LER BPM Issues and Heating Tests. S. Ecklund, for PEP-II group ( N. Kurita, N. Reeck, S. Smith, R. Johnson, S. Novokhatski, A. Kulikov ). Issues. BPM Absolute Accuracy See G. Yocky, ORM and BBA results BPM failure under high Power conditions June event with vacuum vent Heating formula - PowerPoint PPT Presentation

Citation preview

Page 1: LER BPM Issues and  Heating Tests

LER BPM Issues and Heating Tests

S. Ecklund, for PEP-II group ( N. Kurita, N. Reeck, S. Smith, R. Johnson, S. Novokhatski,

A. Kulikov )

Page 2: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 2

Issues

• BPM Absolute Accuracy– See G. Yocky, ORM and BBA results

• BPM failure under high Power conditions– June event with vacuum vent– Heating formula– Lab. measurements– Test buttons

• Plan for future running

Page 3: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 3

LER Beam Current and RF Voltage History

Page 4: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 4

LER IR2 chamber Cu (HER) Button Geometry

Page 5: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 5

LER IR2 BPM

Page 6: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 6

LER ARC BPM

Page 7: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 7

Straight BPM

• R = 44.45 mm vs. 31 for LER ARC and IR2

• Expect to have ½ the power of LER ARC and IR2 BPM’s

Page 8: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 8

June 2005 Event

• Thermocouple T1162QUA indicates R btn falls 14 June

Page 9: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 9

1162 falls 14 June, beam at (5,-2)

Page 10: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 10

2022 heats up when 1162 falls

Page 11: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 11

Failed BPM• PR02 1162

– LER outgoing– In HER arc-type

duct• Hexagonal Cu

• Burned Cable– Lower aisle side– Vac leak through

center of coax

Page 12: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 12

Page 13: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 13

Page 14: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 14

BPM absorbed Power - Assumptions

• dT ~ Power ~ ib2 f(z) g(x,y) = Nb ib2 f(z) g(x,y)

• Assume power absorbed at one frequencyf(z) = exp(- (r z/c)2) / exp(-(r 0/c)2)

• Bunch lengthening and scale with Vrf -1/2

z = sqrt(V0/Vrf) (0 + i ib)

f(z) = exp(-r2 (V0/Vrf) ((0 + i ib) /c)2 ) / exp(-(r 0/c)2)

• Position dependence from calculated signalg(x,y) ~ signal 2

Page 15: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 15

LER Bunch Lengthening with current (from Sasha Novokhatski)

(0 + i ib)

Page 16: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 16

z

2.5 3 3.5 4.05 4.5 5 5.4 6 6.50

0.5

1.5

2.5

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

20.00

sigz

V rf

ib

Page 17: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 17

f(z)Relative Specific Bunch Power

0.00

0.50

1.00

1.50

2.00

2.50

0 0.5 1 1.5 2 2.5 3 3.5

ib

2.5

3

3.5

4.05

4.5

5

5.4

6

6.5

Vrf

Page 18: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 18

Nb ib2 f(z)

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

0 0.5 1 1.5 2 2.5 3 3.5

ib

2.5

3

3.5

4.05

4.5

5

5.4

6

6.5

Relative Power vs. bunch current for 1740 bunches

Vrf

Page 19: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 19

g(x,y) from (Steve Smith)

X (mm)0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

0 1.0 1.1 1.2 1.3 1.4 1.5 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.3 2.4 2.4 2.4 2.4 2.4 2.4 2.31 1.1 1.2 1.3 1.4 1.6 1.7 1.8 2.0 2.1 2.2 2.3 2.5 2.6 2.6 2.7 2.7 2.8 2.8 2.7 2.7 0.02 1.2 1.3 1.4 1.6 1.7 1.9 2.0 2.2 2.3 2.5 2.6 2.8 2.9 3.0 3.1 3.1 3.1 3.2 3.1 3.1 0.03 1.3 1.4 1.5 1.7 1.9 2.1 2.2 2.4 2.6 2.8 3.0 3.1 3.3 3.4 3.5 3.5 3.6 3.6 3.6 3.5 0.04 1.3 1.5 1.7 1.9 2.0 2.2 2.5 2.7 2.9 3.1 3.3 3.5 3.7 3.8 3.9 4.0 4.1 4.1 4.1 4.0 0.05 1.4 1.6 1.8 2.0 2.2 2.5 2.7 3.0 3.2 3.5 3.7 3.9 4.1 4.3 4.5 4.6 4.7 4.7 4.6 4.6 0.06 1.5 1.7 1.9 2.1 2.4 2.7 3.0 3.3 3.6 3.9 4.1 4.4 4.7 4.9 5.1 5.2 5.3 5.3 5.3 5.2 0.07 1.6 1.8 2.0 2.3 2.6 2.9 3.2 3.6 3.9 4.3 4.6 5.0 5.3 5.6 5.8 6.0 6.1 6.1 6.1 0.0 0.08 1.6 1.9 2.2 2.4 2.8 3.1 3.5 3.9 4.3 4.8 5.2 5.6 6.0 6.3 6.6 6.8 7.0 7.0 7.0 0.0 0.09 1.7 2.0 2.3 2.6 3.0 3.4 3.8 4.3 4.8 5.3 5.8 6.3 6.8 7.2 7.5 7.8 8.0 8.1 0.0 0.0 0.0

