18
DESCRIPCIÓN UNIDAD M u Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón PRELIMINARES CAMPAMENTO 18 M2 UN 1.993.076 2.011.011 2.027.950 2.012.008 2.015.993 2.024.961 2.006.029 CAMPAMENTO 9 M2 UN 1.162.731 1.171.698 1.180.168 1.172.197 1.174.189 1.178.673 1.169.207 CERCA EN ALAMBRE DE PUA 4 HILOS ML 14.092 14.092 14.092 14.092 14.092 14.092 14.092 CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.797 15.797 15.797 15.797 15.797 15.797 15.797 CERCA EN ALAMBRE DE PUA 6 HILOS ML 18.273 18.273 18.273 18.273 18.273 18.273 18.273 CERCA EN TABLA H=2.30 M ML 65.276 65.276 65.276 65.276 65.276 65.276 65.276 CERCA EN TEJA DE ZINC H=1.80 M ML 45.934 46.134 46.323 46.145 46.190 46.290 46.079 CERCA EN TELA VERDE H = 2.10 M ML 21.348 21.548 21.737 21.559 21.604 21.704 21.493 DEMOLICIÓN ESCALERAS EN CONCRETO M2 80.242 80.242 80.242 80.242 80.242 80.242 80.242 DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 6.261 6.261 6.261 6.261 6.261 6.261 6.261 DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 8.882 8.882 8.882 8.882 8.882 8.882 8.882 DEMOLICIÓN ENCHAPE MURO M2 6.813 6.813 6.813 6.813 6.813 6.813 6.813 DEMOLICIÓN PAÑETE MURO M2 7.419 7.419 7.419 7.419 7.419 7.419 7.419 DEMOLICIÓN CIELO RASO FALSO M2 8.964 8.964 8.964 8.964 8.964 8.964 8.964 DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 9.084 9.084 9.084 9.084 9.084 9.084 9.084 DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 13.497 13.497 13.497 13.497 13.497 13.497 13.497 DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 18.477 18.477 18.477 18.477 18.477 18.477 18.477 DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 27.441 27.441 27.441 27.441 27.441 27.441 27.441 DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 39.898 39.898 39.898 39.898 39.898 39.898 39.898 DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 49.367 49.367 49.367 49.367 49.367 49.367 49.367 DEMOLICIÓN PLACA MACIZA 0.15 M M2 40.806 40.806 40.806 40.806 40.806 40.806 40.806 DEMOLICIÓN PLACA MACIZA 0.20 M M2 57.319 57.319 57.319 57.319 57.319 57.319 57.319 DEMOLICIÓN PLACA MACIZA 0.25 M M2 67.872 67.872 67.872 67.872 67.872 67.872 67.872 DEMOLICIÓN PLACA MACIZA 0.30 M M2 83.193 83.193 83.193 83.193 83.193 83.193 83.193 DEMOLICIÓN PLACA PISO 0.05 M M2 9.103 9.103 9.103 9.103 9.103 9.103 9.103 DEMOLICIÓN PLACA PISO 0.10 M M2 14.736 14.736 14.736 14.736 14.736 14.736 14.736 DEMOLICIÓN PLACA PISO 0.15 M M2 22.422 22.422 22.422 22.422 22.422 22.422 22.422 DEMOLICIÓN PLACA PISO 0.20 M M2 36.746 36.746 36.746 36.746 36.746 36.746 36.746 DEMOLICIÓN VIGAS Y COLUMNAS M3 233.157 233.157 233.157 233.157 233.157 233.157 233.157 DESCAPOTE A MAQUINA E=0.20 M M2 1.539 1.539 1.539 1.539 1.539 1.539 1.539 DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.807 5.807 5.807 5.807 5.807 5.807 5.807 DESMONTE APARATOS SANITARIOS UN 20.960 20.960 20.960 20.960 20.960 20.960 20.960 DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 11.490 11.490 11.490 11.490 11.490 11.490 11.490 DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 11.307 11.307 11.307 11.307 11.307 11.307 11.307 DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 10.480 10.480 10.480 10.480 10.480 10.480 10.480 DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.803 9.803 9.803 9.803 9.803 9.803 9.803 DESMONTE MUROS SECOS M2 15.459 15.459 15.459 15.459 15.459 15.459 15.459 DESMONTE MARCOS Y PUERTAS UN 13.512 13.512 13.512 13.512 13.512 13.512 13.512 DESMONTE VENTANAS M2 11.490 11.490 11.490 11.490 11.490 11.490 11.490 LETRINA DE 2.0x1.0 UN 897.668 899.667 903.843 900.475 900.521 903.709 899.112 LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE PRESICIÓN M2 10.354 10.354 10.354 10.354 10.354 10.354 10.354 REPLANTEO MANUAL DE CIMIENTOS M2 3.732 3.732 3.732 3.732 3.732 3.732 3.732 RED ELÉCTRICA PROVISIONAL L=50M UN 2.668.833 2.668.833 2.668.833 2.668.833 2.668.833 2.668.833 2.668.833 RED TELEFÓNICA PROVISIONAL UN 247.168 247.168 247.168 247.168 247.168 247.168 247.168 RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 9.189 9.189 9.189 9.189 9.189 9.189 9.189 1,43 1,44 1,45 1,37 1,38 1,39 1,40 1,41 1,42 1,31 1,32 1,33 1,34 1,35 1,36 1,25 1,26 1,27 1,28 1,29 1,30 1,19 1,20 1,21 1,22 1,23 1,24 1,13 1,14 1,15 1,16 1,17 1,18 1,10 1,11 1,12 1,1 1,2 1,3 1,4 1,5 1,6 GOBERNACIÓN DE CUNDINAMARCA LISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018) PROVINCIA: ALMEIDAS ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE ÍTEM CONSTRUCCIÓN 1 1,7 1,8 1,9

LISTA DE PRECIOS ICCU 2018

  • Upload
    others

  • View
    69

  • Download
    3

Embed Size (px)

Citation preview

Page 1: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

PRELIMINARESCAMPAMENTO 18 M2 UN 1.993.076 2.011.011 2.027.950 2.012.008 2.015.993 2.024.961 2.006.029CAMPAMENTO 9 M2 UN 1.162.731 1.171.698 1.180.168 1.172.197 1.174.189 1.178.673 1.169.207CERCA EN ALAMBRE DE PUA 4 HILOS ML 14.092 14.092 14.092 14.092 14.092 14.092 14.092CERCA EN ALAMBRE DE PUA 5 HILOS ML 15.797 15.797 15.797 15.797 15.797 15.797 15.797CERCA EN ALAMBRE DE PUA 6 HILOS ML 18.273 18.273 18.273 18.273 18.273 18.273 18.273CERCA EN TABLA H=2.30 M ML 65.276 65.276 65.276 65.276 65.276 65.276 65.276CERCA EN TEJA DE ZINC H=1.80 M ML 45.934 46.134 46.323 46.145 46.190 46.290 46.079CERCA EN TELA VERDE H = 2.10 M ML 21.348 21.548 21.737 21.559 21.604 21.704 21.493DEMOLICIÓN ESCALERAS EN CONCRETO M2 80.242 80.242 80.242 80.242 80.242 80.242 80.242DEMOLICIÓN BALDOSA DE PISO H=0.02 M M2 6.261 6.261 6.261 6.261 6.261 6.261 6.261DEMOLICIÓN BALDOSA DE PISO H=0.04 M M2 8.882 8.882 8.882 8.882 8.882 8.882 8.882DEMOLICIÓN ENCHAPE MURO M2 6.813 6.813 6.813 6.813 6.813 6.813 6.813DEMOLICIÓN PAÑETE MURO M2 7.419 7.419 7.419 7.419 7.419 7.419 7.419DEMOLICIÓN CIELO RASO FALSO M2 8.964 8.964 8.964 8.964 8.964 8.964 8.964DEMOLICIÓN ADOQUÍN SOBRE ARENA, H=0.15 m M2 9.084 9.084 9.084 9.084 9.084 9.084 9.084DEMOLICIÓN MUROS EN MAMPOSTERÍA 0.15 M M2 13.497 13.497 13.497 13.497 13.497 13.497 13.497DEMOLICIÓN MUROS EN MAMAPOSTERÍA 0.25 M M2 18.477 18.477 18.477 18.477 18.477 18.477 18.477DEMOLICIÓN PLACA ALIGERADA 0.30 M M2 27.441 27.441 27.441 27.441 27.441 27.441 27.441DEMOLICIÓN PLACA ALIGERADA 0.40 M M2 39.898 39.898 39.898 39.898 39.898 39.898 39.898DEMOLICIÓN PLACA ALIGERADA 0.50 M M2 49.367 49.367 49.367 49.367 49.367 49.367 49.367DEMOLICIÓN PLACA MACIZA 0.15 M M2 40.806 40.806 40.806 40.806 40.806 40.806 40.806DEMOLICIÓN PLACA MACIZA 0.20 M M2 57.319 57.319 57.319 57.319 57.319 57.319 57.319DEMOLICIÓN PLACA MACIZA 0.25 M M2 67.872 67.872 67.872 67.872 67.872 67.872 67.872DEMOLICIÓN PLACA MACIZA 0.30 M M2 83.193 83.193 83.193 83.193 83.193 83.193 83.193DEMOLICIÓN PLACA PISO 0.05 M M2 9.103 9.103 9.103 9.103 9.103 9.103 9.103DEMOLICIÓN PLACA PISO 0.10 M M2 14.736 14.736 14.736 14.736 14.736 14.736 14.736DEMOLICIÓN PLACA PISO 0.15 M M2 22.422 22.422 22.422 22.422 22.422 22.422 22.422DEMOLICIÓN PLACA PISO 0.20 M M2 36.746 36.746 36.746 36.746 36.746 36.746 36.746DEMOLICIÓN VIGAS Y COLUMNAS M3 233.157 233.157 233.157 233.157 233.157 233.157 233.157DESCAPOTE A MAQUINA E=0.20 M M2 1.539 1.539 1.539 1.539 1.539 1.539 1.539DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 5.807 5.807 5.807 5.807 5.807 5.807 5.807DESMONTE APARATOS SANITARIOS UN 20.960 20.960 20.960 20.960 20.960 20.960 20.960DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 11.490 11.490 11.490 11.490 11.490 11.490 11.490DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 11.307 11.307 11.307 11.307 11.307 11.307 11.307DESMONTE DE CUBIERTAS (TERMOACÚSTICA) M2 10.480 10.480 10.480 10.480 10.480 10.480 10.480DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 9.803 9.803 9.803 9.803 9.803 9.803 9.803DESMONTE MUROS SECOS M2 15.459 15.459 15.459 15.459 15.459 15.459 15.459DESMONTE MARCOS Y PUERTAS UN 13.512 13.512 13.512 13.512 13.512 13.512 13.512DESMONTE VENTANAS M2 11.490 11.490 11.490 11.490 11.490 11.490 11.490LETRINA DE 2.0x1.0 UN 897.668 899.667 903.843 900.475 900.521 903.709 899.112LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEPRESICIÓN

M2 10.354 10.354 10.354 10.354 10.354 10.354 10.354

REPLANTEO MANUAL DE CIMIENTOS M2 3.732 3.732 3.732 3.732 3.732 3.732 3.732RED ELÉCTRICA PROVISIONAL L=50M UN 2.668.833 2.668.833 2.668.833 2.668.833 2.668.833 2.668.833 2.668.833RED TELEFÓNICA PROVISIONAL UN 247.168 247.168 247.168 247.168 247.168 247.168 247.168RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 9.189 9.189 9.189 9.189 9.189 9.189 9.189

1,431,441,45

1,371,381,391,40

1,41

1,42

1,311,321,331,341,351,36

1,251,261,271,281,291,30

1,191,201,211,221,231,24

1,131,141,151,161,171,18

1,101,111,12

1,11,21,31,41,51,6

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓN1

1,71,81,9

Page 2: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNCIMIENTOSBASE AGREGADO PÉTREO (MATERIAL DE AFIRMADO) M3 86.050 86.050 125.458 98.044 98.044 125.458 86.050BASE ARENA CEMENTO 1:20 M3 195.329 211.572 226.912 212.474 216.083 224.206 207.059DEMOLICIÓN CABEZAS DE PILOTES M3 297.878 297.878 297.878 297.878 297.878 297.878 297.878DEMOLICIÓN CIMIENTO ENTERRADO M3 207.425 207.425 207.425 207.425 207.425 207.425 207.425IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX M2 22.022 22.022 22.022 22.022 22.022 22.022 22.022SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 641.015 660.486 678.877 661.569 665.896 675.632 655.077VIGA DE AMARRE EN CONCRETO 3500 PSI M3 644.421 664.824 684.094 665.957 670.491 680.694 659.156ZAPATAS EN CONCRETO 3500 PSI M3 600.398 619.503 637.546 620.564 624.809 634.362 614.195PILOTE DE MADERA D=20 CM ML 49.628 49.628 49.628 49.628 49.628 49.628 49.628PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

ML 153.044 153.044 153.044 153.044 153.044 153.044 153.044

PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

ML 190.717 190.717 190.717 190.717 190.717 190.717 190.717

PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

ML 236.274 236.274 236.274 236.274 236.274 236.274 236.274

PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

ML 297.601 297.601 297.601 297.601 297.601 297.601 297.601

PILOTE HINCADO 25X25 ML 104.971 106.383 107.717 106.462 106.776 107.482 105.991PILOTE HINCADO 30X30 ML 129.553 131.600 133.534 131.714 132.169 133.192 131.032DADOS EN CONCRETO 3500PSI M3 586.249 605.353 623.397 606.414 610.660 620.213 600.046MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM) ML 91.564 91.564 91.564 91.564 91.564 91.564 91.564

DESAGÜES E INSTALACIONES SUBTERRÁNEASSIFÓN PARA DRENAJE EN PVC DE 4" UN 38.180 38.281 38.376 38.286 38.309 38.359 38.253SIFÓN EN PVC 6" UN 196.830 196.930 197.026 196.936 196.958 197.009 196.902CAJA DE INSPECCIÓN DE 100X100 UN 459.363 467.911 494.978 474.167 472.762 495.205 465.536CAJA DE INSPECCIÓN DE 40X40 UN 226.707 229.381 233.509 230.018 230.333 233.203 228.638CAJA DE INSPECCIÓN DE 60X60 UN 259.842 264.323 271.072 265.338 265.896 270.545 263.078CAJA DE INSPECCIÓN DE 80X80 UN 343.041 350.660 360.374 351.850 353.105 359.323 348.544DUCTO ELÉCTRICO PVC 4" ML 104.446 104.446 104.675 104.516 104.476 104.695 104.446POZO SÉPTICO ETERNIT 1000 LT UN 1.274.782 1.274.782 1.277.071 1.275.479 1.275.081 1.277.270 1.274.782TUBERÍA CONCRETO CLASE I SIN REFUERZO 12" ML 114.885 116.000 117.053 116.062 116.309 116.867 115.690TUBERÍA CONCRETO CLASE II SIN REFUERZO 8" ML 72.423 73.011 73.567 73.044 73.175 73.469 72.848TUBERÍA DRENAJE PVC 110 ML 27.683 27.988 28.276 28.005 28.072 28.225 27.903TUBERÍA DRENAJE PVC 160 ML 44.583 44.887 45.175 44.904 44.972 45.125 44.803TUBERÍA DRENAJE PVC 200 ML 58.473 58.900 59.303 58.923 59.018 59.232 58.781TUBERÍA DRENAJE PVC 250 ML 80.010 80.498 80.958 80.525 80.633 80.877 80.362TUBERÍA DRENAJE PVC 315 ML 110.703 111.130 111.533 111.154 111.249 111.462 111.011SISTEMA SÉPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL FILTRANTE) UN 950.009 954.886 959.493 955.157 956.241 958.680 953.531SISTEMA SÉPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE) UN 1.341.812 1.351.567 1.360.780 1.352.108 1.354.276 1.359.154 1.348.857SISTEMA SÉPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE) UN 1.745.724 1.765.233 1.783.659 1.766.316 1.770.652 1.780.407 1.759.814

