&AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Title Description Page 10. Indirects, construction management and temporary site faci.. ................................................... 2 10.10. Indirects - construction management, construction and home.. ................................................. 2 10.20. Indirects - temporary construction facilities and containers ........................................................ 3 10.40. Indirects - construction equipment, tools and supplies ............................................................... 5 100. Site Preparation ......................................................................................................................... 7 100.10. Site Preparation Works.............................................................................................................. 7 100.20. Fencing & Gates ........................................................................................................................ 8 100.30. Temporary Roads ...................................................................................................................... 8 100.40. Utility Infrastructure .................................................................................................................... 9 100.60. Final Clean up of Construction Site.......................................................................................... 10 110. Piling........................................................................................................................................ 11 110.10. Pilling Construction .................................................................................................................. 11 130. Concrete & Other Civil Works .................................................................................................. 12 130.10. Earthworks............................................................................................................................... 12 130.20. Roads & Paving Construction .................................................................................................. 16 130.30. Concrete & Grouting Construction ........................................................................................... 21 130.40. Formwork Construction ............................................................................................................ 29 130.50. Coating .................................................................................................................................... 34 130.60. Reinforcement ......................................................................................................................... 35 130.70. Embedments - Fabrication, Supply & Installation ..................................................................... 37 130.80. Fabrication Pre-cast Concrete Elements.................................................................................. 47 130.90. Transport of Elements ............................................................................................................. 58 130.100. Assembly of Elements ............................................................................................................. 58 130.110. Special Task Civil Works ......................................................................................................... 64 130.120. Special Systems / Elements for Civil Construction ................................................................... 67 140. Installation of Non Process Piping ........................................................................................... 70 140.20. PVC Piping Material ................................................................................................................. 70 140.30. PEHD Piping Material .............................................................................................................. 71 150. Finishing Works ....................................................................................................................... 73 150.10. Building Interior Work .............................................................................................................. 73 190. Structural Steel Installation ...................................................................................................... 87 190.10. Primary Structural Steel Erection / Installation ......................................................................... 87 210. Passive Fire Protection ............................................................................................................ 89 210.20. Fire Proofing Supply and Application ....................................................................................... 89 540. Supply of Non Process Piping ................................................................................................. 90 540.20. PVC Piping Material ................................................................................................................. 90 540.30. PEHD Piping Material .............................................................................................................. 91 820. Daywork Construction and Pre-commissioning/Additional Unit.. .............................................. 93 820.10. Daywork / Surcharges.............................................................................................................. 93 820.20. Additional unit Rates machinery and equipment ...................................................................... 95 820.30. Hourly rates standard cranage services ................................................................................... 96 Summary ................................................................................................................................. 98 Linde Engineering Division Printed: 2015-03-12 Page 1 of 98

Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

Embed Size (px)

Citation preview

Page 1: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of QuantitiesTable of Contents

Currency: EURProject: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Title Description Page

10. Indirects, construction management and temporary site faci.. ...................................................210.10. Indirects - construction management, construction and home.. .................................................210.20. Indirects - temporary construction facilities and containers ........................................................310.40. Indirects - construction equipment, tools and supplies...............................................................5100. Site Preparation.........................................................................................................................7100.10. Site Preparation Works..............................................................................................................7100.20. Fencing & Gates........................................................................................................................8100.30. Temporary Roads ......................................................................................................................8100.40. Utility Infrastructure....................................................................................................................9100.60. Final Clean up of Construction Site..........................................................................................10110. Piling........................................................................................................................................11110.10. Pilling Construction ..................................................................................................................11130. Concrete & Other Civil Works..................................................................................................12130.10. Earthworks...............................................................................................................................12130.20. Roads & Paving Construction ..................................................................................................16130.30. Concrete & Grouting Construction ...........................................................................................21130.40. Formwork Construction............................................................................................................29130.50. Coating ....................................................................................................................................34130.60. Reinforcement .........................................................................................................................35130.70. Embedments - Fabrication, Supply & Installation.....................................................................37130.80. Fabrication Pre-cast Concrete Elements..................................................................................47130.90. Transport of Elements .............................................................................................................58130.100. Assembly of Elements .............................................................................................................58130.110. Special Task Civil Works .........................................................................................................64130.120. Special Systems / Elements for Civil Construction...................................................................67140. Installation of Non Process Piping ...........................................................................................70140.20. PVC Piping Material.................................................................................................................70140.30. PEHD Piping Material ..............................................................................................................71150. Finishing Works.......................................................................................................................73150.10. Building Interior Work ..............................................................................................................73190. Structural Steel Installation ......................................................................................................87190.10. Primary Structural Steel Erection / Installation .........................................................................87210. Passive Fire Protection............................................................................................................89210.20. Fire Proofing Supply and Application .......................................................................................89540. Supply of Non Process Piping .................................................................................................90540.20. PVC Piping Material.................................................................................................................90540.30. PEHD Piping Material ..............................................................................................................91820. Daywork Construction and Pre-commissioning/Additional Unit.. ..............................................93820.10. Daywork / Surcharges..............................................................................................................93820.20. Additional unit Rates machinery and equipment ......................................................................95820.30. Hourly rates standard cranage services...................................................................................96

Summary .................................................................................................................................98

Linde Engineering Division

Printed: 2015-03-12 Page 1 of 98

Page 2: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

10. Indirects, construction management and temporary site facilities

10.10. Indirects - construction management, construc tion and home office services

10.10.10. Field non-manual, insurances and services

10.10.10.5 Wages, acommodation & travel, transport - all-inclusiveWages for indirect personnel (above foreman level):Cost for construction management e.g. but not limited toconstruction manager, contract administrator, HSE manager,QA/QC manager and all staff above foreman level.

Technical planning and control, settlement and measurement

- general indirect labours such as surveyor and laboratoryhelper, carrier and driver, internal security services, otherindirect labour cost

- QA/QC (as per ITP and other project requirements)

- quantity survey (invoice and progress reporting)

- any manpower to fulfill all HSE requirements, e.g. HSEmanager, supervisors (minimum ratio day shift 1:60, night shift1:30), clinic, ambulance, doctor, etc.

- contribution and provision of manpower for HSE patrol whichis organized and under control of COMPANY

- any engineering required for the execution of CONTRACTORactivities as well as for the set up of site installations

- any cost/activities for administration of documents, e.g. filing,copy, etc.

- any cost/activities for preparation/submission of documents,e.g. plan overview job sit installation, chart for expected powerand water consumption, manpower histogram, day work report(to be submitted daily based on COMPANY provided form),progress report incl. quantity tracking curves, inspectionprotocols(ITC's), quality report, progress report, M&DS(material&data sheets), procurement plan, constructionschedule level 5, method statements, project executionprocedure, provision of any kind of guarantees, any kind ofpermissions, quantity survey, invoices, any kind safe workreports, site engineering, red-lined drawings, etc.

- all cost/activities in conjunction with overall site coordination

- all overhead cost for handling of any of lower tiers ofCONTRACTOR, Manufactures, Suppliers, etc. or

Linde Engineering Division

Printed: 2015-03-12 Page 2 of 98

Page 3: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

CONTRACTOR procurement activities

- costs for manpower headcount as per COMPANY/OWNERrequest

- including indirect salaries, indemnity and pay leave, medicaltreatment, health insuranceAcommodation:including mobilisation and demobilisation, day and nightexpenses, meal expensesTransport:Cost for transport of Contractor's personnel to and from site

1 LSUM 76,397.20 Total 10.10.10. Field non-manual, insurances and ser vi.. 76,397.20

Total 10.10. Indirects - construction management, .. 76,397.20

10.20. Indirects - temporary construction facilities and containers

10.20.10. Contractor's temporary offices

WIC-Name: LE/SI-en, WIC-No.: 10. 20. 10.Remark to chapter 10.20.10including preparation and gravelling of area and temporaryfencing.

CONTRACTOR shall provide temporary office facilities andservices necessary to complete SCOPE OF WORK, but is notlimited to:

- site offices incl. sanitary facilities, furniture, archive, storage- medical and sanitary offices

- camp and/or accommodation for own manpower

- parking areas for equipment, busses, personnel/site cars

- sign boards, access stairs and ladders

- any equipment and material to fulfill all HSE requirements

- provision of PPE (Personal Protection Equipment) for allworkers according to COMPANY HSE policy and projectrequirements

- temporary fire fighting equipment as per HSE- and projectrequirements

- any shifting of temporary site installation, in particular site

Linde Engineering Division

Printed: 2015-03-12 Page 3 of 98

Page 4: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

installation at the construction area, e.g. shelters, workshop,laydown areas incl. material, bar bending and cutting shop,smoking shelter as per site requirements or instruction byCOMPANY/OWNER

- all cost/activities (equipment and material) required for heavyrain/snow protection and measures required for execution ofWORK during rain season/winter time

- provision of facilities for tool box meeting, safety awards andother appreciations

10.20.10.10 WIC-Name: LE/SI-en, WIC-No.: 10. 20. 10. 10MobilisationCONTRACTOR shall deliver, mobilise and assemble temporaryoffice facilities and services necessary to complete SCOPE OFWORK as per note to chapter 10.20.10.

1 LSUM 2,143.34

10.20.10.20 WIC-Name: LE/SI-en, WIC-No.: 10. 20. 10. 20RentalCONTRACTOR shall provide temporary office facilities andservices necessary to complete SCOPE OF WORK as per noteto chapter 10.20.10 during the construction time as per timeschedule of Exhibit/Article C.

25.00 Week 63.49 1,587.25

10.20.10.30 WIC-Name: LE/SI-en, WIC-No.: 10. 20. 10. 30DemobilisationCONTRACTOR shall disassemble and remove temporary officefacilities and services including any efforts for final cleaning ofsite incl. landscaping after finishing of the construction activities,demolishing of any building items, e.g. foundation, slabs, pipes,tanks, etc.

1 LSUM 1,355.90 Total 10.20.10. Contractor's temporary offices 5,086. 49

10.20.40. Offices and facilities for Company use

WIC-Name: LE/SI-en, WIC-No.: 10. 20. 40.Remark to chapter 10.20.40including preparation and gravelling of area and temporaryfencing.Containers for use of Company staff according specification andlayout drawing provided in Exhibit E and F.

Linde Engineering Division

Printed: 2015-03-12 Page 4 of 98

Page 5: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

10.20.40.10 WIC-Name: LE/SI-en, WIC-No.: 10. 20. 40. 10MobilisationCONTRACTOR shall deliver, mobilise and assemble offices forCompany use as per note to chapter 10.20.40.

1 LSUM 28,709.56

10.20.40.20 WIC-Name: LE/SI-en, WIC-No.: 10. 20. 40. 20RentalCONTRACTOR shall provide offices for Company use as pernote to chapter 10.20.40 during the construction time as pertime schedule of Exhibit/Article C.

53.00 Week 3,395.72 179,973.16

10.20.40.30 WIC-Name: LE/SI-en, WIC-No.: 10. 20. 40. 30DemobilisationCONTRACTOR shall disassemble and remove offices forCompany use including any efforts for final cleaning of site incl.landscaping after finishing of the construction activities,demolishing of any building items, e.g. foundation, slabs, pipes,tanks, etc.

1 LSUM 25,312.67 Total 10.20.40. Offices and facilities for Company u se 233,995.39

Total 10.20. Indirects - temporary construction fac. . 239,081.88

10.40. Indirects - construction equipment, tools and supplies

10.40.10. Indirects - construction equipment

10.40.10.5 Equipment for indirect servicesincluding operater personnel, fuel and oil expenses.For general/service machinery and equipment (e.g. tower crane,equipment which can not be allocated to one single item in theBill of Quantities) for the complete construction period.• Delivery and removal of machinery and equipment incl.loading and truck-mounted crane• Assembly, modification and disassembly of general machineryand equipment• Provision of general/service machinery and equipment• Operation- and maintenance salaries and consumables ofgeneral/service machinery and equipmentContractor to submit equipment list and to indicate which of it isincluded in this item 10.40.10.10.

1 LSUM 8,762.74

Linde Engineering Division

Printed: 2015-03-12 Page 5 of 98

Page 6: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

Total 10.40.10. Indirects - construction equipment 8, 762.74

Total 10.40. Indirects - construction equipment, .. 8 ,762.74

Total 10. Indirects, construction management and.. 32 4,241.82

Linde Engineering Division

Printed: 2015-03-12 Page 6 of 98

Page 7: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

100. Site Preparation

100.10. Site Preparation Works

100.10.10. Early Works

100.10.10.40 WIC-Name: LE/SI-en, WIC-No.: 100. 10. 10. 40Demolition and disposal of existing roadsAll WORK required for the complete execution of demolition andremoval of existing roads shall be included in the unit rate, but isnot limited to if not otherwise specified at Exhibit E"Specification": • Any kind of equipment required for the completedemolition/removal • Cutting and breaking of demolished material (un- and re-inforced concrete) to a transportable size• Sort of demolished materials according to requirements andtemporary storage • Final/complete removal and disposal of the demolishedmaterial • Any equipment/manpower required for the work • Any kind of consumables required • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

102.25 m3 91.62 9,368.15

100.10.10.50 WIC-Name: LE/SI-en, WIC-No.: 100. 10. 10. 50Demolition and disposal of existing concrete struct ures/underground facilitiesAll WORK required for the complete execution of demolition andremoval of existing concrete structure/existing undergroundfacilities shall be included in the unit rate, but is not limited to ifnot otherwise specified at Exhibit E "Specification": • Any kind of equipment required for the completedemolition/removal • Cutting and breaking of demolished material (un- and re-inforced concrete) to a transportable size • Sort of demolished materials according to requirements andtemporary storage • Final/complete removal and disposal of the demolishedmaterial • Any equipment/manpower required for the work • Any kind of consumables required • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

4.53 m3 297.99 1,349.89

Linde Engineering Division

Printed: 2015-03-12 Page 7 of 98

Page 8: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

Total 100.10.10. Early Works 10,718.04

Total 100.10. Site Preparation Works 10,718.04

100.20. Fencing & Gates

100.20.10. Fencing

100.20.10.10 WIC-Name: LE/SI-en, WIC-No.: 100. 20. 10. 10temporary fenceAll WORK required for the complete execution of temporaryfence shall be included in the unit rate, but is not limited to, if nototherwise specified at Exhibit E "Specification": • Any WORK required for the preparation of the work • Mobilization, demobilization, shifting, transport and installationof chain-link fencing, tension devices, posts, mesh size (mm):50 x 50, hot-dip galvanized or plastic coated • Vertical fence height (m): appr. 2.0 • Supply and install of pre-cast fence supports / foundations • Embedded items for all fence elements, connection elements,signs • Any equipment/manpower required for transport, lifting,placement, alignment, modification, dismantling • Any consumables required for the work • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area

590.00 m 7.63 4,501.70 Total 100.20.10. Fencing 4,501.70

Total 100.20. Fencing & Gates 4,501.70

100.30. Temporary Roads

100.30.10. Road built up

100.30.10.10 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 100. 30. 10. 10Base-course layer for temporary roads and specific lay down areas All WORK required for the complete execution of base-courselayer shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• Any activity to prepare the work incl. paperwork• Provision of material certificates• Any equipment/manpower required for the work

Linde Engineering Division

Printed: 2015-03-12 Page 8 of 98

Page 9: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Any kind of consumables required• Any HSE related measures and items, e.g. sign boards,barricades• Cleaning of work area

1.00 m3 55.08 only Unit Price Total 100.30.10. Road built up 0.00

Total 100.30. Temporary Roads 0.00

100.40. Utility Infrastructure

100.40.10. Utility Infrastructure Construction

100.40.10.10 WIC-Name: LE/SI-en, WIC-No.: 100. 40. 10. 10Temporary water tie-inAll WORK required for the complete execution of temporarywater tie-in shall be included in the unit rate, but is not limited toif not otherwise specified at Exhibit E "Specification": • Any activity to prepare the work incl. paperwork • Any equipment/manpower required for the work • All surveying activities • All excavation/backfilling activities • All kind of materials required • Provision/installation/maintenance/removal of any kind ofscaffold, platforms and ladders required for the work • Any kind of consumables required • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

1 PC 362.78 362.78

100.40.10.20 WIC-Name: LE/SI-en, WIC-No.: 100. 40. 10. 20Temporary electrical power tie-inAll WORK required for the complete execution of temporaryelectrical power tie-in shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification": • Any activity to prepare the work incl. paperwork • Any equipment/manpower required for the work • All surveying activities • All excavation/backfilling activities • All kind of materials required • Provision/installation/maintenance/removal of any kind ofscaffold, platforms and ladders required for the work • Any kind of consumables required • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

1 PC 734.70 734.70

Linde Engineering Division

Printed: 2015-03-12 Page 9 of 98

Page 10: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

Total 100.40.10. Utility Infrastructure Construction 1,097.48

Total 100.40. Utility Infrastructure 1,097.48

100.60. Final Clean up of Construction Site

100.60.10. Final Cleaning Area

100.60.10.10 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 100. 60. 10. 10Removal of all temporary installations incl. final landscapingAll WORK required for the complete removal of all temporaryinstallations incl. final landscaping shall be included in the unitrate, but is not limited to if not otherwise specified at Exhibit E"Specification": • Any activity to prepare the work incl. paperwork • Any equipment/manpower required for the work • All surveying activities • All excavation/backfilling activities • All demolition/deconstruction activities • All kind of materials required • Any kind of consumables required • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

1.00 m2 5.85 only Unit Price Total 100.60.10. Final Cleaning Area 0.00

Total 100.60. Final Clean up of Construction Site 0.0 0

Total 100. Site Preparation 16,317.22

Linde Engineering Division

Printed: 2015-03-12 Page 10 of 98

Page 11: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

110. Piling

110.10. Pilling Construction

110.10.130. Sheet Piling

110.10.130.40 WIC-Name: LE/SI-en, WIC-No.: 110. 10.130. 40Sheeting / bracing of cable/pipe trenches up to 1.5 m depthAll WORK required for the complete execution ofsheeting/bracing shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification": • All procurement activities of sheeting/bracing incl. approvalprocedure of potential supplier, shop approved drawings,material test reports, supervision/inspection of quality of steelprofile and wooden beams at suppliers premises • All work required to prepare and perform the sheeting/bracingactivities, incl. preparation/maintenance of working area ofsheeting/bracing equipment • Mobilization/Demobilization/Maintenance of all equipment,manpower, consumables, material, supervision, incl. third partysupervision required for sheet pilings. • Any surveying activities incl. of provision of survey protocols • Supply and delivery of material needed for sheeting / bracing • Furnishing, transport, handling, stock piling, lifting, tracing • Installing including placing, driving, cutting holes and othermaterials • Any HSE related measures and items, e.g. sign boards,barricades • Any tests to be carried out by third party supervision • Disassembly and complete disposal of sheets/bracings notused, e.g. damaged items or items which has be put underquarantine due to quality inspection etc. • Removal of temporary interpile sheeting and transport todisposal after use • QA/QC Inspection as per project requirements • Cleaning of work area

12.00 m2 67.55 810.60 Total 110.10.130. Sheet Piling 810.60

Total 110.10. Pilling Construction 810.60

Total 110. Piling 810.60

Linde Engineering Division

Printed: 2015-03-12 Page 11 of 98

Page 12: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

130. Concrete & Other Civil Works

130.10. Earthworks

130.10.10. Excavation

130.10.10.10 WIC-Name: LE/SI-en, WIC-No.: 130. 10. 10. 10Machine excavation (class 3/4 - easy/medium to loos e) and deposit at defined laydownareas All WORK required for the complete execution of machineexcavation shall be included in the unit rate, but is not limited to

if not otherwise specified at Exhibit E "Specification": • Any activities required for the preparation of work • All surveying activities incl. paperwork • The unit rates cover all excavation activities

independent from size and location • Handling / Transport / placement / deposit ofexcavated material incl. aptitude test and provision of certificate

test for backfill material • Temporary storage of excavated material incl.

maintenance of temporary laydown areas • Distance to temporary storage are up to 5km • Maintenance of excavation pits, e.g. dewatering, slope

protection etc. • Any equipment/manpower required for the excavation • Provision/Maintenance of any kind of shoring, support

structures • Compaction of bottom of construction pit acc.

