30
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE CERN u PS DiV!SION PS/DI/Note 95-01 (Info) January 1995 List of PS Divisional Notes 1994 AR PS/ AR/ Note 94-01 PS/ AR/ Note 94-02 PS/ AR/ Note 94-03 PS/ AR/ Note 94-04 PS/ AR/ Note 94-05 PS/ AR/ Note 94-06 PS/ AR/ Note 94-07 PS/ AR/ Note 94-08 PS/ AR/ Note 94-09 SAP Mtg 09 PS/ AR/ Note 94-10 SAP Mtg 10 PS/ AR/ Note 94-11 (Min.) (MD) (MD) (MD) (Info.) (Min.) (Min.) Minutes of the Forum of Symbolic Computing for Accelerator Physics held vn Friday 16December1993 M. lv!attini Low b's and D = 0 in LEAR without Additional Quadrupoles R. Giannini Summary of the MD'S on ECOOL - December 1993 Reported by]. Bosser (15.1.1994) Mesures sur le Refroidissement Stochastique de LEAR F. Caspers, M. Chanel, J.C. Perrier, E. Roux, /.L. Sanchez Ameliorations du Systeme de Refroidissement Stochastique Transversal de LEAR M. Chanel Effet de charge d'espace d'un faisceau refroidi par electrons en fonction du point de fonctionnement a LEAR M. Chanel Patrouille de securite dans le AAC /. Ottaviani et B. Williams Caracteristiques et perfonnances des differentes cibles utilisees au AA cntre 1980et1986 G. Adrian Minutes of the Forum of Symbolic Computing for Accelerator Physics M. Martini Minutes of the Forum of Symbolic Computing for Accelerator Physics M. Martini Magnetized Electron Beam Cooling Time for Heavy Ions /. Bosser, I. Meshkov, G. Tranquille 1

List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE

CERN u PS DiV!SION

PS/DI/Note 95-01 (Info)

January 1995

List of PS Divisional Notes 1994

AR

PS/ AR/ Note 94-01

PS/ AR/ Note 94-02

PS/ AR/ Note 94-03

PS/ AR/ Note 94-04

PS/ AR/ Note 94-05

PS/ AR/ Note 94-06

PS/ AR/ Note 94-07

PS/ AR/ Note 94-08

PS/ AR/ Note 94-09

SAP Mtg 09

PS/ AR/ Note 94-10

SAP Mtg 10

PS/ AR/ Note 94-11

(Min.)

(MD)

(MD)

(MD)

(Info.)

(Min.)

(Min.)

Minutes of the Forum of Symbolic Computing for Accelerator Physics held vn Friday 16December1993 M. lv!attini

Low b's and D = 0 in LEAR without Additional Quadrupoles

R. Giannini

Summary of the MD'S on ECOOL - December 1993

Reported by]. Bosser (15.1.1994)

Mesures sur le Refroidissement Stochastique de LEAR

F. Caspers, M. Chanel, J.C. Perrier, E. Roux, /.L. Sanchez

Ameliorations du Systeme de Refroidissement Stochastique Transversal de LEAR M. Chanel

Effet de charge d'espace d'un faisceau refroidi par electrons en fonction du point de fonctionnement a LEAR

M. Chanel

Patrouille de securite dans le AAC

/. Ottaviani et B. Williams

Caracteristiques et perfonnances des differentes cibles utilisees au AA cntre 1980et1986

G. Adrian

Minutes of the Forum of Symbolic Computing for Accelerator Physics

M. Martini

Minutes of the Forum of Symbolic Computing for Accelerator Physics

M. Martini

Magnetized Electron Beam Cooling Time for Heavy Ions

/. Bosser, I. Meshkov, G. Tranquille

1

Page 2: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PSI AR/ Note 94-12

PS/ AR/ Note 94-13 (Spec.)

PS/ AR/ Note 94-14

PSI ARI Note 94-15 (MD)

PS/ AR/ Note 94-16

PS/ AR/ Note 94-17 (Min.)

SAP Mtg 11

PS/ AR/ Note 94-18

PS/ AR/ Note 94-19

PS/ AR/ Note 94-20 (Min.)

SAP 12

PS/ AR/ Note 94-21 (Info.)

PS/ AR/ Note 94-22 (MD)

PS/ AR/ Note 94-23 (MD)

PS/ AR/ Note 94-24

Pbar Note 552 Fermilab

PS/ AR/ Note 94-25

SAP Mtg 13

Combined Longitudinal and Transverse Multiturn Injection in Heavy Ion Accumulator Ring

S. Maury and D. Mohl

Complement to the Official Agreement signed between CERN and Russia for Studies on the Neutralization of Dense Electron Beams

J. Bosser and I.N. Meshkov

Possible AAC Stacking Rate Improvements F. Caspers, 5. Maury, J.C. Schnuriger

LEAR MD Report: Bunched Beam Schottky Spectrum J. Bosser, F. Caspers, M. Chanel, M. Church (FNAL), S. Jacobson, S. Maury, and D. Mohl

Proposal to build a New Conical Converter Solenoid for LIL

J.C. Schnuriger

Minutes of the Forum of Symbolic Computing for Accelerator Physics

M. Martini

A collection of accelerator algorithms for the personal computer -Part II (e-e+ converter, linac, solenoid, pp- target, etc.)

J .-C. Schnuriger

Coherent instabilities of primary ions due to electron-cooling system in LEAR P. Zenkevitch, visitor from ITEP, Moscow

Symbolic computing for accelerator physics (Minutes of the forum held on 7.7.1994)

M. Martini

Ferrimagnetic resonance (FMR)A method to measure magnetic fields in accelerator environment (First results from PS)

F. Caspers

Compte rendu des MD effcctues entre mars et avril 1994

R. Ley

AAC - Compte rcndu des MD effectues de mars a juin 1994

C. Metzger

Deceleration and collider mode for the Fermilab antiproton accumulator M. Church and S. Maury

Symbolic computing for accelerator physics. (Minutes of the forum held on 3.11.1994)

M. Martini

2

)

Page 3: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ AR/ Note 94-26 (MD)

PS/ AR/ Note 94-27 (Spec.)

PS/ AR/ Note 94-28 (MD)

PS/ AR/ Note 94-29 (Min.)

BO

PS/ BD/ Note 94-01

PS/ BD/ Note 94-02

PS/ BD/ Note 94-03 (MD)

PS/ BD/ Note 94-04

PS/ BD/ Note 94-05 (MD)

PS/ BD/ Note 94-06 (Min.)

PS/ BD I Note 94-07 (Min.)

PS/ BD/ Note 94-08

PS/ BD/ Note 94-09 (Min.)

PS/ BD/ Note 94-10 (Min.)

PS/ BD/ Note 94-11 (Tech.)

MD Cycles simulant Jes Ions Pb53+

M. Chanel, R. Ley, equipe operation

Status of the Studies of the Neutralisation of Dense Electron Beams J. Bosser

MD Summary Report. Week 31, October 1994. Ecool Team

S. Maury

Collection of Transparencies from Discussion Meeting on Electron Beam Neutralisation

Use of micro-calorimeters

J. Bosser

Real-time program for the PS FFT Q-measurement

S. Johnston

Preparation of PS instrumentation for the LHC test

J. Belleman, J.L. Gonzalez, S. Johnston, E. Schulte

Profilometer for small dimension proton beams

J. Bosser, I. Meshkov

PSB Q-measurement by FFT for LHC test

A. Chapman-Hatchett, S. Johnston

Fast Q-measurement for the PS BY FFT Analysis. Slides presented to PS operators (February 25, 1994)

J.L. Gonzalez

Meeting on Booster Q-measurement held on 17.01.1994

A. Chapman-Hatchett

Implementation du timing du PSB en vue de l'injection d'ions de Pb53

/.-D. Schnell

Minutes of a visit to LETI, Grenoble, May 9, 1994.

