18
BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and Plan Fred Nobrega Long Quadrupole (LQ) Workshop February 7-9, 2007

LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

Embed Size (px)

Citation preview

Page 1: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

BNL - FNAL - LBNL - SLAC

Long Dipole Mirror (LM) Status and Plan

Fred Nobrega

Long Quadrupole (LQ) WorkshopFebruary 7-9, 2007

Page 2: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 2Long Quadrupole (LQ) Workshop, February 7-9, 2007

LM Status

• 2m copper cable practice coil impregnation complete

• 2m (LM01) PIT mirror: cured, reacted, and

impregnation complete coil measurement complete begin instrumentation

followed by yoke assy

• 4m (LM02) RRP mirror : winding tooling ready for

installation & shake down

• Long magnet infrastructure: ~ 90% complete

Dipole Mirror Cross Section Schematic

Page 3: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 3Long Quadrupole (LQ) Workshop, February 7-9, 2007

LM01, 2m PIT Coil Winding

Ceramic cable insulation w/50% overlap.

Page 4: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 4Long Quadrupole (LQ) Workshop, February 7-9, 2007

LM01, 2m PIT & Coil Lifting Fixture

Page 5: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 5Long Quadrupole (LQ) Workshop, February 7-9, 2007

6m Reaction Furnace

• 6m of thermal load• PIT Heat treat cycle•5 witness samples• Argon supply line for reaction fixture

Page 6: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 6Long Quadrupole (LQ) Workshop, February 7-9, 2007

LM01, 2m Coil Heat Treat

Page 7: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 7Long Quadrupole (LQ) Workshop, February 7-9, 2007

LM01, 2m Coil After Heat Treat

LM01 preparationfor impregnation.

Page 8: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 8Long Quadrupole (LQ) Workshop, February 7-9, 2007

LM01, 2m Impregnation Prep.

Page 9: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 9Long Quadrupole (LQ) Workshop, February 7-9, 2007

2m O.D. x 8m, t = 60° C, pressure 30 m Hg

Vacuum Oven

Page 10: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 10Long Quadrupole (LQ) Workshop, February 7-9, 2007

LM01, 2m PIT Coil After Impreg.

Page 11: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 11Long Quadrupole (LQ) Workshop, February 7-9, 2007

LM01 Coil X-Section Measurement

TQC coil # 018

Cross section measurements taken in body of coil.

Page 12: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 12Long Quadrupole (LQ) Workshop, February 7-9, 2007

IB3 Fabrication Floor Jan. 2006

Page 13: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 13Long Quadrupole (LQ) Workshop, February 7-9, 2007

IB3 Fabrication Floor, Feb 2007

Page 14: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 14Long Quadrupole (LQ) Workshop, February 7-9, 2007

ICB, LHCIR Quad Production

Page 15: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 15Long Quadrupole (LQ) Workshop, February 7-9, 2007

ICB, February 2007

Page 16: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 16Long Quadrupole (LQ) Workshop, February 7-9, 2007

FY07 LM Plan

• Start (PIT) 2m dipole mirror winding, Oct 2006• Analyze practice coil process results, Nov 2006• 4m winding, curing, impregnation tooling shake

down, Nov 2006• Start 4m practice winding, Dec 2006• Test (PIT) 2m dipole mirror, Jan 2007• Complete ICB tooling move to IB3, Jan 2007• Test (RRP) 4m dipole mirror, Jun 2007

Page 17: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 17Long Quadrupole (LQ) Workshop, February 7-9, 2007

Scale-up Schedule

Page 18: LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and

LM dipole status & plans – Fred Nobrega 18Long Quadrupole (LQ) Workshop, February 7-9, 2007

Conclusion

• The scale up of the 1m model PIT magnets to 2m (PIT) & 4m (RRP) long mirror magnets is progressing without major surprises (so far).

• Design specific long tooling and manufacturing processes are a scale up of the 1m dipole magnet.

• Long generic tooling is from the LHC quadrupole program and will soon all be in IB3.