Giovanni Rumolo, G. Iadarola, O. Dominguez, G. Arduini in LHC Performance Workshop (Chamonix 2012), 6 February 2012 For all LHC data shown (or referred to) in this presentation and discussions: V. Baglin, H. Bartosik, P. Baudrenghien, G. Bregliozzi, S. Claudet, J. Esteban- Müller, W. Höfle, G. Lanza, T. Mastoridis, G. Papotti, F. Roncarolo, E. Shaposhnikova, L. Tavian, D. Valuch LHC experience with different bunch spacings in 2011 (25, 50 & 75 ns): Electron cloud aspects

LHC experience with different bunch spacings in 2011 (25

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LHC experience with different bunch spacings in 2011 (25

Giovanni Rumolo, G. Iadarola, O. Dominguez, G. Arduini

in LHC Performance Workshop (Chamonix 2012), 6 February 2012

For all LHC data shown (or referred to) in this presentation and discussions: V. Baglin, H. Bartosik, P. Baudrenghien, G. Bregliozzi, S. Claudet, J. Esteban-

Müller, W. Höfle, G. Lanza, T. Mastoridis, G. Papotti, F. Roncarolo, E. Shaposhnikova, L. Tavian, D. Valuch

LHC experience with different bunch spacings in 2011 (25, 50 & 75 ns):

Electron cloud aspects

Page 2: LHC experience with different bunch spacings in 2011 (25

Introduction

2

Focus of this talk Results of the analysis of the 2011 electron cloud observations and measurements

Commissioning with beam

13/03 05/04

75ns physics run (nominal)

12/04 21/02

Nominal: 1.1 x 1011 ppb 2.5 mm

First 1380 bunches in LHC

28/06 18/07 30/09

ex,y decreasing towards 1.1mm

Nb increasing towards 1.45 x 1011 ppb

Nominal 50ns beams

Scrubbing run 50ns

Physics run 50ns

30/10

Page 3: LHC experience with different bunch spacings in 2011 (25

Introduction

3

Focus of this talk Results of the analysis of the 2011 electron cloud observations and measurements

– 75ns operation no electron cloud observations in 2011 – 50ns operation

→ Observations during scrubbing → Physics operation with residual electron cloud activity

– 25ns MDs: evolution of dmax in the arcs and uncoated SS – Estimation of scrubbing time and closing remarks

Commissioning with beam

13/03 05/04

75ns physics run (nominal)

12/04 21/02

Scrubbing run 50ns

Physics run 50ns

29/06 26/08

07-14-24/10

30/10

Nominal: 1.1 x 1011 ppb 2.5 mm

25ns MDs (nominal)

Page 4: LHC experience with different bunch spacings in 2011 (25

Electron cloud observables

4

Electron flux to the chamber wall Fe

PRESSURE RISE

POWER ON THE CHAMBER WALL

Beam chamber

Page 5: LHC experience with different bunch spacings in 2011 (25

Electron cloud observables

5

COHERENT INSTABILITY

INCOHERENT EMITTANCE GROWTH

Beam chamber

Beam

Electron cloud with density re around the beam

– Affects only the last bunches of each batch

– Can be single or coupled bunch

– Causes degrading lifetime and slow beam loss

– Typically associated to bunch shortening and loss pattern increasing along the batch

Page 6: LHC experience with different bunch spacings in 2011 (25

Scrubbing run in 2011

6

⇒ The scrubbing run took place in the week 5–12 April 2011 − Nominal 50ns spaced beams with up to 1020 bunches per beam

injected into the LHC and stored at 450 GeV/c

⇒ Very efficient machine cleaning – The dynamic vacuum decreased by one order of magnitude over 17h

of effective beam time (i.e. 72h machine time) – The heat load on the beam screen in the arcs

→ significant at the beginning of the scrubbing run →within measurement resolution at the end

– The average stable phase decreased by one order of magnitude – Instabilities and emittance growth, visible during the first fills,

disappeared later even with low chromaticity settings

⇒ After scrubbing, physics with 50ns and stable beams with 1380 bunches per beam on 28 June 2011

Page 7: LHC experience with different bunch spacings in 2011 (25

0 5 10 15 200

2

4

6

8

10x 10

13

Inte

nsit

y

Time [h]

0 5 10 15 20

0

1

2

3

4

5

6

Av.

heat

load

[W

/hcell

]

Time [h]

09/04 13/04

Beam 1 Beam 2 Energy

Average heat load [x 10 mW/m/beam]

dmax in the arcs:

estimation technique

Before 50ns scrubbing

After 50ns scrubbing

Two snapshots before (09/04) and after (13/04) the scrubbing run to reproduce the measured heat load by means of simulations!

