37
LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 1 Name and address of the notified bodies Identification number Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives Notified bodies as per Article 12 or recognized third-party organizations as per Article 13 ASOCIACION ESPANOLA DE ENSAYOS NO DESTRUCTIVOS C/ Bocangel, 28 - 2° Izda 28028 Madrid Spain Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3 ASOCIACION ESPANOLA DE SOLDADURA Y TECNOLOGIAS DE UNION C/ Gabino Jimeno, 5B 28026 MADRID Spain Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2 ÖSTERREICHISCHE GESELLSCHAFT FÜR ZERSTÖRUNGSFREIE PRÜFUNG (ÖGFZP) Krugerstraße 16 1015 WIEN Austria Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3 INDUZERT - AKKREDITIERTE ZERTIZIERUNGS - UND ÜBERWACHUNGSSTELLE DER VOEST ALPINE STAHL LINZ GMBH Voest Alpine Straße 3 4031 LINZ Austria Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2 SCHWEIßTECHNISCHE ZENTRALANSTALT E.V. (SZA) Arsenal, Objekt 207 1030 Wien Austria Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2 UNTERSTÜTZUNGSVEREIN FÜR DIE ZERTIFIZIERUNGSSTELLE DES BERUFSFÖRDERUNGSINSTITUTES (BFI CERT) Parkstraße 11 8700 LEOBEN Austria Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2 ZERTIFIEZIERUNGSSTELLE WIFI ÖSTERREICH Wiedner Hauptstraße 63 1045 WIEN Austria Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2 DEUTSCHER VERBAND FÜR SCHWEIßEN UND VERWANDTE VERFAHREN E.V. DVS-PERSZERT IM DVS Aachener Straße 172 40223 DÜSSELDORF Germany Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : …LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 1 Name and address of the notified bodies Identification number

  • Upload
    others

  • View
    41

  • Download
    1

Embed Size (px)

Citation preview

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 1

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

ASOCIACION ESPANOLA DE ENSAYOS NO DESTRUCTIVOSC/ Bocangel, 28 - 2° Izda 28028 MadridSpain

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

ASOCIACION ESPANOLA DE SOLDADURA Y TECNOLOGIAS DE UNIONC/ Gabino Jimeno, 5B 28026 MADRIDSpain

Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2

ÖSTERREICHISCHE GESELLSCHAFT FÜR ZERSTÖRUNGSFREIE PRÜFUNG (ÖGFZP)Krugerstraße 16 1015 WIENAustria

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

INDUZERT - AKKREDITIERTE ZERTIZIERUNGS - UND ÜBERWACHUNGSSTELLE DER VOEST ALPINE STAHL LINZ GMBHVoest Alpine Straße 3 4031 LINZAustria

Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2

SCHWEIßTECHNISCHE ZENTRALANSTALT E.V. (SZA)Arsenal, Objekt 207 1030 WienAustria

Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2

UNTERSTÜTZUNGSVEREIN FÜR DIE ZERTIFIZIERUNGSSTELLE DES BERUFSFÖRDERUNGSINSTITUTES (BFI CERT)Parkstraße 11 8700 LEOBENAustria

Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2

ZERTIFIEZIERUNGSSTELLE WIFI ÖSTERREICHWiedner Hauptstraße 63 1045 WIENAustria

Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2

DEUTSCHER VERBAND FÜR SCHWEIßEN UND VERWANDTE VERFAHREN E.V. DVS-PERSZERT IM DVSAachener Straße 172 40223 DÜSSELDORFGermany

Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 2

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

DGZFP - DEUTSCHE GESELLSCHAFT FÜR ZERSTÖRUNGSFREIE PRÜFUNG E.V.Max-Planck-Strasse 6 12489 BERLINGermany

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

DVS ZERT E.V.Aachener Straße 172 40223 DÜSSELDORFGermany

Pressure equipment Approval of permanent joining procedures Annex I, 3.1.2

(SLV) SCHWEIßTECHINSCHE LEHR-UND VERSUCHANSTALT MECKLENBURG-VORPOMMERN GMBHErich-Schlesinger-Straße 50 18059 ROSTOCKGermany

Pressure equipment Approval of permanent joining proceduresApproval of permanent joining personnel

Annex I, 3.1.2Annex I, 3.1.2

(SLV)SCHWEIßTECHNISCHE LEHR- UND VERSCUHSANSTALT BERLIN-BRANDENBURG GMBHLuxemburger Straße 21 13353 BERLINGermany

