruit juice production, grp ##
Plant: 1100
Status: 4 “Released general”
Use: 1 “Production“
Planner group: 001 “Planner group PI”
Charge quantity range: 1000 - 20000 liters
1-5-4-1 Text for recipe header
Create a text for the header that describes the recipe.
Choose Header text.
Header text: Fruit juice production, grp ##
Base recipe for fruit juice production at the fruit juice mixing line.
(C) SAP AG LO305 29
1-5-4-2 Operations and phases
Create the following operations and phases for the recipe:
Op Ph SOp CRD Resource Description
100 T-JM1## Mix
110 x 100 SP Charge
120 x 100 SP Mix
130 x 100 SP Discharge
1-5-4-3 Material BOM
Create the following material BOM for the recipe:
Item: ICt Material component Quantity Unit of measure
10 L Fruit premix T-RJ1## 350 LF
20 L Lemon juice T-RJ2## 7.65 LS
30 L Treated water T-RI5## 570 L
40 L Sugar T-RJ3## 10 KG
Maintain the following data in the BOM header:
BOM text: Fruit juice
Base quantity: 1000 L
1-5-4-4 Material list
Assign all of the materials listed above to phase 110.
Save the master recipe.
(C) SAP AG LO305 30
1-5-5 Material quantity calculation
Maintain the required formulas in the material quantity calculation for master recipe T-JUI1##. Save the material quantity calculation without copying the results to the material list (and then to the BOM).
To produce fruit juice, we will begin with a fruit premix which has varying fruit and acid content. The fruit premix has a limited shelf life so complete batches must be used. Since the fruit content of the final product must be 35%, the quantity of fruit juice produced may have to be adjusted. Lemon juice is used to balance the variations of acid content in the fruit premix and to maintain a 2% acid content in the final product. Treated water is added (rounded up to full liters) to obtain the quantity of fruit juice . Finally, sugar is added (in 100 gram portions) to improve the taste. The sugar content is approximately 1% of the total product quantity.
The components fruit premix B and lemon juice C both consist of their active ingredients fruit and acid, as well as their carrier material water. The physical quantity will refer to the sum of the active ingredient quantity and the carrier material quantity.
To do the following exercise, refer to the slides Material Quantity Calculation - Process (I) and (II).
1-5-5-1 Product Quantity Calculation
The total quantity of fruit juice A1 is calculated by dividing the fruit quantity in the batches of fruit premix B1n by the fruit content of fruit juice A2 (which is 35%).
What is the calculation formula for the total quantity of the fruit juice (also the product quantity in this case)?
_____________________________________________
Familiarize yourself with the functions available in the application help for material quantity calculation.
What is the formula that is to be entered in the cell [001,001]?
_____________________________________________
What result appears in the Quantity column for product T-FJ1## after you enter the formula above?
_____________________________________________
(C) SAP AG LO305 31
How does this result change when you recalculate the product quantity for the fruit premix after batch determination in the process order?
_____________________________________________
_____________________________________________
(C) SAP AG LO305 32
1-5-5-2 Calculating the fruit quantity B1 in the fruit premix
The fruit premix has varying fruit and acid content. You need to use a quantity that will always produce a fruit juice with 35% fruit content and 2% acid content. The fruit premix B component is listed in the material list in its proportion unit LF (liter of fruit) which equals fruit quantity B1. It is calculated by multiplying the total quantity of fruit juice A1 by its fruit content in percent A2.
What is the calculation formula for the fruit quantity?
_____________________________________________
What formula must be entered in the cell [004,001]?
_____________________________________________
What result appears in the Quantity column for material T-RJ1## after you enter the formula above?
_____________________________________________
1-5-5-3 Calculating the acid quantity C1 in the lemon juice
In the product fruit juice, a certain acid quantity must be obtained (= 2 % of the total quantity of the fruit juice), which is a combination of the acid quantity in the fruit premix and the acid quantity C1 in the lemon juice.
What is the formula for calculating the acid quantity in the fruit juice?
Acid quantity in the fruit juice = _____________________
The acid quantity in the fruit juice is calculated from the total quantity of fruit juice A1 and the acid content of the fruit juice in percent A3.
To obtain the desired acid quantity in the fruit juice, the acid quantity contained in the lemon juice must be added to the acid quantity contained in the fruit premix batches.
The fruit premix is listed in the material list in its proportion unit LF and therefore also in its fruit quantity. Which calculation is required to be able to convert the fruit quantities B1n to the physical quantities of the fruit premix batches (unit of measure: liters)?
Physical quantity = ___________________________
The physical quantity must be multiplied by the acid content B3n to obtain the acid quantity of the fruit premix in the batches. For this reason, a USER-EXIT is used to enter the quotient of acid content and fruit content of the individual batches in the 5th column "Intermediate results".
(C) SAP AG LO305 33
Intermediate results = B3n / B2n
The acid quantity of the fruit premix is calculated from the product of the fruit quantity B1n and intermediate result in the 5th column.
What is the formula that is to be entered in the cell [005,001]?
_____________________________________________
What result appears in the Quantity column for material T-RJ2## after you enter the formula above?
_____________________________________________
1-5-5-4 Calculating the component quantity of treated water D1
After the fruit premix and lemon juice have been charged, water is added until the required product quantity is reached.
The total quantity of water is calculated by subtracting the two physical quantities of fruit premix and lemon juice from the total quantity of fruit juice.
What is the calculation formula for the total quantity of water?
_____________________________________________
What is the formula that is to be entered in the cell [006,001]?
_____________________________________________
What result appears in the Quantity column for material T-RI5## after you enter the formula above?
_____________________________________________
Change the formula so that the result is rounded down to the next whole liter.
What is the formula in cell [006,001]?
_____________________________________________
Use the same function to round the product quantity down to the next whole liter!
What is the formula in cell [001,001]?
_____________________________________________
1-5-5-5 Calculating the component quantity sugar E1
The sugar completely dissolves in the fruit juice. A sugar content of 1% of the product quantity ensures the best taste for the fruit juice.
(C) SAP AG LO305 34
100 grams of sugar should always be added to the fruit juice mixture per 10 liters of fruit juice. The sugar quantity is always weighed on the fruit juice mixing line to exactly 100 grams.
Which of the three formulas gives the correct result?
a) [001,001] DIV 100
b) [001,001] DIV 10 / 10
c) [001,001] / 10 DIV 10
_____________________________________________
Maintain the correct formula for calculating the sugar quantity.
Save the formula without copying the result to the BOM.
1-5-5-6 Formula test for different quantities of fruit premix
The fruit premix component is the starting point for all further material quantity calculations in this example. Use different active ingredient quantities of the fruit premix to check the function of the formula entered. Choose the formula for the component quantity of the fruit premix and overwrite it with the following values:
a) T-RJ1##: Quantity = 352 (LF)
(C) SAP AG LO305 35
Enter the new values of the other quantities:
Material Quantity
Fruit juice
Lemon juice
Treated water
Sugar
Recalculate the product quantity to adjust it. What are the new quantities?
Material Quantity
Fruit juice
Lemon juice
Treated water
Sugar
Which value has not changed, even though it is dependent on the product quantity?
_____________________________________________
Cancel material quantity calculation without saving.
b) T-RJ1##: Quantity = 370 (LF)
Enter the new values of the other quantities in the table below:
Material Quantity
Fruit juice
Lemon juice
Treated water
Sugar
Recalculate the product quantity to adjust it. What are the new quantities?
Material Quantity
(C) SAP AG LO305 36
Fruit juice
Lemon juice
Treated water
Sugar
Cancel material quantity calculation without saving.
(C) SAP AG LO305 37
11.26Solutions
Unit: Master Recipes
Topic: Materials
1-1 Material-recipe assignment
Use the production version transaction to access your recipe T-DET1##.
In the recipe:
Recipe header tab
Choose Material assignments.
Material assignment resulted from the creation of production version 0001 for material T-FD1##.
1-2 Creating a BOM and material list for the product assigned
1-2-1 Bill of material for material T-FD1##
You are on the Material assignments tab.
Recipes tabChoose Materials.
On the Create Material BOM: Initial Screen, choose Enter.Enter the material components.
To enter the base quantity, choose Header,
1-2-2 Material list for material T-FD1##in the BOM header:F3 (Back)
Materials tab
Choose Create assignment.
1-3 Checking the production version
Task list exists (no warnings or errors)BOM exists (no warnings or errors)
(C) SAP AG LO305 38
Last check ok (green light)
(C) SAP AG LO305 39
1-4 Classification of BOM Components
1-4-1 In your master recipe T-DET1## for material T-FD1##, classify the BOM component T-RD1##.
Production versions
Select: Production version 0001
Choose Recipe.
Materials tab
Choose Bill of material.
Select: T-RD1##
Extras Batch classification.
To which class of class type 0023 Batch is the BOM item assigned? Why?
023_14 This class was used in the unit “Batches” to classify the raw material T-RD1##.
The BOM item inherits the classification from the material master.
1-5 Material quantity calculation
1-5-1 Create resource
SAP standard menu Logistics Production -Process Master Data Resources Resource Create.
Resource Category: RE##
Description: Fruit mixing line
When you maintain the resource data, the system suggests values that were created in Customizing as default values.
Copy the default values without changing them.
Capacities screen:
Choose Capacity Header Data.
Enter grouping 01 for shift definitions and shift sequences.
Choose Intervals and shifts.
Choose Insert intervals.
Valid from: <today> Valid until: < today + 1 year >
(C) SAP AG LO305 40
Shift sequence: M2 < ENTER >
Costing screen:
Position the cursor on the Cost center field.
F4 – help: Cost center short text: *Food*
Cost center: 4271 Food Production
Save the resource.
1-5-2 Checking the material master records
Treated water = T-RI5##
Sugar = T-RJ3##
1-5-3 Creating production versions
SAP standard menu Logistics Production -Process Master Data Production Versions
Selection conditions:
Plant: 1100
Material: T-FJ1##
Choose Create production version.
Detail maintenance:
Material: T-FJ1##
Production version: 0001 fruit juice production
From lot size: 1000 To lot size: 20000
Valid from: <today>
Detailed planning:
Task list type: Master recipe
Task list group: T-JUI1## Group counter 1
Alternative BOM 1 BOM usage 1
Ignore warnings.
Close the detail screen.
1-5-4 Creating master recipes
Select production version 0001.
Choose Recipe.
Final date: < today >
(C) SAP AG LO305 41
Profile: PI01
Maintain the data as described for the exercise.
1-5-4-1 Text for recipe header
Recipe header tab
Maintain the data as described for the exercise.
1-5-4-2 Operations and phases
Operations tab
Maintain the data as described for the exercise.
1-5-4-3 Material BOM
Materials tab
Screen: Create Material BOM: Initial Screen Choose Enter.
Screen: Item Overview: General
Item: ICt Material component Quantity Unit of measure
10 L T-RJ1## 350 LF
20 L T-RJ2## 7.65 LS
30 L T-RI5## 570 L
40 L T-RJ3## 10 KG
Choose Header (or F6).
BOM text: Fruit juice
Base quantity: 1000
Choose Back.
1-5-4-4 Material list
Materials tab
Select all materials.
Choose Create assignment.
Assign to operation/phase: 110
Save the master recipe.
(C) SAP AG LO305 42
(C) SAP AG LO305 43
1-5-5 Material quantity calculation
1-5-5-1 Product quantity calculation formula:
A1 = (B1n) / A2
Formula definition in cell [001,001]:
CSUM(004) / ( [001,002] / 100 )
Result: 1000
This result changes immediately when the active ingredient quantity of the batch found for the process order is not equal to the active ingredient quantity planned. The product quantity adjusts itself to the active ingredient quantity found.
1-5-5-2 Fruit quantity calculation formula:
B1 = A1 * A2
Formula definition in cell [004,001]:
[001,001] * ([001,002] / 100)
Result: 350
1-5-5-3 Acid quantity calculation formula:
Acid quantity in the fruit juice = A1 * A3
Physical quantity calculation formula
Physical quantity = (B1n / B2n)
Formula definition in cell [005,001]:
[001,001] * ([001,003] / 100) – CPSM (004;005)
Result: 6,875
1-5-5-4 Water quantity calculation formula:
D1 = A1 - (B1n / B2n) - (C1n / C3n)
Formula definition in cell [006,001]:
[001,001] - CQSM(004;002) - CQSM(005;003)
Result: 545,31
Formula definition in cell [006,001]:
ROUND ([001,001] –CQSM(004;002) – CQSM(005;003))
Formula definition in cell [001,001]:
ROUND (CSUM(004) / ([001,002] / 100))
(C) SAP AG LO305 44
1-5-5-5 Sugar quantity calculation formula:
Correct result: Formula b
1-5-5-6 Formula test
a) T-RJ1##: Quantity = 352 (LF)
Material Quantity
Fruit juice 1000
Lemon juice 6.8
Treated water 543
Sugar 10
Recalculated product quantity:
Material Quantity
Fruit juice 1006
Lemon juice 6.92
Treated water 549
Sugar 10
The sugar quantity has not changed. It is not increased by 100 grams until the product quantity is increased by 10 liters. Cancel without saving.
b) T-RJ1##: Quantity = 370 (LF)
Material Quantity
Fruit juice 1000
Lemon juice 6.125
Treated water 522
Sugar 10
(C) SAP AG LO305 45
Recalculated product quantity:
Material Quantity
Fruit juice 1057
Lemon juice 7.265
Treated water 576
Sugar 10.5
(C) SAP AG LO305 46
12
SAP AG 1999
Master Recipes: Control View
Process management
Process instructions and control recipe destinations
Control recipe creation
PI sheet simulation
Contents:
(C) SAP AG LO305 1
12.2
SAP AG 1999
Master Recipes, Control View: Unit Objectives
Define the tasks of process management
Create and send control recipes
Define and simulate a PI sheet
At the conclusion of this unit, you will be able to:
(C) SAP AG LO305 2
12.3
SAP AG 1999
Overview Diagram 12
PP-PI Overview
Master Data: Overview
Materials
R/3 Classification System
Batches
Resources: Customizing
Resources: Functions
Introduction Production Version
Master Recipes: Operationsand Phases
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
11
2
3
4
5
6
7
8
1 9
10
13
14
15
Summary and Conclusion16
Master Recipes: Materials
12 Master Recipes: Control View
(C) SAP AG LO305 3
12.4
SAP AG 1999
Master Recipes, Control View: Business Scenario
The process manufacturing of the product will be controlled by process operators. As the person responsible, you will define a corresponding PI sheet in your master recipe.