E. Schulte

Minutes of the visit of Mrs. Yan Yin to CERN, 19-26.5.94

E. Schulte

Local Oscillator Upgrade for the PS

J.L. Gonzalez

3

Page 4: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PSI BD/ Note 94-12

PS/ BO/ Note 94-13 (Min.)

a>

PS/ CO/ Note 94-01 (Spec.)

PSI CO/ Note 94-02

PS/ CO/ Note 94-03 (Tech.)

PS/ CO/ Note 94-04 (Min.)

PS/ CO/ Note 94-05 (Spec.)

PS/ CO/ Note 94-06 (Spec.)

PS/ CO/ Note 94-07 (Tech.)

PSI CO/ Note 94-08 (Min.)

PS/ CO/ Note 94-09

PS/ CO/ Note 94-10 (Info.)

PS/ CO/ Note 94-11 (Min.)

Interface specifique pour le timing des equipements d'acquisition des transfonnateurs de faisceau des Jinacs II et III et de la ligne d'injection du PSB

].D. Schnell

Minutes of 1191-Z17 Meetings held on 25, 27, 31 May and 7, 15June1994

V. Agoritsas

Emittance Measurement - Software Specifications

R.M. Suresh Babu, A.Bandyiopadhyaya, Luc De Bois

Protocole de Controle - Description et Utilisation des Impulsions de Timing

G. Benincasa

PSB93-PM - Posbnortem des tests du 16 au 22.12.1993

C. Serre

CPS94-03 Conversion PSl - Zone Est et Etude RF PS (Reunion du 18.1.1994) C. Serre

The DSC Configuration Management Tools at PS. Using the database application "hardware" for the DSC

]. Cuperus, A. Gagnaire

Description of the PS/CO G64 System. Interfacing the stepping motors in the PS Complex

C. Dehavay

New Directory Organisation for DSC Applications (EMs & RT Tasks)

C.-H. Sicard

PSB 93-17 Conversion Booster. Etat du travail; tests de demarrage (9.2.1994)

C. Serre

1993 Annual Report - Controls Group

F. Perriollat for the CO Group

Transparents presentes aux Operateurs du Groupe PS/OP

Ch. Serre

Compte rendu de la reunion du 4 fevrier 1994

Cl. Dehavay

4

Page 5: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ CO/ Note 94-12

PS/ CO/ Note 94-13

Revised 31.3.94

PS/ CO/ Note 94-14

PS/ CO/ Note 94-15

PS/ CO/ Note 94-16

PS/ CO/ Note 94-17

PS/ CO/ Note 94-18

PS/ CO/ Note 94-19

PS/ CO/ Note 94-20

PS/ CO/ Note 94-21

PS/ CO/ Note 94-22

PS/ CO/ Note 94-23

PS/ CO/ Note 94-24

PS/ CO/ Note 94-25

PS/ CO/ Note 94-26

(Min.)

(Tech.)

(Tech.)

(Tech.)

(Spec.)

(Min.)

(Tech.)

(Min.)

(Min.)

(Min.)

(Info.)

(Info.)

(Min.)

(Tech.)

(Spec.)

CPS 94-03 Conversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994)

Ch. Serre

Replacement of the ICVI 96 by the VMOD-TTI.. Module

A. Gagnaire, W. Heinze

Pulse Train Generator for Cyclic MPV908 Applications

W. Heinze

Timing-interrupts pour le PPM du PSB

M. Arruat, G. Daems

The PS G64 Stepping Motors Interface System: Installation Guide

C. Dehavay

EXM 94-01 G. Daems

Development of a VME Dual Port Memory with Up/Down Counter

A. AAS

EXM 94-02

G. Daems

CPS 94-04 Conversion PSI : ZE & RF - Planning ZE et Etude RF (21.4.1994)

C. Serre

EXM 94-03

G. Daems

The IHEP-CERN ColJaboration on UNK Accelerator Controls. (Briefing of L. Evans for his CRC attendance in May 1994)

B. Kuiper

Renovation du SOS F. Perriollat

PSB93-19 Conversion Booster. Postmortem demarrage mars/avril 1994 (26.4.94) .

C. Serre

Proposition pour les Archives ]. Cuperus, F. di Maio

Posting requests for a correction or an extension of a generic application

F. Di Maio, A. Risso

5

Page 6: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ CO/ Note 94-27

PS/ CO/ Note 94-28

PS/ CO/ Note 94-29

PS/ CO/ Note 94-30

PSI CO/ Note 94-31

PS/ CO/ Note 94-32

PSI CO/ Note 94-33

PS/ CO/ Note 94-34

PS/ CO/ Note 94-35

PS/ CO/ Note 94-36

PS/ CO/ Note 94-37

PS/ CO/ Note 94-38

PSI CO/ Note 94-39

PS/ CO/ Note 94-40

PS/ CO/ Note 94-41

PSI CO/ Note 94-42

(Tech.) The PLS Display Module in Euro-Mechanic Format

Cl. Dehavay

(Min.) CPS 94-05 Conversion PSl : East Hall, RF, Instrumentation & Layout (17.5.1994)

(Min.)

(Min.)

(Min.)

Ch. Serre

EXM94-04 G. Daems

Software Sharing

B. Kuiper

EXM94-05 G. Daerns

EXM 94-06 G. Daerns

(Tech.) PSB Beam Statistics - The User's Manual

V. Adorni

(Min.)

(Min.)

(Spec.)

(TecJ:t.)

(Min.)

(Min.)

The Integration of the Setup. Diagnosis and Recovery in Accelerator Control P. Skarek, L.Z. Varga

The PNPI-shell and the Setup

L.Z. Varga

EXM94-07 G. Daerns

CP594-06 - Conversion PSl - East Hall, Layout CPS04 (14.6.1994)

C. Serre

Application VistarPSB. Specifications M. Gourber

Application VistarPSB. AlgoriThm Specifications

M. Gourber

EXM 94-08 G. Daerns

EXM 94-09 G. Daems

(Tech.) Timing Event Generation: User Requirements

C.-H. Sicard

6

Page 7: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PSI CO/ Note 94-43 (Tech.)

PSI CO/ Note 94-44 (Tech.)

PSI CO/ Note 94-45 (Min.)

PSI CO/ Note 94-46 (Min.)

PSI CO/ Note 94-47

PS/ CO/ Note 94-48 (Tech.)

PSI CO/ Note 94-49 (Tech.)

PSI CO/ Note 94-50 (Tech.)

PS/ CO/ Note 94-51 (Tech.)

PS/ CO/ Note 94-52 (Tech.)

PS/ CO/ Note 94-53 (Tech.)

PSI CO/ Note 94-54 (Min.)

PS/ CO/ Note 94-55 (Spec.)

PSI CO/ Note 94-56 (Spec.)

PSI CO/ Note 94-57 (Min.)

PS/ CO/ Note 94-58 (Spec.)

RT Task "templates" and parametrisation

C.-H. Sicard

General Module Class Variants

]. Cuperus

CPS94-07 I CPS-RFll. Layout de la tranche CPS94 -Travaux logiciels.

F. di Maio

EXM 94-10 (21.7.1994)

G. Daems

Proposal for Diagnosing Timing Problems Related to BCD Structures

Isabel Campos, Paul Skarek, Laszlo Zs. Varga

Test Procedure for the DP-RAM

W. Heinze

User Manual for the DP-RAM

W. Heinze

Specifications For Composite Variable Modules (CVMS) In DSCs C.-H. Sicard

SPECS : Program Interaction with RT Tasks in DSC's

C.-H. Sicard

The Tg8 Device Driver

/ulian Lewis

Reduce Useless Equipment Accesses

A. Risso

EXM No. 94-11

G. Daems

Using DSC at PS . User's Manual for 1/0 Configuration Management with Hardware

A. Gagnaire

The Timing Transfer Survey Application

M. Gourber-Pace

EXM 94-12

G. Daems

Radial Perturbations. Specifications

M. Pace-Gourber

7

Page 8: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ CO/ Note 94-59 (Tech.)