Pressure equipment Approval of permanent joining proceduresApproval of permanent joining personnel

Annex I, 3.1.2Annex I, 3.1.2

(SLV) SCHWEIßTECHNISCHE LEHR- UND VERSUCHSANSTALT - MANNHEIM GMBHKäthe-Kollwitz-Straße 19 68169 MANNHEIMGermany

Pressure equipment Approval of permanent joining proceduresApproval of permanent joining personnel

Annex I, 3.1.2Annex I, 3.1.2

(SLV) SCHWEIßTECHNISCHE LEHR- UND VERSUCHSANSTALT - HALLE GMBHKöthener Str. 33a 06118 HALLEGermany

Pressure equipment Approval of permanent joining proceduresApproval of permanent joining personnel

Annex I, 3.1.2Annex I, 3.1.2

(SLV) SCHWEIßTECHNISCHE LEHR-UND VERSUCHANSTALT IM - SAARLAND GMBHHeuduckstraße 91 66117 SAARBRÜCKENGermany

Pressure equipment Approval of permanent joining proceduresApproval of permanent joining personnel

Annex I, 3.1.2Annex I, 3.1.2

(SLV)SCHWEIßTECHNISCHE LEHR-UND VERSUCHSANTALT - HANNOVERAm Lindener Hafen 1 30453 HANNOVERGermany

Pressure equipment Approval of permanent joining proceduresApproval of permanent joining personnel

Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 3

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

SECTOR CERT GMBHKirchstraße 12 53840 TROISDORFGermany

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

COFREND - CONFÉDÉRATION FRANÇAISE DES ESSAIS NON DESTRUCTIFS1 rue Boissier 75724 PARIS CEDEX 15France

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

STICHTING VOOR DE CERTIFICATIE VAN VAKBEKWAAMHEID SKOBoerhaavelaan 40, Postbus 190 2700 AD ZOETERMEERNetherlands

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

KVALITETSTEKNIK NDT ABIndustrigatan 6 46137 TROLLHÄTTANSweden

Pressure equipment Approval of permanent joining proceduresApproval of permanent joining personnel

Annex I, 3.1.2Annex I, 3.1.2

NDT TRAINING CENTER ABRegattagatan 23 72348 VASTERASSweden

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

SAQ OFP CERTIFIERING ABNeongaten 4 B 43153 MölndalSweden

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

FORCE TECHNOLOGY SWEDEN ABTallmätargatan 7 721 34 VÄSTERÅSSweden

Pressure equipment Approval of permanent joining proceduresApproval of permanent joining personnel

Annex I, 3.1.2Annex I, 3.1.2

TRK KONTROLLADMINISTRATION ABTärningholmsgatan 9 21751 MALMÖSweden

Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2

TWI CERTIFICATION LTDGranta Park Great Abingdon CB1 6AL CAMBRIGDGEUnited Kingdom

Pressure equipment Approval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

LAADUNVARMISTUS OYVarvintie 17 92100 RAAHEFinland

Pressure equipment Approval of permanent joining personnel Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 4

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

CENTRO ITALIANO DI COORDINAMENTO PER LE PROVE NON DISTRUTTIVE (CICPND)Via C. Pisacane 46 LEGNANOItaly

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

BELGIAN ASSOCIATION FOR NONDESTRUCTIVE TESTING A.S.B.L. (BANT)Allée de la Cense Rouge, 15 4031 ANGLEURBelgium

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

EUROCERT A/SLumberveien 51C 4621 KRISTIANSANDNorway

Pressure equipment Approval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

EWIS AG - EUROPÄISCHER WERKSTOFF- UND INSPEKTIONSSERVICEEinsiedelstrasse, 6 23554 LÜBECKGermany

Pressure equipment Approval of permanent joining proceduresApproval of permanent joining personnel

Annex I, 3.1.2Annex I, 3.1.2

STICHTING NEDERLANDS INSTITUUT VOOR LASTECHNIEKKrimkade, 20 2251 KA VOORSCHOTENNetherlands

Pressure equipment Approval of permanent joining proceduresApproval of permanent joining personnel