(C) SAP AG LO305 4
12.5
SAP AG 1999
Process Management
ExecutionExecutionProcessProcessplanningplanning
ProcessProcessmanagementmanagement
ProcessProcesscontrolcontrol
R/3 or R/3 or external systemexternal system
Process order
Controlrecipe
Process messages
Furthermessage
dest.
ProcesProcescontrolcontrolsystemsystem
PI sheetPI sheet
Process management is the interface between PP-PI and the systems involved in process control. Due to its flexible structure, it can be linked to fully automated, partially automated, and manually operated lines. Process management comprises the following functions:
Receiving control recipes with process instructions from released process ordersTransferring control recipes to the corresponding process operators or process control systemsTranslating process instructions into natural language so that they can be displayed and maintained on the screen by the process operatorReceiving, checking, and transferring process messages with actual process dataManual entry of process messages
(C) SAP AG LO305 5
12.6
SAP AG 1999
Process management
Creating and Downloading Control Recipes
Text
PI sheetPI sheet
Process control system
Process control systemPI sheet
Control recipe destination:
Processorder
Manually operatedManually operated Automated
Phase 12Phase 11 Phase 13Phase 13 Phase 21Phase 21 Phase 22Phase 22 Phase 23Phase 23
Operation 10 Operation 20
DisDis--chargecharge
ReacReac--tiontion
ChargeCharge
DisDis--chargecharge
Charge Reac-tion
Using control recipe destinations, you specify the process operators or process control systems that are to carry out the process instructions of an order in the process order.
You assign control recipe destinations to the phases of the process order. This assignment is independent of the subdivision of operations into phases. This means that you can assign different destinations to phases of the same operation if this makes sense from the point of view of process control.
Process management creates one control recipe for each control recipe destination of a process order. A control recipe can only be created if all the phases involved are released. Once a control recipe has been created, you can no longer change the process instructions of the corresponding phases in the order.
(C) SAP AG LO305 6
12.7
SAP AG 1999
Process Instructions and Control Recipes
...
Oper. 100Oper. 100
Proc.instructionsPh 110Ph 110 CRD A1CRD A1
Proc.instructionsPh 120Ph 120 CRD A1CRD A1
Proc.instructions
Ph 130Ph 130 CRD P1CRD P1
Oper. 300Oper. 300
Oper. 200Oper. 200
Proc.instructionsPh 210Ph 210 CRD P1CRD P1
Proc.instructionsPh 220Ph 220 CRD P1CRD P1
Proc.instructions
Ph 230Ph 230 CRD P2CRD P2
Master recipe
...
Oper. 100Oper. 100
Proc.instructionsPh 110Ph 110 CRD A1CRD A1
Proc.instructionsPh 120Ph 120 CRD A1CRD A1
Proc.instructions
Ph 130Ph 130 CRD P1CRD P1
Oper. 300Oper. 300
Oper. 200Oper. 200
Proc.instructionsPh 210Ph 210 CRD P1CRD P1
Proc.instructionsPh 220Ph 220 CRD P1CRD P1
Proc.instructions
Ph 230Ph 230 CRD P2CRD P2
Process order
Dest. A1Dest. A1
Dest. P1Dest. P1
Dest. P2Dest. P2
Ctrl recipe 1
Ctrl recipe 2
Ctrl recipe 3
Process instructions are structures with which data or requests from R/3 process planning are copied to process control. Process instructions are assigned to the phases of a master recipe or process order.
Each phase must have a control recipe destination assigned to it. A control recipe destination indicates a process control system, a process operator, or a group of process operators to which the process instructions that have been created for the phase are to be transferred.
To execute an actual production process, a process order is created on the basis of a master recipe. Together with the control recipe destinations and process instructions, the operation and phase structure is copied from the master recipe.
Once a process order has been released for production, the process instructions to be sent to the same control recipe destination are grouped in a control recipe and transferred to process control. Exactly one control recipe is created for each control recipe destination.
(C) SAP AG LO305 7
12.8
SAP AG 1999
Ph 110
Ph 120
Ph 130
Ph 210
Ph 220
Ph 230
Ph 310
Ph 330
Op. 100Op. 100
Op. 200Op. 200
Op. 300Op. 300
Control recipe 2/Control recipe destination P1
Control recipe 3/Control recipe -destination P2
Ph110 Ph120 Ph130
Ph 210 Ph 220 Ph 230
Ph 310 Ph 320 Ph 330
Ctrl recipe 1 Ctrl recipe 2 Ctrl recipe 3
Control recipe 1/Control recipe destination A1
Planning view Control view
Example Recipe structure
Planning View and Control View
Ph 320
Op. 100Op. 100
Op. 200Op. 200
FILL MIX EMPTY
Op. 300Op. 300
FILL REACT EMPTY
FILL COOL EMPTY
Master recipes have a planning and a control view. The planning view comprises the planning of operations, materials, resources, and inspection characteristics.
In the planning view, phases are combined into operations. Phases are hierarchically subordinate to operations.
The control view contains information in the form of process instructions. This is required for communication with the process control level.
In the control view, phases are combined for a control recipe destination. Phases of a recipe that are combined for a control recipe destination do not need to belong to the same operation.
The graphic shows an example of an operation/phase structure, with two phases of different operations being processed in parallel. The parallel filling and emptying phases are monitored by the same process control system or process operator.
(C) SAP AG LO305 8
12.9
SAP AG 1999
Operation 100Operation 100
Proc. instr. 10Proc. instr. 10
PI char. 10
PI char. 20
Phase 110Phase 110PI sheetPI sheet
Instruction 1:Instruction 1:
Readtemperature
Temp:Temp:
Control recipe
PI Sheet
CRD 01Proc.oper.
Process order
Master recipe
The control recipe destination can either be an automatic process control system or a process operator in a production line that is manually operated (either totally or partially).
If a control recipe is sent to a process operator, the process instructions are prepared for display in natural language and interactive processing on the screen.
(C) SAP AG LO305 9
12.10
SAP AG 1999
Note:
PI SheetPI Sheet
Comment sheetComment sheetPI sheet 1000000449
Due to an error...Due to an error...
Received
Process order: 1234 Material: XYZ Test material
Operating group: W01
Phase 10 / Instruction 10Heat solvent.Start agitator.Add material ABC.
Note:Note:
Phase 10 / Instruction 20Check material quality.Record material quantity.Stop heating and slowdown agitator.
Temp.: ______ °CRot. speed:_____Quantity:_______kgSignature:_____
Record insp. resultsCall mat. qty calculationQuantity: ____ kgRot. speed: ______Signature: ____
Phase 10 / Instruction 30Start cooling and recordtime and temperatureevery hour.
Total quantity: ?___
Time10:0011:01
Temperature175.0168.3
Input values
Header
Controlinformation
Additionalinformation
Input values
Signature forproc. step
Formula result
Insp. resultsrecording
Function call
Comments
PI Sheet: Structure
The R/3 PI sheet contains the following elements:A header with general data such as order number, material number, and operating groupTexts containing control information and instructions for the process operatorAdditional information that can be called up using the corresponding pushbuttonComments maintained by the operators, which can be displayed using the corresponding pushbuttonInput fields (individually or in tables) for the actual process data to be reportedFields for formula results to be calculated by the systemThe Record inspection results pushbutton, which you can use to jump to the QM function for recording inspection resultsPushbuttons to call R/3 function modules in order to start a dialog (for example, order confirmation) or retrieve data from internal or external applications (such as R/3 Document Management)
(C) SAP AG LO305 10
12.11
SAP AG 1999
Phase
Process instruction view
Process instructions
PIassistant
Process instructioncharacteristics view
Alternativemaintenance
Master Recipe / Process OrderMaster Recipe / Process Order
Process Instruction Maintenance
You can use the PI assistant to maintain process instructions and process instruction categories. The PI assistant displays special selection views for each process instruction type. No knowledge of
process instruction characteristics or their use is required to work with the PI assistant. When you exit the PI assistant, the characteristic overviews of the process instructions are created.
You can use the PI assistant to:Define PI categories in CustomizingDefine process instructions in the master recipe or process order
(C) SAP AG LO305 11
12.12
SAP AG 1999
RecipeControl recipe dest. 10 Operating group 10Address GROUP 10Type 1 Control recipe transfer to R/3
PI sheetDigit. signature Required
InstCat ItemSequenceScope of gen.Filters
Description
OPTEXT 030100
At the start of an operation
Only one proc. instructionNo filter
SEQDEF 050105
At the start of a phase
For all predecessorsNo filter
Op. 10
Ph. 11 CRD A1
Displaying Generated Process Instructions
You can display information on the process instructions that are automatically generated for the recipe from the operation overview of the master recipe.
The system displays the following information for each control recipe destination assigned to the phases:The header data of the destination (for example, address, type, type of signature)The settings for the automatically generated process instructions (for example, process instruction category, item, scope of generation)
(C) SAP AG LO305 12
12.13
SAP AG 1999
Process controlsystem
PI sheet
Simulation
PPPP
PP-PIPP-PI
Production requirementsProduction requirements
Master recipeMaster recipe
Process managementProcess management
Process orderProcess order
ProcessProcessmessagesmessages
ProcessProcesscontrol levelcontrol level
Control recipe:Control recipe:proc.instructionsproc.instructions
PI Sheet Simulation in the Master Recipe
The effects process instructions and their characteristics have on the layout and structure of the PI sheet become visible only after the control recipe has been created. To check the PI sheet beforehand, you can simulate a PI sheet in the master recipe.
From within the master recipe, you can simulate a PI sheet or parts of a PI sheet in the following ways:For a control recipe destinationFor selected phasesFor selected process instructions
(C) SAP AG LO305 13
12.14
SAP AG 1999
Master Recipes, Control View: Unit Summary
Process instructions that have been assigned to phases are combined in control recipes.
One control recipe is created for each control recipe destination.
The control recipes are sent to the corresponding control recipe destinations.
A control recipe can be created to appear on the screen as a PI sheet for a process operator.
You can simulate a PI sheet from the master recipe.
(C) SAP AG LO305 14
12.15Exercises
Unit: Master Recipes
Topic: Control View
At the conclusion of these exercises, you will better understand:
Control recipe destinations
Process instructions
PI sheets
The process manufacturing of the product will be controlled by process operators.
As the person responsible, define a corresponding PI sheet in your master recipe.
1-1 Control recipe destinations and process instructions
Display the operation overview for recipe 1 of the recipe group COLORS.
1-1-1 Control recipe destination
Which control recipe destinations have been assigned to the phases of the recipe?
Input help F4 in the Destination field
CRD Description of control recipe destinations
____ __________________________________
____ __________________________________
1-1-2 Process instructions
Which process instruction categories are assigned to phase 1010?
To which process instruction types do they belong?
(C) SAP AG LO305 15
In the operation overview:Choose Proc. inst for phase 1010
Input help F4 for Type field.
(C) SAP AG LO305 16
ProcInstCat Type
__________ ___________________________
__________ ___________________________
__________ ___________________________
Which process instruction types have been defined in the R/3 System?
______________________________
______________________________
______________________________
______________________________
______________________________
______________________________
______________________________
Display the administrative data for a process instruction.
Choose Process instruction details and then the Admin. Data tab.
1-1-3 Process instruction characteristics
Which process instruction characteristics are assigned to the process instruction INSTR?
Choose Process instruction details.
______________________________
______________________________
The characteristics PPPI_INSTRUCTION and PPPI_NOTE are each assigned a long text. Display the long texts.
Display the administrative data for a process instruction characteristic.
Choose Details for process instruction characteristic and then the Administrative data tab.
1-1-4 Simulating a PI sheet
(C) SAP AG LO305 17
Display the PI sheet for the phases with control recipe destination 01 in a simulation.
Choose Simulate PI sheet.
1-2 Defining a PI sheet in recipe T-DET1##
Create process instructions for your recipe T-DET1## using the information in the following table. Check and correct the texts and remove the process instruction characteristics you do not need.
The process instructions required for reporting material movement and order dates as well as other process instructions with information on operations, phases, and material components are all defined as automatically generated process instructions for the control recipe destination DE (See course LO060).
Note: In this exercise, you only have to define process instructions for instructions and notes for the line operator. Process instructions for in-process quality checks will be explained in a separate unit.
Phase 110:
PI ProcInstCat PI Characteristic
10 INSTR PPPI_INSTRUCTION (control instructions)
Long text (ZT-DET100-1): Fill the required quantity of raw materials T-RD1## (sulfuric acid) and T-RD2## (lauryl alcohol) into charging tank and confirm the filled quantity. Pay attention to the safety instructions.
PPPI_NOTE (note)
Long text (ZT-DET100-2): Caution! Corrosive material! Wear protective clothing, gloves, and protective mask.
Phase 120:
PI ProcInstCat PI Characteristic
10 INSTR PPPI_INSTRUCTION (control instruction)
Long text (ZT-DET100-3):Turn on agitator. Mix ingredients for 10 min.
Phase 130:
PI ProcInstCat PI Characteristic
(C) SAP AG LO305 18
10 INSTR PPPI_INSTRUCTION (control instruction)
Long text (ZT-DET100-4):Add displayed quantity of water to mixture.
Phase 210:
PI ProcInstCat PI Characteristic
10 INSTR PPPI_INSTRUCTION (control instruction)
Long text (ZT-DET100-5):Transfer material from charging tank to reaction tank. Start agitator.
Phase 220:
PI ProcInstCat PI Characteristic
10 INSTR PPPI_INSTRUCTION (control instruction)
Long text (ZT-DET100-6): Carefully add the required raw materials T-RD4## (1 butanol) and T-RD5## (sodium hydroxide) to the reaction vessel. Confirm consumed quantities. Mix for 10 minutes. Pay attention to the safety instructions.
PPPI_NOTE
Long text (ZT-DET100-7): Caution! Wear protective clothing, gloves, and protective mask.
Phase 310:
PI ProcInstCat PI Characteristic
10 INSTR PPPI_INSTRUCTION (control instruction)
Long text (ZT-DET100-8):Transfer the contents from the reaction vessel to the cooling vessel.
Phase 330:
PI ProcInstCat PI Characteristic
10 INSTR PPPI_INSTRUCTION (control instruction)
Long text (ZT-DET100-9): Fill the product you just produced into the transport vehicle and confirm the quantity produced. Check if the cooling vessel is empty and close the valves.
PPPI_NOTE (note)
Long text (ZT-DET100-10): Wear protective clothing and gloves!
20 DE_PROD
(C) SAP AG LO305 19
Simulate your PI sheet.
Save your recipe.
For more information, display the process instructions that are automatically generated in Customizing for the control recipe destination.
Goto Process management Control recipe dest.