PS/ CO/ Note 94-60 (Tech.)

PS/ CO/ Note 94-61 (Spec.)

PS/ CO/ Note 94-62 (Spec.)

PS/ CO/ Note 94-63 (Spec.)

PSI CO/ Note 94-64 (Min.)

PS/ CO/ Note 94-65 (Min.)

PSI CO/ Note 94-66 (Min.)

PS/ CO/ Note 94-67 (Min.)

PS/ CO/ Note 94-68 (Tech.)

PS/ CO/ Note 94-69 (Tech.)

PS/ CO/ Note 94-70 (Spec.)

PS/ CO/ Note 94-71 (Min.)

PS/ CO/ Note 94-72 (Info.)

PS/ CO/ Note 94-73 (Tech.)

PS/ CO/ Note 94-74 (Tech.)

Process in the Console Manager

F. di Maio

Modifications to the GM Data-tables, library and Oracle interface planned for shutdown 95

C.-H. Sicard

Proposal for a DSC Software Interface to the TDC CAEN ModV 488 VME module

A. Gagnaire

General Sampler Oass Specifications

F. di Maio, C.-H. Sicard

Phase Modulation Control for 200 MHz Cavities

M. Gourber-Pace

EXMNo.13

G. Daems

EXM 94-14

G. Daems

Minutes of the Meeting on TG8 and Drivers Cards

W. Heinze

EXM 94-15

G. Daems

Double PPM for Power Supplies

W. Heinze

GMl Addresses and Lower level Modules

}. Cuperus

CPS94 Timings. Software Interface Specifications

Franck Di Maio

CPS94#08 Conversion PSl. Programmes des tests de decembre

Christian Serre

VME in the DSC at PS. VMe hardware approach by W. Heinze. VME Basic Access VME 1/0 by A. Gagnaire

DAC Versions for the GFAS

W. Heinze

User Manual for VMOO-DOR

W. Heinze

8

Page 9: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ CO/ Note 94-75

PS/ CO/ Note 94-76

PS/ CO/ Note 94-77

PS/ CO/ Note 94-78

PS/ CO/ Note 94-79

PS/ CO/ Note 94-80

PS/ CO/ Note 94-81

PS/ CO/ Note 94-82

PS/ CO/ Note 94-83

PS/ CO/ Note 94-84

PS/ CO/ Note 94-85

PS/ CO/ Note 94-86

DI

PS/ DI/ Note 94-01

PS/ DI/ Note 94-02

PS/ DI/ Note 94-03

Tech. Mtg N° 49

(Min.)

(Min.)

(Spec.)

(Min.)

(Tech.)

(Min.)

(Tech.)

(Spec.)

(Min.)

(Min.)

(Min.)

(Info.)

(Min.)

EXM94-16

Ch. Serre

EXM 94-17

G. Daems

BCD Checker and BCD Rule Editor - User's Guide

I. Campos, P. Skarek, L. Varga

CPS94-09-CPS94-RF15- Conversion PSl. Etat d'avancement des travaux pour les tests de decembre 94

Ch. Serre

Analog and Digital Input/Output with Standard VME Modules

W. Heinze

EXM94-18

G. Daems

Knowledge Based Setup Facility

J.-M. Bouche, G. Daems, V. Filimonov, V. Khomoutnikov, I. Riabov

Hints for Using the TDC CAEN V488

W. Heinze

Equipment Module Read-Only Editor: Specifications

C.-H. Sicard

Timing and Event Distribution via the MTG-System and MTG-Cable. (Minutes of a meeting on 18.11.94)

G. Daems

EXM94-19

G. Daems

EXM 94-20

G. Daems

List of PS Divisional Notes 1993

Edited by S.L. Neboux

Justification for the PS Exploitation Budget

B. W. Allardyce

Compte rendu de la mini-reunion technique N°. 49 du 19janvier1994.

B. W. Allardyce

9

Page 10: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ DI I Note 94-04

Tech. Mtg N° 50

PS/ DI/ Note 94-05

Tech. Mtg N° 51

PS/ DI/ Note 94-06

PS/ DI/ Note 94-07

Tech. Mtg N° 52

PS/ DI/ Note 94-08

Tech. Mtg N° 53

PS/ DI/ Note 94-09

PS/ DI/ Note 94-10

PSI DI/ Note 94-11

Tech. Mtg N° 54

PS/ DI/ Note 94-12

PS/ DI/ Note 94-13

Tech. Mtg N° 55

PS/ DI/ Note 94-14

Tech. Mtg N° 56

PS/ DI/ Note 94-15

Tech. Mtg N° 57

PS/ DI/ Note 94-16

Tech. Mtg N° 58

PS/ DI/ Note 94-17

PS/ DI/ Note 94-18

Tech. Mtg N° 59

(Min.)

(Min.)

(Min.)

(Min.)

(Min.)

(Min.)

(Min.)

(Min.)

(Min.)

(Min.)

(Min.)

(Min.)

(Tech.)

(Min.)

Operation avec antiprotons

B. W. Allardyce

Proton Injector Performance and OutJook

B. W. Allardyce

Lead ion accelerating facility: notes on the 17th co-ordination and specification meeting held on November 26, 1993 at CERN H. Umstiitter

Applications of Symbolic Computing at PS in 1994 B. W. Allardyce

Champ magnetique principal PS

B. W. Allardyce

LEAR in ppbar Collider Mode (Preliminary Feasibility study)

P. Lefevre

Compte rendu de la reunion PS sur le budget 1994le16 mars 1994 B. W. Allardyce

Ions plomb dans LEAR pour LHC: le test de decembre 1994

B. W. Allardyce

Lead Ion Accelerating facility: Notes on the 18th Co-ordination and Specification Meeting held on February 11, 1994 at CERN

H.H. Umstiitter

MOAS94

M. Boutheon

Preparations for the CERN/Canada workshops of 9-11May1994 Brian Allardyce

Application of symbolic computing in the PS in 1994 Brian Allardyce

Laser Ion Source

Brian Allardyce

Upgrading of the PS complex as LHC proton pre-injector. Project proposal. K. Schindl

Demarrage des machines en 1994 B. Allardyce

10

Page 11: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PSI DI/ Note 94-19 (Min.) Renovation des stations de refroidissement du PS et politique

Tech. Mtg N° 60 d'utilisation des groupes diesel du CERN.

B. Allardyce

PSI DI/ Note 94-20 (Min.) Projet de conversion du PS pour LHC

Tech. Mtg N° 61 B. Allardyce

PSI DI/ Note 94-21 (Min.) Lead Ion Accelerating Facility: Notes on the 19th Co-ordination and Specification Meeting held on May 6, 1994 at CERN

R.H. Umstlitter

PS/ DI/ Note 94-22 PS Training Plan 1994-1995

D. Dekkers

PS/ DI/ Note 94-23 Status of FPP Project D-082

B.W. Allardyce

PS/ DJ/ Note 94-24 Timing Booster; reflexions suite au memorandum de H. Koziol du 11.8.1994.