Page 8: LHC experience with different bunch spacings in 2011 (25

8

Measured heat load

Total simulated heat load

fastBCT + bunch-by-bunch b-length (B1)

fastBCT + bunch-by-bunch b-length (B2)

Simulator PyECLOUD

0 10 20 30 40 50 60 70 800

5

10

x 1010

Bunch position [us]B

un

ch

in

ten

sit

y [

pp

b]

0 10 20 30 40 50 60 70 800

1

2

Bunch position [us]

Bu

nc

h le

ng

th [

ns

]

0 10 20 30 40 50 60 70 800

1

2

x 109

Time [us]

e- p

er

un

it le

ng

th [

m-1

]0 10 20 30 40 50 60 70 80

0

5

10

x 1010

Bunch position [us]

Bu

nc

h in

ten

sit

y [

pp

b]

0 10 20 30 40 50 60 70 800

1

2

Bunch position [us]

Bu

nc

h le

ng

th [

ns

]0 10 20 30 40 50 60 70 80

0

1

2

x 109

Time [us]e

- pe

r u

nit

le

ng

th [

m-1

]

dmax in the arcs:

estimation technique

1.8 1.9 2 2.1 2.2 2.3 2.4 2.50

5

10

15

20

25

dmax

Hea

t lo

ad [

W/h

cell]

R0=0.7, scan in dmax Emax=330 eV

Page 9: LHC experience with different bunch spacings in 2011 (25

0 5 10 15 200

2

4

6

8

10x 10

13

Inte

nsit

y

Time [h]

0 5 10 15 20

0

1

2

3

4

5

6

Av.

heat

load

[W

/hcell

]

Time [h]

09/04 13/04

Beam 1 Beam 2 Energy

dmax in the arcs: results (50ns)

Before 50ns scrubbing

After 50ns scrubbing

2.28

2.18

dmax

50ns threshold@450 GeV

50ns [email protected] TeV

2.2

2.1

Page 10: LHC experience with different bunch spacings in 2011 (25

dmax in uncoated straight sections:

estimation technique

10

• The evaluation of dmax is done in the field-free regions in proximity of the pressure gauges

– Used Beam1 data from gauges (Cu): VGI.141.6L4.B and VGPB.2.5L3.B – A solution (R0 , dmax) is found comparing the pressure rises DPi measured at

different injections with the electron fluxes Fi from simulations

Baked but uncoated: SEY ~1.6-1.9.

Length 0.3 m

Pumping speed from NEG and maximum for CH4 ≈ 10 L/s

NEG

Measured pressures

Simulated electron fluxes

Page 11: LHC experience with different bunch spacings in 2011 (25

11

• Pressure rise measurements with 50ns beam to estimate dmax in the field-free regions in proximity of the pressure gauges (R0 ≈0.2–0.3)

– Measurements done at the beginning and at the end of the scrubbing run – Measurements done during the 50ns operation of LHC (19 May) – As expected, we are approaching the dmax thresholds for 50ns beams

29 June 2011, date of the first injections of 25ns beams in LHC

50ns threshold@450GeV

dmax in uncoated straight sections:

results (50ns)

50ns [email protected]

Page 12: LHC experience with different bunch spacings in 2011 (25

12

1380 bunches per ring e growth < 2% /h

• By end-June 2011, LHC was filled with 1380 bunches per beam – Nominal 50ns beams not suffering from obvious electron cloud limitations, very low rate

emittance growth – No typical pattern along the batches as from electron cloud

• Reduction of transverse emittances and increase of bunch current (from July onwards) did not cause any significant return of the electron cloud – Consistent with expected electron cloud behaviour (weak dependence on transverse

emittances, decrease with bunch current in dipoles)

• Pressure rise from electron cloud only survived in a wide common StSt beam pipe (close to ALICE)

