7/28/2019 Library Vb1
1/92
A PROJECT REPORT ON
LIBRAY MANAGEMENT SYSTEM
SUBMITTED BY
Ayush Jain
DEPARTMENT OF MBA (IT) IIIrd Sem
Sikkim Manipal University Learning Center
DEHRADUN
1
7/28/2019 Library Vb1
2/92
2011-2013
ACKNOWLEDGEMENT
We would like to pay sincere gratitude to Learning center of SMU
Dehradun who created a healthy and technical Environment for
the successful completion of the project.
We humbly extends our words of gratitude faculty member
s for providing us with their valuable time and help whenever it
was required.
And finally ,thanks to all those who inspired us directly or
indirectly.
Ayush Jain
2
7/28/2019 Library Vb1
3/92
PREFACE
Software is a mechanism for automating business,industry
,government,education and medium for transferring new technology, a
method of capturing valuable expertise for use by others, a others ,a
means of differentiating one companys products from other
competitors into corporations collective knowledge.
This software is meant for making the library processes easier and
comfortable to the librarians.the software is quite user friendly and selfexplanatory.the algoriythms used For this purpose are trusted over
years and sufficiently Secure and efficient.Some of the features of thissoftware are its handiness and quick response.
Project is developed in VISUAL BASIC, which provides a greater
flexibility in data management.this project provide better linkage
between different modules and by use of menus and buttons,it is more
easy to use.It provides an uninterrupted flow of information and
control along with adequate security.Record handling is made easy by
process of addition,modification,deletionand query of any record.In thisproject it is tried to make system more convenient and effective interms of file handling,costand record maintenance.This report provides
better way for use to understand.User can understandthe project with a very little effort.
PROJECT REPORT
ON3
7/28/2019 Library Vb1
4/92
LIBRARY MANAGEMENT SYSTEM
AT
IAIT SIKKIM MANIPAL UNIVERSITYDEHRADUN
SUBMITTED AS THE PRACTICAL WORK
OF SOFTWARE ENGINEERING
IN
IIIrd Sem of MBA
SUBMITTED BY: SUBMITTED AT:
Ayush Jain DEPARTMENT OF
MBA IT
IAITDEHRADUN
4
7/28/2019 Library Vb1
5/92
CONTENTS
CONTENTS
1. SOFTWARE DEVELOPMENT LIFE CYCLE
5
7/28/2019 Library Vb1
6/92
2. SYSTEM ANALYSIS AND DESIGN
3. FEASIBILITY CONSIDERATIONS
4. UTILITY OF THE SOFTWARE
5. REQUIREMENT ANALYSIS AND SPECIFICATION
6. HARDWARE REOUIREMENTS7. SOFTWARE REQUIREMENTS
8. S.R.S.
9. DESIGNING.
10. DATA FLOW DIAGRAM
11. ER DIAGRAM
12. .
13. QUALITY ASSURANCE
14. TESTING
15. LEVEL OF TESTING
16. IMPLEMENTATION
17. ANNEXURE
18. INPUT FORMS19. OUTPUT FORMS
20. MENUS
21. FLOW CHART
22. MAINTENANCE
23. COST ESTIMATION
24. CONCLUSION
25. REFERENCES
INTRODUCTION
6
7/28/2019 Library Vb1
7/92
This project on Library Management System
aims on making the working of library
processes easier and comfortable to the
librarians and students.this project will help
to issue the books, maintain the book-bankand charging the and other library related
issues.
This software will also help to get
information about a particular book,availability
of books etc.
SOFTWARE DEVELOPMENT LIFE CYCLE
A software life cycle is a series of identifiable stages that a software
product undergoes during its life time.This project LIBRARY
7
7/28/2019 Library Vb1
8/92
MANAGEMENT usually starts with a feasibility study stage, and then
reouirement analysis and specification,design,coding,testing and
maintenance.In this model the life cycle model is Iterative Waterfall
Model
ITERATIVE WATERFALL MODEL
The waterfall model divides the life cycle of a software development
process into phases as shown:-
FEASIBILITY ST
AND SPECIFICATION
TESTING
The classical waterfall model is an idealistic one since it assumes
that no development error is ever committed by the engineers during
any of the life cycle phases .However in practical development
environment,the engineers do commit a large numbers of errors in
almost every phase of life cycle.Resource of the many can be
:oversight ,wrong assumptions,use of inappropriate technologies
8
FEASIBILITY
STUDY
REQUIREMENT
ANALYSIS
ANDSPECIFICATION
DESIGN
CODING AND
UNIT TESTING
INTEGRATION &SYSTEM TESTING
MAINTENANC
E
7/28/2019 Library Vb1
9/92
,communication gape among the project engineers etc.These defects
usually get detected much later in the life cycle.For example a
designdefect might go unnoticed till we reach the coding and
trusting phase.Once,a dfect is detected,the engineers need to go back
to the phase where the defect had occurred and redo some of thework done during that phase and subsequent phase to correct the
defect and its effect on the later phases.
Therefore in any practical software development work it is notpossible to strictly follows the classical waterfall model.Feedback
paths are needed in the figure,to allow for the correction of the
errors committed during the phase that are detected in later phase .
Though errors are inevitable in almost every phase of
development it is desirable to detect these errors in the same phase
in which they occur.However ,it may not always be possible todetect all errors in the same phase in which they
occur.Nevertheless ,the the error should be detected in the designphase itself this problem can be taken care of easily than if the error
is identified,say, at the end of the integration and system testing
phase.In the later case,it would be necessary not only to rework ,but
also to appropriately redo the coding and the system testing,thus
incurring higher cost.The principle of detecting errors as close to
their points of introduction as possible is known as the phase
containment of errors.This is an important software engineeringprinciple.
9
7/28/2019 Library Vb1
10/92
SYSTEM ANALYSIS
AND
DESIGN
TRANSFORMATION
SRS DESIGNSPECIFICATION
10
DESIGN
7/28/2019 Library Vb1
11/92
CUSTOMER SYSTEM BUILDER
S/W DESIGNING is a highly creative process of s/w development cyclewhere the designer plan how a s/w system should be produce to make a
functional reliable and reasonably easy to understand
SRS tell us what a system does and became the input for the design
It is a process which help us how a system works
SRS justified with the designed specifications
The process of s/w design involves the transformation of idea in todetail, implementation, description with the objective of satisfying the
s/w requirement in to working system the designer must satisfy both
customer as well as system builders
A good s/w design need to fulfill
. Correct and complete
. Understandable
. At the right level
. Maintainable
. Flexiblity
SAD
DEFINITION
11
CONCEPTUAL
DESIGN
TECHNICAL
DESIGN
7/28/2019 Library Vb1
12/92
A system is an orderly grouping of interdependent components linked
together to a plan to achieve a specific objective.
The design of system has three basic implications:
1. System must be designed to achieve a predetermined objective.
1. Interrelationship and interdependence must exist among the
components.
2. The objective of the organization as a whole should have a higher
priority then the objective of its subsystems.
Steps In System Design:
Recognition of Need The problem
Feasibility Study
Analysis
Design
Implementation
Post Implementation and Maintenance
An Approach to System Development
12
7/28/2019 Library Vb1
13/92
The basic objective of System Analysis and Design is to develop
methods and procedures for system development that can scale up for
large systems and that can be used for consistently produce high
quality systems at low cost and small cycle time.The basic approach isto be separate the development project.The former the controls the
quality,scalability ,consistency and productivity.Hence,we need to
focus on development process.
The basic approach used in System Design is PHASED
DEVELOPMENT PROCESS.The development process consists of
many phases,each phase ending in a defined output.The phases are
performed in the order specified by the processs model. This ensuresthat the cost of the problem is lower than it would have been by taking
the whole problem together .