requirements • Compaction test and load bearing capacities test of the

existing bottom of construction pit incl. third party supervision • Provision / maintenance of barricades, crossings,

access stairs etc. • Provision of HSE items and requirements, e.g. Sign

boards, activities in conjunction with confined space • Any kind of consumables required • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign

boards, barricades • Cleaning of work area

896.46 m3 24.09 21,595.72

130.10.10.30 WIC-Name: LE/SI-en, WIC-No.: 130. 10. 10. 30Hand excavationAll WORK required for the complete execution of handexcavation shall be included in the unit rate, but is not limited toif not otherwise specified at Exhibit E "Specification": • Any activities required for the preparation of work incl. relatedpaperwork • All surveying activities incl. paperwork • The unit rates cover all hand excavation activities independent

Linde Engineering Division

Printed: 2015-03-12 Page 12 of 98

Page 13: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• from size and location • Disposal of hand excavated material • Handling and temporary storage of excavated material incl.maintenance of temporary laydown areas • Maintenance of excavation pits, e.g. dewatering, slopeprotection etc. • Any equipment/manpower required for the excavation • Provision/Maintenance of any kind of shoring, supportstructures • Provision/maintenance of barricades, crossings, access stairsetc. • Provision of HSE items and requirements, e.g. Sign boards,activities in conjunction with confined space • Any kind of consumables required • All QA / QC inspections as per project requirements • Cleaning of work area

85.76 m3 117.31 10,060.51

130.10.10.70 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 130. 10. 10. 70Up-/downgrade for machine excavation class 5 - diff icult loose soil

1.00 m3 13.22 only Unit Price

130.10.10.80 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 130. 10. 10. 80Up-/downgrade for machine excavation class 6 - easy to loose rock

1.00 m3 45.73 only Unit Price Total 130.10.10. Excavation 31,656.23

130.10.20. Backfilling

130.10.20.10 WIC-Name: LE/SI-en, WIC-No.: 130. 10. 20. 10Backfill with stored materialAll WORK required for the complete execution of backfilling withstored material shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification": • Any activities required for the preparation of work incl. relatedpaperwork • Provision of material certificates • All surveying activities incl. paperwork • The unit rates cover backfill activities independent from sizeand location • Handling / transport / placement / compaction of backfillmaterial in layers acc. requirements • Any equipment/manpower required for backfill and compaction • Provision/Maintenance of any kind of shoring, supportstructures • Provision of water for backfill • Compaction test and load bearing capacities test of theexisting and backfilled material incl. third party supervision

Linde Engineering Division

Printed: 2015-03-12 Page 13 of 98

Page 14: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Provision/maintenance of barricades, crossings, access stairsetc. • Provision of HSE items and requirements, e.g. sign boards,activities in conjunction with confined space • Final disposal of surplus material • Any kind of consumables required • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

370.40 m3 36.40 13,482.56

130.10.20.20 WIC-Name: LE/SI-en, WIC-No.: 130. 10. 20. 20Backfill with new supplied specified materialAll WORK required for the complete execution of backfilling withnew supplied material shall be included in the unit rate, but isnot limited to if not otherwise specified at Exhibit E"Specification": • Any activities required for the preparation of work incl. relatedpaperwork • Provision of material certificates • All surveying activities incl. paperwork • The unit rates cover backfill activities independent from sizeand location • Supply/transport/placement/compaction of backfill material inlayers acc. to requirements • Handling/temporary storage of backfill material incl.maintenance of temporary laydown areas • Any equipment/manpower required for backfill and compaction • Provision of water for backfill • Compaction test and load bearing capacities test of theexisting and backfilled material incl. third party supervision • Provision/maintenance of barricades, crossings, access stairsetc. • Provision of HSE items and requirements, e.g. Sign boards,activities in conjunction with confined space • Any kind of consumables required • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

134.60 m3 60.92 8,199.83

130.10.20.70 WIC-Name: LE/SI-en, WIC-No.: 130. 10. 20. 70Backfill with crushed rock, 63/20mmAll WORK required for the complete execution of the base-course shall be included in the unit rate, but is not limited to ifnot otherwise specified at Exhibit E "Specification": • Levelling/shaping/compaction of soil/selected backfill • Provision of material certificates • Supply, Placement of subbase material (clean, tough, crushedrock (63/20mm), compacted at least 95 percent of maximum

Linde Engineering Division

Printed: 2015-03-12 Page 14 of 98

Page 15: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• dry density) incl. compaction tests and documentation • Finishing/levelling of subbase surface • Any equipment/manpower required for the work • Compaction test and load bearing capacities test of thebackfilled material incl. third party supervision • Any kind of consumables required • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

36.50 m3 79.18 2,890.07

130.10.20.80 WIC-Name: LE/SI-en, WIC-No.: 130. 10. 20. 80Backfill with sub-base-course material, crushed roc k 90/20mmAll WORK required for the complete execution of the sub-base-course shall be included in the unit rate, but is not limited to ifnot otherwise specified at Exhibit E "Specification": • Levelling/shaping/compaction of soil/selected backfill • Provision of material certificates • Supply, Placement of subbase material (clean, tough, crushedrock (90/20mm), compacted at least 95 percent of maximumdry density) incl. compaction tests and documentation • Finishing/levelling of subbase surface • Any equipment/manpower required for the work • Compaction test and load bearing capacities test of thebackfilled material incl. third party supervision • Any kind of consumables required • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

47.34 m3 79.18 3,748.38

130.10.20.100 WIC-Name: LE/SI-en, WIC-No.: 130. 10. 20. 100Fine gritAll WORK required for the complete execution of fine grit shallbe included in the unit rate, but is not limited to if not otherwisespecified at Exhibit E "Specification":• Levelling/shaping/compaction of fine grit• Provision of material certificates• Supply, Mixing, Placement of fine grit • Compaction incl. compaction test load bearing test anddocumentation• Levelling/shaping of top surface• Any equipment/manpower required for the work• Any kind of consumables required• All QA / QC inspections as per project requirements• Any HSE related measures and items, e.g. sign boards,barricades• Cleaning of work area

5.46 m3 221.94 1,211.79

Linde Engineering Division

Printed: 2015-03-12 Page 15 of 98

Page 16: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

130.10.20.150 WIC-Name: LE/SI-en, WIC-No.: 130. 10. 20. 150Backfill with gravel, 0/45 mmAll WORK required for the complete execution of backfilling withgravel shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification": • Any activities required for the preparation of work incl. relatedpaperwork • Provision of material certificates • All surveying activities incl. paperwork • The unit rates cover backfill activities independent from sizeand location • Handling / transport / placement / compaction of backfillmaterial in layers acc. requirements • Any equipment/manpower required for backfill and compaction • Provision/Maintenance of any kind of shoring, supportstructures • Provision of water for backfill • Compaction test and load bearing capacities test of theexisting and backfilled material incl. third party supervision • Provision/maintenance of barricades, crossings, access stairsetc. • Provision of HSE items and requirements, e.g. sign boards,activities in conjunction with confined space • Final disposal of surplus material • Any kind of consumables required • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

7.00 m3 60.92 426.44 Total 130.10.20. Backfilling 29,959.07

Total 130.10. Earthworks 61,615.30

130.20. Roads & Paving Construction

130.20.10. Roads & Paving

130.20.10.10 WIC-Name: LE/SI-en, WIC-No.: 130. 20. 10. 10Gravel for unpaved areasAll WORK required for the complete execution of gravel worksshall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• Supply, placement gravel acc. to specification and approveddetail drawing (thickness approx. 7-15cm)• finishing/levelling of surface• Fitting work around inlets, shaft covers, paved areas, etc.• Any equipment/manpower required for the work

Linde Engineering Division

Printed: 2015-03-12 Page 16 of 98

Page 17: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Any kind of consumables required• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

10.00 m3 79.18 791.80

130.20.10.20 WIC-Name: LE/SI-en, WIC-No.: 130. 20. 10. 20Concrete roads / pavingAll WORK required for the complete execution concrete pavingshall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification": • Supply and installation of concrete C20/25 incl. curing andprotection against damaging (thickness of paving / roads varies12 up to 30 cm on average incl. selected area exceeding theaverage thickness) • Fitting work around inlets, shaft covers, etc. • Finishing (wood flood or broom finish) / levelling of concretesurface • Formwork incl. chamfers • Any kind of joints e.g. expansion joints and saw cutting joints • Soft boards for joints • Any equipment/manpower required for the work • Any kind of consumables required • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area Following items will be compensated separately with regard tothe corresponding BOQ item unit rate: • Subbase material • PE-sheet • upgrade of concrete strength and/or other concrete additives • Reinforcement • Joint sealant (hydrocarbons resistant) • Coating of selected areas • Floor hardener • Paving marking / painting due to HSE reasons • Dowels for expansion joints • Curbs and concrete pedestals for minor structural steel, pipesupports or equipment supports integrated in the paving slab Comparable concrete classes:• B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

21.12 m3 231.51 4,889.49

130.20.10.110 WIC-Name: LE/SI-en, WIC-No.: 130. 20. 10. 110Paving joint sealantAll WORK required for the complete supply and installation ofpaving joint sealant shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification":• Cleaning of joints, removal of top portion of soft boards

Linde Engineering Division

Printed: 2015-03-12 Page 17 of 98

Page 18: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Masking tape• Supply, application of sealant material (flexible, one-component sealant based on polyurethane with goodmechanical resistant, good resistance against hydrocarbonsand permissible movement capacity ) incl. primer, e.g. Sikaflex-PRO 3 WF manufactured BY SIKA or equivalent material• Provision of material certificates• installation acc. manufacturer´s guideline • Any equipment/manpower required for the work• Any kind of consumables required• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

41.80 m 68.07 2,845.33

130.20.10.130 WIC-Name: LE/SI-en, WIC-No.: 130. 20. 10. 130Paving / road markingAll WORK required for the complete supply and application ofpaving / road marking shall be included in the unit rate, but isnot limited to if not otherwise specified at Exhibit E"Specification":• All preparation activities• Provision of material certificates• Supply, adding of paving/road marking paint (1-component,film-forming, aqueous-binder-based paint for thin layer, sprayapplied, on asphalt and concrete substrates), colour as perspecification, e.g. Triflex Hydro Line manufactured by TRIFLEXor equivalent• Any equipment/manpower required for the work• Any kind of consumables required• Finishing/curing/touch up paint• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

12.00 m 31.40 376.80

130.20.10.150 WIC-Name: LE/SI-en, WIC-No.: 130. 20. 10. 150Boarder stone for walkwaysAll WORK required for the complete supply and installation ofboarder stones shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification":• All preparation activities• Supply and installation of boarder stone e.g. pre-cast concreteboarder stone or equivalent• Any equipment/manpower required for the work• Any kind of consumables required incl. lean concrete supportand joint filling• Any HSE related measures and items, e.g. sign boards,

Linde Engineering Division

Printed: 2015-03-12 Page 18 of 98

Page 19: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• barricades• QA/QC Inspection as per project requirements• Cleaning of work area

7.00 m 54.69 382.83

130.20.10.160 WIC-Name: LE/SI-en, WIC-No.: 130. 20. 10. 160concrete cobble stones / brick pavers All WORK required for the complete execution of concretecobble stones / brick pavers, shall be included in the unit rate,but is not limited to if not otherwise specified at Exhibit E

"Specification": • All work required to prepare and perform the work, incl.preparation of working area, protection of adjacent items and

related paperwork, e.g. permissions etc. • Provision of material certificates • Supply/application of concrete cobble stones incl.

surrounds and fine chips, joints, lean concrete etc. • Transport, handling, shifting, intermediatestorage/protection of tiles, profiles, adhesive and mortar incl.

preparation of storage areas • All equipment/manpower required for the work • Cutting/alignment/surveying • Any consumables required for the work • All QA / QC inspections as per project requirements • HSE related measures, e. g sign boards, barricades • Cleaning of work area

9.10 m2 168.47 1,533.08

130.20.10.180 WIC-Name: LE/SI-en, WIC-No.: 130. 20. 10. 180Paving cutting jointAll WORK required for the complete execution of paving cuttingjoint shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• Preparation of cutting joint• Any equipment/manpower required for the work• Any kind of consumables required• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

8.00 m 41.19 329.52

130.20.10.190 WIC-Name: LE/SI-en, WIC-No.: 130. 20. 10. 190Paving movement jointAll WORK required for the complete execution of pavingmovement joint shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification":• Preparation of movement joint• Any equipment/manpower required for the work• Any kind of consumables required• Any HSE related measures and items, e.g. sign boards,

Linde Engineering Division

Printed: 2015-03-12 Page 19 of 98

Page 20: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• barricades• QA/QC Inspection as per project requirements• Cleaning of work area

4.00 m 60.39 241.56 Total 130.20.10. Roads & Paving 11,390.41

130.20.20. Accompanying tasks

130.20.20.70 WIC-Name: LE/SI-en, WIC-No.: 130. 20. 20. 70Grating light duty, galvanizedAll WORK required for the complete supply and installation ofgrating, light duty shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification": • Any WORK required for the preparation of the work • The unit rate covers all kind of grating, light duty independentfrom there size and location • Transport, handling, installation, placing, alignment of grating,light duty (wheel load 20kN on 0,24x0,25m, 10 kN/m2), as perspecification • Intermediate storage/protection of grating, light duty, supportsand consumables • Any equipment/manpower required for the handling andinstallation • All consumables screws, nuts, washers, dowels, weldingseams, cut-outs etc. • Cleaning, touch up paint • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area

9.60 m2 173.92 1,669.63

130.20.20.80 WIC-Name: LE/SI-en, WIC-No.: 130. 20. 20. 80Grating medium duty, galvanizedAll WORK required for the complete supply and installation ofgrating, medium duty shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification":• Any WORK required for the preparation of the work• The unit rate covers all kind of grating, medium duty (wheelload 30 kN on 0,24x0,25m, 12,5 kN/m2) independent from theresize and location• Transport, handling, installation, placing, alignment of grating,medium duty, as per specification • Intermediate storage/protection of grating, medium duty,supports and consumables• Any equipment/manpower required for the handling andinstallation• All consumables screws, nuts, washers, dowels, weldingseams, cut-outs etc.• Cleaning, touch up paint

Linde Engineering Division

Printed: 2015-03-12 Page 20 of 98

Page 21: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

34.44 m2 173.92 5,989.80

130.20.20.110 WIC-Name: LE/SI-en, WIC-No.: 130. 20. 20. 110Checkered platesAll WORK required for the complete supply and installation ofcheckered plate shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification":• Any WORK required for the preparation of the work• The unit rate covers all kind of checkered plates independentfrom there size and location• Transport, handling, installation, placing, alignment of as perspecification • Intermediate storage/protection, supports and consumables• Any equipment/manpower required for the handling andinstallation• All consumables screws, nuts, washers, dowels, weldingseams, cut-outs etc.• Cleaning, touch up paint• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

8.81 m2 291.29 2,566.26 Total 130.20.20. Accompanying tasks 10,225.69

Total 130.20. Roads & Paving Construction 21,616.10

130.30. Concrete & Grouting Construction

130.30.10. Lean Concrete

130.30.10.10 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 10. 10Concrete: strength C 8/10All WORK required for the complete execution of concreteworks shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification": • Any work required for the preparation of concrete pours incl.permissions • The unit rate covers all kinds of in situ concrete itemsindependent from there size and location • Supply, placement of concrete, aggregates as perspecification • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any equipment/manpower required for mixing, transport,

Linde Engineering Division

Printed: 2015-03-12 Page 21 of 98

Page 22: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• conveying, compacting • Concrete tests (on site and at the laboratory), incl. third partysupervision • Curing incl. all required consumables, e.g. water, Hessianlayers, PH-sheets, heat or cold insulation • Finishing/levelling/cosmetics • Closing of tie rod holes acc. to applicable quality criteria • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area Comparable concrete classes:• B10 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C8/10(EN 206-1) / 2000 PSI (ACI 318-83)

27.40 m3 140.84 3,859.02

130.30.10.20 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 10. 20Concrete: strength C 12/15All WORK required for the complete execution of concreteworks shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification": • Any work required for the preparation of concrete pours incl.permissions • The unit rate covers all kinds of in situ concrete itemsindependent from there size and location • Supply, placement of concrete, aggregates as perspecification • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any equipment/manpower required for mixing, transport,conveying, compacting • Concrete tests (on site and at the laboratory), incl. third partysupervision • Curing incl. all required consumables, e.g. water, Hessianlayers, PH-sheets, heat or cold insulation • Finishing/levelling/cosmetics • Closing of tie rod holes acc. to applicable quality criteria • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area Comparable concrete classes:• B15 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C12/15(EN 206-1) / 2000 PSI (ACI 318-83)

60.38 m3 144.05 8,697.74 Total 130.30.10. Lean Concrete 12,556.76

Linde Engineering Division

Printed: 2015-03-12 Page 22 of 98

Page 23: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

130.30.20. Concrete Elements

130.30.20.10 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 20. 10Concrete for foundations/-slabs, compression streng th: C20/25All WORK required for the complete execution of concreteworks for concrete foundations/-slabs shall be included in theunit rate, but is not limited to if not otherwise specified at ExhibitE "Specification": • Any work required for the preparation of concrete pours incl.permissions • The unit rate covers all kind of in situ concrete foundationindependent from there size and location • Supply, placement of concrete, compacting, aggregates as perspecification • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any equipment/manpower required for mixing, transport,conveying, compacting • Concrete tests (on site and at the laboratory), incl. third partysupervision • Curing incl. all required consumables, e.g. water, Hessianlayers, PH-sheets, heat or cold insulation • Closing of tie rod holes acc. to applicable quality criteria • Finishing/levelling/cosmetics • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area Following items will be compensated separately with regard tothe corresponding BoQ item unit rate: • Reinforcement • Embedments • Admixtures Comparable concrete classes: • B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

119.24 m3 137.11 16,349.00

130.30.20.20 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 20. 20Concrete for pedestals, compression strength: C20/2 5All WORK required for the complete execution of concreteworks for pedestals shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification": • Any work required for the preparation of concrete pours incl.permissions • The unit rate covers all kind of in situ concrete pedestalsindependent from there size and location • Supply, placement of concrete, compacting, aggregates as perspecification • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc.

