DACWte-c-eg-oe23 Permanent Water Supply
middotsuperfundmiddot Site Ibullland
converbullation of 13 November 1ggo inforainC you that touch-up paintinC and the correction of
on tbe inapection report by dated 28 September 1ggo are to bein on oontinue throuch 1g November 1ggo
Your encineerinC review conbullultant Dufrebullne-Benry Inc view the corrective work Commentbull made by
time of corrective action will be thibull office
The paintinC bullubcontractorbull teohnical inbullpector will be 18 November 1ggo to tnbullpect the
~41u oiP Er~~n~ lnUbullbullbullbull Authoriamped Beprebullentative ot tbe Oontractinl Officer Burrlllville Project Office
r
I I I -I
7 ~ DEPARTMENT OF THE ARMY FILE COPY
NEW ENGlAND DIVISION CORPS OF ENGINEERS 424 TRAPELO ROAD
WALTHAM MASSACHUSETTS 02264middot9149
14 November 1 ggo
SubJect Contract No Conbulltruction of Webulltern Sand amp Gravbulll Burrillville Rhode
Mr William Planaan Nabullonville Water Dibulltrict 23 Polabullki load Harriaville B I 02830
Dear Mr Planacan
Thibull ia to confirm our
the deficient paint ite noted R L Merithew Inc 14 November 1ggo and
ibull welcome to your conbullultant made at entertained abull advibullory
the to
on the 81te Tburbullday corrective work
CF Contractbull Conbulltruction Div SERO Eabulltern Area Office Burrillville EPA ~ middotLynne Fratubull SEA Ronald S Ponte SEA Doulabull F Reed
PAUrlDEF DOC