Annex I, 3.1.2Annex I, 3.1.2

CZECH WELDING SOCIETY ANBVelflikova, 4 160 75 PRAHA 6Czech Republic

Pressure equipment Approval of permanent joining proceduresApproval of permanent joining personnel

Annex I, 3.1.2Annex I, 3.1.2

ASSOCIATION FOR PERSONNEL CERTIFICATIONAreal VU Bechovice, budova 11 190 11 PRAHA 9Czech Republic

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

SFS-SERTIFIOINTI OYPL 44 (Sahaajankatu 20) 00881 HELSINKIFinland

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

RELACRE, ASSOCIAÇÃO DE LABORATÓRIOS ACREDITADOS DE PORTUGALRua Filipe Folque, 2-6°/Dt° 1050 - 113 LISBOAPortugal

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 5

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

BRITISH INSTITUTE OF NON-DESTRUCTIVE TESTING1 Spencer Parade NN1 5AA NORTHAMPTONUnited Kingdom

Pressure equipment Approval of non-destructive testing personnel Annex I, 3.1.3

AIB-VINÇOTTE INTERNATIONAL S.A.27-29, avenue André Drouart 1160 BRUXELLESBelgium

26 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

BUREAU VERITAS ASBLMechelsesteenweg, 128-136 2018 AntwerpenBelgium

27 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 6

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

INSTITUTO DE SOLDADURA E QUALIDADE (ISQ)EN 249 - Km 3, Cabanas - Leião Tagus ParkAp119-2781 OEIRAS CODEXPortugal

28 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2

APRAGAZ A.S.B.L.Chaussée de Vilvorde 156 1120 BRUXELLESBelgium

29 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

ARBEJDSTILSYNETLandskronagade, 33 2100 KOBENHAVNDenmark

30 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 7

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

TÜV SAARLAND E.V.Saarbrücker Strasse, 8 66280 SULZBACHGermany

34 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

TÜV ANLAGENTECHNIK GMBH UNTERNEHMENSGRUPPE TÜV RHEINLAND/BERLIN-BRANDENBURGAm Grauen Stein D-51105 KölnGermany

35 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

TÜV SÜDDEUTSCHLAND BAU UND BETRIEB GMBHWestendstraße, 199 80686 MÜNCHENGermany

36 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 8

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

ZURICH CERTIFICATION LIMITED54, Hagley Road - Edgbaston B16 8QP BIRMINGHAMUnited Kingdom

37 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

LLOYD'S REGISTER OF SHIPPING - UK INDUSTRY - STATUTORY SERVICESMiddlemarch Office Village/Siskin Drive CV3 4FJ COVENTRYUnited Kingdom

38 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 9

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

ROYAL & SUN ALLIANCE INSURANCE PLC(TRADING AS ROYAL & SUN ALLIANCE CERTIFICATION SERVICES)17 York Street M2 3RS MANCHESTERUnited Kingdom

40 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

PLANT SAFETY LTDParklands - Wilmslow Road - Didsbury M20 2RE MANCHESTERUnited Kingdom

41 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

TÜV PFALZ E.V.Merkurstraße, 45 67663 KAISERSLAUTERNGermany

43 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 10

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

RWTÜV SYSTEMS GMBHLangemarkstrasse, 20 45141 ESSENGermany

44 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

TÜV NORD E.V.TÜV CERT-ZERTIFIZIERUNGSSTELLEGroße Bahnstraße, 31 22525 HAMBURGGermany

45 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

CUALICONTROL- ACI, S.A.Caleruega, 67 28033 MADRIDSpain

52 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GArticle 11Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 11

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

ASISTENCIA TECNICA INDUSTRIAL S.A.E.Avenida de la Industria, 15 bis 28760 TRES CANTOSSpain

53 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GArticle 11Annex I, 3.1.2Annex I, 3.1.2

BUREAU VERITAS ESPAÑOL S.A.c/ Francisca Delgado,11- Arroyo de Vega 28109 ALCOBENDASSpain

54 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GArticle 11Annex I, 3.1.2Annex I, 3.1.2

ECA - ENTIDAD COLABORADORA DE LA ADMINISTRACION S.A.Avenida Tibidabo, 30 08022 BARCELONASpain

56 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GArticle 11Annex I, 3.1.2Annex I, 3.1.2

EUROCONTROL S.A.C/ Zurbano, 39 28010 MADRIDSpain

57 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GArticle 11Annex I, 3.1.2Annex I, 3.1.2