(C) SAP AG LO305 20
12.16Solutions
Unit: Master Recipes
Topic: Control View
1-1 Control recipe destinations and process instructions
1-1-1 Control recipe destination
Logistics Production - Process Master Data Master Recipe Recipe and Material List Display
Operations tab.
Use the input help (F4) in the Destination field.
CRD Description of control recipe destinations
01 PI sheet for group 1
A1 PI sheet for group A1
1-1-2 Process instructions
In the operation overview, choose Proc. inst. for phase 1010.
Use the input help (F4) in the Type field.
ProcInstCat Type
INSTR Process parameter
READ2 Process data request
SIGN Process data request
Which process instruction types have been defined in the R/3 System?
Universal process instruction category
Process parameter
Process data request
(C) SAP AG LO305 21
Process message subscription
Process data calculation formula
Inspection results request
Dynamic function call
Sequence definition
(C) SAP AG LO305 22
Display the administrative data for a process instruction.
Choose Process instruction details and then the Admin. Data tab.
1-1-3 Process instruction characteristics
Which process instruction characteristics are assigned to the process instruction INSTR?
Choose Details for process instructions.
PPPI_INSTRUCTION
PPPI_NOTE
The characteristics PPPI_INSTRUCTION and PPPI_NOTE are each assigned a long text. Display the long texts.
Choose Values.
Display the administrative data for a process instruction characteristic.
Choose Details for process instruction characteristics.
Administrative data tab
1-1-4 Simulating a PI sheet
Display the PI sheet for control recipe destination 01.
Operation tab
Select phases.
Choose Simulate proc. inst.
(C) SAP AG LO305 23
1-2 Defining a PI sheet in recipe T-DET1##
Operations tab
Select phases listed.
Choose Proc. inst.
Enter or select process instructions.
Choose Assistant or Details for process instructions.
Maintain control instructions or notes.
Choose Copy (only if you are maintaining in the assistant).
The control instructions and notes are defined in the system as standard texts. You can call up these texts in the long text editor by choosing:
Integrate Text Standard...
Enter text name ZT-DET100-*
Set Expand immediately indicator.
Simulate your PI sheet.Select all phases in the operation overview..
Choose Simulate proc. inst.
(C) SAP AG LO305 24
13
SAP AG 1999
Material Master Maintenance
BOMs for the Manufacture of Co-Products
Contents:
Aspects of Co-Product Manufacturing
(C) SAP AG LO305 1
13.2
SAP AG 1999
At the conclusion of this unit, you will be able to:
Aspects of Co-Product Manufacturing: Unit Objectives
Maintain the material master and BOMs for the manufacture of co-products
Create an apportionment structure for cost apportionment to co-products
Create a process order for a co-product
(C) SAP AG LO305 2
13.3
SAP AG 1999
PP-PI Overview
Master Data: Overview
Materials
R/3 Classification System
Batches
Resources: Customizing
Resources: Functions
Introduction Production Version
Master Recipes: Control View
Master Recipes:Operations and Phases
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
1111
22
33
44
55
66
77
88
1 99
1212
1010
1414
1515
Summary and Conclusion1616
Master Recipes: Materials
13 Aspects of Co-Product Manufacturing
Overview Diagram 13
(C) SAP AG LO305 3
13.4
SAP AG 1999
Aspects of Co-Product Manufacturing:Business Scenario
Your company also produces fertilizer.
During the production process of the fertilizer, you want the co-product sulfuric acid to be produced.
As the person responsible, you will change the existing master recipe for fertilizer production regarding the manufacture of a co-product.
You must also make the corresponding changes to the material master of the co-products.
(C) SAP AG LO305 4
13.5
SAP AG 1999
Catalyst
Ingredients
Operation 10 "Charging"
Catalyst
Intra material
Waste
Chargevessel
Operation 20 "Reaction"
Reaction vessel
Co-product A
Co-product B
Typical Material Flow for the Manufacture of Co-Products
The graphic uses two examples of operations carried out at the primary resources charge vessel and reaction vessel to show a typical material flow in process manufacturing.
The graphic shows:Ingredients entering the production processThe temporary appearance of an intermediate product between two processing units which is processed further without leaving the process. Such materials are assigned material type INTR Intra material.Waste produced during the manufacturing processThe use of a catalyst that enters the process at a certain point of time and leaves it again laterThe manufacture of one or more products. If several planned materials are manufactured during one production run, they are called co-products.
(C) SAP AG LO305 5
13.6
SAP AG 1999
Co-product
Material YMaterial Y--300300
Cost-apportionment to co-productsApportionment structure Source struct.
Production version 1
Equivalence numbers
Material costs
Production costs
Y-300
P-300
10
1
Y-300
P-300
10
1
Production version 2...
...
00010002
PIPI
Y-300 and P-300Y-300 and Z-300
Material Master
The Co-product indicator must be set in the material master of a material that is to be manufactured as a co-product.
When manufacturing co-products, the entire costs incurred for the process order are collected at order header level and distributed to the individual co-products using equivalence numbers.
In the material master record, you define one or more apportionment structures. An apportionment structure specifies how the order costs are to be distributed to the co-products manufactured in a specific production process. You can maintain equivalence numbers for each apportionment structure and assign the apportionment structure to a production version.
When you create a process order, the system uses this data to automatically generate a settlement rule. This settlement rule is then used to distribute the total costs incurred to the co-products.
A source structure is used to distribute the equivalences in the apportionment structure according to cost element groups. How the costs are apportioned to the individual co-products can then differ according to the various cost element groups involved. You define source structures in Customizing.
(C) SAP AG LO305 6
13.7
SAP AG 1999
= Co-productC= Input material= Output material
+-
......
YY--300 "Yellow paint"300 "Yellow paint"
Co-product
Co-product
Leading productLeading product
C
300 - 100 Water +
300 - 120 Diaminobenzol +
P-300 Paste -
BOMS for the Manufacture of Co-Products
In PP-PI, the manufacture of co-products can be represented by assigning a co-product as a leading product to the BOM header. All other co-products appear as BOM items.
The following prerequisites must be met for the manufacture of co-products:The Co-product indicator must be set in the material master of the co-products.The Co-product indicator must also be set for BOM items that have co-products assigned to them.
The manufacture of co-products can also be represented using the material type PROC Process material. A process material is specifically used to represent the manufacture of co-products. A process material is not a physically existing material but rather it represents a manufacturing process. As a BOM header for a process material, all co-products of the manufacturing process are listed as BOM items with manufacture of co-product indicators. There is no quantity or value update for a process material. This transaction takes place at co-product level.
A process order can either be created for a co-product or for a process material.
(C) SAP AG LO305 7
13.8
SAP AG 1999
Material BOMs Master recipe
Quantity StructureQuantity Quantity StructureStructure
Prices for materials
Prices for activitiesPrices for activities
Overheads from costing sheet
Prices for processes
Value Structure
Value Value StructureStructure
Costing resultsCosting resultsCosting results
Itemization
M Material $M Material $E Activity $E Activity $G Overhead $X Process $
Costelements
$ $ $400 000 $610 000 $612 000 $660 000 $670 000 $
CostingCostingCosting
An
alys
isA
nal
ysis
An
alys
is
Pricing
Valuating
Profitability analysis
Controlling
PricingPricing
ValuatingValuating
Profitability analysisProfitability analysis
ControllingControlling
C
Material Costing: Objectives
Material costing uses data from Logistics, such as the material BOM and the master recipe, as the quantity structure to calculate costs for material consumption and the activities.
Material costing valuates this quantity structure with:
Prices for materials in the material master
Prices for activities in Cost Center Accounting
Prices for processes in Activity-Based Costing
Overhead on the direct costs for these materials and activities
Overhead for sales and administration costs
You can analyze the results in different ways
The analysis is used, for example, to estimate costs or for reporting
(C) SAP AG LO305 8
13.9
SAP AG 1999
Costing date from 04/01/2000
Costing date to 04/30/2000
Quantity structure date 04/01/2000
Valuation date 04/01/2000
Costing variantCosting variant
PlantPlant
MaterialMaterial
Lot sizeLot size
ItemizationItemizationCost Component Split
Cost Component Split LogLog
Mat Act. OH ProcessSystem messages
InformationWarning
Error
ExplanationExplanation
Executing a Material Cost Estimate
When you create a cost estimate with a quantity structure, you enter the costing variant, the material, the plant, and the costing version. If you do not enter a costing lot size, the default value from the material master record is used. The system determines and valuates the quantity structure automatically.
The dates are proposed from the costing variant and determine the following: The valuation of the quantity structure (valuation date) The validity period of the cost estimate (costing date from/to) The explosion of the quantity structure (explosion date)
(C) SAP AG LO305 9
13.10
SAP AG 1999
Aspects of Co-Product Manufacturing:Unit Summary
The manufacture of co-products is the production of several materials in one manufacturing run.
In the material master of the co-products to be produced, the Co-product indicator must be set.
One co-product is assigned to the BOM header as the leading product. All other co-products appear as BOM items.
A process order can be created in the BOM item for the leading product or for a co-product.
(C) SAP AG LO305 10
13.11Exercises
Unit: Aspects of Co-Product Manufacturing
Topic: Master Data Maintenance
At the conclusion of these exercises, you will be able to:
Set up a material master for co-product manufacturing
Create an apportionment structure
Extend a BOM to include co-product manufacturing
Your company also produces fertilizer.
During the production process of the fertilizer, you want the co-product sulfuric acid to be produced.
As the person responsible, you will change the existing master recipe for fertilizer production to reflect the manufacture of a co-product.
You must also make the corresponding changes to the material master of the co-products.
Scenario: The recipe T-RC1## describes the production of fertilizer. During the production process, the co-product T-FF3## (sulfuric acid) is to be produced along with the product.
1-1 Overview of master recipe T-RC1##
Familiarize yourself with the data in master recipe 1 of the recipe group T-RC1##.
1-1-1 Operation overview
Familiarize yourself with the operations, phases, and resources assigned.
1-1-2 Recipe header data
Display the recipe header data.
Which material is assigned to the recipe as a product?
________________________
(C) SAP AG LO305 11
1-1-3 Material list
Familiarize yourself with the material components that are assigned to the recipe.
Which materials are assigned?
________________________
________________________
________________________
1-2 Material master: Co- product indicator
Set the Co-product indicator for your materials T-FF1## and T-FF3## in the material master or make sure it is set.
Select view(s): MRP 2
Plant: 1100
For which material type was the co-product T-FF3## created?
Material type: _____________
1-3 Bill of material
Enter the material T-FF3## in the master recipe T-RC1## as a co-product in the bill of material of the “leading“ product T-FF1##.
Start recipe maintenance on the date of creation (previous exercise) in the material list.
Choose BOM.
Item ICt Component Quantity Un
0040 L T-FF3## 7- L
Set the Co-product indicator for the new BOM item T-FF3##.
Choose Item
Adjust the base quantity in the BOM header.
Choose Header.
In the material list, assign the co-product T-FF3## to phase 330.
Save your recipe.
(C) SAP AG LO305 12
1-4 Material master: apportionment structure
For the fertilizer production process, create an apportionment structure for cost apportionment of the process order costs to the co-products T-FF1## and T-FF3##. Do this in the material master record of the leading product.
Select view(s): MRP 2
Plant: 1100
Choose Joint production.
Cost Apportionment to Co-Products: Apportionment Structures screen
Assign the source structure to PI so you can directly distribute the production costs to different cost elements.
Aufteilungsschema Schema
0001 T-FF1## and T-FF3## PI
On the Cost Apportionment to Co- Products: Equivalence Numbers screen, you can assign the groupings of cost categories already defined in the source structure to the Assignment field and distribute them to the co-products using the equivalence numbers.
Maintain the following equivalence numbers:
Choose Equivalence numbers.
Assignment Co-product EqNo
1 "Material costs" T-FF1## 10
1 "Material costs" T-FF3## 1
2 "Production costs" T-FF1## 5
2 "Production costs" T-FF3## 3
3 "Miscellaneous" T-FF1## 2
3 "Miscellaneous" T-FF3## 1
Save your material master record.
(C) SAP AG LO305 13
1-5 Material master: Assigning an apportionment structure to a production version
In the material master record for the product T-FF1##, assign your apportionment structure 0001 to the corresponding production version.
Select view(s): MRP 4
Plant: 1100
Choose ProdVersion.
Choose Details.
1-6 Source structure in Customizing
In Customizing, display the source structure PI with which the production costs are directly distributed to the different cost elements.
Determine the source (cost element group) for each assignment in the PI source structure and write them down in the following table (enter controlling area 1000 if prompted):
Assignment Cost element group
Material costs
Production costs
Misc. costs
From the controlling application menu, display the cost element groups above and list three cost elements for each cost element group:
Cost element group Cost element
(C) SAP AG LO305 14
1-7 Creating process orders for the co-products
1-7-1 Create a process order (order type PI01) for the leading product T-FF1## in production plant 1100.
Create Process Order: Header General Data screen
Total quantity: (for example) 1000 l
Basic dates: start (for example) today + 1 week
On the Operation Overview and the Material List screens, check whether the data from your master recipe has been copied correctly.
Also check whether the apportionment structure for the manufacture of co-products was copied correctly.
In the order header, choose Header -> Settlement rule
1-7-2 Create a process order (order type PI01) for the co-product T-FF3##.
Total quantity: (for example) 70 l
Basic dates: start (for example) today + 1 week
In the order header, the co-product T-FF3## is replaced by the leading BOM material T-FF1##.
The quantity to be produced for the leading BOM material is calculated from the target quantity for the co-product.
1-8 Material costing: Performing material costing with a quantity structure
You want to replan product costs for the fertilizer T-FF1## and the sulfuric acid T-FF3##. To do this, you will perform material costing with a quantity structure.
1-8-1 Write down the costing lot size for the fertilizer T-FF1## in the material master:
____________________________________________________________
1-8-2 Create a material costing estimate with quantity structure for the fertilizer T-FF1## in plant 1100. Choose the costing variant PPC1 Standard cost estimate (Mat) and confirm the dates suggested.
1-8-3 Go to the costing data and write down the status and the costing lot size:
(C) SAP AG LO305 15
___________________________________________
___________________________________________
1-8-4 Write down the following quantity structure data:
Bill of material:
Alternative:
Task list group:
Group counter:
Process:
Production version:
Apportionment structure:
Use the F1 help to find out more about the Process field.
1-8-5 Which costing sheet was used for valuation?
____________________________________________________________
Display the cost in relation to the costing lot size.
Display the itemization for the cost of goods manufactured?
___________________________________________________________
An item category distinguishes costing items according to their cost source. What is the source of item category A?
____________________________________________________________
Save your material cost estimate.
