l’Infra, une activité au cœur de la SNCF
INFRASTRUCTURE
French Highspeed on South East TGV line: 25 years of evolution
Jean-Paul BALENSIVice-president of Operation System and Safety DivisionSNCFEURAILSPEED 2005Milano, 7-9 November 2005
2l’Infra, une activité au cœur de la SNCF
Introduction
First French HSL was open in 1981/1983 on Paris – Lyon route.
General lines scheme:
3l’Infra, une activité au cœur de la SNCF
Building the first HSL: a bet for the National Railway Company SNCF
A French strategic and economical choice in order to revitalize railway passenger traffic.
Evolution of passenger traffic flows and modal market shares:
0
20
40
60
80
100
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
Years
In m
illio
ns o
f pas
seng
ers
CHARTER
THALYS
EUROSTAR
TGV NORD
Interconnecting TGV
TGV ATLANTIQUE
TGV SUD-EST
TGV traffic in 2002: 87.8 million pax
TGV / AIR Market Shares between Paris and Lyon
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
AIR TGVNew Line Commissioning
4l’Infra, une activité au cœur de la SNCF
Building the first HSL: a bet for the National Railway Company SNCF (2)
A completely new technical environment and a major investment for SNCF: new dedicated infrastructure, new signalling system, new type of rolling stock.
Investment costs:
TGV Sud-EstTGV Sud-Est
Infrastructure : 1.86Rolling stock : 1.56Total : 3.41(billion Euros)SNCF own moneyand borrows
A 90% increase in traffic ridership,
18.2 million passengers in 1991
24.3 million passengers in 2000
Profitability for:SNCF: 15% (IRT)whole community : 30%
5l’Infra, une activité au cœur de la SNCF
How to ensure safety running at 300 km/h?
Adapting infrastructure to highspeed: Enclosed line and no level crossing Wider distance between tracks Either-direction working tracks
6l’Infra, une activité au cœur de la SNCF
How to ensure safety running at 300 km/h? (2)
The cab-signal: a specific on-board system for highspeed.
Scheme of TVM 300 et TVM 430 stopping sequences:
TVM 430 system
TVM 300 system
7l’Infra, une activité au cœur de la SNCF
How to ensure safety at 300 km/h? (3)
Co-operation between SNCF and ALSTOM to build the TGV, a rolling stock designed for HSL.
Specificities of a TGV train-set:
MotorizationMotorization concentratedconcentrated underunder the the power carspower cars
4 power trucks under each trainset
Un train articulé
8l’Infra, une activité au cœur de la SNCF
How to ensure safety at 300 km/h? (4)
A new dedicated maintenance organisation: No commercial traffic during the night, Massive organisation with dedicated maintenance technical means
along the line,(extension of this organisation to conventional lines as more efficient and profitable),
Set up of a « sweeping train » with speed limit at 160 km/h every morning after maintenance works and before the first commercial train
A centralized dispatching centre grouping train operation and power supply management
Adapting safety rules to a new environment: Implementing temporary operating safety rules to be progressively
included in general rules Specific measures to be taken in case of incidents on rolling stock Specific procedures to be followed in case of infrastructure
incidents
9l’Infra, une activité au cœur de la SNCF
Results in terms of safety and regularity
Collision with an obstacle on main lineswith consequences (assistance needed, injuried people,…)
0
10
20
30
40
50
60
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
Coll hors LGV Coll sur LGV
Derailment on main lines
01020304050607080
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
Déraill hors LGV dérail sur LGV
Ponctualité TGV à 05 minutes
70%
75%
80%
85%
90%
95%
100%
Janvier Février Mars Avril Mai Juin Juillet Août Septembre Octobre Novembre Décembre
Atlantique radial 2004 Atlantique radial 2005Sud-Est radial 2004 Sud-Est radial 2005Nord radial 2004 Nord radial 2005TGV 2004 TGV 2005Objectif 2005
10l’Infra, une activité au cœur de la SNCF
For-coming evolution on Paris-Lyon HSL
Paris-Lyon HSL is the first piece of the French current highspeed network
Passenger demand is still increasing on this route
The opening in 2001 of HSL continuation until Marseille brought more trains on the line section between Paris and Lyon
New HSL projects connected with this route will also bring more trains
The consequence is a lack of capacity on the Paris-Lyon route
11l’Infra, une activité au cœur de la SNCF
Solutions to increase line capacity
Increasing rolling stock capacity:
TGV Duplex (double-deck) offers +40% seats
Modifying train graphic in order to add paths and using ERTMS level 2 combined with current TVM system it is the solution retained for the future Eastern HSL Paris-Frankfurt)
12l’Infra, une activité au cœur de la SNCF