There are many models of development process.But there are
some phases that are must to develop the system and rest depends on
the model chosen.
These activities are shown in figure and dicussed further:
13
Sources of System Ideas
Top Management Consumers
Organization Govt Rules and
Regulations
7/28/2019 Library Vb1
14/92
Recognition of Need The Problem?
The first step in development process is to know theproblem
that the system is going to solve.The basic for a candidate system is the
14
User
Competition
Union
System Analysis
System DevelopmentProcess
Analysis
Recoginition of Need
Feasibilit Stud
Design
Im lementation
Post Im lementation
Maintenance
7/28/2019 Library Vb1
15/92
recognition of the need for improving an information to determine
whether an alternative system can solve the
problem.
In large environments ,where formal procedures are the norm,the task is to prepare a statement specifying the scope and objective of
the problem.Then the problem must be reviewed with the user for
accuracy and efficiency.At this stage , only rough estimate of the costanalysis and benefits of developing the process may be determined.
However an accurate analysis can be made by a feasibility study.
15
7/28/2019 Library Vb1
16/92
FEASIBILITYSTUDY
FEASIBILITY STUDY
Thefeasibility study proposes one or more conceptual solutions to
the problem set for the project . the conceptual solutions give an
idea of what the new system will look like.They
define what will be done on the computer and what will remain
manual.They also whaty inputs the systems and outputs will
produce.These solutions must be accepted .feasibility study is done
16
7/28/2019 Library Vb1
17/92
so that an ill-conceived system is recognized early in definition
phase.
During system engineering ,however ,we concentrate our attention
on four primary areas of interest:
Economic Feasibility :An evaluation pf development costweighed against the ultimate income or benefit derived from
the developed system.This new propsed system is economically
feasible as it does not involve much financial costs and is very
beneficial to the division as this system will save the time
required queries ,will generate reports and also make sure that
the data is not damaged as in the case of manual system where
the data is written on papers.
Technical Feasibility: A study of function, performance andconstraints that may affect the ability to achieve an acceptable
system.In technical feasibility , configuration of the system is
given more importance than the actual make of hardware.The
configuration should give the complete picture about the system
requirement.
Operational Feasibility: It is mainly related to humanorganizational and political aspects.It is carried out by a small
group of people who are familiar with information system
techniques,who understand the parts of the business that are
relevant to the project and skilled in system analysis and design
process.This system feasible since the staff using older manual
system is experienced in handling the computerized
systems.The staff of the division support the new system,as itwill be designied keeping their views in consideration.The
changes made in the system are as advised by them and some
others according to the needs which will make the system user
friendly and easy to use.
17
7/28/2019 Library Vb1
18/92
Legal Feasibility: Legal feasibility is a determination ofwhether a proposed project infringes on known acts,statues,as
well as any pending might appear sound, on closer investigation
it may be found to infringe on several legal areas.
Time Feasibility: Time feasibility is adeterminatin ofwhether a proposed project can be implemented fully within a
stipulated time frame.If a project takes too much time it is likely
to be rejected.
Accordingly, the proposed systemLIBRARY MANAGEMENT
stands out on these constraints to fulfill the
requirements.Economically the proposed system is cost-effective
as it makes use of the minimum available resources ( H/W,S/W)
AND IS IN TUNE WITH THE LATEST TECHNOLOGY.The
system is designed keeping in view further expansion at the
software level. As the proposed system is GUI based ,it is user
friendly and saves the end-user from the complexities of theinternal working.This enables the user to understand the usability
of the system in a very short period of tme.
During the project development the users were consulted and the
developed applications were shown to them and some demo had
been given to have the comments of them and to modify our
project.The suggestions of the users had been noted the
18
7/28/2019 Library Vb1
19/92
19
7/28/2019 Library Vb1
20/92
ANALYSIS
ANALYSIS
Analysis is the detailed study of the various operations
performed by the System and their relationship within and outside
of the system.During Analysis data are collected on the availablefiles,decisions points and transaction system.
The interview is the commonly used tool in analysis.Training
experience and common sense are required for collection of
information needed to do the analysis . Once analysis is completedthe analyst has a firm understanding of what is to be done.
20
7/28/2019 Library Vb1
21/92
SYSTEM ANALYSIS
INITIAL INVESTIGATION:-
The iitial investigation system has the objective of determinig the validity of
the user request for the candidate system and whether a feasibility study
should be conducted .
The objective of determining the validity of the user request for the
candidate system and whether a feasibility study should be conducted .The
objective should be understood within the framework of the organization
MIS(Management Information System).
The basic steps that were followed during the initial investigation :-
Recognition of the Need :
To recognize what the user need from the system.The success
of the system depends largely on how accurately a problem is
defined,through investigation ,
and properly carried out through the choice of the solution .User need
identification and analysis are concerned with the user needs rather than
what he\she wants.
What is the problem? :
What problem the users are facing which has motivated them to
ask for the candidate system? What all short coming do the existing system
is having? What all changes does the user request?
21
7/28/2019 Library Vb1
22/92
INFORMATION GATHERING
22
On-Site
Obeservation
Review Literature
Procedures andForms
Information
GatheringTools
Data
Organization
7/28/2019 Library Vb1
23/92
On-Site observation Technique
The major objectives of on-site observation is to get as close as possibleto the real system being studied.The following questions were answered
during the on-site observation technique:-
What kind of system is it ? What does it do?
Who runs the system ? Who are the important people in it ?
What is the history of the system ? How did it get to its present stage?What kind of system is it in comparision with other systems in the
organization?
Information About the User Staff
23
Questionaire
Interviews
7/28/2019 Library Vb1
24/92
Another kind of information for the analysis is knowledge about the people
who run the
Present system.Their job functions and information requirements.The
relationships of their jobs to the existing system,and the interpersonal
network that holds the users group together .
In summary, the major focus is to find out what people the analyst is going
to be dealing with and what each person expects to get out of a candidate
system before it goes through design and final implementation.
The application using staff is the well-qualified employees.They are very
good in their respective fields. But less about the use of the application,so
the system has to be developed so that it can help them to understand the
application better and fater.
INTERVIEWS
24
7/28/2019 Library Vb1
25/92
QUESTIONAIRE
25
7/28/2019 Library Vb1
26/92
USER REQUIREMENTS:
Besides all the jobs that were being done in the existing system ,theuser expected certain other features to be added to the package.Since
the existing system is manual,reports are not generated but in the
proposed computerised system the reports are required at different
queries.In the manual system , all return item and returnable not returnitem were not obtained but in the proposed system, user requires to
generates these ranges.
PERFORMANCE REQUIREMENTS :
The following performance characteristics were taken care of while
developing the system:
User Friendliness
The system is easy to learn and understand.Anative user can also use
the system effectively,without any difficulty.
26
7/28/2019 Library Vb1
27/92
User Satisfaction
The system is such that it stands up to the users expectations.
Respose Time
The response time of all the operations is good .This has been made
possible by careful programming.
Error Handling
Response to user errors and undesired situations have been taken care
of ensure that the system operates without halting.
Safety and Robustness
The system is able to avoid or tackle disastrous action.In other words,it
should be foul proof.The system safetyguards against undesired events
without human intervention.
27
7/28/2019 Library Vb1
28/92
HARDWARE-SOFTWARE SELECTION
There are several things to do before selection:
1. Define sysem capabilities that make sense .
2. Specify the magnitude of the problem.
3. Assess the competence of the in-house staff.
4. Consider hardware and software as a package.
5. Develop a time frame for selection.
6. Provide user indoctrinations.
The criteria for software selection are:
1. Reliability : Gives consistent results.
2. Functionality : Functions to standards.
28
7/28/2019 Library Vb1
29/92
3. Capacity : Satisfies volume requirements.
4. Flexibility : Adapts to changing needs.
5. Usability : Is user friendly?
6. Security : Maintains integrity and prevents unauthorized
access.