Linde Engineering Division

Printed: 2015-03-12 Page 23 of 98

Page 24: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Any equipment/manpower required for mixing, transport,conveying, compacting • Curing incl. all required consumables, e.g. water, Hessianlayers, PH-sheets, heat or cold insulation • Concrete tests (on site and at the laboratory), incl. third partysupervision • Finishing/levelling/cosmetics • Closing of tie rod holes acc. to applicable quality criteria • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area Following items will be compensated separately with regard tothe corresponding BoQ item unit rate: • Reinforcement • Embedments • Admixtures Comparable concrete classes: • B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

4.38 m3 212.33 930.01

130.30.20.40 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 20. 40Concrete for walls, compression strength: C20/25All WORK required for the complete execution of concreteworks for concrete walls shall be included in the unit rate, but isnot limited to if not otherwise specified at Exhibit E"Specification": • Any work required for the preparation of concrete pours incl.permissions • The unit rate covers all kind of in situ concrete wallindependent from there size and location • Supply, placement of concrete, compacting, aggregates as perspecification • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any equipment/manpower required for mixing, transport,conveying, compacting • Curing incl. all required consumables, e.g. water, Hessianlayers, PH-sheets, heat or cold insulation • Concrete tests (on site and at the laboratory), incl. third partysupervision • Closing of tie rod holes acc. to applicable quality criteria • Finishing/levelling/cosmetics • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area Following items will be compensated separately with regard tothe corresponding BoQ item unit rate: • Reinforcement • Embedments

Linde Engineering Division

Printed: 2015-03-12 Page 24 of 98

Page 25: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Admixtures Comparable concrete classes: • B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

4.92 m3 147.25 724.47

130.30.20.60 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 20. 60Concrete for beams, compression strength: C20/25All WORK required for the complete execution of concreteworks for concrete beams shall be included in the unit rate, butis not limited to if not otherwise specified at Exhibit E"Specification": • Any work required for the preparation of concrete pours incl.permissions • The unit rate covers all kind of in situ concrete beamsindependent from there size and location • Supply, placement of concrete, compacting, aggregates as perspecification • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any equipment/manpower required for mixing, transport,conveying, compacting • Curing incl. all required consumables, e.g. water, Hessianlayers, PH-sheets, heat or cold insulation • Concrete tests (on site and at the laboratory), incl. third partysupervision • Finishing/levelling/cosmetics • Closing of tie rod holes acc. to applicable quality criteria • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area Following items will be compensated separately with regard tothe corresponding BoQ item unit rate: • Reinforcement • Embedments • Admixtures Comparable concrete classes: • B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

4.26 m3 144.58 615.91

130.30.20.70 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 20. 70Concrete for concrete trenches, compression strengt h: C20/25All WORK required for the complete execution of concreteworks for concrete trench shall be included in the unit rate, butis not limited to if not otherwise specified at Exhibit E"Specification": • Any work required for the preparation of concrete pours incl.permissions • The unit rate covers all kind of in situ concrete trenchesindependent from there size and location

Linde Engineering Division

Printed: 2015-03-12 Page 25 of 98

Page 26: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Supply, placement of concrete, compacting, aggregates as perspecification • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any equipment/manpower required for mixing, transport,conveying, compacting • Curing incl. all required consumables, e.g. water, Hessianlayers, PH-sheets, heat or cold insulation • Concrete tests (on site and at the laboratory), incl. third partysupervision • Closing of tie rod holes acc. to applicable quality criteria • Finishing/levelling/cosmetics • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area Following items will be compensated separately with regard tothe corresponding BoQ item unit rate: • Reinforcement • Embedments • Admixtures Comparable concrete classes:• B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

1.09 m3 167.52 182.60

130.30.20.90 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 20. 90Concrete for concrete catch basin, strength C 20/25All WORK required for the complete execution of concreteworks for concrete catch basins shall be included in the unitrate, but is not limited to if not otherwise specified at Exhibit E"Specification": • Any work required for the preparation of concrete pours incl.permissions • The unit rate covers all kind of in situ concrete catch basinsindependent from there size and location • Provision, placement, curing, finishing and placement ofconcrete • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any equipment/manpower required for mixing, transport,conveying, compacting • Curing incl. all required consumables, e.g. water, Hessianlayers, PH-sheets, heat or cold insulation • Concrete tests (on site and at the laboratory), incl. third partysupervision • Closing of tie rod holes acc. to applicable quality criteria • Finishing/levelling/cosmetics • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area

Linde Engineering Division

Printed: 2015-03-12 Page 26 of 98

Page 27: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

Following items will be compensated separately with regard tothe corresponding BoQ item unit rate: • Reinforcement • Embedments • Admixtures Comparable concrete classes: • B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

1.45 m3 167.52 242.90 Total 130.30.20. Concrete Elements 19,044.89

130.30.30. Concrete Additives

130.30.30.10 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 30. 10Upgrade concrete strength C 20/25 to C 25/30All WORK required to cover the surcharge for upgrade ofconcrete from C20/25 to C25/30 shall be included in the unitrate, but is not limited to if not otherwise specified at Exhibit E"Specification": • Provision of material certificate Comparable concrete classes:• B30 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C25/30(EN 206-1) / C30P (BS 1881) / 4000 PSI (ACI 318-83)

18.51 m3 8.54 158.08

130.30.30.20 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 30. 20Upgrade concrete strength C 20/25 to C 30/37All WORK required to cover the surcharge for upgrade ofconcrete from C20/25 to C30/37 shall be included in the unitrate, but is not limited to if not otherwise specified at Exhibit E"Specification": • Provision of material certificate Comparable concrete classes:• B35 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C30/37(EN 206-1) / C35P (BS 1881) / 5000 PSI (ACI 318-83)

0.24 m3 11.74 2.82

130.30.30.30 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 30. 30Upgrade concrete strength C 20/25 to C 35/45All WORK required to cover the surcharge for upgrade ofconcrete from C20/25 to C35/45 shall be included in the unitrate, but is not limited to if not otherwise specified at Exhibit E"Specification": • Provision of material certificate Comparable concrete classes:• B45 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C35/45(EN 206-1) / 5500 PSI (ACI 318-83)

110.46 m3 13.87 1,532.08

Linde Engineering Division

Printed: 2015-03-12 Page 27 of 98

Page 28: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

130.30.30.60 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 30. 60Surcharge for waterproof concreteAll WORK required to cover the surcharge for waterproofconcrete of work shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification":• Any work required for the preparation of concrete pours incl.permissions• Specified mixed design for waterproof concrete• Provision of material certificate• Finishing treatment of concrete• Closing of tie rod holes acc. to requirements of waterproofstructure

64.27 m3 12.80 822.66

130.30.30.120 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 30. 120Joint water stop for concrete structureAll WORK required for the complete supply and installation ofjoint water stop for concrete structure shall be included in theunit rate, but is not limited to if not otherwise specified at ExhibitE "Specification":• All preparation activities• Provision of material certificates• Supply, installation water stop metal type or plastic type(hydrocarbons resistant) incl. supports• Cutting, bending, welding acc. manufacturer´s guideline • Hydro test after concreting• Any equipment/manpower required for the work• Any kind of consumables required• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

108.19 m 71.17 7,699.88

130.30.30.121 Joint water stop for concrete structur e - water swelling rubber/tape

All WORK required for the complete supply and installation ofjoint water stop for concrete structure shall be included in theunit rate, but is not limited to if not otherwise specified at ExhibitE "Specification":• All preparation activities• Provision of material certificates• Supply, installation water stop metal type or plastic type(hydrocarbons resistant) incl. supports• Cutting, bending, welding acc. manufacturer´s guideline • Hydro test after concreting• Any equipment/manpower required for the work• Any kind of consumables required• Any HSE related measures and items, e.g. sign boards,

Linde Engineering Division

Printed: 2015-03-12 Page 28 of 98

Page 29: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• barricades• QA/QC Inspection as per project requirements• Cleaning of work area

12.40 m 14.93 185.13 Total 130.30.30. Concrete Additives 10,400.65

130.30.40. Grouting

130.30.40.20 WIC-Name: LE/SI-en, WIC-No.: 130. 30. 40. 20Grouting, cement-based, non-shrinkAll WORK required for the complete execution of cement-basedgrouting works shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification": • All work required for the preparation of work • Chipping of the concrete surface • Formwork incl. support or fixing (nailing onto concrete item isnot allowed!!!), chamfers • all areas must be free of grease and dirt • Water soacking 24 hours • Supply, placement, of grouting material (high performance,dual-expansion, non-shrink, pourable, cementitious precisiongrout), gap 15 mm up to 500 mm, e.g. Conbextra HF,Conbextra TS manufactured by FOSROC or equivalent • The unit rate covers all kinds of items to be groutedindependent from there size and location and also grouting forshear connectors, filling of pump frames etc. • All kind of scaffold and platforms required for the work • Any equipment/manpower required for mixing, transport,conveying, compacting, curing • Grouting tests (on site and at the laboratory), incl. third partysupervision • Curing incl. all required consumables, e.g. water, Hessianlayers, PH-sheets, heat or cold insulation • Finishing/levelling • Expansion joints incl. filling (if required) • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area

3.36 m3 5,420.36 18,212.41 Total 130.30.40. Grouting 18,212.41

Total 130.30. Concrete & Grouting Construction 60,214 .71

130.40. Formwork Construction

Linde Engineering Division

Printed: 2015-03-12 Page 29 of 98

Page 30: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

130.40.10. Formwork of below ground Elements

130.40.10.30 WIC-Name: LE/SI-en, WIC-No.: 130. 40. 10. 30Formwork foundations/-slabsAll WORK required for the complete execution of formworkworks shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• Any work required for the preparation formworks incl.permissions, approvals, structural calculations• All kind of strutting, scaffold, bracing and platforms requiredfor the work• Any equipment/manpower required for the handling andinstallation• Temporary storage / transport on lay-down area• Providing and fixing to correct level, line plumb, vertical,plain/smooth, leak-proof formwork in all shapes • Leaving necessary recesses, opening, chamfer etc. keepingthe same in position during concreting• Removing after the specified curing period• Application of shutter release agent• Any kind of consumables required, e.g. welding seams,braces, dowels, screws, angles etc.• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

167.52 m2 57.30 9,598.90

130.40.10.50 WIC-Name: LE/SI-en, WIC-No.: 130. 40. 10. 50Formwork pedestals, height up to plant elevation +0 ,3 m All WORK required for the complete execution offormwork works shall be included in the unit rate, but is not

limited to if not otherwise specified at Exhibit E "Specification": • Any work required for the preparation formworks incl.

permissions, approvals, structural calculations • All kind of strutting, scaffold, bracing and platforms

required for the work • Any equipment/manpower required for the handling

and installation • Temporary storage / transport on lay-down area • Providing and fixing to correct level, line plumb,

vertical, plain/smooth, leak-proof formwork in all shapes • Leaving necessary recesses, opening, chamfer etc.

keeping the same in position during concreting • Removing after the specified curing period • Application of shutter release agent • Any kind of consumables required, e.g. welding seams,

braces, dowels, screws, angles etc. • Any HSE related measures and items, e.g. sign

Linde Engineering Division

Printed: 2015-03-12 Page 30 of 98

Page 31: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• boards, barricades • QA/QC Inspection as per project requirements • Cleaning of work area

23.09 m2 137.64 3,178.11 Total 130.40.10. Formwork of below ground Elements 12 ,777.01

130.40.20. Formwork of above ground Elements

130.40.20.50 WIC-Name: LE/SI-en, WIC-No.: 130. 40. 20. 50Formwork walls, height < 6 mAll WORK required for the complete execution of formworkworks shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• Any work required for the preparation formworks incl.permissions, approvals, structural calculations• All kind of strutting, scaffold, bracing and platforms requiredfor the work• Any equipment/manpower required for the handling andinstallation• Temporary storage / transport on lay-down area• Providing and fixing to correct level, line plumb, vertical,plain/smooth, leak-proof formwork in all shapes • Leaving necessary recesses, opening, chamfer etc. keepingthe same in position during concreting• Removing after the specified curing period• Application of shutter release agent• Any kind of consumables required, e.g. welding seams,braces, dowels, screws, angles etc.• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

29.04 m2 78.74 2,286.61

130.40.20.90 WIC-Name: LE/SI-en, WIC-No.: 130. 40. 20. 90Formwork beams, height < 6 mAll WORK required for the complete execution of formworkworks shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• Any work required for the preparation formworks incl.permissions, approvals, structural calculations• All kind of strutting, scaffold, bracing and platforms requiredfor the work• Any equipment/manpower required for the handling andinstallation• Temporary storage / transport on lay-down area• Providing and fixing to correct level, line plumb, vertical,plain/smooth, leak-proof formwork in all shapes • Leaving necessary recesses, opening, chamfer etc. keepingthe same in position during concreting

Linde Engineering Division

Printed: 2015-03-12 Page 31 of 98

Page 32: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Removing after the specified curing period• Application of shutter release agent• Any kind of consumables required, e.g. welding seams,braces, dowels, screws, angles etc.• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

30.70 m2 84.29 2,587.70 Total 130.40.20. Formwork of above ground Elements 4, 874.31

130.40.30. Formwork of waterproof Elements

130.40.30.130 WIC-Name: LE/SI-en, WIC-No.: 130. 40. 30. 130Formwork for manholes and catchbasins, waterproof c oncreteAll WORK required for the complete execution of formworkworks shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• Any work required for the preparation formworks incl.permissions, approvals, structural calculations• All kind of strutting, scaffold, bracing and platforms requiredfor the work• Any equipment/manpower required for the handling andinstallation• Temporary storage / transport on lay-down area• Providing and fixing to correct level, line plumb, vertical,plain/smooth, leak-proof formwork in all shapes • Leaving necessary recesses, opening, chamfer etc. keepingthe same in position during concreting• Removing after the specified curing period• Application of shutter release agent• Any kind of consumables required, e.g. welding seams,braces, dowels, screws, angles etc.• Tie rods applicable for waterproof concrete• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

9.10 m2 70.74 643.73 Total 130.40.30. Formwork of waterproof Elements 643. 73

130.40.40. Special Task

130.40.40.10 WIC-Name: LE/SI-en, WIC-No.: 130. 40. 40. 10Formwork block outs and pockets < 0,2 m² All WORK required for the complete execution offormwork works shall be included in the unit rate, but is not

limited to if not otherwise specified at Exhibit E "Specification":

Linde Engineering Division

Printed: 2015-03-12 Page 32 of 98

Page 33: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Any work required for the preparation formworks incl. permissions, approvals, structural calculations

• All kind of strutting, scaffold, bracing and platforms required for the work

• Any equipment/manpower required for the handling and installation

• Temporary storage / transport on lay-down area • Providing and fixing to correct level, line plumb,

vertical, plain/smooth, leak-proof formwork in all shapes • Leaving necessary recesses, opening, chamfer etc.

keeping the same in position during concreting • Removing after the specified curing period • Application of shutter release agent • Any kind of consumables required, e.g. welding

seams, braces, dowels, screws, angles etc. • Any HSE related measures and items, e.g. sign

boards, barricades • QA/QC Inspection as per project requirements • Cleaning of work area

1.80 m2 368.12 662.62

130.40.40.20 WIC-Name: LE/SI-en, WIC-No.: 130. 40. 40. 20Formwork block outs and pockets < 2.5 m²All WORK required for the complete execution of formworkworks shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• Any work required for the preparation formworks incl.permissions, approvals, structural calculations• All kind of strutting, scaffold, bracing and platforms requiredfor the work• Any equipment/manpower required for the handling andinstallation• Temporary storage / transport on lay-down area• Providing and fixing to correct level, line plumb, vertical,plain/smooth, leak-proof formwork in all shapes • Leaving necessary recesses, opening, chamfer etc. keepingthe same in position during concreting• Removing after the specified curing period• Application of shutter release agent• Any kind of consumables required, e.g. welding seams,braces, dowels, screws, angles etc.• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

2.15 m2 147.25 316.59

130.40.40.30 WIC-Name: LE/SI-en, WIC-No.: 130. 40. 40. 30Formwork block outs and pockets >= 2.5 m²All WORK required for the complete execution of formworkworks shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":

Linde Engineering Division

Printed: 2015-03-12 Page 33 of 98

Page 34: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Any work required for the preparation formworks incl.permissions, approvals, structural calculations

• All kind of strutting, scaffold, bracing and platforms requiredfor the work

• Any equipment/manpower required for the handling andinstallation

• Temporary storage / transport on lay-down area• Providing and fixing to correct level, line plumb, vertical,

plain/smooth, leak-proof formwork in all shapes • Leaving necessary recesses, opening, chamfer etc. keeping

the same in position during concreting• Removing after the specified curing period• Application of shutter release agent• Any kind of consumables required, e.g. welding seams,

braces, dowels, screws, angles etc.• Any HSE related measures and items, e.g. sign boards,

barricades• QA/QC Inspection as per project requirements• Cleaning of work area

21.53 m2 86.62 1,864.93 Total 130.40.40. Special Task 2,844.14

Total 130.40. Formwork Construction 21,139.19

130.50. Coating

130.50.10. Coating Construction

130.50.10.10 WIC-Name: LE/SI-en, WIC-No.: 130. 50. 10. 10PE-sheetAll WORK required for the complete execution of PE Sheetworks shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• All work required for the preparation of work• Supply, Placement of PE-Sheet one (1) layer, 0,25 mm• Required overlap of PE-sheet shall be included in the unit rate• Any equipment/manpower required for the work• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

621.89 m2 3.16 1,965.17

130.50.10.30 WIC-Name: LE/SI-en, WIC-No.: 130. 50. 10. 30Coating bituminousAll WORK required for the complete execution of works ofbituminous coating shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification": • All work required for the preparation of work

Linde Engineering Division

Printed: 2015-03-12 Page 34 of 98

Page 35: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• All work required for surface preparation, e.g. cleaning by gritblasting or other suitable methods • Supply and application of bituminous coating acc. tomanufacturer´s specification • The unit rate covers all kinds of items to be coatedindependent from there size and location • All kind of scaffold and platforms required for the work • Any equipment/manpower required for transport, temporarystockpiling, application, curing • Adhesion tests on site, incl. third party supervision • Finishing, touch-up paint • Any kind of consumables required for the work • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area

14.05 m2 32.97 463.23

130.50.10.70 WIC-Name: LE/SI-en, WIC-No.: 130. 50. 10. 70Soft board – protection of coated areas All WORK required for the complete execution of works forsoft boards shall be included in the unit rate, but is not limited to

if not otherwise specified at Exhibit E "Specification": • All work required for the preparation of work • Supply, transport, handling, temporary stockpiling,

placing of soft boards and disposal of waste material • Protection of coating by means of soft boards • The unit rate covers all kind of items to be coated

independent from there size and location • Any equipment/manpower required for the work • Any kind of consumables required for the work and

fixing • Any HSE related measures and items, e.g. sign

boards, barricades • QA/QC Inspection as per project requirements • Cleaning of work area

14.05 m2 19.45 273.27 Total 130.50.10. Coating Construction 2,701.67

Total 130.50. Coating 2,701.67

130.60. Reinforcement

130.60.10. Reinforcement Construction

130.60.10.20 WIC-Name: LE/SI-en, WIC-No.: 130. 60. 10. 20Rebar Reinforcement, BST 500 S, yield strength 500 MpaAll WORK required for the complete execution of reinforcementworks shall be included in the unit rate, but is not limited to if not

Linde Engineering Division

Printed: 2015-03-12 Page 35 of 98

Page 36: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

otherwise specified at Exhibit E "Specification": • All work required for the preparation of work • Any equipment/manpower required for the handling, transport,temporary stockpiling, shifting as per site conditions,arrangement and disposal of waste material • Supply, bending, cutting and arrangement of rebarreinforcement BST 500S incl. spacers, binding wire etc.according to approved drawing, specification or relevantstandards • Reinforcement shall be clean and bended with spacersprofessionally placed in the formwork • Any welding connections of rebar reinforcement incl. anyconnection points/elements/rebars for passive cathodicprotection systems incl. galvanized plates as per projectspecification • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work areaComparable steel classifications:• BST 500 S (DIN 488-1) / At500C (GOST 10884-94) / Gr.75(500) (ASTM A615) / A 500 (SP 52-101-2003)

12.91 t 1,067.00 13,774.97

130.60.10.30 WIC-Name: LE/SI-en, WIC-No.: 130. 60. 10. 30Wire mesh reinforcement, BST 500 M, yield strength 500 MpaAll WORK required for the complete execution of reinforcementworks shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification": • All work required for the preparation of work • All kind of scaffold, bracing and platforms required for the work • Any equipment/manpower required for the handling, transport,temporary stockpiling, shifting as per site conditions,arrangement and disposal of waste material • Supply, bending, cutting and arrangement of wire meshreinforcement BST 500M incl. spacers, binding wire etc.according to approved drawing, specification or relevantstandards • Reinforcement shall be clean and bended with spacersprofessionally placed in the formwork • Any welding connections of wire mesh reinforcement • incl. any connection points/elements/rebars for passivecathodic protection systems incl. galvanized plates as perproject specification • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work areaComparable steel classifications: • BST 500 M (DIN 488-1) / At500C (GOST 10884-94) / Gr.75(500) (ASTM A615) / A 500 (SP 52-101-2003)

0.96 t 1,067.00 1,024.32

Linde Engineering Division

Printed: 2015-03-12 Page 36 of 98

Page 37: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

Total 130.60.10. Reinforcement Construction 14,799.29

Total 130.60. Reinforcement 14,799.29

130.70. Embedments - Fabrication, Supply & Installat ion

130.70.10. Anchor bolts - Supply

130.70.10.50 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 10. 50Anchor bolts (high strength) - fabrication & supplyAll WORK required for the complete fabrication and supply ofanchor bolts (24CrMo4) shall be included in the unit rate. • Any WORK required for the preparation of the work, e. g.preparation of anchor bolt list, material certificates, etc. • The unit rate covers all kind of anchor bolts independent fromthere size and location • All procurement activities of anchors incl. approval procedureof potential supplier, supervision/inspection of quality offabricated anchors at suppliers premises • Transport, handling, installation of anchor bolts as perspecification • Intermediate storage/protection of anchor bolts • Any equipment/manpower required for the fabrication,transport, handling • All QA / QC inspections as per project requirements • All consumables nuts, washers, anchor plates, sleeves etc.Valid Standards:• A320 (ASTM) / 24CrMo4 (EN)• GOST 24379.1-80

77.18 kg 21.87 1,687.93 Total 130.70.10. Anchor bolts - Supply 1,687.93

130.70.20. Embedded items - Fabrication & Supply

130.70.20.20 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 20. 20Steel embedments (S235 JR G1) hot dip galvanized - fabrication & supplyAll WORK required for the complete fabrication/supply of allkind of steel embedments shall be included in the unit rate, butis not limited to if not otherwise specified at Exhibit E"Specification":• Any WORK required for the preparation of the work• The unit rate covers all kind of steel embedments, hot dipgalvanized, independent from there size and location• Supply, fabrication, transport, handling of steel embedmentsas per specification• Intermediate storage/protection of steel embedments