M. Boutheon

PS/ DI/ Note 94-25 (Min.) Minutes of PS Budget Meeting held on 2nd November 1994

B.W. Allardyce

PS/ DI/ Note 94-26 (Min.) Compte rendu de la reunion technique du PS N°62 du 9 novembre 1994

Tech. Mtg N° 62 B.W. Allardyce

PS/ DJ/ Note 94-27 The Accelerators for the AUSTRON Spallation Source

F. Baumann, B. Blind, P.J. Bryant, E. Griesmayer, ]. Janik, M. Pavlovic, T. Wang, L. Coull, G. Eaton, D. Fiander, 0. Grobner, K. Henrichsen, G. Heritier, C. Hill, K. Johnsen, H. Koziol, A. Lombardi, K.D. Metzmacher, S. Pichler, W. Pirkl, M. Regler, K. Schindl, H. SchOnauer, H. Schanbacher, A. Sullivan, B. Szeless, B. Zotter

) PSI DI/ Note 94-28 (Min.) The Laser Ion Source Experiment

Tech. Mtg N° 63 B.W. Allardyce

PS/ DI/ Note 94-29 (Min.) Minutes of PS Budget Meeting held on 30th November 1994

B.W. Allardyce

PSI DI! Note 94-30 (Min.) Le "fantOme" de Lear ou "Unexpected Beam Blowup"

Tech. Mtg N° 64 B.W. Allardyce

PS/ DI/ Note 94-31 (Min.) Revision du projet D-067

Tech. Mtg N° 65 B.W. Allardyce

PS/ Dl/ Note 94-32 (Min.) Stabilisation du champ magnetique principal PS

Tech. Mtg N° 66 B.W. Allardyce

11

Page 12: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ HI/ Note 94-01

PSI HI/ Note 94-02 (MD)

PS/RF/Note 94-11 (MD)

PS/ HI/ Note 94-03

PS/ HI/ Note 94-04 (ME)

PS/ HI/ Note 94-05

PSI HI/ Note 94-06

PS/ HI/ Note 94-07

PS/ HI/ Note 94-08 (ME)

PS/ HJ I Note 94-09 (ME)

PSI HJ I Note 94-10 (Spec.)

PS/ HI/ Note 94-11 (Spec.)

PS/ HI/ Note 94-12

PS/ HI/ Note 94-13

PSI HJ/ Note 94-14 (ME)

PS/ HI/ Note 94-15

The PSB Energy Increase to 1.4 GeV (MD report)

K. Schindl

Setting-up of Linac 2 for High Intensity

C. Hill, A. Lombardi, M. Vretenar

Possible RFQ Designs for a Lead Ion Beam generated by a Laser Ion Source

Alessandra Lombardi

PSB ME-News: Introduction of PPM Mode between Cycles with low and high BOOT

H. Fiebiger, N. Rasmussen

Calculations for Pb53+ Injection into the PS Booster

N. Rasmussen

A Complete Expression for the Longitudinal Beam Transfer Function

N. Rasmussen

Tracking Particle Trajectories in the Phase Plane

N. Rasmussen

PSB ME News: First Injection of Pb53+ Ions into the PSB

H. Schonauer

PSB ME-News: First Acceleration of Pb53+ in PSB Ring 3

E. Jensen, K. Schindl

Video Emittance Measurement

S.K. Bose, S. V. Deshpande

Virtual Scope - Software Specifications

S.K. Bose, S. V. Deshpande, Balhans ]ayaswal, U. Raich

RFQ - Principe du Folded Dipole

I. Hassine

RFQ UNAC a Basse Energie - Modifications et Adaptation au PC du Programme RFQLOW

V. Desille, N. Catalan Lasheras

PSB ME NEWS: First Acceleration of Pb53+ Ions in the PS: Booster Part

H. Schonauer

Lead Ions Acceleration: Budget

D. Dekkers

12

)

Page 13: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ HI/ Note 94-16

PS/ HI/ Note 94-17

LP

PS/ lP/ Note 94-01

PS/ lP/ Note 94-02

PS/ lP/ Note 94-03

PS/ lP/ Note 94-04

PS/ lP I Note 94-05

PS/ lP I Note 94-06

PS/ lP I Note 94-07

PS/ lP/ Note 94-08

PS/ lP I Note 94-09

PS/ lP/ Note 94-10

PS/ LP/ Note 94-11

AT/MA/ Note

PS/ lP/ Note 94-12

(Tech.)

(Min.)

(Min.)

(Spec.)

(Min.)

(Tech.)

(Min.)

(Min.)

(Tech.)

(Min.)

(Info.)

(Tech.)

(Min.)

Test of ProgTam RFQLOW

N. Catalan Lasheras

Gating of the ECR on unwanted Linac 3 Cycles

J. Knott

CR du 18eme LPI Techn. Mtg.

J.P. Potier

CR Du 17eme LPI Techn. Meeting

J.P. Potier

Specifications pour un nouvel ensemble de Production de e•

J.C. Godot, L. Rinolfi

Min. of Mtg. held on 27. 1. 94 (Uppsala Collaboration)

F. Chautard

Delay Time Experienced by a Laser Pulse on Transit through a Substrate

P. M. Devlin-Hill, P. Joly

CUC Agenda 18February1994

J.H.B. Madsen

The CTF Run N° 4 1993. Results and comments H. Braun, JHB. Madsen and S. Schreiber.

J.H. B. Madsen

Autocorrelateur du l.aboratoire de Photoemission

P. Joly

CTF Run N° 1 - 1994 J.H.B. Madsen

Collaboration Uppsala University I CERN Visit of Prof. T. Ekelof, D. Reistad, Y. Yin at CERN on 17 March 1994

J.P. Dclahaye

Mcsure Magnetique du Solenoide ''bridge coil" SNX pour le LIL M. Comuet, G. Patron

Minutes of the Meeting held on 17 March 1994

F. Chautard

13

Page 14: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ IP/ Note 94-13

PS/ lJ> I Note 94-14

PSI IP I Note 94-15

PSI IP I Note 94-16

PS/ IP/ Note 94-17

PS/ IP/ Note 94-18

PS/ IP/ Note 94-19

PS/ IP/ Note 94-20

PS/ IP/ Note 94-21

PS/ IP/ Note 94-22

PS/ IP I Note 94-23

PS/ IP I Note 94-25

PS/ LP I Note 94-26

PS/ LP I Note 94-27

(Min.) CUC Agenda 15 April 1994

/.H.B. Madsen

(Tech.) Combining Wideband Signals from a Wall Current monitor

/.Durand

(Min.) Minutes of a Meeting of the Uppsala University /CERN Collaboration

E. Schulte

(Spec.) Technical Specification for High Power Pulsed Klystrons for the LPI Accelerator

P. Pearce

(Min) Notes of Visits to Several Companies in the UK during 21-23 March 1994

(Tech.)

(Spec.)

(Min.)

(Min.)

(Tech.)

(Info.)

(Tech.)

(Min.)

(Spec.)

P. Pearce

Mesure Magnetique du Solenoide SNFll de Reserve pour le CTF

D. Cornuet et de G. Patron

Technical Specification. Manufacture of the Magnetic Bunch Compressor of the CLIC Test Facility

P. Pearce

Notes on the PS Specification Meeting concerning the Repair and Purchase of Klystrons for the LPI Machine

P. Pearce

Minutes of a Meeting held on 28. 4. 94 concerning the Development of new ON/OFF Coordinators for the LIL machine

P. Pearce

A Faulty Interlock Display Program for LPI Modulators

R. Gilmour

Procedure pour Faisceau CMS dans LEA

L. Rinolfi

Using a 0.5 - 700 MHz Electrostatic Pick-up at the PS/LP Photoemission Laboratory

/.Durand

Min. of a Tcchn. Presentation on 30 GHz RF power Sources given by Thorrn Microwave Limited UK

P. Pearce

Technical Specification for the repair and reconditioning of high power pulsed klystrons for the LPI accelerator

P. Pearce

14

Page 15: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PSI LP I Note 94-28

PS/ LP/ Note 94-29

PS/ LP/ Note 94-30

PS/ LP/ Note 94-31

DO 15300/PS

PS/ LP/ Note 94-32

PSI LP I Note 94-33

PS/ LP/ Note 94-34

PS/ LP/ Note 94-35

PS/ LP/ Note 94-36

PS/ LP I Note 94-37

PS/ LP/ Note 94-38

PS/ lJ> I Note 94-39

PSI LP I Note 94-40

(Spec.)