ESTRUCTURAS EN CONCRETOCASETÓN DE LONA 0.8 X 0.35 M2 42.018 42.018 42.018 42.018 42.018 42.018 42.018CASETÓN DE LONA 0.80X0.70 M2 55.436 55.436 55.436 55.436 55.436 55.436 55.436COLUMNAS 3500 PSI M3 805.952 825.056 843.100 826.117 830.363 839.916 819.749CONCRETO CICLÓPEO 2000 PSI, 40% RAJÓN M3 261.927 282.756 304.122 285.144 286.754 301.556 278.339ENTREPISO LÁMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

M2 98.211 100.066 101.817 100.169 100.581 101.508 99.550

ENTREPISO LÁMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE REFUERZO, CONCRETO DE 3500 PSI

M2 115.798 118.024 120.126 118.147 118.642 119.755 117.405

ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 129.548 132.515 135.318 132.680 133.340 134.824 131.691ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 136.684 139.837 142.815 140.012 140.713 142.290 138.961ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 156.600 160.496 164.174 160.712 161.577 163.525 159.413ENTREPISO CASETÓN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 174.176 178.627 182.831 178.874 179.864 182.090 177.390ENTREPISOS CASETÓN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 193.312 198.320 203.050 198.598 199.711 202.216 196.929ENTREPISO VIGUETA PLACA M2 99.270 99.614 99.938 99.633 99.709 99.881 99.518ESCALERA MACIZA 3500 PSI M3 953.112 972.216 990.260 973.277 977.523 987.076 966.909

4,114,124,13

4,5

4,6

4,74,84,9

4,10

44,14,24,34,4

3,133,143,153,163,173,18

3,73,83,9

3,103,113,12

3,13,23,33,43,53,6

2,142,152,162,17

3

2,82,9

2,10

2,11

2,12

2,13

2,22,32,42,52,62,7

22,1

Page 3: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNMURO LADRILLO ESTRUCTURAL E=0.12 cm M2 95.100 95.409 95.701 95.426 95.495 95.650 95.323ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 79.305 81.215 83.020 81.321 81.746 82.701 80.685ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 89.204 91.541 93.748 91.671 92.190 93.359 90.892ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 103.953 106.884 109.652 107.047 107.698 109.163 106.070MURO DE CONTENCIÓN EN CONCRETO 3500 PSI, H=2.0 M M3 705.757 724.862 742.905 725.922 730.168 739.721 719.554PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 49.421 50.019 50.583 50.052 50.185 50.484 49.853PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 281.471 290.003 298.061 290.477 292.373 296.640 287.633ACERO FIGURADO 37000 PSI KG 4.168 4.168 4.168 4.168 4.168 4.168 4.168ACERO FIGURADO 60000 PSI KG 4.371 4.371 4.371 4.371 4.371 4.371 4.371REFUERZO MALLA ELECTROSOLDADA KG 6.145 6.145 6.145 6.145 6.145 6.145 6.145TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 852.611 871.715 889.759 872.776 877.022 886.575 866.408TANQUE SUBTERRÁNEO EN CONCRETO DE 3500 PSI M3 777.085 797.988 817.731 799.149 803.795 814.247 792.181VIGA AÉREA 3500 PSI M3 846.480 865.584 883.628 866.645 870.891 880.444 860.277VIGA CINTA 3500 PSI M3 826.397 845.501 863.545 846.562 850.808 860.361 840.194VIGA CANAL EN CONCRETO 3500 PSI M3 1.036.830 1.055.935 1.073.978 1.056.995 1.061.241 1.070.794 1.050.627BASE EN CONCRETO POBRE 1500 PSI M3 319.851 340.377 359.762 341.517 346.078 356.342 334.675

MAMPOSTERÍAALFAJÍAS CONCRETO 2500 PSI E= 0.15 M ML 29.747 30.247 30.718 30.274 30.385 30.635 30.108ALFAJÍAS CONCRETO 2500 PSI E= 0.25 M ML 50.121 50.620 51.092 50.648 50.759 51.008 50.481ALFAJÍA EN LADRILLO PRENSADO MACIZO ML 35.003 35.104 35.199 35.110 35.132 35.182 35.076ARCOS EN LADRILLO PRENSADO ML 163.829 164.031 164.222 164.042 164.087 164.188 163.975DINTELES CONCRETO DE 2500 PSI 15x20 ML 44.216 44.814 45.378 44.847 44.980 45.278 44.648DINTELES EN BLOQUE 0.15 M ML 27.422 27.731 28.023 27.748 27.817 27.972 27.645ENCHAPES LADRILLO PRENSADO M2 98.793 99.197 99.578 99.219 99.309 99.511 99.085MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 91.077 93.069 94.950 93.180 93.622 94.618 92.516MURO DRYWALL DOBLE CARA 0.12 M M2 91.219 91.219 91.219 91.219 91.219 91.219 91.219MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 53.533 53.533 53.533 53.533 53.533 53.533 53.533MURO DRYWALL DOBLE CARA 0.10 M M2 87.859 87.859 87.859 87.859 87.859 87.859 87.859MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 51.853 51.853 51.853 51.853 51.853 51.853 51.853MURO SUPERBOARD DOBLE CARA 0.10 M M2 101.818 101.818 101.818 101.818 101.818 101.818 101.818MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 60.154 60.154 60.154 60.154 60.154 60.154 60.154MURO SUPERBOARD DOBLE CARA 0.12 M M2 113.220 113.220 113.220 113.220 113.220 113.220 113.220MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 65.855 65.855 65.855 65.855 65.855 65.855 65.855MURO EN BLOQUE Nº 5 E=0.12 M M2 40.656 40.859 41.050 40.870 40.915 41.017 40.803MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 24.642 24.743 24.839 24.749 24.771 24.822 24.715MURO EN BLOQUE DE CONCRETO 0.10 M M2 52.932 53.067 53.195 53.075 53.105 53.173 53.030MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 31.845 31.913 31.977 31.917 31.932 31.966 31.894MURO EN BLOQUE DE CONCRETO 0.12 M M2 59.548 59.683 59.811 59.691 59.721 59.788 59.646MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 35.827 35.894 35.958 35.898 35.913 35.947 35.876MURO EN BLOQUE DE CONCRETO 0.20 M M2 98.952 99.628 100.266 99.665 99.816 100.154 99.440MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 58.555 58.893 59.212 58.912 58.987 59.156 58.799MURO EN BLOQUE Nº 4 E= 0.10 M M2 37.279 37.414 37.542 37.421 37.451 37.519 37.376MURO EN BLOQUE Nº 4 E=0.10 M (LINEAL) ML 22.620 22.688 22.752 22.692 22.707 22.740 22.669MURO EN BLOQUE Nº 5 E=0.23 M M2 74.118 74.389 74.644 74.404 74.464 74.599 74.313MURO EN BLOQUE Nº 5 E=0.23 M (LINEAL) ML 44.720 44.855 44.983 44.863 44.893 44.961 44.818MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 88.144 88.453 88.745 88.470 88.539 88.694 88.367MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 53.410 53.565 53.711 53.574 53.608 53.685 53.522MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 181.522 182.468 183.362 182.521 182.731 183.204 182.205MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 109.155 109.628 110.075 109.654 109.759 109.996 109.497MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 90.655 91.300 91.910 91.336 91.479 91.802 91.121MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 54.666 54.989 55.293 55.007 55.078 55.239 54.899MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 46.820 47.123 47.408 47.139 47.207 47.358 47.038MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 28.509 28.660 28.803 28.668 28.702 28.778 28.618MURO TOLETE COMÚN 0.06 M M2 33.762 33.898 34.025 33.905 33.935 34.003 33.860MURO TOLETE COMÚN 0.06 M (LINEAL) ML 20.587 20.655 20.718 20.658 20.673 20.707 20.636MURO TOLETE COMÚN 0.12 M M2 50.954 51.224 51.480 51.239 51.299 51.435 51.149MURO TOLETE COMÚN 0.12 M (LINEAL) ML 31.258 31.393 31.521 31.401 31.431 31.498 31.3555,40

5,345,355,365,375,385,39

5,285,295,305,315,325,33

5,225,235,245,255,265,27

5,165,175,185,195,205,21

5,105,115,125,135,145,15

5,45,55,65,75,85,9

4,29

55,15,25,3

4,234,244,254,264,274,28

4,174,184,194,204,214,22

4,144,154,16

Page 4: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNMURO TOLETE COMÚN 0.25 M M2 98.261 98.667 99.050 98.690 98.780 98.982 98.554MURO TOLETE COMÚN 0.25 M (LINEAL) ML 59.879 60.082 60.273 60.093 60.138 60.239 60.025MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 71.771 72.041 72.296 72.056 72.116 72.251 71.966MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 43.367 43.502 43.629 43.509 43.539 43.607 43.464MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 150.846 151.792 152.686 151.845 152.055 152.528 151.529MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 91.814 92.287 92.734 92.313 92.418 92.655 92.155REMATES LADRILLO PRENSADO ML 31.733 31.834 31.929 31.839 31.862 31.912 31.806SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 37.098 37.563 38.001 37.588 37.691 37.924 37.434SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 62.403 63.022 63.606 63.056 63.194 63.503 62.850LAVADA DE FACHADA M2 5.245 5.245 5.245 5.245 5.245 5.245 5.245PASAMANOS EN CONCRETO 2500 PSI ML 50.482 50.981 51.453 51.009 51.120 51.370 50.843DOVELA, GROUTING 3000 PSI ML 10.601 10.601 10.601 10.601 10.601 10.601 10.601ANCLAJE 3/8" L=30CM UN 13.964 13.964 13.964 13.964 13.964 13.964 13.964ANCLAJE 1/2" L=50CM UN 18.235 18.235 18.235 18.235 18.235 18.235 18.235ANCLAJE 5/8" L=70CM UN 25.455 25.455 25.455 25.455 25.455 25.455 25.455ANCLAJE 3/4" L=70CM UN 37.859 37.859 37.859 37.859 37.859 37.859 37.859ANCLAJE 1" L= 70CM UN 4.926 5.067 5.201 5.075 5.107 5.177 5.028

PAÑETES, REVOQUES Y REPELLOSENTRAMADO MADERA CIELO RASO M2 16.138 16.138 16.138 16.138 16.138 16.138 16.138FILOS O DILATACIONES B/PLACA ML 5.743 5.844 5.939 5.849 5.872 5.922 5.816FILOS O DILATACIONES S/MURO ML 6.929 7.030 7.125 7.035 7.058 7.108 7.002GOTERA EN MORTERO 1:4 ML 8.202 8.303 8.398 8.308 8.331 8.381 8.275IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA M2 6.816 6.816 6.816 6.816 6.816 6.816 6.816MALLA BAJO ENTRAMADO M2 13.681 13.681 13.681 13.681 13.681 13.681 13.681PAÑETE BAJO GUADUA 1:5, E=2 CM M2 24.979 25.431 25.857 25.456 25.556 25.782 25.305PAÑETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 15.084 15.309 15.523 15.322 15.372 15.485 15.247PAÑETE BAJO MALLA 1:4, E=2 CM M2 21.079 21.363 21.631 21.379 21.442 21.584 21.284PAÑETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 12.823 12.965 13.099 12.973 13.005 13.076 12.926PAÑETE BAJO MALLA 1:5, E=2 CM M2 21.088 21.540 21.966 21.565 21.665 21.891 21.414PAÑETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 12.828 13.054 13.267 13.066 13.116 13.229 12.991PAÑETE CULATAS 1:4, E=2 CM M2 21.079 21.363 21.631 21.379 21.442 21.584 21.284PAÑETE CULATAS 1:4, E=2 CM (LINEAL) ML 12.823 12.965 13.099 12.973 13.005 13.076 12.926PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 22.067 22.389 22.693 22.407 22.479 22.639 22.300PAÑETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 13.316 13.477 13.629 13.486 13.522 13.602 13.433PAÑETE LISO MUROS 1:4, E=1.5 CM M2 17.543 17.759 17.963 17.771 17.819 17.927 17.699PAÑETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 10.767 10.875 10.977 10.881 10.905 10.959 10.845PAÑETE LISO MUROS 1:5, E=1.5 CM M2 17.550 17.894 18.219 17.913 17.989 18.161 17.798PAÑETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 10.770 10.942 11.105 10.952 10.990 11.076 10.894PAÑETE LISO PLACAS 1:4, E=2 CM M2 21.857 22.141 22.409 22.157 22.220 22.362 22.062PAÑETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 13.193 13.335 13.469 13.342 13.374 13.445 13.295PAÑETE LISO PLACAS 1:5, E=2 CM M2 21.866 22.318 22.745 22.343 22.443 22.669 22.193PAÑETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 13.197 13.423 13.636 13.435 13.486 13.598 13.360PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM M2 18.160 18.504 18.829 18.523 18.600 18.772 18.408PAÑETE RÚSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 11.058 11.230 11.392 11.239 11.277 11.363 11.182PAÑETE RÚSTICO PLACAS 1:5, E=2 CM M2 22.756 23.207 23.634 23.233 23.333 23.559 23.082PAÑETE RÚSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 14.046 14.272 14.485 14.284 14.335 14.447 14.209

CUBIERTASAFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 26.778 27.184 27.567 27.206 27.296 27.499 27.071AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE TELA IMPERMEABLE)

M2 83.054 84.050 84.990 84.105 84.326 84.824 83.773

BAJANTE PVC (AMAZONAS, RAINGO) ML 55.131 55.131 55.131 55.131 55.131 55.131 55.131BAJANTE PVC AGUAS LLUVIAS D=3" ML 22.071 22.071 22.071 22.071 22.071 22.071 22.071BAJANTE PVC AGUAS LLUVIAS D=4" ML 34.622 34.622 34.622 34.622 34.622 34.622 34.622CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 80.469 80.469 80.469 80.469 80.469 80.469 80.469CABALLETE FIJO TEJA FIBROCEMENTO ML 63.078 63.078 63.078 63.078 63.078 63.078 63.078CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 36.812 36.812 36.812 36.812 36.812 36.812 36.812