LHC operation with 50ns beams

Page 13: LHC experience with different bunch spacings in 2011 (25

Summary 50ns run

(before 25ns beam in LHC)

13

dmax (last estimated)

dmax (threshold @450 GeV)

dmax (threshold @3.5 TeV)

Straight section (uncoated)

1.66 1.63 1.58

Beam screen (arcs) 2.18 2.2 2.1

Nominal beam 1.1 x 1011 ppb * Thresholds in the arcs do not change significantly at least up to Nb=1.8 x 1011 ppb

Page 14: LHC experience with different bunch spacings in 2011 (25

0 5 10 15 20 25 30 35 40 45 50 550

5

10

15

20x 10

13

Inte

nsit

y

Time [h]

0 5 10 15 20 25 30 35 40 45 50 55

0

10

20

30

40

Time [h]

Heat

load

[W

/hcell

]

S12

S23

S34

S45

S56

S67

S78

S81

25ns experience in 2011

DATE SHORT DESCRIPTION

29 June Injections of 9 x 24b trains per beam with different spacings between them

26 August Two attempts to inject a 48b train with damper on and off: fast instability dumps the beam within 500 turns in both cases (SBI and CBI)

7 October High chromaticity (Q’x,y ≈15): Injection tests with trains of 72-144-216-288 bunches from the SPS + ramp to 3.5 TeV & 5h store with 60b (12+24+24) per beam

14 October High chromaticity: injection of up to 1020 bunches per beam in 72b trains (decreasing spacings between trains at each fill: 6.3–3.2–1 ms)

24-25 October Injection of up to 2100 bunches in Beam 1 and 1020 in Beam 2 (1ms train spacing)

Scrubbing

29/06 07/10 24-25/10 14/10

Beam 1 Beam 2 Energy

Page 15: LHC experience with different bunch spacings in 2011 (25

• Attempt made on 14 October to take pressure rise measurements on a dedicated fill with decreasing spacings (4—3—2—1 ms), but hard to use data for the dmax estimation due to rapid evolution of beam and vacuum

• After considerable 25ns scrubbing, on the morning of the 25 October, 8 x 72b batches with different spacings could be injected for Beam 1 and remain stable to allow the pressure values to level

15

dmax in the uncoated sections:

results (25ns)

0 5 10 15 20 25 30 35 40 45 50 550

5

10

15

20x 10

13

Inte

nsit

y

Time [h]

0 5 10 15 20 25 30 35 40 45 50 55

0

10

20

30

40

Time [h]

Heat

load

[W

/hcell

]

S12

S23

S34

S45

S56

S67

S78

S81

29/06 07/10 24-25/10 14/10

Page 16: LHC experience with different bunch spacings in 2011 (25

• Scrubbing with 25ns beam (~40h) has lowered dmax to 1.35 ! • Again, we are not far from the threshold for 25ns beams, but further scrubbing is

needed

16

Start of 25ns beams in LHC

25ns threshold @3.5TeV

25ns threshold @450GeV

dmax in the uncoated sections:

results (25ns)

50ns threshold @3.5TeV

50ns threshold @450GeV

Page 17: LHC experience with different bunch spacings in 2011 (25

0 5 10 15 20 25 30 35 40 45 50 550

5

10

15

20x 10

13

Inte

nsit

y

Time [h]

0 5 10 15 20 25 30 35 40 45 50 55

0

10

20

30

40

Time [h]

Heat

load

[W

/hcell

]

S12

S23

S34

S45

S56

S67

S78

S81

17

dmax in the arcs: results (25ns)

29/06 07/10 24-25/10 14/10

Six snapshots from the 25ns MDs to reproduce the measured heat load by simulations!

Heat load averaged sector by sector [x 10 mW/m/beam]

Page 18: LHC experience with different bunch spacings in 2011 (25

0 5 10 15 20 25 30 35 40 45 50 550

5

10

15

20x 10

13

Inte

nsit

y

Time [h]

0 5 10 15 20 25 30 35 40 45 50 55

0

10

20

30

40

Time [h]

Heat

load

[W

/hcell

]

S12

S23

S34

S45

S56

S67

S78

S81

18

dmax in the arcs: results (25ns)

29/06 07/10 24-25/10 14/10

Three snapshots from the 25ns MDs to try disentangling aperture of Beam1 from Beam2

Page 19: LHC experience with different bunch spacings in 2011 (25

0 10 20 30 40 500

5

10

15

20x 10

13

Inte

nsit

y

Time [h]

0 10 20 30 40 50

1.4

1.6

1.8

2

2.2

dm

ax

Time [h] 19

dmax has decreased from the initial 2.1 to 1.52 in the arcs !