INSPECCION Y GARANTIA DE CALIDAD S.A.Via de los Dos Castillas,33 Ctr E. Atic7 28224 POZUELO DE ALARCONSpain

58 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GArticle 11Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 12

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

GROUPEMENT DES ASSOCIATIONS DE PROPRIETAIRES D'APPAREILS A VAPEUR ET ELECTRIQUES (GAPAVE)191, rue de Vaugirard 75015 PARISFrance

60 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

BUREAU VERITAS17 place des Reflets - La Défense 2 92400 COURBEVOIEFrance

62 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

LABORATOIRE NATIONAL D'ESSAIS (LNE)1, rue Gaston Boissier 75724 PARIS CEDEX 15France

71 Pressure-cookers EC Type-examinationEC design-examination

Annex III - Module BAnnex III - Module B1

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 13

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

DVGW DEUTSCHER VEREIN DES GAS- UND WASSERFACHES E.V.Josef-Wirmer-Straße 1-3 D-53123 BONNGermany

85 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1

BSI 389 Chiswick High Road W4 4AL LONDONUnited Kingdom

86 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnelApproval of nnon-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

TÜV THÜRINGEN E.V.Melchendorfer Straße. 64 99096 ERFURTGermany

90 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 14

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

TÜV TECHNISCHE ÜBERWACHUNG HESSEN GmbHRüdesheimer Straße, 119 64285 DARMSTADTGermany

91 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

LLOYD'S REGISTER ESPAÑA, S.A.C/ Princesa, 29-1° 28008 MADRIDSpain

94 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

NOVOTEC CONSULTORES, S.A.C/ Arturo Soria, 343 28033 MADRIDSpain

95 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GArticle 11Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 15

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

SGS, TECNOS, S.A.C/ Trespaderne, 29 28042 MADRIDSpain

96 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GArticle 11Annex I, 3.1.2Annex I, 3.1.2

GERMANISCHER LLOYD AG, HAUPTVERWALTUNGVorsetzen, 32 20459 HAMBURGGermany

98 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining procedures

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2

ASOCIACION ESPAÑOLA DE NORMALIZACION Y CERTIFICACION (AENOR)C/ Génova, 6 E-28004 MADRIDSpain

99 Portable fire extinguishersPressure accessoriesSafety accessories

EC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduct quality assuranceFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module EAnnex III - Module HAnnex III - Module H1

ISTITUTO SUPERIORE PREVENZIONE E SICUREZZA DEL LAVOROVia Urbana, 167 00184 ROMAItaly

100 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 16

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

DIN CERTCO GESELLSCHAFT FÜR KONFORMITÄTSBEWERTUNG MBHBurggrafenstraße 6 10787 BERLINGermany

196 Pressure accessoriesSafety accessories

EC Type-examinationProduction quality assurance

Annex III - Module BAnnex III - Module D

FORCE INSTITUT, FORCE-DANTEST CERTPark Alle 345 2605 BrøndbyDenmark

200 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnelApproval of nnon-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

STOOMWEZEN B.V.Weena Zuid 168, Postbus 769 3000 AT ROTTERDAMNetherlands

343 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 17

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

SGS UNITED KINGDOM LTDSGS House, Johns Lane-Tividale B69 3HX BIRMINGHAMUnited Kingdom

353 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

ISTITUTO DI RICERCHE, PROVE E ANALISI SRLVia Artigiani, 63 25040 BIENNOItaly

398 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

ISTITUTO GIORDANO S.P.A.Via Rossini, 2 47814 BELLARIAItaly

407 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 18

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

TÜV- ÖSTERREICHKrugerstrasse 16 1010 WIENAustria

408 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

DET NORSKE VERITAS INSPECTION ABWarfvinges väg 19B - PO Box 30234 30234SE-104 25 STOCKHOLMSweden

409 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

INSPECTA OYPO Box 44 00811 HELSINKIFinland

424 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 19

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

ITALCERTViale Sarca, 336 20216 MILANOItaly

426 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1

TEKNOLOGISK INSTITUTT - ITPO BOX 2608 - St.Hanshaugen 0131 OSLONorway

435 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

METALLURGICAL INDUSTRIAL RESEARCH & TECHNOLOGICAL DEVELOPMENT CENTER - MIRTEC S.A.A' Industrial Area of Volos 38500 VOLOSGreece