7,57,67,77,8

77,1

7,2

7,37,4

6,236,246,256,266,276,28

6,176,186,196,206,216,22

6,116,126,136,146,156,16

6,56,66,76,86,9

6,10

66,16,26,36,4

5,525,535,545,555,565,57

5,465,475,485,495,505,51

5,415,425,435,445,45

Page 5: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNCABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 84.319 84.319 84.319 84.319 84.319 84.319 84.319CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 100.628 100.628 100.628 100.628 100.628 100.628 100.628CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 147.742 147.742 147.742 147.742 147.742 147.742 147.742CABALLETE CUBIERTA TERMOACÚSTICA ML 58.586 58.586 58.586 58.586 58.586 58.586 58.586CANAL PVC AMAZONAS ML 81.527 81.527 81.527 81.527 81.527 81.527 81.527CANAL PVC RAINGO ML 74.174 74.174 74.174 74.174 74.174 74.174 74.174TEJA CANALETA 43 FIBROCEMENTO L=6M M2 131.126 131.126 131.126 131.126 131.126 131.126 131.126TEJA CANALETA 90 FIBROCEMENTO L=6M M2 76.510 76.510 76.510 76.510 76.510 76.510 76.510TEJA CANALETA 90 LÁMINA GALVANIZADA L=6M M2 56.268 56.268 56.268 56.268 56.268 56.268 56.268CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=50 ML 32.302 32.302 32.302 32.302 32.302 32.302 32.302TEJA DE BARRO M2 59.229 59.733 60.210 59.761 59.873 60.126 59.593TEJA EN LÁMINA GALVANIZADA CAL 26 PINTADA M2 46.898 46.898 46.898 46.898 46.898 46.898 46.898TEJA EN LÁMINA GALVANIZADA CAL 26 M2 43.010 43.010 43.010 43.010 43.010 43.010 43.010TEJA FIBROCEMENTO Nº4 M2 36.470 36.470 36.470 36.470 36.470 36.470 36.470TEJA FIBROCEMENTO No. 6 M2 35.693 35.693 35.693 35.693 35.693 35.693 35.693TEJA FIBROCEMENTO No. 8 M2 35.960 35.960 35.960 35.960 35.960 35.960 35.960TEJA TERMOACÚSTICA M2 50.455 50.455 50.455 50.455 50.455 50.455 50.455TEJA PLÁSTICA No.6 M2 44.397 44.397 44.397 44.397 44.397 44.397 44.397TEJA ESPAÑOLA ETERNIT M2 81.038 81.038 81.038 81.038 81.038 81.038 81.038TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 149.362 149.362 149.362 149.362 149.362 149.362 149.362TEJA SIN TRASLAPO M2 67.248 67.248 67.248 67.248 67.248 67.248 67.248ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 42.606 42.606 42.606 42.606 42.606 42.606 42.606ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 33.312 33.312 33.312 33.312 33.312 33.312 33.312ESTRUCTURA METÁLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL ABIERTO 4"x2", 15 MM)

M2 57.788 57.788 57.788 57.788 57.788 57.788 57.788

FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=20 ML 20.052 20.052 20.052 20.052 20.052 20.052 20.052FLANCHE EN LÁMINA GALVANIZADA CAL. 22; DS=30 ML 24.061 24.061 24.061 24.061 24.061 24.061 24.061MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 26.023 26.023 26.023 26.023 26.023 26.023 26.023MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 33.424 33.424 33.424 33.424 33.424 33.424 33.424BAJANTE EN LÁMINA GALVANIZADA CAL. 22; DS=40 ML 22.142 22.142 22.142 22.142 22.142 22.142 22.142CANAL EN LÁMINA GALVANIZADA CAL. 22; DS=90 ML 52.089 52.089 52.089 52.089 52.089 52.089 52.089DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 353.312 353.312 353.312 353.312 353.312 353.312 353.312CUBIERTA EN POLICARBONATO ALVEOLAR M2 409.286 409.286 409.286 409.286 409.286 409.286 409.286CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 269.558 269.558 269.558 269.558 269.558 269.558 269.558CORTASOL CELOSIA C-23 EN ALUZINC M2 287.695 287.695 287.695 287.695 287.695 287.695 287.695

MORTEROS Y CONCRETOSCONCRETO 4000 PSI M3 455.180 475.650 494.983 476.787 481.336 491.571 469.963CONCRETO 3500 PSI M3 396.453 415.001 432.519 416.031 420.153 429.428 409.848CONCRETO 3000 PSI M3 393.701 412.605 430.460 413.656 417.857 427.310 407.354CONCRETO 2500 PSI M3 352.726 372.643 391.453 373.749 378.175 388.134 367.110CONCRETO 2000 PSI M3 327.614 347.602 366.480 348.712 353.154 363.149 342.050CONCRETO 1500 PSI M3 295.424 315.352 334.173 316.459 320.887 330.852 309.816MORTERO SECO 1:10 M3 237.902 251.825 264.973 252.598 255.692 262.654 247.957MORTERO 1:4 ARENA LAVADA DE PEÑA M3 447.910 461.429 474.197 462.180 465.184 471.944 457.673MORTERO 1:5 ARENA LAVADA DE PEÑA M3 448.344 469.846 490.154 471.041 475.819 486.570 463.873MORTERO 1:3 ARENA LAVADA DE PEÑA M3 506.649 526.759 545.752 527.877 532.345 542.400 521.173MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEÑA M3 730.709 750.819 769.812 751.937 756.405 766.460 745.233

CARPINTERÍA EN MADERABARANDA EN MADERA CEDRO MACHO ML 122.796 122.796 122.796 122.796 122.796 122.796 122.796CHAZOS PARA CARPINTERÍA EN MADERA UN 3.962 4.063 4.159 4.069 4.091 4.142 4.035DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 137.627 137.627 137.627 137.627 137.627 137.627 137.627DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 168.300 168.300 168.300 168.300 168.300 168.300 168.300MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 243.718 243.718 243.718 243.718 243.718 243.718 243.718MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 271.207 271.207 271.207 271.207 271.207 271.207 271.207MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 298.729 298.729 298.729 298.729 298.729 298.729 298.729HOJA PUERTA FORTEC 0.81 UN 198.254 198.254 198.254 198.254 198.254 198.254 198.2549,8

9,29,39,49,59,69,7

8,98,108,11

99,1

8,38,48,58,68,78,8

7,417,42

88,18,2

7,357,367,377,387,397,40

7,297,307,31

7,32

7,337,34

7,237,247,257,267,277,28

7,177,187,197,207,217,22

7,117,127,137,147,157,16

7,97,10

Page 6: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNHOJA PUERTA FORTEC 0.91 UN 224.714 224.714 224.714 224.714 224.714 224.714 224.714HOJA PUERTA FORTEC 1.50 UN 330.554 330.554 330.554 330.554 330.554 330.554 330.554HOJA ENTAMBORADA PUERTA INTERÉS SOCIAL 0.76-1.10 UN 125.488 125.488 125.488 125.488 125.488 125.488 125.488HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 166.501 166.501 166.501 166.501 166.501 166.501 166.501HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 185.023 185.023 185.023 185.023 185.023 185.023 185.023HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 470.794 470.794 470.794 470.794 470.794 470.794 470.794PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 42.032 42.032 42.032 42.032 42.032 42.032 42.032PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 26.305 26.305 26.305 26.305 26.305 26.305 26.305VENTANERÍA EN MADERA CEDRO MACHO M2 99.389 99.389 99.389 99.389 99.389 99.389 99.389CERRADURA DE ENTRADA PRINCIPAL UN 120.518 120.518 120.518 120.518 120.518 120.518 120.518SUMINISTRO E INSTALACIÓN CERROJO DOBLE UN 93.661 93.661 93.661 93.661 93.661 93.661 93.661SUMINISTRO E INSTALACIÓN CERRADURA DE POMO ENTRADA UN 29.151 29.151 29.151 29.151 29.151 29.151 29.151SUMINISTR E INSTALACIÓN CERRADURA DE POMO ALCOBA UN 29.151 29.151 29.151 29.151 29.151 29.151 29.151SUMINISTRO E INSTALACIÓN CERRADURA DE POMO BAÑO UN 27.643 27.643 27.643 27.643 27.643 27.643 27.643ESPEJO INCOLORO 3 MM SIN BISELAR M2 42.322 42.322 42.322 42.322 42.322 42.322 42.322ESPEJO BISELADO INCOLORO 4 MM M2 52.344 52.344 52.344 52.344 52.344 52.344 52.344VIDRIO ESMERILADO INCOLORO 4 MM M2 63.033 63.033 63.033 63.033 63.033 63.033 63.033VIDRIO ESMERILADO INCOLORO 5 MM M2 75.728 75.728 75.728 75.728 75.728 75.728 75.728VIDRIO TEMPLADO PULIDO 10 MM M2 355.850 355.850 355.850 355.850 355.850 355.850 355.850VIDRIO TEMPLADO PULIDO 8 MM M2 248.951 248.951 248.951 248.951 248.951 248.951 248.951VIDRIO TRANSPARENTE 3 MM M2 33.636 33.636 33.636 33.636 33.636 33.636 33.636VIDRIO TRANSPARENTE 4 MM M2 42.990 42.990 42.990 42.990 42.990 42.990 42.990VIDRIO TRANSPARENTE 5 MM M2 52.344 52.344 52.344 52.344 52.344 52.344 52.344VIDRIO TRANSPARENTE 6 MM M2 65.706 65.706 65.706 65.706 65.706 65.706 65.706

CARPINTERÍA METÁLICACAJA CONTADOR DE AGUA UN 75.909 75.909 75.909 75.909 75.909 75.909 75.909CELOSÍA ALUMINIO 100CM X 60 CM M2 210.280 210.280 210.280 210.280 210.280 210.280 210.280ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)

ML 80.503 80.503 80.503 80.503 80.503 80.503 80.503

MARCO PARA PUERTA EN LÁMINA CAL 18 -0.8 UN 144.547 144.547 144.547 144.547 144.547 144.547 144.547MARCO TAPA CAJA DE INSPECCIÓN UN 136.338 136.338 136.338 136.338 136.338 136.338 136.338MARQUESINA EN LÁMINA COLD ROLLED CAL.16 M2 89.523 89.523 89.523 89.523 89.523 89.523 89.523PUERTA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 210.728 210.728 210.728 210.728 210.728 210.728 210.728PUERTA VENTANA EN LÁMINA CAL 18 INC. ANTICORROSIVO M2 109.917 109.917 109.917 109.917 109.917 109.917 109.917CERCHA PARA CUBIERTA EN ÁNGULO INC. ANTICORROSIVO KG 6.603 6.603 6.603 6.603 6.603 6.603 6.603CERRAMIENTO MALLA ESLABONADA C. 10 INC. ÁNGULO (PARAL EN TUBO ESTRUCTURAL GALVANIZADO 2")

M2 99.771 99.771 99.771 99.771 99.771 99.771 99.771

CERRAMIENTO EN POSTES Y PANELES GALVANIZADOS (REJA CLASICA) H: 2.00 MTS M2 120.590 120.590 120.590 120.590 120.590 120.590 120.590CORREA 2 D=1/2" 1 D=1/2" CELOSÍA EN 3/8" INC. ANTICORROSIVO ML 41.066 41.066 41.066 41.066 41.066 41.066 41.066DIVISIÓN DE BAÑO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 535.821 535.821 535.821 535.821 535.821 535.821 535.821DIVISIÓN BAÑO ALUMINIO Y ACRÍLICO H= 1.8 M M2 192.995 192.995 192.995 192.995 192.995 192.995 192.995PANEL PARA BAÑO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTÁTICA M2 217.124 217.124 217.124 217.124 217.124 217.124 217.124

DIVISIÓN PARA BAÑO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y ACCESORIOS) M2 488.889 488.889 488.889 488.889 488.889 488.889 488.889

REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 128.586 128.586 128.586 128.586 128.586 128.586 128.586PUERTA CORTINA INCLUYE ESMALTE M2 390.597 390.597 390.597 390.597 390.597 390.597 390.597SUMINISTRO E INSTALACIÓN TEMPLETES 3/8" INC. ANTICORROSIVO ML 6.029 6.029 6.029 6.029 6.029 6.029 6.029VENTANA EN ALUMINIO CORREDIZA M2 275.055 275.055 275.055 275.055 275.055 275.055 275.055VENTANA LÁMINA CALIBRE 18 INC. ANTICORROSIVO M2 122.302 122.302 122.302 122.302 122.302 122.302 122.302REJILLA PISO 0.30 M M2 85.999 85.999 85.999 85.999 85.999 85.999 85.999TAPA SHUT EN LÁMINA COLD ROLLED CAL.16 UN 88.857 88.857 88.857 88.857 88.857 88.857 88.857

CELOSÍA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

KG 10.591 10.591 10.591 10.591 10.591 10.591 10.591

10,22

10,23

10,1610,1710,1810,1910,2010,21

10,10

10,1110,1210,1310,14

10,15

10,410,510,610,710,810,9

10,10(1)

9,32

1010,110,2

10,3

9,269,279,289,299,309,31

9,209,219,229,239,249,25

9,149,159,169,179,189,19

9,99,109,119,129,13

Page 7: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNCELOSÍA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA.CONTEMPLA TAMBIEN:FABRICACIÓN, SUMINISTRO, MONTAJE

KG 11.739 11.739 11.739 11.739 11.739 11.739 11.739

ESTRUCTURA EN PERFILES LÁMINA DELGADA (LÁMINA CR), PARA POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERÍA, PINTURA Y PLATINERÍA. CONTEMPLA TAMBIÉN:FABRICACIÓN, SUMINISTRO Y MONTAJE