(C) SAP AG LO305 16
1-8-7 Create a material cost estimate with a quantity structure for sulfuric acid T-FF3## in plant 1100 with the costing variant PPC1 for costing lot size 7 L. Compare the data. What are the differences?
____________________________________________________________
____________________________________________________________
____________________________________________________________
(C) SAP AG LO305 17
13.12Solutions
Unit: Aspects of Co-Product Manufacturing
Topic: Master Data Maintenance
1-1 Overview of master recipe T-RC1##
Master Data Production Versions
Plant: 1100
Group: T-RC1##
Select production version.
Choose Recipe.
1-1-1 Operation overview
1-1-2 Recipe header data
Recipe header tab
Which material is assigned to the recipe as a product?
Choose Material assignments.
T-FF1##, Fertilizer, fluid, form A
1-1-3 Material list
Recipes tab
Choose Materials.
Which materials are assigned?
T-RF1##
(C) SAP AG LO305 18
T-RF3##
T-RF2##
(C) SAP AG LO305 19
1-2 Material master: Co- product indicator
Master Data Material Master Material -> Change -> Immediately
Select view(s): MRP 2
Plant: 1100
X Co-product
For which material type was the co-product T-FF3## created?
Choose Information on material.
Material type: Semi-finished product
1-3 Bill of material
Master DataProduction Versions
Plant: 1100
Group: T-RC1##
Choose Recipes.
Materials tab
Choose Bill of material.
Item ICt Component Quantity Un
0040 L T-FF3## 7- L
Set the Co-product indicator for the new BOM item T-FF3##.
Choose Item
x Co-product
Adjust the base quantity in the BOM header to 1000 liters.
Choose Header.
(C) SAP AG LO305 20
1-4 Material master: Apportionment structure
Master Data Material Master Material -> Change -> Immediately
Select view(s): MRP 2
Plant: 1100
Choose Joint production.
Cost Apportionment to Co-Products: Apportionment Structures screen
1-5 Material master: Assigning an apportionment structure to a production version
Master Data Material Master Material -> Change -> Immediately
Select view(s): MRP 4
Plant: 1100
Choose ProdVersion.
Choose Details.
Apportionment structure 0001
1-6 R/3 Customizing IMG Controlling Product Cost – Controlling Product Cost Planning Selected Functions in Material Costing Costing in Joint Production Define Source Structure
Select PI source structure.
Double-click the Assignment folder.
Select each assignment and double-click the Source folder.
(Controlling area 1000)
Assignment Cost element group
Material cost CO – PC – MAT
Production cost CO – PC – PROD
Misc. costs CO – PC – MISC
(C) SAP AG LO305 21
SAP standard menu Accounting Controlling Cost Element Accounting Master Data Cost Element Group Display
Cost element group: Cost element (example):
CO – PC – MAT 400000 Raw material
404000 Spare parts
405000 Packaging
CO – PC – PROD 620000 Machine costs
629600 Staging
625000 Setup
CO – PC – MISC 655300 OH Administration
655400 OH sales
416200 Electricity actual usage
1-7 Creating process orders for the co-products
1-7-1 Create a process order (order type PI01) for the leading product T-FF1##.
Logistics -> Production - Process -> Process Order / Process Order -> Create -> With material
Also check whether the apportionment structure for the manufacture of co-products was copied correctly.
In the order header, choose Header -> Settlement rule
(C) SAP AG LO305 22
1-8 Material costing: Performing material costing with a quantity structure
1-8-1 Production -Process Master Data Material Master Material. Display Display current
Material: T-FF1##
Select view(s): Costing 1
Plant: 1100
Costing lot size: 1000
1-8-2 Production - Process Product Cost Planning Material Costing Costing with Quantity Structure Create
Material: T-FF1##
Plant: 1100
Costing variant: PPC1
Costing version: 1
Choose Enter.
Confirm the proposed dates by choosing Enter again.
1-8-3 Costing data tab
Status: Calculated without errors
Costing lot size: 1000 liters
1-8-4 Quantity Structure tab
Quantity structure data:
Bill of material: Unique number for each BOM
Alternative: 1
Task list group: T-RC1##
Group counter: 1
Process: T-FF100
Production version: 0001
Apportionment structure: 0001
(C) SAP AG LO305 23
The Process field shows which process is used to cost a co-product.
1-8-5 Valuation tab
The costing sheet COGS, with which overhead costs are calculated, was used for valuation.
(C) SAP AG LO305 24
1-8-6 Costing tab
Choose Itemization
The costing item with item category A has the co-product T-FF3## as its cost source.
Save.
1-8-7 Differences to first material cost estimate:
The costing structure is created from the sulfuric acid view. The fertilizer T-FF1## appears in the individual cost itemization with item category A.
(C) SAP AG LO305 25
14
SAP AG 1999
Inspection Lot
Specification of Batches Produced
Material Master
Master Recipe
Material Specification
Contents:
Aspects of Quality Inspection During Production
(C) SAP AG LO305 1
14.2
SAP AG 1999
Modify the material master for in-process quality inspection
Enter master inspection characterisics for the quality inspection
Prepare the master recipe for the in-process quality inspection
At the conclusion of this unit, you will be able to:
Aspects of Quality Inspection During Production:Unit Objectives
(C) SAP AG LO305 2
14.3
SAP AG 1999
PP-PI Overview
Master Data: Overview
Introduction
R/3 Classification System
Batches
Resources: Customizing
Resources: Functions
Production Version
Master Recipes:Operations and Phases
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Materials
Engineering Change Management,Recipe Approval
1111
22
33
11
55
66
77
88
99
1010
1212
1313
44
1515
Summary and Conclusion1616
Master Recipes: Materials
1414Aspects of Quality InspectionDuring Production
Overview Diagram 14
(C) SAP AG LO305 3
14.4
SAP AG 1999
Aspects of Quality Inspection During Production:Business Scenario
Headache tablets are produced in the pharmaceutical subdivision of your company.
A master recipe for the production process is available.
As the person responsible, you will check the changes in the material master and master recipe that are specific to QM.
(C) SAP AG LO305 4
14.5
SAP AG 1999
50
40
30
20
10
Integration with Quality Management
Inspection specificationsConcentrationpH valueViscosity
R/3 QM insp. lot: insp. char.
QM-IDI
Ext. labor. information system(LIMS): analyt. specification
Inspection results recording20 %7.3100 cP
R/3 QM insp. lot: char. values
QM-IDI
LIMS: analytical results
Between the production plant and the laboratory or the quality assurance system, information on product quality and analysis values can be exchanged. This happens when the R/3 Quality Management System is used, with or without linking to external LIMS (laboratory information systems).
You define the specifications of a quality inspection in the inspection characteristics of an inspection lot in R/3 QM. During inspection results recording, the results of the quality inspection are assigned to the inspection characteristics of the inspection lot.
There is a direct link between PP-PI and R/3 Quality Management. The quality of materials produced can be checked in an in-process inspection taking place in parallel to the production process. In this case, the inspection lot is created for the corresponding process order. The inspection characteristics are created in the operations and phases of the master recipe the process order is based on and are then transferred to the inspection lot. Inspection results recording takes place when the process order is carried out. If the product is to be handled in batches, inspection results can be used for batch specification by automatically copying them to the class characteristics of the batch produced.
You can also check the product quality before a goods receipt after production. In this case, an inspection lot is created from an inspection plan maintained in R/3 QM.
R/3 QM can be linked to a LIMS using the QM-IDI interface. In this case, inspection specifications are transferred from R/3 QM to the LIMS, which in turn sends the inspection results back to R/3 QM.
(C) SAP AG LO305 5
14.6
SAP AG 1999
12
9
6
3
11 1
7 58 4
210
GoodsGoodsmovementmovement
Order(production)
SalesSalesorderorder
DeliveryDelivery
DeadlineDeadlinemonitoringmonitoring
ManuallyManually
Inspection lot
CreatedCreatedbyby
InspectionInspection
Inspection Lot
The functions of quality inspection of the R/3 System are fully integrated into the entire logistics process. They affect all business activities (such as product planning, production, procurement, and sales).
A quality inspection can only be carried out if an inspection lot is created. Inspection lots are fully integrated in the logistics chain, such as the neighboring R/3 tasks of goods receipt, goods issue, and process order. They document the entire inspection process, from inspection specifications to inspection results recording, and to the usage decision. They can be created automatically or manually from different sources of the corresponding application.
In-process inspection takes place parallel to the production process. The inspection lot is either created manually or automatically from within the process order when the order is released. The inspection characteristics are maintained for the operations or phases of the master recipe the process order is based on. They are then transferred to the inspection lot. The inspection results are recorded for the inspection characteristics of the inspection lot while the process order is carried out.
In other tasks, such as a goods receipt, the inspection lot is created on the basis of an inspection plan maintained in R/3 QM. Inspection plans are master data of R/3 QM.
(C) SAP AG LO305 6
14.7
SAP AG 1999
...
...
...
...
ManuallyAutom. at
order release
...
Inspection lotInspection lot
Insp. characteristic
Unplannedinsp. charact.
Inspection operation
Master recipeMaster recipe
Process orderProcess order
Operation / phase
Material
Insp. characteristics
Insp. type:"In-process inspection of production order"
In-Process Inspection - Inspection Lot
In an in-process quality inspection, the inspection lot is created on the basis of the underlying master recipe. In the master recipe, you maintain inspection specifications in the form of inspection characteristics for the corresponding operations or phases.
You can either create the inspection lot manually or the system creates it automatically when you release the process order. For the system to be able to do so, you must activate the inspection type Inspection during production in the material master of the material to be produced. The inspection characteristics for the operations or phases of the master recipe are then transferred to the corresponding inspection operations of the inspection lot.
Later, you can also add unplanned inspection characteristics from within the process order.
(C) SAP AG LO305 7
14.8
SAP AG 1999
Master recipe
Operation / phase
Insp. characteristics
Prod. resource/tool (PRT)
Assignment of Production Resource / Tool to Inspection Characteristics
If tools or equipment are required for in-process quality inspection, you can assign production resource/tools to the phases and operations of a master recipe. You can then assign these production resource/tools to the inspection characteristics of the same phase or the same operation.
After the release of the process order, the assignment of the production resource/tool is transferred to the inspection lot. When inspection results are recorded, the production resource/tools of the phase or operation concerned is displayed.
Production resource/tools are mobile resources in production or plant maintenance. They are divided into the following categories:
MaterialsEquipmentDocumentsMiscellaneous production resource/tools
(C) SAP AG LO305 8
14.9
SAP AG 1999
Operation 10 Operation 20 Operation 30
Inspection char. C1
C2
C3 C4
C5
Insp. points
Inspection lot
Partial lot 1Partial lot 1
Partial lot 2Partial lot 2
C1 C1 C1
C2 C2 C2
C3 C3 C4 C4
C5 C5
Batch B2Batch B2
Batch B1Batch B1
Inspection Points, Partial Lots, and Batches
This graphic shows the general relationship between inspection points, partial lots, and batches. If you set the Inspection points indicator on the QM Data header detail screen of the master recipe, all
in-process inspection results recordings are carried out with relation to inspection points. Unlike inspection without inspection points, you can record inspection results for the inspection characteristics of the same inspection operation several times. The intervals between the inspection points can be time-related (that is, at certain points in time), quantity-related (that is, after a certain quantity has been produced), or freely defined.
Inspection results recording is performed for the inspection characteristics of the inspection lot with exactly one inspection lot being created for each process order. If partial quantities with different specifications are produced in a process order, you can assign inspection points to a corresponding partial lot to record inspection results. You can create several partial lots.
Partial lots describe a certain production quantity during production. This quantity is processed in several operations or phases. For each operation or phase, you can perform an inspection with inspection points for different inspection characteristics and assign the results to the partial lot. A new partial lot is created when the first inspection point of this partial lot is processed.
An example where partial lots are used is the manufacture of co-products, that is, the production of several materials in one process order. Each co-product can be represented by a partial lot.
(C) SAP AG LO305 9
If the finished product is managed in batches, you can assign partial lots to individual batches. Selected inspection results can automatically be copied to the class characteristics of the batch for batch specification.
(C) SAP AG LO305 10
14.10
SAP AG 1999
Operation 10 Operation 20 Operation 30
C1: "Temperature"
C2: "Concentration"
C3: "pH value" C4: "Viscosity"
C5: "Color"
Insp. lot / Partial lot 1
QM master insp. characterist. Batch characteristicsLink
C2: Concentration: 20 %
C3: pH value: 6.5
C4: Viscosity: 100 cP
Concentration: 20 %
pH value: 6.5
Viscosity: 100 cPAutom. value transfer
ConcentrationConcentration
pH valuepH value
ViscosityViscosity
Batch B1Batch B1
Specification of Batches Produced
C1
C2
C3 C4
C5
In an in-process inspection, inspection characteristics for the operations and phases of the master recipe, which the process order or inspection lot are based on, contain inspection specifications. You can either create inspection characteristics in the master recipe or refer to already existing master inspection characteristics.
Master inspection characteristics are master data maintained in R/3 QM. They facilitate the maintenance of routine inspections and enable a linking to the class characteristics of batches. Due to this link, quality inspection results can automatically be copied from the inspection characteristics to the corresponding class characteristics of the batch produced.
If you choose inspection with inspection points, inspection points are assigned to a corresponding partial lot to record inspection results. You can assign several partial lots to an inspection lot. A partial lot describes a discrete production quantity that can be assigned to a batch. Once a usage decision for this inspection point has been made, the inspection results of an inspection point are transferred to the class characteristics of the batch linked to the master inspection characteristics.
If you want to carry out an inspection without inspection points, inspection results are recorded for the entire inspection lot. You can assign the production quantity to a batch. Once a usage decision for the entire inspection lot has been made, the inspection results are transferred to the class characteristics of the batch linked to the master inspection characteristics.
(C) SAP AG LO305 11
14.11
SAP AG 1999
Material
Classificationdata
Classification systemQuality Management
Batch class
Material SpecificationMaterial Specification
Master insp. charact. XMaster insp. charact. X
Master insp. charact. YMaster insp. charact. Y
General characteristic AGeneral characteristic A
General characteristic BGeneral characteristic B
AA
BB
XX
YY
Creating a Material Specification
To be able to transfer QM inspection results to the batch specification automatically, you must make the following settings:
You must define the general characteristics in which the inspection results are to be transferred as a numeric value. You should create the master inspection characteristics with reference to corresponding general characteristics. As a result, the value ranges of the general characteristic are transferred when you carry out a quality inspection with a material specification.You create a material specification for the material in QM. You can assign one master inspection characteristic to each general characteristic. With this connection, you clearly specify which master inspection characteristic transfers its result to which general characteristic. If you have created master inspection characteristics with reference to general characteristics of the material in the system, they are automatically transferred to the material specification.