437 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 20

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

CENTRO DE APOIO TECNOLÓGICO À INDÚSTRIA METALOMECÂNICARua dos Plátanos, 197 4100 PORTOPortugal

464 Pressure equipment EC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduct quality assuranceProduct verificationFull quality assurance

Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module EAnnex III - Module FAnnex III - Module H

VERITEC LIMITEDFaraday H.-The Village, Birchwood House WA3 6FZ WARRINGTONUnited Kingdom

466 Pressure equipment and assemblies except for portable fire extinguishers and bottles for breathing apparatus

Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GAnnex I, 3.1.2Annex I, 3.1.2

ISTITUTO ITALIANO DELLA SALDATURAVia Lungobisagno Istria 15 16141 GENOVAItaly

475 Pressure equipment European approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

CONSORZIO DNV - MODULO UNO Via Paracelso 20, 20041 AGRATE BRIANZAItaly

496 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 21

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

CENTRO SVILUPPO SETTORE IMPIEGO SPA (CSI)Via Lombardia, 20 20021 BollateItaly

497 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1

LLOYD'S REGISTER QUALITY ASSURANCE GmbHManagementzertifizierer und UmweltgutachterorganisationMönckebergstraße, 27 20095 HAMBURGGermany

525 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApprooval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

CENTRE TECHNIQUE DES INDUSTRIES MECANIQUES (CETIM)52, rue Felix Louat - B.P. 80067 60304 SENLISFrance

526 Pressure equipment European approval of materials Article 11

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 22

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

ABS GROUP LIMITEDABS House - 1 Frying Pan Alley E1 7HR LONDONUnited Kingdom

528 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

TÜV BAYERN SZA TECHNISCHE PRÜF-GMBHArsenal Objekt, 207 1030 WienAustria

531 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

TPA - ENERGIE- UND UMWELTTECHNIK GMBHLaxenburgerstraße, 228 1230 WienAustria

532 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testingg personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 23

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

ISTITUTO DI CERTIFICAZIONE DELLA QUALITÀ Via G. Giardino, 4 20123 MILANOItaly

546 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1

FINN STRØM A.S.Teglverksveien 9 3400 LIERNorway

572 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1

DET NORSKE VERITAS ASVeritasveien 1 1322 HOVIKNorway

575 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnelApproval of non-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 24

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

BUNDESANSTALT FÜR MATERIALFORSCHUNG UND PRÜFUNG (BAM)Unter den Eichen 87 D-12205 BERLINGermany

589 Portable fire extinguishers and bottles for breathing apparatus Safety accessories Pressure accessories

EC Type-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceEC unit verificationEuropean approval of materials

Annex III - Module BAnnex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module GArticle 11

KIWA N.V., CERTIFICATIE EN KEURINGENSir Winston Churchill-laan, 273, Postb70 2280 AB RIJSWIJKNetherlands

620 Pressure equipment and assemblies of categories II, III, IV as parts of LPG and water installations

Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1

ÅF- KONTROLL ABPO Box 35 16493 KISTASweden

640 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2

TUV HELLAS S.A.60, El. Venizelou Street 15341 AG. PARASKEVIGreece

654 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GAnnex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 25

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

MOODY TOTTRUP HELLAS S.A.Messogion avenue 387 153 43 ATHENSGreece

656 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verification

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module G

DEKRA AUTOMOBIL GMBHHandwerkstrasse 15 D-70565 STUTTGARTGermany

685 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining procedures

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2

Zentrallabor der TOS e. V. - Zertifizierungsstelle für AufzügeFischerweg 408 18069 ROSTOCKGermany

686 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 26

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

EUROPEAN CERTIFYING ORGANIZATION SPAVia Granarolo, 62 48018 FAENZAItaly

714 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2

AGBAR CERTIFICACIÓN, S.L.Torretxu Bidea, 7 48150 SONDIKASpain

720 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GArticle 11Annex I, 3.1.2Annex I, 3.1.2

ENTIDAD DE CERTIFICATION Y ASEGURAMIENTO (ECA)WTC Muelle Barc. Ed Sur, planta 7 8039 BARCELONASpain