25ns threshold @450 GeV

25ns threshold @3.5 TeV

dmax in the arcs: results

29/06 07/10 24-25/10 14/10

2011 scrubbing history of LHC arcs

Page 20: LHC experience with different bunch spacings in 2011 (25

20

Not only heat load and pressure rise, the beam sees the electron cloud, too, and it consequently…

⇒ Loses energy

⇒Gets unstable and is quickly lost or exhibits emittance growth

⇒Has a bad lifetime with a pattern degrading towards the tail(s) of the batches

Page 21: LHC experience with different bunch spacings in 2011 (25

21

Not only heat load and pressure rise, the beam sees the electron cloud, too, and it consequently…

⇒ Loses energy

⇒Gets unstable and is quickly lost or exhibits emittance growth

⇒Has a bad lifetime with a pattern degrading towards the tail(s) of the batches

Page 22: LHC experience with different bunch spacings in 2011 (25

0 500 1000 1500 2000 2500 3000 35000

0.5

1

1.5

2

Bun

ch e

nerg

y lo

ss [m

J/Tu

rn]

25ns bucket number

Simulated

Measured

22

Beam observables: energy loss

Beam 1

0 500 1000 15000

0.2

0.4

0.6

0.8

1

1.2

1.4

Bun

ch e

nerg

y lo

ss [m

J/Tu

rn]

25ns bucket number

Simulated

Measured

Beam 2

Measurements the energy loss per bunch is obtained from the stable phase shift

Simulations − We use the test case the last fill on the 25 October

Page 23: LHC experience with different bunch spacings in 2011 (25

23

Not only heat load and pressure rise, the beam sees the electron cloud, too, and it consequently…

⇒ Loses energy

⇒Gets unstable and is quickly lost or exhibits emittance growth

⇒Has a bad lifetime with a pattern degrading towards the tail(s) of the batches

Page 24: LHC experience with different bunch spacings in 2011 (25

24-25 October batches injected with 1 ms spacing, Q’x=3, Q’y=15

• The benefits from scrubbing have been visible on the 25ns beam: – The effect of the electron

cloud has gradually moved later later along the trains, in spite of the closer spacing!

– First 1 – 2 trains seem to be hardly affected now

– In general, improvement in vertical

• Both beams are still unstable in the two planes, or anyway affected by emittance growth

Beam observables: emittance growth

14 October batches injected with 3.6 ms spacing, Q’x,y=15

Page 25: LHC experience with different bunch spacings in 2011 (25

0 10 20 30 40 50 60 70 800

5

10

x 1010

Bunch position [us]

Bu

nc

h in

ten

sit

y [

pp

b]

0 10 20 30 40 50 60 70 800

1

2

Bunch position [us]

Bu

nc

h le

ng

th [

ns

]

0 10 20 30 40 50 60 70 800

1

2

x 109

Time [us]

e- p

er

un

it le

ng

th [

m-1

]Beam observables: emittance growth

0 10 20 30 40 50 60 70

104

106

108

Time [ms]

e- per

un

it le

ng

th [m

-1]

dmax

=1.50

0 10 20 30 40 50 60 700

2

4

6

8

10

12x 10

11

Time [ms]

Acc

um

. nu

mb

er o

f im

pac

t. e-

dmax

=1.50

Page 26: LHC experience with different bunch spacings in 2011 (25

26

Not only heat load and pressure rise, the beam sees the electron cloud, too, and it consequently…

⇒ Loses energy

⇒Gets unstable and is quickly lost or exhibits emittance growth

⇒Has a bad lifetime with a pattern degrading towards the tail(s) of the batches

Page 27: LHC experience with different bunch spacings in 2011 (25

24 October batches injected with 1 ms spacing Beam 1

Beam observables: beam losses

0 10 20 30 40 50 60 70

104

106

108

Time [ms]

e- per

un

it le

ng

th [m

-1]

dmax

=1.50

0 10 20 30 40 50 60 700

2

4

6

8

10

12x 10

11

Time [ms]