(C) SAP AG LO305 12
14.12
SAP AG 1999
Insp. lot
023_08(colors)
General characteristics
Classification System
Master inspec. char.
Material TP-F3##
Batch_01
C001
C002
C003
Viscosity
Density
Wavelength
Class
9-114
9-112
9-111
Viscosity
Density
Wavelength
QM
Char. values:175 cP2.00 g/ccm 600 nm
In-Process Inspection - Example
The material to be produced TP-F3## belongs to class 023_08. The general characteristics C001, C002, C003 of the classification system are assigned to this class. Material specification allows the general characteristics to be assigned to the QM master inspection characteristics 9-111, 9-112, and 9-114. Parallel to the production process, the inspection requests are created as inspection characteristics in the operations or phases of the master recipe the inspection lot is based on, and transferred to the inspection lot. The inspection results are recorded for the inspection characteristics of the inspection lot while the process order is carried out. Since the finished product is to be handled in batches, the partial lot that has been produced can be assigned to a batch "batch_01". The inspection results are transferred to the classification characteristics of the batch produced during batch specification.
(C) SAP AG LO305 13
14.13
SAP AG 1999
Aspects of Quality Inspection During Production:Unit Summary
The quality of materials that have been produced can be checked in-process.
The prerequisite for a quality inspection is the creation of an inspection lot whose inspection characteristics are maintained.
The partial lots produced can be assigned to individual batches. In this case, inspection results can be transferred to the classification characteristics of the batch produced.
(C) SAP AG LO305 14
14.14In-Process Quality Inspection: Exercises
Unit: Aspects of Quality Inspection During Production
Topic: Master Data Maintenance
At the conclusion of these exercises, you will be able to:
Set up the material master for the quality inspection
Describe master inspection characteristics
Create a material specification
Prepare a master recipe for an in-process quality inspection
Make an inspection results recording for a phase in the PI sheet
Headache tablets are produced in the pharmaceutical subdivision of your company.
A master recipe for the production process is available.
As the person responsible, you will check the changes in the material master and master recipe that are specific to QM.
1-1 Material master: inspection type “In-process inspection of production order”
You must activate the inspection type In-process inspection of production order in the material master of your finished product. This will allow an in-process quality inspection to be carried out for process orders in the production of your material T-HT2## (Tablet Cetepharm-N). First check the settings for the material T-HT2##.
Select view(s): Quality Management
Plant: 1100
Choose Insp. setup
Insp. type: ___________________________________
Active indicator set: yes/no
1-2 Master inspection characteristics
(C) SAP AG LO305 15
For tablet production, sieve size, water contents, and active ingredients contents are to be inspected during the production process. In QM master data maintenance, the corresponding master inspection characteristics have been defined.
Display the following master inspection characteristics for plant 1100. What are the descriptions for each characteristic?
Master inspec. char Description
N-100
N-200
N-300
Logistics -> Quality management -> Quality planning -> Basic data -> Inspection characteristic -> Display
The batch we will produce is to be specified according to the inspection results for the active ingredient potency. Which class characteristic is referred to by the master inspection characteristic N-300?
Master inspec. char Description Class char.
N-300
(C) SAP AG LO305 16
1-3 Material specification
A material specification for your finished product must be created to allow the in-process inspection results of a batch to be transferred from the master inspection characteristic N-300 to the class characteristic N-006.
The link between master inspection characteristics and the class characteristics for a certain material is created during material specification.
Check the material specification defined for your product T-HT2##.
Material master menu -> Environment -> QM maint. functions -> Display matl spec.
1-4 Master recipe
A recipe has been maintained in the system for the production of the product T-HT2## (tablet Cetepharm-N).
Display recipe 2 of the recipe group T-TAB##.
1-4-1 Control key
In which phase is a control key selected that does not correspond with PI01 in the operation overview?
Phase number: ___________________
Control key: ___________________
Which indicator has been set for PI02 that has not been set for PI01?
____________________________________________
Choose F4 for control key PI02 . Choose Detail info for control key PI02.
(C) SAP AG LO305 17
1-4-2 Inspection characteristics that have been defined
Which inspection characteristics are to be checked in phase 0021?
Master inspec. char Description
Choose Quant. data.
1-4-3 Process instruction QMJUMPPH
For phase 0021 "Mix" of the master recipe 2 of the group T-TAB##, only the process instruction "INSTR" (instructions with notes) is defined for the time being. Further process instructions will be automatically generated when creating a process order.
Data has been defined in Customizing for each control recipe destination “## + 70 ” (70 plus your group number).
On the Operations tab, choose Goto Process management Control recipe dest. to display the process instructions you want to generate.
At which position is a process instruction of the category QMJUMPPH generated in the control recipe? (This process instruction allows you to branch to the QM inspection results recording in a PI sheet.)
Position:
Description:
Which filter is set for the process instruction QMJUMPPH on the operation and phase level? Check this in Customizing for the control recipe destination.
______________________________________________
(C) SAP AG LO305 18
1-5 Inspection results recording for phase 021
In the following exercise, you will perform an in-process quality inspection from the PI sheet (based on the master data displayed in the previous exercises 1-1 to 1-4).
1-5-1 Creating a process order for material T-HT2##
Create a process order of the process order type PI01 for the material T-HT2## in plant 1100.
Create Process Order: Header General Data screen
Total quantity: 500 pieces
Basic dates: start: today + 1 week
Choose Enter and pay attention to the messages in the status bar. The master recipe T-TAB## (tablet production) is copied with the material list and the process order is scheduled.
In the operation overview and in the material list, check whether the data in master recipe T-TAB## has been copied correctly.
1-5-2 Releasing the process order and generating the control recipe
Release your order.
Choose Release.
Generate a control recipe for control recipe destination (## +70).
Choose Generating a control recipe.
Save your order and write down the process order number.
Process order number: _________________________
1-5-3 Sending the control recipe and maintaining the PI sheet
In the control recipe monitor, select the control recipe that corresponds to your process order and send it.
Process Management menu -> Control recipe -> Control recipe monitor
(C) SAP AG LO305 19
Find and edit the PI sheet.
Process Management -> PI sheet -> Find
Confirm the start and finish of phase maintenance with your signature. Sign with your user name and confirm with your password.
1-5-4 Recording inspection results
Double-click the yellow Record inspection results field in phase 0021.
Enter a number to identify your inspection point and confirm by choosing Enter.
On the Record Results for Inspection Point: Characteristic Overview screen, enter results for the three inspection characteristics (sieve size, water content, potency of active ingredient) within the tolerance range (Result column).
After you enter the last inspection results, choose Enter to trigger automatic valuation. The recording is complete and can be saved.
Valuation and Partial Lot Allocation screen
Assign a partial lot to the inspection point.
Choose Create partial lot.
Assign a batch to the partial lot. Enter CHARGE01 as a description for the batch master record.
Choose Create batch.
The system takes you from the inspection results record to the PI sheet results.
Confirm the end of phase 0021 in the PI sheet with your signature and save the PI sheet.
1-5-5 Display batch with inspection results
Display the batch master record CHARGE01 for material T- HT2##.
Material master menu: Batch Display
Goto the classification data of the batch.
Classification tab
Check whether the value entered in the inspection results recording for the active ingredient content was transferred to the batch master record.
(C) SAP AG LO305 20
14.15 Solutions
Unit: In-Process Quality Inspection
Topic: Master Data Maintenance
1-1 Material Master: Inspection type “In-process inspection of production order”
Material Master / Material -> Display -> Display current
Select view(s): Quality Management
Plant: 1100
Choose Inspection setting.
Insp. type: 03 = In-process insp. for production order
Active indicator set: yes
1-2 Master inspection characteristics
Display the following master inspection characteristics for plant 1100. What are the descriptions for each characteristic?
Master inspec. char Description
N-100 Sieve size
N-200 Water content
N-300 Potency of active ingredient
Logistics -> Quality management -> Quality planning -> Basic data Inspection characteristic -> Display
Master inspec. char Description Class char.
(C) SAP AG LO305 21
N-300 Potency of active
ingredient
N-006
(C) SAP AG LO305 22
1-3 Material specification
Check the material specification defined for your product T-HT2##.
Material master menu/ Environment -> QM maint. functions -> Display matl spec.
1-4 Master recipe
A recipe has been maintained in the system for the production of the product T-HT2## (tablet Cetepharm-N).
Display recipe 2 of the recipe group T-TAB##.
Production versions. Choose Recipe (for production version 0002).
1-4-1 Control key
In which phase is a control key selected that does not correspond with PI01 in the operation overview?
Phase number: 0021
Control key: PI02
Which indicator has been set for PI02 that has not been set for PI01?
Insp. char. required
Choose F4 for control key PI02. Choose Detail info for control key PI02.
1-4-2 Inspection characteristics that have been defined
Which inspection characteristics are to be checked in phase 0021?
Choose Insp. char for phase 0021.
(C) SAP AG LO305 23
Master inspec. char Description
N-100 Sieve size
N-200 Water content
N-300 Potency of active ingredient
1-4-3 Process instruction QMJUMPPH
Operations tab
Select phase 0021.
Goto Process Management Control recipe dest.
At which position is a process instruction of the category QMJUMPPH generated in the control recipe?
Position: 06
Description: At the finish of a phase
Which filter is set for the process instruction QMJUMPPH at the operation and phase level?
(Suggestion: Open a new session)
Customizing: Process Management Control Recipe / PI Sheet
Define and Set Control Recipe Destination
Control recipe destination "## +70"
Process instructions to be generated
Choose Execute object for the process instruction category QMJUMPPH.
Selection criteria at operation/phase level:
The control key for the phase for which QMJUMPPH is to be generated must have the "Insp. characteristics expected" indicator set.
1-5 Inspection results recording for phase 021
1-5-1 Creating a process order for material T-HT2##
(C) SAP AG LO305 24
Logistics -> Production - Process -> Process Order Process Order -> Create -> With material
Create Process Order: Header General Data screen
Total quantity: 500 pieces
Basic dates: start today + 1 week
In the operation overview and in the material list, check whether the data in master recipe T-TAB## has been copied correctly.
Choose Operations.
Choose Materials.
1-5-2 Releasing the process order and generating the control recipe
Release your order.
Choose Release.
Generate a control recipe for control recipe destination "## + 70".
Choose Generating a control recipe.
1-5-3 Sending the control recipe and maintaining the PI sheet
In the control recipe monitor, select the control recipe that corresponds to your process order and send it.
Process Management menu Control recipe -> Control recipe monitor
Find and edit the PI sheet.
Process Management PI Sheet Find
1-5-4 Record inspection results.
(C) SAP AG LO305 25
1-5-5 Display batch with inspection results
(C) SAP AG LO305 26
15
SAP AG 1999
Change master record
Engineering change request
Changing master recipes
Recipe approval
Digital signature
Contents:
Engineering Change Management, Recipe Approval
(C) SAP AG LO305 1
15.2
SAP AG 1999
At the conclusion of this unit, you will be able to:
Engineering Change Management, Recipe Approval: Unit Objectives
Create change master records
Create engineering change requests / engineering change orders
Define the validity period of recipe objects
Carry out an approval procedure for a master recipe
Define digital signatures
(C) SAP AG LO305 2
15.3
SAP AG 1999
PP-PI Overview
Master Data: Overview
Materials
R/3 Classification System
Batches
Resources: Customizing
Resources: Functions
Introduction Production Version
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Master Recipes: Operations and Phases
1111
22
33
44
55
66
77
88
1 99
1212
1313
1414
1010
Summary and Conclusion1616
Master Recipes: Materials
15Engineering Change Management,Recipe Approval
Overview Diagram 15
(C) SAP AG LO305 3
15.4
SAP AG 1999
Engineering Change Management, Recipe Approval: Business Scenario
Headache tablets are produced in the pharmaceutical subdivision of your company.
A master recipe for the production process is available.
To ensure regulatory compliance, you must follow an existing status profile for recipe approval to change the master recipe.
As the person responsible, specify the changeability of your master record accordingly.
(C) SAP AG LO305 4
15.5
SAP AG 1999
Eng. changemgmt
Material masters
Task lists- Master recipe
- Routing- Reference oper. set
- Inspection plan - Equipment task list- Gen. maint. task list
DocumentsClasses
CharacteristicsClassification
Configuration profileObject dependencies
BOMs- Material BOM
- Document structure
- Equipment BOM
- Functional location BOM
- Order BOM
Objects Linked to Engineering Change Management
Engineering change management is a central, integrated part of product data management (PDM) within the standard system.
(C) SAP AG LO305 5
15.6
SAP AG 1999
For different objects
At the same or different times
With cross-application and specialdocumentation
Monitoring and documentation of changes
Planning and realization at a specified time
Saving several change statuses of an object
Integration with the logistics process chain
Grouping of related changes
Why Use Engineering Change Management for Changes?
Engineering change management is a central logistics function that can be used to change various types of master data and document the changes.
A valid-from date for the change master record (or the engineering change request/engineering change order) is used to make changes valid on a predefined date. This aids long-term planning.
You can use engineering change management to store R/3 objects (for example, BOMs or routings) more than once. This means that the objects can be stored in all relevant change statuses.
The changes take effect automatically at the predefined time in all areas of the logistics process chain (for example, sales order, material requirements planning, and shop floor and production control).
You can use engineering change managment to group changes to different R/3 objects that are affected by one change. You can change all the objects at the same time, or you can define different change dates for individual objects. You can create general documentation for all changes made as well as special documentation for each specific object change.
You can use engineering change management to fulfill your legal obligations to document changes.
(C) SAP AG LO305 6
15.7
SAP AG 1999
Old
New
+
Old
New
Old
New
Change documents +
Without history(without change docu.)
Without history(with change docu.)
With history(with change docu.)
Change documents
Engineering Change Management: With and Without History
ECM
You can perform object changes (for example, BOM and routing changes) in the system either with or without history. The system generates change documents even for changes without history.
Changes without historyThese are changes that do not have to be documented because they take place during the development stage of the product, for example.The status of the object before the change is not saved. You can only find out about the status of the object before the change by using change documents.
Changes with historyThese are changes that must be documented because they take place during production, for example.Both the status before and after the change is saved. The system also generates change documents. These change documents differ for some objects from those generated for changes without history.Engineering change management in the SAP System allows for complete documentation of changes. Some of these changes may be needed for product liability purposes, for example.