Linde Engineering Division

Printed: 2015-03-12 Page 37 of 98

Page 38: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Any equipment/manpower required for the fabrication,transport, handling• Touch up paint• All QA / QC inspections as per project requirements• Any HSE related measures and items, e.g. sign boards,barricades

108.60 kg 3.73 405.08

130.70.20.70 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 20. 70Steel embedments stainless steel (A2) - fabrication & supplyAll WORK required for the complete fabrication/supply of allkind of stainless steel embedments shall be included in the unitrate, but is not limited to if not otherwise specified at Exhibit E"Specification":• Any WORK required for the preparation of the work• The unit rate covers all kind of stainless steel embedments,independent from there size and location• Supply, fabrication, transport, handling of steel embedmentsas per specification• Intermediate storage/protection of steel embedments• Any equipment/manpower required for the fabrication,transport, handling• Touch up paint• All QA / QC inspections as per project requirements• Any HSE related measures and items, e.g. sign boards,barricades

60.00 kg 12.80 768.00

130.70.20.90 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 20. 90Roxtec/HCX Frames - fabrication & supplyAll WORK required for the complete fabrication/supply of allkind of Roxtec/HCX frames shall be included in the unit rate, butis not limited to if not otherwise specified at Exhibit E"Specification":• Any WORK required for the preparation of the work• The unit rate covers all kind of Roxtec/HCX frames,independent from there size and location• Supply, fabrication, transport, handling of frames as perspecification• Intermediate storage/protection of frames• Any equipment/manpower required for the fabrication,transport, handling• All QA / QC inspections as per project requirements• Any HSE related measures and items, e.g. sign boards,barricades

2.00 m2 1,991.97 3,983.94 Total 130.70.20. Embedded items - Fabrication & Supp ly 5,157.02

Linde Engineering Division

Printed: 2015-03-12 Page 38 of 98

Page 39: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

130.70.30. Embedments - Installation

130.70.30.10 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 30. 10Anchor bolts of in-situ concrete items - installati onAll WORK required for the complete installation of anchor boltsshall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• Any WORK required for the preparation of the work• Any procurement activities, transport, handling, temporarystock piling of anchor bolts• Accurate placing of the bolts acc. specifications• Related surveying activity before and after concreting incl.related paper work• Protection of anchor bolts during concreting, protection untilhand over to others • Any scaffolding and platforms required for the work• Any equipment/manpower required for the work• Cleaning and touch-up paint• Any kind of consumables, templates, etc. required for the workand fixing• All QA / QC inspections as per project requirements• Any HSE related measures and items, e.g. sign boards,barricades• Cleaning of work area

1,299.46 kg 4.73 6,146.45

130.70.30.40 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 30. 40Steel embedments of in-situ concrete items - instal lationAll WORK required for the complete installation of steelembedments shall be included in the unit rate, but is not limitedto if not otherwise specified at Exhibit E "Specification": • Any WORK required for the preparation of the work • Transport, handling, temporary stock piling of steelembedments • Accurate placing of the steel embedments acc. specifications • Related surveying activity before and after concreting incl.related paper work • Protection of steel embedments during concreting, protectionuntil hand over to others • Any scaffolding and platforms required for the work • Any equipment/manpower required for the work • Any kind of consumables, templates, supports, etc. requiredfor the work and fixing • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area

168.60 kg 3.23 544.58

Linde Engineering Division

Printed: 2015-03-12 Page 39 of 98

Page 40: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

130.70.30.60 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 30. 60Roxtec/HCX frames - installationAll WORK required for the complete installation of Roxtec/HCXframes shall be included in the unit rate, but is not limited to ifnot otherwise specified at Exhibit E "Specification": • Any WORK required for the preparation of the work • Transport, handling, temporary stock piling of frames • Accurate placing of the frames acc. specifications • Related surveying activity before and after concreting incl.related paper work • Protection of steel embedments during concreting, protectionuntil hand over to others • Any scaffolding and platforms required for the work • Any equipment/manpower required for the work • Any kind of consumables, templates, supports, etc. requiredfor the work and fixing • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area

2.00 m2 209.72 419.44 Total 130.70.30. Embedments - Installation 7,110.47

130.70.40. Grounding Embedments inside foundation - Fabrication & Supply

130.70.40.10 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 40. 10Fixed grounding terminal, stainless steel - fabrica tion & supplyAll WORK required for the complete supply shall be included inthe unit rate, but is not limited to if not otherwise specified atExhibit E "Specification":• Any WORK required for the preparation of the work, e. g.preparation of material list, material certificates, etc.• The unit rate covers all kind of grounding terminal, StainlessSteel• All procurement activities of Grounding Material incl. approvalprocedure of potential supplier, supervision/inspection of qualityof fabricated anchors at suppliers premises• Transport, handling, installation of grounding materials as perspecification• Intermediate storage/protection of grounding materials• Any equipment/manpower required for the fabrication,transport, handling• All QA / QC inspections as per project requirements• All consumables and bulk material as earthing screws, bolts,nuts, washers required

30 PC 16.97 509.10

Linde Engineering Division

Printed: 2015-03-12 Page 40 of 98

Page 41: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

130.70.40.20 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 40. 20Solid round conductor, stainless steel - fabricatio n & supplyAll WORK required for the complete supply shall be included inthe unit rate, but is not limited to if not otherwise specified atExhibit E "Specification": • Any WORK required for the preparation of the work, e. g.preparation of material list, material certificates, etc. • The unit rate covers all kind of grounding terminal, StainlessSteel • All procurement activities of Grounding Material incl. approvalprocedure of potential supplier, supervision/inspection of qualityof fabricated anchors at suppliers premises • Transport, handling, installation of grounding materials as perspecification • Intermediate storage/protection of grounding materials • Any equipment/manpower required for the fabrication,transport, handling • All QA / QC inspections as per project requirements • All consumables and bulk material as earthing screws, bolts,nuts, washers required

80.00 m 7.90 632.00

130.70.40.30 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 40. 30Solid tape, stainless steel - fabrication & supplyAll WORK required for the complete supply shall be included inthe unit rate, but is not limited to if not otherwise specified atExhibit E "Specification":• Any WORK required for the preparation of the work, e. g.preparation of material list, material certificates, etc.• The unit rate covers all kind of grounding terminal, StainlessSteel• All procurement activities of Grounding Material incl. approvalprocedure of potential supplier, supervision/inspection of qualityof fabricated anchors at suppliers premises• Transport, handling, installation of grounding materials as perspecification• Intermediate storage/protection of grounding materials• Any equipment/manpower required for the fabrication,transport, handling• All QA / QC inspections as per project requirements• All consumables and bulk material as earthing screws, bolts,nuts, washers required

200.00 m 8.43 1,686.00

130.70.40.40 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 40. 40Cross joint connection, solid round conductor, stai nless steel - fabrication & supplyAll WORK required for the complete supply shall be included inthe unit rate, but is not limited to if not otherwise specified atExhibit E "Specification":• Any WORK required for the preparation of the work, e. g.preparation of material list, material certificates, etc.

Linde Engineering Division

Printed: 2015-03-12 Page 41 of 98

Page 42: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• The unit rate covers all kind of grounding terminal, StainlessSteel• All procurement activities of Grounding Material incl. approvalprocedure of potential supplier, supervision/inspection of qualityof fabricated anchors at suppliers premises• Transport, handling, installation of grounding materials as perspecification• Intermediate storage/protection of grounding materials• Any equipment/manpower required for the fabrication,transport, handling• All QA / QC inspections as per project requirements• All consumables and bulk material as earthing screws, bolts,nuts, washers required

20 PC 4.48 89.60

130.70.40.50 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 40. 50Cross joint connection, solid tape, stainless steel - fabrication & supplyAll WORK required for the complete supply shall be included inthe unit rate, but is not limited to if not otherwise specified atExhibit E "Specification":• Any WORK required for the preparation of the work, e. g.preparation of material list, material certificates, etc.• The unit rate covers all kind of grounding terminal, StainlessSteel• All procurement activities of Grounding Material incl. approvalprocedure of potential supplier, supervision/inspection of qualityof fabricated anchors at suppliers premises• Transport, handling, installation of grounding materials as perspecification• Intermediate storage/protection of grounding materials• Any equipment/manpower required for the fabrication,transport, handling• All QA / QC inspections as per project requirements• All consumables and bulk material as earthing screws, bolts,nuts, washers required

30 PC 4.48 134.40

130.70.40.70 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 40. 70Solid round conductor, galvanized steel - fabricati on & supplyAll WORK required for the complete supply shall be included inthe unit rate, but is not limited to if not otherwise specified atExhibit E "Specification": • Any WORK required for the preparation of the work, e. g.preparation of material list, material certificates, etc. • The unit rate covers all kind of grounding terminal, galvanizedsteel• All procurement activities of Grounding Material incl. approvalprocedure of potential supplier, supervision/inspection of qualityof fabricated anchors at suppliers premises • Transport, handling, installation of grounding materials as perspecification • Intermediate storage/protection of grounding materials

Linde Engineering Division

Printed: 2015-03-12 Page 42 of 98

Page 43: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Any equipment/manpower required for the fabrication,transport, handling • All QA / QC inspections as per project requirements • All consumables and bulk material as earthing screws, bolts,nuts, washers required

96.00 m 8.11 778.56

130.70.40.80 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 40. 80Solid tape, galvanized steel - fabrication & supplyAll WORK required for the complete supply shall be included inthe unit rate, but is not limited to if not otherwise specified atExhibit E "Specification": • Any WORK required for the preparation of the work, e. g.preparation of material list, material certificates, etc. • The unit rate covers all kind of grounding terminal, galvanizedsteel• All procurement activities of Grounding Material incl. approvalprocedure of potential supplier, supervision/inspection of qualityof fabricated anchors at suppliers premises • Transport, handling, installation of grounding materials as perspecification • Intermediate storage/protection of grounding materials • Any equipment/manpower required for the fabrication,transport, handling • All QA / QC inspections as per project requirements • All consumables and bulk material as earthing screws, bolts,nuts, washers required

100.00 m 5.76 576.00

130.70.40.90 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 40. 90Cross joint connection, solid round conductor, galv anized steel - fabrication & supplyAll WORK required for the complete supply shall be included inthe unit rate, but is not limited to if not otherwise specified atExhibit E "Specification": • Any WORK required for the preparation of the work, e. g.preparation of material list, material certificates, etc. • The unit rate covers all kind of grounding terminal, galvanizedsteel• All procurement activities of Grounding Material incl. approvalprocedure of potential supplier, supervision/inspection of qualityof fabricated anchors at suppliers premises • Transport, handling, installation of grounding materials as perspecification • Intermediate storage/protection of grounding materials • Any equipment/manpower required for the fabrication,transport, handling • All QA / QC inspections as per project requirements • All consumables and bulk material as earthing screws, bolts,nuts, washers required

40 PC 3.41 136.40

Linde Engineering Division

Printed: 2015-03-12 Page 43 of 98

Page 44: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

130.70.40.100 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 40. 100Cross joint connection, solid tape, galvanized stee l - fabrication & supplyAll WORK required for the complete supply shall be included inthe unit rate, but is not limited to if not otherwise specified atExhibit E "Specification": • Any WORK required for the preparation of the work, e. g.preparation of material list, material certificates, etc. • The unit rate covers all kind of grounding terminal, galvanizedsteel• All procurement activities of Grounding Material incl. approvalprocedure of potential supplier, supervision/inspection of qualityof fabricated anchors at suppliers premises • Transport, handling, installation of grounding materials as perspecification • Intermediate storage/protection of grounding materials • Any equipment/manpower required for the fabrication,transport, handling • All QA / QC inspections as per project requirements • All consumables and bulk material as earthing screws, bolts,nuts, washers required

10 PC 3.41 34.10 Total 130.70.40. Grounding Embedments inside foundat ion.. 4,576.16

130.70.50. Grounding Embedments inside foundation - Installation

130.70.50.10 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 50. 10Foundation fixed grounding terminal installation - installationAll WORK required for the complete installation of groundingelements shall be included in the unit rate, but is not limited to ifnot otherwise specified at Exhibit E "Specification": • Any WORK required for the preparation of the work • Any procurement activities, transport, handling, temporarystock piling• Accurate placing and fixing of the grounding elements(grounding terminals and plates) acc. specifications and drawing • Marking of grounding elements acc. specification • Connection and welding with reinforcement before pouring ofconcrete • Related surveying activity before and after concreting incl.related paper work • Protection of grounding elements during concreting, protectionuntil hand over to others • Any scaffolding and platforms required for the work • Any equipment/manpower required for the work • Cleaning and touch-up paint • Any kind of consumables, templates, etc. required for the workand fixing • All QA / QC inspections as per project requirements

Linde Engineering Division

Printed: 2015-03-12 Page 44 of 98

Page 45: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

36 PC 12.16 437.76

130.70.50.20 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 50. 20Solid round conductor - installationAll WORK required for the complete installation of groundingelements shall be included in the unit rate, but is not limited to ifnot otherwise specified at Exhibit E "Specification": • Any WORK required for the preparation of the work • Any procurement activities, transport, handling, temporarystock piling • Accurate placing and fixing of the grounding elements(grounding terminals and plates) acc. specifications and drawing • Marking of grounding elements acc. specification • Connection and welding with reinforcement before pouring ofconcrete • Related surveying activity before and after concreting incl.related paper work • Protection of grounding elements during concreting, protectionuntil hand over to others • Any scaffolding and platforms required for the work • Any equipment/manpower required for the work • Cleaning and touch-up paint • Any kind of consumables, templates, etc. required for the workand fixing • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

198.00 m 6.08 1,203.84

130.70.50.30 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 50. 30Solid tape - installationAll WORK required for the complete installation of groundingelements shall be included in the unit rate, but is not limited to ifnot otherwise specified at Exhibit E "Specification": • Any WORK required for the preparation of the work • Any procurement activities, transport, handling, temporarystock piling • Accurate placing and fixing of the grounding elements(grounding terminals and plates) acc. specifications and drawing • Marking of grounding elements acc. specification • Connection and welding with reinforcement before pouring ofconcrete • Related surveying activity before and after concreting incl.related paper work • Protection of grounding elements during concreting, protectionuntil hand over to others • Any scaffolding and platforms required for the work • Any equipment/manpower required for the work

Linde Engineering Division

Printed: 2015-03-12 Page 45 of 98

Page 46: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Cleaning and touch-up paint • Any kind of consumables, templates, etc. required for the workand fixing • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

300.00 m 6.08 1,824.00

130.70.50.40 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 50. 40Cross joint connection, solid round conductor - ins tallationAll WORK required for the complete installation of groundingelements shall be included in the unit rate, but is not limited to ifnot otherwise specified at Exhibit E "Specification": • Any WORK required for the preparation of the work • Any procurement activities, transport, handling, temporarystock piling • Accurate placing and fixing of the grounding elements(grounding terminals and plates) acc. specifications and drawing • Marking of grounding elements acc. specification • Connection and welding with reinforcement before pouring ofconcrete • Related surveying activity before and after concreting incl.related paper work • Protection of grounding elements during concreting, protectionuntil hand over to others • Any scaffolding and platforms required for the work • Any equipment/manpower required for the work • Cleaning and touch-up paint • Any kind of consumables, templates, etc. required for the workand fixing • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

60 PC 4.05 243.00

130.70.50.50 WIC-Name: LE/SI-en, WIC-No.: 130. 70. 50. 50Cross joint connection, solid tape - installationAll WORK required for the complete installation of groundingelements shall be included in the unit rate, but is not limited to ifnot otherwise specified at Exhibit E "Specification": • Any WORK required for the preparation of the work • Any procurement activities, transport, handling, temporarystock piling • Accurate placing and fixing of the grounding elements(grounding terminals and plates) acc. specifications and drawing • Marking of grounding elements acc. specification • Connection and welding with reinforcement before pouring ofconcrete • Related surveying activity before and after concreting incl.related paper work

Linde Engineering Division

Printed: 2015-03-12 Page 46 of 98

Page 47: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Protection of grounding elements during concreting, protectionuntil hand over to others • Any scaffolding and platforms required for the work • Any equipment/manpower required for the work • Cleaning and touch-up paint • Any kind of consumables, templates, etc. required for the workand fixing • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

40 PC 4.05 162.00 Total 130.70.50. Grounding Embedments inside foundat ion.. 3,870.60

Total 130.70. Embedments - Fabrication, Supply & Ins .. 22,402.18

130.80. Fabrication Pre-cast Concrete Elements

130.80.10. Concrete Construction for Pre-Cast Elemen ts

130.80.10.10 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 10. 10Concrete of pre-cast concrete foundation, strength C20/25All WORK required for the complete execution of concreteworks for pre-cast concrete foundation shall be included in theunit rate, but is not limited to if not otherwise specified at ExhibitE "Specification": • Any work required for the preparation of concrete pours • The unit rate covers all kind of pre-cast concrete foundationindependent from there size and location • Receipt, placement, curing, finishing and placement ofconcrete • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any kind of lifting lugs, lifting devices and equipment for safetransport and lifting • Any equipment/manpower required for mixing, transport,conveying, compacting • Concrete tests (on workshop and at the laboratory), incl. thirdparty supervision • Finishing/levelling/cosmetics • Handling, transport inside fabrication shop, temporarystockpiling, loading, transport to site and unloading on site of thefinish pre-cast concrete element • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area Following items will be compensated separately with regard tothe corresponding BoQ item unit rate:

Linde Engineering Division

Printed: 2015-03-12 Page 47 of 98

Page 48: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Reinforcement • Assembly of pre-cast elements • Embedments • Admixtures Comparable concrete classes: • B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

43.27 m3 969.63 41,955.89

130.80.10.20 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 10. 20Concrete of pre-cast concrete beam, strength C20/25All WORK required for the complete execution of concreteworks for pre-cast concrete beam shall be included in the unitrate, but is not limited to if not otherwise specified at Exhibit E"Specification": • Any work required for the preparation of concrete pours • The unit rate covers all kind of pre-cast concrete beamsindependent from there size and location • Receipt, placement, curing, finishing and placement ofconcrete • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any kind of lifting lugs, lifting devices and equipment for safetransport and lifting • Any equipment/manpower required for mixing, transport,conveying, compacting • Concrete tests (on workshop and at the laboratory), incl. thirdparty supervision • Finishing/levelling/cosmetics • Handling, transport inside fabrication shop, temporarystockpiling, loading, transport to site of the finish pre-castconcrete element • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area Following items will be compensated separately with regard tothe corresponding BoQ item unit rate: • Reinforcement • Assembly of pre-cast elements • Embedments • Admixtures Comparable concrete classes: • B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

4.36 m3 791.61 3,451.42

130.80.10.40 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 10. 40Concrete of pre-cast concrete wall, strength C20/25All WORK required for the complete execution of concreteworks for pre-cast concrete wall shall be included in the unitrate, but is not limited to if not otherwise specified at Exhibit E

Linde Engineering Division

Printed: 2015-03-12 Page 48 of 98

Page 49: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

"Specification": • Any work required for the preparation of concrete pours • The unit rate covers all kind of pre-cast concrete wallindependent from there size and location • Receipt, placement, curing, finishing and placement ofconcrete • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any kind of lifting lugs, lifting devices and equipment for safetransport and lifting • Any equipment/manpower required for mixing, transport,conveying, compacting • Concrete tests (on workshop and at the laboratory), incl. thirdparty supervision • Finishing/levelling/cosmetics • Handling, transport inside fabrication shop, temporarystockpiling, loading, transport to site and unloading on site of thefinish pre-cast concrete element • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area Following items will be compensated separately with regard tothe corresponding BoQ item unit rate: • Reinforcement • Assembly of pre-cast elements • Embedments • Admixtures Comparable concrete classes:• B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

91.85 m3 693.66 63,712.67

130.80.10.50 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 10. 50Concrete of pre-cast concrete slab, strength C20/25All WORK required for the complete execution of concreteworks for pre-cast concrete slab shall be included in the unitrate, but is not limited to if not otherwise specified at Exhibit E"Specification": • Any work required for the preparation of concrete pours • The unit rate covers all kind of pre-cast concrete slabsindependent from there size and location • Receipt, placement, curing, finishing and placement ofconcrete • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any kind of lifting lugs, lifting devices and equipment for safetransport and lifting • Any equipment/manpower required for mixing, transport,conveying, compacting • Concrete tests (on workshop and at the laboratory), incl. thirdparty supervision