7. Performance : Delivers as expected.
8. Serviceability : Has good documentation and vendor support.
9. Ownership : Has right to modify and share use of
package.10. Minimal Costs : Is affordable for intended
Application
OPERATING ENVIRONMENT
Minimum Hardware Requirments
Micoprocessor : Pentium-3 166MHz
RAM : 32 MB
Hard Disk : 2.1 GB
Monitor : SVGA Monitor
FDD : 1.44 MB
Software Requirments
Operating System : Windows 98/NT/XP/VISTA
Front-End-Tools : Visual Basic 6.0
Back-End : MS Access 97
29
7/28/2019 Library Vb1
30/92
Structured Analysis
Structured analysis is a set techniques and graphical tools and that
allow the analyst to develop a new kind of system specifications that
are easily understandable to the userAnalyst works primarily with their wits, pencils and paper. Structured
analysis considers new goals and structured analysis are:-
Data Flow Digram
ER Diagram
Data Dictionary
Structured English
Decision Trees
30
7/28/2019 Library Vb1
31/92
Decision Tables
DFDCONTEXT DIAGRAM
Formatted report
Issue request request
31
STUDENT MANAGEMENT
0
LIBRARY
MANAGEMENT
SYSTEM
7/28/2019 Library Vb1
32/92
Items
Context Diagram
32
SUPPLIERS
USERFACULTYINFORMATIO
N
SYSTEM
DATA
BASE
7/28/2019 Library Vb1
33/92
LEVEL ONE
33
Information
of
Storage
process
Datacollection
process
Informatio
n processor
Information
entered
Print report
DATA BASE
7/28/2019 Library Vb1
34/92
DESIGNING
34
Informatio
n requestUser
7/28/2019 Library Vb1
35/92
DESIGN
The design process for software system has two levels.At the first
Level the focus is on deciding which module is needed for theSystem ,the specifications of these modules , and how the modules
Should be interconnected.That is what is called the system design or
Top-level design .It is used in two ways , a verb , it represents the
Process of design.Used as noun, it represents the result of the design
process , which is the design of the system,the goal of the design process
is to produce a model or representation of the
system , which can be used later to build that system .The produced model
is called the design of the system , in the second level , the internal design of
the modules, or how the specifications of the module can be satisfied, isdecided .This design level is often called detailed or logic design.
A design methodology is a systematic approach to creating a design by
applying of a set of techniques and guidelines.Most design methodologies
focus on the system design .Most current design methodologies essentially
offer a setoff guidelines that can be used as a developer to design a system.
These techniques are not formalized and not reduce the design activity to a
Sequence of steps thet can be followed by the designer.The input to the
design phase is the specifications for the system to be designed.The output
of the top level design phase is the architectural design or the system designfor the software system to built.
The design can be object-oriented or function-oriented .The purpose of the
design phase is to specify the components for transformation function.
Hence , the basic output of the system design phase.When the function
oriented design approach is being followed ,is the definition of all the
35
7/28/2019 Library Vb1
36/92
major data structures of the system, all the modules of the system , and how
the modules interact with each other.
The design of the system is essentially a blueprint or a plan for the solution
for the system.Here we consider a system to be a set of components with
clearly defined behavior that interacts with each services for its
environment .A component of a system can be considered a system, a
component is a software module.
TRADITIONAL DESIGN APPROACH
The traditional design approach is currently being used by many software
development houses. Traditional design consist of two different activities :
first a structured analysis of the requirement specification is carrie out
where the detailed structure of the program is examined.During structured
analysis are transformed into software design.
Structured analysis involves preparing a detailed analysis of the different
functions to be supported by the system and identification of the dataflow
among the different function in addition to identifying the various processesin the system, the dataflow among the processes are also identified.Dataflow
diagrams DFDs are used to perform structured analysis and to document the
results.
Structured design consists of two main activities :Architectural design
and Detailed design
System Designing
System design, aims to identify the modules that should be in the system ,the specifications of these modules , and how they interact with each other to
produce the desired results.
In the system design the focus is on identifying the modules .In other words ,
in system design the attention is on what components are needed . After
identifying the modules ,after that the inter action, after that the interaction
between those modules is carried out to get the desired output .The out put
36
7/28/2019 Library Vb1
37/92
of this phase is data structure , file format and major modules in the system
and specifications are decided.
The system design controls the major structural characteristics of the system.
The system design has the major impact on the testability and modifiability
of a system, and it impacts its efficiency.Much of the design efforts for the
designing software are spent creating a system design.
DETAILED DESIGNING
During Detailed design, the internal logic of each of the modules specified in
system design is decided.During this phase further details of the data
structures and logarithmic design of each of the modules is specified.
The basic goal of detailed design is to specify the logic for the different
modules that have been specified during system design.Specifying the logicwill require developing an algorithm that will implement the given
specifications. The term algorithm is quite general and applicable to a wide
variety of areas.
There are a number of steps that one has to perform while developing an
algorithm.The starting step is the design of algorithms is the statement of the
problem.The problem for ahich the algorithm is being derived has to be
precisely stated and properly understood by the person responsible for
designing the algorithms in the next step the data structure and the program
structure is decided to design the algorithm.Once the algoritm is designed ,its correctness should be verified.
OBJECT-ORIENTED DESIGNING APPROACH
Object-Oriented design is a relatively new technique.In this techniquevarious objects that occur in the problem domain and the solution domain
are first identified and different relationships that exists among these objects
are identified .The object structure is further refined to obtain the detailed
design.The OOD approach has several benefits such as lower development
time and effort and better maintainability of the product.
37
7/28/2019 Library Vb1
38/92
DBMSDATABASE MANAGEMENT
SYSTEM
38
7/28/2019 Library Vb1
39/92
DATABASE MANAGEMENT SYSTEM
Between the data base itself (i.e. where the data is actually stored ) and the
user of the system , is a layer of software called DBMS . All requests from
the users for access to the database from hardware level details. All database
management systems allow users to create containers (i.e. relation and
tables) for data storage and management.
CHARACTERISTICS OF DBMS:
It represents complex relationships between data.
Keeps tight control over data redundancy.
Enforces user defined rules to ensure the integrity of table
data.
Has a centralized data dictionary for the storage of information
pertaining to data and manipulation
Ensures that data can be shared across applications.
Enforces data access authorization.
Has automatic intelligent backup and recovery procedure for data.
Have different interfaces via which users can manipulate data.
39
7/28/2019 Library Vb1
40/92
Database Management System provides user with a method of
abstracting their data requirements and removes the problems of
specifying the details of the storage and maintenance of data .
Database Management System is a complex software system
consisting of number of componenets.It provides the user data
definition language and data manipulation language.
ADVANTAGES OF DBMS:
In brief advantages of DBMS are as follows:
Centralized management and control over the data.
Reduction of redundancies.
Data can be shared.
Data integrity can be maintained.
Security Restriction can be applied.
Data Inconsistency can be avoided
Data Independency can be obtained.
40
7/28/2019 Library Vb1
41/92
DATABASE DESIGN
Whenever you start making a project,which has some data to be stored at the
back end .It is necessary to first choose the database you will be using for
providing the back end.In this project Library Management we used
MS ACCESS as back end for storing the data .The data is to be stored in the
form of tables.Below is the description of the various tables that are used in
the database.