10 1.7 2.0 2.4 2.7 3.1 3.6 4.1 4.7 5.3 5.9 6.5 7.1 7.7 8.2 8.6 9.0 9.2 9.3 0.0 0.0 0.011 1.8 2.1 2.4 2.8 3.3 3.8 4.4 5.1 5.8 6.5 7.3 8.0 8.7 9.4 9.9 10.4 10.7 0.0 0.0 0.0 0.012 1.8 2.1 2.5 2.9 3.5 4.1 4.7 5.5 6.3 7.2 8.1 9.0 9.9 10.7 11.4 12.0 12.4 0.0 0.0 0.0 0.013 1.8 2.1 2.5 3.0 3.6 4.3 5.0 5.9 6.9 8.0 9.1 10.2 11.3 12.3 13.2 13.9 0.0 0.0 0.0 0.0 0.014 1.7 2.1 2.5 3.0 3.7 4.4 5.3 6.3 7.5 8.8 10.1 11.5 12.9 14.2 15.3 0.0 0.0 0.0 0.0 0.0 0.015 1.6 2.0 2.4 3.0 3.7 4.5 5.5 6.7 8.1 9.6 11.3 13.1 14.8 16.5 0.0 0.0 0.0 0.0 0.0 0.0 0.016 1.5 1.9 2.3 2.9 3.6 4.5 5.7 7.0 8.7 10.6 12.6 14.8 17.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.017 1.4 1.7 2.2 2.7 3.5 4.5 5.7 7.3 9.2 11.5 14.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.018 1.2 1.5 1.9 2.5 3.2 4.3 5.6 7.4 9.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.019 1.0 1.2 1.6 2.2 2.9 3.9 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.020 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Y (

mm

)

HER Arc Chamber Power Ratio vs. Position

Normalized to Centered Beam

(for beam within 20 mm of duct center)

Page 20: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 20

g(x,y)

HER Arc Power Ratio

Pxy

Page 21: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 21

Lab Test - BPM Heating Experiment

• Used weld test chamber with two buttons• Measurement in air• Power applied to button with 25 ohm, 25 W resistor as a

heater. Measured current and voltage.• Thermocouples (6) measured:

– Heater resistor– Button (2)– BPM collar (normal QUA location)– BPM cable (new RGBY tc) or center pin of connector– Cu Chamber about 1 inch from BPM

• Data read with laptop running Matlab code reading serial 485 module (ADAM 4019 ADC)

Page 22: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 22

Lab Test Setup

Page 23: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 23

Lab Test - Run 3 Data

Page 24: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 24

Lab Test - Run 3 Results

• Button dT / Collar dT = 15 to 18• Button dT/Power = 9 to 14 deg C / Watt• T vs. Power not linear

– Convective cooling – Radiative cooling

Page 25: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 25

Page 26: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 26

Summary

• No clear threshold for all buttons to fall

• Have a formula, but– HOM’s are a complication not included– Assumes f=7 GHz absorption in 15 mm button

• Stay below parameters of June failure till buttons are improved in 2006 down.

Page 27: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 27

LER Test New BPM Buttons• Installed 3 new (modified) buttons in LER

during October 2005 down– Short on 15 mm button– 7 mm no insert– 7 mm with insert– Feed-through, no button – Compare with normal 15 mm button

• Measured– Temperature Rise at collar– Power to Filter-Isolator (FIB) Load Resistor

Page 28: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 28

Shorted 15 mm Button

From Nick Reeck

Page 29: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 29

7 mm – no insert

From Nick Reeck

Page 30: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 30

7 mm button with insert

From Nick Reeck

Page 31: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 31

TC Location

TC T1022RA,GA,BA,YA were moved to the FIB on BPM units 1022, 1052, 1092, and 1032

Page 32: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 32

BPM 1052 7 mm, no insert

Page 33: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 33

BPM 1092 7 mm, with insert

Page 34: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 34

Other Normal15 mm LER ARC BPMs1012, dT = 10 deg. F

Page 35: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 35

PR02 2152 New – no buttondT = 2 – 3 F

Page 36: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 36

Test Button Results at I = 2.2 A 7 mm button with insert is winner

Unit FIB dT (F)

FIBPower = dT/1.3

Button collar dT (F)

BPM 102215 mm shorted

76 58 8 to 10

BPM 103215 mm Normal

35 27 <= 11

BPM 10527 mm without insert

45 35 5

BPM 10927 mm with insert

17 13 3

BPM 2152 feed-thrus only

? ? 2 to 3

200 Watt FIB Rating

Page 37: LER BPM Issues and  Heating Tests

MAC 18 January 2006 LER BPM issues and heating tests 37

Conclusion on Button Heating• Run 5B

– Limit Current to 3.3 A– Limit LER RF V to 4.5 MV– Limit Orbit offset to 3 mm– Watch TC and raw signal for change

• Run 6– LER ARC – Install new 7 mm buttons– IR2 Straight - bare feed-through or smaller buttons– LER Straight should be OK with ½ power in larger

chamber