Learning from UK CfD Auctions 12 th September 2019 Luke Clark, Director of Strategic Communications, RenewableUK

Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

Learning from UK CfD Auctions

12th September 2019Luke Clark, Director of Strategic Communications, RenewableUK

Page 2: Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

UK Offshore Wind in 2030

Page 4: Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

Policy Context

0

50

100

150

200

250

300

350

400

Today (DUKES2018)

BEIS reference CCC High RES CCC CentralNuclear

CCC High LowCarbon

FES TwoDegrees 2017

FES TwoDegrees 2018

FESCommunityRenewables

TWh

Scenarios

2030 Generation mix forecasts from different scenarios

Storage

Renewables

Other Thermal

Nuclear

Gas

Oil

CCS

Coal

58% RES

62% RES

2030

• UK Net Zero 2050 – Four-fold increase in RES generation• Renewables dominate c.60-80% • Contracts for Difference is the main policy to deliver renewables

Page 5: Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

Contracts for Difference

• Eligibility criteria: planning consent and grid connection agreement

• Competition on Price only. 15-year contract with Strike Price pay as cleared. Reference prices based on future wholesale price forecast.

• 12 Month Milestone Delivery Date for FID or 10% spend committed

• CfD allocation round every 2-years from 2019

AR1 - 2015

2017/18 18/19 19/20 2020/21 21/22 22/23 23/24 24/25 25/26 26/27

AR year

TCD

AR2 - 2017

AR3 - 2019

Page 6: Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

AR1 & AR2

• First CfD Allocation Round February 2015– £325m Budget allocated - £315m spend – 100MW budget ringfence for wave and tidal stream technologies

– East Anglia 1, 714MW for delivery 2017/8– Neart na Gaoithe, 448MW for delivery 2018/9– Other technologies: Onshore Wind 749MW, Solar PV 72MW, Advanced

Conversion Technologies Energy from Waste with CHP

• Second CfD Allocation Round September 2017– £290m Budget allocated – £148m spend– 150MW maxima for fueled technologies

– Hornsea Two, 1386MW, and Moray East, 950MW, for delivery 2022/3– Triton Knoll, 860MW, for delivery 2021/22– Other technologies: ACT 65MW, Biomass CHP 86MW

1.2GW Offshore Wind at £115/MWh Strike Price

3.2GW Offshore Wind at £74.45-£57.50/MWh Strike Price

Page 7: Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

AR 3: What is new this time?

Au

ctio

n R

ule

s • RIW

• Delivery years 23/24 and 2024/25

• £65m budget

• No technology specific minima or maxima

• Whole auction capacity cap set at 6GW C

ost

mit

igat

ion • Increased load

factor assumptions

• Different reference prices for baseload and variable technologies

Page 8: Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

2017 2018 2021 2022 2023 2024 2025 2026 2027 2028

140

historical future

105

5653

119.89

114.39

57.50

Unforeseen cost reductions

???

Administrative Strike Prices for this auction are 62% lower than 5 years

ago

Administrative strike prices vs. Clearing prices

OREC, Cost Reduction Monitoring programme, 2017

100

Page 9: Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

How low can they go?

Reduction of construction costs

by 10%

Reduction of cost of capital by 1%

Increase of Load Factor by

1% Reduction of insurance costs

by 10%

Page 10: Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

Rapid Technology Innovation

Page 11: Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

CfD – Offshore Wind Scaling-up

First

2GW11 Years

Last

2GW18 Months

Page 12: Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

Where Next?

The Future is Floating?

Page 13: Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

Where Next?

Zero Subsidy

£-

£20.00

£40.00

£60.00

£80.00

£100.00

£120.00

£140.00

Strike Prices

Reference Price

Page 14: Learning from UK CfD Auctions...• First CfD Allocation Round February 2015 –£325m Budget allocated - £315m spend –100MW budget ringfence for wave and tidal stream technologies

http://www.renewableuk.com

Luke Clark

Director of Strategic Communications

RenewableUK

[email protected]

Find out more…