LETTER OF TRANSMITTAL
5525 Merle Hay Road, Suite 200 Johnston, IA 50131 515.278.2913
To: City of Clive
2123 NW 111th Street
Clive, IA 50325
Date: 1/22/2021
Job No. 190600
Attn: Jim Hagelie
Re: Clark Street Reconstruction – Phase 2
We are sending you the following items:
Attached
Under Separate Cover
Via
Shop Drawings Prints Plans Samples Submittals
Specifications Copy of Letter Change Order Addendum #1
Copies Date Description
1 1/22/2021 Addendum #1
For Approval Reviewed as submitted Resubmit Copies for approval
For Your Use Reviewed as noted Submit Copies for distribution
As Requested Returned for corrections Return Corrected prints
For Review and Comment
Prints Returned After Loan To Us For Bids Due
Remarks: Please contact us if you have any questions (515-278-2913).
Copies to: Jim Hagelie (City of Clive); File Signed:
J:\2019\190600\Design\Permits\IDNR Wastewater\trn-010820-Wastewater Construction Permit Application.doc
HR Green, Inc. Clark Street Reconstruction Phase 2
Project No. 190600.03 Clive, Iowa
Addendum #1
Page 1 of 2
Clark Street Reconstruction Phase 2 Clive, Iowa
CONTRACTOR’S BID DATE: Tuesday, February 2, 2021 @ 2:00 PM
PLACE FOR CONTRACTORS TO SUBMIT BIDS: City of Clive
City Clerk’s Office 1900 NW 114th St.
Clive, IA 50325
ADDENDUM NO.1 January 22, 2021
TO ALL PLANHOLDERS:
The following changes, clarifications, additions, and/or deletions are hereby made as part of the contract documents for the above-referenced project, as fully and completely as if the same were fully set forth therein:
Questions Received (Clarification): No questions this addendum.
Plans
1. Replace the following plan sheets with revised plan sheets attached to this Addendum #1:
MWM01, MWM02, MWM03
Summary of Changes: Callouts added to the plan set for watermain runs at the intersections to clarify where restrained joint pipe is needed after receiving questions from potential bidder.
Specifications and Bid Documents No changes to be made to any quantities. Any additional work/ cost should be considered incidental to already listed bid item quantities.
HR Green, Inc. Clark Street Reconstruction Phase 2
Project No. 190600.03 Clive, Iowa
Addendum #1
Page 2 of 2
All bidders shall acknowledge receipt and acceptance of Addendum No. 1 by signing
in the space provided on the Bid Form. Bids submitted without Addendum No. 1 being acknowledged will be considered non-responsive.
Larry J. Stevens HR Green, Inc.
5525 Merle Hay Road, Suite 200 Johnston, Iowa 50131-1448
Phone: (515) 657-5273
END OF ADDENDUM #1
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.
Date: 1/22/21
Larry J. Stevens, P.E
License No. 09350
My renewal date is December 31, 2021
Pages or sheets covered by this seal:
Addendum #1
123 LF 12" PVC RJ 190 LF 12" PVC UNRESTRAINED
OO
FEET
20
CLARK STREET
ST
A. 104
+10.00
895
905
910
915
100 101 102 103 104 105 106
925
920
900
925
920
915
910
905
900
895
ST
A. 103
+37.05
ADDENDUM #11 1/21/21 HM
PO
T
Sta 100
+00.0
0
100
101
PC
Sta 101
+42.9
8
102
103
PT
Sta 103
+35.10
PI
Sta 102
+40.20
104
105
106
CLARK ST.
114T
H S
T.
SIGN
WHU
EBEB
SIGN
TP
SIGN
SIGN
TVP
SIGN
SIGN
TVP
1351 NW 114TH ST
STATE EMPLOYEES CREDIT
1401 C
AMPUS DRMERCY R
EHABILITATION
11009 CLARK ST
WILLIAMS, STEPHANIE T
10987 CLARK ST
GUTHERIE, MARK
7660
0.000
LC 1IN PIPE W/ Y CAP 14775 BENT
7659
0.000
LC 1/2RB W/ Y CAP 7625 BENT
7661
0.000
LC 1IN PIPE W/ Y CAP 14775 BENT
7075
0.000
LC 1/2RB W/ Y CAP 7625
7075
0.000
LC 1/2RB W/ Y CAP 7625
7075
0.000
LC 1/2RB W/ Y CAP 7625
CLARK ST.
114T
H S
T.