(Info.)

(Tech.)

(Spec.)

(Min)

(Tech.)

(Tech.)

(Tech.)

(Tech.)

(Spec.)

(Tech.)

(Min.)

(Tech)

Technical Specification for the Purchase of High Power Pulsed Klystrons for the LPI Accelerator

P. Pearce

An Outline of the Programme for the CTF Run N° 2, Started 5/07 /94

].H.B. Madsen

The CTF Run N° 1 1994. Results and Comments H. Braun, /HB. Madsen and S. Schreiber

Technical Specification for the machining and Welding of components for a new converter Electrons - Positrons J.C. Godot

Visite au LAL

J.C. Godot

LPI Modulator Interlock Fault Data Collection Program

R. Gilmour

LPl Modulator Interlock Fault Data Display Program - Workstation Version

R. Gilmour

LPI Modulators Interlock Fault Data Statistical Analysis Program

R. Gilmour

User Level Software for the New Interlock System of the LPI Klystron Modulators

R. Gilmour

Technical Specification. For The Purchase Of A 30 GHz Travelling Wave Tube Amplifier System P. Pearce

Operating Procedure for the crF Laser S. Hutchins

Review of the Tender IT-2257 /PS concerning Repair and Reconditioning of High Power Klystron Tubes Peter Pearce

A Review of L-Band Klystrons (15 GHz for Peak Pulsed Power up to 40 MW

P. Pearce

15

Page 16: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ U'/ Note 94-41 (Min.) CLIC Meeting Minutes

/.H.B. Madsen

PS/ U' I Note 94-42 (Tech.) Polarized Positron Sources

A.A . . Mikhailichenko

PS/ U' I Note 94-43 (Tech.) Beam Loading Effects on a Single Bunch and on a Bunch Train in the CI'F 95

F. Chautard

PS/ U'/ Note 94-44 (Tech.) Fringe Field in the Bunch Compressor for the CI'F

F. Chautard

PS/ LI'/ Note 94-45 (Min.) The CTF Run No. 2 - 1994. Results and Comments

/.H.B. Madsen

PS/ IJ>/ Note 94-46 (Min.) Summary of the CUC/PS Meeting on 21st October 1994

/.H.B. Madsen

PS/ IJ>/ Note 94-47 (Tech) Review of the Faults occurring in MDK13 during Run N°2

G. Coudert, G. McMonagle, P. Pt!llrce, G. Rentier

PS/ U'/ Note 94-48 (Tech.) Requirements for the Assembly and Magnetic Measure- ments of the CERN Bunch Compressor for the CTF

P. Bossard, F. Chautard, D. Cornuet, L. Rinolfi

PS/ IJ>/ Note 94-49 (Tech.) Notes on a Visit to Sincrotrone Trieste on the 26th and 27th September 1994

P. Pt!llrce

PS/ IJ>/ Note 94-50 (Tech.) Propositions pour la Section Acceleratrice "ACS 25" du UL

L. Rinolfi

PS/ LI'/ Note 94-51 (Min.) CUC PS Meeting 4. 11. 94 )

/.H.B. Madsen

PS/ LP/ Note 94-52 (Tech.) Bunch Compressor Limitations

F. Chautard

PS/ LP I Note 94-53 (Min.) Notes of a Visit to PSI Vi11igen on the 21st September 1994 concerning the SLS Modulator Collaboration

P. Pt!llrce

PS/ LI'/ Note 94-54 (Min.) CLIC Beam Dynamics Meeting No 1

A. Riche

PS/ IJ>/ Note 94-55 (Min.) CLIC Beam Dynamics Meeting No 2

A. Riche

PS/ LP/ Note 94-56 (Min.) Reunion Techn . CR du 9. 11. 94

f.P. Potier

16

Page 17: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ LP I Note 94-57 (Min.)

PS/ LP/ Note 94-58 (Min.)

OP

PS/ OP/ Note 94-01 (Tech.)

PS/ OP/ Note 94-02 (Tech.)

PS/ OP/ Note 94-03

PS/ OP/ Note 94-04 (Tech.)

PSI OP I Note 94-05 (Min.)

PS/ OP/ Note 94-06

PS/ OP/ Note 94-07 (Info.)

PS/ OP/ Note 94-08 (Min.)

PS/ OP/ Note 94-09 (MD)

PS/ OP I Note 94-10 (Min.)

PS/ OP/ Note 94-11 (MD)

PS/ OP/ Note 94-12 (MD)

PS/ OP/ Note 94-13 (Tech.)

CUC/PS Meeting 18 November 1994

].H.B. Madsen

Resume de la Reunion CUC du 2. 9.94

J.C., Godot, G. Suberlucq

Use of Real-time Oock to program Energy-related Functions

B. Frammery

L'Interface PLS - Point de vue des utilisateurs

B. Frammery

Operation du Complexe PS pendant la periode 4 de 1993

]. Boillot, D. Dagan

Fast Extraction for PS196

E. Roux

Minutes of the meeting (20.1.1994) on rhw PS fast wire scanner

Ch. Steinbach

Operation Statistics of the PS Accelerator Complex for the Year 1993

G. Azzoni, D. Dagan

Transparents presentes aux Techniciens d'Operation en janvier 1994

H. Mulder

NOASNo.20

B. Frammery

Creation et utilisation des cycles magnetiques dans le cadre du test LHC

N. Blazianu

Compte rendu de la reunion du 4.2.94 concemant le systeme de recherche de personnes (RP) et du telephone cellulaire (GSM)

Use of the PS Fast Wire Scanner during the LHC Test beam Machine Development of December 1993

E. Falk, F. Hoekemeijer, J. Os/ors, Ch. Steinbach

Test LHC 1,4 GeV /c: Modulation des Courants des Septa et d'un Quadrupole par PLS G. Cyvoct, G. Daems

Feasibility Study towards using DEC-RTI GUI's: Spectrum Analysers Emulator

J-L. Sanchez Alvarez

17

Page 18: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ OP I Note 94-14

PS/ OP/ Note 94-15

PS/ OP/ Note 94-16

PS/ OP/ Note 94-17

PS/ OP/ Note 94-18

PS/ OP/ Note 94-19

PS/ OP I Note 94-20

PS/ OP I Note 94-21

PS/ OP I Note 94-22

PS/ OP/ Note 94-23

PS/ OP I Note 94-24

PS/ OP I Note 94-25

PSI OP I Note 94-26

PS/ OP I Note 94-27

(Info.)

(Min.)

(Info.)

(Info.)

(MD)

(Min.)

(Min.)

Transparents presentes aux Techniciens d'Operation en janvier 1994 (cours)

K.H. Schindl

N20AS 21. Compte Rendu de la reunion du 16 fevrier 1994

B. Frammery

Programme d'Operation du Complexe PS en 1994

J. Boillot

Le Timing AAC COte Hardware

J. Ottaviani

Timings d'injection - Le tycle LEAR et son timing inteme (Cours donnes aux techniciens d'operation PS/OP /U.AR/ AAC)

J. Duran-Lopez

Summary of MD sessions on LEAR fast extraction at 105 MeV I c (13-14.12.1993)

S. Baird

Repartition of the cycles in 1994

J. Boillot, D. Manglunki

Programme de demarrage du PS en mars 1994

Ch. Steinbach

Compte rendu de la reunion du groupe d'etudes sur la stabilite du champ principal PS (reunion du 7.3.1994)

Ch. Steinbach

Preparation du demarrage mars 1994

A. Nicoud, C. Saulnier

(Info.) Acceleration d'ions Plomb au CERN Transparents presentes tors du cours donne aux techniciens d'operation pendant le grand arret 1994

D. Dekkers

(Tech.) Proposition de CATV pour les informations generates du PS G. Mercer

(Info.) Ultra Slow Extraction (Course given to LEAR/ AAC operators during the shutdown)

H. Mulder

(Info.) Source d'lons Plomb Cours donne aux techniciens d'operation PS/Ll/PSB K. Langbein

18

Page 19: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ OP/ Note 94-28

PS/ OP I Note 94-29 (Info.)