(C) SAP AG LO305 7
15.8
SAP AG 1999
Advance planning / validity period of changes
Def. of object types (such as recipes, BOMs, etc.) that can be changed
Def. of objects (such as recipe "REC-101") that can bechanged
Def. of authorizations required for change master recordmaintenance
Complete documentation of changes
Changemaster record
- Change number
FunctionsFunctions
Change Master Record (Change Number)
Change master records (synonymous with change numbers) are used to plan changes in advance and combine related changes to different objects, such as master recipes, materials, and bills of material. They are created within engineering change management and can contain such information as:
The date from which the changes are to be validThe types of objects and, if required, object management records for the individual objects to be changed A special authorization that you need to work with the change master record
You can create, change, or display a master recipe with reference to a change master record. The valid-from date in the master record is then used as the key date. This implies:
When you create a recipe, the new recipe is valid from this date.When you display or change a recipe, the system selects the change status valid on this date.Unlike recipe maintenance without a change number, the system creates a new change status for all changed objects. This change status is valid from the valid-from date of the change number.
(C) SAP AG LO305 8
15.9
SAP AG 1999
Change number Valid-from date Authorization group Reason for change
Master recipes Material BOMs Documents
For example, master recipe "Colors"
Change headerChange header
Object typesObject types
Object mgmt recordsObject mgmt records
Structure of a Change Master Record
In the change header, a short description of the change, the valid-from date, and the status is maintained. You determine which objects can be changed with the change master record by selecting the object
types. One of the functions of the object management record is to enable you to document changes to a specific
object.
(C) SAP AG LO305 9
15.10
SAP AG 1999
1993
When was the change carried out?
Why was the change carried out?
State after the change?
Change on 12/01/93
State before the change?
?
Recipe "COLORS"
Change Change withwith historyhistory
Fromto05/01/9312/01/93
PI10
ProcInstCatXY
Recipe "COLORS"Fromto05/01/9312/01/93
PI10
ProcInstCatXX
Change Documentation
A change becomes effective on a precisely defined date. The changed object is stored twice: in its state before and after the change. The state of the object
before the change ends with the valid-to date. The state after the change begins with the valid-from date. Changes are documented in a change master record.
(C) SAP AG LO305 10
15.11
SAP AG 1999
Key date
Key dateKey date
ValidityValidityperiodperiod
Time
Validity ofoperation 1
Validity ofrecipe header
Validity ofrecipe header
Validity ofoperation 2
Engineering Change Mgmt - Validity Period of Recipe Objects
Every recipe object (such as, header, operation, material component) has a validity period. You can determine the start of this validity period using the key date you enter when creating or changing a recipe or recipe object.
When you create a recipe, the recipe becomes valid from the key date.When you select a recipe for change or display, the system displays the recipe version valid on the key date.If you change a recipe with a change number, the system uses the valid-from date in the change master record as the key date. The new change status becomes valid from that date. If you change a master recipe without a change number, the change is valid for the entire validity period of the change status selected.
The default value for the key date is the current date.
(C) SAP AG LO305 11
15.12
SAP AG 1999
Changerequest
-Change number- Change type
Approval procedure for changes
System status network / user status profile
Authorizations for user status
Workflow link
FunctionsFunctions
Advance planning / validity period of changes
Def. of object types (f.ex. recipes, BOMs, etc.) that canbe changed
Def. of objects that can be changed (f.ex. recipe "REC-101”)
Def. of authorizations required for change master recordmaintenance
Complete documentation of changes
Engineering Change Request / Order
Engineering change orders have the functionality of change master records. However, they comprise the following additional functions:
The possibility of triggering a workflow task such as sending a message to the person responsible at a particular processing stageA procedure for the approval and release of changes during which an unapproved engineering change request is converted into an approved engineering change order.The assignment of a user status profile to extend the system status networkThe assignment of authorizations for user statuses
You can create, change, or display a master recipe with reference to an engineering change order. The valid-from date of the engineering change order is then used as the key date. The engineering change order must meet the following requirements:
It must have been approved and contain at least one object management recordIf a corresponding change rule has been maintained for the recipe, the change type of the object management record must also be identical to that in the recipe header.To maintain component assignments, material quantity calculation, and the bill of material from within the recipe, you also need an object management record with approved changes for the bill of material.
(C) SAP AG LO305 12
15.13
SAP AG 1999
User status profileWorkflow tasks
Change number Change type for change header Valid-from date Authorization group Reason for change
Master recipes Material BOMs Documents
For example, master recipe "Colors" Change type for object Reason for change
Change headerChange header
Object typesObject types
Object mgmt recordsObject mgmt records
Structure of an Engineering Change Request
General header data of the change request:The change request is identified by the change number you enter.The change type controls the change process for the entire order using a system status profile. You can assign a user status profile and workflow tasks for different processing steps to the change type.The valid-from date specifies the date on which the changes come into effect.By entering an authorization group, you can define that a special authorization is required to maintain the engineering change request.Entering a reason for the change enables you to document planned changes fully.
Allowed object types:You must define the object types that may be changed with the engineering change request. These include, for instance, master recipes, material BOMs, and material master records.
Creating object management records for objects you want to change:You must create an object management change record for every object you want to change using the engineering change request. An example for a change object would be a certain master recipe.You maintain a change type for each object management record. The change type controls the change process for the specific object.Entering a reason for the change for an object management record enables you to document planned changes of a particular object fully.
(C) SAP AG LO305 13
15.14
SAP AG 1999
Changemaster record
- Change number
Change type
System status
User status
Object mgmt records
Generating obj. mgmt records
Entering valid-from date
Changing objects
Eng. changeorder/request
- Change number- Change type
-
-
-
X
X
Immediately
Immediately
X
X
X
X
-
Bef. conversion
Aft. conversion
Comparison of Change Master Records and Engineering Change Requests / Orders
In contrast to the engineering change requests/orders, you may not enter any change types for change master records. There is no system status network for change master records.
Since object management records are not automatically generated for the engineering change request/order, the icon for this does not appear in the object type overview.
You cannot use the automatic generation function here, because the engineering change request/order is to control the business processes of requesting, inspecting, and releasing changes for certain assigned objects. This excludes an implied assignment during object change itself (by using the change number).
Note: The example in the graphic corresponds to the default setting for the engineering change request/order.
(C) SAP AG LO305 14
15.15
SAP AG 1999
None
With change number
With engineering change order (without change type)
With engineering change order (with change type)
1
3
2
Change ruleChange rule
Changing Master Recipes
In process industries, requirements for documentation and checking of master recipes vary widely depending on the branch of industry and the product. They range from fairly unrestricted maintenance of recipes to detailed planning, documentation and even strict approval procedures.
To meet these requirements, the R/3 System offers various types of recipe maintenance. You can enter a change rule in the recipe to specify the maintenance procedure that is to be used for a recipe (General View screen).
You can create or change master recipes as follows:Without a change number:All you need is an authorization for the corresponding recipe transactions. Changes are valid for the entire validity period of the selected change status.With a change number:By using a change master record, you can combine planning and execution when creating and changing related objects such as recipes, materials, and bills of material. The validity date is specified using a change master record (synonymous with change number). A new version is created for all changed recipe objects (for example, operation, relationship).With an engineering change order:With engineering change orders, the functionality of the change master record is enhanced by a detailed approval procedure. By entering a change type, you can specify that the approval procedure must be carried out in a specific user-defined way.
(C) SAP AG LO305 15
As soon as you have assigned a change rule to a recipe and thus defined that it is subject to a specific change procedure, this recipe is locked for all change procedures that are less restrictive. To revoke the restriction, you must change the recipe in the way specified in the change procedure.
(C) SAP AG LO305 16
15.16
SAP AG 1999
Change not necessaryChange not necessaryChange not possibleChange not possible
Errors in changeErrors in change
Errors correctedErrors corrected
Objectchange
Change released
Change completed
Change possible
ObjectObject
System Status Network Object
The procedure for approving and releasing engineering change requests or orders is controlled via links between statuses and business transactions. The statuses mark particular processing statuses during the approval procedure. They include both fixed system statuses and user-defined user statuses. You can proceed from one status to the next by carrying out a business transaction.
The predefined status network for the object management record is valid for all objects to be changed that are of the object type material, document, BOM, and task list.
You can easily change the status from Change possible to Change not possible or Change not necessary in any direction, as shown in the graphic.
Only the status Change possible requires further consideration of the object change and the setting of another status. When at least one object management record contains this status, the request that belongs to it must be converted to an order.
After you make the setting Change complete, the change can be set to Errors in change. In this case, the errors must be corrected before the changes can be released.
You can extend the status network to include user status.
(C) SAP AG LO305 17
15.17
SAP AG 1999
EngEng. change request. change request
EngEng. change order. change order
Check
Checked
Approve
Convert
Reject request
Withdrawapproval
Requestcomplete
Request notcomplete
Complete
Release
System Status Network for Engineering Change Requests / Orders
An extensive, pre-defined status network exists for the engineering change request/order (process control).
You are only allowed to assign object management records to the order before you set the status Checked.
When all assigned object management records have the status Change possible or Change not required, the request can be set to Checked and Approved and can be converted to an order.
After setting the status to Checked or Approved, the request can be rejected. After settting the status to Approved, the approval can be withdrawn. If at least one object is to be changed, the request must be converted to an order. Before converting, you must maintain the valid-from date of the request. After converting, you can set the request to Not complete. In this case, you must set the request to
Complete again in order for the process to continue. When the order and the object management record have been released, the object can be changed. You can lock the request/order at any time and withdraw the lock again. You can extend the status network to include user statuses.
(C) SAP AG LO305 18
15.18
SAP AG 1999
(...)• Change objects (for example, recipe "COLORS")
Create engineering change request
Object changes (f.ex. for recipes "COLORS") possible
Recipe approval (f.ex. for recipe "COLORS") granted
Complete and release changes/ engineering change order
Convert change request into change order
Approve changes
Check planned changes
Recipe Approval (General Procedure)
The change procedure using an engineering change request comprises three main steps:Creating an engineering change requestChecking an engineering change request and converting it into an engineering change orderChanging objects and completing the change
For a master recipe marked with change type With engineering change order, this process represents an approval procedure. Once the procedure has been released, the maintained recipe is marked as Approved recipe for the change period defined by the valid-from date of the change request.
Recipes that have already been approved but are changed using another change order are considered unapproved during the period between the conversion and release for the change period defined by the valid-from date. Approval is granted when the change order is released.
(C) SAP AG LO305 19
15.19
SAP AG 1999
Check by plant mgmt
Check request Check object(f.ex. recipe "COLORS")
(User status) Check by chemistCheck by qual. assurance
Changes possibleReq. checked
Approve request
Convert requestObjects can be changed(f.ex. recipe "COLORS")
Status of change header Status of change objects
Recipe Approval (Statuses I)
The procedure for approving and releasing engineering change requests or orders is controlled via links between statuses and business transactions. The statuses mark particular processing statuses during the approval procedure. They include:
A fixed network of system statusesCompany-specific user statuses
You can proceed from one status to the next by carrying out a business transaction. SAP has defined a standard approval procedure, which has been implemented via a network of system
statuses:1. An engineering change request is created that describes planned changes to various objects,
including master recipes.2. The planned changes to the individual objects are checked and marked as possible or
unnecessary.3. After the check has been concluded, the engineering change request is approved and converted
into an engineering change order. Now you can make the changes, that is, the master recipe can be maintained with reference to the engineering change order.
(C) SAP AG LO305 20
15.20
SAP AG 1999
Complete order Complete changes
Check by chemistCheck by qual. assurance
Release changes
Check by plant mgmt
Convert requestObjects can be changed(f.ex. recipe "COLORS")
Release order
Status of change header Status of change objects
Master recipe is approved
Recipe Approval (Statuses II)
4. After the changes to all objects have been made, the entire engineering change order is completed.
5. The engineering change order is released. The recipe has now been approved and can be used to create orders requiring an approved recipe. If the approval procedure defined by SAP does not meet all your requirements, you can add company-
specific checks at the change order header or change object level. To do so, assign a change type with a corresponding user status profile to the engineering change request or the change object.
Status profiles are defined and assigned to change types within Customizing for engineering change management. They contain company-specific user statuses. In the status profile, you link these user statuses to the business transactions you carry out, thus inserting them in the existing network of system statuses.
You can specify that a special authorization is required to set or delete a user status.
(C) SAP AG LO305 21
15.21
SAP AG 1999
Particular business transactions:Digital signature required
Special approval procedure requiredSpecial approval procedure required
Unique and forgeryUnique and forgery--proof proof user identificationuser identification
Documentation:Documentation:name of user, signed transaction, date, timename of user, signed transaction, date, time
Digital Signature (I)
You can specify that a user must execute a digital signature to be able to carry out particular business transactions.
The digital signature enables you to meet the security requirements laid down in the Good Manufacturing Practices (GMP) with regard to the execution of these transactions. The digital signature ensures that:
A transaction can only be carried out by users with a special authorizationThe user identification is unique and forgery-proofThe name of the user is documented together with the signed transaction and the date and time, and cannot be falsified afterwards.
(C) SAP AG LO305 22
15.22
SAP AG 1999
Digital signatureDigital signature
PPPP--PI:PI:
PI sheet Batch record
Eng. change request / order
Engineering Change MgmtEngineering Change Mgmt
Inspection results recording Usage decision
QM:QM:
Digital Signature (II)
The digital signature can be implemented for the following areas: Quality management
Saving inspection results for an inspection lotRecording and changing the usage decision for an inspection lot
Engineering change managementChanging the status of an engineering change order/requestReleasing an engineering change order
PP-PICompleting a phase in the PI sheetAccepting invalid values within input validations in the PI sheetApproving a batch record
(C) SAP AG LO305 23
15.23
SAP AG 1999
PPPP--PI:PI:
PI sheet:Customizing for control recipe destination DS (digital signature)Batch record approval: Digital signature always required
PI sheet:Customizing for control recipe destination DS (digital signature)DS (digital signature)Batch record approval: Digital signature always requiredDigital signature always required
Engineering Change Management:Engineering Change Management:
Customizing: Change types Customizing: Change types
QM:QM:
Material authorization groups Digital signature for results recording Digital signature for usage decision
Material authorization groups Digital signature for results recordingDigital signature for results recording Digital signature for usage decisionDigital signature for usage decision
Activating the Digital Signature
To specify that a digital signature is required for the above mentioned transactions, you must have activated the function in the relevant application. This can be done in the following ways:
In PP-PI:For completing a phase as well as for accepting invalid input values in the PI sheet, set the DS (digital signature) indicator in Customizing for Control Recipe Destinations.When approving a batch record, the user must always execute a digital signature.
In engineering change management:To save status changes of the engineering change request before order processing, set the Dig. sig. indicator in Customizing for change types for object master records.For change order release, set the Dig. sig. indicator in Customizing for change types for object master records.