KG 9.357 9.357 9.357 9.357 9.357 9.357 9.357

INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIOACOMETIDA EN PVC 1/2" 5M UN 221.305 221.305 221.305 221.305 221.305 221.305 221.305ACOMETIDA EN PVC 3/4" 5M UN 266.453 266.453 266.453 266.453 266.453 266.453 266.453BAJANTE AGUAS LLUVIAS PVC 3" ML 22.071 22.071 22.071 22.071 22.071 22.071 22.071BAJANTE AGUAS LLUVIAS PVC 4" ML 34.622 34.622 34.622 34.622 34.622 34.622 34.622BAJANTE AGUAS RESIDUALES PVC 3" ML 33.271 33.271 33.271 33.271 33.271 33.271 33.271BAJANTE AGUAS RESIDUALES PVC 4" ML 42.601 42.601 42.601 42.601 42.601 42.601 42.601BAJANTE AGUAS RESIDUALES PVC 6" ML 87.688 87.688 87.688 87.688 87.688 87.688 87.688CONEXIÓN TANQUE ELEVADO PVC UN 222.656 222.656 222.656 222.656 222.656 222.656 222.656INSTALACIÓN APARATO SANITARIO UN 44.278 44.278 44.278 44.278 44.278 44.278 44.278INSTALACIÓN BOMBAS AGUA UN 616.334 616.334 616.334 616.334 616.334 616.334 616.334INSTALACIÓN EQUIPO HIDRONEUMÁTICO UN 1.268.924 1.268.924 1.268.924 1.268.924 1.268.924 1.268.924 1.268.924LLAVE MANGUERA UN 35.110 35.110 35.110 35.110 35.110 35.110 35.110NIPLE PASAMURO 2" UN 66.957 66.957 66.957 66.957 66.957 66.957 66.957NIPLE PASAMURO 4" UN 100.000 100.000 100.000 100.000 100.000 100.000 100.000PUNTO AGUA CALIENTE CPVC UN 84.218 84.218 84.218 84.218 84.218 84.218 84.218PUNTO HIDRÁULICO PVC-P/PARAL 1/2" UN 61.675 61.675 61.675 61.675 61.675 61.675 61.675PUNTO HIDÁULICO PVC-P/PARAL 3/4" UN 65.548 65.548 65.548 65.548 65.548 65.548 65.548PUNTO HIDRÁULICO PVC-P/PARAL 1 1/4" UN 82.818 82.818 82.818 82.818 82.818 82.818 82.818SALIDA SANITARIA PVC-S/PARAL 2" UN 66.593 66.593 66.593 66.593 66.593 66.593 66.593SALIDA SANITARIA PVC-S/PARAL 3" UN 83.122 83.122 83.122 83.122 83.122 83.122 83.122SALIDA SANITARIA PVC-S/PARAL 4" UN 88.849 88.849 88.849 88.849 88.849 88.849 88.849SALIDA SANITARIA PVC-S/SIFON 3" UN 73.422 73.422 73.422 73.422 73.422 73.422 73.422RED SUMINISTRO CPVC 1/2" ML 12.464 12.464 12.464 12.464 12.464 12.464 12.464RED SUMINISTRO CPVC 3/4" ML 17.509 17.509 17.509 17.509 17.509 17.509 17.509RED SUMINISTRO PVC 1 1/2" ML 22.869 22.869 22.869 22.869 22.869 22.869 22.869RED SUMINISTRO PVC 1" ML 14.151 14.151 14.151 14.151 14.151 14.151 14.151RED SUMINISTRO PVC 1/2" ML 8.470 8.470 8.470 8.470 8.470 8.470 8.470RED SUMINISTRO PVC 2 1/2" ML 50.842 50.842 50.842 50.842 50.842 50.842 50.842RED SUMINISTRO PVC 2" ML 32.555 32.555 32.555 32.555 32.555 32.555 32.555RED SUMINISTRO PVC 3/4" ML 10.595 10.595 10.595 10.595 10.595 10.595 10.595RED SANITARIA PVC-S 2" ML 25.184 25.184 25.184 25.184 25.184 25.184 25.184RED SANITARIA PVC-S 3" ML 34.910 34.910 34.910 34.910 34.910 34.910 34.910RED SANITARIA PVC-S 4" ML 47.354 47.354 47.354 47.354 47.354 47.354 47.354RED SANITARIA PVC-S 6" ML 88.309 88.309 88.309 88.309 88.309 88.309 88.309REGISTRO 1" UN 107.435 107.435 107.435 107.435 107.435 107.435 107.435REGISTRO 1/2" UN 59.925 59.925 59.925 59.925 59.925 59.925 59.925REGISTRO 3/4" UN 76.224 76.224 76.224 76.224 76.224 76.224 76.224REGISTRO 1 1/2" UN 183.905 183.905 183.905 183.905 183.905 183.905 183.905REGISTRO 2 1/2" UN 378.886 378.886 378.886 378.886 378.886 378.886 378.886REGISTRO 2" UN 280.079 280.079 280.079 280.079 280.079 280.079 280.079REVENTILACIÓN 2" ML 17.580 17.580 17.580 17.580 17.580 17.580 17.580REVENTILACIÓN 3" ML 22.178 22.178 22.178 22.178 22.178 22.178 22.178TANQUE PLÁSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 172.471 172.471 172.471 172.471 172.471 172.471 172.471TANQUE PLÁSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIÓN) UN 280.413 280.413 280.413 280.413 280.413 280.413 280.413TANQUE PLÁSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIÓN) UN 466.395 466.395 466.395 466.395 466.395 466.395 466.395TUBERÍA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 40.332 40.332 40.332 40.332 40.332 40.332 40.332

TUBERÍA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 47.544 47.544 47.544 47.544 47.544 47.544 47.544

TUBERÍA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 61.145 61.145 61.145 61.145 61.145 61.145 61.145

11,4311,4411,4511,46

11,47

11,48

11,3711,3811,3911,4011,4111,42

11,3111,3211,3311,3411,3511,36

11,2511,2611,2711,2811,2911,30

11,1911,2011,2111,2211,2311,24

11,1311,1411,1511,1611,1711,18

11,711,811,9

11,1011,1111,12

11,111,211,311,411,511,6

10,24

10,25

11

Page 8: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNTUBERÍA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 69.198 69.198 69.198 69.198 69.198 69.198 69.198

TUBERÍA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 89.146 89.146 89.146 89.146 89.146 89.146 89.146

TUBERÍA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 103.501 103.501 103.501 103.501 103.501 103.501 103.501TUBERÍA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES) ML 153.176 153.176 153.176 153.176 153.176 153.176 153.176PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 1/2" UN 61.809 61.809 61.809 61.809 61.809 61.809 61.809PUNTO HIDRÁULICO PARA ROCIADOR AUTOMÁTICO 3/4" UN 62.059 62.059 62.059 62.059 62.059 62.059 62.059ROCIADOR AUTOMÁTICO 1/2" K=5.6 PENDIENTE UL-FM UN 39.918 39.918 39.918 39.918 39.918 39.918 39.918ROCIADOR AUTOMÁTICO 3/4" K=8.1 PENDIENTE UL-FM UN 49.126 49.126 49.126 49.126 49.126 49.126 49.126PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO DE HASTA 2" ML 4.155 4.155 4.155 4.155 4.155 4.155 4.155PINTURA PARA TUBERÍA RED DE INCENDIOS CON DIÁMETRO MAYOR A 2" ML 6.539 6.539 6.539 6.539 6.539 6.539 6.539GABINETE TIPO III UN 1.011.365 1.011.365 1.011.365 1.011.365 1.011.365 1.011.365 1.011.365GABINETE TIPO I UN 773.488 773.488 773.488 773.488 773.488 773.488 773.488SIAMESA INYECCIÓN 4" X 2 1/2" X 2 1/2" UN 2.591.036 2.591.036 2.591.036 2.591.036 2.591.036 2.591.036 2.591.036SIAMESA INYECCIÓN 3" X 2 1/2" X 2 1/2" UN 2.160.708 2.160.708 2.160.708 2.160.708 2.160.708 2.160.708 2.160.708VÁLVULA MARIPOSA 3" UN 629.510 629.510 629.510 629.510 629.510 629.510 629.510VÁLVULA MARIPOSA 4" UN 813.673 813.673 813.673 813.673 813.673 813.673 813.673VÁLVULA DE TOMA Y EXPULSIÓN DE AIRE 1" UN 312.322 312.322 312.322 312.322 312.322 312.322 312.322

INSTALACIONES ELÉCTRICASACOMETIDA AÉREA 10 M. PVC UN 362.201 362.201 362.201 362.201 362.201 362.201 362.201SALIDA LÁMPARA TOMA PVC COMPLETA UN 57.544 57.544 57.544 57.544 57.544 57.544 57.544SALIDA LÁMPARA TOMA EMT COMPLETA UN 68.076 68.076 68.076 68.076 68.076 68.076 68.076SALIDA LÁMPARA. CONMUTABLE PVC COMPLETA UN 75.637 75.637 75.637 75.637 75.637 75.637 75.637SALIDA LÁMPARA CONMUTABLE EMT COMPLETA UN 89.027 89.027 89.027 89.027 89.027 89.027 89.027SALIDA TELÉFONO PVC COMPLETA UN 54.133 54.133 54.133 54.133 54.133 54.133 54.133SALIDA TIMBRE PVC COMPLETA UN 61.676 61.676 61.676 61.676 61.676 61.676 61.676STRIP TELEFÓNICO 10 PARES UN 142.660 142.660 142.660 142.660 142.660 142.660 142.660SALIDA TOMA DOBLE PVC COMPLETA UN 55.559 55.559 55.559 55.559 55.559 55.559 55.559SALIDA TRIFÁSICA PVC COMPLETA UN 127.623 127.623 127.623 127.623 127.623 127.623 127.623SALIDA T.V PVC COMPLETA. UN 76.376 76.376 76.376 76.376 76.376 76.376 76.376SALIDA BIFÁSICA C.N. UN 45.280 45.280 45.280 45.280 45.280 45.280 45.280TABLERO PARCIAL 4 CIRCUITOS UN 95.570 95.570 95.570 95.570 95.570 95.570 95.570TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 408.196 408.196 408.196 408.196 408.196 408.196 408.196TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 543.435 543.435 543.435 543.435 543.435 543.435 543.435TUBERÍA PVC CONDUIT 1/2" ML 3.518 3.518 3.518 3.518 3.518 3.518 3.518TUBERÍA PVC CONDUIT 3/4" ML 4.646 4.646 4.646 4.646 4.646 4.646 4.646TUBERÍA PVC CONDUIT 1" ML 7.225 7.225 7.225 7.225 7.225 7.225 7.225TUBERÍA PVC CONDUIT 1 1/2" ML 12.927 12.927 12.927 12.927 12.927 12.927 12.927LÍNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 271.478 271.478 271.478 271.478 271.478 271.478 271.478LÁMPARA 2X32 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 76.799 76.799 76.799 76.799 76.799 76.799 76.799LÁMPARA 2X48 BAJO PLACA LÁMINA LATERAL INDUSTRIAL UN 103.812 103.812 103.812 103.812 103.812 103.812 103.812LÁMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 42.623 42.623 42.623 42.623 42.623 42.623 42.623POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1.393.932 1.393.932 1.393.932 1.393.932 1.393.932 1.393.932 1.393.932POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 1.033.174 1.033.174 1.033.174 1.033.174 1.033.174 1.033.174 1.033.174POSTE METÁLICO 6M UN 1.287.382 1.287.382 1.287.382 1.287.382 1.287.382 1.287.382 1.287.382FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 598.233 598.233 598.233 598.233 598.233 598.233 598.233APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 109.552 109.552 109.552 109.552 109.552 109.552 109.552LUMINARIA 70W SODIO UN 501.821 501.821 501.821 501.821 501.821 501.821 501.821LUMINARIA 150W SODIO UN 627.674 627.674 627.674 627.674 627.674 627.674 627.674REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1.656.913 1.656.913 1.656.913 1.656.913 1.656.913 1.656.913 1.656.913REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1.220.321 1.220.321 1.220.321 1.220.321 1.220.321 1.220.321 1.220.321

PISOS BASESALISTADO ENDURECIDO 1:3, E=0.04 M2 41.004 41.778 42.508 41.821 41.993 42.379 41.563ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 40.616 41.390 42.120 41.433 41.604 41.991 41.175ALISTADO PARA LISTÓN M2 15.017 15.171 15.317 15.180 15.214 15.292 15.128ALISTADO PISOS 1:3, E=0.04 M2 30.528 32.075 33.536 32.161 32.504 33.278 31.645

13,213,313,4

12,3012,3112,32

1313,1

12,2412,2512,2612,2712,2812,29

12,1812,1912,2012,2112,2212,23

12,1212,1312,1412,1512,1612,17

12,612,712,812,9

12,1012,11

1212,112,212,312,412,5

11,6111,6211,6311,6411,65

11,5511,5611,5711,5811,5911,60

11,49

11,50

11,5111,5211,5311,54

Page 9: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNALISTADO TERRAZAS 1:3, E= 0.08 M2 87.277 88.824 90.285 88.910 89.253 90.027 88.394CAÑUELA CONCRETO 2000 PSI 0.20X0.12 ML 26.801 27.201 27.578 27.223 27.312 27.512 27.090CONCRETO BASE GRADAS 2500 PSI M2 58.003 59.995 61.876 60.105 60.548 61.544 59.441CONCRETO ESTRIADO RAMPAS 2500 PSI M2 80.381 83.568 86.578 83.745 84.453 86.047 82.683MANTO FIBERGLASS 600X1 M2 30.379 30.379 30.379 30.379 30.379 30.379 30.379PEGANTE MORTERO-CONCRETO M2 23.077 23.077 23.077 23.077 23.077 23.077 23.077PERMA PLY 2 CAPAS M2 27.117 27.117 27.117 27.117 27.117 27.117 27.117PLACA BASE CONCRETO 0.08 2500 PSI M2 47.205 48.998 50.691 49.097 49.496 50.392 48.500PLACA BASE CONCRETO 0.10 2500 PSI M2 55.301 57.492 59.561 57.614 58.101 59.196 56.883PLACA BASE CONCRETO 0.15 2500 PSI M2 80.126 83.512 86.709 83.700 84.452 86.145 82.571TRITURADO FINO 1/2 M3 90.253 102.601 114.265 103.288 106.032 112.207 99.171TRITURADO GRUESO 3/4 M3 96.928 107.658 126.946 111.040 111.832 125.954 104.677

PISOS,ACABADOS,ENCHAPES Y ACCESORIOSBALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 57.866 58.175 58.467 58.192 58.261 58.416 58.089BALDOSA CERÁMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 34.604 34.759 34.905 34.767 34.802 34.879 34.716ADOQUÍN CONCRETO 6CM M2 66.844 67.618 68.348 67.661 67.833 68.219 67.403ADOQUÍN CONCRETO 8CM M2 70.144 70.918 71.648 70.961 71.133 71.519 70.703ADOQUÍN GRES PEATONAL M2 74.404 75.178 75.908 75.221 75.392 75.779 74.963BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO. INCLUYE ALISTADO

M2 75.989 76.299 76.591 76.316 76.385 76.539 76.213

GRAVILLA PARA GRADAS ML 37.928 38.227 38.510 38.244 38.311 38.460 38.144ACABADO EN GRANITO (INCLUYE DILATACIÓN EN BRONCE Y PULIDA) M2 166.444 167.836 169.151 167.914 168.223 168.919 167.450ACABADO EN GRAVILLA LAVADA M2 47.729 48.482 49.194 48.524 48.691 49.068 48.273GUARDAESCOBA EN GRANITO ML 44.207 44.207 44.207 44.207 44.207 44.207 44.207GUARDAESCOBA EN GRAVILLA ML 10.614 10.914 11.196 10.930 10.997 11.147 10.830GUARDAESCOBA PVC CARAMELO ML 9.390 9.390 9.390 9.390 9.390 9.390 9.390GUARDAESCOBA PVC CEDRO ML 12.595 12.595 12.595 12.595 12.595 12.595 12.595GUARDAESCOBA PINO CARIBE ML 10.590 10.590 10.590 10.590 10.590 10.590 10.590GUARDAESCOBA CEDRO BLANCO ML 17.675 17.675 17.675 17.675 17.675 17.675 17.675GUARDAESCOBA EN MADERA SAPAN ML 34.345 34.345 34.345 34.345 34.345 34.345 34.345GUARDAESCOBA GRES Y CERÁMICA ML 9.334 9.334 9.334 9.334 9.334 9.334 9.334LISTÓN M.H. AMARILLO M2 74.755 74.755 74.755 74.755 74.755 74.755 74.755PASO ESCALERA GRANITO ML 120.981 122.064 123.086 122.124 122.364 122.906 121.763PIRLANES ALUMINIO ML 7.647 7.647 7.647 7.647 7.647 7.647 7.647PIRLANES LADRILLO ML 32.273 32.474 32.665 32.486 32.530 32.631 32.418PISO VINILO TRÁFICO RESIDENCIAL M2 46.006 46.006 46.006 46.006 46.006 46.006 46.006PISO VINILO TRÁFICO PESADO M2 53.421 53.421 53.421 53.421 53.421 53.421 53.421PULIDA LACADA PISO MADERA M2 49.497 49.497 49.497 49.497 49.497 49.497 49.497TABLETA DE GRES 25X25 M2 50.290 50.599 50.891 50.616 50.685 50.840 50.513TABLÓN DE GRES LISO O RÚSTICO 33X 33 M2 56.341 56.650 56.942 56.667 56.736 56.891 56.564GUARDAESCOBA GRANO MÁRMOL P2; PAYANDE FONDO BLANCO ML 11.056 11.056 11.056 11.056 11.056 11.056 11.056ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 49.779 50.082 50.368 50.099 50.166 50.318 49.998JABONERA PORCELANA ACUARIO UN 20.681 20.681 20.681 20.681 20.681 20.681 20.681JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA Y PERCHA SIMPLE)