PS/ OP/ Note 94-30 (Info.)

PS/ OP I Note 94-31 (Info.)

PS/ OP/ Note 94-32 (Info.)

PS/ OP/ Note 94-33 (Info.)

PS/ OP I Note 94-34 (Tech.)

PS/ OP/ Note 94-35 (Min.)

PS/ OP/ Note 94-36 (Tech.)

PS/ OP I Note 94-37 (Tech.)

PS/ OP/ Note 94-38 (Tech.)

PS/ OP/ Note 94-39 (Min.)

PS/ OP/ Note 94-40 (Tech.)

PS/ OP/ Note 94-41 (MD)

PC Based Data Logging System with Two Channels of Output and Four Channels of Input

A. Findlay

LEAR Injection Tuning. Cours donne aux technidens d'operation PS/LEAR/ AAC

J.-L. Sanchez Alvarez

AAC Timing. Course given to the AAC and LEAR Operation Technicians during the 1994 shutdown

T. Eriksson

AAC Modes. Course given to AAC and LEAR operation technicians during 1994 shutdown

T. Eriksson

Ejection Lente au PS. Notes du cours donne aux techniciens d'operation le 11.3.1994

Ch. Steinbach

Lead Ions in the PSB. Cours donne aux techniciens d'operation le 10.3.1994

H. SchOnauer

A broadband based video system for the PS complex

G. Mercer

Minutes of the briefing of 16 March 1994

Ch. Steinbach

Vacuum Display Facility

S. Jacobsen

Programme d'Alarmes pour le Mode Economie

G. Adrian

Journal de demarrage du PS apres l'arret de 1994

C. Steinbach

N20AS - Compte rendu de la reunion du 14 avril 1994

B. Frammery

Projet d'amenagement de la salle 354 1-011

D. Manglunki

Compte rendu d'etudes machine sur la stabilite du champ magnetique principal du PS

Ed. Ch. Steinbach

19

Page 20: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ OP I Note 94-42 (MD)

PS/ OP I Note 94-43 (Min.)

PS/ OP/ Note 94-44 (Min.)

PS/ OP I Note 94-45 (Min.)

PS/ OP/ Note 94-46 (Tech.)

PS/ OP/ Note 94-47

PS/ OP I Note 94-48 (Min.)

PS/ OP/ Note 94-49 (Tech.)

PS/ OP I Note 94-50 (Tech.)

PS/ OP I Note 94-51

PS/ OP I Note 94-52

PS/ OP/ Note 94-53 (Min.)

PS/ OP/ Note 94-54 (Min.)

PS/ OP/ Note 94-55 (Tech.)

PS/ OP I Note 94-56 (Min.)

Spill Control Using Extraction Intensity Feedback (MD of 18.4.1994)

H. Mulder

Compte rendu de la reunion du Groupe d'etudes sur la stabilite du champ principal PS (22.4.1994)

Ch. Steinbach

N20AS - Compte rendu de la reunion du 27.4.94

B. Frammery

N20AS - Compte rendu de la reunion du 11 mai 1994

B. Frammery

Spectrum Logger Facility

S. Jacobsen

Groupe d'etude sur la stabilite du champ principal du PS : Etat des travaux debut juin 1994

P. Bossard, D. Cornuet, B. Godenzi, Ch. Steinbach, H. Ullrich

Compte rendu des tests partiels du 13.6.1994

C. Saulnier

LEAR Info

E.Roux

LEAR Injection Line Trajectories

J.L Sanchez Alvarez

Operation du Complexe PS pendant la periode 1de1994

/.Boillot, D. Dagan

Operation du Complexe PS. Suivi des problemes suite A la premia-e periode d'operation de 1994

/. Boillot

Problemes du vide du Booster - Compte rendu de la reunion 10/8/94

£ Wildner

N20AS. Reunion du 27juillet1994

B. Frammcry

Mode d'Utilisation du Programme Scope

/.L. Mary

Compte rendu de la reunion du groupe d'etude sur la stabilite du champ principal PS du 12 ao'llt 1994

C. Steinbach

20

Page 21: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ OP/ Note 94-57 (Tech.)

PS/ OP I Note 94-58 (Tech.)

PS/ OP/ Note 94-59 (Min.)

PS/ OP I Note 94-60 (Min.)

PS/ OP I Note 94-61 (Min.)

PS/ OP/ Note 94-62 (Tech.)

PS/ OP I Note 94-63

PS/ OP I Note 94-64 (MD)

PS/ OP I Note 94-65 (Info.)

PS/ OP I Note 94-66 (Tech.)

PSI OP I Note 94-67

PS/ OP/ Note 94-68 (Min.)

PS/ OP/ Note 94-69 (Min.)

PS/ OP/ Note 94-70 (Min.)

PS/ OP I Note 94-71 (Min.)

PS/ OP/ Note 94-72 (Tech.)

System Design For Remote Signal Processor

Henk Mulder

Emittance Evolution Program for LEAR

f .-L. Sanchez Alvarez

NOAS28

B. Frammery

Compte Rendu de la Reunion du Groupe d'Etudes sur la Stabilite du Champ Principal PS (27.9.1994)

Ch. Steinbach

Compte rendu de la reunion des Tests Partiels du 10.10.1994

Ch. Steinbach

Mise en marche des scrapers AAC apres une coupure de courant

f. Ottaviani

Measurement of Local Tune and Emittance from Schotttky-Scans in LEAR

M. Ludwig

ISOLDE Beam Profile Test with Sem Grids (MD du 29.9.1994)

Reported by E. Wildner

Ions Plomb dans le PS. Copie des transparents

D. Manglunki

AAC-LEAR Transfer Efficiencies From 18/07 to 23/10

Jose-Luis Sanchez Alvarez

Operation du Complexe PS. Statistiques de fonctionnement pendant Ja periode 2/1994

D. Dagan

Compte rendu du briefing du PS du 31.10.1994

Ch. Steinbach

Compte rendu de la reunion NOAS No. 29

B. Frammery

Section LPI: Compte rendu de la reunion du 28.10.1994

B. Frammery

NOASNo.30

B. Frammery

Operation du Complexe PS. Suivi des problemes suite a la deuxieme periode d'operation de 1994 ·

f. Boillot

21

Page 22: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ OP I Note 94-73 (Min.)

PS/ OP I Note 94-74 (Min.)

PS/ OP/ Note 94-75 (Min.)

PS/ OP/ Note 94-76 (Tech.)

PA

PS/ PA/ Note 94-01 (MD)

PS/ PA/ Note 94-02 (MD)

PS/ PA/ Note 94-03 (MD)

PS/ PA/ Note 94-04 (MD)

PS/ PA/ Note 94-05 (Spec.)

PS/ PA/ Note 94-06 (MD)

PS/ PA/ Note 94-07 (MD)

PS/ PA/ Note 94-08 (Min.)