In QM:For inspection results recording, set the Digital signature for results recording indicator in the material authorization groups.For the usage decision, set the Digital signature for usage decision indicator in the material authorization groups.
(C) SAP AG LO305 24
15.24
SAP AG 1999
Engineering Change Management, Recipe Approval: Unit Summary
You can use change master records to plan the validity period of changes.
Change orders also facilitate special approval procedures for changes.
The approval and release of engineering change orders takes place via the status profile.
You can use the digital signature to ensure that particular transactions are only carried out by authorized persons.
(C) SAP AG LO305 25
15.25 Exercises
Unit: Engineering Change Management
Topic: Change Numbers and Recipe Approval
At the conclusion of these exercises, you will be able to:
Create change numbers/master records
Go through the recipe approval process
Create engineering change requests / engineering change orders
Headache tablets are produced in the pharmaceutical subdivision of your company.
A suitable production version with a master recipe and BOM for process manufacturing already exist.
To ensure regulatory compliance, you must follow an existing status profile for recipe approval to change the master recipe.
As the person responsible, specify the changeability of your master record accordingly.
1-1 Creating change master records (change numbers)
Create two change master records to change a master recipe.
Create Change Master: Initial Screen
Change number: AEND_01_##
(or)AEND_02_##
Type: Change master
Function: Without release key
Create Change Master Record: Change Header screen
Description: Change number of group ##
Valid from: Today + 1 week for AEND_01_##
Today + 2 weeks for AEND_02_##
(C) SAP AG LO305 26
Change no. status: 01 ‘active’
After you release the data, the Create Change Master: Object Types screen appears.
Specify that your master recipes and BOMs are changeable objects.
Edit -> More -> Object sub-types
Object type specification: Task list and BOM
Set the following indicators for the object types "Master recipe" and "Material BOM":
– Actv.
– Object
– MgtRec
Note: By setting these indicators, you define that
i) Master recipes and material BOMS (and production versions) can be changed with this change number
ii) Object management records are automatically created for the changed objects
Save your change master records.
1-2 Changing master recipe objects with a change number
1-2-1 Change the master recipe T-DET1## with the change number AEND_01_##.
Production – Process Master Data Production Versions
Task list group: T-DET1##Choose Assign change number.
Change number: AEND 01
Choose Recipe.
Change the charge quantity range of your recipe to 1,000 -40,000 L.
Display the administrative data for the recipe header.
Save your recipe and your production version.
1-2-2 Change your master recipe T-DET1## with the change number AEND_02_##.
Enter the original charge quantity range (1,000 -20,000 L).
Display the administrative data.
(C) SAP AG LO305 27
Save your recipe and your production version again.
1-2-2-1 Display the header data of the recipe T-DET1## and the administrative data for the following key dates:
– Today
– Today +10 days
– Today + 20 days
1-3 Documentation of changes
1-3-1 Documentation in the change master record
Display the change master record AEND_01_##.
Which master recipe was changed with the change number, that is, for which master recipe was an object management record generated?
_____________________
Change number Display
Choose All objects.
Note: You find details on an object management record by double-clicking each object. Detailed descriptions of changes can be defined for an object management record.
1-3-2 Recipe changes
Which changes were made to the recipe header of recipe T-DET1##?
Master recipe menu / Reporting Recipe -> Recipe changes
(C) SAP AG LO305 28
Task list type: 2
Plant: 1100
Recipe group: T-DET1##
Recipe: 1
Change documentation for the following object: recipe header
Program -> Execute
______________________________________
______________________________________
______________________________________
1-4 Recipe approval
1-4-1 Change rule
1-4-1-1 Select the production versions for recipe T-TAB##. Open the master recipe for production version 0001 of material T-HT2## on the key date "Today".
Which processing mode (display or change?) appears?
__________________________________
Find out the meaning and function of the “Change rule“ and “Change type“ fields using the F1 help in the recipe header.
Which change rule or change type is set?
Change rule:
Change type:
Save the recipe.
(C) SAP AG LO305 29
1-4-1-2 Try to access the recipe in the change mode.
Master Data Master Recipes Recipe and Material List Change
Why can you only display the recipe data and not make any changes?
_____________________________________________
_____________________________________________
Notice the message in the status bar. Get more information on error diagnosis and how to proceed further by double-clicking this message.
1-4-2 Creating an engineering change request
1-4-2-1 In engineering change management, create change request REQUEST## of the change type 100, "change of recipes".
Make the following entries on the Create Engineering Change Request: Change Header screen:
Description: Recipe change T-TAB##
Valid from: Today + 1 week
Change no. status: 01 ‘active’
Reason for change: Display SOP in ProdInst for T-TAB##
Allow the changeability of the object types “Master recipe“ and "Material BOM".
Edit MoreObject sub-types/ Task list and BOM indicators
Set the Actv. indicator and Object indicator for the object types Master recipe and Material BOM. Delete all indicators set for other object types.
Define the recipe T-TAB## and the BOM for material T-HT2## as changeable objects.
Choose Objects.
(C) SAP AG LO305 30
TL type TL group Description Change type
2 T-TAB##Add new
proc. inst. for SOP call100
Materials tab
Material Plant BOM usg. Description Change type
T-HT2## 1100 1 No change see above
Define the following long text for the object management record referring to the the planned changes to the recipe:
Task list tab
Choose Details for T-TAB##
Choose Object long text
Due to a new safety rating of material T-RD1##, you must be able to call up the Standard Operating Procedure (SOP) from the archive system in the PI sheet for phase 110. An appropriate process instruction must be added for phase 110. The change must be valid from the date “today + 1 week“.
1-4-2-2 Which statuses are set for your change objects?
In each object management record for the recipe or BOM, choose Status mgmt.
System status:
____________________________________
User status:
____________________________________
Which statuses are set for the change request?
Choose Change header and then Status mgmt.
(C) SAP AG LO305 31
System status:
____________________________________
User status:
____________________________________
Save your change request.
1-4-3 Try to change your recipe T-TAB## (group counter 2, production version 2) with reference to this request.
Which error message do you receive?
______________________________________________________
Display the message log. What is the message text for the error message?
______________________________________________________
Find out more about the reasons for the error and how to fix it by double-clicking the error message.
______________________________________________________
______________________________________________________
1-5 Checking, approving and converting the engineering change request
1-5-1 Set the status Check request for the engineering change request.
Engineering Change RequestChange / Choose Set status / Choose Check request.
1-5-2 What additional system status is set for the engineering change request?
____________________________________
1-5-3 What additional system status is set for the engineering change objects?
____________________________________
Choose Objects.
Select objects.
Choose Detail and then Status mgmt.
(C) SAP AG LO305 32
Choose Previous / Next object.
1-5-4 Can you set the object system status Change possible for your recipe or BOM at the moment?
____________________________________
In the object management record of the recipe or BOM, choose Set status.
1-5-5 Before you can set the status, the user status that is set must be withdrawn by the authorized persons.
Withdraw each user status.
Choose Status mgmt.
1-5-6 Set the object status to Change possible.
1-5-7 Which status is additionally set for the change header?
_____________________________________
1-5-8 Set the system status to ECR checked.
1-5-9 The request must now be approved and converted to an engineering change order before the engineering change object can be edited. Before you can set the status, the user status that is already set must be withdrawn by an authorized person.
Withdraw the user status and set the system status Approve request and Convert request.
Save your engineering change order.
1-6 Changing with an engineering change order
Change your master recipe T-TAB## (group counter 2, production version 0002) with reference to your engineering change order ORDER##.
Add the process instructions DOC_SHOW of type 6 “Dynamic function call“ for phase 11.
Save your recipe and the production version.
1-7 Closing and releasing object changes and engineering change orders
(C) SAP AG LO305 33
Call up your engineering change order in the change mode.
Which statuses does the engineering change order have?
_____________________________________
_____________________________________
_____________________________________
_____________________________________
Which statuses do the characteristics have?
_____________________________________
_____________________________________
_____________________________________
_____________________________________
1-7-1 Set the status Complete change for the engineering change objects.
In the meantime, save your engineering change order and try to change your recipe T-TAB## with reference to the engineering change order.
Find out more about the system messages created while doing this.
1-7-2 Continue to process your engineering change order.
Which system statuses do the engineering change objects have now?
_____________________________________
_____________________________________
_____________________________________
Which user status was set when you closed?
_____________________________________
_____________________________________
_____________________________________
The engineering change object can only be released after being inspected by the responsible areas defined by the object user status. These authorized users withdraw their user status after inspection, and the object can then be released.
Withdraw the user status for the engineering change object and set the object system status Release change.
1-7-3 Set the system status Close for the engineering change order.
(C) SAP AG LO305 34
Which system statuses does the engineering change order have now?
_____________________________________
_____________________________________
_____________________________________
Which user status was set when you closed?
_____________________________________
The engineering change order and corresponding approval can only be released after being inspected by the responsible area defined by the order user status. An authorized person withdraws the user status after inspection and releases the order.
Withdraw the user status for the order and set the order system status to Release change.
Save your engineering change order.
1-8 Status report on engineering change order
Generate a detailed status report on your engineering change order.
(C) SAP AG LO305 35
15.26Solutions
Unit: Engineering Change Management
Topic: Change Numbers and Recipe Approval
1-1 Creating change master records (change numbers)
Create two change master records to change a master recipe.
Production - Process -> Master Data -> Engineering Change Management Change Number -> Create
Specify that your master recipe is a changeable object.
Edit -> More -> Object sub-types
Object type specification: Task list.and BOM
1-2 Changing master recipe objects with change numbers
1-2-1 Change the master recipe T-DET1## with the change number AEND_01_##
Production versions
Select Production version.
Choose Assign change number.
Enter the change number and choose Enter.
Choose Recipes.
Recipe header tab
Enter the new charge quantity range
Administrative data tab
The recipe is now assigned the change number with its validity range.
Save the recipe and production version.
(C) SAP AG LO305 36
Choose Refresh.
1-2-2 same as in 1-2-1
1-2-2-1 Select production version.
Choose Recipe.
Enter key date.
Choose Display recipes.
Recipe header and Administrative data tab
1-3 Documentation of changes
1-3-1 Documentation in the change master record
Display the change master record AEND_01_##.
Which master recipe was changed with the change number, that is, for which master recipe was an object management record generated?
T-DET1##
Change number Display
Choose All objects.
1-3-2 Recipe changes
Which changes were made to the recipe header of recipe T-DET1##?
Changes were made to the lot size (Charge quantity range) using the change number from part 1-1.
1-4 Recipe approval
1-4-1 Change rule
1-4-1-1 Production versions for master recipe T-TAB##
Select production version 0001.
Choose Recipes.
You are in the display mode.
(C) SAP AG LO305 37
Recipe header tab
Change rule: “With engineering change order" (with change type)
Change type: 200
1-4-1-2 Try to access the recipe in the change mode.
Why can you only display the recipe data and not make any changes?
The change rule 3 (= with engineering change order) does not allow changes to the recipe without the entry of an engineering change order.
1-4-2 Creating an engineering change requestProduction-Process -> Master Data -> Engineering Change Management -> Change Number -> Create
1-4-2-1 In engineering change management, create change request REQUEST## of the change type 100.
Enter data and press Enter.
Allow the changeability of the object types “Master recipe“ and "Material BOM".
Edit MoreObject sub-types/ Set Task list and BOM indicators.
Choose Copy.
Set the "Active" and "Object" indicators for the material BOM and master recipe and choose "Enter".
Define the recipe T-TAB## and the BOM for material T-HT2## as changeable objects.
Choose Objects.
Task list tab.
Enter data for T-TAB## and press Enter.
Material BOM tab
Enter data for material T-HT2## and press Enter.
(C) SAP AG LO305 38
Task list tab
Select task list group T-TAB##.
(C) SAP AG LO305 39
Choose Detail view.
Choose Long text object.
Enter text, save and go back.
1-4-2-2 Which status types are set for your change objects?
In each object management record, choose Status mgmt.
System status:
Created
User status:
CHEM: Check by chemist
QUAL: Check by quality assurance
PROC: Check by process technology
Choose Back.
Which statuses are set for the change request?
Choose Change header and then Status mgmt.
System status:
Created
User status:
Check by plant management
Save engineering change request
1-4-3 Try to change your recipe T-TAB## (group counter 2, production version 0002) with reference to this request.
Production versions
Select Production version 0002.
Choose Assign change number.
(C) SAP AG LO305 40
Which error message do you receive?
The change number was not assigned to all entries you have selected. Incorrect entries are still selected.
Display the message log. What is the message text for the error message?
System status: ECR is not yet approved
Find out more about the reasons for the error and how to fix it by double-clicking the error message.
The system checks the system status of the engineering change request. The engineering change request must be approved and converted to an engineering change order.
1-5 Checking, approving and converting the engineering change request
Check
1-5-1 Set the status Check request for the engineering change request.
Engineering Change Request Change / Choose Set status. / Choose Check request.
Choose Continue.
1-5-2 What additional system status is set for the engineering change request?
Choose Status mgmt.
Status: Check ECR
Choose Back.
1-5-3 What additional system status is set for the engineering change objects?
Choose Objects.
Select both objects.
Choose Detail view.
Choose Status mgmt.
To navigate between the individual objects:
Choose Previous / Next object.
Status: Inspection request for ECR
Choose Back.
(C) SAP AG LO305 41
1-5-4 Can you set the object system status Change possible for your recipe or BOM at the moment?
Choose Set status.
No
Choose Continue.
1-5-5 Choose Status mgmt.
Remove all indictors for the user status for both objects
Choose Back.
1-5-6 For both objects:
Choose Set status for status Change possible.
Approval and conversion
1-5-7 Which status is additionally set for the change header?
Choose Change header.
Choose Status mgmt.
Status: All objects checked
Choose Back.
1-5-8 Set the request system status to ECR checked.
Choose Set status.
Choose Req. checked.
Choose Continue.
1-5-9 Choose Status mgmt.
Remove indicator for user status
Choose Back.
Choose Set status.
Choose Approve request.
Choose Convert request.
Choose Continue.
Save order
1-6 Changing with an engineering change order
Production versions
(C) SAP AG LO305 42
Select Production version 0002.
Choose Assign change number.
Choose Recipes.
Operations tab
Select phase 11 and choose Process instructions.
Add process instruction DOC_SHOW.
Save recipe and production version.
1-7 Closing and releasing object changes and engineering change orders
Call up your engineering change order in the change mode.
Change Number Change
Which statuses does the engineering change order have?
Choose Status mgmt.
All objects checked
ECR checked
ECR approved
ECOP: ECO to be processed
Choose Back.
Which statuses do the characteristics have?
Choose Objects.
Select both objects.
