RAILROAD COMMISSION OF TEXAS PIPELINE SAFETY DIVISION - DAMAGE PREVENTION SECTION Status Summary - Texas Damage Reporting Form Page 1 of 3 Incident Number: 72959 Status: SUBMITTED Company: TNMP (ED FINLEY) Street: 520 E. MAIN (LEONARD ST.) City: LEWISVILLE County: DENTON Incident Date: 01/11/2013 Reference Number: 106845-1 Report Type: EXCAVATOR Company Contact: ED FINLEY

Lewisville TNMP Company Report

  • Upload
    cbs11

  • View
    3.600

  • Download
    0

Embed Size (px)

DESCRIPTION

Lewisville TNMP Company Report

Citation preview

Page 1: Lewisville TNMP Company Report

RAILROAD COMMISSION OF TEXASPIPELINE SAFETY DIVISION - DAMAGE PREVENTION SECTION

Status Summary - Texas Damage Reporting Form

Page 1 of 3

Incident Number: 72959 Status: SUBMITTED

Company: TNMP (ED FINLEY)

Street: 520 E. MAIN (LEONARD ST.)

City: LEWISVILLE

County: DENTON

Incident Date: 01/11/2013

Reference Number: 106845-1 Report Type: EXCAVATOR

Company Contact: ED FINLEY

Page 2: Lewisville TNMP Company Report

Texas Damage Reporting FormSubmitted to RRC on 01/14/2013

Incident #:  72959   Reference #:  106845-1   Incident Date:  01/11/2013   County:  DENTON 

Who is submitting this information?Stakeholder/Submitter:Name of person providing the information:

ElectricEd Finley

P5 Operator InformationOperator P5 Number:Operator Full Name:Operator Address:Operator Address Line 2:City, State, Zip:Representative Name:Representative Phone:

Not Applicable (for Excavator and Public Reports)

Excavator Contact InformationExcavator Company Name:Excavator Address:City, State, Zip:Excavator Contact Name:Excavator Contact Phone Number:Excavator Contact Fax Number:Excavator Email Address:

TNMP1479 FM 407LEWISVILLE, TX 75077 2126ED FINLEY(972) 979-1453(972) [email protected]

Other Contact Information (General Contractor)Company Name:Address:City, State, Zip:Contact Name:Contact Phone Number:Contact Fax Number:Email Address:

Not Applicable

Excavation InformationType of Excavator:Type of Excavation Equipment:Type of Work Performed:Depth of planned excavation?

UtilityAugerPole6 ft, 6 inches

Date and Location of Incident ** ( see RRC Note below )Date of Incident:State:County:City/Subdivision/Location Name:Street Address:Nearest Intersection:Latitude/LongitudeRight of way where incident occurred:

01/11/2013Texas (USA)DENTONLewisville520 E. MainLeonard St.33.046191 -96.988217Public - City Street

Affected Facility InformationCompany name of affected facility:What type of facility operation was affected?What type of product was involved?What was the depth of the damaged facility?

ATMOSDistributionNatural or Other Gases6 ft, 0 inches

Page 2 of 3TDRF Form Rev. 01-2011

Page 3: Lewisville TNMP Company Report

Texas Damage Reporting FormSubmitted to RRC on 01/14/2013

Incident #:  72959   Reference #:  106845-1   Incident Date:  01/11/2013   County:  DENTON 

Notification, Locating, MarkingWas the One Call Center notified prior to excavation? Yes

Name of One Call Notification Center? Lone Star Notification CenterOne Call ticket Number? 521195237Date of Notification: 12/17/2012

What was type of locator: Unknown/OtherIf contracted, what was the name of the contracted locator?

Were facility marks visible in the area of excavation? YesWere facilities marked correctly? No

If not marked correctly, how far off in feet? 2Did excavator have to make a second call to the One-Call Center? NoWere marks made within 48 hrs of notification of intent to excavate? YesMethod Used to Locate: Unknown

If other, explain method:Was paint a type of marking used? YesWere flags a type of marking used? YesWas there another type of marking used? No

If yes, describe:Was site marked by "White Lining"? YesWere special instructions part of the locate order? YesWere maps used during marking? UnknownDid excavator give 48-hrs notice prior to excavating? YesDid the pipeline operator provide a positive response? YesDid locator meet with excavator at time of marking? NoWere pipeline company representatives on site at the time of excavation? No

Excavator DowntimeDid the excavator incur down time? Yes

If yes, how much down time? 3 or more hours.Estimate cost of down time? $1- $500

Did the operator provide an incident information card? No

Description of DamageWas there damage to a pipeline? Yes

Description of Root CausePossible Cause: Facility marking or location not sufficient

Additional Comments

**RRC Note: Your incident location may have been changed through our process of matching reports for the same incident. If this report was matched to this incident in error, please contact us [email protected].

Page 3 of 3TDRF Form Rev. 01-2011