41
7/28/2019 Library Vb1
42/92
42
7/28/2019 Library Vb1
43/92
PROJECT TESTING
43
7/28/2019 Library Vb1
44/92
PROJECT TESTING
A strategy for software testing must accommodate low-level tests that
are necessary to verify that a small source code segment has been correctly
implemented as well as high-level tests that validate major system functions
against customer requirements. A strategy must provide guidance for the
practitioner and a set of milestones for the manager. Because the steps of the
test strategy occur at a time when deadline pressure begins to rise, progress
must be measurable and problems must surface as earl as possible.
Following testing techniques are well known and the same strategy is
adopted during this project testing.
1 Unit testing: Unit testing focuses verification effort on the
smallest unit of software design- the software component or
module. The unit test is white-box oriented. The module
interface is tested to ensure that information properly flows into
and of the program unit under test the local data structure has
been examined to ensure that data stored temporarily maintains
its integrity during all steps in an algorithms execution.
Boundary conditions are tested to ensure that the module
operated properly at boundaries established to limit or restrict
processing. All independent paths through the control structure
are exercised to ensure that all statements in a module haven
executed at least once.
44
7/28/2019 Library Vb1
45/92
2 Integration testing: Integration testing is a systematic
technique for constructing the program structure while at the
same time conducting tests to uncover errors associated with
interfacing. The objective of this test is to take unit tested
components and build a program structure that has been
dictated by design.
3 Validation testing: At the culmination of integration testing,
software is completely assembled as a package, interfacing
errors have been uncovered and corrected, and a final series of
software testsvalidation testing-may begins. Validation can
be defined in many ways, but a simple definition is that
validation succeeds when software functions in a manner that
can be reasonably expected by the customer.
4 System testing: System testing is actually a series of
different tests whose primary purpose is to fully exercise the
computer-based system. Below we have described the two
types of testing which have been taken for this project.
(a) Security testing: Any computer-based system that
manages sensitive information causes actions that can
improperly harm (or benefit) individuals is a target for
improper or illegal penetration. Penetration spans a broad
range of activities: hackers who attempt to penetrate
system for sport; disgruntled employees who attempt to
penetrate for revenge; dishonest individuals who attempt
to penetrate for illicit personal gain.
For security purposes, when anyone who is not
authorized user cannot penetrate this system. When programs
45
7/28/2019 Library Vb1
46/92
first load it check for correct username and password. If any
fails to act according will be simply ignored by the system.
(b)Performance Testing: Performance testing is
designed to test the run-time performance of software
within the context of an integrated system. Performance
testing occurs throughout all steps in the testing process.
Even at the unit level, the performance of an individual
module may be assessed as white-box tests are
conducted.
Criteria for Completion of Testing
Every time the customer/user executes a compute program, the program is
being tested. This sobering fact underlines the importance of other software
quality assurance activities.
Validation Checks
Software testing is one element of broader topic that is often referred to asverification and validation. Verification refers to the set of activities that
ensure that software correctly implements a specific function. Validation
refers to a different set of activities that ensure that the software that has
been built is traceable to customer requirements. Validation checks are
useful when we specify the nature of data input. In this project while
entering the data to many text box you will find the use of validation checks.
When you try to input wrong data, your entry will be automatically
abandoned.
46
7/28/2019 Library Vb1
47/92
IMPLEMENTATION
47
7/28/2019 Library Vb1
48/92
Implementation
This phase is primarily concerned with user training,site preparation
and file conversion.The candidate system is linked to terminals or
remote sites,the telecommunication network and tests of the network
and tests of the network along with the system are also included under
implementation.
System testing checks the readlines and accuracy of the system to
accesss update and retieve data from the files .Once the programs
become available,test data are read and processed against the test
files.If the successful, the program is then run with live data .
Otherwise, a diagnostic procedure is used to locate and correct errors
in the program.
48
7/28/2019 Library Vb1
49/92
MAINTENANCE
POST IMPLEMENTATION
AND
49
7/28/2019 Library Vb1
50/92
MAINTENANCE
After the installation phase is completed and the user stall is adjusted
to the challenges created by the candidate system ,evaluation and the
maintenance begin.Like any system,there is any aging process that
requires periodic maintenance of hardware and software .If the new
information is inconsistent with the design specifications,in tune with
design specifications.The importance of maintenance is to continue to
bring the new system to standards.
It has been estimated that maintenance of any software product
usually requires much more efforts than the efforts necessary to
develop the product.Many study indicates that the relative effort of development of a
typical system to its maintenanace effort to roughly in the ratio 40:60.
Maintenance involves performing any one or more of the following
three kinds of activities:
1. Correcting errors that wwere not discovered during the probuct-
developing phase.This is called Corrective Maintenance.
2. Improving the Implementation of the system and enhancing the
functionality of the system according to the customers requirements.
This is calledPerfective Maintenance.
3. Porting the software to a new environment,e.g. to a new computer or