Linde Engineering Division

Printed: 2015-03-12 Page 49 of 98

Page 50: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Finishing/levelling/cosmetics • Handling, transport inside fabrication shop, temporarystockpiling, loading, transport to site and unloading on site of thefinish pre-cast concrete element • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area Following items will be compensated separately with regard tothe corresponding BoQ item unit rate: • Reinforcement • Assembly of pre-cast elements • Embedments • Admixtures Comparable concrete classes:• B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

43.87 m3 577.14 25,319.13

130.80.10.70 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 10. 70Concrete of pre-cast concrete catch basin, strength C20/25All WORK required for the complete execution of concreteworks for pre-cast concrete catch basin shall be included in theunit rate, but is not limited to if not otherwise specified at ExhibitE "Specification": • Any work required for the preparation of concrete pours • The unit rate covers all kind of pre-cast concrete catch basinindependent from there size and location • Receipt, placement, curing, finishing and placement ofconcrete • Comparable concrete classes • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any kind of lifting lugs, lifting devices and equipment for safetransport and lifting • Any equipment/manpower required for mixing, transport,conveying, compacting • Concrete tests (on workshop and at the laboratory), incl. thirdparty supervision • Finishing/levelling/cosmetics • Handling, transport inside fabrication shop, temporarystockpiling, loading, transport to site and unloading on site of thefinish pre-cast concrete element • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area Following items will be compensated separately with regard tothe corresponding BoQ item unit rate: • Reinforcement • Assembly of pre-cast elements • Embedments

Linde Engineering Division

Printed: 2015-03-12 Page 50 of 98

Page 51: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Admixtures Comparable concrete classes:• B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

17.20 m3 1,440.45 24,775.74

130.80.10.80 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 10. 80Concrete of pre-cast concrete manhole, strength C20 /25All WORK required for the complete execution of concreteworks for pre-cast concrete manhole shall be included in theunit rate, but is not limited to if not otherwise specified at ExhibitE "Specification": • Any work required for the preparation of concrete pours • The unit rate covers all kind of pre-cast concrete manholeindependent from there size and location • Receipt, placement, curing, finishing and placement ofconcrete • Comparable concrete classes • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any kind of lifting lugs, lifting devices and equipment for safetransport and lifting • Any equipment/manpower required for mixing, transport,conveying, compacting • Concrete tests (on workshop and at the laboratory), incl. thirdparty supervision • Finishing/levelling/cosmetics • Handling, transport inside fabrication shop, temporarystockpiling, loading, transport to site and unloading on site of thefinish pre-cast concrete element • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area Following items will be compensated separately with regard tothe corresponding BoQ item unit rate: • Reinforcement • Assembly of pre-cast elements • Embedments • Admixtures Comparable concrete classes:• B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

4.86 m3 1,498.07 7,280.62

130.80.10.100 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 10. 100Concrete of pre-cast concrete trench, strength C20/ 25All WORK required for the complete execution of concreteworks for pre-cast concrete trench shall be included in the unitrate, but is not limited to if not otherwise specified at Exhibit E"Specification": • Any work required for the preparation of concrete pours

Linde Engineering Division

Printed: 2015-03-12 Page 51 of 98

Page 52: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• The unit rate covers all kind of pre-cast concrete trenchesindependent from there size and location • Receipt, placement, curing, finishing and placement ofconcrete • All kind of scaffold and platforms required for the work • Any kind of consumables required, e.g. spacer etc. • Any kind of lifting lugs, lifting devices and equipment for safetransport and lifting • Any equipment/manpower required for mixing, transport,conveying, compacting • Concrete tests (on workshop and at the laboratory), incl. thirdparty supervision • Finishing/levelling/cosmetics • Handling, transport inside fabrication shop, temporarystockpiling, loading, transport to site and unloading on site of thefinish pre-cast concrete element • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area Following items will be compensated separately with regard tothe corresponding BoQ item unit rate: • Reinforcement • Assembly of pre-cast elements • Embedments • Admixtures Comparable concrete classes:• B25 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C20/25(EN 206-1) / C25P (BS 1881) / 3500 PSI (ACI 318-83)

20.20 m3 1,568.55 31,684.71 Total 130.80.10. Concrete Construction for Pre-Cast Ele.. 198,180.18

130.80.20. Upgrade, surcharge for pre-cast elements

130.80.20.10 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 20. 10Upgrade concrete strength C20/25 to C25/30 for pre- cast elementsAll WORK required to cover the surcharge for upgrade ofconcrete from C20/25 to C25/30 shall be included in the unitrate, but is not limited to if not otherwise specified at Exhibit E"Specification": • Provision of material certificate Comparable concrete classes:• B30 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C25/30

(EN 206-1) / C30P (BS 1881) / 4000 PSI (ACI 318-83)8.53 m3 8.54 72.85

130.80.20.20 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 20. 20Upgrade concrete strength C20/25 to C30/37 for pre- cast elementsAll WORK required to cover the surcharge for upgrade ofconcrete from C20/25 to C30/37 shall be included in the unit

Linde Engineering Division

Printed: 2015-03-12 Page 52 of 98

Page 53: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

rate, but is not limited to if not otherwise specified at Exhibit E"Specification": • Provision of material certificate Comparable concrete classes:• B35 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C30/37(EN 206-1) / C35P (BS 1881) / 5000 PSI (ACI 318-83)

4.86 m3 12.80 62.21

130.80.20.30 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 20. 30Upgrade concrete strength C20/25 to C35/45 for pre- cast elementsAll WORK required to cover the surcharge for upgrade ofconcrete from C20/25 to C35/45 shall be included in the unitrate, but is not limited to if not otherwise specified at Exhibit E"Specification": • Provision of material certificate Comparable concrete classes: • B45 (DIN 1045, SNiP 52-01-2003, SP 52-101-2003) / C35/45(EN 206-1) / 5500 PSI (ACI 318-83)

212.20 m3 17.07 3,622.25

130.80.20.50 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 20. 50Surcharge for waterproof concrete for pre-cast elem entsAll WORK required to cover the surcharge for waterproofconcrete for complete execution of work shall be included in theunit rate, but is not limited to if not otherwise specified at ExhibitE "Specification":• Any work required for the preparation of concrete pours incl.permissions• Specified mixed design for waterproof concrete• Provision of material certificate• Finishing treatment of concrete

22.07 m3 12.80 282.50 Total 130.80.20. Upgrade, surcharge for pre-cast ele ments 4,039.81

130.80.30. Formwork for Pre-Cast Elements

130.80.30.10 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 30. 10Formwork pre-cast concrete elementsAll WORK required for the complete execution of formworkworks for pre-cast concrete elements shall be included in theunit rate, but is not limited to if not otherwise specified at ExhibitE "Specification":• Any work required for the preparation formworks • Any kind of formwork material acc. to specificationindependent from size and location of pre-cast concreteelement• All kind of strutting, scaffold, bracing and platforms requiredfor the work• Any equipment/manpower required for the handling andinstallation

Linde Engineering Division

Printed: 2015-03-12 Page 53 of 98

Page 54: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Providing and fixing to correct level, line plumb, vertical,plain/smooth, leak-proof formwork in all shapes• Leaving necessary recesses, opening, chamfer etc. keepingthe same in position during concreting• Removing after the specified curing period• Any kind of consumables required, e.g. welding seams,braces, dowels, screws, angles etc.• Application of shutter release agent• All QA / QC inspections as per project requirements• Any HSE related measures and items, e.g. sign boards,barricades• Cleaning of work area

1,260.75 m2 0.00 0.00 Total 130.80.30. Formwork for Pre-Cast Elements 0.00

130.80.40. Reinforcement Construction for Pre-Cast E lements

130.80.40.20 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 40. 20Reinforcement pre-cast concrete elements, BST 500 SAll WORK required for the complete execution of reinforcementworks for pre-cast concrete elements shall be included in theunit rate, but is not limited to if not otherwise specified at ExhibitE "Specification": • All work required for the preparation of work • All kind of scaffold, bracing and platforms required for the work • Any equipment/manpower required for the handling, transport,temporary stockpiling, shifting, arrangement and disposal ofwaste material • Supply, bending, cutting and arrangement of rebarreinforcement incl. spacers, binding wire etc. according toapproved drawing, specification or relevant standards • Reinforcement shall be clean and arranged with spacersprofessionally placed in the formwork • Any welding connections of rebar reinforcement • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work areaComparable steel classifications:• BST 500 S (DIN 488-1) / At500C (GOST 10884-94) / Gr.75(500) (ASTM A615) / A 500 (SP 52-101-2003)

35.56 t 1,141.69 40,598.50

130.80.40.30 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 130. 80. 40. 30Reinforcement pre-cast concrete elements, BST 500 MAll WORK required for the complete execution of reinforcementworks for pre-cast concrete elements shall be included in theunit rate, but is not limited to if not otherwise specified at Exhibit

Linde Engineering Division

Printed: 2015-03-12 Page 54 of 98

Page 55: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

E "Specification": • All work required for the preparation of work • All kind of scaffold, bracing and platforms required for the work • Any equipment/manpower required for the handling, transport,temporary stockpiling, shifting, arrangement and disposal ofwaste material • Supply, bending, cutting and arrangement of rebarreinforcement incl. spacers, binding wire etc. according toapproved drawing, specification or relevant standards • Reinforcement shall be clean and arranged with spacersprofessionally placed in the formwork • Any welding connections of rebar reinforcement • All QA / QC inspections as per project requirements • Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work areaComparable steel classifications:• BST 500 M (DIN 488-1) / At500C (GOST 10884-94) / Gr.75(500) (ASTM A615) / A 500 (SP 52-101-2003)

1.00 t 1,141.69 only Unit Price Total 130.80.40. Reinforcement Construction for Pre- Cas.. 40,598.50

130.80.80. Embedded items for Pre-Cast Elements - Fa brication & Installation

130.80.80.10 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 130. 80. 80. 10Anchor bolts (normal strength) of pre-cast concrete elements - fabrication & installationAll WORK required for the complete fabrication and supply ofanchor bolts (normal strength) shall be included in the unit rate,but is not limited to, if not otherwise specified at Exhibit E"Specification": • Any WORK required for the preparation of the work, e. g.preparation of anchor bolt list, material certificates, etc. • The unit rate covers all kind of anchor bolts, independent fromthere size and location • All procurement activities of anchors incl. approval procedureof potential supplier, supervision/inspection of quality offabricated anchors at suppliers premises • Transport, handling, installation of anchor bolts as perspecification • Intermediate storage/protection of anchor bolts • Any equipment/manpower required for the fabrication,transport, handling • All QA / QC inspections as per project requirements • All consumables nuts, washers, anchor plates, sleeves etc.Valid Standards: • A193 Gr.B57 (ASTM) / S355 J2+N (EN) • GOST 24379.1-80

1.00 kg 8.96 only Unit Price

Linde Engineering Division

Printed: 2015-03-12 Page 55 of 98

Page 56: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

130.80.80.80 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 80. 80Steel embedments (S235 JR G1) hot dip galvanized of pre-cast concrete elements -fabrication & installationAll WORK required for the complete fabrication/supply andinstallation of all kind of steel embedments, hot dip galvanized,shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• Any WORK required for the preparation of the work, e. gpreparation of steel embedment list, material certificates, etc.• The unit rate covers all kind of steel embedments, hot dipgalvanized, independent from there size and location• Supply, fabrication, transport, handling and installation of steelembedments as per specification• Any equipment/manpower required for the fabrication,transport, handling and installation• All consumables nuts, washers, anchor plates, sleeves etc.• Touch up paint• All QA / QC inspections as per project requirements• Any HSE related measures and items, e.g. sign boards,barricades• Cleaning of work area

1,578.00 kg 6.72 10,604.16

130.80.80.110 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 80. 110Steel embedments (S355 J0) hot dip galvanized of pr e-cast concrete elements -fabrication & installationAll WORK required for the complete fabrication/supply andinstallation of all kind of steel embedments, hot dip galvanized,shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• Any WORK required for the preparation of the work, e. gpreparation of steel embedment list, material certificates, etc.• The unit rate covers all kind of steel embedments, hot dipgalvanized, independent from there size and location• Supply, fabrication, transport, handling and installation of steelembedments as per specification• Any equipment/manpower required for the fabrication,transport, handling and installation• All consumables nuts, washers, anchor plates, sleeves etc.• Touch up paint• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

795.00 kg 8.32 6,614.40

130.80.80.210 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 80. 210Fixed grounding terminal, galvanized steel - fabric ation & installationAll WORK required for the complete supply shall be included inthe unit rate, but is not limited to if not otherwise specified atExhibit E "Specification":

Linde Engineering Division

Printed: 2015-03-12 Page 56 of 98

Page 57: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Any WORK required for the preparation of the work, e. g.preparation of material list, material certificates, etc.

• The unit rate covers all kind of grounding terminal,galvanized steel

• All procurement activities of Grounding Material incl.approval procedure of potential supplier, supervision/inspectionof quality of fabricated anchors at suppliers premises

• Transport, handling, installation of grounding materials asper specification

• Intermediate storage/protection of grounding materials • Any equipment/manpower required for the fabrication,

transport, handling • All QA / QC inspections as per project requirements • All consumables and bulk material as earthing screws, bolts,

nuts, washers required 6 PC 24.65 147.90

130.80.80.220 WIC-Name: LE/SI-en, WIC-No.: 130. 80. 80. 220Solid round conductor, galvanized - fabrication & i nstallationAll WORK required for the complete fabrication and installationshall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification": • Any WORK required for the preparation of the work, e. g.preparation of material list, material certificates, etc. • The unit rate covers all kind of grounding terminal, galvanizedsteel • All procurement activities of incl. approval procedure ofpotential supplier, supervision/inspection of quality of fabricatedanchors at suppliers premises, transport, handling, temporarystock piling • Transport, handling, installation of grounding materials as perspecification • Intermediate storage/protection of grounding materials • Any equipment/manpower required for the fabrication,transport, handling • All consumables and bulk material as earthing screws, bolts,nuts, washers required• Accurate placing and fixing of the grounding elements(grounding terminals and plates) acc. specifications and drawing • Marking of grounding elements acc. specification • Connection and welding with reinforcement before pouring ofconcrete • Related surveying activity before and after concreting incl.related paper work • Protection of grounding elements during concreting, protectionuntil hand over to others • Any scaffolding and platforms required for the work • Any equipment/manpower required for the work • Cleaning and touch-up paint • Any kind of consumables, templates, etc. required for the workand fixing • All QA / QC inspections as per project requirements

Linde Engineering Division

Printed: 2015-03-12 Page 57 of 98

Page 58: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Any HSE related measures and items, e.g. sign boards,barricades • Cleaning of work area

84.00 m 6.10 512.40 Total 130.80.80. Embedded items for Pre-Cast Element s -.. 17,878.86

Total 130.80. Fabrication Pre-cast Concrete Elements 260,697.35

130.90. Transport of Elements

130.90.10. Transport Pre-cast Concrete Elements

130.90.10.10 WIC-Name: LE/SI-en, WIC-No.: 130. 90. 10. 10Transport Pre-cast Concrete Elements All WORK required for the complete transport of pre-castconcrete elements shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification":• All work required for transport of pre-cast concrete elementsincl. permission and permit application for transport with longvehicles with excess width (if applicable) • Any additional effort and costs for alternative routing in case ofusage of long vehicles with excess width• Loading and Transport from fabrication shop to constructionsite and/or specified laydown area • All transport and loading equipment and operators andconsumables • All rigging personal required for loading, any consumablerequired for loading and transport (e.g. temporary woodsupports for transportation etc.)• Any HSE related items, e.g. sign boards, barricades• Any QA/QC inspectionFollowing items will be compensated separately with regard tothe corresponding BOQ item unit rate:• Fabrication of pre-cast elements• Assembly of pre-cast elements

564.04 t 0.00 0.00 Total 130.90.10. Transport Pre-cast Concrete Element s 0.00

Total 130.90. Transport of Elements 0.00

130.100. Assembly of Elements

130.100.10. Assembly of Pre-cast Concrete Elements

Linde Engineering Division

Printed: 2015-03-12 Page 58 of 98

Page 59: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

130.100.10.10 WIC-Name: LE/SI-en, WIC-No.: 130.100. 10. 10Assembly of pre-cast concrete foundation, weight < 10 to All WORK required for the complete assembly of all kind ofpre-cast concrete items shall be included in the unit rate, but isnot limited to if not otherwise specified at Exhibit E"Specification":• Any WORK required for the preparation of the assembly, e.g.preparation/maintenance of the crane area and temporarylaydown areas as well as access ways• Development and submitting of Rigging studies• All surveying activities, incl. required paperwork• The unit rate covers the installation of all kind of pre-castconcrete foundations, independent from there size and location• Unloading of supplied elements, temporary stockpiling,loading, transport, handling, lifting, assembly of pre-castconcrete as per specification• Supports and consumables for temporary stockpiling • All kind of scaffold, platforms and ladders required for the work• Any equipment/material/manpower required for transport,lifting, supporting, alignment, e.g. cranes, temporary supports,generators, trucks and trailers, welding machines, concretemixer, grinders drill machine, chipping hammer • All consumables required for the assembly, e.g. all neoprenesupports, levelling plates, wooden wedges, screws, dowels,lifting lugs, any welding activities, rebars, steel plates, etc.• Grouting and formwork of horizontal and vertical joints• Permanent elastic joint sealant of horizontal and vertical joints• Clearance of site after assembly from all scaffolds, platformsand surplus material• Concrete/grouting tests (on site and at the laboratory), weldingtests incl. third party supervision• Finishing/cosmetics of pre-cast elements• Any HSE related items and measures, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work areaFollowing items will be compensated separately with regard tothe corresponding BOQ item unit rate:• excavation• lean concrete• internal and/or external coating

108.18 t 0.00 0.00

130.100.10.20 WIC-Name: LE/SI-en, WIC-No.: 130.100. 10. 20Assembly of pre-cast concrete beam, weight < 25 to All WORK required for the complete assembly of all kind ofpre-cast concrete items shall be included in the unit rate, but isnot limited to if not otherwise specified at Exhibit E"Specification":• Any WORK required for the preparation of the assembly, e.g.preparation/maintenance of the crane area and temporary

Linde Engineering Division

Printed: 2015-03-12 Page 59 of 98

Page 60: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• laydown areas as well as access ways• Development and submitting of Rigging studies• All surveying activities, incl. required paperwork• The unit rate covers the installation of all kind of pre-castconcrete beams independent from there size and location• Unloading of supplied elements, temporary stockpiling,loading, transport, handling, lifting, assembly of pre-castconcrete as per specification• Supports and consumables for temporary stockpiling • All kind of scaffold, platforms and ladders required for the work• Any equipment/material/manpower required for transport,lifting, supporting, alignment, e.g. cranes, temporary supports,generators, trucks and trailers, welding machines, concretemixer, grinders drill machine, chipping hammer • All consumables required for the assembly, e.g. all neoprenesupports, levelling plates, wooden wedges, screws, dowels,lifting lugs, any welding activities, rebars, steel plates, etc.• Grouting and formwork of horizontal and vertical joints• Permanent elastic joint sealant of horizontal and vertical joints• Clearance of site after assembly from all scaffolds, platformsand surplus material• Concrete/grouting tests (on site and at the laboratory), weldingtests incl. third party supervision• Finishing/cosmetics of pre-cast elements• Any HSE related items and measures, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

10.89 t 0.00 0.00

130.100.10.40 WIC-Name: LE/SI-en, WIC-No.: 130.100. 10. 40Assembly of pre-cast concrete wall, weight < 25 to All WORK required for the complete assembly of all kind ofpre-cast concrete items shall be included in the unit rate, but isnot limited to if not otherwise specified at Exhibit E"Specification":• Any WORK required for the preparation of the assembly, e.g.preparation/maintenance of the crane area and temporarylaydown areas as well as access ways• Development and submitting of Rigging studies• All surveying activities, incl. required paperwork• The unit rate covers the installation of all kind of pre-castconcrete walls independent from there size and location• Unloading of supplied elements, temporary stockpiling,loading, transport, handling, lifting, assembly of pre-castconcrete as per specification• Supports and consumables for temporary stockpiling • All kind of scaffold, platforms and ladders required for the work• Any equipment/material/manpower required for transport,lifting, supporting, alignment, e.g. cranes, temporary supports,generators, trucks and trailers, welding machines, concretemixer, grinders drill machine, chipping hammer