830 Pressure equipment Production quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module HAnnex III - Module H1

THE LOSS PREVENTION CERTIFICATION BOARD (LPCB) - BRE CERTIFICATION LTD, INCORPORATING BRE CERTIFICATION, LPCB AND WIMLASGarston WD25 9XX WATFORDUnited Kingdom

832 Portable fire extinguishers EC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduct quality assuranceProduct verificationFull quality assurance

Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module EAnnex III - Module FAnnex III - Module H

Components for water and gas fire suppression and extinguishing systems

Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verification

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module H

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 27

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

Full quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module H1

INGENIERIA Y TECNICAS DE CALIDAD S.L.Polg Aurrera-Manzana 1,n°63- 1a planta 48510 TRAPAGARANSpain

844 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GArticle 11Annex I, 3.1.2Annex I, 3.1.2

ASSOCIATION POUR LA SECURITE DES APPAREILS A PRESSION (ASAP)Imm. Ampère-16, rue Ampère 95307 CERGY PONTOISEFrance

851 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

HARTFORD STEAM BOILER INTERNATIONAL GMBHFrerener Str. 13 49785 LINGENGermany

871 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining procedures

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 28

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

SIGNUM GESELLSCHAFT FÜR ANLAGENSICHERHEIT MBHIndustriepark Hoechst Geb.K801 65926 FrankfurtGermany

874 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GAnnex I, 3.1.2Annex I, 3.1.2

POLARTEST OYP.O. Box 41 01621 VANTAAFinland

875 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

HSB INSPECTION QUALITY LIMITED11 Seymor Court, Tudor Road, Manor Park WA7 1SY RUNCORNUnited Kingdom

878 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 29

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

TÜV UK LIMITEDSurrey House, Surrey Street CR9 11XZ CROYDONUnited Kingdom

879 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

GASWÄRME-INSTITUT ESSEN E.V.Hafenstrasse 101 D-45356 ESSENGermany

909 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1

RINAVE - QUALIDADE E SEGURANCA ACEEstr. Paço do Lumiar/Pólo Tecnol.,Lote17 1600-485 LISBOAPortugal

933 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 30

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

VELOSI CERTIFICATION BUREAU LIMITEDClifton House - 318A Kings Road RG1 4JG READINGUnited Kingdom

946 Pressure equipment and assemblies except for portable fire extinguishers and bottles for breathing apparatus

Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

TUV - ITALIA SRL Via Bettola 32 20092 CINISELLO BALSAMOItaly

948 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1

AIB - VINCOTTE NEDERLAND B.V.Heusing 2 - Postbus 6869 4802 HW BREDANetherlands

954 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnelApproval of nnon-destructive testing personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2Annex I, 3.1.3

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 31

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

BRITISH INSPECTING ENGINEERS LIMITEDChatsworth Technology Park - Dunston Roa S41 8XA ChesterfieldUnited Kingdom

964 Portable fire extinguishers and bottles for breathing apparatus Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materials

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11

INSTITUTO TECNOLÓGICO DO GÁS ( ITG )Av. Almirante G. Coutinho, C. E. Sintra Ed. 15 2710 SINTRAPortugal

1006 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2

STROJIRENSKY ZKUSEBNI USTAV S.P.hudcova 56B 621 00 BRNOCzech Republic

1015 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 32

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

ITI TUV S.R.O.Modranska 98 147 00 PRAHA 4Czech Republic

1017 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

TÜV INTERNACIONAL GRUPO TÜV RHEINLAND, S.L.C/ José Silva, 17 28043 MadridSpain

1027 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GArticle 11Annex I, 3.1.2Annex I, 3.1.2

STAATLICH MATERIALPRÜFUNGSANSTALT UNIVERSITÄT STUTTGARTPfaffenwaldring, 32 70569 STUTTGARTGermany

1080 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationEuropean approval of materialsApproval of permanent joining procedures

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GArticle 11Annex I, 3.1.2

ECOSIM SRLVia Ponchielli 28/B 51016 MONTECATINI TERMEItaly

1091 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verification

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module G

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 33

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

SOCIETA CONSORTILE PASCAL A.R.L.Via G. Giardino 4 20123 MILANOItaly

1115 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

KW2 METINGEN EN INSPECTIES B.V.Terminalweg, 4/ Postbus 2620 3800 GD AMERSFOORTNetherlands