to a new operating system.This is calledAdaptive Maintenance.
50
7/28/2019 Library Vb1
51/92
COST
ESTIMATION
51
7/28/2019 Library Vb1
52/92
ANNEXURE
FLOW CHART
SCREEN INTERFACE
52
7/28/2019 Library Vb1
53/92
53
ENTER
DETAILS& NO.
SAVE DATA IN DATABASE
START
ALREADY EXIST
DATA
BASE
BOOK
ID
7/28/2019 Library Vb1
54/92
54
STOP
START
CHECKSTUDENT
ID
PLEASE ENTER
STUDENT ID
ENTER
STUDENT ID
DATA
BASE
SAVE DATA IN
DATA BASE
STOP
7/28/2019 Library Vb1
55/92
55
START
QUIT
ENTER THESTUDENT
ID
CHECK BUTTON
CLICK RETURN
CLICK
DATABASE
SHOW ALL THE
BOOKS STOREDIN DATA BASE
7/28/2019 Library Vb1
56/92
CODING
Private Sub CmdAddBook_Click()
If (Text1.Text = "" Or Text2.Text = "" Or Text3.Text = "" Or Text4.Text = "" Or
Text5.Text = "" Or Text6.Text = "") Then
MsgBox ("Please fill the book details completely."), vbCritical
Text1.SetFocusElse
Data1.RecordSource = "select * from book_mast"
Data1.Refresh
Data1.Recordset.AddNew
Data1.Recordset.Fields(0) = UCase(Trim(Text1.Text))
Data1.Recordset.Fields(1) = Text2.Text
Data1.Recordset.Fields(2) = Text3.Text
Data1.Recordset.Fields(3) = Text4.Text
Data1.Recordset.Fields(4) = CInt(Text5.Text)
Data1.Recordset.Fields(5) = CInt(Text6.Text)Data1.Recordset.Update
Data1.Recordset.Close
Text1.Text = ""
Text2.Text = ""
Text3.Text = ""
Text4.Text = ""
Text5.Text = ""
Text6.Text = ""
MsgBox ("New book record has been saved sucessfully."), vbInformation
End IfEnd Sub
Private Sub CmdBackHome_Click()
FrmHomePage.Data2.RecordSource = "select * from book_mast"FrmHomePage.Data2.Refresh
FrmHomePage.Show
Unload Me
End Sub
56
7/28/2019 Library Vb1
57/92
Private Sub Form_Activate()
Text1.SetFocus
End Sub
Private Sub Form_Load()Data1.DatabaseName = App.Path & "\" & "Member.mdb"
End Sub
Private Sub Text1_LostFocus()
On Error GoTo errorhandle
Data1.RecordSource = "select * from book_mast where book_code='" +
Trim(Text1.Text) + "'"
Data1.Refresh
Do While Not Data1.Recordset.EOF
c = c + 1Data1.Recordset.MoveNext
Loop
If c 0 ThenMsgBox ("This book Code all ready exist, please enter another code."), vbCritical,
"Duplicate"
Text1.Text = " "
Text1.SetFocus
End If
Exit Sub
errorhandle:MsgBox "Error occurred!Wrong Book Code", vbInformation, "Error"
End
End Sub
Private Sub Command1_Click()
If (Text1.Text = "" Or Text2.Text = "" Or Text3.Text = "" Or Text4.Text = "" OrCombo1.Text = "" Or Combo2.Text = "") Then
MsgBox ("Please fill the book details completely."), vbCritical
Text1.SetFocus
Else
Data1.RecordSource = "select * from Mem_mast"
Data1.RefreshData1.Recordset.AddNew
Data1.Recordset.Fields(0) = UCase(Trim(Text1.Text))
Data1.Recordset.Fields(1) = Text2.Text
Data1.Recordset.Fields(2) = Text3.Text
Data1.Recordset.Fields(3) = Combo1.Text
Data1.Recordset.Fields(4) = Combo2.TextData1.Recordset.Fields(5) = Text4.Text
57
7/28/2019 Library Vb1
58/92
Data1.Recordset.Update
Data1.Recordset.Close
Text1.Text = ""
Text2.Text = ""
Text3.Text = ""
Text4.Text = ""End If
End Sub
Private Sub Command2_Click()
FrmHomePage.Data1.RecordSource = "select * from Mem_mast"
FrmHomePage.Data1.Refresh
FrmHomePage.Show
Unload Me
End Sub
Private Sub Form_Activate()
Text1.SetFocus
End Sub
Private Sub Form_Load()
Data1.DatabaseName = App.Path & "\" & "Member.mdb"
End Sub
Private Sub Text1_LostFocus()
On Error GoTo errorhandleData1.RecordSource = "select * from mem_mast where Member_ID='" +
Trim(Text1.Text) + "'"
Data1.Refresh
Do While Not Data1.Recordset.EOF
c = c + 1Data1.Recordset.MoveNext
Loop
If c 0 Then
MsgBox "This member code all ready exist, please enter new code.", vbCritical,
"Duplicate"
Text1.Text = " "Text1.SetFocus
End If
Exit Sub
errorhandle:
MsgBox "Error occurred!Wrong Member Code", vbInformation, "Error"
EndEnd Sub
58
7/28/2019 Library Vb1
59/92
Dim cs As Integer
Dim s As Integer
Private Sub CmdCencel_Click()
Unload MeFrmHomePage.Enabled = True
End Sub
Private Sub Cmdok_Click()
FrmHomePage.Enabled = False
m = Trim(Text1.Text)
b = Trim(Text2.Text)
If (Text1.Text = "" Or Text2.Text = "") Then
MsgBox ("Please enter the member code or book code"), vbInformation, "Enter
Code"Text1.SetFocus
Else
FrmHomePage.Data3.RecordSource = "select * from issue_mast whereMember_ID='" + m + "' and Book_Code='" + b + "'"
FrmHomePage.Data3.Refresh
Do While Not FrmHomePage.Data3.Recordset.EOF
c = c + 1
FrmHomePage.Data3.Recordset.MoveNext
Loop
If (c = 0) ThenFrmHomePage.Data3.RecordSource = "select * from issue_mast"
FrmHomePage.Data3.Refresh
MsgBox ("Wrong Member code or book code, Please enter correct code."),
vbCritical, "Wrong code"
Text1.Text = ""Text2.Text = ""
Text1.SetFocus
FrmHomePage.Data3.Recordset.Close
Else
FrmHomePage.Data3.RecordSource = "select * from issue_mast where
Member_ID='" + m + "' and Book_Code='" + b + "'"FrmHomePage.Data3.Refresh
FrmHomePage.Data3.Recordset.Delete
FrmHomePage.Data3.Recordset.Close
FrmHomePage.Data3.RecordSource = "select * from issue_mast"
FrmHomePage.Data3.Refresh
FrmHomePage.Data2.RecordSource = "select * from book_mast wherebook_code='" + b + "'"
59
7/28/2019 Library Vb1
60/92
FrmHomePage.Data2.Refresh
FrmHomePage.Data2.Recordset.Edit
s = FrmHomePage.Data2.Recordset.Fields(4)
cs = s + 1
FrmHomePage.Data2.Recordset.Fields(4) = cs
FrmHomePage.Data2.Recordset.UpdateFrmHomePage.Data2.Recordset.Close
Unload Me
FrmHomePage.Enabled = True
End If
End If
End Sub
Private Sub Form_Unload(Cancel As Integer)
MDIForm1.Enabled = True
End Sub
Private Sub Text2_KeyPress(KeyAscii As Integer)
If (KeyAscii = 13) ThenCmdok_Click
End If
End SubPrivate Sub CmdFirst_Click()
Data1.Recordset.MoveFirst
CmdFirst.Enabled = False
CmdPrevious.Enabled = False
CmdLast.Enabled = TrueCmdNext.Enabled = True
End Sub
Private Sub CmdNext_Click()
Data1.Recordset.MoveNexts = Data1.Recordset.RecordCount
CmdFirst.Enabled = True
CmdPrevious.Enabled = True
If Data1.Recordset.AbsolutePosition = s - 1 Then
CmdNext.Enabled = False
CmdLast.Enabled = FalseEnd If
End Sub
Private Sub CmdLast_Click()
Data1.Recordset.MoveLast
CmdFirst.Enabled = TrueCmdPrevious.Enabled = True
60
7/28/2019 Library Vb1
61/92
CmdNext.Enabled = False
CmdLast.Enabled = False
End Sub
Private Sub CmdPrevious_Click()If Data1.Recordset.AbsolutePosition = 0 Then
CmdFirst.Enabled = False
CmdPrevious.Enabled = False
Else
Data1.Recordset.MovePrevious
CmdNext.Enabled = True
CmdLast.Enabled = True
End If
End Sub
Private Sub CmdDelete_Click()
BookCode = Text1.Text
