HuanucoHuanuco
PucallpaPucallpa
Tingo MaríaTingo María
3
HuancayoHuancayo2
Dv Cerro de PascoDv Cerro de Pasco
La OroyaLa Oroya
Pte Ricardo PalmaPte Ricardo PalmaRamiro PrialéRamiro Prialé
1
Section 1:Section 1: Ramiro Prialé - Ramiro Prialé - Bridge Ricardo PalmaBridge Ricardo Palma
Section 2: Section 2: Pte Ricardo Pte Ricardo Palma - La Oroya - Palma - La Oroya - Huancayo and La Oroya - Huancayo and La Oroya - Detour Cerro de PascoDetour Cerro de Pasco
Section 3: Section 3: Detour Cerro de Detour Cerro de Pasco - Huánuco - Tingo Pasco - Huánuco - Tingo María -PucallpaMaría -Pucallpa
Pte Ricardo PalmaPte Ricardo Palma
Detour Cerro de PascoDetour Cerro de Pasco
La OroyaLa Oroya
HuancayoHuancayo
370 km
Concession structureConcession structureIncludes the sub – sections Includes the sub – sections Ricardo Palma Ricardo Palma bridge-La Oroya, La Oroya-Huancayo bridge-La Oroya, La Oroya-Huancayo and and detourdetour Oroya Cerro de Pasco. (370km) Oroya Cerro de Pasco. (370km)
ModalityModality Comprehensive project bidComprehensive project bid
Concession termConcession term 25 years25 years
Competition factorCompetition factorWorks that the concessionaire intends to Works that the concessionaire intends to execute, in addition to the works categorized execute, in addition to the works categorized as mandatory by the State.as mandatory by the State.
FinancingFinancingResponsibility of the concessionaire for Responsibility of the concessionaire for works execution, operation and works execution, operation and maintenance.maintenance.
StrategicStrategic partnerpartner
The strategic partner will be the operator, The strategic partner will be the operator, who must have and maintain a minimum who must have and maintain a minimum thirty five percent (35%) share of the thirty five percent (35%) share of the concessionaire’s subscribed capital.concessionaire’s subscribed capital.
Guarantees Guarantees Guarantees are considered for the proposal’s Guarantees are considered for the proposal’s effectiveness and seriousness, for the Contract’s effectiveness and seriousness, for the Contract’s
performance and Work’s execution.performance and Work’s execution.
Best Economic ProposalBest Economic Proposal
The Best Economic Proposal will be the one submitted The Best Economic Proposal will be the one submitted by a short listed bidder by a short listed bidder which proposes, in accordance which proposes, in accordance with the established priority, executing the highest with the established priority, executing the highest number of Works for Tender and Tiebreak, in addition to number of Works for Tender and Tiebreak, in addition to the Works categorized as mandatory by the State.the Works categorized as mandatory by the State.
AwardAward It will be granted if at least two valid Economic It will be granted if at least two valid Economic proposals are received.proposals are received.
TollToll unitsunitsThe three existing tolls will be handed over to The three existing tolls will be handed over to the concessionaire on the date of the concessionaire on the date of commissioning.commissioning.
Works
Mandatory
Upgrading Ricardo Palma bridge-La Oroya
Upgrading La Oroya-Huancayo
upgrading La Oroya-Cerro de Pasco detour
A
B
For Tender and Tiebreak
Priority 1: C
Priority 2: D
Priority 3: E
Priority 4: F
Priority 5: G
Priority 6: H
Detour. Cerro de Pasco
Detour. Cerro de Pasco
Ricardo Palma bridge
Ricardo Palma bridge
Huancayo
Huancayo
La OroyaLa Oroya
Ricardo Palma bridgeRicardo Palma bridge
Cerro de Pasco detourCerro de Pasco detour
La OroyaLa Oroya
HuancayoHuancayo
The grantor will execute the a regular The grantor will execute the a regular and routine maintenance in the 3 sub and routine maintenance in the 3 sub
sections of the concession, for 3 years. sections of the concession, for 3 years. Due the deadline each sub sections will Due the deadline each sub sections will be handed over to the concessionaire.be handed over to the concessionaire.
A month of the Contract A month of the Contract subscription date in all toll subscription date in all toll
units units
Actual toll + VATActual toll + VAT
In each sub section where In each sub section where the MTC finished the the MTC finished the regular maintenanceregular maintenance
$ 1.50 + VAT$ 1.50 + VAT
La OroyaLa Oroya
Cerro de Pasco detour
Pte. Ricardo Palma
Huancayo
CasaracraCasaracra
QuiullaQuiullaCorconaCorcona
Toll UnitsToll Units
Short listing requirementsShort listing requirements
Operation Operation
In the last ten years (10) is operating or has operated one or more asphalted road concessions that add at least 100 kilometers, or in the last five years (5) is operating or has operated one or more asphalted road concessions that add at least 50 kilometers; in both cases, for a minimum period of two years (2) accumulated.
Financing Financing
Minimum net assets: To be defined, Audited Minimum net assets: To be defined, Audited financial statements 2006, 2007 and 2008 or similar financial statements 2006, 2007 and 2008 or similar documents. Reference letter issued by a banking documents. Reference letter issued by a banking company or a international financing institution, company or a international financing institution, according the Tender Documents. according the Tender Documents.
Social CapitalSocial Capital To be defined.
Short listing RequirementsShort listing Requirements
ConstructionConstruction
the builder does not need to proved its experience to the builder does not need to proved its experience to be declared as a short listing bidder. The accreditation be declared as a short listing bidder. The accreditation will be done from the Award date up to 30 calendar will be done from the Award date up to 30 calendar days after the mention date. days after the mention date.
The builder must certify that he has executed in the last The builder must certify that he has executed in the last 15 years, at least 100 km, among “ New Road works”, 15 years, at least 100 km, among “ New Road works”, “Upgrading” and “Maintenance”, can accumulated the “Upgrading” and “Maintenance”, can accumulated the length of two way road only in case of different roads length of two way road only in case of different roads (motorway) (motorway)
From the required total accreditation length, mention in From the required total accreditation length, mention in the preceding paragraph, must have executed at least the preceding paragraph, must have executed at least 10% in the elevation above 2,400 masl. 10% in the elevation above 2,400 masl.
TentativeTentative Schedule Schedule
Presentation of Envelope N° 1 Presentation of Envelope N° 1 (credentials for short listing)(credentials for short listing)
Up to 30 calendar days before the presentation of Envelopes N°2 and N°3.
Delivery of the final contrac version approved by Proinversion Board of Directors.
In 240 calendar days after the publication of call for Tenders.
Presentation of Envelopes N°2 and N°3 (economic and technical proposals)
Third Quarter 2010.
Opening of Envelope N°3 and Award. Up to 10 calendar days after the previous event.
Closing date. Up to 60 working days after the Award .
Suggestions and Queries
Section 2 of IIRSA Centro Road Projects
Communications Phone: 6121233 (direct line)Fax [511] 2212935
E-mail [email protected]
Important note: This "Document" has been prepared and provided by Proinversion only for information purposes to potential investors (the "Interested Parties") to help them define their interest in participating in the call for the concession of IIRSA Centro.By receiving this Document, the receiver accepts that the Peruvian Government, PROINVERSION, and its Advisors will be exempted from any responsibility or liability arising hereunder or from any information related herewith, even if PROINVERSION or its Advisors may have been aware of any potential errors or omissions herein.