Linde Engineering Division

Printed: 2015-03-12 Page 60 of 98

Page 61: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• All consumables required for the assembly, e.g. all neoprenesupports, levelling plates, wooden wedges, screws, dowels,lifting lugs, any welding activities, rebars, steel plates, etc.• Grouting and formwork of horizontal and vertical joints• Permanent elastic joint sealant of horizontal and vertical joints• Clearance of site after assembly from all scaffolds, platformsand surplus material• Concrete/grouting tests (on site and at the laboratory), weldingtests incl. third party supervision• Finishing/cosmetics of pre-cast elements• Any HSE related items and measures, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work area

229.64 t 0.00 0.00

130.100.10.50 WIC-Name: LE/SI-en, WIC-No.: 130.100. 10. 50Assembly of pre-cast concrete slab, weight < 15 to All WORK required for the complete assembly of all kind ofpre-cast concrete items shall be included in the unit rate, but isnot limited to if not otherwise specified at Exhibit E"Specification":• Any WORK required for the preparation of the assembly, e.g.preparation/maintenance of the crane area and temporarylaydown areas as well as access ways• Development and submitting of Rigging studies• All surveying activities, incl. required paperwork• The unit rate covers the installation of all kind of pre-castconcrete slabs independent from there size and location• Unloading of supplied elements, temporary stockpiling,loading, transport, handling, lifting, assembly of pre-castconcrete as per specification• Supports and consumables for temporary stockpiling • All kind of scaffold, platforms and ladders required for the work• Any equipment/material/manpower required for transport,lifting, supporting, alignment, e.g. cranes, temporary supports,generators, trucks and trailers, welding machines, concretemixer, grinders drill machine, chipping hammer • All consumables required for the assembly, e.g. all neoprenesupports, levelling plates, wooden wedges, screws, dowels,lifting lugs, any welding activities, rebars, steel plates, etc.• Grouting and formwork of horizontal and vertical joints• Permanent elastic joint sealant of horizontal and vertical joints• Clearance of site after assembly from all scaffolds, platformsand surplus material• Concrete/grouting tests (on site and at the laboratory), weldingtests incl. third party supervision• Finishing/cosmetics of pre-cast elements• Any HSE related items and measures, e.g. sign boards,

Linde Engineering Division

Printed: 2015-03-12 Page 61 of 98

Page 62: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• barricades• QA/QC Inspection as per project requirements• Cleaning of work area

109.68 t 0.00 0.00

130.100.10.70 WIC-Name: LE/SI-en, WIC-No.: 130.100. 10. 70Assembly of pre-cast concrete catch basin, weight < 5 to All WORK required for the complete assembly of all kind ofpre-cast concrete items shall be included in the unit rate, but isnot limited to if not otherwise specified at Exhibit E"Specification":• Any WORK required for the preparation of the assembly, e.g.preparation/maintenance of the crane area and temporarylaydown areas as well as access ways• Development and submitting of Rigging studies• All surveying activities, incl. required paperwork• The unit rate covers the installation of all kind of pre-castconcrete catch basins independent from there size and location• Unloading of supplied elements, temporary stockpiling,loading, transport, handling, lifting, assembly of pre-castconcrete as per specification• Supports and consumables for temporary stockpiling • All kind of scaffold, platforms and ladders required for the work• Any equipment/material/manpower required for transport,lifting, supporting, alignment, e.g. cranes, temporary supports,generators, trucks and trailers, welding machines, concretemixer, grinders drill machine, chipping hammer • All consumables required for the assembly, e.g. all neoprenesupports, levelling plates, wooden wedges, screws, dowels,lifting lugs, any welding activities, rebars, steel plates, etc.• Grouting and formwork of horizontal and vertical joints• Permanent elastic joint sealant of horizontal and vertical joints• Clearance of site after assembly from all scaffolds, platformsand surplus material• Concrete/grouting tests (on site and at the laboratory), weldingtests incl. third party supervision• Finishing/cosmetics of pre-cast elements• Any HSE related items and measures, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work areaFollowing items will be compensated separately with regard tothe corresponding BOQ item unit rate:• excavation• lean concrete• internal and/or external coating

43.01 t 0.00 0.00

130.100.10.80 WIC-Name: LE/SI-en, WIC-No.: 130.100. 10. 80Assembly of pre-cast concrete manhole, weight < 15 to All WORK required for the complete assembly of all kind ofpre-cast concrete items shall be included in the unit rate, but is

Linde Engineering Division

Printed: 2015-03-12 Page 62 of 98

Page 63: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

not limited to if not otherwise specified at Exhibit E"Specification":• Any WORK required for the preparation of the assembly, e.g.preparation/maintenance of the crane area and temporarylaydown areas as well as access ways• Development and submitting of Rigging studies• All surveying activities, incl. required paperwork• The unit rate covers the installation of all kind of pre-castconcrete manholes independent from there size and location• Unloading of supplied elements, temporary stockpiling,loading, transport, handling, lifting, assembly of pre-castconcrete as per specification• Supports and consumables for temporary stockpiling • All kind of scaffold, platforms and ladders required for the work• Any equipment/material/manpower required for transport,lifting, supporting, alignment, e.g. cranes, temporary supports,generators, trucks and trailers, welding machines, concretemixer, grinders drill machine, chipping hammer • All consumables required for the assembly, e.g. all neoprenesupports, levelling plates, wooden wedges, screws, dowels,lifting lugs, any welding activities, rebars, steel plates, etc.• Grouting and formwork of horizontal and vertical joints• Permanent elastic joint sealant of horizontal and vertical joints• Clearance of site after assembly from all scaffolds, platformsand surplus material• Concrete/grouting tests (on site and at the laboratory), weldingtests incl. third party supervision• Finishing/cosmetics of pre-cast elements• Any HSE related items and measures, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work areaFollowing items will be compensated separately with regard tothe corresponding BOQ item unit rate:• excavation• lean concrete• internal and/or external coating

12.16 t 0.00 0.00

130.100.10.100 WIC-Name: LE/SI-en, WIC-No.: 130.100. 10. 100Assembly of pre-cast concrete trench, weight < 20 t o All WORK required for the complete assembly of all kind ofpre-cast concrete items shall be included in the unit rate, but isnot limited to if not otherwise specified at Exhibit E"Specification":• Any WORK required for the preparation of the assembly, e.g.preparation/maintenance of the crane area and temporarylaydown areas as well as access ways• Development and submitting of Rigging studies• All surveying activities, incl. required paperwork• The unit rate covers the installation of all kind of pre-castconcrete trenches independent from there size and location

Linde Engineering Division

Printed: 2015-03-12 Page 63 of 98

Page 64: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Unloading of supplied elements, temporary stockpiling,loading, transport, handling, lifting, assembly of pre-castconcrete as per specification• Supports and consumables for temporary stockpiling • All kind of scaffold, platforms and ladders required for the work• Any equipment/material/manpower required for transport,lifting, supporting, alignment, e.g. cranes, temporary supports,generators, trucks and trailers, welding machines, concretemixer, grinders drill machine, chipping hammer • All consumables required for the assembly, e.g. all neoprenesupports, levelling plates, wooden wedges, screws, dowels,lifting lugs, any welding activities, rebars, steel plates, etc.• Grouting and formwork of horizontal and vertical joints• Permanent elastic joint sealant of horizontal and vertical joints• Clearance of site after assembly from all scaffolds, platformsand surplus material• Concrete/grouting tests (on site and at the laboratory), weldingtests incl. third party supervision• Finishing/cosmetics of pre-cast elements• Any HSE related items and measures, e.g. sign boards,barricades• QA/QC Inspection as per project requirements• Cleaning of work areaFollowing items will be compensated separately with regard tothe corresponding BOQ item unit rate:• excavation• lean concrete• internal and/or external coating

50.50 t 0.00 0.00 Total 130.100.10. Assembly of Pre-cast Concrete Elem ents 0.00

Total 130.100. Assembly of Elements 0.00

130.110. Special Task Civil Works

130.110.10. Concrete Core Drilling

130.110.10.20 WIC-Name: LE/SI-en, WIC-No.: 130.110. 10. 20Concrete core drilling < 3’’ All WORK required for the complete execution (mobilization,operation, demobilization) of concrete core drilling, shall beincluded in the unit rate, but is not limited to if not otherwisespecified at Exhibit E "Specification":• Any WORK required for the preparation of the work incl.permissions• The unit rate covers all kind of core drilling (diameters etc.),independent from there location• Cutting of embedded rebars• Any equipment/manpower required for the work

Linde Engineering Division

Printed: 2015-03-12 Page 64 of 98

Page 65: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Any consumables required for the work• Any scaffold and platforms required for the work• Provision of electrical power (generator) and cooling water• Removal of waste material incl. cleaning of work area• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements

50 cm 3.38 169.00

130.110.10.30 WIC-Name: LE/SI-en, WIC-No.: 130.110. 10. 30Concrete core drilling < 6’’ All WORK required for the complete execution (mobilization,operation, demobilization) of concrete core drilling, shall beincluded in the unit rate, but is not limited to if not otherwisespecified at Exhibit E "Specification":• Any WORK required for the preparation of the work incl.permissions• The unit rate covers all kind of core drilling (diameters etc.),independent from there location• Cutting of embedded rebars• Any equipment/manpower required for the work• Any consumables required for the work• Any scaffold and platforms required for the work• Provision of electrical power (generator) and cooling water• Removal of waste material incl. cleaning of work area• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements

50 cm 4.62 231.00

130.110.10.40 WIC-Name: LE/SI-en, WIC-No.: 130.110. 10. 40Concrete core drilling < 8’’ All WORK required for the complete execution (mobilization,operation, demobilization) of concrete core drilling, shall beincluded in the unit rate, but is not limited to if not otherwisespecified at Exhibit E "Specification":• Any WORK required for the preparation of the work incl.permissions• The unit rate covers all kind of core drilling (diameters etc.),independent from there location• Cutting of embedded rebars• Any equipment/manpower required for the work• Any consumables required for the work• Any scaffold and platforms required for the work• Provision of electrical power (generator) and cooling water• Removal of waste material incl. cleaning of work area• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements

50 cm 5.94 297.00

Linde Engineering Division

Printed: 2015-03-12 Page 65 of 98

Page 66: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

130.110.10.50 WIC-Name: LE/SI-en, WIC-No.: 130.110. 10. 50Concrete core drilling < 12’’ All WORK required for the complete execution (mobilization,operation, demobilization) of concrete core drilling, shall beincluded in the unit rate, but is not limited to if not otherwisespecified at Exhibit E "Specification":• Any WORK required for the preparation of the work incl.permissions• The unit rate covers all kind of core drilling (diameters etc.),independent from there location• Cutting of embedded rebars• Any equipment/manpower required for the work• Any consumables required for the work• Any scaffold and platforms required for the work• Provision of electrical power (generator) and cooling water• Removal of waste material incl. cleaning of work area• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements

1,200 cm 8.28 9,936.00 Total 130.110.10. Concrete Core Drilling 10,633.00

130.110.20. Accompany Task

130.110.20.10 WIC-Name: LE/SI-en, WIC-No.: 130.110. 20. 10Concrete cutting All WORK required for the complete execution (mobilization,operation, demobilization) of concrete cutting, shall be includedin the unit rate, but is not limited to if not otherwise specified atExhibit E "Specification":• Any WORK required for the preparation of the work incl.permissions• The unit rate covers all kind of concrete cuttings, independentfrom there location• Cutting of embedded rebars• Any equipment/manpower required for the work• Any consumables required for the work• Any scaffold and platforms required for the work• Provision of electrical power (generator) and cooling water• Removal of waste material incl. cleaning of work area• Any HSE related measures and items, e.g. sign boards,barricades• QA/QC Inspection as per project requirements

2.48 m2 411.86 1,021.41

130.110.20.50 WIC-Name: LE/SI-en, WIC-No.: 130.110. 20. 50Leak test for waterproof barriers All WORK required for the complete leak test of waterproofbarriers shall be included in the unit rate, but is not limited to if

Linde Engineering Division

Printed: 2015-03-12 Page 66 of 98

Page 67: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

not otherwise specified at Exhibit E "Specification":• All work required to prepare and perform the work, incl.preparation of working area incl. related paperwork e.g.permissions • All material required incl. water consumption• All equipment/manpower required for the work• Any consumables required for the work• Any scaffold and platforms required for the work• All QA / QC inspections as per project requirements• HSE related measures• Cleaning of work area

39.45 m3 80.56 3,178.09 Total 130.110.20. Accompany Task 4,199.50

Total 130.110. Special Task Civil Works 14,832.50

130.120. Special Systems / Elements for Civil Constr uction

130.120.10. Special Anchor Systems

130.120.10.70 WIC-Name: LE/SI-en, WIC-No.: 130.120. 10. 70HILTI HST safety anchor stud: HST – R , A4 stainles s steel (DIN 1.4401/AISI 316) M16,max. fastenable thickness 140 mm, fabrication and s upplyAll WORK required for the complete execution of HILTI safetyanchor system, shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E"Specification": • Any WORK required for the preparation of the work• All procurement activities of HILTI safety anchor System• Transport, handling and storage• Provision of material certificates

20 PC 29.61 592.20

130.120.10.100 WIC-Name: LE/SI-en, WIC-No.: 130.120. 10. 100HILTI HST safety anchor stud: HST – HCR , high corr osion resistant (DIN 1.4529) M12,max. fastenable thickness 140 mm, fabrication and s upplyAll WORK required for the complete execution of HILTI safetyanchor system, shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E"Specification": • Any WORK required for the preparation of the work• All procurement activities of HILTI safety anchor System• Transport, handling and storage• Provision of material certificates

40 PC 24.89 995.60

Linde Engineering Division

Printed: 2015-03-12 Page 67 of 98

Page 68: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

130.120.10.110 WIC-Name: LE/SI-en, WIC-No.: 130.120. 10. 110HILTI HST safety anchor stud: HST – HCR , high corr osion resistant (DIN 1.4529) M16,max. fastenable thickness 140 mm, fabrication and s upplyAll WORK required for the complete execution of HILTI safetyanchor system, shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E"Specification": • Any WORK required for the preparation of the work• All procurement activities of HILTI safety anchor System• Transport, handling and storage• Provision of material certificates

20 PC 29.61 592.20

130.120.10.510 WIC-Name: LE/SI-en, WIC-No.: 130.120. 10. 510Anchor system for fastening of reinforcement bars d ia 8 mm, e.g. HILTI HIT, fabrication,supply and installationAll WORK required for the complete execution of anchor systemfor fastening of reinforcement bars, e.g. HILTI HIT, shall beincluded in the unit rate, but is not limited to if not otherwisespecified at Exhibit E "Specification": • Any WORK required for the preparation of the work • Drilling, supply and fastening of single anchoring bar withHILTI anchor system independent from there location(procedure and steps for installation acc. to manufacturer´sinstructions)• applicable for System RE500, HY 20, HY 50, HY 150, TZand ICE • Provision of material certificates • Any equipment/manpower required for transport, installation • All required concrete drillings • Any consumables required for the work • Any scaffold and platforms required for the work • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area

10 PC 14.07 140.70

130.120.10.520 WIC-Name: LE/SI-en, WIC-No.: 130.120. 10. 520Anchor system for fastening of reinforcement bars d ia 10 mm, e.g. HILTI HIT, fabrication,supply and installationAll WORK required for the complete execution of anchor systemfor fastening of reinforcement bars, e.g. HILTI HIT, shall beincluded in the unit rate, but is not limited to if not otherwisespecified at Exhibit E "Specification": • Any WORK required for the preparation of the work • Drilling, supply and fastening of single anchoring bar withHILTI anchor system independent from there location(procedure and steps for installation acc. to manufacturer´sinstructions)

Linde Engineering Division

Printed: 2015-03-12 Page 68 of 98

Page 69: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• applicable for System RE500, HY 20, HY 50, HY 150, TZand ICE • Provision of material certificates • Any equipment/manpower required for transport, installation • All required concrete drillings • Any consumables required for the work • Any scaffold and platforms required for the work • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area

10 PC 14.33 143.30

130.120.10.530 WIC-Name: LE/SI-en, WIC-No.: 130.120. 10. 530Anchor system for fastening of reinforcement bars d ia 12 mm, e.g. HILTI HIT, fabrication,supply and installationAll WORK required for the complete execution of anchor systemfor fastening of reinforcement bars, e.g. HILTI HIT, shall beincluded in the unit rate, but is not limited to if not otherwisespecified at Exhibit E "Specification": • Any WORK required for the preparation of the work • Drilling, supply and fastening of single anchoring bar withHILTI anchor system independent from there location(procedure and steps for installation acc. to manufacturer´sinstructions)• applicable for System RE500, HY 20, HY 50, HY 150, TZand ICE • Provision of material certificates • Any equipment/manpower required for transport, installation • All required concrete drillings • Any consumables required for the work • Any scaffold and platforms required for the work • Any HSE related measures and items, e.g. sign boards,barricades • QA/QC Inspection as per project requirements • Cleaning of work area

80 PC 18.68 1,494.40 Total 130.120.10. Special Anchor Systems 3,958.40

Total 130.120. Special Systems / Elements for Civil .. 3,958.40

Total 130. Concrete & Other Civil Works 483,976.69

Linde Engineering Division

Printed: 2015-03-12 Page 69 of 98

Page 70: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

140. Installation of Non Process Piping

140.20. PVC Piping Material

140.20.20. Plastic pipes, PVC-U

140.20.20.30 WIC-Name: LE/SI-en, WIC-No.: 140. 20. 20. 30Plastic pipe, PVC-U, DN 150All WORK required for the installation of Plastic Pipes, PVC-Ushall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• All work required to prepare and perform the work, incl.preparation of working area incl. related paperwork e.g.permissions • Measurements for permeability tests and pressure tests arepart of the unit rate. The openings are to close during theconstruction time.• Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas• All equipment/manpower required for the work • Any consumables required for the work• All QA / QC inspections as per project requirements• HSE related measures• Cleaning of work areaFollowing items will be compensated separately with regard tothe corresponding BOQ item unit rate:• Excavation of pipe trenches• Backfilling of pipe trenches• Sanding of pipe• Catchbasin and manholes• Fittings• Supply of Piping Material

40.00 m 16.43 657.20 Total 140.20.20. Plastic pipes, PVC-U 657.20

140.20.30. Plastic bow, PVC-U

140.20.30.30 WIC-Name: LE/SI-en, WIC-No.: 140. 20. 30. 30Plastic bow, PVC-U, 15-87°, DN 150All WORK required for the installation of Plastic Bow, PVC-Ushall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• All work required to prepare and perform the work, incl.preparation of working area incl. related paperwork e.g.permissions • Provision of required certificates• All material required incl. supply and transportation of Plasticbow, Polyvinylchlorid-hart PVC-U, 15-87°, DN 150, supply andplace in trench, pipe with socket and sealing

Linde Engineering Division

Printed: 2015-03-12 Page 70 of 98

Page 71: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Measurements for permeability tests and pressure tests arepart of the unit rate. The openings are to close during theconstruction time.• Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas• All equipment/manpower required for the work • Any consumables required for the work• All QA / QC inspections as per project requirements• HSE related measures• Cleaning of work areaFollowing items will be compensated separately with regard tothe corresponding BOQ item unit rate:• Excavation of pipe trenches• Backfilling of pipe trenches• Sanding of pipe• Catchbasin and manholes• Straight piping• Supply of Piping Material

15 PC 17.71 265.65 Total 140.20.30. Plastic bow, PVC-U 265.65

Total 140.20. PVC Piping Material 922.85

140.30. PEHD Piping Material

140.30.10. Plastic Pipes, PEHD, incl. Fittings

140.30.10.30 WIC-Name: LE/SI-en, WIC-No.: 140. 30. 10. 30Plastic pipe, PEHD, DN 150, all fittings includedAll WORK required for the installation of Plastic Pipes, PEHD,incl. Fittings shall be included in the unit rate, but is not limited toif not otherwise specified at Exhibit E "Specification":• All work required to prepare and perform the work, incl.preparation of working area incl. related paperwork e.g.permissions• Lay to slope in trench acc. drawing and specification, includingsealing and all other works • Measurements for permeability tests and pressure tests arepart of the unit rate. The openings are to close during theconstruction time.• Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas• All equipment/manpower required for the work • Any consumables required for the work• All QA / QC inspections as per project requirements• HSE related measures• Cleaning of work areaFollowing items will be compensated separately with regard tothe corresponding BOQ item unit rate:

Linde Engineering Division

Printed: 2015-03-12 Page 71 of 98

Page 72: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Excavation of pipe trenches• Backfilling of pipe trenches• Sanding of pipe• Catchbasin and manholes• Supply of Piping Material

44.00 m 65.99 2,903.56 Total 140.30.10. Plastic Pipes, PEHD, incl. Fittings 2,903.56

140.30.30. Plastic bow, PEHD

140.30.30.30 WIC-Name: LE/SI-en, WIC-No.: 140. 30. 30. 30Plastic bow, PEHD, 45-90°, DN 150All WORK required for the installation of Plastic bow, PEHDshall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• All work required to prepare and perform the work, incl.preparation of working area incl. related paperwork e.g.permissions • The openings are to close during the construction time.• Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas• All equipment/manpower required for the work • Any consumables required for the work• All QA / QC inspections as per project requirements• HSE related measures• Cleaning of work areaFollowing items will be compensated separately with regard tothe corresponding BOQ item unit rate:• Excavation of pipe trenches• Backfilling of pipe trenches• Sanding of pipe• Catchbasin and manholes• Straight piping• Supply of Piping Material

21 PC 180.82 3,797.22 Total 140.30.30. Plastic bow, PEHD 3,797.22

Total 140.30. PEHD Piping Material 6,700.78

Total 140. Installation of Non Process Piping 7,623.6 3

Linde Engineering Division

Printed: 2015-03-12 Page 72 of 98

Page 73: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

150. Finishing Works

150.10. Building Interior Work

150.10.10. Masonry / Plaster

150.10.10.40 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 10. 40Masonry lime-stone units All WORK required for the complete execution of masonrylimestone unit shall be included in the unit rate, but is not limitedto if not otherwise specified at Exhibit E "Specification":• All work required to prepare and perform the masonryactivities, incl. preparation of working area, protection ofadjacent items and related paperwork, e.g. permissions etc.• Provision of material certificates• Supply/placing of masonry limestone units, independent fromsize and location, as per approved drawing, incl. rebars, blockout grouting, mortar, connection profiles, concrete lintel,peripheral tie beam• Transport, handling, shifting, intermediate storage/protectionof masonry limestone units incl. preparation of storage areas• All equipment/manpower required for the work• Any scaffold and platforms required for the work• All consumables required for the work• All surveying activities • All QA / QC inspections as per project requirements• Finishing/curing incl. protection• HSE related measures, e. g sign boards, barricades• Cleaning of work area

6.00 m3 440.14 2,640.84

150.10.10.50 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 10. 50Cement-lime plaster All WORK required for the complete execution of cement-lime plaster shall be included in the unit rate, but is not limited toif not otherwise specified at Exhibit E "Specification":• All work required to prepare and perform the cement-limeplaster activities, incl. preparation of working area, protection ofadjacent items, e. g doors, windows, equipment, etc. andrelated paperwork, e.g. permissions etc.• Provision of material certificates• Supply/application of cement-lime plaster, two layers forinternal and external use, incl. fiber reinforcement for areas withunderground material change and any kind of plaster profiles• All reveals, grooves, corners and edges • Transport, handling, shifting, intermediate storage/protectionof plaster incl. preparation of storage areas• All equipment/manpower required for the work• Any scaffold and platforms required for the work• All consumables required for the work• All QA / QC inspections as per project requirements

Linde Engineering Division

Printed: 2015-03-12 Page 73 of 98

Page 74: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Finishing/curing incl. protection• HSE related measures, e. g sign boards, barricades• Cleaning of work area

18.60 m2 35.21 654.91

150.10.10.90 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 10. 90Refractory clay bricksAll WORK required for the complete execution of refactory brickunit shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• All work required to prepare and perform the masonryactivities, incl. preparation of working area, protection ofadjacent items and related paperwork, e.g. permissions etc.• Provision of material certificates• Supply/placing of refractory brick units, independent from sizeand location, as per approved drawing, incl. rebars, block outgrouting, mortar, connection profiles, concrete lintel, peripheraltie beam• Transport, handling, shifting, intermediate storage/protectionof refractory brick units incl. preparation of storage areas• All equipment/manpower required for the work• Any scaffold and platforms required for the work• All consumables required for the work• All surveying activities • All QA / QC inspections as per project requirements• Finishing/curing incl. protection• HSE related measures, e. g sign boards, barricades• Cleaning of work area

7.51 m3 2,277.99 17,107.70 Total 150.10.10. Masonry / Plaster 20,403.45

150.10.20. Painting

150.10.20.10 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 20. 10Interior paint – wall, ceiling, columns, beams, sta irs, truss All WORK required for the complete execution ofinterior painting system shall be included in the unit rate, but isnot limited to if not otherwise specified at Exhibit E

"Specification": • All work required to prepare and perform the paintingactivities, incl. preparation of working area, protection ofadjacent items, e. g doors, windows, equipment, etc. and

related paperwork, e.g. permissions etc. • Provision of material certificates • Supply/application of interior dispersion paint (solventand plasticizer free, dull matt, with or antique white, especiallygood covering properties, wet abrasion resistance, applicablefor surface, e.g. cement lime-, cement- , gypsum plaster,woodchip paper, gypsum board), brush, roller or air spray

applied incl. surface preparation and priming coat

Linde Engineering Division

Printed: 2015-03-12 Page 74 of 98

Page 75: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• All reveals, grooves, corners and edges • All equipment/manpower required for the work • Any scaffold and platforms required for the work • Protection of finished painting • Touch up paint • All consumables required for the work, e.g. joint filler,

etc. • All QA / QC inspections as per project requirements • HSE related measures, e. g sign boards, barricades • Cleaning of work area

129.44 m2 6.25 809.00

150.10.20.60 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 20. 60Epoxy paint, industrial floor All WORK required for the complete execution of epoxypaint shall be included in the unit rate, but is not limited to if not

otherwise specified at Exhibit E "Specification": • All work required to prepare and perform the paintingactivities, incl. preparation of working area, protection ofadjacent items, e. g doors, walls, equipment, etc. and related

paperwork, e.g. permissions etc. • Supply/application of epoxy paint (water dilatable,solvent-free-two-component floor seal for interior use, silkygloss, resistant to diluted lyes, weak acid, oils, petrol, water andaqueous saline solutions (road salt), hard wearing, resistant tomechanical loads, good adhesive and covering properties,useable for industrial floors, colour: some grey or pebble grey),

roller applied incl. surface preparation and priming coat • Incl. execution/painting of skirtings • All equipment/manpower required for the work • Any scaffold and platforms required for the work • Provision of material certificates • Finishing/curing incl. protection • Touch up paint • All consumables required for the work • All QA / QC inspections as per project requirements,

e.g. pull-up test, etc. • HSE related measures, e. g sign boards, barricades • Cleaning of work area

36.64 m2 36.06 1,321.24

150.10.20.120 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 20. 120Wall paper All WORK required for the complete execution of wallpaper shall be included in the unit rate, but is not limited to if not

otherwise specified at Exhibit E "Specification": • All work required to prepare and perform the wall paperactivities, incl. preparation of working area, protection ofadjacent items, e. g doors, windows, equipment, etc. and

related paperwork, e.g. permissions etc. • Provision of material certificates • Supply/application of wall papers

Linde Engineering Division

Printed: 2015-03-12 Page 75 of 98

Page 76: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• All equipment/manpower required for the work • Any scaffold and platforms required for the work • All consumables required for the work • All QA / QC inspections as per project requirements,

e.g. pull-up test, etc. • HSE related measures, e. g sign boards, barricades • Cleaning of work area

72.40 m2 14.57 1,054.87 Total 150.10.20. Painting 3,185.11

150.10.30. Screed / Flooring / Sealing

150.10.30.30 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 30. 30Ceramic tiles for floorsAll WORK required for the complete execution of ceramic tiles,shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification": • All work required to prepare and perform the work, incl.preparation of working area, protection of adjacent items, e.g.doors, walls, equipment, etc. and related paperwork, e.g.permissions etc. • Provision of material certificates • Supply/laying of ceramic tiles for floors, industrial standard,high abrasion resistance independent from location, size andpattern as per project specifications, incl. tile adhesive, elasticand mineral joint filler • Incl. skirtings, all kind of profiles, cutting and termination ofembedments • Transport, handling, shifting, intermediate storage/protectionof tiles, profiles, adhesive and mortar incl. preparation of storageareas • All equipment/manpower required for the work • Any scaffold and platforms required for the work • Finishing/curing incl. protection • All consumables required for the work • All surveying activities • All QA / QC inspections as per project requirements • HSE related measures, e.g. sign boards, barricades • Cleaning of work area

2.50 m2 391.24 978.10

150.10.30.170 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 30. 170Water proof barrier (made of bituminous sheeting)All WORK required for the complete execution of water proofbarriers, shall be included in the unit rate, but is not limited to ifnot otherwise specified at Exhibit E "Specification": • All work required the to prepare and perform the work, incl.preparation of working area, protection of adjacent items andrelated paperwork, e.g. permissions etc. • Provision of material certificates

Linde Engineering Division

Printed: 2015-03-12 Page 76 of 98

Page 77: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Supply/application of water proof barrier with bituminoussheeting consisting of tapes for wall/floor junction, tapes foroutside corners, tapes for inside corners, tapes for wallpenetration, tapes for floor drain • in the area of wall-/ pedestal-/ foundation junction etc. thebarrier shall be raised > 300 mm as lip • All equipment/manpower required for the work • Any consumables required for the work • Any scaffold and platforms required for the work • All QA / QC inspections as per project requirements • HSE related measures, e.g. sign boards, barricades • Cleaning of work area

303.84 m2 30.52 9,273.20 Total 150.10.30. Screed / Flooring / Sealing 10,251.3 0

150.10.40. Insulation of Civil Building

150.10.40.200 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 40. 200Thermal insulation stone wool, 50 mmAll WORK required for the complete execution of thermalinsulation stone wool, shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification": • All work required to prepare and perform the work, incl.preparation of working area and related paperwork, e.g.permissions etc. • Provision of material certificates • Supply/installation of thermal insulation stone wool, plain orsloped (homogeneous, low thermal conductivity 0,040 W/m·K),independent from location and number of layers, incl. adhesive,all kind of profiles, fixtures • Transport, handling, shifting, intermediate storage/protectionof insulation incl. preparation of storage areas • All equipment/manpower required for the work • Any scaffold and platforms required for the work • All QA / QC inspections as per project requirements • HSE related measures, e.g. sign boards, barricades • Cleaning of work area

72.40 m2 9.14 661.74 Total 150.10.40. Insulation of Civil Building 661.74

150.10.50. Dry-lining

150.10.50.50 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 50. 50Dry lining wall, cover both side, double layerAll WORK required for the complete execution of dry-lining wall,shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification": • All work required to prepare and perform the work, incl.

Linde Engineering Division

Printed: 2015-03-12 Page 77 of 98

Page 78: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• preparation of working area and related paperwork, e.g.permissions etc. • Provision of material certificates • Supply/installation of the complete dry-lining wall, (metal ortimber studs and stringers 125 mm, gypsum board- moistureresistant 12,5 mm, double layer, both sides), incl. vapourbarrier, thermal/sound insulation • Incl. all kind of profiles, fixtures, joint filler, expanded rubber forconnection profiles at floor, wall and ceiling • incl. of opening/closing of any kind of wall penetration • incl. surface/joint fill, smoothing, grinding • Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas • All equipment/manpower required for the work • Any consumables required for the work • Survey and alignment • Any scaffold and platforms required for the work • All QA / QC inspections as per project requirements • HSE related measures, e. g sign boards, barricades • Cleaning of work area Following items will be compensated separately: • thermal or sound insulation

182.05 m2 56.02 10,198.44

150.10.50.80 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 50. 80Dry lining ceiling, cover one side, single layer All WORK required for the complete execution of dry-liningceiling, shall be included in the unit rate, but is not limited to ifnot otherwise specified at Exhibit E "Specification":• All work required to prepare and perform the work, incl.preparation of working area and related paperwork, e.g.permissions etc.• Provision of material certificates• Supply/installation of the complete dry-lining ceiling, (metal ortimber studs and stringers 125 mm, gypsum board- moistureresistant 12,5 mm, single layer, one side), incl. vapour barrier,thermal insulation 0,040 W/m·K• Incl. all kind of profiles, fixtures, joint filler, expanded rubber forconnection profiles at floor, wall and ceiling• incl. of opening/closing of any kind of ceiling penetration• incl. surface/joint fill, smoothing, grinding• Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas• All equipment/manpower required for the work• Survey and alignment • Any consumables required for the work• Any scaffold and platforms required for the work• All QA / QC inspections as per project requirements• HSE related measures, e. g sign boards, barricades

Linde Engineering Division

Printed: 2015-03-12 Page 78 of 98

Page 79: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Cleaning of work areaFollowing items will be compensated separately:• thermal or sound insulation

46.14 m2 168.59 7,778.74 Total 150.10.50. Dry-lining 17,977.18

150.10.70. Doors / Fire Door / Rolling Gate / Framed Fire Protection

150.10.70.20 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 70. 20Wooden door, single wingAll WORK required for the complete execution of wooden door,single wing, shall be included in the unit rate, but is not limited toif not otherwise specified at Exhibit E "Specification": • All work required to prepare and perform the work incl.preparation of working area and related paperwork e.g.permissions • Provision of material certificate • Supply/installation of wooden door, veneered wood or painted,colour and pattern, wooden frame mounted at masonry orconcrete, incl. door hardware, e.g. hinges, lock set, door handleand kick plate made of stainless steel, threshold, door stop, jointfiller, sealant, temporary lock cylinder as per projectspecification • Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas • All equipment/manpower required for the work • Any consumables required for the work • Any scaffold and platforms required for the work • incl. temporary protection/removal/storage/reinstallation ofdoor wings as per site requirements • incl. alignment, touch up paint, cleaning of doors • Protection of adjacent item, e.g. floor • All QA / QC inspections as per project requirements • HSE related measures, e. g sign boards, barricades • Cleaning of work area Following items will be compensated separately: • Special filling: tempered glass • Special filling: aeration elements • door closer • panic bar

2.03 m2 393.01 797.81

150.10.70.40 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 70. 40Metal door, single wingAll WORK required for the complete execution of metal door,single wing, shall be included in the unit rate, but is not limited toif not otherwise specified at Exhibit E "Specification": • All work required to prepare and perform the work incl.preparation of working area and related paperwork e.g.permissions

Linde Engineering Division

Printed: 2015-03-12 Page 79 of 98

Page 80: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Provision of material certificate • Supply/installation of the metal door, single wing, single-walledconsisting of galvanized metal sheet, metal frame mounted atmasonry or concrete, removable transom, powder coated, incl.door hardware, e.g. hinges, lock set, door handle and kick platemade of stainless steel, threshold, door stop, joint filler, sealant,temporary lock cylinder acc. specification • Final painting acc. safety requirements or corporate design ofclient / owner • Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas • All equipment/manpower required for the work • Any consumables required for the work • Any scaffold and platforms required for the work • incl. temporary protection/removal/storage/reinstallation ofdoor wings as per site requirements • incl. alignment, touch up paint, cleaning of doors • Protection of adjacent item, e.g. floor • All QA / QC inspections as per project requirements • HSE related measures, e. g sign boards, barricades • Cleaning of work area Following items will be compensated separately: • Special filling: tempered glass • Special filling: aeration elements • door closer • panic bar

1.53 m2 526.12 804.96

150.10.70.50 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 70. 50Metal door, double wingAll WORK required for the complete execution of metal door,double wing, shall be included in the unit rate, but is not limitedto if not otherwise specified at Exhibit E "Specification": • All work required to prepare and perform the work incl.preparation of working area and related paperwork e.g.permissions • Provision of material certificate • Supply/installation of the metal door, double wing, single-walled consisting of galvanized metal sheet, metal framemounted at masonry or concrete, removable transom, powdercoated, incl. door hardware, e.g. hinges, lock set, door handleand kick plate made of stainless steel, threshold, door stop, jointfiller, sealant, temporary lock cylinder acc. specification • Final painting acc. safety requirements or corporate design ofclient / owner • Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas • All equipment/manpower required for the work • Any consumables required for the work • Any scaffold and platforms required for the work • incl. temporary protection/removal/storage/reinstallation ofdoor wings as per site requirements

Linde Engineering Division

Printed: 2015-03-12 Page 80 of 98

Page 81: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• incl. alignment, touch up paint, cleaning of doors • Protection of adjacent item, e.g. floor • All QA / QC inspections as per project requirements • HSE related measures, e. g sign boards, barricades • Cleaning of work area Following items will be compensated separately: • Special filling: tempered glass • Special filling: aeration elements • door closer • panic bar

3.52 m2 435.12 1,531.62

150.10.70.180 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 70. 180Fire door, 90 min, single wingAll WORK required for the complete execution of fire door, 90minutes fire-resistant, single wing, shall be included in the unitrate, but is not limited to if not otherwise specified at Exhibit E"Specification": • All work required to prepare and perform the work, incl.preparation of working area and related paperwork e.g.permissions • Provision of material certificate • Supply/installation of the fire door, 90 min fire-resistant, singlewing, double-walled consisting of galvanized metal sheet, filledwith stone wool, metal frame mounted at masonry or concrete,cement based grouting of door frame, removable transom,powder coated, incl. door hardware, e.g. hinges, door closer,electro-magnetic door holder, electro push button, smokecontrol door, lock set, panic device, door handle and kick platemade of stainless steel, threshold, door stop, joint filler, sealant,floor/wall marking, safety lights or signals devices acc. projectspecification • Final painting acc. safety requirements or corporate design ofclient / owner • Labelling of door regarding correct installation acc. tomanufacturer´s guideline • Electrical installation: connection of all electrical parts incl.termination box. Main fusing will be provided by Others • Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas • All equipment/manpower required for the work • Any consumables required for the work • Any scaffold and platforms required for the work • incl. temporary protection/removal/storage/reinstallation ofdoor wings as per site requirements • incl. alignment, touch up paint, cleaning of doors • Protection of adjacent item, e.g. floor • All QA / QC inspections as per project requirements • HSE related measures, e. g sign boards, barricades • Cleaning of work area

8.12 m2 702.96 5,708.04

Linde Engineering Division

Printed: 2015-03-12 Page 81 of 98

Page 82: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

150.10.70.320 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 70. 320Door signAll WORK required for the complete execution of door sign,shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification": • All work required to prepare and perform the work, incl.preparation of working area and related paperwork e.g.permissions • Provision of material certificate • Supply/installation of door sign (stainless steel polished, sizeapprox. 15x20 cm, plastic protection cover) • Incl. label consisting of: Plant/Client logo; Building name;Room number; Name of persons; Rank of persons • All equipment/manpower required for the work • Any consumables required for the work • Any scaffold and platforms required for the work • Protection of adjacent item, e.g. floor • All QA / QC inspections as per project requirements • HSE related measures, e. g sign boards, barricades • Cleaning of work area

7 PC 51.22 358.54

150.10.70.330 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 70. 330Cylinder for general lock systemAll WORK required for the complete execution of door sign,shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification": • All work required the to prepare and perform the work, incl.preparation of working area and related paperwork e.g.permissions • Provision of material certificate • Incl. detail engineering and related locking tables • Supply/installation of cylinder for general lock systemdoubleside, increased safety requirements, incl. 5 keys • All equipment/manpower required for the work • Any consumables required for the work • All QA / QC inspections as per project requirements • HSE related measures • Cleaning of work area

7 PC 154.72 1,083.04

150.10.70.340 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 70. 340Panic device All WORK required for the complete execution of Panicdevice shall be included in the unit rate, but is not limited to if

not otherwise specified at Exhibit E "Specification": • All work required to prepare and perform the work, incl.preparation of working area, protection of adjacent items and

related paperwork, e.g. permissions etc. • Provision of material certificates • Supply / Installation of Panic device as per project

Linde Engineering Division

Printed: 2015-03-12 Page 82 of 98

Page 83: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• specification independent from size and location, as per approved drawing, incl. drilling of holes, fixing

• Transport, handling, shifting, intermediatestorage/protection of panic device incl. preparation of storage

area • All equipment / manpower required for the work • All consumables required for the work incl. fixing

materials • All surveying activities • All QA/QC inspection as per project requirements • HSE related measures, e.g. sign boards, barricades • Cleaning of work area