UN 123.591 123.591 123.591 123.591 123.591 123.591 123.591

REJILLA PLÁSTICA SOSCO 3X2 UN 10.054 10.054 10.054 10.054 10.054 10.054 10.054REJILLA SIFÓN CON SOSCO 4.5CM X 3.5CM UN 22.600 22.600 22.600 22.600 22.600 22.600 22.600REJILLA METÁLICA TRADICIONAL 3X2 SOSCO UN 14.553 14.553 14.553 14.553 14.553 14.553 14.553REJILLA PLÁSTICA VENTILACIÓN 20X20 UN 14.143 14.143 14.143 14.143 14.143 14.143 14.143REMATES BOCEL ALUMINIO ML 8.652 8.652 8.652 8.652 8.652 8.652 8.652REMATES BOCEL PORCELANA ML 8.802 8.802 8.802 8.802 8.802 8.802 8.802TAPA REGISTRO 20X20 UN 19.169 19.169 19.169 19.169 19.169 19.169 19.169TAPA REGISTRO 6X6 UN 17.483 17.483 17.483 17.483 17.483 17.483 17.483DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MÁRMOL N.5 M2 18.654 18.654 18.654 18.654 18.654 18.654 18.654DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MÁRMOL FUNDIDO EN SITIO M2 21.565 21.565 21.565 21.565 21.565 21.565 21.565CERÁMICA PISO TRÁFICO 5, CALIDAD PRIMERA M2 65.941 66.250 66.542 66.267 66.336 66.491 66.164MEDIA CAÑA EN GRANITO ML 77.514 77.514 77.514 77.514 77.514 77.514 77.514PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 34.603 34.603 34.603 34.603 34.603 34.603 34.603

14,3814,3914,4014,4114,4214,43

14,3214,3314,3414,3514,3614,37

14,2614,2714,2814,29

14,30

14,31

14,2014,2114,2214,2314,2414,25

14,1414,1514,1614,1714,1814,19

14,814,9

14,1014,1114,1214,13

14,214,314,414,5

14,6

14,7

13,1413,1513,16

1414,1

13,813,9

13,1013,1113,1213,13

13,513,613,7

Page 10: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNPINTURA ACRÍLICA PARA PISOS M2 13.350 13.350 13.350 13.350 13.350 13.350 13.350PRADIZACIÓN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 101.663 101.663 101.663 101.663 101.663 101.663 101.663GRAMA SINTÉTICA PARA CAMPOS DEPORTIVOS M2 123.182 123.182 123.182 123.182 123.182 123.182 123.182

CIELO RASOAPLIQUE YESO ML 72.849 72.849 72.849 72.849 72.849 72.849 72.849ARMADURA MADERA Y MALLA M2 36.321 36.321 36.321 36.321 36.321 36.321 36.321CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 55.761 55.761 55.761 55.761 55.761 55.761 55.761CIELO RASO DURACUSTIC M2 68.317 68.317 68.317 68.317 68.317 68.317 68.317CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 51.034 51.034 51.034 51.034 51.034 51.034 51.034CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 94.423 94.423 94.423 94.423 94.423 94.423 94.423CORNISAS YESO ML 48.869 48.869 48.869 48.869 48.869 48.869 48.869LISTÓN M.H. PINO ROMERÓN (INCLUYE ESTRUCTURA DE APOYO) M2 104.270 104.270 104.270 104.270 104.270 104.270 104.270MALLA CON VENA M2 13.586 13.586 13.586 13.586 13.586 13.586 13.586

EXCAVACIONES Y RELLENOSEXPLANACIÓN Y EXTENDIDA M3 5.627 5.627 5.627 5.627 5.627 5.627 5.627EXCAVACIONES VARIAS A MÁQUINA SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

M3 18.479 18.479 18.479 18.479 18.479 18.479 18.479

EXCAVACIÓN MANUAL ZANJA EN TIERRA H=1.0 M M3 25.905 25.905 25.905 25.905 25.905 25.905 25.905EXCAVACIÓN MANUAL EN MATERIAL COMÚN H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

M3 43.707 43.707 43.707 43.707 43.707 43.707 43.707

EXCAVACIÓN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYERETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

M3 49.987 49.987 49.987 49.987 49.987 49.987 49.987

EXCAVACIÓN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 85.005 85.005 85.005 85.005 85.005 85.005 85.005RELLENO CON MATERIAL DEL SITIO COMPACTADO MECÁNICAMENTE M3 19.114 19.114 19.114 19.114 19.114 19.114 19.114RELLENO EN RECEBO COMÚN COMPACTADO MECÁNICAMENTE M3 84.264 84.264 123.672 96.258 89.404 127.099 84.264RELLENO GRAVILLA DE RÍO COMPACTADO MECÁNICAMENTE M3 111.264 127.181 142.214 128.066 131.602 139.561 122.759RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADOMECÁNICAMENTE

M3 170.484 203.038 240.733 209.892 204.752 239.020 199.612

AFRIMADO (NORMA INVIAS 311) M3 75.956 75.956 115.364 87.950 87.950 115.364 75.956SUBBASE GRANULAR (NORMA INVIAS 320) M3 159.995 146.288 230.244 171.989 163.422 214.824 154.855BASE GRANULAR (NORMA INVIAS 330) M3 167.453 200.008 237.702 206.861 201.721 235.989 196.581

APARATOS SANITARIOSSUMINISTRO E INSTALACIÓN SANITARIO TANQUE (INCLUYE GRIFERÍA) UN 302.265 302.265 302.265 302.265 302.265 302.265 302.265SUMINISTRO E INSTALACIÓN SANITARIO FLUXÓMETRO (INCLUYE GRIFERÍA) UN 889.371 889.371 889.371 889.371 889.371 889.371 889.371SUMINISTRO E INSTALACIÓN SANITARIO INFANTIL (INCLUYE GRIFERÍA) UN 482.250 482.250 482.250 482.250 482.250 482.250 482.250SUMINISTRO E INSTALACIÓN LAVAMANOS COLGAR (INCLUYE GRIFERÍA) UN 140.548 140.548 140.548 140.548 140.548 140.548 140.548SUMINISTRO E INSTALACIÓN LAVAMANOS PEDESTAL (INCLUYE GRIFERÍA) UN 196.292 196.292 196.292 196.292 196.292 196.292 196.292SUMINISTRO E INSTALACIÓN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERÍA) UN 182.361 182.361 182.361 182.361 182.361 182.361 182.361SUMINISTRO E INSTALACIÓN ORINAL DE LLAVE (INCLUYE GRIFERÍA) UN 400.356 400.356 400.356 400.356 400.356 400.356 400.356SUMINISTRO E INSTALACIÓN ORINAL DE FLUXÓMETRO (INCLUYE GRIFERÍA) UN 1.022.652 1.022.652 1.022.652 1.022.652 1.022.652 1.022.652 1.022.652SUMINISTRO E INSTALACIÓN ORINAL INFANTIL (INCLUYE GRIFERÍA) UN 291.075 291.075 291.075 291.075 291.075 291.075 291.075SUMINISTRO E INSTALACIÓN DUCHA MEZCLADORA SIN SALIDA A BAÑERA UN 206.566 206.566 206.566 206.566 206.566 206.566 206.566SUMINISTRO E INSTALACIÓN DUCHA SENCILLA UN 82.701 82.701 82.701 82.701 82.701 82.701 82.701SUMINISTRO E INSTALACIÓN LAVAPLATOS DE EMPOTRAR EN ACERO INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

UN 249.797 249.797 249.797 249.797 249.797 249.797 249.797

SUMINISTRO E INSTALACIÓN LAVAPLATOS DE SOBREPONER EN ACERO INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERÍA)

UN 367.545 367.545 367.545 367.545 367.545 367.545 367.545

PINTURASIMPERMEABILIZACIÓN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 8.384 8.384 8.384 8.384 8.384 8.384 8.384ANTICORROSIVO SOBRE LÁMINA LINEAL ML 3.102 3.102 3.102 3.102 3.102 3.102 3.102ANTICORROSIVO SOBRE LÁMINA LLENA M2 11.200 11.200 11.200 11.200 11.200 11.200 11.200BARNIZ SOBRE MUEBLES M2 42.393 42.393 42.393 42.393 42.393 42.393 42.393CARBURO SOBRE PAÑETES M2 5.869 5.869 5.869 5.869 5.869 5.869 5.869COLORPLAST FACHADA SOBRE FACHADA M2 65.619 65.619 65.619 65.619 65.619 65.619 65.619DEMARCACIÓN CON MARMOLINA ML 3.496 3.496 3.496 3.496 3.496 3.496 3.496

18,318,418,518,618,7

17,12

17,13

1818,118,2

17,617,717,817,9

17,1017,11

1717,117,217,317,417,5

16,9

16,10

16,1116,1216,13

16,3

16,4

16,5

16,616,716,8

15,815,9

1616,1

16,2

15,215,315,415,515,615,7

14,4414,4514,46

1515,1

Page 11: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNESMALTE SOBRE LÁMINA LINEAL ML 2.785 2.785 2.785 2.785 2.785 2.785 2.785ESMALTE SOBRE LÁMINA LLENA M2 14.007 14.007 14.007 14.007 14.007 14.007 14.007ESMALTE SOBRE MADERA LINEAL ML 4.053 4.053 4.053 4.053 4.053 4.053 4.053ESMALTE SOBRE MADERA LLENA M2 14.767 14.767 14.767 14.767 14.767 14.767 14.767ESMALTE SOBRE MARCOS LÁMINA M2 5.752 5.752 5.752 5.752 5.752 5.752 5.752ESMALTE SOBRE MARCOS MADERA M2 6.551 6.551 6.551 6.551 6.551 6.551 6.551ESTUCO M2 7.067 7.067 7.067 7.067 7.067 7.067 7.067ESTUCO (LINEAL) ML 4.428 4.428 4.428 4.428 4.428 4.428 4.428ESTUCO Y VINILO 3 MANOS M2 15.598 15.598 15.598 15.598 15.598 15.598 15.598ESTUCO Y VINILO 3 MANOS (LINEAL) ML 9.678 9.678 9.678 9.678 9.678 9.678 9.678LACA PISOS MADERA M2 22.913 22.913 22.913 22.913 22.913 22.913 22.913LÍNEAS TRÁFICO 0.10 ML 2.701 2.701 2.701 2.701 2.701 2.701 2.701MARMOLINA SOBRE PAÑETE M2 12.197 12.197 12.197 12.197 12.197 12.197 12.197TINTILLA SOBRE MADERA LINEAL ML 3.292 3.292 3.292 3.292 3.292 3.292 3.292TINTILLA SOBRE MADERA LLENA M2 12.653 12.653 12.653 12.653 12.653 12.653 12.653VINILO SOBRE PAÑETE 2 MANOS M2 7.119 7.119 7.119 7.119 7.119 7.119 7.119VINILO SOBRE PAÑETE 2 MANOS (LINEAL) ML 4.480 4.480 4.480 4.480 4.480 4.480 4.480WASH-PRIMER SOBRE ALUMNIO M2 21.860 21.860 21.860 21.860 21.860 21.860 21.860PINTURA EPÓXICA M2 12.754 12.754 12.754 12.754 12.754 12.754 12.754PINTURA EPÓXICA (LINEAL) ML 7.886 7.886 7.886 7.886 7.886 7.886 7.886

DOTACIONES DEPORTIVASCANCHA MINIBALONCESTO Y/O MINIFÚTBOL (PAR) UN 6.051.426 6.051.426 6.051.426 6.051.426 6.051.426 6.051.426 6.051.426CANCHA MÚLTIPLE TUBO A.N. INCL.TABLERO ACRÍLICO CON RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)

UN 10.691.949 10.691.949 10.691.949 10.691.949 10.691.949 10.691.949 10.691.949

CANCHA PARA MICROFÚTBOL (PAR) UN 2.798.192 2.798.192 2.798.192 2.798.192 2.798.192 2.798.192 2.798.192CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 9.144.450 9.144.450 9.144.450 9.144.450 9.144.450 9.144.450 9.144.450CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 8.563.030 8.563.030 8.563.030 8.563.030 8.563.030 8.563.030 8.563.030DEMARCACIÓN CON PINTURA TIPO TRÁFICO E=0.10 M ML 2.701 2.701 2.701 2.701 2.701 2.701 2.701TABLERO PARA BALONCESTO EN ACRÍLICO 10 MM (PAR) UN 859.259 859.259 859.259 859.259 859.259 859.259 859.259MALLA NYLON PETROLIZADA VOLEIBOL UN 85.789 85.789 85.789 85.789 85.789 85.789 85.789SOPORTE MALLA VOLEIBOL CON TENSOR UN 1.554.250 1.554.454 1.554.648 1.554.466 1.554.511 1.554.614 1.554.398CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 675.763 680.489 684.952 680.751 681.802 684.165 679.176

INSTALACIONES RED GASESTUBERÍA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 29.398 29.398 29.398 29.398 29.398 29.398 29.398TUBERÍA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 43.637 43.637 43.637 43.637 43.637 43.637 43.637TUBERÍA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 54.087 54.087 54.087 54.087 54.087 54.087 54.087TUBERÍA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 17.661 17.661 17.661 17.661 17.661 17.661 17.661TUBERÍA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 21.385 21.385 21.385 21.385 21.385 21.385 21.385TUBERÍA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 29.143 29.143 29.143 29.143 29.143 29.143 29.143TUBERÍA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 26.161 26.161 26.161 26.161 26.161 26.161 26.161TUBERÍA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 27.578 27.578 27.578 27.578 27.578 27.578 27.578TUBERÍA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 34.470 34.470 34.470 34.470 34.470 34.470 34.470VÁLVULA DE BOLA GAS 1/2" UN 17.633 17.633 17.633 17.633 17.633 17.633 17.633VÁLVULA DE BOLA GAS 3/4" UN 23.103 23.103 23.103 23.103 23.103 23.103 23.103VÁLVULA DE BOLA GAS 1" UN 35.517 35.517 35.517 35.517 35.517 35.517 35.517VÁLVULA POLIETILENO GAS 1/2" UN 272.093 272.093 272.093 272.093 272.093 272.093 272.093VÁLVULA POLIETILENO GAS 3/4" UN 313.122 313.122 313.122 313.122 313.122 313.122 313.122VÁLVULA POLIETILENO GAS 1" UN 326.613 326.613 326.613 326.613 326.613 326.613 326.613ACOMETIDA GAS 1/2" ML 303.126 303.126 303.126 303.126 303.126 303.126 303.126