12" DI MJ SLEEVE
103+37.05, 25.94' LT
FIRE HYDRANT ASSEMBLY
103+48.53, 22.00' RT
FIRE HYDRANT
REMOVE EXISTING
FIRE HYDRANT
REMOVE EXISTING
WITH BOX
12" DI MJ GATE VALVE
103+45.16, 25.00' RT
W/ CONC. THRUST BLOCK
12" DI MJ 90° BEND
103+41.18, 26.00' LT
W/ CONC. THRUST BLOCK
12" DI MJ 45° BEND
104+47.60, 25.00' RT
W/ CONC. THRUST BLOCK
12" DI MJ 45° BEND
104+51.14, 29.00' RT
INSTALL 1" COPPER TEST PORT
12" DI MJ 90° BEND
103+41.25, 25.00' RT
WATER MAIN CROSSING
GASKET STORM SEWER AT
FLUSHING AND TESTING
WITH TAPS WHILE
INSTALL TEMPORARY CAP
51 LF 12" PVC RJ1
WHUWHU
CO
CO
CO
CO
CO
CO
CO
CO
PHASE 2
CITY OF CLIVE, IOWA...\SHT_190600_MWM01_Phase2.dgn
CLARK STREET RECONSTRUCTION
CAD FILE:
CAD DATE:
APPROVED:
DRAWN BY: JOB DATE:
JOB NUMBER:
REVISION DESCRIPTIONNO. DATE BY
1/22/2021 hmanter7:42:52 AM
2020
190600LJS
SHEET NO.HCM
WATER MAIN PLAN AND PROFILEMWM.01
SLEEVE
12" DI MJ
WITH BOX
GATE VALVE
12" DI MJ
TO
P
OF
PIP
EC
OV
ER
OV
ER
5.5'
MI
N
12" STORM SEWER EXISTING/ PROPOSED
TEE AND ASSEMBLY12"X6" FIRE HYDRANT
ELEVATION = 922.79FINISH GRADE
BENDS (X 2)
12" DI MJ 90°
TEST PORT
1" COPPER SEWER TO BE REMOVEDEXISTING 12" STORM
SEPARATION18" MINIMUM
THRUST BLOCKBEND W/ CONC 12" DI MJ 45°
THRUST BLOCKBEND W/ CONC 12" DI MJ 45°
177 LF 12" PVC RJ192 LF 12" PVC UNRESTRAINED 131 LF 12" PVC UNRESTRAINED 100 LF 12" PVC RJ
OO
FEET
20
880
CLARK STREET
ST
A. 107
+92.00
ST
A. 111
+00.00
910
900
895
890
885
905
107 108 109 110 111 112106
910
905
900
895
890
885
880
ST
A. 109
+69.00
ADDENDUM #1HM1/21/211
106
107
108
109
110
111
112
CLARK ST.
109
TH S
T.
108
TH S
T.
EB
EB
SIGN
WHUSIGN
TPSIGNSIGN
SIGN
SIGN
EB
TP
EB SIGN
MIDAMERICAN ENERGY COMPANY
10866 CLARK ST
HEFNER-MILLER, BEGIE
10820 CLARK ST
WHITTING, MARJORIE A
10844 CLARK ST
HULET, DAVID N
10790 CLARK ST
STUMP, GARY D
10965 CLARK ST
MONSERRATE, ROBERT
10943 CLARK ST
TABORGA, HECTOR R
1431 NW 109TH ST
GUZMAN, RAUL
1430 NW 108TH ST
THOMPSON, MARK A
10919 CLARK ST
VEENSTRA, BRADLEY
7652
0.000
LC 5/8RB
7645
0.000
LC 5/8RB W/ DEST Y CAP
7644
0.000
LC 5/8RB W/ DEST Y CAP
7643
0.000
LC 1/2RB
CLARK ST.
109
TH S
T.
108
TH S
T.