FrmHomePage.Data3.RecordSource = "select * from issue_mast wherebook_code='" + BookCode + "'"
FrmHomePage.Data3.Refresh
Do While Not FrmHomePage.Data3.Recordset.EOF
c = c + 1
FrmHomePage.Data3.Recordset.MoveNext
Loop
If c 0 ThenMsgBox "Don't Delete, we have issued this book", vbInformation, "Library"
FrmHomePage.Data3.Recordset.Close
CmdBackHome.SetFocus
Else
If MsgBox("Are you sure want to remove all information of this book.",vbYesNo + vbQuestion, "Delete Book") = vbYes Then
Data1.Recordset.Delete
MsgBox ("All information of this book has been removed."), vbInformation
FrmHomePage.Data2.Refresh
Data1.Recordset.MoveFirst
ElseCmdBackHome.SetFocus
End If
End If
End Sub
Private Sub CmdBackHome_Click()FrmHomePage.Show
61
7/28/2019 Library Vb1
62/92
Unload Me
FrmHomePage.Data2.RecordSource = "select * from book_mast"
FrmHomePage.Data2.Refresh
End Sub
Private Sub Form_Activate()CmdDelete.SetFocus
End Sub
Private Sub Form_Load()
Data1.DatabaseName = App.Path & "\" & "Member.mdb"
End Sub
Private Sub CmdFirst_Click()
Data1.Recordset.MoveFirst
CmdFirst.Enabled = False
CmdPrevious.Enabled = FalseCmdLast.Enabled = True
CmdNext.Enabled = True
End Sub
Private Sub CmdNext_Click()
Data1.Recordset.MoveNext
s = Data1.Recordset.RecordCount
CmdFirst.Enabled = True
CmdPrevious.Enabled = True
If Data1.Recordset.AbsolutePosition = s - 1 ThenCmdNext.Enabled = False
CmdLast.Enabled = False
End If
End Sub
Private Sub CmdLast_Click()
Data1.Recordset.MoveLast
CmdFirst.Enabled = True
CmdPrevious.Enabled = True
CmdNext.Enabled = False
CmdLast.Enabled = FalseEnd Sub
Private Sub CmdPrevious_Click()
s = Data1.Recordset.RecordCount
If Data1.Recordset.AbsolutePosition = 0 Then
CmdFirst.Enabled = FalseCmdPrevious.Enabled = False
62
7/28/2019 Library Vb1
63/92
Else
Data1.Recordset.MovePrevious
CmdNext.Enabled = True
CmdLast.Enabled = True
End If
End Sub
Private Sub CmdDelete_Click()
MemberCode = Text1.Text
FrmHomePage.Data3.RecordSource = "select * from issue_mast where
Member_ID='" + MemberCode + "'"
FrmHomePage.Data3.Refresh
Do While Not FrmHomePage.Data3.Recordset.EOF
c = c + 1
FrmHomePage.Data3.Recordset.MoveNext
LoopIf c 0 Then
MsgBox "The member has not returned the book", vbInformation
FrmHomePage.Data3.Recordset.CloseCmdBackHome.SetFocus
Else
If MsgBox("Are you sure want to remove all information of this member.",
vbYesNo + vbQuestion, "Delete Member") = vbYes Then
Data1.Recordset.Delete
MsgBox ("All information of this member has been removed"), vbInformation
Data1.Recordset.MoveFirstElse
CmdBackHome.SetFocus
End If
End If
End Sub
Private Sub CmdBackHome_Click()
FrmHomePage.Show
Unload Me
FrmHomePage.Data1.RecordSource = "select * from mem_mast"
FrmHomePage.Data1.RefreshEnd Sub
Private Sub Form_Activate()
CmdDelete.SetFocus
End Sub
Private Sub Form_Load()
63
7/28/2019 Library Vb1
64/92
Data1.DatabaseName = App.Path & "\" & "Member.mdb"
End Sub
Private Sub CmdNewMember_Click()
FrmHomePage.Hide
FrmAddMember.Show
FrmAddMember.Text1.Text = ""FrmAddMember.Text2.Text = ""
FrmAddMember.Text3.Text = ""
End Sub
Private Sub CmdAddBook_Click()
FrmHomePage.Hide
FrmAddBook.Show
FrmAddBook.Text1.Text = ""
FrmAddBook.Text2.Text = ""
FrmAddBook.Text3.Text = ""FrmAddBook.Text4.Text = ""
FrmAddBook.Text5.Text = ""
FrmAddBook.Text6.Text = ""End Sub
Private Sub CmdBookIssue_Click()
FrmHomePage.Hide
FrmIssue.Show
FrmIssue.Data1.RecordSource = "select * from Issue_mast"
FrmIssue.Data1.RefreshFrmIssue.Text1.Text = ""
FrmIssue.Text2.Text = ""
FrmIssue.Text3.Text = ""
FrmIssue.Text5.Text = ""
FrmIssue.Text6.Text = ""
FrmIssue.Text8.Text = ""
FrmIssue.Text1.SetFocus
End Sub
Private Sub CmdDeleteMember_Click()FrmHomePage.Hide
FrmDeleteMem.Show
End Sub
Private Sub CmdBookReturn_Click()
FrmBookReturn.ShowMDIForm1.Enabled = False
64
7/28/2019 Library Vb1
65/92
End Sub
Private Sub CmdDeleteBook_Click()
FrmHomePage.Hide
frmDeleteBook.Show
End Sub
Private Sub CmdExitProgram_Click()
End
End Sub
Private Sub Form_Load()
Data1.DatabaseName = App.Path & "\" & "Member.mdb"
Data2.DatabaseName = App.Path & "\" & "Member.mdb"
Data3.DatabaseName = App.Path & "\" & "Member.mdb"
If (CurrentAccType = "Administrator") ThenAdministratorAcc
Else
LimitedAccEnd If
End Sub
Private Sub SSTab1_Click(PreviousTab As Integer)
If SSTab1.Tab = 0 Then
Data1.RecordSource = "select * from Mem_mast"
Data1.RefreshCmdNewMember.Visible = True
CmdAddBook.Visible = False
CmdBookIssue.Visible = False
CmdDeleteMember.Visible = True
CmdBookReturn.Visible = FalseCmdDeleteBook.Visible = False
ElseIf SSTab1.Tab = 1 Then
Data2.RecordSource = "select * from Book_mast"
Data2.Refresh
CmdNewMember.Visible = False
CmdAddBook.Visible = TrueCmdBookIssue.Visible = False
CmdDeleteMember.Visible = False
CmdBookReturn.Visible = False
CmdDeleteBook.Visible = True
ElseIf SSTab1.Tab = 2 Then
Data3.RecordSource = "select * from Issue_mast"Data3.Refresh
65
7/28/2019 Library Vb1
66/92
CmdNewMember.Visible = False
CmdAddBook.Visible = False
CmdBookIssue.Visible = True
CmdDeleteMember.Visible = False
CmdBookReturn.Visible = True
CmdDeleteBook.Visible = FalseEnd If
End Sub
Private Sub Timer1_Timer()
Text1.Text = Time()
Text2.Text = Date
End Sub
Public Sub LimitedAcc()
MDIForm1.MemberDetails = FalseMDIForm1.BookDetails = False
MDIForm1.IssueReturn = False
MDIForm1.UserAccount = FalseCmdNewMember.Enabled = False
CmdAddBook.Enabled = False
CmdBookIssue.Enabled = False
CmdDeleteMember.Enabled = False
CmdBookReturn.Enabled = False
CmdDeleteBook.Enabled = False
DBGrid1.AllowUpdate = FalseDBGrid2.AllowUpdate = False
End Sub
Public Sub AdministratorAcc()
If SSTab1.Tab = 0 ThenData1.RecordSource = "select * from mem_mast"
Data1.Refresh
CmdNewMember.Visible = True
CmdAddBook.Visible = False
CmdBookIssue.Visible = False
CmdDeleteMember.Visible = TrueCmdBookReturn.Visible = False
CmdDeleteBook.Visible = False
End If
If SSTab1.Tab = 1 Then
Data2.RecordSource = "select * from Book_mast"
Data2.RefreshCmdNewMember.Visible = False
66
7/28/2019 Library Vb1
67/92
CmdAddBook.Visible = True
CmdBookIssue.Visible = False
CmdDeleteMember.Visible = False
CmdBookReturn.Visible = False
CmdDeleteBook.Visible = True
End IfIf SSTab1.Tab = 2 Then
Data3.RecordSource = "select * from Issue_mast"
Data3.Refresh
CmdNewMember.Visible = False
CmdAddBook.Visible = False
CmdBookIssue.Visible = True
CmdDeleteMember.Visible = False
CmdBookReturn.Visible = True
