BNL - FNAL - LBNL - SLAC
Long Dipole Mirror (LM) Status and Plan
Fred Nobrega
Long Quadrupole (LQ) WorkshopFebruary 7-9, 2007
LM dipole status & plans – Fred Nobrega 2Long Quadrupole (LQ) Workshop, February 7-9, 2007
LM Status
• 2m copper cable practice coil impregnation complete
• 2m (LM01) PIT mirror: cured, reacted, and
impregnation complete coil measurement complete begin instrumentation
followed by yoke assy
• 4m (LM02) RRP mirror : winding tooling ready for
installation & shake down
• Long magnet infrastructure: ~ 90% complete
Dipole Mirror Cross Section Schematic
LM dipole status & plans – Fred Nobrega 3Long Quadrupole (LQ) Workshop, February 7-9, 2007
LM01, 2m PIT Coil Winding
Ceramic cable insulation w/50% overlap.
LM dipole status & plans – Fred Nobrega 4Long Quadrupole (LQ) Workshop, February 7-9, 2007
LM01, 2m PIT & Coil Lifting Fixture
LM dipole status & plans – Fred Nobrega 5Long Quadrupole (LQ) Workshop, February 7-9, 2007
6m Reaction Furnace
• 6m of thermal load• PIT Heat treat cycle•5 witness samples• Argon supply line for reaction fixture
LM dipole status & plans – Fred Nobrega 6Long Quadrupole (LQ) Workshop, February 7-9, 2007
LM01, 2m Coil Heat Treat
LM dipole status & plans – Fred Nobrega 7Long Quadrupole (LQ) Workshop, February 7-9, 2007
LM01, 2m Coil After Heat Treat
LM01 preparationfor impregnation.
LM dipole status & plans – Fred Nobrega 8Long Quadrupole (LQ) Workshop, February 7-9, 2007
LM01, 2m Impregnation Prep.
LM dipole status & plans – Fred Nobrega 9Long Quadrupole (LQ) Workshop, February 7-9, 2007
2m O.D. x 8m, t = 60° C, pressure 30 m Hg
Vacuum Oven
LM dipole status & plans – Fred Nobrega 10Long Quadrupole (LQ) Workshop, February 7-9, 2007
LM01, 2m PIT Coil After Impreg.
LM dipole status & plans – Fred Nobrega 11Long Quadrupole (LQ) Workshop, February 7-9, 2007
LM01 Coil X-Section Measurement
TQC coil # 018
Cross section measurements taken in body of coil.
LM dipole status & plans – Fred Nobrega 12Long Quadrupole (LQ) Workshop, February 7-9, 2007
IB3 Fabrication Floor Jan. 2006
LM dipole status & plans – Fred Nobrega 13Long Quadrupole (LQ) Workshop, February 7-9, 2007
IB3 Fabrication Floor, Feb 2007
LM dipole status & plans – Fred Nobrega 14Long Quadrupole (LQ) Workshop, February 7-9, 2007
ICB, LHCIR Quad Production
LM dipole status & plans – Fred Nobrega 15Long Quadrupole (LQ) Workshop, February 7-9, 2007
ICB, February 2007
LM dipole status & plans – Fred Nobrega 16Long Quadrupole (LQ) Workshop, February 7-9, 2007
FY07 LM Plan
• Start (PIT) 2m dipole mirror winding, Oct 2006• Analyze practice coil process results, Nov 2006• 4m winding, curing, impregnation tooling shake
down, Nov 2006• Start 4m practice winding, Dec 2006• Test (PIT) 2m dipole mirror, Jan 2007• Complete ICB tooling move to IB3, Jan 2007• Test (RRP) 4m dipole mirror, Jun 2007
LM dipole status & plans – Fred Nobrega 17Long Quadrupole (LQ) Workshop, February 7-9, 2007
Scale-up Schedule
LM dipole status & plans – Fred Nobrega 18Long Quadrupole (LQ) Workshop, February 7-9, 2007
Conclusion
• The scale up of the 1m model PIT magnets to 2m (PIT) & 4m (RRP) long mirror magnets is progressing without major surprises (so far).
• Design specific long tooling and manufacturing processes are a scale up of the 1m dipole magnet.
• Long generic tooling is from the LHC quadrupole program and will soon all be in IB3.