Acc

um

. nu

mb

er o

f im

pac

t. e-

dmax

=1.50

Losses degrading batch by batch

Weaker losses due to delayed injection

Even weaker losses due to delayed injection +

scrubbing from the injection of 1st batch

(1.551.52)

Page 28: LHC experience with different bunch spacings in 2011 (25

24-25 October first three batches injected of last three fills

Beam observables: beam losses

Beam 2 Beam 1

• At this point the behaviour of the two beams is very similar • This suggests similar electron cloud rise and saturation value • It is consistent with the dmax estimation made for beam 2 with the heat

load data

Page 29: LHC experience with different bunch spacings in 2011 (25

Summary 25ns MDs

29

dmax (last estimated)

dmax (threshold @450 GeV)

dmax (threshold @3.5 TeV)

Straight section (uncoated)

1.35 1.25 1.22

Beam screen (arcs) 1.52 1.45 1.37

⇒ We still need to scrub by an additional ~0.15 to ensure ecloud-less operation of 25ns beams

⇒ Based on our models and lab measurements, we will try giving a rough estimation of how long we need to scrub the arcs

Page 30: LHC experience with different bunch spacings in 2011 (25

30

Estimation of the scrubbing time

0 10 20 30 40 50 60 70 800

5

10

x 1010

Bunch position [us]

Bu

nc

h in

ten

sit

y [

pp

b]

0 10 20 30 40 50 60 70 800

1

2

Bunch position [us]

Bu

nc

h le

ng

th [

ns

]

0 10 20 30 40 50 60 70 800

1

2

x 109

Time [us]

e- p

er

un

it le

ng

th [

m-1

]

0 10 20 30 40 50 60 70 800

5

10

x 1010

Bunch position [us]

Bu

nc

h in

ten

sit

y [

pp

b]

0 10 20 30 40 50 60 70 800

1

2

Bunch position [us]

Bu

nc

h le

ng

th [

ns

]

0 10 20 30 40 50 60 70 800

1

2

x 109

Time [us]

e- p

er

un

it le

ng

th [

m-1

]

⇒ Structure of the scrubbing beam Conservative assumption: the beam at the end of the last 25ns fill

in 2011 ⇒ Map the electron current density to the beam screen wall Je [A/mm2]

as a function of dmax

1 1.2 1.4 1.6 1.8 210

-6

10-4

10-2

100

Av

. sc

rub

bin

g c

urr

en

t [A

/m2]

SEYmax

Page 31: LHC experience with different bunch spacings in 2011 (25

Estimation of the scrubbing time

1 1.2 1.4 1.6 1.8 210

-6

10-4

10-2

100

Av

. sc

rub

bin

g c

urr

en

t [A

/m2]

SEYmax

R. Cimino

Page 32: LHC experience with different bunch spacings in 2011 (25

Estimation of the scrubbing time:

results

0 5 10 151.45

1.5

1.55

1.6

1.65

Time [h]

SE

Ym

ax

0 5 10 150

0.5

1

1.5

2

2.5

x 109

Time [h]

Ma

x n

. o

f e

- pe

r u

nit

le

ng

th [

m-1

]

0 5 10 151.45

1.5

1.55

1.6

1.65

Time [h]

SE

Ym

ax

0 5 10 150

10

20

30

40

50

Time [h]H

ea

t lo

ad

[W

/hc

ell

]

0 5 10 151.45

1.5

1.55

1.6

1.65

Time [h]S

EY

max

0 5 10 150

0.5

1

1.5

2

2.5

x 109

Time [h]

Ma

x n

. o

f e

- pe

r u

nit

le

ng

th [

m-1

]

~9h

~8h

~2h

It took ~2.8h of equivalent beam 1 to go from dmax 1.65 to 1.52

Probably realistic to assume at least 20h beam time

R. Cimino

Page 33: LHC experience with different bunch spacings in 2011 (25

33

⇒ Based on our best knowledge at the moment, scrubbing the LHC arcs with the 25ns beam we had during the last 2011 fill could take about 20h effective beam time

⇒ This lowers the electron cloud by “only” one order of magnitude, therefore does not guarantee running without incoherent effects already at the end of the calculated scrubbing time (it can take longer)