CmdDeleteBook.Visible = False
End IfEnd SubPrivate Sub CmdBackHome_Click()
FrmHomePage.Data3.RecordSource = "select * from issue_mast"
FrmHomePage.Data3.RefreshFrmHomePage.Show
Unload Me
End Sub
Private Sub CmdIssueBook_Click()
If (Text1.Text = "" Or Text2.Text = "" Or Text3.Text = "" Or Text4.Text = "" Or
Text5.Text = "" Or Text6.Text = "") ThenMsgBox ("Please fill form completly."), vbCritical
Text1.SetFocus
Else
Data1.RecordSource = "select * from issue_mast"
Data1.RefreshData1.Recordset.AddNew
Data1.Recordset.Fields(0) = UCase(Text1.Text)
Data1.Recordset.Fields(1) = Text2.Text
Data1.Recordset.Fields(2) = Text3.Text
Data1.Recordset.Fields(3) = Text4.Text
Data1.Recordset.Fields(4) = CDate(Text5.Text)Data1.Recordset.Fields(5) = CDate(Text6.Text)
Data1.Recordset.Fields(6) = CInt("1")
Data1.Recordset.Update
Data1.Recordset.Close
FrmHomePage.Data2.RecordSource = "select * from book_mast where
Book_Code='" + Text3.Text + "'"FrmHomePage.Data2.Refresh
67
7/28/2019 Library Vb1
68/92
FrmHomePage.Data2.Recordset.Edit
Text8.Text = CInt(Text8.Text) - 1
FrmHomePage.Data2.Recordset.Fields(4) = Val(Text8.Text)
FrmHomePage.Data2.Recordset.Update
FrmHomePage.Data2.Recordset.Close
Text1.Text = ""Text2.Text = ""
Text3.Text = ""
Text4.Text = ""
Text5.Text = ""
Text6.Text = ""
End If
End Sub
Private Sub Form_Activate()
Text1.SetFocusEnd Sub
Private Sub Form_Load()Data1.DatabaseName = App.Path & "\" & "Member.mdb"
End Sub
Private Sub List1_Click()
Text4.Text = List1.Text
FrmHomePage.Data2.RecordSource = "select * from book_mast where
book_name='" + List1.Text + "'"FrmHomePage.Data2.Refresh
Do While Not FrmHomePage.Data2.Recordset.EOF
Text3.Text = FrmHomePage.Data2.Recordset.Fields(0)
Text8.Text = FrmHomePage.Data2.Recordset.Fields(4)
FrmHomePage.Data2.Recordset.MoveNextLoop
FrmHomePage.Data2.Recordset.Close
If Val(Text8.Text) >= 1 Then
CmdIssuebook.SetFocus
Else
MsgBox ("Please check your stock. All books are issued."), vbInformation,"Check Stock"
Text3.Text = ""
Text4.Text = ""
Text8.Text = ""
End If
End Sub
68
7/28/2019 Library Vb1
69/92
Private Sub Text2_GotFocus()
If Text1.Text = "" Then
MsgBox ("Please enter member code first."), vbCritical, "Member Code"
Text1.SetFocus
Else
FrmHomePage.Data1.RecordSource = "select * from Mem_mast whereMember_ID='" + Trim(Text1.Text) + "'"
FrmHomePage.Data1.Refresh
Do While Not FrmHomePage.Data1.Recordset.EOF
m = m + 1
FrmHomePage.Data1.Recordset.MoveNext
Loop
FrmHomePage.Data1.Refresh
If m = 0 Then
MsgBox ("Wrong member code, Please retype member code."), vbCritical,"Worng Code"
Text1.Text = ""
Text1.SetFocusElse
Data1.RecordSource = "select * from issue_mast where Member_ID='" +
Trim(Text1.Text) + "'"
Data1.Refresh
Do While Not Data1.Recordset.EOF
c = c + 1
Data1.Recordset.MoveNextLoop
If c 0 Then
MsgBox "Please return the book first", vbInformation, "Return Book"
Text1.Text = " "
Text1.SetFocusElse
FrmHomePage.Data1.RecordSource = "select * from Mem_mast where
Member_ID='" + Trim(Text1.Text) + "'"
FrmHomePage.Data1.Refresh
Text2.Text = FrmHomePage.Data1.Recordset.Fields(1)
FrmHomePage.Data1.Recordset.CloseList1.Clear
FrmHomePage.Data2.RecordSource = "select * from book_mast"
FrmHomePage.Data2.Refresh
Do While Not FrmHomePage.Data2.Recordset.EOF
FrmIssue.List1.AddItem (FrmHomePage.Data2.Recordset.Fields(1))
FrmHomePage.Data2.Recordset.MoveNextLoop
69
7/28/2019 Library Vb1
70/92
FrmHomePage.Data2.Recordset.Close
End If
End If
End If
End Sub
Private Sub Text5_GotFocus()
Text5.Text = Date
End Sub
Private Sub Text6_GotFocus()
Text6.Text = Date + 10
End SubPrivate Sub cmdSubmit_Click()
Data1.Refresh
Do While Not Data1.Recordset.EOF
If UCase(txtId.Text) = UCase(Data1.Recordset.Fields(0)) AndUCase(txtPass.Text) = UCase(Data1.Recordset.Fields(1)) Then
CurrentUser = UCase(txtId.Text)
CurrentPassword = UCase(txtPass.Text)CurrentAccType = Data1.Recordset.Fields(2)
FrmHomePage.Show
Unload Me
c = 0
Exit Do
End If
c = c + 1Data1.Recordset.MoveNext
Loop
If c 0 Then
MsgBox ("Invalid Userid and Password,please try again. "), vbCritical, "Invalid"
txtId.Text = ""txtPass.Text = ""
txtId.SetFocus
End If
End Sub
Private Sub Form_Load()
Data1.DatabaseName = App.Path & "\" & "Member.mdb"End Sub
Private Sub Label10_Click()
frmAbout.Show
End Sub
Private Sub Label3_Click()
70
7/28/2019 Library Vb1
71/92
Frame1.Visible = False
Frame2.Visible = True
End Sub
Private Sub txtPass_KeyPress(KeyAscii As Integer)
If (KeyAscii = 13) ThencmdSubmit_Click
End If
End Sub
Private Sub txtPass_LostFocus()
cmdSubmit.SetFocus
End SubPrivate Sub CmdChangePass_Click()
Data1.Refresh
Do While Not Data1.Recordset.EOF
If (UCase(CurrentUser) = Data1.Recordset.Fields(0)) Thenc = 0
Exit Do
Elsec = c + 1
Data1.Recordset.MoveNext
End If
Loop
If (c = 0 And UCase(Text2.Text) = CurrentPassword) Then
If (UCase(Text3.Text = Text4.Text)) Then
Data1.Recordset.EditData1.Recordset.Fields(1) = UCase(Text4.Text)
Data1.Recordset.Update
Data1.Recordset.Fields.Refresh
MsgBox ("Your Password has been changed sucessfully."), vbInformation +
vbOKOnlyMDIForm1.Enabled = True
Unload Me
Else
MsgBox ("Your new password and confirm password do not match."),
vbCritical
Text2.Text = ""Text3.Text = ""
Text4.Text = ""
Text2.SetFocus
End If
Else
MsgBox ("Your old password is invalid, please retype old password."),vbCritical
71
7/28/2019 Library Vb1
72/92
Text2.Text = ""
Text3.Text = ""
Text4.Text = ""
Text2.SetFocus
End If
End Sub
Private Sub CmdExit_Click()
MDIForm1.Enabled = True
Unload Me
End Sub
Private Sub Form_Activate()
Text2.SetFocus
End Sub
Private Sub Form_Load()
Data1.DatabaseName = App.Path & "\" & "Member.mdb"
Data1.RecordSource = "Security"Text1.Text = CurrentUser
End Sub
Private Sub Form_Unload(Cancel As Integer)
MDIForm1.Enabled = True
End Sub
Private Sub Text4_KeyPress(KeyAscii As Integer)
If (KeyAscii = 13) Then
CmdChangePass_Click
End If
End SubOption Explicit
Private Sub Form_Load()
Me.Caption = "Loding Application Please Wait Few Second"
End Sub
Private Sub Timer1_Timer()FrmLoginForm.Show
Unload Me
End Sub
Private Sub Timer2_Timer()
Me.Caption = Me.Caption & "..."End SubDim Atype As String
72
7/28/2019 Library Vb1
73/92
Private Sub cmdAddnew_Click()
Frame1.Enabled = True
cmdSave.Enabled = True
cmdRemoveAccount.Enabled = False
Option1.SetFocusEnd Sub
Private Sub CmdCencel_Click()
MDIForm1.Enabled = True
Unload Me
End Sub
Private Sub CmdDelete_Click()