INSTALACIONES RED VOZ Y DATOSSENSOR DE HUMO FOTOELÉCTRICO UN 221.275 221.275 221.275 221.275 221.275 221.275 221.275CABLE DETECTOR LINEAL DE CALOR ML 33.884 33.884 33.884 33.884 33.884 33.884 33.884SIRENA DE 110 V UN 103.401 103.401 103.401 103.401 103.401 103.401 103.401CÁMARA CCTV UN 263.382 263.382 263.382 263.382 263.382 263.382 263.382PARLANTE-CIELO FALSO UN 52.056 52.056 52.056 52.056 52.056 52.056 52.056

21,421,5

20,16

21,121,121,221,3

20,1020,1120,1220,1320,1420,15

20,420,520,620,720,820,9

19,10

2020,120,220,3

19,419,519,619,719,819,9

18,27

1919,1

19,2

19,3

18,2118,2218,2318,2418,2518,26

18,1518,1618,1718,1818,1918,20

18,918,1018,1118,1218,1318,14

18,8

Page 12: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNAMPLIFICADOR 100W UN 572.510 572.510 572.510 572.510 572.510 572.510 572.510AMPLIFICADOR 300W UN 1.417.824 1.417.824 1.417.824 1.417.824 1.417.824 1.417.824 1.417.824ACOMETIDA CABLE RG-6 PARA MICRÓFONO ML 45.112 45.112 45.112 45.112 45.112 45.112 45.112MICRÓFONO PG 48LC (INCLUYE BASE) UN 221.224 221.224 221.224 221.224 221.224 221.224 221.224TOMA PARA MICRÓFONO UN 44.080 44.080 44.080 44.080 44.080 44.080 44.080CABLE BLINDADO STEREO PARA MICRÓFONO ML 3.761 3.761 3.761 3.761 3.761 3.761 3.761SPLITERS UN 6.305 6.305 6.305 6.305 6.305 6.305 6.305TUBERÍA CONDUIT EMT GALVANIZADA 1/2". ML 18.719 18.719 18.719 18.719 18.719 18.719 18.719TUBERÍA CONDUIT EMT GALVANIZADA 3/4". ML 24.516 24.516 24.516 24.516 24.516 24.516 24.516TUBERÍA CONDUIT EMT GALVANIZADA 1". ML 31.810 31.810 31.810 31.810 31.810 31.810 31.810BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 122.608 122.608 122.608 122.608 122.608 122.608 122.608TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 31.993 31.993 31.993 31.993 31.993 31.993 31.993BANDEJA PORTACABLES PARA RACK UN 104.525 104.525 104.525 104.525 104.525 104.525 104.525RACK 2' X 24" UN 184.206 184.206 184.206 184.206 184.206 184.206 184.206RACK 3' X 24" UN 288.724 288.724 288.724 288.724 288.724 288.724 288.724RACK 5' X 24" UN 358.996 358.996 358.996 358.996 358.996 358.996 358.996RACK 7' X 24" UN 392.071 392.071 392.071 392.071 392.071 392.071 392.071PATCH PANEL 48 PUERTOS CATEGORÍA 6A UN 575.240 575.240 575.240 575.240 575.240 575.240 575.240PATCH PANEL 24 PUERTOS CATEGORÍA 6A UN 339.172 339.172 339.172 339.172 339.172 339.172 339.172SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIÓN) UN 103.937 103.937 103.937 103.937 103.937 103.937 103.937PATCH CORD 2M CATEGORÍA 6A UN 13.826 13.826 13.826 13.826 13.826 13.826 13.826PATCH CORD 5M CATEGORÍA 6A UN 28.247 28.247 28.247 28.247 28.247 28.247 28.247CABLE UTP CATEGORÍA 6A ML 5.008 5.008 5.008 5.008 5.008 5.008 5.008CANALETA METÁLICA 4X6 CMS ML 35.332 35.332 35.332 35.332 35.332 35.332 35.332CANALETA METÁLICA 4X10 CMS ML 36.909 36.909 36.909 36.909 36.909 36.909 36.909CANALETA METÁLICA 6X10 CMS ML 37.696 37.696 37.696 37.696 37.696 37.696 37.696CANALETA PLÁSTICA 13X7 MM ML 24.590 24.590 24.590 24.590 24.590 24.590 24.590CANALETA PLÁSTICA 20X12 MM ML 27.183 27.183 27.183 27.183 27.183 27.183 27.183CANALETA PLÁSTICA 32X12 MM ML 28.273 28.273 28.273 28.273 28.273 28.273 28.273CANALETA PLÁSTICA 40X60 MM ML 47.424 47.424 47.424 47.424 47.424 47.424 47.424SWITCH 10/100/1000 24 PUERTOS UN 612.861 612.861 612.861 612.861 612.861 612.861 612.861SWITCH 10/100/1000 16 PUERTOS UN 315.107 315.107 315.107 315.107 315.107 315.107 315.107SWITCH 10/100/1000 8 PUERTOS UN 88.795 88.795 88.795 88.795 88.795 88.795 88.795CABLE TELEFÓNICO 2 PARES ML 1.839 1.839 1.839 1.839 1.839 1.839 1.839CABLE TELEFÓNICO 10 PARES ML 8.489 8.489 8.489 8.489 8.489 8.489 8.489CABLE TELEFÓNICO 20 PARES ML 12.640 12.640 12.640 12.640 12.640 12.640 12.640CABLE TELEFÓNICO 40 PARES ML 21.080 21.080 21.080 21.080 21.080 21.080 21.080CABLE TELEVISIÓN RG6 ML 3.914 3.914 3.914 3.914 3.914 3.914 3.914ACOMETIDA TELEFÓNICA 1/2" ML 22.462 22.462 22.462 22.462 22.462 22.462 22.462ACOMETIDA TELEFÓNICA 1" ML 32.628 32.628 32.628 32.628 32.628 32.628 32.628ACOMETIDA TELEVISIÓN 1" RG6" ML 19.421 19.421 19.421 19.421 19.421 19.421 19.421CABLE DE FIBRA ÓPTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIÓN) ML 15.389 15.389 15.389 15.389 15.389 15.389 15.389BANDEJA PARA FIBRA ÓPTICA HASTA 24 HILOS UN 617.751 617.751 617.751 617.751 617.751 617.751 617.751

21,4621,4721,48

21,4021,4121,4221,4321,4421,45

21,3421,3521,3621,3721,3821,39

21,2821,2921,3021,3121,3221,33

21,2221,2321,2421,2521,2621,27

21,1621,1721,1821,1921,2021,21

21,1021,1121,1221,1321,1421,15

21,621,721,821,9

Page 13: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNURBANISMOACUEDUCTOCODO 45 PVC UNIÓN MECÁNICA 2" UN 9.712 9.712 9.712 9.712 9.712 9.712 9.712CODO 45 PVC UNIÓN MECÁNICA 4" UN 90.456 90.456 90.456 90.456 90.456 90.456 90.456CODO 45 PVC UNIÓN MECÁNICA 8" UN 508.893 508.893 508.893 508.893 508.893 508.893 508.893CODO 45 PVC UNIÓN MECÁNICA 10" UN 1.086.136 1.086.136 1.086.136 1.086.136 1.086.136 1.086.136 1.086.136CODO 90 PVC UNIÓN MECÁNICA 4" UN 124.593 124.593 124.593 124.593 124.593 124.593 124.593CODO 90 PVC UNIÓN MECÁNICA 8" UN 758.339 758.339 758.339 758.339 758.339 758.339 758.339CODO 90 PVC UNIÓN MECÁNICA 10" UN 1.631.667 1.631.667 1.631.667 1.631.667 1.631.667 1.631.667 1.631.667COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2" X 1/2" UN 13.133 13.133 13.133 13.133 13.133 13.133 13.133COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 2 1/2" X 1/2" UN 16.172 16.172 16.172 16.172 16.172 16.172 16.172COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 3" X 1/2" UN 20.278 20.278 20.278 20.278 20.278 20.278 20.278COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 4" X 1/2" UN 22.183 22.183 22.183 22.183 22.183 22.183 22.183COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 1/2" UN 26.571 26.571 26.571 26.571 26.571 26.571 26.571COLLAR DE DERIVACIÓN PVC UNIÓN MECÁNICA 6" X 2" UN 26.571 26.571 26.571 26.571 26.571 26.571 26.571TAPÓN PVC UNIÓN MECÁNICA 3" UN 106.446 106.446 106.446 106.446 106.446 106.446 106.446TAPÓN PVC UNIÓN MECÁNICA 4" UN 123.312 123.312 123.312 123.312 123.312 123.312 123.312TAPÓN PVC UNIÓN MECÁNICA 8" UN 381.545 381.545 381.545 381.545 381.545 381.545 381.545TEE PVC UNIÓN MECÁNICA 2" UN 143.252 143.252 143.252 143.252 143.252 143.252 143.252TEE PVC UNIÓN MECÁNICA 4" UN 236.152 236.152 236.152 236.152 236.152 236.152 236.152TEE PVC UNIÓN MECÁNICA 8" UN 1.044.638 1.044.638 1.044.638 1.044.638 1.044.638 1.044.638 1.044.638TEE PVC UNIÓN MECÁNICA 10" UN 1.203.532 1.203.532 1.203.532 1.203.532 1.203.532 1.203.532 1.203.532TUBERÍA PVC UNIÓN MECÁNICA RDE 21 2" ML 14.207 14.207 14.207 14.207 14.207 14.207 14.207TUBERÍA PVC UNIÓN MECÁNICA RDE 26 2" ML 12.547 12.547 12.547 12.547 12.547 12.547 12.547TUBERÍA PVC UNIÓN MECÁNICA RDE 26 4" ML 30.772 30.772 30.772 30.772 30.772 30.772 30.772TUBERÍA PVC UNIÓN MECÁNICA RDE 26 8" ML 122.341 122.341 122.341 122.341 122.341 122.341 122.341TUBERÍA PVC UNIÓN MECÁNICA RDE 26 10" ML 182.032 182.032 182.032 182.032 182.032 182.032 182.032TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 4" ML 29.821 29.821 29.821 29.821 29.821 29.821 29.821TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 8" ML 102.612 102.612 102.612 102.612 102.612 102.612 102.612TUBERÍA PVC UNIÓN MECÁNICA RDE 32.5 10" ML 151.907 151.907 151.907 151.907 151.907 151.907 151.907UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 2 1/2" UN 30.108 30.108 30.108 30.108 30.108 30.108 30.108UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 4" UN 62.043 62.043 62.043 62.043 62.043 62.043 62.043UNIÓN RÁPIDA DE CONSTRUCCIÓN PVC 8" UN 249.574 249.574 249.574 249.574 249.574 249.574 249.574UNIÓN REPARACION PVC 4" UN 72.364 72.364 72.364 72.364 72.364 72.364 72.364UNIÓN REPARACIÓN PVC 8" UN 290.323 290.323 290.323 290.323 290.323 290.323 290.323UNIÓN REPARACIÓN UNIÓN Z PVC 6" UN 174.430 174.430 174.430 174.430 174.430 174.430 174.430UNIÓN REPARACIÓN UNIÓN Z PVC 10" UN 495.464 495.464 495.464 495.464 495.464 495.464 495.464VÁLVULA COMPUERTA ELÁSTICA 6" UN 1.325.851 1.325.851 1.325.851 1.325.851 1.325.851 1.325.851 1.325.851VÁLVULA COMPUERTA ELÁSTICA 8" UN 1.959.039 1.959.039 1.959.039 1.959.039 1.959.039 1.959.039 1.959.039

ALCANTARILLADO - EXCAVACIONESENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 10.785 10.785 10.785 10.785 10.785 10.785 10.785ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 24.666 24.666 24.666 24.666 24.666 24.666 24.666RELLENO CON MATERIAL DE EXCAVACIÓN M3 19.114 19.114 19.114 19.114 19.114 19.114 19.114RELLENO TIPO 1 "GRAVILLA" M3 64.505 74.775 84.475 75.346 77.628 82.763 71.922RELLENO TIPO 2 "RECEBO" M3 79.230 79.230 118.638 91.223 84.370 122.065 79.230RELLENO TIPO 4 "SUBBASE B-200" M3 81.016 81.016 120.424 93.010 93.010 120.424 81.016RELLENO TIPO 5 "TRITURADO GRUESO" M3 102.237 111.460 123.759 107.361 107.361 117.609 99.162RELLENO TIPO 6 "RAJÓN-PIEDRA" M3 83.186 103.037 126.021 107.216 104.081 124.976 100.947RELLENO TIPO 7 "ARENA DE PEÑA" M3 90.667 103.783 116.169 104.511 107.425 113.984 100.139

ALCANTARILLADO - TUBERÍACODO 45 PVC ALCANTARILLADO 8" UN 113.784 113.784 113.784 113.784 113.784 113.784 113.784CODO 45 PVC ALCANTARILLADO 16" UN 1.185.562 1.185.562 1.185.562 1.185.562 1.185.562 1.185.562 1.185.562CODO 90 PVC ALCANTARILLADO 8" UN 148.671 148.671 148.671 148.671 148.671 148.671 148.671CODO 90 PVC ALCANTARILLADO 16" UN 1.373.165 1.373.165 1.373.165 1.373.165 1.373.165 1.373.165 1.373.165CODO 90 PVC ALCANTARILLADO 24" UN 957.145 957.145 957.145 957.145 957.145 957.145 957.145SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 62.545 62.545 62.545 62.545 62.545 62.545 62.545