FIRE HYDRANT ASSEMBLY
108+44.11, 28.00' RT
WITH BOX
12" DI MJ GATE VALVE
108+51.55, 33.00' RT
WITH BOX
8" DI MJ GATE VALVE
108+65.17, 28.80' RT
6" DI MJ SLEEVE
108+65.13, 46.52' LT
8"X6" REDUCER
108+65.13, 42.07' LT
WITH BOX
8" DI MJ GATE VALVE
109+00.73, 43.11' RT
FIRE HYDRANT ASSEMBLY
111+35.10, 28.00' RT
8" DI MJ SLEEVE
109+00.72, 56.60' RT
FIRE HYDRANT
REMOVE EXISTING FIRE HYDRANT
REMOVE EXISTING
12"X8" DI MJ TEE
109+00.76, 33.00' RT
WITH BOX
8" DI MJ GATE VALVE
111+90.04, 30.37' RT
8"X6" REDUCER
111+90.03, 42.16' LT
6" DI MJ SLEEVE
111+90.03, 46.44' LT
12"X8" DI MJ TEE
111+90.04, 33.00' RT
12"X8" DI MJ TEE
108+65.14, 33.00' RT
INSTALL 1" COPPER TEST PORT
INSTALL 1" COPPER TEST PORT
INSTALL 1" COPPER TEST PORT
INSTALL 1" COPPER TEST PORTCONC THRUST BLOCK
12" DI MJ 22.5° BEND W/
108+08.30, 33.00' RT
CONC THRUST BLOCK
12" DI MJ 22.5° BEND W/
107+98.45, 29.00' RT
WITH BOX
12" DI MJ GATE VALVE
109+08.53, 33.00' RT
WATER MAIN CROSSING
GASKET STORM SEWER AT
WATER MAIN CROSSING
GASKET STORM SEWER AT
WITH BOX
12" DI MJ GATE VALVE
111+98.29, 33.00' RT
WATER MAIN CROSSING
GASKET STORM SEWER AT
FULLY RESTRAIN 8" PIPE
8" PIPE
FULLY RESTRAIN
1
1
FULLY RESTRAIN 8" PIPE1
WHU WHU
WHU WHUWHU
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
COCO
COCO
CO
PHASE 2
CITY OF CLIVE, IOWA...\SHT_190600_MWM01_Phase2.dgn
CLARK STREET RECONSTRUCTION
CAD FILE:
CAD DATE:
APPROVED:
DRAWN BY: JOB DATE:
JOB NUMBER:
REVISION DESCRIPTIONNO. DATE BY
1/22/2021 hmanter7:42:54 AM
2020
190600LJS
SHEET NO.HCM
WATER MAIN PLAN AND PROFILEMWM.02
SEPARATION18" MINIMUM
SEPARATION18" MINIMUM
TEE AND ASSEMBLY12"X6" FIRE HYDRANT
WITH BOX
GATE VALVE
12" DI MJ
MJ TEE
12"X8" DI
SEWER TO BE REMOVED
EXISTING 36" STORM
STORM SEWER
PROPOSED 36"
SANITARY SEWERPROPOSED 8" EXISTING/
MJ TEE
12"X8" DI
WATER MAIN EXISTING 6"
ELEVATION = 899.38
FINISH GRADE
TO
P
OF
PIP
EC
OV
ER
OV
ER
5.5'
MI
N
TEE AND ASSEMBLY12"X6" FIRE HYDRANT
MJ TEE
12"X8" DI
ELEVATION = 906.61FINISH GRADE
W/ CONC THRUST BLOCK12" DI MJ 22.5° BEND
W/ CONC THRUST BLOCK12" DI MJ 22.5° BEND
WITH BOX
12" DI MJ GATE VALVE
WITH BOX
12" DI MJ GATE VALVE
TEST PORT
1" COPPER
116 LF 12" PVC UNRESTRAINED 211 LF 12" PVC RJ 104 LF 12" PVC UNRESTRAINED 110 LF 12" PVC RJ59 LF 12" PVC RJ
OO
FEET
20
CLARK STREET
915
900
895
890
ST
A. 113
+75.00
ST
A. 115
+86.00
ST
A. 116
+90.00
905
885
910
113 114 115 116 117 118112
915
910
905
900
895
890
885
ST
A. 112
+59.00
ST
A. 118
+00.00
ADDENDUM #1HM1/21/211
112
113
114
115
116
117
PC
Sta 117
+08.31
118
PI
Sta 118
+15.95
CLARK ST.
107
TH S
T.
106
TH S
T.
WHU
SIGN SBSB
EB
TVP
SIGN
WHU
SIGN
EB
SB
SBEB
TP
10790 CLARK ST
STUMP, GARY D
10760 CLARK ST
DETAEYE, THOMAS C
1396 NW 107TH ST
HANTEN, RANDALLE E
10674 CLARK ST
NEELY, ERIC
10620 CLARK ST
KELLEY, SEAN C
10596 CLARK ST
HOWLAND, ERIC
1431 NW 108TH ST
BARTLETT, ALICIA
1430 107TH ST
MATIJEVICH, MATT
1433 NW 107TH ST
SCOTT, STEVEN R
10649 CLARK ST
ABUSHARKH, MOHAMED
1434 NW 106TH ST
HAATS, KARLA K
10648 CLARK ST
SHEMIRANI, ALI
LC 5/8RB W/ DEST Y CAP
7638
0.000
LC 5/8RB
7636
0.000
LC 1/2RB W/ Y CAP 7814
7639
0.000
LC 1/2RB W/ ORG CAP ILEGABLE
7636
0.000
LC 1/2RB W/ Y CAP 7814
7641
0.000
LC 1/2RB W/ ORG CAP 12971
CLARK ST.