If MsgBox("Are you sure want to delete this account.", vbYesNo + vbQuestion,
"Delete Account") = vbYes ThenData1.Recordset.Delete
Data1.Recordset.MoveFirst
Text1.Text = Data1.Recordset.Fields(0)Text2.Text = Data1.Recordset.Fields(1)
Data1.Refresh
Else
CmdCencel.SetFocus
End If
End Sub
Private Sub CmdNext_Click()
Data1.Recordset.MoveNext
If Data1.Recordset.EOF = True Then
MsgBox ("This is Last User Account"), vbInformation + vbOKOnly
Data1.Recordset.MoveLastEnd If
If Not Data1.Recordset.EOF = True Then
Text1.Text = Data1.Recordset.Fields(0)
Text2.Text = Data1.Recordset.Fields(1)
Text4.Text = Data1.Recordset.Fields(2)
End IfEnd Sub
Private Sub CmdPrevious_Click()
Data1.Recordset.MovePrevious
If Data1.Recordset.BOF = True Then
MsgBox ("This is First User Account"), vbInformation + vbOKOnlyData1.Recordset.MoveFirst
73
7/28/2019 Library Vb1
74/92
End If
If Not Data1.Recordset.BOF = True Then
Text1.Text = Data1.Recordset.Fields(0)
Text2.Text = Data1.Recordset.Fields(1)
Text4.Text = Data1.Recordset.Fields(2)
End IfEnd Sub
Private Sub cmdRemoveAccount_Click()
Text4.Visible = True
Frame4.Enabled = True
Text1.Text = Data1.Recordset.Fields(0)
Text2.Text = Data1.Recordset.Fields(1)
Text4.Text = Data1.Recordset.Fields(2)
Text3.Visible = False
Label3.Caption = "Account Type"cmdAddnew.Enabled = False
cmdRemoveAccount.Enabled = False
End Sub
Private Sub cmdSave_Click()
If (Text1.Text = "" Or Text2.Text = "" Or Text3.Text = "") Then
MsgBox ("Please fill all entery."), vbOKOnly + vbInformation
Text1.Text = ""
Text2.Text = ""
Text3.Text = ""Text1.SetFocus
Else
If (Text2.Text Text3.Text) Then
MsgBox ("Password and confirm password do not match."), vbOKOnly +
vbInformationText2.Text = ""
Text3.Text = ""
Text1.SetFocus
Else
Data1.Recordset.AddNew
Data1.Recordset.Fields(0) = UCase(Text1.Text)Data1.Recordset.Fields(1) = UCase(Text2.Text)
Data1.Recordset.Fields(2) = Atype
Data1.Recordset.Update
Data1.Refresh
MsgBox ("New user account is created sucessfully."), vbOKOnly +
vbInformationData1.Refresh
74
7/28/2019 Library Vb1
75/92
Text1.Text = ""
Text2.Text = ""
Text3.Text = ""
Frame1.Enabled = False
Frame2.Enabled = False
cmdSave.Enabled = FalseEnd If
End If
End Sub
Private Sub Form_Activate()
Text4.Visible = False
cmdAddnew.SetFocus
End Sub
Private Sub Form_Load()Data1.DatabaseName = App.Path & "\" & "Member.mdb"
Data1.RecordSource = "Security"
Frame1.Enabled = FalseFrame2.Enabled = False
Frame4.Enabled = False
cmdSave.Enabled = False
End Sub
Private Sub Form_Unload(Cancel As Integer)
MDIForm1.Enabled = TrueEnd Sub
Private Sub Option1_Click()
Atype = "Limited"
Frame2.Enabled = TrueEnd Sub
Private Sub Option2_Click()
Atype = "Administrator"
Frame2.Enabled = True
End Sub
Private Sub Text1_LostFocus()
Data1.RecordSource = "select * from Security where UserName='" +
UCase(Trim(Text1.Text)) + "'"
Data1.RefreshDo While Not Data1.Recordset.EOF
75
7/28/2019 Library Vb1
76/92
c = c + 1
Data1.Recordset.MoveNext
Loop
If c 0 Then
MsgBox "This user name is all ready exist, please enter another name",
vbExclamation + vbOKOnlyText1.Text = " "
Text1.SetFocus
Else
Text2.SetFocus
End If
End Sub
Private Sub AboutLMS_Click()
frmAbout.Show
End Sub
Private Sub AddMember_Click()
FrmAddMember.Show
End Sub
Private Sub ChangePassword_Click()
FrmPassChange.Show
MDIForm1.Enabled = False
End Sub
Private Sub DeleteBook_Click()frmDeleteBook.Show
End Sub
Private Sub DeleteMember_Click()
FrmDeleteMem.ShowEnd Sub
Private Sub IssueBook_Click()
FrmIssue.Show
End Sub
Private Sub NewBook_Click()
FrmAddBook.Show
End Sub
Private Sub ReturnBook_Click()
FrmBookReturn.ShowMDIForm1.Enabled = False
76
7/28/2019 Library Vb1
77/92
End Sub
Private Sub UserAccount_Click()
FrmUserAccount.Show
MDIForm1.Enabled = False
End Sub
SNAP SHOTS
77
7/28/2019 Library Vb1
78/92
78
7/28/2019 Library Vb1
79/92
79
7/28/2019 Library Vb1
80/92
80
7/28/2019 Library Vb1
81/92
81
7/28/2019 Library Vb1
82/92
82
7/28/2019 Library Vb1
83/92
83
7/28/2019 Library Vb1
84/92
84
7/28/2019 Library Vb1
85/92
85
7/28/2019 Library Vb1
86/92
86
7/28/2019 Library Vb1
87/92
87
7/28/2019 Library Vb1
88/92
88
7/28/2019 Library Vb1
89/92
89
7/28/2019 Library Vb1
90/92
CONCLUSION
PRODUCT PERSPECTIVE
90
7/28/2019 Library Vb1
91/92
The has been developed for GEIT library for well equipped
library.The system has been developed keeping in mind that the users might
not have any specialization in computers and thus one of the major aim was
to build a user friendly, easy to use system.
An attractive and easy to use graphical user interface makes tasks
easier for the users.The system will be used for viewing,manipulating and
extraction information.This system has been developed to manage and keep
records.
POST AUDIT IMPLEMENTATION
The system Library Management Systemwill be implementedas the organization is in a desperate need of system.The system is aimed to
provide its full fledged capabilities to the department and speed up the
job.The system is supposed to provide all the support needed to manage the
information related .
INSTALLATION DETAILS
The system can be installed as any other software is done by justrunning the setup.
This can be done through the package and deployment tool
provided by Visual Basic.The user can just click the setup icon and the
system will be loaded and once it is loaded , it is ready to use.
LIMITATIONS
The system has following limitations :91
7/28/2019 Library Vb1
92/92
This software is limited to the library automation.
The coding of the software is complex and prone to errors.
This software works out only in the systems in which the front-end
and back-end used in the software are installed.
If while editing or deleting the records the user confirms the
operation and then wants to retrieve the original information then
cannot be done.
Since the information stored has a very high value for the organization
hence in order to prevent accidental data loss the facility to deletemore than one record at a time ,has not been provided.Thus whenever
he/she wants to delete the records then they have to be deleted one by
one.
SUGGESTIONS AND RECOMMENDATIONS
The system has been built purely as per the requirements of the
organization.The system can be upgraded and made more powerful by
adding extra features and refining the exixting ones.
Thus user is suggested to be careful while changes to the existing