5 PC 400.13 2,000.65

150.10.70.350 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 70. 350Door closerAll WORK required for the complete execution of door closershall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification":• All work required to prepare and perform the work, incl.preparation of working area, protection of adjacent items andrelated paperwork, e.g. permissions etc.• Provision of material certificates• Supply / Installation of door closer as per project specificationindependent from size and location, as per approved drawing,incl. drilling of holes, fixing • Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage area• All equipment / manpower required for the work• All consumables required for the work incl. fixing materials• All surveying activities• All QA/QC inspection as per project requirements• HSE related measures, e.g. sign boards, barricades• Cleaning of work area

4 PC 261.42 1,045.68

150.10.70.440 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 70. 440Surcharge tempered glassAll WORK required for the complete execution of temperedglass, shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification": • All work required to prepare and perform the work, incl.preparation of working area and related paperwork e.g.permissions • Provision of material certificate • Supply/installation of the tempered glass inside door wingsincl. cut out, cover strips, sealant, touch up paint • Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas • All equipment/manpower required for the work • Any consumables required for the work • Any scaffold and platforms required for the work

Linde Engineering Division

Printed: 2015-03-12 Page 83 of 98

Page 84: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• incl. temporary protection of glass as per site requirements • Cleaning of glass • All QA / QC inspections as per project requirements • HSE related measures, e.g. sign boards, barricades • Cleaning of work area

1.68 m2 469.99 789.58 Total 150.10.70. Doors / Fire Door / Rolling Gate / Fra.. 14,119.92

150.10.90. Special Task Finishing Works

150.10.90.10 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 90. 10Floor inlet, roofAll WORK required for the complete execution of floor inlet,roof, shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification": • All work required to prepare and perform the work, incl.preparation of working area incl. related paperwork e.g.permissions • Provision of required certificates • Supply/installation of floor inlet roof (high drainageperformance, corrosion protection: aluminium plastic coated,UV-resistance, drainage during building phase, clamping flangefor bitumen sealing, thermal insulated, dia > 150 mm) • All equipment/manpower required for the work • Any consumables required for the work • Alignment/grouting of floor inlet • Any scaffold and platforms required for the work • Temporary protection • All QA / QC inspections as per project requirements • HSE related measures • Cleaning of work area

4 PC 354.24 1,416.96

150.10.90.40 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 90. 40Rain water discharge pipe and fittingsAll WORK required for the complete execution of rain waterdischarge system, shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification": • All work required to prepare and perform the work, incl.preparation of working area incl. related paperwork e.g.permissions • Provision of required certificates • Supply/installation of rain water discharge system (highdrainage performance, corrosion protection: hot-dip galvanized,incl. gutter, down pipes, cleaning pipes, connectors 90°, socketpieces, tees 90°, transition pipes, traps, accessories, etc.,drainage during building phase, dia > 150 mm) • Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas • All equipment/manpower required for the work

Linde Engineering Division

Printed: 2015-03-12 Page 84 of 98

Page 85: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• Any consumables required for the work • Any scaffold and platforms required for the work • incl. temporary drain pipes as per site requirements • All QA / QC inspections as per project requirements • HSE related measures • Cleaning of work area

12.00 m 142.98 1,715.76

150.10.90.50 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 90. 50Metal sheeting galvanized as parapet coverAll WORK required for the complete execution of metal sheet asparapet cover, shall be included in the unit rate, but is not limitedto if not otherwise specified at Exhibit E "Specification":• All work required to prepare and perform the work, incl.preparation of working area incl. related paperwork e.g.permissions • Provision of required certificates• Supply/installation of metal sheet for parapet cover incl. allsupport structures, metal sheet galvanized, cutting and bending,sealant, all junctions, joints and cut-outs, fixtures• Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas• All alignment and measurement/surveying• All equipment/manpower required for the work• Any consumables required for the work• Any scaffold and platforms required for the work• Temporary storage incl. preparation of storage areas• Touch-up paint• All QA / QC inspections as per project requirements• HSE related measures• Cleaning of work area

44.24 m2 119.50 5,286.68

150.10.90.140 WIC-Name: LE/SI-en, WIC-No.: 150. 10. 90. 140Rain water gutterAll WORK required for the complete execution of rain watergutter, shall be included in the unit rate, but is not limited to if nototherwise specified at Exhibit E "Specification": • All work required to prepare and perform the work, incl.preparation of working area incl. related paperwork e.g.permissions • Provision of required certificates • Supply/installation of rain water gutter (high drainageperformance, corrosion protection: hot-dip galvanized, cleaningpipes, connectors 90°, socket pieces, tees 90°, transition pipes,traps, accessories, etc., drainage during building phase, dia> 150 mm) • Transport, handling, shifting, intermediate storage/protectionincl. preparation of storage areas • All equipment/manpower required for the work • Any consumables required for the work • Any scaffold and platforms required for the work

Linde Engineering Division

Printed: 2015-03-12 Page 85 of 98

Page 86: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• incl. temporary drain pipes as per site requirements • All QA / QC inspections as per project requirements • HSE related measures • Cleaning of work area

19.00 m 57.62 1,094.78 Total 150.10.90. Special Task Finishing Works 9,514.1 8

Total 150.10. Building Interior Work 76,112.88

Total 150. Finishing Works 76,112.88

Linde Engineering Division

Printed: 2015-03-12 Page 86 of 98

Page 87: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

190. Structural Steel Installation

190.10. Primary Structural Steel Erection / Installa tion

190.10.40. Steel Buildings and Shelters: Structural Steel Erection of Primary Steel

190.10.40.10 WIC-Name: LE/SI-en, WIC-No.: 190. 10. 40. 10Light sections (less than 21 kg/m)All WORK required for the complete installation works of all kindof structural steel, shall be included in the unit rate, but is notlimited to if not otherwise specified at Exhibit E "Specification": • Any WORK required for the preparation of the installation, e.g.preparation/maintenance of the crane area and temporarylaydown areas as well as access ways • The unit rate covers the installation and all related measuresdescribed below of all kind of structural steel elementsindependent from their size and location • Take-over, check items regarding visible damages caused bytransport and registration • Unloading of supplied pre-fabricated steel work and all relatedmaterials, stockpiling, loading, transport, handling e.g. fromwarehouses or lay-down areas to erection site, lifting, • Installation of structural steel as per specification and AFCerection drawings into final position including plumbing,levelling, packing, grinding, shimming and any final adjustmentsrequired to rectify fabrication errors • Checking and acceptance of foundations and anchor bolts • All kind of scaffold, platforms and ladders required for the work • All surveying activities, incl. required paperwork • Intermediate storage/protection of structural steel incl.supports and consumables • Any equipment/manpower required for the installation,transport, lifting, supporting, alignment, handling, cutting,bending at site, e.g. cranes, temporary supports, generators,trucks and trailers, welding machines • All consumables surface protection foil, temporary assemblysupports, welding bars etc. • Any bolting and/or welding activities • All required tests, e.g. bolt tightening , welding seam test etc. • Recording and provision of all QA/QC inspections as perapplicable codes, regulations and contract specifications incl. allrequired equipment • Touch up paint • Any HSE related measures and items, e.g. sign boards,barricades • Grouting will be compensated separately • Cleaning of work area • Final cleaning of erected structural steel

4.00 t 3,236.56 12,946.24

Linde Engineering Division

Printed: 2015-03-12 Page 87 of 98

Page 88: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

Total 190.10.40. Steel Buildings and Shelters: Struc tur.. 12,946.24

Total 190.10. Primary Structural Steel Erection / .. 12,946.24

Total 190. Structural Steel Installation 12,946.24

Linde Engineering Division

Printed: 2015-03-12 Page 88 of 98

Page 89: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

210. Passive Fire Protection

210.20. Fire Proofing Supply and Application

210.20.20. Fire Proof Plaster System

210.20.20.20 Fire protective plaster of equipment, C arbon Fire with Temperature 120 °C , 2 hours fireresistance

57.18 m2 314.77 17,998.55 Total 210.20.20. Fire Proof Plaster System 17,998.55

Total 210.20. Fire Proofing Supply and Application 17 ,998.55

Total 210. Passive Fire Protection 17,998.55

Linde Engineering Division

Printed: 2015-03-12 Page 89 of 98

Page 90: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

540. Supply of Non Process Piping

540.20. PVC Piping Material

540.20.10. Plastic Pipes, PVC-U, incl. Fittings

540.20.10.30 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 540. 20. 10. 30Plastic pipe, PVC-U, DN 150, all fittings includedAll WORK required for the supply of Plastic Pipes, PVC-U, incl.Fittings shall be included in the unit rate, but is not limited to ifnot otherwise specified at Exhibit E “Specification”:• All work required to prepare and perform the work, incl.preparation of working area incl. related paperwork e.g.permissions • Provision of required certificates• All material required incl. supply and transportation of plasticpipes, DN 150, Polyvinylchloridhart (PVC-U) pipe with socketand sealing, • Transport to site, handling, shifting, intermediatestorage/protection incl. preparation of storage areas• All equipment/manpower required for the work • Any consumables required for the work• All QA / QC inspections as per project requirements• HSE related measures• Cleaning of work areaFollowing items will be compensated separately with regard tothe corresponding BOQ item unit rate:• Installation of Pipe

40.00 m 16.43 only Unit Price Total 540.20.10. Plastic Pipes, PVC-U, incl. Fitting s 0.00

540.20.30. Plastic bow, PVC-U

540.20.30.30 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 540. 20. 30. 30Plastic bow, PVC-U, 15-87°, DN 150All WORK required for the supply of Plastic Bow, PVC-U shallbe included in the unit rate, but is not limited to if not otherwisespecified at Exhibit E “Specification”:• All work required to prepare and perform the work, incl.preparation of working area incl. related paperwork e.g.permissions • Provision of required certificates• All material required incl. supply and transportation of Plasticbow, Polyvinylchlorid-hart PVC-U, 15-87°, DN 150 pipe withsocket and sealing• Transport to site, handling, shifting, intermediatestorage/protection incl. preparation of storage areas

Linde Engineering Division

Printed: 2015-03-12 Page 90 of 98

Page 91: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

• All equipment/manpower required for the work • Any consumables required for the work• All QA / QC inspections as per project requirements• HSE related measures• Cleaning of work areaFollowing items will be compensated separately with regard tothe corresponding BOQ item unit rate:• Installation of Pipe

15 PC 17.71 only Unit Price Total 540.20.30. Plastic bow, PVC-U 0.00

Total 540.20. PVC Piping Material 0.00

540.30. PEHD Piping Material

540.30.10. Plastic Pipes, PEHD, incl. Fittings

540.30.10.30 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 540. 30. 10. 30Plastic pipe, PEHD, DN 150, all fittings includedAll WORK required for the supply of Plastic Pipes, PEHD, incl.Fittings shall be included in the unit rate, but is not limited to ifnot otherwise specified at Exhibit E “Specification”:• All work required to prepare and perform the work, incl.preparation of working area incl. related paperwork e.g.permissions • Provision of required certificates• All material required incl. supply and transportation of plasticpipes, DN 150, Polyethylen (PEHD), including all necessaryfittings and weldings • Transport to site, handling, shifting, intermediatestorage/protection incl. preparation of storage areas• All equipment/manpower required for the work • Any consumables required for the work• All QA / QC inspections as per project requirements• HSE related measures• Cleaning of work areaFollowing items will be compensated separately with regard tothe corresponding BOQ item unit rate:• Installation of Pipe

44.00 m 65.99 only Unit Price Total 540.30.10. Plastic Pipes, PEHD, incl. Fittings 0.00

540.30.30. Plastic bow, PEHD

Linde Engineering Division

Printed: 2015-03-12 Page 91 of 98

Page 92: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

540.30.30.30 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 540. 30. 30. 30Plastic bow, PEHD, 45-90°, DN 150All WORK required for the supply of Plastic bow, PEHD shall beincluded in the unit rate, but is not limited to if not otherwisespecified at Exhibit E “Specification”:• All work required to prepare and perform the work, incl.preparation of working area incl. related paperwork e.g.permissions • Provision of required certificates• All material required incl. supply and transportation of Plasticbow, Polyethylen (PEHD), 45-90°, DN 150• Transport to site, handling, shifting, intermediatestorage/protection incl. preparation of storage areas• All equipment/manpower required for the work • Any consumables required for the work• All QA / QC inspections as per project requirements• HSE related measures• Cleaning of work areaFollowing items will be compensated separately with regard tothe corresponding BOQ item unit rate:• Installation of Pipe

21 PC 180.82 only Unit Price Total 540.30.30. Plastic bow, PEHD 0.00

Total 540.30. PEHD Piping Material 0.00

Total 540. Supply of Non Process Piping 0.00

Linde Engineering Division

Printed: 2015-03-12 Page 92 of 98

Page 93: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

820. Daywork Construction and Pre-commissioning/Addi tional Unit Rates

820.10. Daywork / Surcharges

WIC-Name: LE/SI-en, WIC-No.: 820. 10.Remark to chapter 820.10Hourly Rates for personnel, and where personnel is included inother rates, shall be deemed to include, but not be limited to,basic salaries, wages, bonus, overtime pay, payroll burdens,leave salaries, sick leave, uplifts, weekly rest days, publicholidays, cost for approval of work on Sunday, public holidayand at night, protective clothing, small tools, consumables,travel expenses, insurance, medical costs, visas, residencepermits, oil field security passes, end of service benefits, and allother overheads, profit and cost whatsoever, except VAT.

820.10.10. Daywork, Basis 56 h/Week, Monday to Satur day

820.10.10.10 WIC-Name: LE/SI-en, WIC-No.: 820. 10. 10. 10Foreman

100.00 Hour 43.02 4,302.00

820.10.10.20 WIC-Name: LE/SI-en, WIC-No.: 820. 10. 10. 20Civil and Steel Construction Workerspecific for Civil and Structural Works, E3 and E5

400.00 Hour 39.29 15,716.00

820.10.10.40 WIC-Name: LE/SI-en, WIC-No.: 820. 10. 10. 40Rigger

300.00 Hour 40.26 12,078.00

820.10.10.70 WIC-Name: LE/SI-en, WIC-No.: 820. 10. 10. 70Scaffolder

200.00 Hour 40.26 8,052.00

820.10.10.160 WIC-Name: LE/SI-en, WIC-No.: 820. 10. 10. 160HelperHelper

400.00 Hour 34.97 13,988.00 Total 820.10.10. Daywork, Basis 56 h/Week, Monday to .. 54,136.00

820.10.20. Daywork, surcharge, Sunday and public hol iday

820.10.20.10 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 10. 20. 10Foreman

1.00 Hour 86.04 only Unit Price

Linde Engineering Division

Printed: 2015-03-12 Page 93 of 98

Page 94: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

820.10.20.20 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 10. 20. 20Civil and Steel Construction Workerspecific for Civil and Structural Works, E3 and E5

1.00 Hour 78.57 only Unit Price

820.10.20.40 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 10. 20. 40Rigger

1.00 Hour 80.51 only Unit Price

820.10.20.70 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 10. 20. 70Scaffolder

1.00 Hour 80.51 only Unit Price

820.10.20.160 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 10. 20. 160HelperHelper

1.00 Hour 69.94 only Unit Price Total 820.10.20. Daywork, surcharge, Sunday and publ ic .. 0.00

820.10.30. Daywork, surcharge, at night from 20:00 - 06:00 hours

820.10.30.10 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 10. 30. 10Foreman

1.00 Hour 8.60 only Unit Price

820.10.30.20 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 10. 30. 20Civil and Steel Construction Workerspecific for Civil and Structural Works, E3 and E5

1.00 Hour 7.86 only Unit Price

820.10.30.40 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 10. 30. 40Rigger

1.00 Hour 8.05 only Unit Price

820.10.30.70 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 10. 30. 70Scaffolder

1.00 Hour 8.05 only Unit Price

Linde Engineering Division

Printed: 2015-03-12 Page 94 of 98

Page 95: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

820.10.30.160 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 10. 30. 160HelperHelper

1.00 Hour 6.99 only Unit Price Total 820.10.30. Daywork, surcharge, at night from 2 0:.. 0.00

Total 820.10. Daywork / Surcharges 54,136.00

820.20. Additional unit Rates machinery and equipmen t

WIC-Name: LE/SI-en, WIC-No.: 820. 20.Remark to chapter 820.20Hourly rates for equipment shall be deemed to include, but notbe limited to, all operating cost, maintenance, repairs, fuel,lubricants, spare parts, taxes, depreciation, insurance,overheads, and all other overheads and cost whatsoever,except VAT.

820.20.10. Hourly rates machinery and equipment

820.20.10.20 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 20. 10. 20trailer (normal and flatbed)

1.00 Hour 87.49 only Unit Price

820.20.10.40 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 20. 10. 40truck

1.00 Hour 64.02 only Unit Price

820.20.10.50 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 20. 10. 50truck with loading device

1.00 Hour 51.22 only Unit Price

820.20.10.70 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 20. 10. 70forklifter

1.00 Hour 20.08 only Unit Price

820.20.10.80 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 20. 10. 80lifting platform up to 25m

1.00 Hour 21.34 only Unit Price

Linde Engineering Division

Printed: 2015-03-12 Page 95 of 98

Page 96: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

820.20.10.90 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 20. 10. 90excavating machine

1.00 Hour 44.22 only Unit Price Total 820.20.10. Hourly rates machinery and equipmen t 0.00

Total 820.20. Additional unit Rates machinery and .. 0.00

820.30. Hourly rates standard cranage services

820.30.10. Hourly rates standard cranage services

820.30.10.10 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 30. 10. 1025 to - Transport to and from site

1 PC 81.82 only Unit Price

820.30.10.20 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 30. 10. 2025 to - Assembly and Disassembly

1 PC 81.82 only Unit Price

820.30.10.30 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 30. 10. 3025 to - Rental Rate as of ready for Lifting

1.00 Hour 81.82 only Unit Price

820.30.10.40 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 30. 10. 4025 to - stand-by rate

1.00 Hour 81.82 only Unit Price

820.30.10.90 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 30. 10. 9050 to - Transport to and from site

1 PC 100.26 only Unit Price

820.30.10.100 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 30. 10. 10050 to - Assembly and Disassembly

1 PC 100.26 only Unit Price

820.30.10.110 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 30. 10. 11050 to - Rental Rate as of ready for Lifting

1.00 Hour 100.26 only Unit Price

Linde Engineering Division

Printed: 2015-03-12 Page 96 of 98

Page 97: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of Quantities

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref.No. Specification Quantity UoM Unit Price Item Total

in EUR in EUR

820.30.10.120 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 30. 10. 12050 to - stand-by rate

1.00 Hour 100.26 only Unit Price

820.30.10.170 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 30. 10. 170100 to - Transport to and from site

1 PC 780.72 only Unit Price

820.30.10.180 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 30. 10. 180100 to - Assembly and Disassembly

1 PC 311.14 only Unit Price

820.30.10.190 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 30. 10. 190100 to - Rental Rate as of ready for Lifting

1.00 Hour 155.57 only Unit Price

820.30.10.200 *** Optional Item ohne GBWIC-Name: LE/SI-en, WIC-No.: 820. 30. 10. 200100 to - stand-by rate

1.00 Hour 144.05 only Unit Price Total 820.30.10. Hourly rates standard cranage servi ces 0.00

Total 820.30. Hourly rates standard cranage services 0.00

Total 820. Daywork Construction and Pre-commissio.. 5 4,136.00

Linde Engineering Division

Printed: 2015-03-12 Page 97 of 98

Page 98: Linde Engineering Division &AA W-LZ 9303 Bill of Quantities · &AA W-LZ 9303 Bill of Quantities Table of Contents Currency: EUR Project: 3230A1E9 Gelsenkirchen LD5 WBS: 02 &AE W-LZ

&AA W-LZ 9303 Bill of QuantitiesSummary

Project: 3230A1E9 Gelsenkirchen LD5WBS: 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0 (ALL) Ref. No Outline Specs Amount in EUR

LV 0210. Indirects, construction management and temporary site.. 324,241.82100. Site Preparation 16,317.22110. Piling 810.60130. Concrete & Other Civil Works 483,976.69140. Installation of Non Process Piping 7,623.63150. Finishing Works 76,112.88190. Structural Steel Installation 12,946.24210. Passive Fire Protection 17,998.55540. Supply of Non Process Piping 0.00820. Daywork Construction and Pre-commissioning/Additional.. 54,136.00

Total LV 02 &AE W-LZ 1301 Civil Rev.2.0, QCT5.0.. 99 4,163.63