PS/ PA/ Note 94-09 (PPC)

PS/ PA/ Note 94-10 (PPC>

Compte rendu du briefing du PS du 6.12.1994

Ch. Steinbach

Compte rendu de la reunion des tests partiels du 13.121994

C. Saulnier

Compte rendu de la reunion du 16.12.1994 sur la distribution du timing Bdot

Ch. Steinbach

AAC- LEAR Transfer Efficiencies from 09.11to14.12.1994

].-L. Sanchez Alvarez

Chromaticity Correction in the PS

G. Azzoni, M. Martini

Double Batch Filling in the PS G. Daems, ]. Philippe, J.P. Riunaud

Single Bunch Transverse Instabilities at 1 GeV PS-MD Report

R. Cappi

Test of the 2Qy=12 Resonance Compensation for the LHC Test Beam

R. Cappi, E. Wildner

Technical Specificationfor Low Loss, SF6 Gas Pressurized, 26.30 High Voltage Coaxial Cable for PS Injection Kicker Magnets

K. Metzmacher

Les Septa DC du PSB et du PS utilises a 1.4 GeV pour le "test LHC"

M. Thivent

Pulsing the PSB Ring 3 Extraction Kicker for the ''LHC test"

A. Fowler, K. Metzmacher, L. Sermeus

Minutes of the Meeting about the TI'2 Stripper held on 21.1.94

D. Manglunki

Minutes of the PPC Meeting held on 1.2.94

D. Manglunki

Minutes of the PPC Meeting held on 8.2.94

D. Manglunki

22

Page 23: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ PA/ Note 94-11

PS/ PA/ Note 94-12

PS/ PA/ Note 94-13

PS/ PA/ Note 94-14

PS/ PA/ Note 94-15

PS/ PA/ Note 94-16

rs; PA/ Note 94-17

rs; PA/ Note 94-18

Replaces PS/El 79-8

rS/ PA/ Note 94-19

rs/ PA/ Note 94-20

PS/ PA/ Note 94-21

rs/ PA/ Note 94-22

PS/ PA/ Note 94-23

PS/ PA/ Note 94-24

PS/ PA/ Note 94-25

PS/ PA/ Note 94-26

(PPC) Minutes of the PPC Meeting held on 22.2.94

D. Manglunki

AUSTRON Extraction Kicker Feasibility Study

K. Metzmacher

DIRAC (1191) Preliminary Optics in East Hall

Luc Durieu

(Tech.) Schema et Utilisation du Systeme de ContrOle des Collimateurs de la Zone Experimentale Sud

K. Blitzner, M. Chassard, G. Granger

(PPC) Minutes of the PPC Meeting held on 15.3. 1994

D. Manglunki

(Min.) Compte Rendu de la lOeme Reunion PS/PA et AT /VA, du 19 avril 1994

L. Danloy

(MD)

(MD)

(MD)

Cl Transfer Line of LEAR for PS208-Hot Nuclei Experiment

J.-Y. Hemery

Fast Bumper System (F.B.) - (Continuous Transfer) Safety Instructions Revised

L. Sermeus

Ml Transfer Line of LEAR for PS185-Hyperons Experiment

M. Giovannozzi and ].-Y. Hemery

MD Report on the transport of fast extracted 3.5 GeV /c beam.

K. Biitzner and L. Durieu

Initiation aux Lasers

L. Danloy

Steering in the ES Line of LEAR

M. Giovannozzi, J.-Y. Hemery

Safety Instructions for AAC Kicker Systems

/. Schipper

Energy Amplifier Test Line Modification and Setting-up

L. Durieu

MD Report of Sessions of 4 July and 5 July, 1994

Reported by K. Biitzner

PS MD Report of 29-30 August 1994

R. Cappi

23

Page 24: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ PA/ Note 94-27

PS/ PA/ Note 94-28

PS/ PA/ Note 94-29

PS/ PA/ Note 94-30

PS/ PA/ Note 94-31

PS/ PA/ Note 94-32

Rep1aces

PS/ PA/ Note 94-33

PS/ PA/ Note 94-34

PS/ PA/ Note 94-35

PS/ PA/ Note 94-36

ro

PS/ PO/ Note 94-01

PS/ PO/ Note 94-02

PS/ PO/ Note 94-03

Rev.

PS/ PO/ Note 94-04

PS/ PO/ Note 94-05

(PPC)

(Tech.)

(PPC)

(Min.)

(MD)

(PPC)

(MD)

(Spec.)

(Tech.)

(Tech.)

(Tech.)

(Info.)

Initial Testing of Septum SMH 16 (Lead Ion)

]. Borbourgh and M. Hourican

Minutes of the PPC Meeting held on 23.6.94

D. Manglunki

Systene de Detection des Sur-temperatures de l'Aimant Principal du PS

M. B6le-Feysot and P. Bossard

53 Transfer Line of LEAR for PS-207-LEX Experiment

].-Y. Hemery

Minutes of the PPC Meeting held on 22.9.1994

D. Manglunki

Safety Instructions for KF A45 PS Injection Kickers

H. Gaudillet

Compte rendu de la 1 leme Reunion PS/PA et AT IV A du 18 octobre 1994

L. Danloy

Results from the Setting up of the S4 line of LEAR for PS200-TRAP Experiment

M. Giovannozzi and ].-Y. Hemery

Minutes of the PPC meeting held on 8.11.94

D. Manglunki

Results from the setting up of the joint run of PS-197 Crystal barrel and PS-201 Obelix

M. Giovannozzi and J.-Y. Hemery

Specification for Power Electronics Capacitors

E. Kaufmann

Projet de Renovation de la Zone Est

]. Buttkus

Groupe de Support Technique PS-PO. Rapport Annuel des Activites 1993 -1994

]. Gruber

Test du PS comme futur prE!-injecteur du LHC. Modification des convertisseurs pour 1.4 GeV

Listes d'appel du Groupe PS/PO

]. Gruber

24

Page 25: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ PO/ Note 94-06 (Tech.)

PS/ PO/ Note 94-07 (Tech.)

PS/ PO/ Note 94-08 (Spec.)

PS/ PO/ Note 94-09 (Tech.)

PS/ PO/ Note 94-10

PS/ PO/ Note 94-11 (Min.)

PS/ PO/ Note 94-12 (Tech.)

PS/ PO/ Note 94-13 (Spec.)

PS/ PO/ Note 94-14 (Info.)

PS/ PO/ Note 94-15 (Tech.)

RF

PS/ RF I Note 94-01

PS/ RF/ Note 94-02

PS/ RF I Note 94-03 (MD)

Consignes d'operation et de securite des alimentations gamma transition (DlKlTR, SPARE DlKlTR, DSHlTR, SPARE DSHlTR)

]. Lahaye

Consignes d'operation et de securite des alimentations septa pulses -Injection et transfert (Bll.SMV, Bl2.SMV, BI4.SMV, BT.SMV30, BI.SMH, SPARE)

/. Lahaye

Specification technique d'alimentations a decharge de condensateurs pour des aimants a septum de la ligne de transfert PSB-PS J.-P. Royer

New Control Loop for the improvement of the PS Main Magnet Field. Part 1: The Control Loop of the Water Circuit T. Salvermoser

Compte Rendu de la reunion sur la regulation des champs PS avec le Signal B de l'aimant de reference (unite 101) H. Ullrich

Compte rendu des reunions du 8 Juin 1994 entre OCEM et le CERN concemant le contrat des alimentations du distributeur F. Voelker

Alimentation du Bump de l'Ejection Lente du PS par une Tekelec T700

R. Pittin

Technical Specification for a Power Converter for Magnets

/.Buttkus

The Power Converters (PC's) for the FI-Factory Complex DAPHNE at INFN-LNF/Frascati

F. Voelker

Test: B Regulation of the PS Main Magnet Power Supply

T. Salvermoser

Phase Loop Amplifier F. Blas

Concise Description of the Responsibilities of the PS-RF Group

R. Garoby

Acceleration with H = 1 and 2 OF LHC Test Beam in the PSB, Machine Developments End 1993

Participants : F. Blas, /. Boucheron, R. Garoby, F. Pedersen, G.C. S chneider (Author).

25

Page 26: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ RF/ Note 94-04 (MD)

PS/ RF/ Note 94-05 (MD)

PS/ RF I Note 94-06

PS/ RF/ Note 94-07 (Min.)

PS/ RF/ Note 94-08 (Min.)

PS/ RF/ Note 94-09

PS/ RF/ Note 94-10

PS/ RF/ Note 94-11 (MD)

PS/HI/Note 94-02 (MD)

PS/ RF/ Note 94-12 (Min.)

