List of projects selected for funding

Embed Size (px)

Citation preview

Page 1: List of projects selected for funding

PCI name Action type Action name Applicant(s)Action

location

Maximum EU

financial assistance

(in EUR)

PCI compressed air energy storage in United

Kingdom - LarneStudy CAES Larne EIA & FEED

Gaelectric Energy

Storage LtdUK 6,465,000

PCI France - Ireland interconnection between

La Martyre (FR) and Great Island or Knockraha

(IE)

Study Celtic Interconnector Feasibility StudyRTE Reseau de Transport

d'Electricite / EirGrid plcIE, FR 3,860,332

France - United Kingdom interconnection

between Coquelles (FR) and Folkestone (UK)

[currently known as the ElecLink project]

Study ElecLink ElecLink Limited UK, FR 492,669

Ireland - United Kingdom interconnection

between Co. Offaly (IE), Pembroke and Pentir

(UK)

Study Greenwire InterconnectorElement Power Ireland

LimitedIE, UK 809,545

Internal line between Frades B, Ribeira de

Pena and Feira (PT)Study

Environmental and engineering studies for the development of the internal (PT) Ribeira de

Pena - Vieira do Minho 1/2, 400 kV double circuit overhead line

REN Rede Electrica

Nacional, S.A.PT 250,000

Internal line between Vernerov and Vitkov (CZ) Study Final project documentation for substation Vitkov CEPS, a.s. CZ 286,000

Internal line between Vitkov and Prestice (CZ) Study Documentation for zoning permit of the line Vitkov-Prestice CEPS, a.s. CZ 951,000

Internal line between Maritsa East 1 and

Burgas (BG)Work Construction of new 400 kv OHTL between Maritsa East and Burgas

Elektroenergien

Sistemen Operator EADBG 28,996,650

LT part of interconnection between Alytus (LT)

and LT/PL borderWork Litpol Link construction LITGRID AB LT 27,376,500

PCI Reverse flow interconnection on TENP

pipeline in GermanyStudy Reverse Flow TENP - Studies Fluxys TENP GmbH DE 1,232,000

PCI Connection of Malta to the European Gas

network (gas pipeline with Italy at Gela and

Floating LNG Storage and Regasification Unit

(FSRU))

StudyRoute identification study including conceptual design and preparatory activities for the

permitting process for a gas pipeline connection between Malta and Sicily

Ministry for Energy and

Health (Government of

Malta)

MT 400,000

PCI 3rd interconnection point between

Portugal and SpainStudy

Engineering studies (basic and detailed design) for the development of the PCI - 3rd

Interconnection between Portugal and SpainREN-Gasodutos, S.A. PT 505,925

Czeszow-Kielczow pipeline,Poland-Czech

Republic interconnection [currently known as

Stork II] between Libhost- Hat (CZ-PL) -

Kedzierzyn (PL),Zdzieszowice-Kedzierzyn

pipeline

WorkPoland-Czech Republic interconnection [currently known as Stork II] between Libhost- Hat (CZ-

PL) - Kedzierzyn (PL)

Operator Gazociagow

Przesylowych GAZ-

SYSTEM S.A. / NET4GAS

s.r.o.

CZ,PL 62,659,000

Chiren UGS expansion Study Conduct of 3D seismic surveys as a part of the Chiren UGS expansion project 6.20.2. Bulgartransgaz EAD BG 3,900,000

LNG Regasification vessel in Krk (HR) Study Field and laboratory investigation studies and preparation of reports LNG Hrvatska d.o.o. HR 550,000

Gas pipeline Zlobin - Bosiljevo-Sisak - Kozarac -

Slobodnica (HR)Study

Pre-investment phase for the project of the main LNG transit gas pipeline Zlobin-Bosiljevo-

Sisak-Kozarac-SlobodnicaPlinacro Ltd HR 2,250,000

Gas pipeline from the EU to Turkmenistan via

Turkey, Georgia, Azerbaijan and the Caspian

[currently known as the combination of the

"Trans Anatolia Natural Gas Pipeline" (TANAP),

the "Expansion of the South- Caucasus

Pipeline" (SCP-(F)X) and the "Trans-Caspian

Gas Pipeline" (TCP)]

StudyEngineering studies for TANAP Scada System and Crossings under Dardanelle Strait and Evros

River

TANAP DOGALGAZ

ILETIM ANONIM SIRKETITR 2,559,000

Pipeline from offshore Cyprus to Greece

mainland via CreteStudy Eastern Mediterranean Natural Gas Pipeline - Pre-FEED Studies IGI Poseidon S.A. CY,EL 2,000,000

Finngulf LNG Study PRE-FID Studies for Finngulf LNG Terminal Gasum Oy FI 3,385,000

PCI Poland-Denmark interconnection "Baltic

Pipe"Study Feasibility Study regarding the PCI Poland - Denmark interconnection "Baltic Pipe" TRA-N-271

Energinet.dk / Operator

Gazociagow

Przesylowych GAZ-

SYSTEM S.A.

DK,PL 400,000

List of actions selected for receiving financial assistance under the first CEF Energy 2015 call for proposals

Southern Gas Priority Corridor (SGC)

Baltic Energy Market Interconnection Plan in gas Priority Corridor (BEMIP Gas)

Northern Seas offshore grid Priority Corridor ( NSOG)

North-South electricity interconnections in Western Europe Priority Corridor (NSI West Electricity)

North-South electricity interconnections in Central Eastern and South Eastern Europe Priority Corridor (NSI East Electricity)

Baltic Energy Market Interconnection Plan in electricity Priority Corridor (BEMIP Electricity)

North-South gas interconnections in Western Europe Priority Corridor (NSI West Gas)

North-South gas interconnection in Central Eastern and South Eastern Europe Priority Corridor (NSI East Gas)