⇒ The total effective scrubbing time is actually longer because we will need to dump and refill more times, and finally ramp, to extend the reach of the scrubbing efficiency and cover the needed range

⇒ The corresponding machine time could be about 1w

⇒ Towards the end of the scrubbing process, only the last trains reach saturation and scrub. This can be optimized

Inject in trains of 288b from the SPS, or at least (288 + N*72)

Cause more uncaptured beam (like in the SPS)

Minimize the length of the abort gap to possibly use multi-turn effects (e.g. with overinjection)

Estimation of the scrubbing time:

considerations

Page 34: LHC experience with different bunch spacings in 2011 (25

⇒ After the 25ns MDs, the LHC beam chambers have been cleaned to dmax values well below the build up threshold for nominal 50ns beams

⇒ If the present level of machine conditioning was preserved, ‘ecloud-less’ operation of LHC with 50ns beams up to high intensities should be possible in 2012

⇒ Only 2-3 days of scrubbing with 25ns beams for 50ns operation could be sufficient – just to clean parts of the LHC open to air and check the conditioning of the arcs

⇒ Scrubbing of the arcs for 25ns operation could take up to 2 weeks machine time (including also test ramps)

dmax

(estimated) Threshold dmax

(50ns, 450 GeV) Threshold dmax

(50ns, 3.5 TeV) Threshold dmax

(25ns, 450 GeV) Threshold dmax

(25ns, 3.5 TeV)

Straight section

(uncoated) 1.35 1.63 1.58 1.25 1.22

Beam screen (arcs)

1.52 2.2 2.1 1.45 1.37

Concluding remarks

Page 35: LHC experience with different bunch spacings in 2011 (25

Very special thanks to G. Iadarola, H. Bartosik, O. Dominguez, J. Esteban-

Müller, and F. Roncarolo for their careful off-line analysis of large amounts of MD data and the huge simulation effort that improved the general

understanding of electron cloud and scrubbing! Many thanks to G. Arduini, V. Baglin, P. Baudrenghien, G. Bregliozzi, S. Claudet, G. Lanza, G. Papotti, E. Shaposhnikova, L. Tavian for all the beautiful data they

kindly provided us with and the numerous discussions Thanks to B. Goddard, V. Kain, K. Li, H. Maury-Cuna, E. Métral, S. Redaelli, B. Salvant, F. Zimmermann, and all those who promoted and/or actively

participated in the MDs

Thank you for your attention

Page 36: LHC experience with different bunch spacings in 2011 (25

SPARE SLIDES

Page 37: LHC experience with different bunch spacings in 2011 (25

1.35 1.4 1.45 1.5 1.55 1.610

9

1010

1011

1012

1013

dmax

e- c

en

tra

l d

en

sit

y

450GeV

3.5TeV

• Calculated coherent ECI threshold for central density in dipoles is around re=1012 m-3 for nominal intensity and Q’=0 at 450 GeV (simulations were run assuming the whole LHC made of dipoles)

• It can be stabilized with chromaticities Q’x,y>15, but emittance growth due to electron cloud + chromaticity remains!

• Right plot shows that with 25ns beams stability could be achieved only for dmax ≤ 1.5

Instability and emittance growth:

predictions

1.9 2 2.1 2.2 2.3 2.4 2.510

8

109

1010

1011

1012

1013

dmax

e- c

en

tra

l d

en

sit

y

1.1e11

450GeV

3.5TeV

50ns 25ns

Page 38: LHC experience with different bunch spacings in 2011 (25

38

Estimation of the scrubbing time

⇒ Curve of the decrease of dmax with the integrated electron dose deposited on the wall, d=JeDt [C/mm2]

⇒ Depends on material and electron energy, several measurements done in the past (two examples illustrated here)

⇒ If we use the 500eV curve (left plot) we end up with scrubbing times in the machine much lower than those measured perhaps an indication that the real dmax in the machine are lower than we believe (R0=1.0 instead of 0.7?)

Dose [C/mm2]

10-8

10-6

10-4

10-2

100

1

1.2

1.4

1.6

1.8

2

SE

Ym

ax

Dose [C/mm2]

C. Yin-Vallgren, scrubbing of

Cu measured with e- at 500eV