3,53,6

33,13,23,33,4

2,42,52,62,72,82,9

1,37

22,12,22,3

1,311,321,331,341,351,36

1,251,261,271,281,291,30

1,191,201,211,221,231,24

1,131,141,151,161,171,18

1,71,81,9

1,101,111,12

1,11,21,31,41,51,6

1

Page 14: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNSILLA TEE PVC ALCANTARILLADO 10 X 6" UN 112.953 112.953 112.953 112.953 112.953 112.953 112.953SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 266.630 266.630 266.630 266.630 266.630 266.630 266.630SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 266.623 266.623 266.623 266.623 266.623 266.623 266.623SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 428.017 428.017 428.017 428.017 428.017 428.017 428.017SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 113.001 113.001 113.001 113.001 113.001 113.001 113.001SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 113.001 113.001 113.001 113.001 113.001 113.001 113.001SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 266.630 266.630 266.630 266.630 266.630 266.630 266.630SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 266.630 266.630 266.630 266.630 266.630 266.630 266.630SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 428.017 428.017 428.017 428.017 428.017 428.017 428.017TUBERÍA CONCRETO CLASE II REFORZADO 24" ML 430.588 430.588 430.588 430.588 430.588 430.588 430.588TUBERÍA CONCRETO CLASE II REFORZADO 30" ML 698.576 698.576 698.576 698.576 698.576 698.576 698.576TUBERÍA CONCRETO CLASE II REFORZADO 44" ML 1.120.970 1.120.970 1.120.970 1.120.970 1.120.970 1.120.970 1.120.970TUBERÍA CONCRETO CLASE II SIN REFUERZO 10" ML 69.283 69.283 69.283 69.283 69.283 69.283 69.283TUBERÍA CONCRETO CLASE II SIN REFUERZO 24" ML 360.469 360.469 360.469 360.469 360.469 360.469 360.469TUBERÍA CONCRETO CLASE III REFORZADO 24" ML 403.378 403.378 403.378 403.378 403.378 403.378 403.378TUBERÍA CONCRETO CLASE III REFORZADO 44" ML 1.116.855 1.116.855 1.116.855 1.116.855 1.116.855 1.116.855 1.116.855TUBERÍA CONCRETO CLASE I SIN REFUERZO 10" ML 65.331 65.466 65.594 65.473 65.503 65.571 65.428TUBERÍA CONCRETO CLASE I SIN REFUERZO 24" ML 326.867 326.867 326.867 326.867 326.867 326.867 326.867TUBERÍA PVC ALCANTARILLADO 8" ML 49.684 49.684 49.684 49.684 49.684 49.684 49.684TUBERÍA PVC ALCANTARILLADO 10" ML 70.234 70.234 70.234 70.234 70.234 70.234 70.234TUBERÍA PVC ALCANTARILLADO 12" ML 101.316 101.316 101.316 101.316 101.316 101.316 101.316TUBERÍA PVC ALCANTARILLADO 16" ML 155.506 155.506 155.506 155.506 155.506 155.506 155.506TUBERÍA PVC ALCANTARILLADO REFORZADO 20" ML 249.851 249.851 249.851 249.851 249.851 249.851 249.851TUBERÍA PVC ALCANTARILLADO REFORZADO 24" ML 362.989 362.989 362.989 362.989 362.989 362.989 362.989TUBERÍA PVC ALCANTARILLADO REFORZADO 27" ML 459.213 459.213 459.213 459.213 459.213 459.213 459.213TUBERÍA PVC ALCANTARILLADO REFORZADO 33" ML 603.739 603.739 603.739 603.739 603.739 603.739 603.739TUBERÍA PVC ALCANTARILLADO REFORZADO 36" ML 830.148 830.148 830.148 830.148 830.148 830.148 830.148

ALCANTARILLADO - SUMIDEROS Y POZOSPLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 666.043 677.385 688.098 678.016 680.536 686.208 674.234CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

ML 660.371 670.225 679.532 670.773 672.962 677.889 667.488

CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

UN 708.798 716.360 723.502 716.780 718.460 722.242 714.259

PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON REFUERZO) UN 790.663 804.841 818.232 805.629 808.780 815.870 800.903CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAÑETE INTERNO E=1.5CM Y CAÑUELA)

ML 936.631 950.507 963.612 951.278 954.361 961.299 946.653

CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO (INCLUYE ARO Y TAPA HF)

UN 818.120 828.517 838.337 829.095 831.406 836.605 825.629

SUMIDERO EN LADRILLO SL-100 UN 992.981 998.680 1.004.066 998.996 1.000.263 1.003.116 997.097SUMIDERO EN LADRILLO SL-250 UN 1.440.001 1.456.382 1.471.860 1.457.292 1.460.932 1.469.130 1.451.832SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1.965.255 1.995.676 2.024.407 1.997.365 2.004.125 2.019.337 1.987.224SUMIDERO FUNDIDO EN SITIO SL-250 UN 2.612.395 2.662.962 2.710.722 2.665.770 2.677.008 2.702.295 2.648.914SUMIDERO PREFABRICADO SL-100 UN 1.819.462 1.819.462 1.819.462 1.819.462 1.819.462 1.819.462 1.819.462SUMIDERO PREFABRICADO SL-250 UN 3.845.704 3.845.704 3.845.704 3.845.704 3.845.704 3.845.704 3.845.704NIVELACIÓN DE POZOS DE INSPECCIÓN Di=1.20M, E=0.25M, H=0,21M(INCLUYE PAÑETE INTERNO Y DEMOLICIÓN)

UN 138.751 139.153 139.533 139.176 139.265 139.466 139.042

ANDENES Y SARDINELESADOQUÍN DE ARCILLA 20X10X6CM M2 72.620 73.326 73.993 73.365 73.522 73.876 73.130ADOQUÍN DE ARCILLA 20X10X8CM M2 85.984 86.690 87.357 86.729 86.886 87.240 86.494ANDÉN CONCRETO 2500 PSI EN SITIO E=0.1M M2 56.001 58.092 60.067 58.208 58.673 59.719 57.511ANDÉN CONCRETO 3000 PSI EN SITIO E=0.1M M2 60.303 62.288 64.163 62.399 62.840 63.832 61.737ANDÉN CONCRETO 3500 PSI EN SITIO E=0.1M M2 60.592 62.540 64.379 62.648 63.081 64.055 61.999BORDE SEPARADOR VERDE A-170 ML 251.887 252.289 252.669 252.312 252.401 252.602 252.178BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 18.431 18.682 18.919 18.696 18.751 18.877 18.612BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 40.088 41.562 42.954 41.644 41.971 42.708 41.152CAÑUELA PREFABRICADA TIPO A-120 ML 83.098 83.313 83.516 83.325 83.373 83.480 83.253CONTENEDOR DE RAÍCES TIPO A B-20 UN 556.086 560.885 565.418 561.152 562.218 564.618 559.552

5,95,10

5,35,45,55,65,75,8

4,12

4,13

55,15,2

4,6

4,74,84,9

4,104,11

44,1

4,2

4,3

4,4

4,5

3,293,303,313,323,33

3,233,243,253,263,273,28

3,173,183,193,203,213,22

3,113,123,133,143,153,16

3,73,83,9

3,10

Page 15: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNLOSETA PREFABRICADA A-40 M2 63.451 64.372 65.241 64.423 64.627 65.088 64.116LOSETA PREFABRICADA A-60 M2 91.252 92.172 93.042 92.224 92.428 92.888 91.917SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 33.239 34.033 34.782 34.077 34.253 34.650 33.812SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 53.436 55.043 56.561 55.132 55.489 56.293 54.597SARDINEL PREFABRICADO A-10 ML 99.223 103.219 107.800 104.027 103.478 107.566 102.762TABLETA PREFABRICADA A-20 (20X20CM ) M2 60.605 61.162 61.688 61.193 61.316 61.595 61.007

MOBILIARIO URBANOBANCA EN CONCRETO M-40 UN 201.213 202.158 203.051 202.211 202.421 202.894 201.896BANCA EN CONCRETO M-30 UN 659.769 661.092 662.342 661.166 661.460 662.122 660.725BOLARDO M-63 ALTO/HIERRO UN 212.868 213.068 213.257 213.079 213.124 213.224 213.013BOLARDO M-60 CONCRETO UN 160.731 161.865 162.936 161.928 162.180 162.747 161.550BOLARDO M-61 BAJO/CONCRETO UN 162.599 163.733 164.804 163.796 164.048 164.615 163.418BOLARDO M-62 BAJO/HIERRO UN 190.529 191.728 192.861 191.795 192.061 192.661 191.395BORDE CONTENEDOR DE RAICES A-70 ML 58.352 58.892 59.403 58.922 59.042 59.313 58.742BORDILLO PREFABRICADO A-80 ML 67.206 67.811 68.383 67.845 67.979 68.282 67.643CANECA M-120 UN 308.475 308.610 308.738 308.617 308.648 308.715 308.572CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 813.833 814.400 814.936 814.432 814.558 814.841 814.243HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 3.336.230 3.336.608 3.336.965 3.336.629 3.336.713 3.336.902 3.336.503HIDRANTE EXTREMO BRIDA D=4" TIPO TRÁFICO UN 3.431.994 3.432.372 3.432.729 3.432.393 3.432.477 3.432.666 3.432.267CICLOPARQUEADERO M100 TIPO 1 UN 480.038 480.438 480.816 480.460 480.549 480.749 480.327CICLOPARQUEADERO M101 TIPO 2 UN 636.073 637.672 639.183 637.761 638.117 638.916 637.228BANCA EN MADERA M-50 UN 528.344 528.344 528.344 528.344 528.344 528.344 528.344PROTECTOR DE ÁRBOL DE 2 TUBOS M-91 UN 245.617 246.184 246.719 246.215 246.341 246.625 246.026PROTECTOR DE ÁRBOL CIRCULAR M-90 UN 568.423 568.761 569.081 568.780 568.855 569.024 568.668POSTE HISTÓRICO M-131 UN 6.342.007 6.344.842 6.347.520 6.345.000 6.345.630 6.347.048 6.344.055

SEÑALIZACIÓNLÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 3.987 3.987 3.987 3.987 3.987 3.987 3.987MARCA VIAL CON PINTURA EN FRÍO M2 42.946 42.946 42.946 42.946 42.946 42.946 42.946SEÑAL DOBLE DE CICLORUTA UN 310.272 310.473 310.663 310.484 310.529 310.629 310.417SEÑALES DE TRÁNSITO INFORMATIVAS (1.4 X 0.95 M) UN 488.772 489.572 490.327 489.616 489.794 490.194 489.350SEÑAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 232.900 233.101 233.291 233.112 233.157 233.257 233.045SEÑAL DE TRÁNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 247.268 247.469 247.659 247.480 247.525 247.625 247.413SEÑAL DE TRÁNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 258.148 258.349 258.539 258.360 258.405 258.505 258.293TACHAS REFLECTIVAS UN 13.409 13.409 13.409 13.409 13.409 13.409 13.409SUMINISTRO E INSTALACIÓN DE ESTOPEROLES DE 10x3.0 CM UN 14.317 14.317 14.317 14.317 14.317 14.317 14.317TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE SUMINISTRO E INSTALACIÓN)

UN 116.349 116.349 116.349 116.349 116.349 116.349 116.349

7,77,87,9

7,10

7,17,27,37,47,57,6

6,156,166,176,18

7

6,96,106,116,126,136,14

6,36,46,56,66,76,8

5,155,16

66,16,2

5,115,125,135,14

Page 16: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓNVÍAS (SEGÚN ESPECIFICACIONES TÉCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES

1,1 201 P DEMOLICIÓN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

M3 152.777 152.777 152.777 152.777 152.777 152.777 152.777

1,2 201 P DEMOLICIÓN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

M3 53.673 53.673 53.673 53.673 53.673 53.673 53.673

1,3 200.1 DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

HA 2.613.971 2.613.971 2.613.971 2.613.971 2.613.971 2.613.971 2.613.971

1,4 200.2 DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

HA 933.801 933.801 933.801 933.801 933.801 933.801 933.801

1,5 201.7 DEMOLICIÓN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5KM)

M3 89.524 89.524 89.524 89.524 89.524 89.524 89.524

1,6 *** TRANSPORTE DE MATERIALES PROV. DE EXLANACIÓN, CANALES, PRESTAMOS, SOBREACARREOS Y DERRUMBES

M3-KM 1.318 1.318 1.318 1.318 1.318 1.318 1.318

2 NORMA INV EXPLANACIÓN Y EXCAVACIONES2,1 210.1.1 EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 9.548 9.548 9.548 9.548 9.548 9.548 9.5482,2 210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 35.190 35.190 35.190 35.190 35.190 35.190 35.1902,3 210.2.2 EXCAVACIÓN EN MATERIAL COMÚN DE LA EXPLANACIÓN, CANALES Y PRÉSTAMOS M3 8.749 8.749 8.749 8.749 8.749 8.749 8.7492,4 220.1 TERRAPLENES M3 14.967 14.967 14.967 14.967 14.967 14.967 14.9672,5 221.1 PEDRAPLÉN COMPACTO M3 13.068 13.068 13.068 13.068 13.068 13.068 13.0682,6 221.2 PEDRAPLÉN SUELTO M3 7.499 7.499 7.499 7.499 7.499 7.499 7.4992,7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 481 481 481 481 481 481 481

2,8 230.2 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO ÚNICAMENTEMATERIAL ADICIONADO

M3 12.832 12.832 12.832 12.832 12.832 12.832 12.832

2,9 600.1 EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

M3 20.948 20.948 20.948 20.948 20.948 20.948 20.948

2,10 600.2 EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

M3 64.804 64.804 64.804 64.804 64.804 64.804 64.804

2,11 600.3 EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

M3 79.577 79.577 79.577 79.577 79.577 79.577 79.577

2,12 600.4 EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

M3 19.035 19.035 19.035 19.035 19.035 19.035 19.035

2,13 600.4 P EXCAVACIONES VARIAS EN MATERIAL COMÚN SECO A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

M3 39.738 39.738 39.738 39.738 39.738 39.738 39.738

2,14 600.5 EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

M3 31.203 31.203 31.203 31.203 31.203 31.203 31.203

2,15 600.5 P EXCAVACIONES VARIAS EN MATERIAL COMÚN BAJO AGUA A MANO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)

M3 53.644 53.644 53.644 53.644 53.644 53.644 53.644

3 NORMA INV ESTRUCTURA DE PAVIMENTO3,1 460.1 FRESADO CONCRETO ASFÁLTICO (E=5-12 cm) M2 5.366 5.366 5.366 5.366 5.366 5.366 5.3663,2 320.1 SUBBASE GRANULAR M3 159.995 146.288 230.244 171.989 163.422 214.824 154.8553,3 330.1 BASE GRANULAR M3 167.453 200.008 237.702 206.861 201.721 235.989 196.581

3,4 365.1 EXCAVACIÓN PARA REPARACIÓN DEL PAVIMENTO EXISTENTE (INCLUYE RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)

M3 139.125 139.125 139.125 139.125 139.125 139.125 139.125

3,5 420.1 RIEGO DE IMPRIMACIÓN M2 3.182 3.182 3.182 3.182 3.182 3.182 3.1823,6 421.1 RIEGO DE LIGA CON EMULSIÓN ASFÁLTICA CRR-1 M2 1.111 1.111 1.111 1.111 1.111 1.111 1.1113,7 461.1 PAVIMENTO RECICLADO EN FRÍO EN EL LUGAR CON EMULSION ASFÁLTICA M3 218.295 221.282 224.103 221.448 222.112 223.605 220.4523,8 510.1 PAVIMENTO DE ADOQUINES DE CONCRETO M2 67.254 68.614 69.899 68.690 68.992 69.672 68.2363,9 450.1 P MEZCLA DENSA EN CALIENTE TIPO MDC-25 (INCLUYE CEMENTO ASFÁLTICO) M3 618.189 649.492 685.737 656.082 651.139 684.089 646.1973,10 450.2 P MEZCLA DENSA EN CALIENTE TIPO MDC-19 (INCLUYE CEMENTO ASFÁLTICO) M3 627.114 658.417 694.662 665.007 660.064 693.014 655.1223,11 450.9 P MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO ASFÁLTICO) M3 663.497 694.799 731.044 701.389 696.447 729.397 691.5043,12 450.3 P MEZCLA DENSA EN CALIENTE TIPO MDC-10 (INCLUYE CEMENTO ASFÁLTICO) M3 680.664 711.967 748.212 718.557 713.614 746.564 708.672

