100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016
REGIONS OFCLIMATE ACTION
LED Street lighting
Summary
Location and population
Mandating Authority :
Social and environmental impact
Expected project CAPEX :
Main stakeholders
The municipality seeks to reduce energy consumption in public buildings to reduce the intensity of electricity use during peak hours on certain routes in the municipality. This project seeks to achieve: a prior diagnosis of energy consumption; an analysis of road traffic in the arteries of the city; an installation of voltage regulators that operate during off-peak hours.
LED Public Lighting
Energy efficient lighting; establishment of sustainable local energy policy; training for the municipal team; partnerships with local professionals in the energy sector; reduction of GHG emissions; protection of air, water, soil; and contribute to efforts for energy conservation nationwide
Wilaya de Boumerdès;Directions de l’énergie et de l’environnement de la Wilaya;Direction de la sûreté publique (police de l’urbanisme et de la protection de l’envi-ronnement); SONELGAZ (Société Nationale de l’Enérgie et du Gaz);Neighborhood associations
Boumerdès, Algeria 54’556 inh.
Boumerdès Municipality
Tbd
100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016
Source of electricity :
STAGE 3 : Feasibility Studies
STAGE 2 : Pre-Feasibility Studies
Pre-feasibility study
Feasibility study
Building permits signed
Identified sources of fundings
Contract with municipality
Environmental impact study
STAGE 5 : Engineering / Construction / Commercial Operation
Comments
Engineering, Procurement and Construction Contractor
Operation and Maintenance Contractor
STAGE 4 : Permitting / Financing / ContractsProject maturity ( IFC / World Bank Categories )
STAGE 1 : Concept Development, Site identification
Number of Lighting points :
Mapping of the street lighting system :
Current installation
Expected energy / expenses savings
STAGE 1 : Concept Development, Site identification STAGE 2 : Pre-Feasibility Studies STAGE 3 : Feasibility Studies STAGE 4 : Permit t ing / Financing / Contracts STAGE 5 : Engineering/Construction/Commercial Operation
Total consumption: 402 GWh EF / year (2014), Energy per capita 7,4MWh EF / year / person.