1117 Pressure equipment of categories II, III, IV as parts of refrigeration installations

Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verification

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module G

EUROPEAN INSPECTION AND CERTIFICATION COMPANY SA - EUROCERT SATatoiou 73 & Char. Trikoupi 14564 ATHENSGreece

1128 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verification

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module G

CONCERT S.R.L.Viale Regina Margherita, 125 00198 ROMAItaly

1129 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 34

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

CONSORZIO RINA OMECOPiazza della Vittoria 10/7 GENOVAItaly

1130 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

CONSORZIO EUROPEO CERTIFICAZIONE - CECVia Pisacane, 46 LEGNANOItaly

1131 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

BUREAU VERITAS QUALITY INTERNATIONAL B.V.Westblaak, 7 3012 KC ROTTERDAMNetherlands

1151 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 35

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

SGS - CIAT PORTUGUESA - CONSULTORIA, INSPECÇÃO E AUDITORIAS TECNICAS, UNIPESSOAL, LDAAv. José Gomes Ferreira, Ed Atlas 5°/6° 1495-139 MIRAFLORES-ALGÉSPortugal

1155 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2

SGS ICS IBERICA, S.A.C/ Trespaderne, 29 28042 MADRIDSpain

1181 Pressure equipment Production quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module HAnnex III - Module H1

SCHWEIßTECHNISCHE LEHR- UND VERSUCHANSTALT SLV - DUISBURG, NIEDERLASSUNG DER GSI MBHBismarckstrasse, 85 47057 DUISBURGGermany

1182 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

TECNO SRLVia del Portici 27 17014 CAIRO MONTENOTTEItaly

1214 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verification

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module G

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 36

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

RWTÜV PRAHA, SPOL.SR.O.Pod Hajkem 1 180 00 PRAHA 8Czech Republic

1221 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

NORSK KJELKONTROLL A/SRognahaugen 4 6065 ULSTEINVIKNorway

1223 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verification

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module G

EURO-PED SRLVia Aeroporto Francesco Baracca 4 39100 BOLZANOItaly

1233 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentEuropean approval of materialsApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Article 11Annex I, 3.1.2Annex I, 3.1.2

LLOYD'S REGISTER OF SHIPPING AND INDUSTRIAL SERVICES SA87Akti Miaouli 185 38 Piraeus Greece

1241 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verification

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module G

LIST OF BODIES NOTIFIED UNDER DIRECTIVE : 97/23/EC Pressure equipment Page 37

Name and address of the notified bodies Identification number

Responsible for the following products Responsible for the following procedures / modules Annexes / articles of the directives

Notified bodies as per Article 12 or recognized third-party organizations as per Article 13

ENERGIE CONSULT HOLLAND B.V.Plesmanstraat, 59 3905 KZ VEENENDAALNetherlands

1242 Pressure equipment and assemblies of categories II, III, IV as parts of refrigeration installations

Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verification

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module G

SWISS TS TECHNICAL SERVICES AGRichtistrasse, 15 8304 WALLISELLENSwitzerland

1257 Pressure equipment Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessment

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1

ARROWHEAD INDUSTRIAL SERVICES LIMITEDOrion House, 14 Barn Hill PE9 2AE STAMFORDUnited Kingdom

1266 Portable fire extinguishers and bottles for breathing apparatus EC Type-examinationEC design-examinationConformity to typeProduct verificationEC unit verificationEuropean approval of materials

Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module FAnnex III - Module GArticle 11

MOODY INTERNATIONAL CERTIFICATION LTDSalisbury House, Stephenson's Way DE21 6LY DERBYUnited Kingdom

1277 Pressure equipment and assemblies except for portable fire extinguishers and bottles for breathing apparatus

Internal manufacturing checks with monitoring of the final assessmentEC Type-examinationEC design-examinationConformity to typeProduction quality assuranceProduction quality assuranceProduct quality assuranceProduct quality assuranceProduct verificationEC unit verificationFull quality assuranceFull quality assurance with design examination and special surveillance of the final assessmentApproval of permanent joining proceduresApproval of permanent joining personnel

Annex III - Module A1Annex III - Module BAnnex III - Module B1Annex III - Module C1Annex III - Module DAnnex III - Module D1Annex III - Module EAnnex III - Module E1Annex III - Module FAnnex III - Module GAnnex III - Module HAnnex III - Module H1Annex I, 3.1.2Annex I, 3.1.2