107
TH S
T.
106
TH S
T.
6" DI MJ SLEEVE
111+90.03, 46.44' LT
8"X6" REDUCER
111+90.03, 42.16' LT
WITH BOX
8" DI MJ GATE VALVE
111+90.04, 30.37' RT
12"X8" DI MJ TEE
111+90.04, 33.00' RT
WITH BOX
12" DI MJ GATE VALVE
114+35.12, 33.00' RT
6" DI MJ SLEEVE
114+81.34, 46.02' LT
8"X6" REDUCER
114+81.34, 42.01' LT
WITH BOX
8" DI MJ GATE VALVE
114+81.34, 30.00' RT
12"X8" DI MJ TEE
114+81.35, 33.00' RT
FIRE HYDRANT ASSEMBLY
117+25.78, 28.00' RT
12"X8" DI MJ TEE
117+42.34, 32.79' RT
8"X6" REDUCER
117+42.74, 42.63' LT
6" DI MJ SLEEVE
117+42.77, 46.55' LT
8"X6" REDUCER
114+38.12, 43.24' RT6" DI MJ SLEEVE
114+38.13, 46.34' RT
FIRE HYDRANT
REMOVE EXISTING
FIRE HYDRANT
REMOVE EXISTING
12"X8" DI MJ TEE
114+38.06, 33.00' RT
WITH BOX
8" DI MJ GATE VALVE
114+38.10, 40.00' RT
INSTALL 1" COPPER TEST PORT
INSTALL 1" COPPER TEST PORT
INSTALL 1" COPPER TEST PORT
INSTALL 1" COPPER TEST PORT
INSTALL 1" COPPER TEST PORT
WITH BOX
12" DI MJ GATE VALVE
111+98.29, 33.00' RT
WITH BOX
12" DI MJ GATE VALVE
115+25.19, 33.00' RT
WITH BOX
8" DI MJ GATE VALVE
117+42.31, 30.80' RT
FIRE HYDRANT ASSEMBLY
114+32.00, 28.00' RT
WATER MAIN CROSSING
GASKET STORM SEWER AT WATER MAIN CROSSING
GASKET STORM SEWER AT
WATER MAIN CROSSING
GASKET STORM SEWER AT
WATER MAIN CROSSING
GASKET STORM SEWER AT
FULLY RESTRAIN 8" PIPE
FULLY RESTRAIN 8" PIPE
FULLY RESTRAIN 8" PIPE
1
1
1
FULLY RESTRAIN 8" PIPE
1
WHUWHU
WHU
WHU
WHU
WHUWHUWHU
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO CO
CO
CO
CO
CO
CO
PHASE 2
CITY OF CLIVE, IOWA...\SHT_190600_MWM01_Phase2.dgn
CLARK STREET RECONSTRUCTION
CAD FILE:
CAD DATE:
APPROVED:
DRAWN BY: JOB DATE:
JOB NUMBER:
REVISION DESCRIPTIONNO. DATE BY
1/22/2021 hmanter7:42:56 AM
2020
190600LJS
SHEET NO.HCM
WATER MAIN PLAN AND PROFILEMWM.03
18" MINIMUM SEPARATION
24" STORM SEWER EXISTING/ PROPOSED
NECESSARY DEFLECTION AS USE VERTICAL
TO
P
OF
PIP
EC
OV
ER
OV
ER
5.5'
MI
N
SEPARATION18" MINIMUM
SEPARATION18" MINIMUM
TEE AND ASSEMBLY12"X6" FIRE HYDRANT
WITH BOX
GATE VALVE
12" DI MJ
DI MJ TEE
12"X8"
STORM SEWER
PROPOSED 15"
MJ TEE
12"X8" DI
SANITARY SEWER
PROPOSED 8"
EXISTING/
ELEVATION = 906.80
FINISH GRADE
TEE AND ASSEMBLY12"X6" FIRE HYDRANT
MJ TEE
12"X8" DI
ELEVATION = 907.14
FINISH GRADE
WITH BOX
GATE VALVE
12" DI MJ
TEST PORT
1" COPPER