PS/ RF I Note 94-13 (Min.)

PS/ RF/ Note 94-14 (Min.)

PS/ RF/ Note 94-15

PS/ RF/ Note 94-16 (Min.)

PS/ RF/ Note 94-17

Longitudinal beam manipulations in the PS for the LHC

R. Garoby, S. Hancock

Tests of controlled longitudinal blow-up in the PSB R. Garoby, S. Hancock

Description of PLDs used in the "Frequency Translation" Plug-in (PS/ AC Synchronisation loop)

B.J. Evans

CPS94-RF No. 1. Reunion du 25.1.1994 R. Garoby

CPS94-RF No. 2. Reunion du 1.2.1994

R. Garoby

The Low Frequency Fundamental RF System for the LHC Beam Tests in the PSB.

J.M. Baillod, M. Corcelle, P. Gourcy, A. Krusche, M. Paoluzzi, V. Sabaiduc

The Second Harmonic RF System for LHC Beam Tests in the PSB. J.M. Baillod, M. Corcelle, P. Courcy, A. Krusche, M. Paoluzzi, V. Sabaiduc

Setting-up of Linac 2 for High Intensity MD of December ~5, 1993 C. Hill, A. Lombardi, M. Vretenar

CPS94-RF No. 3. Reunion du 8.2.1994

R. Garoby

CPS94-RF No. 4. Reunion du 15.2.1994

R. Garoby

Minutes of the 1st meeting of the Specification committee for the supply, forging, and machining of mechanical pieces for the PS/RF 40 MHz (LHC> prototype cavity. (PE-2232/LHC/PC)

£.Jensen

Modules in the PS 114 MHz Lepton Acceleration Low-Level RF System B.J. Evans

CPS94-RF No. 5. Reunion du 14.3.1994 R. Garoby

Description of "Converter and Data Link" (PS/RF-LL 2028/2) and "Stepper Motor Display". B.J. Evans

26

\

Page 27: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ RF/ Note 94-18

PS/ RF/ Note 94-19

PS/ RF/ Note 94-20

PS/ RF/ Note 94-21

PS/ RF/ Note 94-22

PS/ RF I Note 94-23 (Spec.)

PS/ RF/ Note 94-24 (Min.)

PS/ RF/ Note 94-25

PS/ RF/ Note 94-26

PS/ RF/ Note 94-27 (Min.)

PS/ RF/ Note 94-28

PS/ RF I Note 94-29 (Min.)

PS/ RF/ Note 94-30 (MD)

PS/ RF/ Note 94-31 (Min.)

PS/ RF I Note 94-32

Description of "Digital Loop Processor" (PS/RF-LL 2003-2)

B.J. Evans

Voltage Controlled Amplifiers Used in the AA Production Beam Low-Level RF System

B.J. Evans

Description of "Dual ITL SP 2T' with Added Inverter

B./. Evans

Description of "Inductance Bias Control" (PS/RF-LL 2034/2) and "Inductance Bias Control Interlock" card.

B.J. Evans

Notes on the "114 MHz Switch and Delay" (PS-RF-LL-2065) and "EPA Switch and Delay" (PS/RF-LL-20661) Plug-ins

B.J. Evans

Technical Specification for the PS-RF NIM Powered Crates

J-L. Vallet

CPS94-RF No. 6. Reunion du 11.4.1994

R. Garoby

Logarithmic or Linear Automatic RF Voltage Control (Module PS/RF-HC3155)

D. Grier and P. Maesen

The G64 Interface Used to Control the Radio Frequency Equipment in the PS Booster.

Cl. Dehavay, P. Maesen

CPS94-RFNo. 7. Reunion du 19.4.1994

R. Garoby

Description of PLDs Used in the "High Resolution Phase Shi.fter" (PS/RF-LS 5001).

B./. Evans

CPS94-RF No. 8. Reunion du 3.5.1994

R. Garoby

Acceleration Using the Lead Ion Beam Control with a ~nic Number Change on Intermediate Flat-Top in the PSB Participants : R. Garoby, M. Paoluzzi, G.C. Schneider (Author)

CPS94-RFNo. 9. Reunion du 24.5.1994

R. Garoby

120 W, 100 kHz to 110 MHz Solid State Amplifier (PS/RF-HC 3115)

M. Paoluzzi

27

Page 28: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ RF I Note 94-33 (Min.}

PS/ RF/ Note 94-34 (MD}

PS/ RF/ Note 94-35 (Min.)

PS/ RF I Note 94-36 (MD)

PS/ RF/ Note 94-37

PS/ RF/ Note 94-38 (MD)

PS/ RF/ Note 94-39 (Spec.}

PS/ RF I Note 94-40 (Spec.)

PS/ RF/ Note 94-41 (Min.)

PS/ RF/ Note 94-42 (Min.)

PS/ RF/ Note 94-43 (Min.)

PS/ RF/ Note 94-44 (Min.)

PS/ RF/ Note 94-45

PS/ RF/ Note 94-46

PS/ RF I Note 94-47

CPS94-RF No. 10. Reunion du 7.6.1994

R. Garoby

Compte rendu de MD PSB Plomb, Cycle MDION (4 &: 6 .7.1994)

F. Blas (auteur), R. Garoby, G. Schneider

CPS94 - No. 12 - Reunion du 2/~/94

R. Garoby

Compte Rendu de MD sur le PSB. Acceleration d'ions Plomb , Cycle Mdion (29 juillet 1994)

F. Blas (auteur), R. Garoby, F. Pedersen, G. Schneider

Description of PLD's used in the Linac 3 ECR Source Controls Interface

B.f. Evans

PS Machine Development Report. Premiere tentative d'acceleration d'ions Pb53

• au PS

R. Garoby

Technical Specification for a Digitizing Oscilloscope

F. Blas

Technical Specification for Solid-State RF Power Amplifiers for the CERN LINAC III 202 MHz RF System

/. Broere

CPS94 - No. 13 - Reunion du 16/9/94

R. Garoby

Minutes of a Meeting on Vacuum Aspects of the PS/RF 40 MHz (LHC} Prototype Cavity (PE-2232/LHC/PS, IT 2232/LHC/PS}

E. Jensen

Minutes of a Meeting on the Amplifier of the PS/RF 40 MHz (LHC) Prototype Cavity

E. /ensen

CPS94 - No. 14 - Reunion du 18/10/1994

R. Garoby

Digitizing Recorder

F. Blas

Digital Loop Processor

F. Blas

Digital Arithmetic Unit

F. Blas

28

Page 29: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,

PS/ RF/ Note 94-48 (Min.)

PS/CO/Note 94-78 (Min.)

PS/ RF/ Note 94-49

PSI RF/ Note 94-50

PS/ RF/ Note 94-51

PS/ RF/ Note 94-52

PS/ RF I Note 94-53

Distribution

B.W. Allardyce M.Boutheon D.J.Simon PS Group Leaders PS Secretaries

(Min.)

CPS94-No. 15- Reunion du 15/11/1994

Ch. Serre

Definition of the Control Parameters for the RF Systems of Linacs 2 &: 3

J.B. Evans

Minutes of a Meeting on the Forging of the PS/RF 40 MHz (LHC) Prototype Cavity

E. Jensen

Digital Comb Filter PS/RF-LL 2060/2

F. Blas R. Garoby

Cahier des Charges pour un ''B Train Interface"

F. Blas

Digital 8 Bit Notch Filter PS/RF-LL 2062/2

F. Blas

Edited by Susan Neboux

Database available on PS Server PSDIV\PS\PSNOTES\PSNOTE94.FM and SECRETARIES \PUBLIC\PSNOTES\PSNOTE94.FM

29

Page 30: List of PS Divisional Notes 1994 - CERNConversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994) Ch. Serre Replacement of the ICVI 96 by the VMOD-TTI.. Module A. Gagnaire,