3,12(1) P MEZCLA ASFALTICA NATURAL M3 331.746 364.017 389.114 359.381 364.933 384.545 323.573

3,13 340.1 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-1 M3 313.092 345.646 383.341 352.500 347.360 381.628 342.2203,14 340.2 BASE ESTABILIZADA CON EMULSIÓN ASFÁLTICA TIPO BEE-2 M3 304.590 290.883 374.840 316.584 308.017 359.419 299.450

3,14(1) *** ESTABILIZACION DE SUELOS CON ESTABILIZANTE QUIMICO M3 38.019 38.019 38.019 38.019 38.019 38.019 38.019

Page 17: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓN3,14(2) *** ESTABILIZACION DE SUELOS CON NANO TECNOLOGIA M3 168.435 168.435 168.435 168.435 168.435 168.435 168.435

3,15 311.1 AFIRMADO M3 75.956 75.956 115.364 87.950 87.950 115.364 75.9563,16 431.1 TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIÓN CRR-2 M2 11.185 11.381 11.566 11.392 11.435 11.533 11.3273,17 430.1 TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIÓN CRR-2 M2 4.457 4.555 4.647 4.560 4.582 4.631 4.528

3,18 500.1 CONCRETO PARA PAVIMENTO RÍGIDO MR-38, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

M3 633.325 651.859 669.363 652.889 657.007 666.275 646.711

3,19 500.1 CONCRETO PARA PAVIMENTO RÍGIDO MR-41, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

M3 665.118 684.482 702.770 685.558 689.861 699.543 679.103

3,20 500.1 CONCRETO PARA PAVIMENTO RÍGIDO MR-43, INCLUYE SELLADO DE JUNTAS Y ACERO DE TRANSFERENCIA Y UNIÓN

M3 686.474 706.423 725.265 707.532 711.965 721.940 700.882

3,21 *** SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RÍGIDO (INCLUYE LIMPIEZA, SUMINISTRO E INSTALACIÓN DE FONDO Y SELLANTE)

ML 7.005 7.005 7.005 7.005 7.005 7.005 7.005

3,22 *** RAJÓN PARA MEJORAMIENTO DE LA SUBRASANTE M3 119.495 147.041 178.936 152.840 148.491 177.487 144.141

4 NORMA INV OBRAS DE ARTE4,1 630.1 CONCRETOS CLASE A, f´c =5000 psi. M3 908.150 929.173 949.029 930.341 935.013 945.525 923.3334,2 630.3 CONCRETOS CLASE C, f´c =4000 psi (placas) M3 782.354 803.028 822.555 804.177 808.771 819.109 797.2844,3 630.3 CONCRETOS CLASE C, f´c =4000 psi (vigas en puentes) M3 828.541 850.034 870.334 851.228 856.005 866.751 844.0634,4 630 P CONCRETOS f´c =3500 psi (bases) M3 564.008 582.742 600.435 583.782 587.945 597.313 577.5374,5 630 P CONCRETOS f´c =3500 psi (elevaciones) M3 659.944 679.419 697.813 680.501 684.829 694.567 674.0084,6 630.4 CONCRETOS CLASE D, f´c =3000 psi (bases) M3 561.229 580.322 598.355 581.383 585.626 595.174 575.0184,7 630.4 CONCRETOS CLASE D, f´c =3000 psi (elevaciones) M3 657.054 676.903 695.651 678.007 682.418 692.344 671.3904,8 630.4 CONCRETOS CLASE D, f´c =3000 psi (placas) M3 720.260 739.353 757.386 740.414 744.657 754.205 734.0494,9 630.4 CONCRETOS CLASE D, f´c =3000 psi (box-coulvert) M3 580.488 600.337 619.085 601.441 605.852 615.777 594.8244,10 630.4 CONCRETOS CLASE D, f´c =3000 psi (vigas en puentes) M3 763.988 783.837 802.585 784.941 789.352 799.277 778.3244,11 650 P SUMINISTRO,TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-36 KG 11.820 11.820 11.820 11.820 11.820 11.820 11.820

4,12 650 P SUMINISTRO, TRANSPORTE, FABRICACIÓN, ENSAMBLAJE Y MONTAJE DE ACERO A-588 GRADO B

KG 15.135 15.135 15.135 15.135 15.135 15.135 15.135

4,13 641.1 ACERO DE PREESFUERZO TON-M 1.779 1.779 1.779 1.779 1.779 1.779 1.779

4,14 621.1 PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIÁMETRO 1.50M, CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)

ML 2.663.527 2.663.527 2.663.527 2.663.527 2.663.527 2.663.527 2.663.527

4,15 621.1 P PILOTE EN CONCRETO DE 3000 PSI, DIÁMETRO 1.5M. CONSTRUCCIÓN MANUAL (INCLUYE EXCAVACIÓN EN CUALQUIER TIPO DE MATERIAL, REFUERZO Y ANILLOS)

ML 4.102.095 4.138.056 4.172.020 4.140.054 4.148.045 4.166.027 4.128.067

4,16 621.2 BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE REFUERZO) M3 1.710.980 1.729.884 1.747.739 1.730.935 1.735.136 1.744.589 1.724.6334,17 642.1 SUMINISTRO E INSTALACIÓN DE APOYOS ELASTOMÉRICOS U(DM3) 86.134 86.134 86.134 86.134 86.134 86.134 86.1344,18 632.1 BARANDAS DE CONCRETO DE 3000 PSI, H=1.05 M, D= 0.35 M ML 357.014 359.283 361.425 359.409 359.913 361.047 358.6534,19 632 P BARANDA METÁLICA ML 419.249 419.249 419.249 419.249 419.249 419.249 419.2494,20 *** DREN EN TUBERÍA PVC SANITARIA, D=4" (PUENTES) UN 16.741 16.741 16.741 16.741 16.741 16.741 16.7414,21 671.1 CUNETA DE CONCRETO CLASE E, 2500 PSI FUNDIDA EN EL LUGAR M3 482.887 503.402 547.028 511.922 516.481 543.609 497.7034,22 673.1 MATERIAL GRANULAR FILTRANTE M3 125.417 138.465 155.862 132.666 132.666 147.164 121.0674,23 610.1 RELLENO PARA ESTRUCTURAS M3 83.829 83.829 120.206 94.900 88.574 123.369 83.8294,24 630.6 CONCRETO CLASE F, 2000 PSI PARA SOLADOS Y ATRAQUES M3 376.609 396.796 415.863 397.917 402.404 412.499 391.1894,25 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA BASES M3 370.160 392.169 415.094 394.944 396.028 412.569 387.7844,26 630.7 CONCRETO CICLÓPEO CLASE G, 2000 PSI 40% RAJÓN PARA ELEVACIONES M3 378.803 400.812 423.737 403.587 404.671 421.212 396.4274,27 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA BASES M3 385.227 407.194 430.078 409.966 411.040 427.560 402.8204,28 630 P CONCRETO CICLÓPEO, 2500 PSI 40% RAJÓN PARA ELEVACIONES M3 393.870 415.837 438.721 418.609 419.683 436.203 411.4634,29 630.5 CONCRETO CLASE E, 2500 PSI PARA BASES M3 514.251 534.368 553.366 535.485 539.955 550.013 528.7794,30 630.5 CONCRETO CLASE E, 2500 PSI PARA ELEVACIONES M3 608.438 629.351 649.101 630.512 635.159 645.616 623.5414,31 681.1 GAVIÓN M3 205.311 231.605 262.051 237.140 232.989 260.667 228.8374,32 681.1 GAVIÓN MALLA PVC M3 209.412 235.706 266.152 241.242 237.090 264.768 232.9384,33 672.1 BORDILLO FUNDIDO EN SITIO DE 15X40 CM EN CONCRETO CLASE E, 2500 PSI ML 42.081 43.316 44.482 43.384 43.659 44.276 42.9734,34 672.1 BORDILLO FUNDIDO EN SITIO DE 15-20X15 CM EN CONCRETO CLASE E, 2500 PSI ML 16.205 16.822 17.405 16.857 16.994 17.303 16.651

4,35 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA BIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 25 KN)

M2 10.002 10.002 10.002 10.002 10.002 10.002 10.002

4,36 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-50 M2 14.235 14.235 14.235 14.235 14.235 14.235 14.235

4,37 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA DE REFUERZO BX-75 M2 19.138 19.138 19.138 19.138 19.138 19.138 19.138

Page 18: LISTA DE PRECIOS ICCU 2018

DESCRIPCIÓN UNIDADMu

Chocontá Machetá Manta Sesquilé Suesca Tiribita V.Pinzón

GOBERNACIÓN DE CUNDINAMARCALISTA DE PRECIOS CONSTRUCCIÓN, URBANISMO Y VÍAS (2018)

PROVINCIA: ALMEIDASESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIÓN Y TRANSPORTE

ÍTEM

CONSTRUCCIÓN4,38 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 100 KN)

M2 22.930 22.930 22.930 22.930 22.930 22.930 22.930

4,39 *** SUMINISTRO E INSTALACIÓN DE GEOMALLA UNIAXIAL DE REFUERZO (RESISTENCIA ÚLTIMA 165 KN)

M2 29.450 29.450 29.450 29.450 29.450 29.450 29.450

4,40 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 1800 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

M2 7.178 7.178 7.178 7.178 7.178 7.178 7.178

4,41 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

M2 8.174 8.174 8.174 8.174 8.174 8.174 8.174

4,42 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL NT 2500 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

M2 8.494 8.494 8.494 8.494 8.494 8.494 8.494

4,43 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1700 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

M2 6.063 6.063 6.063 6.063 6.063 6.063 6.063

4,44 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2100 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

M2 9.111 9.111 9.111 9.111 9.111 9.111 9.111

4,45 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 1400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

M2 7.437 7.437 7.437 7.437 7.437 7.437 7.437

4,46 *** SUMINISTRO E INSTALACIÓN DE GEOTEXTIL T 2400 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

M2 9.111 9.111 9.111 9.111 9.111 9.111 9.111

4,47 ***SUMINISTRO E INSTALACIÓN DE GEOTEXTIL TR 4000 (ESTABILIZACIÓN, FILTRO Y SEPARACIÓN)

M2 17.465 17.465 17.465 17.465 17.465 17.465 17.465

4,48 661.1 SUMINISTRO E INSTALACIÓN DE TUBERÍA DE CONCRETO REFORZADO Ø=36" CLASE I, INCLUYE EMBOQUILLADA

ML 622.267 622.579 622.874 622.596 622.666 622.822 622.492

4,49 660.3 SUMINISTRO E INSTALACIÓN TUBERÍA DE CONCRETO SIMPLE, DIÁMETRO 600 MM ML 356.874 361.273 365.429 361.518 362.495 364.696 360.0514,50 *** SUMINISTRO E INSTALACIÓN TUBERÍA EN PVC-ALCANTARILLADO, DIÁMETRO 36" ML 869.987 869.987 869.987 869.987 869.987 869.987 869.9874,51 680.3 RELLENO MATERIAL GRANULAR PARA TIERRA ARMADA M3 144.873 144.873 182.765 156.405 156.405 182.765 144.8734,52 640.1 SUMINISTRO FIGURADO Y ARMADO DE ACERO DE REFUERZO 60000 PSI KG 4.371 4.371 4.371 4.371 4.371 4.371 4.3714,53 *** GEODRÉN PLANAR H = 1.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 84.660 84.660 84.660 84.660 84.660 84.660 84.6604,54 *** GEODRÉN PLANAR H = 2.0 M D=100 MM (INCLUYE SUMINISTRO E INSTALACIÓN) ML 128.964 128.964 128.964 128.964 128.964 128.964 128.9644,55 *** SUMINISTRO E INSTALACIÓN DE BOLSACRETO M3 522.674 543.587 563.337 544.748 549.395 559.852 537.7774,56 682.1 P COLCHONETA RENO M3 221.162 247.457 277.902 252.992 248.840 276.518 244.6894,57 *** TRINCHO EN MADERA M2 67.016 67.016 67.016 67.016 67.016 67.016 67.016

5 NORMA INV SEÑALIZACIÓN5,1 700.1 LÍNEAS DE DEMARCACIÓN CON PINTURA EN FRÍO ML 3.987 3.987 3.987 3.987 3.987 3.987 3.9875,2 700.3 MARCA VIAL CON PINTURA EN FRÍO M2 42.946 42.946 42.946 42.946 42.946 42.946 42.9465,3 730.3 TOPE DEFENSA METÁLICA UN 82.585 82.585 82.585 82.585 82.585 82.585 82.5855,4 730.2 SECCIÓN FINAL DEFENSA METÁLICA UN 68.720 68.720 68.720 68.720 68.720 68.720 68.7205,5 730.1 DEFENSA METÁLICA ML 145.760 146.615 147.423 146.663 146.853 147.281 146.3785,6 701.1 SUMINISTRO E INSTALACIÓN DE TACHAS REFLECTIVAS UNIDIRECCIONALES UN 13.409 13.409 13.409 13.409 13.409 13.409 13.409

6 NORMA INV MANTENIMIENTO VIAL6,1 310.1 CONFORMACIÓN DE LA CALZADA EXISTENTE M2 835 835 835 835 835 835 835

6,2 801.6 LIMPIEZA DE ALCANTARILLAS CON DIÁMETRO MENOR O IGUAL A Ø= 36", INCLUYE RECTIFICACIÓN DE DESCOLES, Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

UN 131.984 131.984 131.984 131.984 131.984 131.984 131.984

6,3 801.7 LIMPIEZA DE PONTONES Y BOX COULVERT, INCLUYE RECTIFICACIÓN DE DESCOLES Y RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM

ML 25.566 25.566 25.566 25.566 25.566 25.566 25.566

6,4 211.1 REMOCIÓN DE DERRUMBES M3 8.310 8.310 8.310 8.310 8.310 8.310 8.3106,5 801.1 ROCERÍA (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM) HA 448.890 448.890 448.890 448.890 448.890 448.890 448.890

6,6 801.4 LIMPIEZA A MANO DE CUNETAS EN CONCRETO (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM)

M2 1.804 1.804 1.804 1.804 1.804 1.804 1.804

6,7 810.1 EMPRADIZACIÓN (INCLUYE 10 CM DE TIERRA NEGRA) M2 15.283 15.283 15.283 15.283 15.283 15.283 15.2836,8 810.3 EMPRADIZACIÓN CON BIOMANTO NATURAL M2 24.690 24.690 24.690 24.690 24.690 24.690 24.6906,9 *** PLÁSTICO DE PROTECCIÓN EN TALUD EXPUESTO M2 9.420 9.420 9.420 9.420 9.420 9.420 9.420

NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZARÁ EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONARÁ LA PROPORCIÓN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES DEL FABRICANTE, SEGÚN DISEÑO Y TIPO DE SUELO.