Choose Detail view.
Choose Status mgmt.
Created
Object: Change possible
Object: To be processed
Object: In preparation
Choose Back.
1-7-1 Set the status Complete change for the engineering change objects.
In the object management record: Choose Set status.
Choose Complete changes.
(C) SAP AG LO305 43
Choose Continue.
(C) SAP AG LO305 44
1-7-2 Continue processing your engineering change order.
Which system status does the engineering change object T-TAB## have now?
In the object management record:
Choose Status mgmt.
Created
Object: Change possible
Object: Change completed
Which user status was set during when you closed?
CHEM: Check by chemist
QUAL: Check by quality assurance
PROC: Check by process technology
For the object in status management:
Remove all indictors for the user status
Choose Back.
Choose Set status.
Choose Release changes.
Choose Continue.
1-7-3 Set the system status Complete order for the engineering change order.
Choose Change header.
Choose Set status.
Choose Close.
Choose Continue.
Which system statuses does the engineering change order have now?
Choose Status mgmt.
All objects checked
ECR checked
ECR approved
ECO confirmed
(C) SAP AG LO305 45
ECO completed
All objects released
Which user status was set while closing?
Check by plant management
Remove indicator for user status
Choose Back.
Choose Set status.
Choose Release order.
A message appears that the engineering change order has been released.
Choose Continue.
Save order
1-8 Status report on engineering change order
Choose Change Number Change
Choose Enter. If a warning appears, confirm with enter.
Environment Reporting Status Report
or
Choose Status report for the system status.
(C) SAP AG LO305 46
16
SAP AG 1999
Life cycle of a process order
Information about further courses
Contents:
Summary and Conclusion
(C) SAP AG LO305 1
16.2
SAP AG 1999
At the conclusion of this unit, you will be able to:
Summary and Conclusion: Unit Objectives
Create a process order for a material
Carry out system-aided batch determination and resource selection
Release the order, create a control recipe, and send it
Maintain the PI sheet and send messages that have been created
(C) SAP AG LO305 2
16.3
SAP AG 1999
PP-PI Overview
Master Data: Overview
Introduction
R/3 Classification System
Batches
Resources: Customizing
Resources: Functions
Production Version
Master Recipes: Operations and Phases
Master Recipes: Control View
Aspects of Co-Product Manufacturing
Aspects of Quality InspectionDuring Production
Engineering Change Management,Recipe Approval
1111
22
33
11
55
66
77
88
99
1010
1212
1313
1414
1515
Materials44
Master Recipes: Materials
1616 Summary and Conclusion
Overview Diagram 16
(C) SAP AG LO305 3
16.4
SAP AG 1999
Summary and Conclusion: Business Scenario
You have made the settings and maintained the data necessary for the process manufacturing of the new product in the R/3 System.
As the person responsible, create a process order and have the corresponding PI sheet maintained by a process operator.
(C) SAP AG LO305 4
16.5
SAP AG 1999
PCS
Process controlsystem (autom.)
PI sheetLaboratory
information syst.
LIMS PI sheet(manual)
Master recipe
Resource
MaterialMaterial
Master dataMaster data
Production planningProduction planning
Qualitymanagement
Processplanning/
orders
Processmanagement
Process datadocumentation/
evaluation
Functions of PP-PI
PP-PI comprises the following functional areas :Resource management: The PI-specific master data of resources describes all means of production and persons involved in the production process.Master recipe management: The PI-specific master data of master recipes describes the manufacture of one or more materials in one production run without relating to a particular order. Master recipes are the basis for process orders.Process planning comprises the planning of process orders. Process orders are created on the basis of master recipes. They describe and monitor the actual production process.Process management coordinates the transfer of data between PP-PI and the process control level. It can be used in fully automated, partially automated, and manually operated plants.Process data documentation and evaluation enables a detailed documentation and evaluation of all planned and actual values of a process.
PP-PI is integrated with, for example:R/3 Quality Management. Via a special interface, external laboratory information systems (LIMS) can be linked to R/3 QM.The higher-level planning components of R/3. Production requirements for PP-PI are created in R/3 Material Requirements Planning. Via a special interface, you can also transfer requirements from an R/2 System or an external planning system to PP-PI.
(C) SAP AG LO305 5
The master data and functions of R/3 Materials Management (such as material, inventory management).
(C) SAP AG LO305 6
16.6
SAP AG 1999
•Material master•Bill of material
•Proc. units•Personnel
•Automatic control•Manual control (PI sheet)
Manually
QMQM
MMMM
PPPP
PP-PIPP-PI
Planned orderPlanned orderProduction reqmts
MaterialsMaterialsMaster recipeMaster recipe Process orderProcess order
ResourcesResources
Process data documen-tation & evaluation Process managementProcess management
ProcessProcessmessagesmessages
Control recipe:Control recipe:proc. instructionsproc. instructions
Process controlProcess controlsystemsystem
Processcontrol level
Data Flow in PP-PI
A production process is triggered by production requirements. Production requirements are created in material requirements planning in the form of planned orders. Planned orders define the basic dates and planned production quantities.
During process planning, planned orders are converted into process orders. The basic dates and production quantities are copied from the planned order. The actual production dates are calculated using the basic dates. You can also create a process order manually.
A process order provides a detailed description of the actual production of one or more materials in one production run. It is the main control instrument in production, describing and monitoring all planned and actual data relating to production.
A master recipe is used as the basis for a process order. It defines, for example, the planned resources and material components.
After a process order has been released for production, the process instructions maintained in the order are bundled into control recipes by process management. The control recipes are either transferred to a process control system via a specific interface or are displayed online in the form of a process instruction sheet (PI sheet) that can be read and maintained by process operators.
Process management in turn receives process messages from the process control level and transfers them to various destinations. For instance, it is possible to record confirmations for the process order, transfer actual values of the process to functions for process data documentation and evaluation, post
(C) SAP AG LO305 7
material consumptions or production yields as goods movements and transfer quality data to Quality Management results recording.
(C) SAP AG LO305 8
16.7
SAP AG 1999
Production reqmnts
Costs
OperationsOperations
Proc. orderProc. order
Process instructions
Resourceassignments
Process ordersettlement
Process data documentation
Archiving / Deleting
Proc. messages to diff. destin.
In-process qualityinspections
Orderconfirmations
Process ordercreation
Scheduling
Cap.rqmts planning
Material availability check
Process order release
Creating & download. control recipes
M
Or
Ord
erder
closingclosing
Pro
plan
nin
gcess
R P
gege
Pro
ces
sP
roc
ess
ProcessProcess
ord
ord
exeexe
cutcut
manamanaion /
ion /m
ent
men
terer
Materialcomponents
RelationshipsRelationships
Material withdrawals
Good receipts PhasesPhases
Life Cycle of a Process Order
The graphic shows the main steps that are carried out for controlling process manufacturing in the R/3 System.
The process order is the main instrument for executing and monitoring production. The procedure of process order management can be divided into the following steps:
Process planningProcess order execution/Process managementOrder closing
(C) SAP AG LO305 9
16.8
SAP AG 1999
Production reqmnts
Costs
OperationsOperations
Proc. orderProc. order
Process instructions
Resourceassignments
Archiving / Deleting
Proc. messages to diff. destin.
In-process qualityinspections
Orderconfirmations
Process ordercreation
Scheduling
Cap.rqmts planning
Material availability check
Process order release
Creating & download. control recipes
M
Ord
Ord
derder
Pro
c.P
roc.
closingclosing
Pro
plan
nin
gcess
R P
gege
Pro
ces
sP
roc
ess
ProcessProcess
ord
ord
exeexe cut
cutmanamanaion /ion /
men
t
men
terer
Materialcomponents
RelationshipsAnordnungs- beziehungen
Material withdrawals
PhasesPhases
LO310LO310Detail Functions inDetail Functions in
Process ManufacturingProcess Manufacturing
Order Processing - Further Information
Process ordersettlement
Good receipts
Process data documentation
Further information on this topic is provided in the course LO310 "Detail Functions in Process Manufacturing".
(C) SAP AG LO305 10
16.9
SAP AG 1999
ExecutionExecutionProcessProcessmanagementmanagement
ProcessProcesscontrolcontrol
And otherAnd othermessagemessage
destinationsdestinations
ProcessProcessplanning
Process Process control control systemsystem
PI sheetPI sheet
LO315LO315Process ManagementProcess Management
Process Management - Further Information
Process order
Control recipes
Process messages
Further information on this topic is provided in the course LO315 "Process Management".
(C) SAP AG LO305 11
16.10
SAP AG 1999
50
40
30
20
10
Integration with Quality Management
LO955LO955Batch ManagementBatch Management
LO705LO705Quality InspectionsQuality Inspections
Batch Management in the Logistics ProcessProduction SalesProcurement
Ware-house
Process/productionorder
Ware-house
Salesorder
AB
AB
Warehouse management Warehouse management
A A
A
KMTKMT
Batch assignment
Batch determination
Batch assignment
Batch determination
Purchaseorder
LO721LO721QM in Process QM in Process ManufacturingManufacturing
QM and Batches - Further Information
Inspection specificationsInspection specificationsConcentrationConcentrationpH valuepH valueViscosityViscosity
R/3 QM insp. lot:R/3 QM insp. lot: Insp. char.Insp. char.
QMQM--IDIIDI
Ext.Ext. Labor. information systemLabor. information system(LIMS):(LIMS): analyt. specificationanalyt. specification
Insp. results recording20 %7,3 100 cP
R/3 QM insp. lot: char. values
QM-IDI
LIMS: analytical results
Further information on the topics "Quality Management" and "Batch Management" are provided in the courses LO705 "Quality Inspections" and LO955 "Batch Management".
(C) SAP AG LO305 12
16.11Summary: Exercises
Unit: Summary
At the conclusion of these exercises, you will be able to:
Create and process orders
Carry out batch determination and resource selection
Generate a control recipe and a PI sheet
Work with the message monitor
You have made the settings and maintained the data necessary for the process manufacturing of the new product in the R/3 System.
As the person responsible, create a process order and have the corresponding PI sheet processed by a line operator.
Note: The following exercises will illustrate the complete execution of a process order based on the master data created in the previous exercises.
1-1 Creating process orders
Create a process order of the order type PI01 for material T-FD1## (detergent) in plant 1100.
Total quantity: (for example) 10000L
Basic dates: start (for example) today + 1 week
Choose Enter and pay attention to the messages in the status bar. The master recipe T-DET1## (detergent production) is copied with the material list and the process order is scheduled.
On the Operation Overview and Material List screens, check whether the data from the master recipe T-DET1## has been copied correctly.
(C) SAP AG LO305 13
1-2 System-aided batch determination
Note:
In the previous exercises, you posted batch stocks for your material component T-RD1## which is to be handled in batches. The batches are classified with the class 023_14 (detergent production) of the class type 023 (batch). The characteristics M100 (concentration) and M200 (density) are assigned to class 023_14 to which you assigned the corresponding batch characteristics.
You also classified the BOM item 0010 T-RD1## in the BOM for material T-FD1## with the same class. By doing this, you defined selection conditions for a system-aided batch determination.
Execute batch determination for component T-RD1## in the order.
Pay attention to the messages.
Assign a selected batch.
Save your order and write down the order number. __________________.
1-3 System-aided resource selection
Note:
In the previous exercises, you classified your reaction vessel with the class REAC_## (Reaction vessel) of the class type 019 (Work center class) and defined specific characteristics for these resources by assigning them values.
The resource T-DTG1## that is assigned to operation 200 only serves planning purposes (task list usage C## Recipe until release group##). An order cannot be released with this resource. Before the release of an order can take place, a planning resource must be replaced with a suitable real resource.
You also classified operation 200 with the class REAC_## and, by assigning the corresponding values to the characteristics, defined selection conditions for a system-aided resource selection of a suitable reaction vessel. The resource network is considered at the same time.
Execute a resource selection for operation 200.
Select a resource.
1-4 Releasing a process order
Release your order.
1-5 Generating a control recipe
(C) SAP AG LO305 14
Generate a control recipe for the order.
Save your order.
1-6 Sending a control recipe
Send your recipe in the control recipe monitor.
1-7 Maintaining the PI sheet
Find and maintain the PI sheet.
Confirm the start and finish of phase maintenance with your signature. Sign with your user PI## and confirm with your.
Read the notes that have been prepared in the PI sheet.
Confirm the material withdrawal quantities of the raw materials T-RD1## and T-RD2##. Use the material information that is listed and F4 as help. Do the same for the withdrawal of the raw materials T-RD3##, T-RD4##, and T-RD5##.
Confirm the produced quantity of the product T-FD1##.
Set the PI sheet to complete after the last signature.
PI sheet -> Set to complete
1-8 Sending process messages
In the message monitor, send the process messages that were created during the maintenance of the PI sheet.
(C) SAP AG LO305 15
1-9 Check withdrawn raw material quantities and time confirmations
Check the withdrawn quantities of raw materials in your process order. Also check the time confirmations for the order.
(C) SAP AG LO305 16
16.12Solutions
Unit: Summary
1-1 Creating process orders
Create a process order of the order type PI01 for material T-FD1## (detergent) in plant 1100.
Logistics -> Production - Process -> Process Order Process Order -> Create -> With material
On the Operation Overview and Material List screens, check whether the data from the master recipe T-DET1## has been copied correctly.
Choose Operations.
Choose Materials.
1-2 System-aided batch determination
Execute batch determination for component T-RD1## in the order.
In the material list:
Choose Trigger batch determination for component T-RD1##
For a batch found:
Choose Copy.
(C) SAP AG LO305 17
1-3 System-aided resource selection
Execute a resource selection for operation 200.
Process order Change
Operation overview
for operation 200:
Choose Execute resource selection.
Select a resource.
1-4 Releasing a process order
Release your order.
Choose Release.
1-5 Generating a control recipe
Generate the control recipe for the order.
Choose Generate control recipe.
1-6 Sending a control recipe
Send your control recipe in the control recipe monitor.
Process Management menu Control recipe -> Control recipe monitor
(C) SAP AG LO305 18
1-7 Editing the PI sheet
Find and edit the PI sheet.
Process Management PI sheet Find
Set the PI sheet to complete after the last signature.
PI sheet -> Set to complete
1-8 Sending process messages
In the message monitor, send the process messages that were created during the maintenance of the PI sheet.
Process management Message -> Message monitor
1-9 Check withdrawn raw material quantities and time confirmations
Check the withdrawn quantities of raw materials in your process order. Also check the time confirmations for the order.
Process order -> Display
Material List
For the material components, choose Material -> Material details
Operation Overview
For the phases, choose Operation -> Operation details
Dates group box.
(C) SAP AG LO305 19